ML030720277: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 1: | Line 1: | ||
{{Adams | |||
| number = ML030720277 | |||
| issue date = 02/19/2003 | |||
| title = STP Nuclear Operating Co Answer Consenting to NRC 02/11/03 Order, Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors, and Indicating Decision to Not Request a Hearing | |||
| author name = Cottle W | |||
| author affiliation = South Texas Project Nuclear Operating Co | |||
| addressee name = | |||
| addressee affiliation = NRC/SECY/RAS | |||
| docket = 05000498, 05000499 | |||
| license number = NPF-076, NPF-080 | |||
| contact person = | |||
| case reference number = EA-03-009, NOC-AE-03001469 | |||
| document type = Letter | |||
| page count = 2 | |||
| project = | |||
| stage = Other | |||
}} | |||
=Text= | |||
{{#Wiki_filter:Nuclear Operating Company South Tcs Pro/ct Elkctdc Generatni Station PO. Box 28 9 Wdsvrth. Tcs 77483 3 February 19, 2003 NOC-AE-03001469 10CFR 2.202 Secretary, Office of the Secretary of the Commission U.S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, DC 20555 South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Order Modifying Licenses (EA-03-009) | |||
STP Nuclear Operating Company (STPNOC) has received the February 11, 2003, NRC Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. Pursuant to 10 CFR § 2.202, STPNOC files this answer consenting to the NRC Order, and indicating its decision to not request a hearing. | |||
I declare under penalty of perjury that the foregoing is true and correct. | |||
Executed on: | |||
1 9 - o3 W. T. Cottle President & Chief Executive Officer O.\\WP\\NL\\NRC-AP\\MISC-03\\03001469 STI 31558155 | |||
NOC-AE-03001469 Page 2 of 2 cc: (paper copy) | |||
Secretary, Office of the Secretary of the Commission U.S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, DC 20555 Samuel J. Collins Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 1 White Flint North, Mail Stop: 0-5 E7 11555 Rockville Pike Rockville, MD 20852-2738 Ellis W. Merschoff Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Assistant General Counsel for Materials Litigation and Enforcement Office of General Counsel U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Cornelius F. O'Keefe U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 cc: (electronic copy) | |||
A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP Jon C. Wood Matthews & Branscomb L. D. Blaylock/W. C. Gunst City Public Service C. A. Johnson AEP Texas Central Company A. Ramirez City of Austin R. L. Balcom Texas Genco, LP Mohan C. Thadani U. S. Nuclear Regulatory Commission}} | |||
Latest revision as of 11:54, 16 January 2025
| ML030720277 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 02/19/2003 |
| From: | Cottle W South Texas |
| To: | NRC/SECY/RAS |
| References | |
| EA-03-009, NOC-AE-03001469 | |
| Download: ML030720277 (2) | |
Text
Nuclear Operating Company South Tcs Pro/ct Elkctdc Generatni Station PO. Box 28 9 Wdsvrth. Tcs 77483 3 February 19, 2003 NOC-AE-03001469 10CFR 2.202 Secretary, Office of the Secretary of the Commission U.S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, DC 20555 South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Order Modifying Licenses (EA-03-009)
STP Nuclear Operating Company (STPNOC) has received the February 11, 2003, NRC Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. Pursuant to 10 CFR § 2.202, STPNOC files this answer consenting to the NRC Order, and indicating its decision to not request a hearing.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on:
1 9 - o3 W. T. Cottle President & Chief Executive Officer O.\\WP\\NL\\NRC-AP\\MISC-03\\03001469 STI 31558155
NOC-AE-03001469 Page 2 of 2 cc: (paper copy)
Secretary, Office of the Secretary of the Commission U.S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, DC 20555 Samuel J. Collins Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 1 White Flint North, Mail Stop: 0-5 E7 11555 Rockville Pike Rockville, MD 20852-2738 Ellis W. Merschoff Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Assistant General Counsel for Materials Litigation and Enforcement Office of General Counsel U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Cornelius F. O'Keefe U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 cc: (electronic copy)
A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP Jon C. Wood Matthews & Branscomb L. D. Blaylock/W. C. Gunst City Public Service C. A. Johnson AEP Texas Central Company A. Ramirez City of Austin R. L. Balcom Texas Genco, LP Mohan C. Thadani U. S. Nuclear Regulatory Commission