ML053260369: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:usiosoon VYYLRPg
{{#Wiki_filter:~)avidF~dton e
                          ~)avidF~dton AP questions          LER                -      e       w:A
w:A usioso YLRPg
! bavid'FnIton - Re: Fwd:                                                                                                 Page 1 ;I From:             David Pelton I To:               Neil Sheehan Date:             9/13/04 2:04PM
! bavid'FnIton - Re: Fwd: AP questions on VY LER Page 1 ;I From:
David Pelton I To:
Neil Sheehan Date:
9/13/04 2:04PM


==Subject:==
==Subject:==
Re: Fwd: AP questions on VY LER Neil, Let me go through each question in order:
Re: Fwd: AP questions on VY LER
: Neil, Let me go through each question in order:
: 1. Was the INPO report cited on Page 4 ('Significant Operating Experience Report (SOER) 90-01 for
: 1. Was the INPO report cited on Page 4 ('Significant Operating Experience Report (SOER) 90-01 for
              'Ground Faults on AC Electrical Distribution'") issued in 1990?
'Ground Faults on AC Electrical Distribution'") issued in 1990?
: 2. Does the NRC have any general commentary on the report's conclusions? If not now, when might we?
: 2. Does the NRC have any general commentary on the report's conclusions? If not now, when might we?
                                                                                                                            `I, r 3. This is not in the report, but someone (maybe Ray Shadis) told the reporter that wind speed in the ductwork increased after a new transformer (as part of the uprate modifications) was Installed and that, in turn, increased the likelihood of failure of the expansion joint. Is that true?
`I, r
: 3. This is not in the report, but someone (maybe Ray Shadis) told the reporter that wind speed in the ductwork increased after a new transformer (as part of the uprate modifications) was Installed and that, in turn, increased the likelihood of failure of the expansion joint. Is that true?
dave p.
dave p.
* fiormation in this record was deleted 4wJ inaccordance with the freedoofntrbil Act, exemptionls FowA
* fiormation in this record was deleted in accordance with the freedoofntrbil Act, exemptionls FowA 4wJ


4'C:\TEMP\GW)00 )001 .TMP                                                               .. Page 1 C:\TEMP\GWIOO '001 .TMP Mail Envelope Properties   (4145E13E.92A: 0: 8288)
4 'C:\\TEMP\\GW)00 )001.TMP C:\\TEMP\\GWIOO '001.TMP Page 1 Mail Envelope Properties (4145E13E.92A: 0: 8288)


==Subject:==
==Subject:==
Re: Fwd: AP questions on VY LER Creation Date:        9/13/04 2:04PM From:                David Pelton Created By:          DLPI @nrc.xov Recipients                                       Action          Date & Time nrc.gov kpl-po.KPDO                                     Delivered        09/13/04 02:04PM NAS (Neil Sheehan)                            Opened          09/13/04 02:24PM Post Office                                     Delivered        Route kpl_po.KPLDO                                   09/13/04 02:04PM  nrc.gov Files                         Size              Date & Time MESSAGE                       3880              09/13/04 02:04PM Options Auto Delete:                   No Expiration Date:             None Notify Recipients:             Yes Priority:                     Standard Reply Requested:             No Return Notification:           None Concealed  
Creation Date:
From:
Created By:
Re: Fwd: AP questions on VY LER 9/13/04 2:04PM David Pelton DLPI @nrc.xov Recipients nrc.gov kpl-po.KPDO NAS (Neil Sheehan)
Action Date & Time 09/13/04 02:04PM 09/13/04 02:24PM Delivered Opened Post Office kpl_po.KPLDO Files MESSAGE Options Auto Delete:
Expiration Date:
Notify Recipients:
Priority:
Reply Requested:
Return Notification:
Concealed  


==Subject:==
==Subject:==
No Security:                     Standard Kf To Be Delivered:               Immediate Status Tracking:             All Information f}}
Security:
To Be Delivered:
Status Tracking:
Delivered 09/13/04 02:04PM Route nrc.gov Size 3880 No None Yes Standard No None Date & Time 09/13/04 02:04PM No Standard Immediate All Information Kf f}}

Latest revision as of 13:21, 15 January 2025

E-Mail from Pelton to Sheehan, AP Questions on VY LER
ML053260369
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/13/2004
From: David Pelton
NRC Region 1
To: Neil Sheehan
Office of Public Affairs Region I
References
FOIA/PA-2004-0369
Download: ML053260369 (2)


Text

~)avidF~dton e

w:A usioso YLRPg

! bavid'FnIton - Re: Fwd: AP questions on VY LER Page 1 ;I From:

David Pelton I To:

Neil Sheehan Date:

9/13/04 2:04PM

Subject:

Re: Fwd: AP questions on VY LER

Neil, Let me go through each question in order:
1. Was the INPO report cited on Page 4 ('Significant Operating Experience Report (SOER) 90-01 for

'Ground Faults on AC Electrical Distribution'") issued in 1990?

2. Does the NRC have any general commentary on the report's conclusions? If not now, when might we?

`I, r

3. This is not in the report, but someone (maybe Ray Shadis) told the reporter that wind speed in the ductwork increased after a new transformer (as part of the uprate modifications) was Installed and that, in turn, increased the likelihood of failure of the expansion joint. Is that true?

dave p.

  • fiormation in this record was deleted in accordance with the freedoofntrbil Act, exemptionls FowA 4wJ

4 'C:\\TEMP\\GW)00 )001.TMP C:\\TEMP\\GWIOO '001.TMP Page 1 Mail Envelope Properties (4145E13E.92A: 0: 8288)

Subject:

Creation Date:

From:

Created By:

Re: Fwd: AP questions on VY LER 9/13/04 2:04PM David Pelton DLPI @nrc.xov Recipients nrc.gov kpl-po.KPDO NAS (Neil Sheehan)

Action Date & Time 09/13/04 02:04PM 09/13/04 02:24PM Delivered Opened Post Office kpl_po.KPLDO Files MESSAGE Options Auto Delete:

Expiration Date:

Notify Recipients:

Priority:

Reply Requested:

Return Notification:

Concealed

Subject:

Security:

To Be Delivered:

Status Tracking:

Delivered 09/13/04 02:04PM Route nrc.gov Size 3880 No None Yes Standard No None Date & Time 09/13/04 02:04PM No Standard Immediate All Information Kf f