{{#Wiki_filter:John Richmond From:                       John Richmond      -
{{#Wiki_filter:John Richmond From:
Sent:                       Tuesday, October 21, 2008 1:30 PM To:                         Jeffrey Kulp; Stephen Pindale Cc:                         Ronald Bellamy; Scott Barber; Marc Ferdas; Michael Modes; Timothy OHara; Richard Conte
Sent:
To:
Cc:


==Subject:==
==Subject:==
Drawing attached for RE: OC Outage Inspection Plan Attachments:                OC View from inside Drywell.jpg; OC Drywell Elevation & Regions.bmp; OC Drywell Key Plan.jpg; OC Drywell Liner Thicknesses.jpg; OC Drywell Support Structure.jpg; OC Drywell Trench, Bay-5.jpg; OC Drywell Trench, Bay-1 7.jpg; OC Drywell X-section.jpg; OC Rx Cavity Detail.jpg; OC Rx Cavity Trough Drain Detail.jpg; OC Sandbed Detail-i .jpg; OC Sandbed Detail-2.jpg; OC Sandbed, Trench, & Sump.jpg All of the attached drawings came from Public Records (ACRS & ASLB presentations).
Attachments:
John Richmond Tuesday, October 21, 2008 1:30 PM Jeffrey Kulp; Stephen Pindale Ronald Bellamy; Scott Barber; Marc Ferdas; Michael Modes; Timothy OHara; Richard Conte Drawing attached for RE: OC Outage Inspection Plan OC View from inside Drywell.jpg; OC Drywell Elevation & Regions.bmp; OC Drywell Key Plan.jpg; OC Drywell Liner Thicknesses.jpg; OC Drywell Support Structure.jpg; OC Drywell Trench, Bay-5.jpg; OC Drywell Trench, Bay-1 7.jpg; OC Drywell X-section.jpg; OC Rx Cavity Detail.jpg; OC Rx Cavity Trough Drain Detail.jpg; OC Sandbed Detail-i.jpg; OC Sandbed Detail-2.jpg; OC Sandbed, Trench, & Sump.jpg All of the attached drawings came from Public Records (ACRS & ASLB presentations).
These drawings may be helpful when discussing various drywell issues.
These drawings may be helpful when discussing various drywell issues.
From: John Richmond Sent: Monday, September 29, 2008 2:04 PM To: Marc Ferdas; Jeffrey Kulp Cc: Stephen Pindale; Ronald Bellamy; Scott Barber
From: John Richmond Sent: Monday, September 29, 2008 2:04 PM To: Marc Ferdas; Jeffrey Kulp Cc: Stephen Pindale; Ronald Bellamy; Scott Barber
Line 27: Line 30:
OC Outage Inspection Plan Marc/Jeff, can you include the following License Renewal items in the Resident Outage Inspection Plan?
OC Outage Inspection Plan Marc/Jeff, can you include the following License Renewal items in the Resident Outage Inspection Plan?
: 1. As soon as reasonably achievable after the Drywell is opened, verify condition of both D/W Trenches (dry, wet, water stains, etc.). Pictures are optional, but always nice.
: 1. As soon as reasonably achievable after the Drywell is opened, verify condition of both D/W Trenches (dry, wet, water stains, etc.). Pictures are optional, but always nice.
: 2. Within about 1-shift after the cavity is flooded up, verify the reactor cavity trough drain leakage rate (we do expect some leakage). After the initial check, continue to check it, about once per day, for a day or two, to see if the leakage rate changes. During 1R21 (2006), the continuous leakage was identified at about 1 gpm, while the cavity was flooded.
: 2. Within about 1-shift after the cavity is flooded up, verify the reactor cavity trough drain leakage rate (we do expect some leakage). After the initial check, continue to check it, about once per day, for a day or two, to see if the leakage rate changes. During 1 R21 (2006), the continuous leakage was identified at about 1 gpm, while the cavity was flooded.
: 3. Within about 1-shift after the cavity is flooded up, verify the 5 D/W sandbed drains, drain collection bottles.
: 3. Within about 1-shift after the cavity is flooded up, verify the 5 D/W sandbed drains, drain collection bottles.
No water or leakage is expected.
No water or leakage is expected.
Line 34: Line 37:
Thanks John Richmond
Thanks John Richmond


Received: from R1CLSTRO1 .nrc.gov ([148.184.99.7]) by R1 MS01 .nrc.gov
Received: from R1CLSTRO1.nrc.gov ([148.184.99.7]) by R1 MS01.nrc.gov
([148.184.99.10]) with mapi; Tue, 21 Oct 2008 13:29:47 -0400 Content-Type: application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding: binary From: John Richmond <John. Richmond@nrc.gov>
([148.184.99.10]) with mapi; Tue, 21 Oct 2008 13:29:47 -0400 Content-Type: application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding: binary From: John Richmond <John. Richmond@nrc.gov>
To: Jeffrey Kulp <Jeffrey.Kulp@nrc.gov>, Stephen Pindale
To: Jeffrey Kulp <Jeffrey.Kulp@nrc.gov>, Stephen Pindale
        <Stephen. Pindale@nrc.gov>
<Stephen. Pindale@nrc.gov>
CC: Ronald Bellamy <Ronald.Bellamy@nrc.gov>, Scott Barber
CC: Ronald Bellamy <Ronald.Bellamy@nrc.gov>, Scott Barber
        <Scott.Barber@nrc.gov>, Marc Ferdas <Marc.Ferdas@nrc.gov>, Michael Modes
<Scott.Barber@nrc.gov>, Marc Ferdas <Marc.Ferdas@nrc.gov>, Michael Modes
        <Michael.Modes@nrc.gov>, Timothy OHara <Timothy.OHara@nrc.gov>, Richard Conte
<Michael.Modes@nrc.gov>, Timothy OHara <Timothy.OHara@nrc.gov>, Richard Conte
        <Richard. Conte@nrc.gov>
<Richard. Conte@nrc.gov>
Date: Tue, 21 Oct 2008 13:29:44 -0400
Date: Tue, 21 Oct 2008 13:29:44 -0400


==Subject:==
==Subject:==
Drawing attached for RE: OC Outage Inspection Plan Thread-Topic: Drawing attached for RE: OC Outage Inspection Plan Thread-Index: AckiXbveQcOAazRyQ8uNcVdUr4+eVgRRFfBQ Message-ID: <2856BC46F6A308418F033D973BBOEE72AA2A4DC877@R1CLSTRO1 .nrc.gov>
Drawing attached for RE: OC Outage Inspection Plan Thread-Topic: Drawing attached for RE: OC Outage Inspection Plan Thread-Index: AckiXbveQcOAazRyQ8uNcVdUr4+eVgRRFfBQ Message-ID: <2856BC46F6A308418F033D973BBOEE72AA2A4DC877@R1CLSTRO1.nrc.gov>


==References:==
==References:==
  <2856BC46F6A308418F033D973BBOEE72969755C4FC@R1CLSTRO1 .nrc.gov>
  <2856BC46F6A308418F033D973BBOEE72969755C4FC@R1CLSTRO1.nrc.gov>
In-Reply-To: <2856BC46F6A308418F033D973BBOEE72969755C4FC@R1CLSTRO1 .nrc.gov>
In-Reply-To: <2856BC46F6A308418F033D973BBOEE72969755C4FC@R1CLSTRO1.nrc.gov>
Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach: yes X-MS-Exchange-Organization-SCL: -1 X-MS-TNEF-Correlator:
Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach: yes X-MS-Exchange-Organization-SCL: -1 X-MS-TNEF-Correlator:
<2856BC46F6A308418F033D973BBOEE72AA2A4DC877@R1 CLSTR01.nrc.gov>
<2856BC46F6A308418F033D973BBOEE72AA2A4DC877@R1 CLSTR01.nrc.gov>
MIME-Version: 1.0
MIME-Version: 1.0


VIEW FROM INSIDE DRYWELL UPPER CURB - EL. 12'.3"                                       TOP OF SANDBED
VIEW FROM INSIDE DRYWELL UPPER CURB - EL. 12'.3" TOP OF SANDBED
. _jL Al A1.
. _jL 0
0 El E 8i             ,7           4 LOWER CURB A6 A   A     A 4
El E 8i Al
                            *7         *7         A A           11'-0"
,7 A1.
      <1                                                                     A DRYWELL FLOOR - EL., 10'-3"
A A
A 4
*7  
*7 A A 4
LOWER CURB 11'-0" A6
<1 A
DRYWELL FLOOR - EL., 10'-3"


REACTOR BUILDING, DRYWELL SUPPORT STRUCTURE
REACTOR BUILDING, DRYWELL SUPPORT STRUCTURE I
                                                                                                    -I--
-I--
I CONTAINMENT SHELL SANDBED REGION---\                               EL. 23'-6"                                     GRADE EL. 23'-6" J
CONTAINMENT SHELL SANDBED REGION---\\
              &REACTOR VESSEL        CURB DRYWELL FLOOR
REACTOR VESSEL CURB
                            ~/
~/
EL. 10'-3"
EL. 23'-6" GRADE EL. 23'-6" J
                                                                                                                      -EL. 5'-D" LIMIT OF TORUS                                    -            MEMBRANE L
DRYWELL FLOOR EL. 10'-3" TORUS 1"
1"                                                      . L-EL. 4'-6""
PEDESTAL TYGON TUBING
WATERPROOFING N'
-CONCRETE MAT 1 4r44 N'
                                                                                              ,1                        MEMBRANE WATERPROOFING (TYP ALL AROUND)
,1
                  . .-      PEDESTAL                                                                        -      WATER STOP (TYP)
-EL.
TYGON                                                                ALL AROUND)
5'-D" LIMIT OF MEMBRANE L
TUBING
WATERPROOFING L-EL. 4'-6""
                                                                                  &#xb8;---.--'i       -'
MEMBRANE WATERPROOFING (TYP ALL AROUND)
                                                                    ,.- I P Uh       MAI       4>
WATER STOP (TYP)
* EL.     _l9-j A-A 5 GALLON io,-o-                                                                                                  *POLY          BOTTLE 1  4r44
ALL AROUND)
                                -CONCRETE MAT I *.* I '~4Z       A:'
A-A 5 GALLON
        -.                                                                            A .' A *~' -A   ~
*POLY BOTTLE EMEMBRANE WATERPROOFING
L                       43'-6"                                                                   EMEMBRANE WATERPROOFING LEVELING SLAB
&#xb8;---.--'i io,-o-I P Uh MAI
* EL.
_l9-j 4>
I I  
'~4Z A:'
A.'
A  
*~'  
-A  
~
L 43'-6" LEVELING SLAB


REACTOR CAVITY STAINLESS STEEL LINER----
REACTOR CAVITY STAINLESS STEEL LINER----
CONCRETE
CONCRETE
        *SEE DETAIL "B'L----\
*SEE DETAIL "B'L----\\
REACTOR VESSEL DRYWELL AND REACTOR CAVITY SECTION DETAIL "A"
REACTOR VESSEL DRYWELL AND REACTOR CAVITY SECTION DETAIL "A"


Head     Iso Elevation 94'-9"                         View Cy 00 Azimut
Head Iso View Elevation 94'-9" Cy 0 0 Azimut
                                .900 AzimL Elevation 71'-10"               2700 Azin Elevation 65'-4"         "L.-         Knuc 50'-11 '                         Uppe
.900 AzimL Elevation 71'-10" 2700 Azin Elevation 65'-4" "L.-
                                    --- Mid(
Knuc 50'-11 '
tion 37'43 Per!
Uppe
ition 27'-6"                           & Equ
--- Mid(
.tion 23'-6"                     H     Lower CVer (10
tion 37'43
                      \
&Per!
Equ ition 27'-6"
.tion 23'-6" H
Lower CVer (10
\\


4
4
        .4                                                                         TOP OF SANDBED EL. 12'-3" & UPPER CURB LOWER CURB EL.                 11-DRYVA WALL
.4 DRYVA WALL TOP OF SANDBED EL. 12'-3" & UPPER CURB LOWER CURB EL.
                    *t A
11-FLOOR EL. 10'-3"
FLOOR EL. 10'-3" 44 4          4, 4.
*t A
4       .              4        4
44 4,
                                                                                                                                              -.                      .4
4 4.
                                                                                                                                          ;~*            4
4 4
                                                                                                                                                -.        A REG ION                        .4 4.
4
4
:4 4                                                                                   4'.
.4
                                                                                                                            .4         '           4"
;~*
                                                                                                                                                                "*,o EL. 8'-99 EXCAVATION                                                             4 4
4 A
                                                                                            ''4'
REG I ON
                                                                                              .4 4.
.4 4
4.
4 4'.
:4 EL. 8'-99 EXCAVATION 4
.4 4  
''4' 4
.4
"*,o 4.
4.44
.4 A
4/ "
4/ "
                                                                                                                                                    ,t,
,t, A
* 4.44  .4                                                                                                  A 4      A
4
          .4 A
.4 A
BAY 5 -TRENCH
.4 4
            .4                4  4.
4 44
                                                                                                                    .4
                                    .4' 4                4                                                                                44 A''        ~.
4..4
                                                                                          .4.     4 4'
4.
4.
                                                                            .4_                  44   ~    .
BAY 5 -TRENCH 4
44
.4
.4' 4
4 A''
~.
4..4 44
.4.
4 4'
4.
4.
                            .4                                                                                                                 :4 4
.4_
4.
44
~
.4 4
4 4
4 4
4 4..                                    .4,      4
:4 4
                                                            . 4                                        4. 4 4 4
. 4 A
A                          4                                             .
4
                                          #,                                                                                                      4               4a
: 4.
4 4
4..
4
.4, 4
4 4a


DRYWELL TO REACTOR CAVITY SEAL DETAIL DETAIL 'B' OBSERVEDDAMAGE-AT LIP OF TROUGH CORRECTED IN 1988
DRYWELL TO REACTOR CAVITY SEAL DETAIL DETAIL 'B' OBSERVEDDAMAGE-AT LIP OF TROUGH CORRECTED IN 1988


EL, 87'-6" (12)
EL, 87'-6" (12)
F EL. 51f-.1O   (8.9)/
F EL. 51f-.1O (8.9)/
TRENH .. EL. 60'-1 (100)
TRENH EL. 60'-1 (100)
NOTE:
NOTE:
NUMBERS IN PARENTHESES, REFER TO.THE ATTACHEDGRAPH IDENTIFCATION NUMBERS KEY PLAN
NUMBERS IN PARENTHESES, REFER TO.THE ATTACHED GRAPH IDENTIFCATION NUMBERS KEY PLAN


TOD OF SANDBED EL. 12"--3" & UPPER CURB LOWER CURB EL. 11'-0" DRYWELL WALL FLOOR EL. 10'-Y"                                                                                                                         4       4     .4
TOD OF SANDBED EL.
                                                                                                                                                              ;4-
12"--3" & UPPER CURB LOWER CURB EL. 11'-0" FLOOR EL. 10'-Y" DRYWELL WALL 4
                                                                                                                                          >4        4 4,   '
4  
h,'                                                                               4. 4 4.. 4         A
.4
                            .4 4
;4-4,  
SANDBED
.4 h,'
                                                                                                      '4                                                      REGION EL. 9'-3                                       .4
>4 4
                                                  .4 3/4   4>                                                   4 4 -                                                                      .4 4    '.4' A   4 44               4.
4..
                                        '0.
4 A
: 4.                                 .4           47 A'   ~  4   .
: 4.
4,                                                                                                                      .4 4     '4 4   4           4   4-    4.                                        4 44
4 4
* AY 17 - RNC' 44
EL. 9'-3 SANDBED REGION
                                                                                                                                          .4' 44 A
'4
4' 4.4.         ~
.4
4'             4     44' A       ,,
.4 3/4 4>
                                          "'.4
4 4
: 4.     4                                                                           4     4   4,. 4
4  
                                                                                                                                                                          .,A A ~                                                                                              4.
'.4' A
                                                                                  '4   . 4
4
                                                                                  ,4'4         ,  .4
.4 44 4.
                                                                                                  .4'               4 '.                   44,            4 4 '.                          .4 4 4.
'0.
4.
4,
.4 47
* AY 17 - RNC' 4
4 4
4-4.
A'  
~ 4 4  
'4
.4 4
44 44 44
.4' A
4.4.  
~
4' 4'
4' 4
4 A  
"'.4 4.
4 A
~
4 4
4,. 4
.,A 4.
'4 4
,4'4  
.4
.4' 4  
.4 4
4 44, 4
4.


LOWER DRYWELL/SANDBED REGION                   NOTE:
LOWER DRYWELL/SANDBED REGION NOTE:
LEAKAGE PATH FROM OUTER DRYWELL TO OUTER DETAIL C                            SANDBED SHELL         /
LEAKAGE PATH FROM OUTER DRYWELL TO OUTER SANDBED SHELL  
SANDBED REGION 15">
/
                          .BOTTOM F SANDBED
DETAIL C SANDBED REGION 15">
        &deg;                 -l               E ,
.BOTTOM F SANDBED
&deg; E
-l  


DRYWE.LL
DRYWE.LL
        /_   N                     EL. 87'-5"
/_
        '7,.                        UT READINGS IN THIS AREA EL. 51'-10"                           ___EL. 60'- 10"
N
                                      ,,  UT READINGS IN THIS AREA EL. 50'-2" UT READINGS IN THESE AREAS EL. _12'-,3" EL. 8'- 11                                 TOP OF SANDBED BOTTOM OF SANDBED SUPPORT SKIRT       -
'7,.
(SEE DETAIL 1)                             1.154" UT READINGS IN THIS AREA-
EL. 87'-5" UT READINGS IN THIS AREA EL. 51'-10" EL. 50'-2" UT READINGS IN THESE AREAS
___EL. 60'- 10" UT READINGS IN THIS AREA EL. _12'-,3" TOP OF SANDBED EL. 8'- 11 BOTTOM OF SANDBED SUPPORT SKIRT (SEE DETAIL 1)
UT READINGS IN THIS AREA-1.154"


DETAIL WA" DETAIL "B' DETAIL 'C'
DETAIL WA" DETAIL "B' DETAIL 'C'


i 6
i 6
SURE PLATE SAND BED AREA 0.770" THK EL. 12'-3"-
SURE PLATE SAND BED AREA 0.770" THK EL.
TOP OF SANDBED & UPPER CURB RADIUS = 19'-5 7/16"               1.154" THK PLATE EL. 8'-1 1" STABILIZING RING                 - EL. 8'--1 "
12'-3"-
TOP OF SANDBED & UPPER CURB RADIUS = 19'-5 7/16" 1.154" THK PLATE EL. 8'-1 1" STABILIZING RING EL. 8'--1 "
EL. 6.'-10 5/16'----
EL. 6.'-10 5/16'----
4' DRAIN PIPE (5 PLACES) 0.676" THK PLATE
4' DRAIN PIPE (5 PLACES) 0.676" THK PLATE
( DRYWELL BOTTOM I
(
      -EL. 2'-3" 1/2" PLATE
DRYWELL BOTTOM I
                                                                                          -- -EL. (-)0'-1" SECTIONAL VIEW OF SAND BED AREA AT VENT PIPE
-EL.
2'-3" 1/2" PLATE
-EL.
(-)0'-1" SECTIONAL VIEW OF SAND AT VENT PIPE BED AREA


LOWER DRYWELL-SANDBED, TRENCH & SUMP ELEVATION LOOKING WEST}}
LOWER DRYWELL-SANDBED, TRENCH & SUMP ELEVATION LOOKING WEST}}

Latest revision as of 12:11, 14 January 2025

E-mail from J. Richmond of USNRC to J. Kulp and S. Pindale of USNRC, Regarding Drawing Attached for Oc Outage Inspection Plan
ML091190090
Person / Time
Site: Oyster Creek
Issue date: 10/21/2008
From: Richmond J
Engineering Region 1 Branch 1
To: Jeffrey Kulp, Stephen Pindale
NRC/RGN-I/DRP/PB6, Engineering Region 1 Branch 2
References
FOIA/PA-2009-0070
Download: ML091190090 (15)


Text

John Richmond From:

Sent:

To:

Cc:

Subject:

Attachments:

John Richmond Tuesday, October 21, 2008 1:30 PM Jeffrey Kulp; Stephen Pindale Ronald Bellamy; Scott Barber; Marc Ferdas; Michael Modes; Timothy OHara; Richard Conte Drawing attached for RE: OC Outage Inspection Plan OC View from inside Drywell.jpg; OC Drywell Elevation & Regions.bmp; OC Drywell Key Plan.jpg; OC Drywell Liner Thicknesses.jpg; OC Drywell Support Structure.jpg; OC Drywell Trench, Bay-5.jpg; OC Drywell Trench, Bay-1 7.jpg; OC Drywell X-section.jpg; OC Rx Cavity Detail.jpg; OC Rx Cavity Trough Drain Detail.jpg; OC Sandbed Detail-i.jpg; OC Sandbed Detail-2.jpg; OC Sandbed, Trench, & Sump.jpg All of the attached drawings came from Public Records (ACRS & ASLB presentations).

These drawings may be helpful when discussing various drywell issues.

From: John Richmond Sent: Monday, September 29, 2008 2:04 PM To: Marc Ferdas; Jeffrey Kulp Cc: Stephen Pindale; Ronald Bellamy; Scott Barber

Subject:

OC Outage Inspection Plan Marc/Jeff, can you include the following License Renewal items in the Resident Outage Inspection Plan?

1. As soon as reasonably achievable after the Drywell is opened, verify condition of both D/W Trenches (dry, wet, water stains, etc.). Pictures are optional, but always nice.
2. Within about 1-shift after the cavity is flooded up, verify the reactor cavity trough drain leakage rate (we do expect some leakage). After the initial check, continue to check it, about once per day, for a day or two, to see if the leakage rate changes. During 1 R21 (2006), the continuous leakage was identified at about 1 gpm, while the cavity was flooded.
3. Within about 1-shift after the cavity is flooded up, verify the 5 D/W sandbed drains, drain collection bottles.

No water or leakage is expected.

4. AmerGen is to apply a strippable coating, as a sealant, in the reactor cavity prior to flood up, to limit cavity seal leakage that could end up in the sandbed area. While you are welcome to observe or inspect this item, my team will verify this item, by a records review, after we arrive on-site.
5. During this outage, AmerGen is suppose to replace some ESW pipe. I understand the pipe has already been laid/installed, and is waiting to be "tied-in" during the outage. Did the Residents observe any portion of the new EtSW pipe installation?

Thanks John Richmond

Received: from R1CLSTRO1.nrc.gov ([148.184.99.7]) by R1 MS01.nrc.gov

([148.184.99.10]) with mapi; Tue, 21 Oct 2008 13:29:47 -0400 Content-Type: application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding: binary From: John Richmond <John. Richmond@nrc.gov>

To: Jeffrey Kulp <Jeffrey.Kulp@nrc.gov>, Stephen Pindale

<Stephen. Pindale@nrc.gov>

CC: Ronald Bellamy <Ronald.Bellamy@nrc.gov>, Scott Barber

<Scott.Barber@nrc.gov>, Marc Ferdas <Marc.Ferdas@nrc.gov>, Michael Modes

<Michael.Modes@nrc.gov>, Timothy OHara <Timothy.OHara@nrc.gov>, Richard Conte

<Richard. Conte@nrc.gov>

Date: Tue, 21 Oct 2008 13:29:44 -0400

Subject:

Drawing attached for RE: OC Outage Inspection Plan Thread-Topic: Drawing attached for RE: OC Outage Inspection Plan Thread-Index: AckiXbveQcOAazRyQ8uNcVdUr4+eVgRRFfBQ Message-ID: <2856BC46F6A308418F033D973BBOEE72AA2A4DC877@R1CLSTRO1.nrc.gov>

References:

<2856BC46F6A308418F033D973BBOEE72969755C4FC@R1CLSTRO1.nrc.gov>

In-Reply-To: <2856BC46F6A308418F033D973BBOEE72969755C4FC@R1CLSTRO1.nrc.gov>

Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach: yes X-MS-Exchange-Organization-SCL: -1 X-MS-TNEF-Correlator:

<2856BC46F6A308418F033D973BBOEE72AA2A4DC877@R1 CLSTR01.nrc.gov>

MIME-Version: 1.0

VIEW FROM INSIDE DRYWELL UPPER CURB - EL. 12'.3" TOP OF SANDBED

. _jL 0

El E 8i Al

,7 A1.

A A

A 4

  • 7
  • 7 A A 4

LOWER CURB 11'-0" A6

<1 A

DRYWELL FLOOR - EL., 10'-3"

REACTOR BUILDING, DRYWELL SUPPORT STRUCTURE I

-I--

CONTAINMENT SHELL SANDBED REGION---\\

REACTOR VESSEL CURB

~/

EL. 23'-6" GRADE EL. 23'-6" J

DRYWELL FLOOR EL. 10'-3" TORUS 1"

PEDESTAL TYGON TUBING

-CONCRETE MAT 1 4r44 N'

,1

-EL.

5'-D" LIMIT OF MEMBRANE L

WATERPROOFING L-EL. 4'-6""

MEMBRANE WATERPROOFING (TYP ALL AROUND)

WATER STOP (TYP)

ALL AROUND)

A-A 5 GALLON

  • POLY BOTTLE EMEMBRANE WATERPROOFING

¸---.--'i io,-o-I P Uh MAI

  • EL.

_l9-j 4>

I I

'~4Z A:'

A.'

A

  • ~'

-A

~

L 43'-6" LEVELING SLAB

REACTOR CAVITY STAINLESS STEEL LINER----

CONCRETE

  • SEE DETAIL "B'L----\\

REACTOR VESSEL DRYWELL AND REACTOR CAVITY SECTION DETAIL "A"

Head Iso View Elevation 94'-9" Cy 0 0 Azimut

.900 AzimL Elevation 71'-10" 2700 Azin Elevation 65'-4" "L.-

Knuc 50'-11 '

Uppe

--- Mid(

tion 37'43

&Per!

Equ ition 27'-6"

.tion 23'-6" H

Lower CVer (10

\\

4

.4 DRYVA WALL TOP OF SANDBED EL. 12'-3" & UPPER CURB LOWER CURB EL.

11-FLOOR EL. 10'-3"

  • t A

44 4,

4 4.

4 4

4

.4

~*

4 A

REG I ON

.4 4

4.

4 4'.

4 EL. 8'-99 EXCAVATION 4

.4 4

4' 4

.4

"*,o 4.

4.44

.4 A

4/ "

,t, A

4

.4 A

.4 4

4.

BAY 5 -TRENCH 4

44

.4

.4' 4

4 A

~.

4..4 44

.4.

4 4'

4.

.4_

4.

44

~

.4 4

4 4

4 4

. 4 A

4

4.

4 4

4..

4

.4, 4

4 4a

DRYWELL TO REACTOR CAVITY SEAL DETAIL DETAIL 'B' OBSERVEDDAMAGE-AT LIP OF TROUGH CORRECTED IN 1988

EL, 87'-6" (12)

F EL. 51f-.1O (8.9)/

TRENH EL. 60'-1 (100)

NOTE:

NUMBERS IN PARENTHESES, REFER TO.THE ATTACHED GRAPH IDENTIFCATION NUMBERS KEY PLAN

TOD OF SANDBED EL.

12"--3" & UPPER CURB LOWER CURB EL. 11'-0" FLOOR EL. 10'-Y" DRYWELL WALL 4

4

.4

4-4,

.4 h,'

>4 4

4..

4 A

4.

4 4

EL. 9'-3 SANDBED REGION

'4

.4

.4 3/4 4>

4 4

4

'.4' A

4

.4 44 4.

'0.

4.

4,

.4 47

  • AY 17 - RNC' 4

4 4

4-4.

A'

~ 4 4

'4

.4 4

44 44 44

.4' A

4.4.

~

4' 4'

4' 4

4 A

"'.4 4.

4 A

~

4 4

4,. 4

.,A 4.

'4 4

,4'4

.4

.4' 4

.4 4

4 44, 4

4.

LOWER DRYWELL/SANDBED REGION NOTE:

LEAKAGE PATH FROM OUTER DRYWELL TO OUTER SANDBED SHELL

/

DETAIL C SANDBED REGION 15">

.BOTTOM F SANDBED

° E

-l

DRYWE.LL

/_

N

'7,.

EL. 87'-5" UT READINGS IN THIS AREA EL. 51'-10" EL. 50'-2" UT READINGS IN THESE AREAS

___EL. 60'- 10" UT READINGS IN THIS AREA EL. _12'-,3" TOP OF SANDBED EL. 8'- 11 BOTTOM OF SANDBED SUPPORT SKIRT (SEE DETAIL 1)

UT READINGS IN THIS AREA-1.154"

DETAIL WA" DETAIL "B' DETAIL 'C'

i 6

SURE PLATE SAND BED AREA 0.770" THK EL.

12'-3"-

TOP OF SANDBED & UPPER CURB RADIUS = 19'-5 7/16" 1.154" THK PLATE EL. 8'-1 1" STABILIZING RING EL. 8'--1 "

EL. 6.'-10 5/16'----

4' DRAIN PIPE (5 PLACES) 0.676" THK PLATE

(

DRYWELL BOTTOM I

-EL.

2'-3" 1/2" PLATE

-EL.

(-)0'-1" SECTIONAL VIEW OF SAND AT VENT PIPE BED AREA

LOWER DRYWELL-SANDBED, TRENCH & SUMP ELEVATION LOOKING WEST