Committed to Nuclear Excellence DAEC EMERGENCY PLANNING DEPARTMENT PROCEDURE TRANSMITTAL ACKNOWLEDGEMENT MEMO (TAM-47)
Committed to Nuclear Excellence DAEC EMERGENCY PLANNING DEPARTMENT PROCEDURE TRANSMITTAL ACKNOWLEDGEMENT MEMO (TAM-47)
To:           NRC-NRR Document Control Desk US NRC Washington DC 20555 Re:           Entire EPIP Document (Copy 28)
To:
NRC-NRR Document Control Desk US NRC Washington DC 20555 Re:
Entire EPIP Document (Copy 28)
PSM
PSM


==Title:==
==Title:==
n/a Distribution Date:             07 /28 /2003 Effective Date of Change:      07/30/2003 Return by:                      08/18/2003 Please perform the following to your assigned manual. If you have any questions regarding this TAM please contact Don A. Johnson at 319-851-7872.
n/a Distribution Date:
REMOVE             INSERT EPIP Table of Contents Revision                                 Rev. 137            Rev. 138 EPIP 2.8 (PWR: 21881)                                           Rev. 1             Rev. 2 EPIP EOF-30 (PWR: 21821)                                         Rev. 0             Rev. 1 PERFORMED BY:
Effective Date of Change:
Print Name                                   Sign Name                        Date Please return to:     K. Dunlap PSC/Emergency Planning 3313 DAEC Rd.
Return by:
07 /28 /2003 07/30/2003 08/18/2003 Please perform the following to your assigned manual. If you have any questions regarding this TAM please contact Don A. Johnson at 319-851-7872.
REMOVE Rev. 137 EPIP Table of Contents Revision INSERT Rev. 138 Rev. 2 Rev. 1 EPIP 2.8 (PWR: 21881)
Rev. 1 EPIP EOF-30 (PWR: 21821)
Rev. 0 PERFORMED BY:
Print Name Please return to:
Sign Name Date K. Dunlap PSC/Emergency Planning 3313 DAEC Rd.
Palo, IA 52324 To be completed by DAEC EP personnel only:
Palo, IA 52324 To be completed by DAEC EP personnel only:
Date TAM retumed:                                                                       p&A EPTools updated:
Date TAM retumed:
EPTools updated:
p&A


-;EMEiRGEN>NCY         IMPLMEN INGX PROCEDU Ei-Rv 3 INDEX                 ~~~~PAGE 1 of 7 Procedure                         Title                       Revision   Date Number 1.1     Determination of Emergency Action Levels             19   09/12/01 1.2     Notification                                         28     4/4/03 1.3     Plant Assembly and Site Evacuation                   9     09/12101 1.4     Release of Emergency-Related Information             4     09/04/02 1.5     Activation and Operation of the EOF                   4     6/11/03 2.1     Activation and Operation of the OSC                   13   09112/01 2.2     Activation and Operation of the TSC                   23   10123/02 2.3     Operation of the FTS-2001 Phone Network               6     09/04/02 2.4     Activation and Operation of the ORAA                   8   09112/01 2.5     Control Room Emergency Response Operation             14   10/15/01 2.6     Activation and Operation of the ORAL                   9   12/30/02 2.7     Activation and Operation of the ODEF                 6     10/15/01 2.8     Security Threat                                       2     7/30/03 I 3.1     In-Plant Radiological Monitoring                     12     9/2/02 3.2     Field Radiological Monitoring                         13     912/02 3.3     Dose Assessment and Protective Action                 19     6/25/03 4.2     First Aid, Decontamination and Medical Support         7     8/23/02 4.3     Rescue and Emergency Repair Work                     11     8/23/02 4.5     Administration of Potassium Iodide (KI)               7     2/10/03 5.2     Recovery and Re-entry                                 9   10/15/01
-;EMEiRGEN>NCY IMPLMEN INGX PROCEDU Ei-Rv 3 INDEX  
~~~~PAGE 1 of 7 Procedure Title Revision Date Number 1.1 Determination of Emergency Action Levels 19 09/12/01 1.2 Notification 28 4/4/03 1.3 Plant Assembly and Site Evacuation 9
09/12101 1.4 Release of Emergency-Related Information 4
09/04/02 1.5 Activation and Operation of the EOF 4
6/11/03 2.1 Activation and Operation of the OSC 13 09112/01 2.2 Activation and Operation of the TSC 23 10123/02 2.3 Operation of the FTS-2001 Phone Network 6
09/04/02 2.4 Activation and Operation of the ORAA 8
09112/01 2.5 Control Room Emergency Response Operation 14 10/15/01 2.6 Activation and Operation of the ORAL 9
12/30/02 2.7 Activation and Operation of the ODEF 6
10/15/01 2.8 Security Threat 2
7/30/03 3.1 In-Plant Radiological Monitoring 12 9/2/02 3.2 Field Radiological Monitoring 13 912/02 3.3 Dose Assessment and Protective Action 19 6/25/03 4.2 First Aid, Decontamination and Medical Support 7
8/23/02 4.3 Rescue and Emergency Repair Work 11 8/23/02 4.5 Administration of Potassium Iodide (KI) 7 2/10/03 5.2 Recovery and Re-entry 9
10/15/01 I


C---EMERGENC   PLAMIMPLEMENT.NGM01iCEDURE&V:i-             Rev. 138 INDEX                             PAGE 2 of 7 Form                         Title                           Revision Referencing Number                                                         Number   Procedure CR-01     OSM/OSS Checklist                                     Rev. 2   EPIP 2.5 CR-02     Back Panel Communicator Checklist                     Rev. 1   EPIP 2.5 CR-03     Dose Projection & ARM Data Sheet                     Rev. 0   EPIP 2.5 CR-04     Control Room to TSC Command and Control               Rev. 1   EPIP 2.5 Transfer Checklist EAL-01     Abnormal Rad Levels/Radioactive Effluent Table       Rev. 3   EPIP 1.1 EAL-02     Fission Barrier Table                                 Rev. 3   EPIP 1.1 EAL-03     Hazards & Other Conditions Affecting Plant Safety     Rev. 2   EPIP 1.1 EAL-04     System Malfunction Table                             Rev. 3   EPIP 1.1 EOF - 02   NRC - HPN Communicator Checklist                     Rev. 3   EPIP 1.5 EOF - 03   Technical Recorder Checklist                         Rev. 2   EPIP 1.5 EOF - 04   Summary of Computer Data Backup Collection           Rev. 1   EPIP 1.5 Activities EOF - 05   EOF Information Services Representative Checklist     Rev. 3   EPIP 1.5 EOF - 06   DAEC Key Parameter Log                               Rev. 0   EPIP 1.5 EOF - 07   Emergency Response and Recovery Director             Rev. 4   EPIP 1.5 Checklist EOF - 08   Rad & EOF Manager Checklist                           Rev. 6 EPIP 1.5, 3.3 EOF - 09   EOF STA/OPS Liaison Checklist                         Rev. 0   EPIP 1.5 EOF -10   EOF-TSC Communicator Checklist                       Rev. 3   EPIP 1.5 EOF - 11   Support Services Coordinator Checklist               Rev. 3   EPIP 1.5 EOF -12   Field Team Director Checklist                         Rev. 0 EPIP 1.5,3.3 EOF -13   Radiological Data Communicator Checklist             Rev. 0 EPIP 1.5,3.3
C---EMERGENC PLAMIMPLEMENT.NGM01 iCEDURE&V:i-Rev. 138 INDEX PAGE 2 of 7 Form Title Revision Referencing Number Number Procedure CR-01 OSM/OSS Checklist Rev. 2 EPIP 2.5 CR-02 Back Panel Communicator Checklist Rev. 1 EPIP 2.5 CR-03 Dose Projection & ARM Data Sheet Rev. 0 EPIP 2.5 CR-04 Control Room to TSC Command and Control Rev. 1 EPIP 2.5 Transfer Checklist EAL-01 Abnormal Rad Levels/Radioactive Effluent Table Rev. 3 EPIP 1.1 EAL-02 Fission Barrier Table Rev. 3 EPIP 1.1 EAL-03 Hazards & Other Conditions Affecting Plant Safety Rev. 2 EPIP 1.1 EAL-04 System Malfunction Table Rev. 3 EPIP 1.1 EOF - 02 NRC - HPN Communicator Checklist Rev. 3 EPIP 1.5 EOF - 03 Technical Recorder Checklist Rev. 2 EPIP 1.5 EOF - 04 Summary of Computer Data Backup Collection Rev. 1 EPIP 1.5 Activities EOF - 05 EOF Information Services Representative Checklist Rev. 3 EPIP 1.5 EOF - 06 DAEC Key Parameter Log Rev. 0 EPIP 1.5 EOF - 07 Emergency Response and Recovery Director Rev. 4 EPIP 1.5 Checklist EOF - 08 Rad & EOF Manager Checklist Rev. 6 EPIP 1.5, 3.3 EOF - 09 EOF STA/OPS Liaison Checklist Rev. 0 EPIP 1.5 EOF -10 EOF-TSC Communicator Checklist Rev. 3 EPIP 1.5 EOF - 11 Support Services Coordinator Checklist Rev. 3 EPIP 1.5 EOF -12 Field Team Director Checklist Rev. 0 EPIP 1.5,3.3 EOF -13 Radiological Data Communicator Checklist Rev. 0 EPIP 1.5,3.3


..AI--EMERGE;,liFi~IPl;MNI~TFQE3URRt.l.                   Rev. 138
..AI--EMERGE;,liFi~IPl;MNI~TFQE3URRt.l.
\                         ~~~~~~~~INDEX                   PAGE 3 of 7 EOF - 14 EOF MIDAS Operator Checklist                     Rev. 1   EPIP 1.5, 3.3 EOF - 15 Radiological Data Plotter Checklist               Rev. 0   EPIP 1.5, 3.3 EOF - 16 Radiological Assessment Coordinator Checklist     Rev. 1   EPIP 1.5, 3.3 EOF - 17 EOF Security Access Clerk Checklist               Rev. 2     EPIP 1.5 EOF -18   EOF Stalling Accountability Roster               Rev. 3     EPIP 1.5 EOF - 19 Drill Announcement Message                       Rev. 0   EPIP 1.4,1.5 EOF -20   Emergency Announcement Message                   Rev. 1   EPIP 1.4,1.5 EOF - 21 Personnel Access Log                             Rev. 1   EPIP 1.4,1.5 EOF -22   Registration Form                                 Rev. 0   EPIP 14,1.5 EOF -23   Security Post Log                                 Rev. 2   EPIP 1.4,1.5 EOF -24   First Floor Security Post Description             Rev. 2   EPIP 1.4,1.5 EOF-25   Fourteenth Floor Security Post Description       Rev. I I   EPIP 1.5 EOF -27   Status Update Message - EOF Communicator         Rev. 0     EPIP 1.5 EOF -28   Verbal Closeout Summary                           Rev. 0     EPIP 1.5 EOP -29   Written Closeout Summary                         Rev. 0     EPIP 1.5 EOF-30   Status Board                                     Rev. 1     EPIP 1.5   I EOF -31   Access B adge Example                             Rev. 0     EPIP 1.5 EOF - 32 EOF Staff Response                               Rev. 3     EPIP.15 EOF - 33 Recovery Issues                                   Rev. 0     EPIP 5.2 EOF - 34 EOF Activities                                   Rev. 0     EPIP 5.2 EOF-35   Recovery Phase Plan Outline Guidance             Rev. 0     EPIP .52 EOF - 36 RE-Entry Briefing Guide                           Rev.0     EPIP 5.2 EOF -37   RE-Entry Debriefing Guide                         Rev. 0     EPIP 5.2 EOF - 38 EOF Messenger Checklist                           Rev. 1     EPIP 1.5 ERO - 01 ERO Position Equivalency Table                   Rev. 0     EPIP 1.5 JPIC - 01 JPIC Manager Checklist                           Rev. 4     EPIP 1.4 JPIC - 03 Alliant Spokesperson Checklist                   Rev. 3     EPIP 1.4
Rev. 138
\\
~~~~~~~~INDEX PAGE 3 of 7 EOF - 14 EOF MIDAS Operator Checklist Rev. 1 EPIP 1.5, 3.3 EOF - 15 Radiological Data Plotter Checklist Rev. 0 EPIP 1.5, 3.3 EOF - 16 Radiological Assessment Coordinator Checklist Rev. 1 EPIP 1.5, 3.3 EOF - 17 EOF Security Access Clerk Checklist Rev. 2 EPIP 1.5 EOF -18 EOF Stalling Accountability Roster Rev. 3 EPIP 1.5 EOF - 19 Drill Announcement Message Rev. 0 EPIP 1.4,1.5 EOF -20 Emergency Announcement Message Rev. 1 EPIP 1.4,1.5 EOF - 21 Personnel Access Log Rev. 1 EPIP 1.4,1.5 EOF -22 Registration Form Rev. 0 EPIP 14,1.5 EOF -23 Security Post Log Rev. 2 EPIP 1.4,1.5 EOF -24 First Floor Security Post Description Rev. 2 EPIP 1.4,1.5 EOF-25 Fourteenth Floor Security Post Description Rev. I I EPIP 1.5 EOF -27 Status Update Message - EOF Communicator Rev. 0 EPIP 1.5 EOF -28 Verbal Closeout Summary Rev. 0 EPIP 1.5 EOP -29 Written Closeout Summary Rev. 0 EPIP 1.5 EOF-30 Status Board Rev. 1 EPIP 1.5 EOF -31 Access B adge Example Rev. 0 EPIP 1.5 EOF - 32 EOF Staff Response Rev. 3 EPIP.15 EOF - 33 Recovery Issues Rev. 0 EPIP 5.2 EOF - 34 EOF Activities Rev. 0 EPIP 5.2 EOF-35 Recovery Phase Plan Outline Guidance Rev. 0 EPIP.52 EOF - 36 RE-Entry Briefing Guide Rev.0 EPIP 5.2 EOF -37 RE-Entry Debriefing Guide Rev. 0 EPIP 5.2 EOF - 38 EOF Messenger Checklist Rev. 1 EPIP 1.5 ERO - 01 ERO Position Equivalency Table Rev. 0 EPIP 1.5 JPIC - 01 JPIC Manager Checklist Rev. 4 EPIP 1.4 JPIC - 03 Alliant Spokesperson Checklist Rev. 3 EPIP 1.4 I


iig-lMER{GENCYPlANIiMPLgEMENTIiNGilCEiiESi-i                 Rev. 13 U               . INDEX                             ~~~~~~~~~PAGE 4 of 7 JPIC - 04 Technical Liaison Checklist                                 Rev. 4   EPIP 1.4 JPIC - 05 Sequence of Events                                           Rev. 0   EPIP 1.4 JPIC - 06 Public Information Officer Support Checklist                 Rev. 5   EPIP 1.4 JPIC -07   Logistics Coordinator Checklist                             Rev. 4     EPIP 1.4 JPIC -08   Logistics Support Checklist                                 Rev. 4     EPIP 1.4 JPIC - 09 Audiovisual Support Checklist                               Rev. 4-   EPIP 1.4 JPIC - 11 Rumor Control Coordinator I Checklist                       Rev. 3     EPIP 1.4 JPIC - 12 Rumor Control Event Summary Log                             Rev. 1     EPIP 1.4 JPIC - 13 Rumor Control Coordinator II Checklist                     Rev. 2     EPIP 1.4 JPIC - 14 Public Rumor Control Checklist                             Rev. 2     EPIP 1.4 JPIC -15   News Media Rumor Control Checklist                         Rev. 4     EPIP 1.4 JPIC -16   Assistant JPIC Manager Checklist                           Rev. 3     EPIP 1.4 JPIC -17   JPIC Security Access Control Checklist                     Rev. 3     EPIP 1.4 JPIC - 18 Sixth Floor Security Post Description                       Rev. 2     EPIP 1.4 JPIC - 19 JPIC D)istribution List                                     Rev. 2     EPIP 1.4 NOTE-01   ERO Notification -Phone System Callout                     Rev. 4     EPIP 1.2 NOTE-02   ERO Notification - Alphanumeric Paging System               Rev. 3     EPIP 1.2 Callout NOTE-03   Event Notification Worksheet                               Rev. 1     EPIP 1.2 NOTE-04   Plant Assembly Notification                                 Rev. 2     EPIP 1.2 NOTE-05   Emergency Action Level Notification                         Rev. 6     EPIP 1.2 NOTE-06   Plant Page for Emergency Classification Changes             Rev. 1     EPIP 1.2 NOTE-07   Basic Notification Flowpath                                 Rev. 1     EPIP 1.2 ODEF-01   ODEF Decontamination Waiting Area                           Rev. 0     EPIP 2.7 ODEF-02   Floor Plan for ORAIJODEF                                   Rev. 0     EPIP 2.7 ODEF-03   Travel Route to ORAIJODEF                                   Rev. 0     EPIP 2.7 ODEF-04   12 Avenue Entrance to ORAIJODEF                             Rev. 0   EPIP 2.7 ORAA-01   Offsite Relocation and Assembly Area Supervisor's           Rev. 1   EPIP 2.4
iig-lMER{GENCYPlANIiMPLgEMENTIiNGilCEiiESi-i Rev. 13 U  
. INDEX  
~~~~~~~~~PAGE 4 of 7 JPIC - 04 Technical Liaison Checklist Rev. 4 EPIP 1.4 JPIC - 05 Sequence of Events Rev. 0 EPIP 1.4 JPIC - 06 Public Information Officer Support Checklist Rev. 5 EPIP 1.4 JPIC -07 Logistics Coordinator Checklist Rev. 4 EPIP 1.4 JPIC -08 Logistics Support Checklist Rev. 4 EPIP 1.4 JPIC - 09 Audiovisual Support Checklist Rev. 4-EPIP 1.4 JPIC - 11 Rumor Control Coordinator I Checklist Rev. 3 EPIP 1.4 JPIC - 12 Rumor Control Event Summary Log Rev. 1 EPIP 1.4 JPIC - 13 Rumor Control Coordinator II Checklist Rev. 2 EPIP 1.4 JPIC - 14 Public Rumor Control Checklist Rev. 2 EPIP 1.4 JPIC -15 News Media Rumor Control Checklist Rev. 4 EPIP 1.4 JPIC -16 Assistant JPIC Manager Checklist Rev. 3 EPIP 1.4 JPIC -17 JPIC Security Access Control Checklist Rev. 3 EPIP 1.4 JPIC - 18 Sixth Floor Security Post Description Rev. 2 EPIP 1.4 JPIC - 19 JPIC D)istribution List Rev. 2 EPIP 1.4 NOTE-01 ERO Notification -Phone System Callout Rev. 4 EPIP 1.2 NOTE-02 ERO Notification - Alphanumeric Paging System Rev. 3 EPIP 1.2 Callout NOTE-03 Event Notification Worksheet Rev. 1 EPIP 1.2 NOTE-04 Plant Assembly Notification Rev. 2 EPIP 1.2 NOTE-05 Emergency Action Level Notification Rev. 6 EPIP 1.2 NOTE-06 Plant Page for Emergency Classification Changes Rev. 1 EPIP 1.2 NOTE-07 Basic Notification Flowpath Rev. 1 EPIP 1.2 ODEF-01 ODEF Decontamination Waiting Area Rev. 0 EPIP 2.7 ODEF-02 Floor Plan for ORAIJODEF Rev. 0 EPIP 2.7 ODEF-03 Travel Route to ORAIJODEF Rev. 0 EPIP 2.7 ODEF-04 12 Avenue Entrance to ORAIJODEF Rev. 0 EPIP 2.7 ORAA-01 Offsite Relocation and Assembly Area Supervisor's Rev. 1 EPIP 2.4


  -.:.g..EME'RG.E'N..Y-PLA       P>t-IRLE.ME NT N   :,,RO   ,,EDURESC, Rev. 138 k                                            INDEX                     ~~~~PAGE 5 of 7 Checklist ORAA-02     Health Physics Support for the Offsite Relocation           Rev. 0   EPIP 2.4 and Assembly Area ORAA-03     Security Support for the Offsite Relocation and             Rev. 0   EPIP 2.4 Assembly Area ORAA-04     Offsite Relocation and Assembly Area                         Rev. 0   EPIP 2.4 ORAA-05     Offsite Relocation and Assembly Area Parking and             Rev. 0   EPIP 2.4 t Vehicle Monitoring OSC-01     OSC Layout                                                   Rev. 0   EPIP 2.1 OSC-02     OSC Organization Chart                                       Rev. 0   EPIP 2.1 OSC-03     Minimum Staffing Level                                       Rev. 1   EPIP 2.1 OSC-04       Recommended Log Entry Topics                                 Rev. 0   EPIP 2.1 OSC-05       Emergency Event Log Sheet                                     Rev. 0   EPIP 2.1 OSC-06     Personal Statement Concerning Incident                       Rev. 0   EPIP 2.1 OSC-07     Emergency Exposure Tracking Log                               Rev. 0   EPIP 2.1 OSC-08     OSC Supervisor Checklist                                     Rev. 0   EPIP 2.1 OSC-09       Health Physics Supervisor Checklist                           Rev. 0   EPIP 2.1 OSC-10       Electrical, Mechanical, I&C Maintenance                       Rev. 0   EPIP 2.1 Supervisor Checklist OSC-1 1     Emergency Assignment Staffing Board Duties                   Rev. 0   EPIP 2.1 OSC-12       External Exposure Limits                                     Rev. 0   EPIP 4.3 OSC-13       Guidance on Dose Limits for Workers Performing               Rev. 0   EPIP 4.3 Emergency Services OSC-14     Guidelines Regarding Selection of Volunteers                 Rev. 0   EPIP 4.3 OSC-15     OSC Repair Team Work Order                                   Rev. 0   EPIP 4.3 OSC-16     Repair Team Datasheet Flowpath                               Rev. 0   EPIP 4.3 PAR-01     PAR Decision Making - Recommendations                         Rev. 0   EPIP 3.3 PAR- 02     PAR Decision Making - Flowchart                               Rev. 0   EPIP 3.3 OnieAsml oain                                                 e.2EI PASE-02 PASE-02      Onsite Assembly Locations                                   Rev. 2   EPIP 1.3
k
-.:. g..EME'RG.E'N..Y-PLA P>t-IRLE.ME NT N
:,,RO  
,,EDURESC, Rev. 138 INDEX  
~~~~PAGE 5 of 7 Checklist ORAA-02 Health Physics Support for the Offsite Relocation Rev. 0 EPIP 2.4 and Assembly Area ORAA-03 Security Support for the Offsite Relocation and Rev. 0 EPIP 2.4 Assembly Area ORAA-04 Offsite Relocation and Assembly Area Rev. 0 EPIP 2.4 ORAA-05 Offsite Relocation and Assembly Area Parking and Rev. 0 EPIP 2.4 Vehicle Monitoring OSC-01 OSC Layout Rev. 0 EPIP 2.1 OSC-02 OSC Organization Chart Rev. 0 EPIP 2.1 OSC-03 Minimum Staffing Level Rev. 1 EPIP 2.1 OSC-04 Recommended Log Entry Topics Rev. 0 EPIP 2.1 OSC-05 Emergency Event Log Sheet Rev. 0 EPIP 2.1 OSC-06 Personal Statement Concerning Incident Rev. 0 EPIP 2.1 OSC-07 Emergency Exposure Tracking Log Rev. 0 EPIP 2.1 OSC-08 OSC Supervisor Checklist Rev. 0 EPIP 2.1 OSC-09 Health Physics Supervisor Checklist Rev. 0 EPIP 2.1 OSC-10 Electrical, Mechanical, I&C Maintenance Rev. 0 EPIP 2.1 Supervisor Checklist OSC-1 1 Emergency Assignment Staffing Board Duties Rev. 0 EPIP 2.1 OSC-12 External Exposure Limits Rev. 0 EPIP 4.3 OSC-13 Guidance on Dose Limits for Workers Performing Rev. 0 EPIP 4.3 Emergency Services OSC-14 Guidelines Regarding Selection of Volunteers Rev. 0 EPIP 4.3 OSC-15 OSC Repair Team Work Order Rev. 0 EPIP 4.3 OSC-16 Repair Team Datasheet Flowpath Rev. 0 EPIP 4.3 PAR-01 PAR Decision Making - Recommendations Rev. 0 EPIP 3.3 PAR- 02 PAR Decision Making - Flowchart Rev. 0 EPIP 3.3 PASE-02 OnieAsml oain e.2EI t
PASE-02 Onsite Assembly Locations Rev. 2 EPIP 1.3


[ EMERGENCY .PLANIMPLEMENTING-PROCEDURES:;               Rev. 138 INDEXC                           PAGE 6 of 7 PASE-05 Site Evacuation Routes                               Rev. 1 EPIP 1.3 SAM-01 EOP-SAG Transition Checklist                         Rev. 0 EPIP 2.2 TSC-01 Emergency Coordinator Checklist                     Rev. 3 EPIP 2.2 TSC-02 TSC Supervisor Checklist                             Rev. 2 EPIP 2.2 TSC-03 Site Radiation Protection Coordinator Checklist     Rev. 1 EPIP 2.2 TSC-04 Technical & Engineering Supervisor Checklist         Rev. 3 EPIP 2.2 TSC-05   Quality Assurance Checklist                         Rev. 1 EPIP 2.2 TSC-06   Security & Support Supervisor Checklist             Rev. 1 EPIP 2.2 TSC-07   Administrative Supervisor Checklist                 Rev. 1 EPIP 2.2 TSC-08   Material Management Supervisor Checklist             Rev. 1 EPIP 2.2 TSC-09   TSC-CR-OSC Communicator Checklist                   Rev. 2 EPIP 2.2 TSC-10   CR-TSC-OSC Communicator Checklist                   Rev. 2 EPIP 2.2 TSC-1 1 TSC-EOF-JPIC Communicator Checklist                 Rev. 1 EPIP 2.2 TSC-12 ENS Communicator Checklist                           Rev. 2 EPIP 2.2 TSC-13 EPN Communicator Checklist                           Rev. I EPIP 2.2 TSC-14 TSC/OSC Operations Liaison Checklist                 Rev. 2 EPIP 2.2 TSC-15 Radiological Support Staff Checklist                 Rev. 1 EPIP 2.2 TSC-16 Radio Operator.-Offsie Checklist                     Rev. 0 EPIP 2.2 TSC-17 Radio Operator - Onsite Checklist                   Rev. 0 EPIP 2.2 TSC-18 TSC MIDAS Operator Checklist                         Rev. 0 EPIP 2.2 TSC-19 Technical & Analysis Engineer Checklist             Rev. 1 EPIP 2.2 TSC-20 TSC Operations Supervisor                           Rev. 2 EPIP 2.2 TSC-21 Eleciical Engineer Checklist                         Rev. 0 EPIP 2.2 TSC-22 I & C Engineer Checklist                             Rev. 0 EPIP 2.2 TSC-23 Mechanical Engineer Checklist                       Rev. 0 EPIP 2.2 TSC-24 Reactor Engineer Checklist                           Rev. 2 EPIP 2.2 TSC-25 SPDS Operator Checklist                             Rev. 1 EPIP 2.2
[ EMERGENCY.PLANIMPLEMENTING-PROCEDURES:;
Rev. 138 INDEXC PAGE 6 of 7 PASE-05 Site Evacuation Routes Rev. 1 EPIP 1.3 SAM-01 EOP-SAG Transition Checklist Rev. 0 EPIP 2.2 TSC-01 Emergency Coordinator Checklist Rev. 3 EPIP 2.2 TSC-02 TSC Supervisor Checklist Rev. 2 EPIP 2.2 TSC-03 Site Radiation Protection Coordinator Checklist Rev. 1 EPIP 2.2 TSC-04 Technical & Engineering Supervisor Checklist Rev. 3 EPIP 2.2 TSC-05 Quality Assurance Checklist Rev. 1 EPIP 2.2 TSC-06 Security & Support Supervisor Checklist Rev. 1 EPIP 2.2 TSC-07 Administrative Supervisor Checklist Rev. 1 EPIP 2.2 TSC-08 Material Management Supervisor Checklist Rev. 1 EPIP 2.2 TSC-09 TSC-CR-OSC Communicator Checklist Rev. 2 EPIP 2.2 TSC-10 CR-TSC-OSC Communicator Checklist Rev. 2 EPIP 2.2 TSC-1 1 TSC-EOF-JPIC Communicator Checklist Rev. 1 EPIP 2.2 TSC-12 ENS Communicator Checklist Rev. 2 EPIP 2.2 TSC-13 EPN Communicator Checklist Rev. I EPIP 2.2 TSC-14 TSC/OSC Operations Liaison Checklist Rev. 2 EPIP 2.2 TSC-15 Radiological Support Staff Checklist Rev. 1 EPIP 2.2 TSC-16 Radio Operator.- Offsie Checklist Rev. 0 EPIP 2.2 TSC-17 Radio Operator - Onsite Checklist Rev. 0 EPIP 2.2 TSC-18 TSC MIDAS Operator Checklist Rev. 0 EPIP 2.2 TSC-19 Technical & Analysis Engineer Checklist Rev. 1 EPIP 2.2 TSC-20 TSC Operations Supervisor Rev. 2 EPIP 2.2 TSC-21 Eleciical Engineer Checklist Rev. 0 EPIP 2.2 TSC-22 I & C Engineer Checklist Rev. 0 EPIP 2.2 TSC-23 Mechanical Engineer Checklist Rev. 0 EPIP 2.2 TSC-24 Reactor Engineer Checklist Rev. 2 EPIP 2.2 TSC-25 SPDS Operator Checklist Rev. 1 EPIP 2.2


.k
.k  
.EM
.EM IML
  -EP0' ER .EN a;.
-EP0' E R.E N a;.
YI      ';.IML PLEME.N.TIN.G.-P.R CEW '$  RE 0- Rev. 138 INDEX                           PAGE 7 of 7 TSC-26   Information Services Representative Checklist         Rev. 2 EPIP 2.2 TSC-27   Fire Marshall Checklist                               Rev. I EPIP 2.2 TSC-28   NRC Roles During A Nuclear Power Plant               Rev. 0 EPIP 2.2 Emergency Checklist TSC-29   TSC Minimum Staffing Level                           Rev. 2 EPIP 2.2 TSC-30   Emergency Action Request Log                         Rev. 0   EPIP 2.2 TSC-31   Radio Operator Log                                   Rev. 0   EPIP 2.2 TSC-32   Status Board Recorder                               Rev. I   EPIP 2.2 TSC-33   Typical Organization of the NRC Site Team             Rev. 0 EPIP 2.2 TSC-34   TSC Organization Chart                               Rev. 3   EPIP 2.2 TSC-35   Assignment Form                                     Rev. 0   EPIP 5.2 TSC-36   Deactivation Report                                   Rev. 0 EPIP 5.2 TSC-37   Plant Operations Status                               Rev. 0 EPIP 5.2 TSC-38   TSC/Control RoomlOSC Activities                     Rev. 0   EPIP 5.2 TSC-39   TSC Clerical Checklist                               Rev. 0 EPIP 2.2 TSC-40   ARM Locations                                         Rev. 0 EPIP 3.1/4.3 TSC-41   PASS Capabilities                                   Rev. 0   EPIP 3.1 TSC-42   On-Site Map                                         Rev. 0   EPIP 3.2 TSC-43   ESB Logon Instructions (TSC/CR/EOF)                 Rev. 0   EPIP 2.2
Y I
';. P LEME.N.T IN.G.-P.R W
C R
E E
0- R e v. 13 8 INDEX PAGE 7 of 7 TSC-26 Information Services Representative Checklist Rev. 2 EPIP 2.2 TSC-27 Fire Marshall Checklist Rev. I EPIP 2.2 TSC-28 NRC Roles During A Nuclear Power Plant Rev. 0 EPIP 2.2 Emergency Checklist TSC-29 TSC Minimum Staffing Level Rev. 2 EPIP 2.2 TSC-30 Emergency Action Request Log Rev. 0 EPIP 2.2 TSC-31 Radio Operator Log Rev. 0 EPIP 2.2 TSC-32 Status Board Recorder Rev. I EPIP 2.2 TSC-33 Typical Organization of the NRC Site Team Rev. 0 EPIP 2.2 TSC-34 TSC Organization Chart Rev. 3 EPIP 2.2 TSC-35 Assignment Form Rev. 0 EPIP 5.2 TSC-36 Deactivation Report Rev. 0 EPIP 5.2 TSC-37 Plant Operations Status Rev. 0 EPIP 5.2 TSC-38 TSC/Control RoomlOSC Activities Rev. 0 EPIP 5.2 TSC-39 TSC Clerical Checklist Rev. 0 EPIP 2.2 TSC-40 ARM Locations Rev. 0 EPIP 3.1/4.3 TSC-41 PASS Capabilities Rev. 0 EPIP 3.1 TSC-42 On-Site Map Rev. 0 EPIP 3.2 TSC-43 ESB Logon Instructions (TSC/CR/EOF)
Rev. 0 EPIP 2.2


0;f EMERGENCY                 PLAN*                                      PRlc~DEPIP                         :MPLEMENTING 2.8 Rev. 2 SECURITY THREAT Page 1 of 11 Effective Date:                           o4
0;f EMERGENCY PLAN
                                                                            /03
:MPLEMENTING PRlc~DEPIP 2.8 Rev. 2 SECURITY THREAT Page 1 of 11 Effective Date:
                                      ,TECHNICAL,RE.V. EW Prepared by:                                                                                       Date: 7/,tg /03 Reviewed by:                                                                                         Date:                   -1Ste I depe       ent Reviewer PROCESS :REVIE
o4  
:: =. r . r. r . . ..    . . ,. : . ..................
/03
                                                          .. .    .  ... .  .. . r . : . : . r r . r .    . .    ...........
,TECHNICAL, RE.V. EW Prepared by:
Reviewed by:                                                                                         Date:     -7 Oprations Manager Reviewed by:                                                                                         Date:     7,29YZi2 5nSecurity Manager PROCEDURE APPROVIAL I am responsible for the technical content of this procedure.
Date: 7/,tg /03 Reviewed by:
Approved by:                                                       7                               Date:     ?A/O                 S Manager, Emergency Planning
Date:  
-1Ste I depe ent Reviewer PROCESS :REVIE
:: = r  
. r. r  
... r.
r r.
r.
Reviewed by:
Date:  
-7 Oprations Manager Reviewed by:
Date: 7,29YZi2 5nSecurity Manager PROCEDURE APPROVIAL I am responsible for the technical content of this procedure.
Approved by:
7 Date: ?A/O S Manager, Emergency Planning


EPIP 2.8 Rev. 2 SECURITY THREAT Page 2 of 11 Table of Contents Pane 1.0 PURPOSE ......................................................                                             3 2.0 DEFINITIONS ......................................................                                         3 3.0 INSTRUCTIONS ......................................................                                         5 3.1   CREDIBILITY DETERMINATION                               .................................... 5 3.2   SEVERITY DETERMINATION ...................................                                           5 3.2.1   CREDIBLE THREAT OF HIGH SEVERITY .......................... 5 3.2.2   CREDIBLE THREAT OF LOW SEVERITY ........................... 6 3.3   FOLLOW-UP ACTIONS ...................................                                                 7 3.4   STAFF AUGMENTATION ...................................                                               7 4.0 RECORDS ......................................................                                             8
EPIP 2.8 Rev. 2 SECURITY THREAT Page 2 of 11 Table of Contents Pane 1.0 PURPOSE......................................................
3 2.0 DEFINITIONS......................................................
3 3.0 INSTRUCTIONS......................................................
5 3.1 CREDIBILITY DETERMINATION  
.................................... 5 3.2 SEVERITY DETERMINATION...................................
5 3.2.1 CREDIBLE THREAT OF HIGH SEVERITY.......................... 5 3.2.2 CREDIBLE THREAT OF LOW SEVERITY........................... 6 3.3 FOLLOW-UP ACTIONS...................................
7 3.4 STAFF AUGMENTATION...................................
7 4.0 RECORDS......................................................
8


==5.0 REFERENCES==
==5.0 REFERENCES==
...................................................... 8 6.0 ATTACHMENTS ......................................................                                         8 ATT 1, 'SECURITY EVENT-SITE EVACUATION ANNOUNCEMENT'.... 9 ATT 2,'SECURITY EVENT - ERO ALPHANUMERIC PAGING SYSTEM CALLOUr................................10             ........................................ 10 ATT 3, -SECURITY EVENT- PHONE SYSTEM CALLOUT ...................... 11
...................................................... 8 6.0 ATTACHMENTS......................................................
8 ATT 1, 'SECURITY EVENT-SITE EVACUATION ANNOUNCEMENT'.... 9 ATT 2, 'SECURITY EVENT - ERO ALPHANUMERIC PAGING SYSTEM CALLOUr................................10  
........................................ 10 ATT 3, -SECURITY EVENT-PHONE SYSTEM CALLOUT...................... 11


EMERGENCY PLAN~e     IMPLEMENTING PRO CURE                   EPIP 2.8 Rev. 2 SECURITY THREAT Page 3 of 11 I
EMERGENCY PLAN~e IMPLEMENTING PRO CURE EPIP 2.8 Rev. 2 SECURITY THREAT Page 3 of 11 I
1.0 PURPOSE (1) This procedure provides instructions for the activation of the Emergency Response Organization in response to Security Events at DAEC.
1.0 PURPOSE (1) This procedure provides instructions for the activation of the Emergency Response Organization in response to Security Events at DAEC.
(2) Based on the national security events of 9/11/2001, a change in the way a nuclear facility prepares for, and responds to, security events is required. The NMC has taken steps to ensure the health and safety of its employees, and the safety of its nuclear facilities.
(2)
(3) This procedure is intended to be used in support of DAEC AOP 914 -
Based on the national security events of 9/11/2001, a change in the way a nuclear facility prepares for, and responds to, security events is required. The NMC has taken steps to ensure the health and safety of its employees, and the safety of its nuclear facilities.
    "SECURITY EVENTS", NMC CD 4.1 - "SECURITY THREATS", NMC SE-0018 "USECURITY THREAT ASSESSMENT", and NMC SE-0017 - "SECURITY THREAT NOTIFICATION".
(3)
This procedure is intended to be used in support of DAEC AOP 914 -
"SECURITY EVENTS", NMC CD 4.1 - "SECURITY THREATS", NMC SE-0018
" USECURITY THREAT ASSESSMENT", and NMC SE-0017 - "SECURITY THREAT NOTIFICATION".
2.0 DEFINITIONS The following definitions supplement those contained in the Quality Assurance Manual, Appendix B, 'Glossary of Terms".
2.0 DEFINITIONS The following definitions supplement those contained in the Quality Assurance Manual, Appendix B, 'Glossary of Terms".
(1) ATTACK (a) Actual physical attack on the site as designated by the site Security Shift Supervisor.
(1) ATTACK (a) Actual physical attack on the site as designated by the site Security Shift Supervisor.
Line 68: Line 129:
(3) THREAT OF ATTACK (a) Security has determined that a credible threat of attack on the site has been made. Security will assess the threat severity as high or low based on SE-0018, 'SECURITY THREAT ASSESSMENr.
(3) THREAT OF ATTACK (a) Security has determined that a credible threat of attack on the site has been made. Security will assess the threat severity as high or low based on SE-0018, 'SECURITY THREAT ASSESSMENr.


  ^EMERGE>NICY                                                 EPIP 2.8 Rev. 2 SECURITY THREAT Page 4 of 11 I
^EMERGE>NICY EPIP 2.8 Rev. 2 SECURITY THREAT Page 4 of 11 I
(4) SECURITY THREAT (a) Any notification from any source which is received at DAEC or NMC Corporate which could be considered as a threat to the safety of DAEC whether considered credible or not (5) HIGH THREAT SEVERITY                                                             V (a) The threat of physical attack to the plant represents a potential, substantial degradation of the level of safety of the plant.
(4) SECURITY THREAT (a) Any notification from any source which is received at DAEC or NMC Corporate which could be considered as a threat to the safety of DAEC whether considered credible or not (5) HIGH THREAT SEVERITY (a) The threat of physical attack to the plant represents a potential, substantial degradation of the level of safety of the plant.
(6) LOW THREAT SEVERITY (a) The threat of physical attack to the plant represents a potential degradation of the level of safety of the plant.
(6) LOW THREAT SEVERITY (a) The threat of physical attack to the plant represents a potential degradation of the level of safety of the plant.
(7) SECURITY DECISION MAKER (a) The senior NMC security person available to address the threat assessment (via NMC SE-0018). This will normally be the NMC Director of Security designee, and would next fall to the DAEC Security Manager, another site's Security Manager, and finally the Security Shift Supervisor (with the direct guidance of the Shift Manager).
(7) SECURITY DECISION MAKER (a) The senior NMC security person available to address the threat assessment (via NMC SE-0018). This will normally be the NMC Director of Security designee, and would next fall to the DAEC Security Manager, another site's Security Manager, and finally the Security Shift Supervisor (with the direct guidance of the Shift Manager).
V


EEDURE             EPIP 2.8 Rev. 2 SECURITY THREAT Page 5 of 11 3.0     INSTRUCTIONS 3.1     CREDIBILITY DETERMINATION (1) Credibility is determined in accordance with NMC SE-0018, Security Threat Assessment".
EEDURE EPIP 2.8 Rev. 2 SECURITY THREAT Page 5 of 11 3.0 INSTRUCTIONS 3.1 CREDIBILITY DETERMINATION (1) Credibility is determined in accordance with NMC SE-0018, Security Threat Assessment".
(a) IF the threat does not involve the potential for the degradation of the safety of the plant, an attempted entry into the protected area or attempted sabotage, THEN the threat is to be considered NON-CREDIBLE.
(a) IF the threat does not involve the potential for the degradation of the safety of the plant, an attempted entry into the protected area or attempted sabotage, THEN the threat is to be considered NON-CREDIBLE.
(b) IE the threat is determined to be CREDIBLE, THEN the Operations Shift Manager (OSM) will be immediately notified and recommended to classify the event as a NOTIFICATION OF UNUSUAL EVENT.
(b) IE the threat is determined to be CREDIBLE, THEN the Operations Shift Manager (OSM) will be immediately notified and recommended to classify the event as a NOTIFICATION OF UNUSUAL EVENT.
3.2     SEVERITY DETERMINATION (1) Following the above determination of Credibility, the Security Decision Maker will also perform an assessment of the threat's severity in accordance with NMC SE-0018.
3.2 SEVERITY DETERMINATION (1) Following the above determination of Credibility, the Security Decision Maker will also perform an assessment of the threat's severity in accordance with NMC SE-0018.
3.2.1 CREDIBLE THREAT OF HIGH SEVERITY (1)   IF the threat assessment determines that it is a CREDIBLE THREAT of HIGH Severity as determined by NMC SE-0018, "Security Threat Assessment",
3.2.1 CREDIBLE THREAT OF HIGH SEVERITY (1)
IF the threat assessment determines that it is a CREDIBLE THREAT of HIGH Severity as determined by NMC SE-0018, "Security Threat Assessment",
THEN the OSM will be notified to consider re-classifying the event as an ALERT per AOP 914, "Security Emergency' and EPIP 1.1, "Determination of Emergency Action Levels".
THEN the OSM will be notified to consider re-classifying the event as an ALERT per AOP 914, "Security Emergency' and EPIP 1.1, "Determination of Emergency Action Levels".
(a) If an attack Is in progress, or is imminent, make the plant page announcement in accordance with AOP 914, "Security Emergency".
(a) If an attack Is in progress, or is imminent, make the plant page announcement in accordance with AOP 914, "Security Emergency".
Line 83: Line 146:
(2) Inform the State and County's in accordance with EPIP 1.2, "Notifications".
(2) Inform the State and County's in accordance with EPIP 1.2, "Notifications".
(3) Activate all EOF and JPIC ERO pagers in accordance with Attachment 2,
(3) Activate all EOF and JPIC ERO pagers in accordance with Attachment 2,
          'Security Event - ERO Alphanumeric Paging System Callout"
'Security Event - ERO Alphanumeric Paging System Callout"
 
:EMERGE-cY PLAN IMPLEME ENTINP EPIP 2.8 Rev. 2 SECURITY THREAT Page 6 of _1 l
:EMERGE-cY PLAN IMPLEME                                         EPIP 2.8 ENTINP Rev. 2 SECURITY THREAT Page 6 of_1        l (4) If off-hours, activate all EOF and JPIC ERO responders in accordance with Attachment 3, "Security Event - Phone System Callout".
(4)
(5) Notify the Plant Manager, or Emergency Coordinator as applicable, to respond to the Control Room to facilitate communication as the OSM may be involved with placing the plant in a safe condition.
If off-hours, activate all EOF and JPIC ERO responders in accordance with, "Security Event - Phone System Callout".
(6) Verify that Local Law Enforcement has been contacted ancq informed that the EOF and JPIC is being activated to coordinate management communications.
(5)
(7) Inform the NRC ENS in accordance with EPIP 1.2, 'Notifications".
Notify the Plant Manager, or Emergency Coordinator as applicable, to respond to the Control Room to facilitate communication as the OSM may be involved with placing the plant in a safe condition.
(8) Work with DAEC and NMC Management to determine what activities are essential and what personnel are needed to support the site.
(6)
(a)     If additional resources are needed to augment existing Operations staff, then refer to step 3.1.4, "Staff Augmentation" 3.2.2 CREDIBLE THREAT OF LOW SEVERITY (1) IF the threat assessment determines that it is a CREDIBLE THREAT of LOW Severity as determined by NMC SE-0018, 'Security Threat Assessment",
Verify that Local Law Enforcement has been contacted ancq informed that the EOF and JPIC is being activated to coordinate management communications.
(7)
Inform the NRC ENS in accordance with EPIP 1.2, 'Notifications".
(8)
Work with DAEC and NMC Management to determine what activities are essential and what personnel are needed to support the site.
(a)
If additional resources are needed to augment existing Operations staff, then refer to step 3.1.4, "Staff Augmentation" 3.2.2 CREDIBLE THREAT OF LOW SEVERITY (1)
IF the threat assessment determines that it is a CREDIBLE THREAT of LOW Severity as determined by NMC SE-0018, 'Security Threat Assessment",
THEN the OSM will be notified. The event should remain as an UNUSUAL EVENT per AOP 914, uSecurity Emergency" and EPIP 1.1, 'Determination of Emergency Action Levels".
THEN the OSM will be notified. The event should remain as an UNUSUAL EVENT per AOP 914, uSecurity Emergency" and EPIP 1.1, 'Determination of Emergency Action Levels".
(a)     Make the plant page announcement in accordance with Attachment 1, "Site Evacuation Announcement for Security Events".
(a) Make the plant page announcement in accordance with Attachment 1, "Site Evacuation Announcement for Security Events".
(2) Inform the State and County's in accordance with EPIP 1.2, 'Notifications".
(2)
(3) Activate all EOF and JPIC ERO pagers in accordance with Attachment 2,
Inform the State and County's in accordance with EPIP 1.2, 'Notifications".
        'Security Event - ERO Alphanumeric Paging System Callout" (4)   If off-hours, activate all EOF and JPIC ERO responders in accordance with Attachment 3, "Security Event - Phone System Callout".
(3)
(5) Verify that Local Law Enforcement has been contacted and informed that the EOF and JPIC is being activated to coordinate management communications.
Activate all EOF and JPIC ERO pagers in accordance with Attachment 2,
(6)   Inform the NRC ENS in accordance with EPIP 1.2, "Notifications".
'Security Event - ERO Alphanumeric Paging System Callout" (4)
(7)   If the threat escalates, then reclassify and go to Section 3.2.1.
If off-hours, activate all EOF and JPIC ERO responders in accordance with, "Security Event - Phone System Callout".
(5)
Verify that Local Law Enforcement has been contacted and informed that the EOF and JPIC is being activated to coordinate management communications.
(6)
Inform the NRC ENS in accordance with EPIP 1.2, "Notifications".
(7)
If the threat escalates, then reclassify and go to Section 3.2.1.


EME               LAN IMPLMNT             R                   EPIP 2.8 Rev. 2 SECURITY THREAT Page 7 of 11 I
EME LAN IMPLMNT R
EPIP 2.8 Rev. 2 SECURITY THREAT Page 7 of 11 I
(8) Work with DAEC and NMC Management to determine what activities are essential and what personnel are needed to support the site.
(8) Work with DAEC and NMC Management to determine what activities are essential and what personnel are needed to support the site.
(a) If additional resources are needed to augment existing Operations staff, then refer to step 3.1.4, "Staff Augmentation" 3.3   FOLLOW-UP ACTIONS I
(a) If additional resources are needed to augment existing Operations staff, then refer to step 3.1.4, "Staff Augmentation" 3.3 FOLLOW-UP ACTIONS (1) If the security threat is resolved, then enter the appropriate EPIPs to reclassify the event, or terminate the event, as applicable.
(1) If the security threat is resolved, then enter the appropriate EPIPs to reclassify the event, or terminate the event, as applicable.
3.4 STAFF AUGMENTATION (1) The OSM/ER&RD has the authority to augment the response staff as necessary to ensure adequate resources are available to assist Operations in maintaining, or restoring, the safe condition of the plant. A section has been added to the Emergency Telephone Book (ETB) to assist in determining who on-site has previous Operations experience, or other critical experience, which could assist Operations.
3.4   STAFF AUGMENTATION (1) The OSM/ER&RD has the authority to augment the response staff as necessary to ensure adequate resources are available to assist Operations in maintaining, or restoring, the safe condition of the plant. A section has been added to the Emergency Telephone Book (ETB) to assist in determining who on-site has previous Operations experience, or other critical experience, which could assist Operations.
(a) This new section of the ETB has been organized based on the following skill sets:
(a) This new section of the ETB has been organized based on the following skill sets:
: 1. Operations
: 1. Operations
Line 112: Line 188:
: d. Severe Accident Management (SAM)
: d. Severe Accident Management (SAM)
: 2. Fire Brigade
: 2. Fire Brigade
: 3. First Aid
: 3. First Aid I
: 4. SCBA
: 4. SCBA


  -EMEREN       PLAN iMP E       TiL                       EPIP 2.8 Rev. 2 SECURITY THREAT Page 8 of 11 I
-EMEREN PLAN iMP E TiL EPIP 2.8 Rev. 2 SECURITY THREAT Page 8 of 11 I
4.0   RECORDS (1) This procedure does not generate any records.
4.0 RECORDS (1) This procedure does not generate any records.
 
==5.0    REFERENCES==


==5.0 REFERENCES==
(1) NMC CD 4.1, 'Security Threats" '
(1) NMC CD 4.1, 'Security Threats" '
(2) NMC SE-0018, -Security ThreatAssessment" (3) NMC SE-001 7, "SecurityThreatNoffication" (4) AOP 914, 'Security Events" (5) EPIP 1.1, 'Determination of EmergencyAction Levels' 6.0   ATTACHMENTS (1) Attachment 1, 'Security Event - Site Evacuation Announcement-(2) Attachment 2, 'Security Event - ERO Alphanumeric Paging System Callout" (3) Attachment 3, 'Security Event - Phone System Callout"
(2) NMC SE-0018, -Security ThreatAssessment" (3)
NMC SE-001 7, "Security Threat Noffication" (4) AOP 914, 'Security Events" (5) EPIP 1.1, 'Determination of EmergencyAction Levels' 6.0 ATTACHMENTS (1) Attachment 1, 'Security Event - Site Evacuation Announcement-(2) Attachment 2, 'Security Event - ERO Alphanumeric Paging System Callout" (3) Attachment 3, 'Security Event - Phone System Callout"


;                    4EMERG PNET                       -GRE             EPIP 2.8 Rev. 2 SECURITY THREAT Page 9 of 11 I
4EMERG PNET  
ATTACHMENT I SECURITY EVENT - SITE EVACUATION ANNOUNCMENT (1)   Ensure to turn on the outside speakers (2) Activate Evacuation Alarm (3)   Make the following page announcement:
-GRE EPIP 2.8 Rev. 2 SECURITY THREAT Page 9 of 11 I
T Attention  all personnel. Attention all personnel. A security threat exists.
ATTACHMENT I SECURITY EVENT - SITE EVACUATION ANNOUNCMENT (1)
Place all essential activities in a safe condition. All EOF personnel assemble at the EOF. All JPIC personnel report to the JPIC.
Ensure to turn on the outside speakers (2)
Activate Evacuation Alarm (3)
Make the following page announcement:
TAttention all personnel. Attention all personnel. A security threat exists.
Place all essential activities in a safe condition.
All EOF personnel assemble at the EOF.
All JPIC personnel report to the JPIC.
Operations and Fire Brigade personnel assemble in the Control Room.
Operations and Fire Brigade personnel assemble in the Control Room.
All other personnel evacuate the site."
All other personnel evacuate the site."
(4)   Repeat steps (2) and (3). (i.e., make announcement twice)
(4)
Repeat steps (2) and (3). (i.e., make announcement twice)


EERGENCY PA           PLEMENTIN     RCEUE               EPIP 2.8 Rev. 2 SECURITY THREAT Page 10 of 11 I
EERGENCY PA PLEMENTIN RCEUE EPIP 2.8 Rev. 2 SECURITY THREAT Page 10 of 11 I
ATTACHMENT 2 SECURITY EVENT - ERO ALPHANUMERIC PAGING SYSTEM CALLOUT (1) Alphanumeric Pagers - Complete this sequence on the AlphaMate 250.
ATTACHMENT 2 SECURITY EVENT - ERO ALPHANUMERIC PAGING SYSTEM CALLOUT (1)
Alphanumeric Pagers - Complete this sequence on the AlphaMate 250.
Terminal Prompts are given: operator responses are in bold.
Terminal Prompts are given: operator responses are in bold.
(a) Ensure the AlphaMate 250 is turned ON.
(a)
(b) Press the PAGE key (top row, left)
Ensure the AlphaMate 250 is turned ON.
(c) ENTER NAME OR NUMBER: key in SECURITY THREAT, press ENTER.
(b)
(d) ENTER MESSAGE (OR CANNED MESSAGE NUMBER): key in "Security threat exists at DAEC. Please report to the EOFIJPIC Immediately" press ENTER.
Press the PAGE key (top row, left)
                                    -OR-(e) ENTER MESSAGE (OR CANNED MESSAGE NUMBER):                   key in `@4",
(c)
ENTER NAME OR NUMBER: key in SECURITY THREAT, press ENTER.
(d)
ENTER MESSAGE (OR CANNED MESSAGE NUMBER): key in "Security threat exists at DAEC. Please report to the EOFIJPIC Immediately" press ENTER.
-OR-(e) ENTER MESSAGE (OR CANNED MESSAGE NUMBER):
key in `@4",
press ENTER, press ENTER (f) The AlphaMate 250 will dial the central computer and display the following, OFFHOOK, CONNECTING, CONNECTED, SENDING MESSAGE, DISCONNECTING, PAGE SENT. Watch the AlphaMate 250 for these indicators.
press ENTER, press ENTER (f) The AlphaMate 250 will dial the central computer and display the following, OFFHOOK, CONNECTING, CONNECTED, SENDING MESSAGE, DISCONNECTING, PAGE SENT. Watch the AlphaMate 250 for these indicators.


EMERGECY   PLA IMPLMENTINJl EPIP 2.8 Rev. 2 SECURITY THREAT Page 11 of 11 ATTACHMENT 3 SECURITY EVENT     - PHONE SYSTEM CALLOUT To initiate a call-out on the AVS1 00 System in response to a security threat, conduct the following using a touch-tone phone:
EMERGECY PLA IMPLMENTINJl EPIP 2.8 Rev. 2 SECURITY THREAT Page 11 of 11 ATTACHMENT 3 SECURITY EVENT - PHONE SYSTEM CALLOUT To initiate a call-out on the AVS1 00 System in response to a security threat, conduct the following using a touch-tone phone:
(1) Call into the AVS100 system by dialing 786-7200.
(1) Call into the AVS100 system by dialing 786-7200.
(2) To log on press # after hearing the initial greeting.
(2)
(3) When asked for your mailbox enter       *    (do not press the # key)
To log on press # after hearing the initial greeting.
(4) When asked for your security code enter         *  (do not press the # key)
(3)
(5) When you hear the system prompt "to send a broadcast press 2', press 2 (do not press the # key).
When asked for your mailbox enter (do not press the # key)
(6) When asked for the " primary list " enter 2006 (do not press the # key).
(4)
(7) When prompted to enter another list or press #, press #
When asked for your security code enter (do not press the # key)
(8) When asked for what Broadcast type press 1 (do not press the # key).
(5)
(9) When prompted Press # to continue (10) Press 2 for quick delivery (11) When asked for type of delivery press I (do not press the # key) for immediate delivery.
When you hear the system prompt "to send a broadcast press 2', press 2 (do not press the # key).
(6)
When asked for the " primary list " enter 2006 (do not press the # key).
(7)
When prompted to enter another list or press #, press #
(8)
When asked for what Broadcast type press 1 (do not press the # key).
(9)
When prompted Press # to continue (10) Press 2 for quick delivery (11) When asked for type of delivery press I (do not press the # key) for immediate delivery.
(12) Listen to the system read your selections back to you. Confirm that you have selected the voice broadcast to list 2006 and the broadcast is for immediate delivery by pressing #.
(12) Listen to the system read your selections back to you. Confirm that you have selected the voice broadcast to list 2006 and the broadcast is for immediate delivery by pressing #.
(13) If your selections are not correct press *, then press 9, then press # to start over at number 4.
(13) If your selections are not correct press *, then press 9, then press # to start over at number 4.
Line 157: Line 254:


SYSTEM STATUS BOARD DATEITIME UPDATED:
SYSTEM STATUS BOARD DATEITIME UPDATED:
Y   t           V             P~~~~~~~~~~~~~~~~~~~~~~~~~-
Y t
RODS REACTIITY                                                   .1.
V P~~~~~~~~~~~~~~~~~~~~~~~~~-
-I                     BORON I                               I           .1 RHR SDC 6.
RODS REACTIITY
RHRCS RHR TC RHR LPCI SAFETY SYSTEMS CORE SPRAY 'A' CORE SPRAY 'B' HPCI RCIC
.1.
: 6.                 6.                       i STARTUP STANDBY AUX lAl ELECTRICAL SYSTEMS        1A2 1A3 1A4 DIESEL 'A' DIESEL 'B' COND 'A' COND 'B' FDWIR 'A' NORMAL MAKEUP FDWTR 'B' CRD 'A' CRD 'B' RELEASE         SBGT 'A MONITORING/       SBGT 'B' FILTERING___I__
-I BORON I
I  
.1 RHR SDC 6.
RHRCS SAFETY SYSTEMS RHR TC RHR LPCI CORE SPRAY 'A' CORE SPRAY 'B' HPCI RCIC
: 6.
: 6.
i STARTUP ELECTRICAL SYSTEMS STANDBY AUX lAl 1A2 1A3 1A4 DIESEL 'A' DIESEL 'B' COND 'A' COND 'B' FDWIR 'A' NORMAL MAKEUP FDWTR 'B' CRD 'A' CRD 'B' RELEASE SBGT 'A MONITORING/
SBGT 'B' FILTERING___I__
EOF-30 Rev.}}
EOF-30 Rev.}}

Latest revision as of 08:19, 16 January 2025

Transmittal of Emergency Plan Implementing Procedures
ML032170615
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/28/2003
From:
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML032170615 (20)


Text

@~ R NMC)

Committed to Nuclear Excellence DAEC EMERGENCY PLANNING DEPARTMENT PROCEDURE TRANSMITTAL ACKNOWLEDGEMENT MEMO (TAM-47)

To:

NRC-NRR Document Control Desk US NRC Washington DC 20555 Re:

Entire EPIP Document (Copy 28)

PSM

Title:

n/a Distribution Date:

Effective Date of Change:

Return by:

07 /28 /2003 07/30/2003 08/18/2003 Please perform the following to your assigned manual. If you have any questions regarding this TAM please contact Don A. Johnson at 319-851-7872.

REMOVE Rev. 137 EPIP Table of Contents Revision INSERT Rev. 138 Rev. 2 Rev. 1 EPIP 2.8 (PWR: 21881)

Rev. 1 EPIP EOF-30 (PWR: 21821)

Rev. 0 PERFORMED BY:

Print Name Please return to:

Sign Name Date K. Dunlap PSC/Emergency Planning 3313 DAEC Rd.

Palo, IA 52324 To be completed by DAEC EP personnel only:

Date TAM retumed:

EPTools updated:

p&A

-;EMEiRGEN>NCY IMPLMEN INGX PROCEDU Ei-Rv 3 INDEX

~~~~PAGE 1 of 7 Procedure Title Revision Date Number 1.1 Determination of Emergency Action Levels 19 09/12/01 1.2 Notification 28 4/4/03 1.3 Plant Assembly and Site Evacuation 9

09/12101 1.4 Release of Emergency-Related Information 4

09/04/02 1.5 Activation and Operation of the EOF 4

6/11/03 2.1 Activation and Operation of the OSC 13 09112/01 2.2 Activation and Operation of the TSC 23 10123/02 2.3 Operation of the FTS-2001 Phone Network 6

09/04/02 2.4 Activation and Operation of the ORAA 8

09112/01 2.5 Control Room Emergency Response Operation 14 10/15/01 2.6 Activation and Operation of the ORAL 9

12/30/02 2.7 Activation and Operation of the ODEF 6

10/15/01 2.8 Security Threat 2

7/30/03 3.1 In-Plant Radiological Monitoring 12 9/2/02 3.2 Field Radiological Monitoring 13 912/02 3.3 Dose Assessment and Protective Action 19 6/25/03 4.2 First Aid, Decontamination and Medical Support 7

8/23/02 4.3 Rescue and Emergency Repair Work 11 8/23/02 4.5 Administration of Potassium Iodide (KI) 7 2/10/03 5.2 Recovery and Re-entry 9

10/15/01 I

C---EMERGENC PLAMIMPLEMENT.NGM01 iCEDURE&V:i-Rev. 138 INDEX PAGE 2 of 7 Form Title Revision Referencing Number Number Procedure CR-01 OSM/OSS Checklist Rev. 2 EPIP 2.5 CR-02 Back Panel Communicator Checklist Rev. 1 EPIP 2.5 CR-03 Dose Projection & ARM Data Sheet Rev. 0 EPIP 2.5 CR-04 Control Room to TSC Command and Control Rev. 1 EPIP 2.5 Transfer Checklist EAL-01 Abnormal Rad Levels/Radioactive Effluent Table Rev. 3 EPIP 1.1 EAL-02 Fission Barrier Table Rev. 3 EPIP 1.1 EAL-03 Hazards & Other Conditions Affecting Plant Safety Rev. 2 EPIP 1.1 EAL-04 System Malfunction Table Rev. 3 EPIP 1.1 EOF - 02 NRC - HPN Communicator Checklist Rev. 3 EPIP 1.5 EOF - 03 Technical Recorder Checklist Rev. 2 EPIP 1.5 EOF - 04 Summary of Computer Data Backup Collection Rev. 1 EPIP 1.5 Activities EOF - 05 EOF Information Services Representative Checklist Rev. 3 EPIP 1.5 EOF - 06 DAEC Key Parameter Log Rev. 0 EPIP 1.5 EOF - 07 Emergency Response and Recovery Director Rev. 4 EPIP 1.5 Checklist EOF - 08 Rad & EOF Manager Checklist Rev. 6 EPIP 1.5, 3.3 EOF - 09 EOF STA/OPS Liaison Checklist Rev. 0 EPIP 1.5 EOF -10 EOF-TSC Communicator Checklist Rev. 3 EPIP 1.5 EOF - 11 Support Services Coordinator Checklist Rev. 3 EPIP 1.5 EOF -12 Field Team Director Checklist Rev. 0 EPIP 1.5,3.3 EOF -13 Radiological Data Communicator Checklist Rev. 0 EPIP 1.5,3.3

..AI--EMERGE;,liFi~IPl;MNI~TFQE3URRt.l.

Rev. 138

\\

~~~~~~~~INDEX PAGE 3 of 7 EOF - 14 EOF MIDAS Operator Checklist Rev. 1 EPIP 1.5, 3.3 EOF - 15 Radiological Data Plotter Checklist Rev. 0 EPIP 1.5, 3.3 EOF - 16 Radiological Assessment Coordinator Checklist Rev. 1 EPIP 1.5, 3.3 EOF - 17 EOF Security Access Clerk Checklist Rev. 2 EPIP 1.5 EOF -18 EOF Stalling Accountability Roster Rev. 3 EPIP 1.5 EOF - 19 Drill Announcement Message Rev. 0 EPIP 1.4,1.5 EOF -20 Emergency Announcement Message Rev. 1 EPIP 1.4,1.5 EOF - 21 Personnel Access Log Rev. 1 EPIP 1.4,1.5 EOF -22 Registration Form Rev. 0 EPIP 14,1.5 EOF -23 Security Post Log Rev. 2 EPIP 1.4,1.5 EOF -24 First Floor Security Post Description Rev. 2 EPIP 1.4,1.5 EOF-25 Fourteenth Floor Security Post Description Rev. I I EPIP 1.5 EOF -27 Status Update Message - EOF Communicator Rev. 0 EPIP 1.5 EOF -28 Verbal Closeout Summary Rev. 0 EPIP 1.5 EOP -29 Written Closeout Summary Rev. 0 EPIP 1.5 EOF-30 Status Board Rev. 1 EPIP 1.5 EOF -31 Access B adge Example Rev. 0 EPIP 1.5 EOF - 32 EOF Staff Response Rev. 3 EPIP.15 EOF - 33 Recovery Issues Rev. 0 EPIP 5.2 EOF - 34 EOF Activities Rev. 0 EPIP 5.2 EOF-35 Recovery Phase Plan Outline Guidance Rev. 0 EPIP.52 EOF - 36 RE-Entry Briefing Guide Rev.0 EPIP 5.2 EOF -37 RE-Entry Debriefing Guide Rev. 0 EPIP 5.2 EOF - 38 EOF Messenger Checklist Rev. 1 EPIP 1.5 ERO - 01 ERO Position Equivalency Table Rev. 0 EPIP 1.5 JPIC - 01 JPIC Manager Checklist Rev. 4 EPIP 1.4 JPIC - 03 Alliant Spokesperson Checklist Rev. 3 EPIP 1.4 I

iig-lMER{GENCYPlANIiMPLgEMENTIiNGilCEiiESi-i Rev. 13 U

. INDEX

~~~~~~~~~PAGE 4 of 7 JPIC - 04 Technical Liaison Checklist Rev. 4 EPIP 1.4 JPIC - 05 Sequence of Events Rev. 0 EPIP 1.4 JPIC - 06 Public Information Officer Support Checklist Rev. 5 EPIP 1.4 JPIC -07 Logistics Coordinator Checklist Rev. 4 EPIP 1.4 JPIC -08 Logistics Support Checklist Rev. 4 EPIP 1.4 JPIC - 09 Audiovisual Support Checklist Rev. 4-EPIP 1.4 JPIC - 11 Rumor Control Coordinator I Checklist Rev. 3 EPIP 1.4 JPIC - 12 Rumor Control Event Summary Log Rev. 1 EPIP 1.4 JPIC - 13 Rumor Control Coordinator II Checklist Rev. 2 EPIP 1.4 JPIC - 14 Public Rumor Control Checklist Rev. 2 EPIP 1.4 JPIC -15 News Media Rumor Control Checklist Rev. 4 EPIP 1.4 JPIC -16 Assistant JPIC Manager Checklist Rev. 3 EPIP 1.4 JPIC -17 JPIC Security Access Control Checklist Rev. 3 EPIP 1.4 JPIC - 18 Sixth Floor Security Post Description Rev. 2 EPIP 1.4 JPIC - 19 JPIC D)istribution List Rev. 2 EPIP 1.4 NOTE-01 ERO Notification -Phone System Callout Rev. 4 EPIP 1.2 NOTE-02 ERO Notification - Alphanumeric Paging System Rev. 3 EPIP 1.2 Callout NOTE-03 Event Notification Worksheet Rev. 1 EPIP 1.2 NOTE-04 Plant Assembly Notification Rev. 2 EPIP 1.2 NOTE-05 Emergency Action Level Notification Rev. 6 EPIP 1.2 NOTE-06 Plant Page for Emergency Classification Changes Rev. 1 EPIP 1.2 NOTE-07 Basic Notification Flowpath Rev. 1 EPIP 1.2 ODEF-01 ODEF Decontamination Waiting Area Rev. 0 EPIP 2.7 ODEF-02 Floor Plan for ORAIJODEF Rev. 0 EPIP 2.7 ODEF-03 Travel Route to ORAIJODEF Rev. 0 EPIP 2.7 ODEF-04 12 Avenue Entrance to ORAIJODEF Rev. 0 EPIP 2.7 ORAA-01 Offsite Relocation and Assembly Area Supervisor's Rev. 1 EPIP 2.4

k

-.:. g..EME'RG.E'N..Y-PLA P>t-IRLE.ME NT N

,,RO

,,EDURESC, Rev. 138 INDEX

~~~~PAGE 5 of 7 Checklist ORAA-02 Health Physics Support for the Offsite Relocation Rev. 0 EPIP 2.4 and Assembly Area ORAA-03 Security Support for the Offsite Relocation and Rev. 0 EPIP 2.4 Assembly Area ORAA-04 Offsite Relocation and Assembly Area Rev. 0 EPIP 2.4 ORAA-05 Offsite Relocation and Assembly Area Parking and Rev. 0 EPIP 2.4 Vehicle Monitoring OSC-01 OSC Layout Rev. 0 EPIP 2.1 OSC-02 OSC Organization Chart Rev. 0 EPIP 2.1 OSC-03 Minimum Staffing Level Rev. 1 EPIP 2.1 OSC-04 Recommended Log Entry Topics Rev. 0 EPIP 2.1 OSC-05 Emergency Event Log Sheet Rev. 0 EPIP 2.1 OSC-06 Personal Statement Concerning Incident Rev. 0 EPIP 2.1 OSC-07 Emergency Exposure Tracking Log Rev. 0 EPIP 2.1 OSC-08 OSC Supervisor Checklist Rev. 0 EPIP 2.1 OSC-09 Health Physics Supervisor Checklist Rev. 0 EPIP 2.1 OSC-10 Electrical, Mechanical, I&C Maintenance Rev. 0 EPIP 2.1 Supervisor Checklist OSC-1 1 Emergency Assignment Staffing Board Duties Rev. 0 EPIP 2.1 OSC-12 External Exposure Limits Rev. 0 EPIP 4.3 OSC-13 Guidance on Dose Limits for Workers Performing Rev. 0 EPIP 4.3 Emergency Services OSC-14 Guidelines Regarding Selection of Volunteers Rev. 0 EPIP 4.3 OSC-15 OSC Repair Team Work Order Rev. 0 EPIP 4.3 OSC-16 Repair Team Datasheet Flowpath Rev. 0 EPIP 4.3 PAR-01 PAR Decision Making - Recommendations Rev. 0 EPIP 3.3 PAR- 02 PAR Decision Making - Flowchart Rev. 0 EPIP 3.3 PASE-02 OnieAsml oain e.2EI t

PASE-02 Onsite Assembly Locations Rev. 2 EPIP 1.3

[ EMERGENCY.PLANIMPLEMENTING-PROCEDURES:;

Rev. 138 INDEXC PAGE 6 of 7 PASE-05 Site Evacuation Routes Rev. 1 EPIP 1.3 SAM-01 EOP-SAG Transition Checklist Rev. 0 EPIP 2.2 TSC-01 Emergency Coordinator Checklist Rev. 3 EPIP 2.2 TSC-02 TSC Supervisor Checklist Rev. 2 EPIP 2.2 TSC-03 Site Radiation Protection Coordinator Checklist Rev. 1 EPIP 2.2 TSC-04 Technical & Engineering Supervisor Checklist Rev. 3 EPIP 2.2 TSC-05 Quality Assurance Checklist Rev. 1 EPIP 2.2 TSC-06 Security & Support Supervisor Checklist Rev. 1 EPIP 2.2 TSC-07 Administrative Supervisor Checklist Rev. 1 EPIP 2.2 TSC-08 Material Management Supervisor Checklist Rev. 1 EPIP 2.2 TSC-09 TSC-CR-OSC Communicator Checklist Rev. 2 EPIP 2.2 TSC-10 CR-TSC-OSC Communicator Checklist Rev. 2 EPIP 2.2 TSC-1 1 TSC-EOF-JPIC Communicator Checklist Rev. 1 EPIP 2.2 TSC-12 ENS Communicator Checklist Rev. 2 EPIP 2.2 TSC-13 EPN Communicator Checklist Rev. I EPIP 2.2 TSC-14 TSC/OSC Operations Liaison Checklist Rev. 2 EPIP 2.2 TSC-15 Radiological Support Staff Checklist Rev. 1 EPIP 2.2 TSC-16 Radio Operator.- Offsie Checklist Rev. 0 EPIP 2.2 TSC-17 Radio Operator - Onsite Checklist Rev. 0 EPIP 2.2 TSC-18 TSC MIDAS Operator Checklist Rev. 0 EPIP 2.2 TSC-19 Technical & Analysis Engineer Checklist Rev. 1 EPIP 2.2 TSC-20 TSC Operations Supervisor Rev. 2 EPIP 2.2 TSC-21 Eleciical Engineer Checklist Rev. 0 EPIP 2.2 TSC-22 I & C Engineer Checklist Rev. 0 EPIP 2.2 TSC-23 Mechanical Engineer Checklist Rev. 0 EPIP 2.2 TSC-24 Reactor Engineer Checklist Rev. 2 EPIP 2.2 TSC-25 SPDS Operator Checklist Rev. 1 EPIP 2.2

.k

.EM IML

-EP0' E R.E N a;.

Y I

';. P LEME.N.T IN.G.-P.R W

C R

E E

0- R e v. 13 8 INDEX PAGE 7 of 7 TSC-26 Information Services Representative Checklist Rev. 2 EPIP 2.2 TSC-27 Fire Marshall Checklist Rev. I EPIP 2.2 TSC-28 NRC Roles During A Nuclear Power Plant Rev. 0 EPIP 2.2 Emergency Checklist TSC-29 TSC Minimum Staffing Level Rev. 2 EPIP 2.2 TSC-30 Emergency Action Request Log Rev. 0 EPIP 2.2 TSC-31 Radio Operator Log Rev. 0 EPIP 2.2 TSC-32 Status Board Recorder Rev. I EPIP 2.2 TSC-33 Typical Organization of the NRC Site Team Rev. 0 EPIP 2.2 TSC-34 TSC Organization Chart Rev. 3 EPIP 2.2 TSC-35 Assignment Form Rev. 0 EPIP 5.2 TSC-36 Deactivation Report Rev. 0 EPIP 5.2 TSC-37 Plant Operations Status Rev. 0 EPIP 5.2 TSC-38 TSC/Control RoomlOSC Activities Rev. 0 EPIP 5.2 TSC-39 TSC Clerical Checklist Rev. 0 EPIP 2.2 TSC-40 ARM Locations Rev. 0 EPIP 3.1/4.3 TSC-41 PASS Capabilities Rev. 0 EPIP 3.1 TSC-42 On-Site Map Rev. 0 EPIP 3.2 TSC-43 ESB Logon Instructions (TSC/CR/EOF)

Rev. 0 EPIP 2.2

0;f EMERGENCY PLAN

MPLEMENTING PRlc~DEPIP 2.8 Rev. 2 SECURITY THREAT Page 1 of 11 Effective Date:

o4

/03

,TECHNICAL, RE.V. EW Prepared by:

Date: 7/,tg /03 Reviewed by:

Date:

-1Ste I depe ent Reviewer PROCESS :REVIE

= r

. r. r

... r.

r r.

r.

Reviewed by:

Date:

-7 Oprations Manager Reviewed by:

Date: 7,29YZi2 5nSecurity Manager PROCEDURE APPROVIAL I am responsible for the technical content of this procedure.

Approved by:

7 Date: ?A/O S Manager, Emergency Planning

EPIP 2.8 Rev. 2 SECURITY THREAT Page 2 of 11 Table of Contents Pane 1.0 PURPOSE......................................................

3 2.0 DEFINITIONS......................................................

3 3.0 INSTRUCTIONS......................................................

5 3.1 CREDIBILITY DETERMINATION

.................................... 5 3.2 SEVERITY DETERMINATION...................................

5 3.2.1 CREDIBLE THREAT OF HIGH SEVERITY.......................... 5 3.2.2 CREDIBLE THREAT OF LOW SEVERITY........................... 6 3.3 FOLLOW-UP ACTIONS...................................

7 3.4 STAFF AUGMENTATION...................................

7 4.0 RECORDS......................................................

8

5.0 REFERENCES

...................................................... 8 6.0 ATTACHMENTS......................................................

8 ATT 1, 'SECURITY EVENT-SITE EVACUATION ANNOUNCEMENT'.... 9 ATT 2, 'SECURITY EVENT - ERO ALPHANUMERIC PAGING SYSTEM CALLOUr................................10

........................................ 10 ATT 3, -SECURITY EVENT-PHONE SYSTEM CALLOUT...................... 11

EMERGENCY PLAN~e IMPLEMENTING PRO CURE EPIP 2.8 Rev. 2 SECURITY THREAT Page 3 of 11 I

1.0 PURPOSE (1) This procedure provides instructions for the activation of the Emergency Response Organization in response to Security Events at DAEC.

(2)

Based on the national security events of 9/11/2001, a change in the way a nuclear facility prepares for, and responds to, security events is required. The NMC has taken steps to ensure the health and safety of its employees, and the safety of its nuclear facilities.

(3)

This procedure is intended to be used in support of DAEC AOP 914 -

"SECURITY EVENTS", NMC CD 4.1 - "SECURITY THREATS", NMC SE-0018

" USECURITY THREAT ASSESSMENT", and NMC SE-0017 - "SECURITY THREAT NOTIFICATION".

2.0 DEFINITIONS The following definitions supplement those contained in the Quality Assurance Manual, Appendix B, 'Glossary of Terms".

(1) ATTACK (a) Actual physical attack on the site as designated by the site Security Shift Supervisor.

(2) ATTACK ON U.S. SOIL (a) Security has received credible information that an attack is underway in the U.S. This may involve attacks on other nuclear plants for which a threat of attack on an NMC site has not been confirmed.

(3) THREAT OF ATTACK (a) Security has determined that a credible threat of attack on the site has been made. Security will assess the threat severity as high or low based on SE-0018, 'SECURITY THREAT ASSESSMENr.

^EMERGE>NICY EPIP 2.8 Rev. 2 SECURITY THREAT Page 4 of 11 I

(4) SECURITY THREAT (a) Any notification from any source which is received at DAEC or NMC Corporate which could be considered as a threat to the safety of DAEC whether considered credible or not (5) HIGH THREAT SEVERITY (a) The threat of physical attack to the plant represents a potential, substantial degradation of the level of safety of the plant.

(6) LOW THREAT SEVERITY (a) The threat of physical attack to the plant represents a potential degradation of the level of safety of the plant.

(7) SECURITY DECISION MAKER (a) The senior NMC security person available to address the threat assessment (via NMC SE-0018). This will normally be the NMC Director of Security designee, and would next fall to the DAEC Security Manager, another site's Security Manager, and finally the Security Shift Supervisor (with the direct guidance of the Shift Manager).

V

EEDURE EPIP 2.8 Rev. 2 SECURITY THREAT Page 5 of 11 3.0 INSTRUCTIONS 3.1 CREDIBILITY DETERMINATION (1) Credibility is determined in accordance with NMC SE-0018, Security Threat Assessment".

(a) IF the threat does not involve the potential for the degradation of the safety of the plant, an attempted entry into the protected area or attempted sabotage, THEN the threat is to be considered NON-CREDIBLE.

(b) IE the threat is determined to be CREDIBLE, THEN the Operations Shift Manager (OSM) will be immediately notified and recommended to classify the event as a NOTIFICATION OF UNUSUAL EVENT.

3.2 SEVERITY DETERMINATION (1) Following the above determination of Credibility, the Security Decision Maker will also perform an assessment of the threat's severity in accordance with NMC SE-0018.

3.2.1 CREDIBLE THREAT OF HIGH SEVERITY (1)

IF the threat assessment determines that it is a CREDIBLE THREAT of HIGH Severity as determined by NMC SE-0018, "Security Threat Assessment",

THEN the OSM will be notified to consider re-classifying the event as an ALERT per AOP 914, "Security Emergency' and EPIP 1.1, "Determination of Emergency Action Levels".

(a) If an attack Is in progress, or is imminent, make the plant page announcement in accordance with AOP 914, "Security Emergency".

(b) If time is available for safe plant evacuation, make the plant page announcement in accordance with Attachment 1, 'Site Evacuation Announcement for Security Events".

(2) Inform the State and County's in accordance with EPIP 1.2, "Notifications".

(3) Activate all EOF and JPIC ERO pagers in accordance with Attachment 2,

'Security Event - ERO Alphanumeric Paging System Callout"

EMERGE-cY PLAN IMPLEME ENTINP EPIP 2.8 Rev. 2 SECURITY THREAT Page 6 of _1 l

(4)

If off-hours, activate all EOF and JPIC ERO responders in accordance with, "Security Event - Phone System Callout".

(5)

Notify the Plant Manager, or Emergency Coordinator as applicable, to respond to the Control Room to facilitate communication as the OSM may be involved with placing the plant in a safe condition.

(6)

Verify that Local Law Enforcement has been contacted ancq informed that the EOF and JPIC is being activated to coordinate management communications.

(7)

Inform the NRC ENS in accordance with EPIP 1.2, 'Notifications".

(8)

Work with DAEC and NMC Management to determine what activities are essential and what personnel are needed to support the site.

(a)

If additional resources are needed to augment existing Operations staff, then refer to step 3.1.4, "Staff Augmentation" 3.2.2 CREDIBLE THREAT OF LOW SEVERITY (1)

IF the threat assessment determines that it is a CREDIBLE THREAT of LOW Severity as determined by NMC SE-0018, 'Security Threat Assessment",

THEN the OSM will be notified. The event should remain as an UNUSUAL EVENT per AOP 914, uSecurity Emergency" and EPIP 1.1, 'Determination of Emergency Action Levels".

(a) Make the plant page announcement in accordance with Attachment 1, "Site Evacuation Announcement for Security Events".

(2)

Inform the State and County's in accordance with EPIP 1.2, 'Notifications".

(3)

Activate all EOF and JPIC ERO pagers in accordance with Attachment 2,

'Security Event - ERO Alphanumeric Paging System Callout" (4)

If off-hours, activate all EOF and JPIC ERO responders in accordance with, "Security Event - Phone System Callout".

(5)

Verify that Local Law Enforcement has been contacted and informed that the EOF and JPIC is being activated to coordinate management communications.

(6)

Inform the NRC ENS in accordance with EPIP 1.2, "Notifications".

(7)

If the threat escalates, then reclassify and go to Section 3.2.1.

EME LAN IMPLMNT R

EPIP 2.8 Rev. 2 SECURITY THREAT Page 7 of 11 I

(8) Work with DAEC and NMC Management to determine what activities are essential and what personnel are needed to support the site.

(a) If additional resources are needed to augment existing Operations staff, then refer to step 3.1.4, "Staff Augmentation" 3.3 FOLLOW-UP ACTIONS (1) If the security threat is resolved, then enter the appropriate EPIPs to reclassify the event, or terminate the event, as applicable.

3.4 STAFF AUGMENTATION (1) The OSM/ER&RD has the authority to augment the response staff as necessary to ensure adequate resources are available to assist Operations in maintaining, or restoring, the safe condition of the plant. A section has been added to the Emergency Telephone Book (ETB) to assist in determining who on-site has previous Operations experience, or other critical experience, which could assist Operations.

(a) This new section of the ETB has been organized based on the following skill sets:

1. Operations
a. SRO
b. RO
c. NSPEO
d. Severe Accident Management (SAM)
2. Fire Brigade
3. First Aid I
4. SCBA

-EMEREN PLAN iMP E TiL EPIP 2.8 Rev. 2 SECURITY THREAT Page 8 of 11 I

4.0 RECORDS (1) This procedure does not generate any records.

5.0 REFERENCES

(1) NMC CD 4.1, 'Security Threats" '

(2) NMC SE-0018, -Security ThreatAssessment" (3)

NMC SE-001 7, "Security Threat Noffication" (4) AOP 914, 'Security Events" (5) EPIP 1.1, 'Determination of EmergencyAction Levels' 6.0 ATTACHMENTS (1) Attachment 1, 'Security Event - Site Evacuation Announcement-(2) Attachment 2, 'Security Event - ERO Alphanumeric Paging System Callout" (3) Attachment 3, 'Security Event - Phone System Callout"

4EMERG PNET

-GRE EPIP 2.8 Rev. 2 SECURITY THREAT Page 9 of 11 I

ATTACHMENT I SECURITY EVENT - SITE EVACUATION ANNOUNCMENT (1)

Ensure to turn on the outside speakers (2)

Activate Evacuation Alarm (3)

Make the following page announcement:

TAttention all personnel. Attention all personnel. A security threat exists.

Place all essential activities in a safe condition.

All EOF personnel assemble at the EOF.

All JPIC personnel report to the JPIC.

Operations and Fire Brigade personnel assemble in the Control Room.

All other personnel evacuate the site."

(4)

Repeat steps (2) and (3). (i.e., make announcement twice)

EERGENCY PA PLEMENTIN RCEUE EPIP 2.8 Rev. 2 SECURITY THREAT Page 10 of 11 I

ATTACHMENT 2 SECURITY EVENT - ERO ALPHANUMERIC PAGING SYSTEM CALLOUT (1)

Alphanumeric Pagers - Complete this sequence on the AlphaMate 250.

Terminal Prompts are given: operator responses are in bold.

(a)

Ensure the AlphaMate 250 is turned ON.

(b)

Press the PAGE key (top row, left)

(c)

ENTER NAME OR NUMBER: key in SECURITY THREAT, press ENTER.

(d)

ENTER MESSAGE (OR CANNED MESSAGE NUMBER): key in "Security threat exists at DAEC. Please report to the EOFIJPIC Immediately" press ENTER.

-OR-(e) ENTER MESSAGE (OR CANNED MESSAGE NUMBER):

key in `@4",

press ENTER, press ENTER (f) The AlphaMate 250 will dial the central computer and display the following, OFFHOOK, CONNECTING, CONNECTED, SENDING MESSAGE, DISCONNECTING, PAGE SENT. Watch the AlphaMate 250 for these indicators.

EMERGECY PLA IMPLMENTINJl EPIP 2.8 Rev. 2 SECURITY THREAT Page 11 of 11 ATTACHMENT 3 SECURITY EVENT - PHONE SYSTEM CALLOUT To initiate a call-out on the AVS1 00 System in response to a security threat, conduct the following using a touch-tone phone:

(1) Call into the AVS100 system by dialing 786-7200.

(2)

To log on press # after hearing the initial greeting.

(3)

When asked for your mailbox enter (do not press the # key)

(4)

When asked for your security code enter (do not press the # key)

(5)

When you hear the system prompt "to send a broadcast press 2', press 2 (do not press the # key).

(6)

When asked for the " primary list " enter 2006 (do not press the # key).

(7)

When prompted to enter another list or press #, press #

(8)

When asked for what Broadcast type press 1 (do not press the # key).

(9)

When prompted Press # to continue (10) Press 2 for quick delivery (11) When asked for type of delivery press I (do not press the # key) for immediate delivery.

(12) Listen to the system read your selections back to you. Confirm that you have selected the voice broadcast to list 2006 and the broadcast is for immediate delivery by pressing #.

(13) If your selections are not correct press *, then press 9, then press # to start over at number 4.

(14) If you have confirmed your selections by pressing # in step 11 above, press 99 once the system says " ready "

  • These numbers have been disseminated to the Control Room and EOF. It is blocked for all other users for security purposes.

SYSTEM STATUS BOARD DATEITIME UPDATED:

Y t

V P~~~~~~~~~~~~~~~~~~~~~~~~~-

RODS REACTIITY

.1.

-I BORON I

I

.1 RHR SDC 6.

RHRCS SAFETY SYSTEMS RHR TC RHR LPCI CORE SPRAY 'A' CORE SPRAY 'B' HPCI RCIC

6.
6.

i STARTUP ELECTRICAL SYSTEMS STANDBY AUX lAl 1A2 1A3 1A4 DIESEL 'A' DIESEL 'B' COND 'A' COND 'B' FDWIR 'A' NORMAL MAKEUP FDWTR 'B' CRD 'A' CRD 'B' RELEASE SBGT 'A MONITORING/

SBGT 'B' FILTERING___I__

EOF-30 Rev.