H8 FPL Energy Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 NOV I 2 2003 Docket No. 50-443 NYN-03096 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station October 2003 Monthly Operating Report Enclosed is Monthly Operating Report 03-10. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of October, 2003 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5. | |||
Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Manager, at (603) 773-7776. | Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Manager, at (603) 773-7776. | ||
Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Station Director cc: | Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Station Director cc: | ||
H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate I-2 G.T. Dentel, NRC Senior Resident Inspector | H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate I-2 G.T. Dentel, NRC Senior Resident Inspector | ||
:J"'c | :J"'c z,q I-7 -- _, | ||
an FPL Group company | |||
-, V-W | -, V-W | ||
.1 OPERATING DATA REPORT DOCKET NO. | |||
: 1. Unit Name: | 50-443 UNIT Seabrook I DATE November 1, 2003 COMPLETED BY P. E. Nardone TELEPHONE (603) 773-7074 OPERATING STATUS | ||
: 2. Reporting Period: | : 1. Unit Name: | ||
: 3. Licensed Thermal Power (MWt): | Seabrook Station Unit I | ||
: 4. Design Electrical Rating (Net MWe): | : 2. | ||
: 5. Maximum Dependable Capacity (Net MWe): | Reporting Period: | ||
: 6. If Changes Occur in Capacity Ratings (Items Number 3 through 5) | OCTOBER 2003 | ||
This Month | : 3. | ||
: 7. Number of Hours Reactor Was Critical | Licensed Thermal Power (MWt): | ||
: 8. Hours Generator On-Line | 3411.0 | ||
: 9. Unit Reserve Shutdown Hours | : 4. | ||
: 10. Net Electrical Energy Generated (MWH) | Design Electrical Rating (Net MWe): | ||
1148.0 | |||
: 5. | |||
Maximum Dependable Capacity (Net MWe): | |||
1155.3 | |||
: 6. | |||
If Changes Occur in Capacity Ratings (Items Number 3 through 5) | |||
Not Applicable Since Last Report, Give Reasons: | |||
This Month Yr-to-Date Cumulative | |||
: 7. | |||
Number of Hours Reactor Was Critical 191.0 6742.0 101376.5 | |||
: 8. | |||
Hours Generator On-Line 141.5 6692.5 98484.9 | |||
: 9. | |||
Unit Reserve Shutdown Hours 0.0 0.0 0.0 | |||
: 10. | |||
Net Electrical Energy Generated (MWH) 124524 7697321 110876225 OPERATING | |||
==SUMMARY== | ==SUMMARY== | ||
The unit continued with its end of cycle coast until 10/03/03 when it ramped down from 89% power to commence its ninth refueling outage. The unit tripped on 10/31/03, shortly after reaching 100% power. | The unit continued with its end of cycle coast until 10/03/03 when it ramped down from 89% power to commence its ninth refueling outage. The unit tripped on 10/31/03, shortly after reaching 100% power. | ||
This yielded an availability factor of 19% and a capacity factor of 14.5% based on the MDC value of 1155.3 Net Mwe. | This yielded an availability factor of 19% and a capacity factor of 14.5% based on the MDC value of 1155.3 Net Mwe. | ||
I of 2 | I of 2 | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS | UNIT SHUTDOWNS AND POWER REDUCTIONS I' ) | ||
'*10 DOCKET NO. | |||
50-443 UNIT Seabrook I DATE November 1, 2003 COMPLETED BY P. E. Nardone TELEPHONE (603) 773-7074 MONTH: OCTOBER 2003 NO. | |||
DATE TYPE' DURATION REASON 2 MEFTHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS (HOURS) | |||
DOWN REACTOR COMMENTS 03-01 09/11/03 S | |||
0.0 H | |||
4 Continued with end of cycle Tavg Power Coastdown 03-02 10/04/03 S | |||
571.5 C | |||
I Planned Refueling Outage (OR09) 03-03 10/27/03 S | |||
14.1 B | |||
5 Performed Turbine Rotor Balancing. Load reduced from 200MWe. | |||
Generator breaker opened. Reactor power held at 1.5% RTP. | Generator breaker opened. Reactor power held at 1.5% RTP. | ||
03-04 | 03-04 10/28/03 S | ||
Generator breaker opened. Reactor power held at 1.5% RTP 03-05 | 13.7 B | ||
5 Performed Turbine Rotor Balancing. Load reduced from 100MWe. | |||
Generator breaker opened. Reactor power held at 1.5% RTP 03-05 10/31(03 F | |||
4.2 B/A 3 | |||
Automatic Reactor Trip on SG Low Level following the loss of one of the two Main Feed Pumps during troubleshooting.. | |||
LER 03-02 will be issued to document this event. | LER 03-02 will be issued to document this event. | ||
2 | 2 3 | ||
S: | F: | ||
Forced Reason: | |||
Method: | |||
S: | |||
Scheduled A-Equipment Failure (Explain) | |||
I -Manual B - Maintenance or Test 2 -Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 -Other (Explain) | |||
F - Administrative G - Operational Error (Explain) | F - Administrative G - Operational Error (Explain) | ||
H - Other (Explain) 2 of 2}} | H - Other (Explain) 2 of 2}} | ||
Latest revision as of 06:26, 16 January 2025
| ML033250336 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 11/12/2003 |
| From: | St.Pierre G Florida Power & Light Energy Seabrook |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NYN-03096 | |
| Download: ML033250336 (3) | |
Text
-
H8 FPL Energy Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 NOV I 2 2003 Docket No. 50-443 NYN-03096 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station October 2003 Monthly Operating Report Enclosed is Monthly Operating Report 03-10. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of October, 2003 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Manager, at (603) 773-7776.
Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Station Director cc:
H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate I-2 G.T. Dentel, NRC Senior Resident Inspector
- J"'c z,q I-7 -- _,
an FPL Group company
-, V-W
.1 OPERATING DATA REPORT DOCKET NO.
50-443 UNIT Seabrook I DATE November 1, 2003 COMPLETED BY P. E. Nardone TELEPHONE (603) 773-7074 OPERATING STATUS
- 1. Unit Name:
Seabrook Station Unit I
- 2.
Reporting Period:
OCTOBER 2003
- 3.
Licensed Thermal Power (MWt):
3411.0
- 4.
Design Electrical Rating (Net MWe):
1148.0
- 5.
Maximum Dependable Capacity (Net MWe):
1155.3
- 6.
If Changes Occur in Capacity Ratings (Items Number 3 through 5)
Not Applicable Since Last Report, Give Reasons:
This Month Yr-to-Date Cumulative
- 7.
Number of Hours Reactor Was Critical 191.0 6742.0 101376.5
- 8.
Hours Generator On-Line 141.5 6692.5 98484.9
- 9.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 10.
Net Electrical Energy Generated (MWH) 124524 7697321 110876225 OPERATING
SUMMARY
The unit continued with its end of cycle coast until 10/03/03 when it ramped down from 89% power to commence its ninth refueling outage. The unit tripped on 10/31/03, shortly after reaching 100% power.
This yielded an availability factor of 19% and a capacity factor of 14.5% based on the MDC value of 1155.3 Net Mwe.
I of 2
UNIT SHUTDOWNS AND POWER REDUCTIONS I' )
'*10 DOCKET NO.
50-443 UNIT Seabrook I DATE November 1, 2003 COMPLETED BY P. E. Nardone TELEPHONE (603) 773-7074 MONTH: OCTOBER 2003 NO.
DATE TYPE' DURATION REASON 2 MEFTHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS (HOURS)
DOWN REACTOR COMMENTS 03-01 09/11/03 S
0.0 H
4 Continued with end of cycle Tavg Power Coastdown 03-02 10/04/03 S
571.5 C
I Planned Refueling Outage (OR09) 03-03 10/27/03 S
14.1 B
5 Performed Turbine Rotor Balancing. Load reduced from 200MWe.
Generator breaker opened. Reactor power held at 1.5% RTP.
03-04 10/28/03 S
13.7 B
5 Performed Turbine Rotor Balancing. Load reduced from 100MWe.
Generator breaker opened. Reactor power held at 1.5% RTP 03-05 10/31(03 F
4.2 B/A 3
Automatic Reactor Trip on SG Low Level following the loss of one of the two Main Feed Pumps during troubleshooting..
LER 03-02 will be issued to document this event.
2 3
F:
Forced Reason:
Method:
S:
Scheduled A-Equipment Failure (Explain)
I -Manual B - Maintenance or Test 2 -Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 -Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain) 2 of 2