On February 5, 2004, the NRC staff completed its end-of-cycle plant performance assessment of the James A. FitzPatrick Nuclear Power Plant. The end-of-cycle review for FitzPatrick involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1, 2003 through December 31, 2003. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
On February 5, 2004, the NRC staff completed its end-of-cycle plant performance assessment of the James A. FitzPatrick Nuclear Power Plant. The end-of-cycle review for FitzPatrick involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1, 2003 through December 31, 2003. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
Overall, FitzPatrick operated in a manner that preserved public health and safety, and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the previous three quarters, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to perform only reactor oversight process (ROP) baseline inspections at your facility through September 30, 2005.
Overall, FitzPatrick operated in a manner that preserved public health and safety, and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the previous three quarters, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to perform only reactor oversight process (ROP) baseline inspections at your facility through September 30, 2005.
Line 28: Line 27:
The inspections in the last twelve months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.
The inspections in the last twelve months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.
As you are aware, the NRC has issued several Orders and threat advisories to enhance security capabilities and improve guard force readiness since the terrorist attacks on September 11, 2001.
As you are aware, the NRC has issued several Orders and threat advisories to enhance security capabilities and improve guard force readiness since the terrorist attacks on September 11, 2001.
We have conducted inspections to review your implementation of these requirements and have monitored your actions in response to changing threat conditions. For calendar year 2004, we plan to continue inspections of order implementation combined with newly developed portions of the security baseline inspection program.
We have conducted inspections to review your implementation of these requirements and have monitored your actions in response to changing threat conditions. For calendar year 2004, we plan to continue inspections of order implementation combined with newly developed portions of the security baseline inspection program.  


Mr. Theodore Sullivan                             2 In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
2 Mr. Theodore Sullivan In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5211 with any questions you may have regarding this letter or the inspection plan.
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5211 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,
                                                      /RA/
/RA/
Glenn Meyer, Chief Projects Branch 3 Division of Reactor Projects, Region 1 Docket No.     50-333 License No. DPR-59
Glenn Meyer, Chief Projects Branch 3 Division of Reactor Projects, Region 1 Docket No.
50-333 License No.
DPR-59


==Enclosure:==
==Enclosure:==
FitzPatrick Nuclear Power Plant Inspection/ Activity Plan
FitzPatrick Nuclear Power Plant Inspection/ Activity Plan


Mr. Theodore Sullivan                           3 cc w/encl:
3 Mr. Theodore Sullivan cc w/encl:
G. Taylor, CEO, Entergy Operations K. Mulligan, General Manager, Plant Operations B. OGrady, VP Operations Support M. Colomb, Director of Oversight A. Halliday, Manager, Regulatory Compliance M. Kansler, President, Entergy D. Pace, VP Engineering J. Fulton, Assistant General Counsel Supervisor, Town of Scriba S. Lyman, Oswego County Administrator C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority S. Lousteau, Treasury Department T. Judson, Central New York Citizens Awareness Network Institute of Nuclear Power Operations (INPO)
G. Taylor, CEO, Entergy Operations K. Mulligan, General Manager, Plant Operations B. OGrady, VP Operations Support M. Colomb, Director of Oversight A. Halliday, Manager, Regulatory Compliance M. Kansler, President, Entergy D. Pace, VP Engineering J. Fulton, Assistant General Counsel Supervisor, Town of Scriba S. Lyman, Oswego County Administrator C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority S. Lousteau, Treasury Department T. Judson, Central New York Citizens Awareness Network Institute of Nuclear Power Operations (INPO)


Mr. Theodore Sullivan                                       4 Distribution w/encl: (VIA E-Mail)
4 Mr. Theodore Sullivan Distribution w/encl: (VIA E-Mail)
Region I Docket Room (with concurrences)
Region I Docket Room (with concurrences)
RidsNrrDipmIipb L. Cline, DRP - NRC Senior Resident Inspector D. Dempsey, Resident Inspector H. Miller, RA J. Wiggins, DRA G. Meyer, DRP S. Barber, DRP C. ODaniell, DRP N. Sheehan, PAO W. Lanning, DRS R. Crlenjak, DRS R. Conte, DRS J. White, DRS R. Lorson, DRS J. Rogge, DRS L. Doerflein, DRS J. Joliceur, OEDO R. Laufer, NRR G. Vissing, PM, NRR R. Clark, NRR P. Tam, NRR DOCUMENT NAME: G:\BRANCH3\ROP4 Annual Assess Ltrs\Fitz AA Letter .wpd After declaring this document An Official Agency Record it will be released to the Public.
RidsNrrDipmIipb L. Cline, DRP - NRC Senior Resident Inspector D. Dempsey, Resident Inspector H. Miller, RA J. Wiggins, DRA G. Meyer, DRP S. Barber, DRP C. ODaniell, DRP N. Sheehan, PAO W. Lanning, DRS R. Crlenjak, DRS R. Conte, DRS J. White, DRS R. Lorson, DRS J. Rogge, DRS L. Doerflein, DRS J. Joliceur, OEDO R. Laufer, NRR G. Vissing, PM, NRR R. Clark, NRR P. Tam, NRR DOCUMENT NAME: G:\\BRANCH3\\ROP4 Annual Assess Ltrs\\Fitz AA Letter.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE           RI/DRP                     R1/DRP NAME             LCline/GWM                 GMeyer/GWM for                        for DATE             03/04/04                   03/02/04 OFFICIAL RECORD COPY
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP R1/DRP NAME LCline/GWM for GMeyer/GWM for DATE 03/04/04 03/02/04 OFFICIAL RECORD COPY


Page 1 of 2                                                                                      FitzPatrick 03/02/2004    12:49:46                                                                Inspection / Activity Plan Report 22 01/01/2004 - 09/30/2005 Unit                                                                                                            No. of Staff     Planned Dates          Inspection Number      Inspection Activity                                                    Title                        on Site       Start      End            Type 7111111B       - LO REQUALIFICATION PROGRAM                                                                 2 1                IP 7111111B            Licensed Operator Requalification Program                                              04/26/2004 04/30/2004 Baseline Inspections 7112103       - OCC RAD SAFETY - INSTRUMENTATION                                                           1 1                IP 7112103            Radiation Monitoring Instrumentation and Protective Equipment                          05/24/2004 05/28/2004 Baseline Inspections 71152B         - PROBLEM IDENTIFICATION AND RESOLUTION                                                       4 1                IP 71152B              Identification and Resolution of Problems                                              07/19/2004 07/23/2004 Baseline Inspections 1                IP 71152B              Identification and Resolution of Problems                                             08/02/2004 08/06/2004 Baseline Inspections 71114         - EP PROGRAM INSPECTION & PI VERIFICATION                                                     1 1                IP 7111402            Alert and Notification System Testing                                                 08/23/2004 08/27/2004 Baseline Inspections 1                IP 7111403            Emergency Response Organization Augmentation Testing                                   08/23/2004 08/27/2004 Baseline Inspections 1                IP 7111404            Emergency Action Level and Emergency Plan Changes                                     08/23/2004 08/27/2004 Baseline Inspections 1                IP 7111405            Correction of Emergency Preparedness Weaknesses and Deficiencies                       08/23/2004 08/27/2004 Baseline Inspections 1                IP 71151              Performance Indicator Verification                                                     08/23/2004 08/27/2004 Baseline Inspections 71130          - SECURITY                                                                                    2 1                IP 7113001            Access Authorization                                                                  08/23/2004 08/27/2004 Baseline Inspections 1                IP 7113002            Access Control                                                                        08/23/2004 08/27/2004 Baseline Inspections 1                IP 7113008            Fitness For Duty Program                                                               08/23/2004 08/27/2004 Baseline Inspections 1                IP 71151              Performance Indicator Verification                                                     08/23/2004 08/27/2004 Baseline Inspections 71121          - OCC RAD SAFETY                                                                              1 1                IP 7112101            Access Control to Radiologically Significant Areas                                     08/30/2004 09/03/2004 Baseline Inspections 1                IP 7112102            ALARA Planning and Controls                                                           08/30/2004 09/03/2004 Baseline Inspections 7111108        - INSERVICE INSPECTION                                                                        1 1                IP 7111108G            Inservice Inspection Activities - BWR                                                 10/04/2004 10/08/2004 Baseline Inspections 71121          - OCC RAD SAFETY                                                                              1 1                IP 7112101            Access Control to Radiologically Significant Areas                                     10/04/2004 10/08/2004 Baseline Inspections 1                IP 7112102            ALARA Planning and Controls                                                           10/04/2004 10/08/2004 Baseline Inspections 1                IP 71151              Performance Indicator Verification                                                     10/04/2004  10/08/2004 Baseline Inspections 7112102       - OCC RAD SAFETY - ALARA                                                                     1 1                IP 7112102            ALARA Planning and Controls                                                            12/13/2004 12/17/2004 Baseline Inspections 71121         - OCC RAD SAFETY                                                                             1 1                IP 7112101            Access Control to Radiologically Significant Areas                                    02/14/2005 02/18/2005 Baseline Inspections 1                IP 7112102            ALARA Planning and Controls                                                            02/14/2005 02/18/2005 Baseline Inspections 71111.05       - TRIENNIAL FIRE PROTECTION INSPECTION                                                       3 1                IP 7111105T            Fire Protection                                                                        03/07/2005 03/11/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.
FitzPatrick Inspection / Activity Plan 01/01/2004 - 09/30/2005 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2004 12:49:46 Report 22 2
7111111B
- LO REQUALIFICATION PROGRAM Baseline Inspections 04/26/2004 04/30/2004 Licensed Operator Requalification Program IP 7111111B 1
1 7112103
- OCC RAD SAFETY - INSTRUMENTATION Baseline Inspections 05/24/2004 05/28/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
4 71152B
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 07/19/2004 07/23/2004 Identification and Resolution of Problems IP 71152B 1
Baseline Inspections 08/02/2004 08/06/2004 Identification and Resolution of Problems IP 71152B 1
1 71114
- EP PROGRAM INSPECTION & PI VERIFICATION Baseline Inspections 08/23/2004 08/27/2004 Alert and Notification System Testing IP 7111402 1
Baseline Inspections 08/23/2004 08/27/2004 Emergency Response Organization Augmentation Testing IP 7111403 1
Baseline Inspections 08/23/2004 08/27/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 1
Baseline Inspections 08/23/2004 08/27/2004 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1
Baseline Inspections 08/23/2004 08/27/2004 Performance Indicator Verification IP 71151 1
2 71130
- SECURITY Baseline Inspections 08/23/2004 08/27/2004 Access Authorization IP 7113001 1
Baseline Inspections 08/23/2004 08/27/2004 Access Control IP 7113002 1
Baseline Inspections 08/23/2004 08/27/2004 Fitness For Duty Program IP 7113008 1
Baseline Inspections 08/23/2004 08/27/2004 Performance Indicator Verification IP 71151 1
1 71121
- OCC RAD SAFETY Baseline Inspections 08/30/2004 09/03/2004 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 08/30/2004 09/03/2004 ALARA Planning and Controls IP 7112102 1
1 7111108
- INSERVICE INSPECTION Baseline Inspections 10/04/2004 10/08/2004 Inservice Inspection Activities - BWR IP 7111108G 1
1 71121
- OCC RAD SAFETY Baseline Inspections 10/04/2004 10/08/2004 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 10/04/2004 10/08/2004 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 10/04/2004 10/08/2004 Performance Indicator Verification IP 71151 1
1 7112102
- OCC RAD SAFETY - ALARA Baseline Inspections 12/13/2004 12/17/2004 ALARA Planning and Controls IP 7112102 1
1 71121
- OCC RAD SAFETY Baseline Inspections 02/14/2005 02/18/2005 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 02/14/2005 02/18/2005 ALARA Planning and Controls IP 7112102 1
3 71111.05
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 03/07/2005 03/11/2005 Fire Protection IP 7111105T 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 2 of 2                                                                                    FitzPatrick 03/02/2004    12:49:46                                                                Inspection / Activity Plan Report 22 01/01/2004 - 09/30/2005 Unit                                                                                                            No. of Staff     Planned Dates          Inspection Number      Inspection Activity                                                    Title                        on Site       Start      End            Type 71111.05       - TRIENNIAL FIRE PROTECTION INSPECTION                                                       3 1                IP 7111105T            Fire Protection                                                                        03/21/2005 03/25/2005 Baseline Inspections 7111401       - EXERCISE & EP PI INSPECTION                                                                 1 1                IP 7111401            Exercise Evaluation                                                                    03/07/2005 03/11/2005 Baseline Inspections 1                IP 71151              Performance Indicator Verification                                                    03/07/2005 03/11/2005 Baseline Inspections 7112201       - PUB RAD SAFETY - RETS                                                                       1 1                IP 7112201            Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems              03/21/2005 03/25/2005 Baseline Inspections 5/16 EXM       - OPERATOR LICENSING INITIAL EXAMS                                                           3 1                    U01525            FITZPATRICK INITIAL EXAM (8/23-27/04)                                                 04/18/2005 04/22/2005 Not Applicable 1                    U01516            FITZPATRICK INITIAL EXAM (2/23-3/1/04)                                                 05/16/2005  05/20/2005 Not Applicable 7112202       - PUB RAD SAFETY - RADWASTE                                                                   1 1                IP 7112202            Radioactive Material Processing and Transportation                                    05/02/2005 05/06/2005 Baseline Inspections 7111107B       - HEAT SINK                                                                                   1 1                IP 7111107B            Heat Sink Performance                                                                  06/13/2005 06/17/2005 Baseline Inspections 7111121       - SSDI                                                                                       6 1                IP 7111121            Safety System Design and Performance Capability                                        08/01/2005 08/05/2005 Baseline Inspections 1                IP 7111121            Safety System Design and Performance Capability                                       08/15/2005 08/19/2005 Baseline Inspections 71121         - OCC RAD SAFETY                                                                             1 1                IP 7112101            Access Control to Radiologically Significant Areas                                    08/29/2005 09/02/2005 Baseline Inspections 1                IP 7112102            ALARA Planning and Controls                                                            08/29/2005 09/02/2005 Baseline Inspections 1                IP 71151              Performance Indicator Verification                                                    08/29/2005 09/02/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.
FitzPatrick Inspection / Activity Plan 01/01/2004 - 09/30/2005 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2004 12:49:46 Report 22 3
71111.05
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 03/21/2005 03/25/2005 Fire Protection IP 7111105T 1
1 7111401
- EXERCISE & EP PI INSPECTION Baseline Inspections 03/07/2005 03/11/2005 Exercise Evaluation IP 7111401 1
Baseline Inspections 03/07/2005 03/11/2005 Performance Indicator Verification IP 71151 1
1 7112201
- PUB RAD SAFETY - RETS Baseline Inspections 03/21/2005 03/25/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1
3 5/16 EXM
- OPERATOR LICENSING INITIAL EXAMS Not Applicable 04/18/2005 04/22/2005 FITZPATRICK INITIAL EXAM (8/23-27/04)
U01525 1
Not Applicable 05/16/2005 05/20/2005 FITZPATRICK INITIAL EXAM (2/23-3/1/04)
U01516 1
1 7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 05/02/2005 05/06/2005 Radioactive Material Processing and Transportation IP 7112202 1
1 7111107B
- HEAT SINK Baseline Inspections 06/13/2005 06/17/2005 Heat Sink Performance IP 7111107B 1
6 7111121
- SSDI Baseline Inspections 08/01/2005 08/05/2005 Safety System Design and Performance Capability IP 7111121 1
Baseline Inspections 08/15/2005 08/19/2005 Safety System Design and Performance Capability IP 7111121 1
1 71121
- OCC RAD SAFETY Baseline Inspections 08/29/2005 09/02/2005 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 08/29/2005 09/02/2005 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 08/29/2005 09/02/2005 Performance Indicator Verification IP 71151 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 04:39, 16 January 2025

Annual Assessment Letter - FitzPatrick
ML040630156
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/02/2004
From: Meyer G
Division Reactor Projects I
To: Ted Sullivan
Entergy Nuclear Northeast
References
IR-04-001
Download: ML040630156 (6)


Text

March 2, 2004 Mr. Theodore Sullivan Vice President - Operations Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093

SUBJECT:

ANNUAL ASSESSMENT LETTER - JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2004001)

Dear Mr. Sullivan:

On February 5, 2004, the NRC staff completed its end-of-cycle plant performance assessment of the James A. FitzPatrick Nuclear Power Plant. The end-of-cycle review for FitzPatrick involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1, 2003 through December 31, 2003. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

Overall, FitzPatrick operated in a manner that preserved public health and safety, and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the previous three quarters, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to perform only reactor oversight process (ROP) baseline inspections at your facility through September 30, 2005.

The enclosed inspection plan details the inspections scheduled through September 30, 2005. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last twelve months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.

As you are aware, the NRC has issued several Orders and threat advisories to enhance security capabilities and improve guard force readiness since the terrorist attacks on September 11, 2001.

We have conducted inspections to review your implementation of these requirements and have monitored your actions in response to changing threat conditions. For calendar year 2004, we plan to continue inspections of order implementation combined with newly developed portions of the security baseline inspection program.

2 Mr. Theodore Sullivan In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5211 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Glenn Meyer, Chief Projects Branch 3 Division of Reactor Projects, Region 1 Docket No.

50-333 License No.

DPR-59

Enclosure:

FitzPatrick Nuclear Power Plant Inspection/ Activity Plan

3 Mr. Theodore Sullivan cc w/encl:

G. Taylor, CEO, Entergy Operations K. Mulligan, General Manager, Plant Operations B. OGrady, VP Operations Support M. Colomb, Director of Oversight A. Halliday, Manager, Regulatory Compliance M. Kansler, President, Entergy D. Pace, VP Engineering J. Fulton, Assistant General Counsel Supervisor, Town of Scriba S. Lyman, Oswego County Administrator C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority S. Lousteau, Treasury Department T. Judson, Central New York Citizens Awareness Network Institute of Nuclear Power Operations (INPO)

4 Mr. Theodore Sullivan Distribution w/encl: (VIA E-Mail)

Region I Docket Room (with concurrences)

RidsNrrDipmIipb L. Cline, DRP - NRC Senior Resident Inspector D. Dempsey, Resident Inspector H. Miller, RA J. Wiggins, DRA G. Meyer, DRP S. Barber, DRP C. ODaniell, DRP N. Sheehan, PAO W. Lanning, DRS R. Crlenjak, DRS R. Conte, DRS J. White, DRS R. Lorson, DRS J. Rogge, DRS L. Doerflein, DRS J. Joliceur, OEDO R. Laufer, NRR G. Vissing, PM, NRR R. Clark, NRR P. Tam, NRR DOCUMENT NAME: G:\\BRANCH3\\ROP4 Annual Assess Ltrs\\Fitz AA Letter.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP R1/DRP NAME LCline/GWM for GMeyer/GWM for DATE 03/04/04 03/02/04 OFFICIAL RECORD COPY

FitzPatrick Inspection / Activity Plan 01/01/2004 - 09/30/2005 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2004 12:49:46 Report 22 2

7111111B

- LO REQUALIFICATION PROGRAM Baseline Inspections 04/26/2004 04/30/2004 Licensed Operator Requalification Program IP 7111111B 1

1 7112103

- OCC RAD SAFETY - INSTRUMENTATION Baseline Inspections 05/24/2004 05/28/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

4 71152B

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 07/19/2004 07/23/2004 Identification and Resolution of Problems IP 71152B 1

Baseline Inspections 08/02/2004 08/06/2004 Identification and Resolution of Problems IP 71152B 1

1 71114

- EP PROGRAM INSPECTION & PI VERIFICATION Baseline Inspections 08/23/2004 08/27/2004 Alert and Notification System Testing IP 7111402 1

Baseline Inspections 08/23/2004 08/27/2004 Emergency Response Organization Augmentation Testing IP 7111403 1

Baseline Inspections 08/23/2004 08/27/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 1

Baseline Inspections 08/23/2004 08/27/2004 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1

Baseline Inspections 08/23/2004 08/27/2004 Performance Indicator Verification IP 71151 1

2 71130

- SECURITY Baseline Inspections 08/23/2004 08/27/2004 Access Authorization IP 7113001 1

Baseline Inspections 08/23/2004 08/27/2004 Access Control IP 7113002 1

Baseline Inspections 08/23/2004 08/27/2004 Fitness For Duty Program IP 7113008 1

Baseline Inspections 08/23/2004 08/27/2004 Performance Indicator Verification IP 71151 1

1 71121

- OCC RAD SAFETY Baseline Inspections 08/30/2004 09/03/2004 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 08/30/2004 09/03/2004 ALARA Planning and Controls IP 7112102 1

1 7111108

- INSERVICE INSPECTION Baseline Inspections 10/04/2004 10/08/2004 Inservice Inspection Activities - BWR IP 7111108G 1

1 71121

- OCC RAD SAFETY Baseline Inspections 10/04/2004 10/08/2004 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 10/04/2004 10/08/2004 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 10/04/2004 10/08/2004 Performance Indicator Verification IP 71151 1

1 7112102

- OCC RAD SAFETY - ALARA Baseline Inspections 12/13/2004 12/17/2004 ALARA Planning and Controls IP 7112102 1

1 71121

- OCC RAD SAFETY Baseline Inspections 02/14/2005 02/18/2005 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 02/14/2005 02/18/2005 ALARA Planning and Controls IP 7112102 1

3 71111.05

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 03/07/2005 03/11/2005 Fire Protection IP 7111105T 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

FitzPatrick Inspection / Activity Plan 01/01/2004 - 09/30/2005 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2004 12:49:46 Report 22 3

71111.05

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 03/21/2005 03/25/2005 Fire Protection IP 7111105T 1

1 7111401

- EXERCISE & EP PI INSPECTION Baseline Inspections 03/07/2005 03/11/2005 Exercise Evaluation IP 7111401 1

Baseline Inspections 03/07/2005 03/11/2005 Performance Indicator Verification IP 71151 1

1 7112201

- PUB RAD SAFETY - RETS Baseline Inspections 03/21/2005 03/25/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1

3 5/16 EXM

- OPERATOR LICENSING INITIAL EXAMS Not Applicable 04/18/2005 04/22/2005 FITZPATRICK INITIAL EXAM (8/23-27/04)

U01525 1

Not Applicable 05/16/2005 05/20/2005 FITZPATRICK INITIAL EXAM (2/23-3/1/04)

U01516 1

1 7112202

- PUB RAD SAFETY - RADWASTE Baseline Inspections 05/02/2005 05/06/2005 Radioactive Material Processing and Transportation IP 7112202 1

1 7111107B

- HEAT SINK Baseline Inspections 06/13/2005 06/17/2005 Heat Sink Performance IP 7111107B 1

6 7111121

- SSDI Baseline Inspections 08/01/2005 08/05/2005 Safety System Design and Performance Capability IP 7111121 1

Baseline Inspections 08/15/2005 08/19/2005 Safety System Design and Performance Capability IP 7111121 1

1 71121

- OCC RAD SAFETY Baseline Inspections 08/29/2005 09/02/2005 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 08/29/2005 09/02/2005 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 08/29/2005 09/02/2005 Performance Indicator Verification IP 71151 1