ML041130510: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:-' FPL Energy
{{#Wiki_filter:-' FPL Energy
    - P     ~g                                                   FPL Energy Seabrook Station
- P  
    -Seabrook Station                                             P.O. Box 300 Scalbrook, NIl 03874 (603) 773-7000 APR 15 2004 Docket No. 50-443 NYN-04034 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station March 2004 Monthly Operating Report Enclosed please find Monthly Operating Report 04-03. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of March, 2004 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
~g FPL Energy Seabrook Station
-Seabrook Station P.O. Box 300 Scalbrook, NIl 03874 (603) 773-7000 APR 15 2004 Docket No. 50-443 NYN-04034 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station March 2004 Monthly Operating Report Enclosed please find Monthly Operating Report 04-03. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of March, 2004 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.
Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.
Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Station Director cc:
Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Station Director cc:
H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate I-2 G.T. Dentel, NRC Senior Resident Inspector
H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate I-2 G.T. Dentel, NRC Senior Resident Inspector


OPERATING DATA REPORT I OCKET NO.           50-443 UNIT NAME              Seabrook 1 DATE                  Aprie 052004 COMPLETED BY          Pete Nardone TELEPHONE              (603) 773-7074 REPORTING PERIOD                  March 2004
OPERATING DATA REPORT I OCKET NO.
: 1. Design Electrical Rating                                 1 148.00
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-443 Seabrook 1 Aprie 052004 Pete Nardone (603) 773-7074 March 2004 1.
: 2. Maximum Dependable Capacity (MWe-Net)                   1,155.30 This Month        Yr-to-Date          Cumulative
2.
: 3. Number of Hours the Reactor was Critical               744.00          2,184.00            105,013.80
Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 1 148.00 1,155.30 3.
: 4. Number of Hours Generator On-line                       744.00         2,184.00             102,098.29
4.
: 5. Reserve Shutdown Hours                                    0.00             0.00                 0.00
5.
: 6. Net Electrical Energy Generated (MWHrs)                861,942.75     2.528,891.82       114,983,223.04 UNIT SHUTDOWNS Type                         Method of No.       Date       F: Forced   Duration   Reason     Shutting           Cause & Corrective Action S: Scheduled   (Hours)               Down 2                     Comments
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date 744.00 2,184.00 744.00 2,184.00 0.00 0.00 861,942.75 2.528,891.82 Cumulative 105,013.80 102,098.29 0.00 114,983,223.04 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration Reason Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments


==SUMMARY==
==SUMMARY==
: The unit operated at 100% power for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.28% based on the MDC value of 1155.3 Net MWe.
: The unit operated at 100% power for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.28% based on the MDC value of 1155.3 Net MWe.
I                                                       2 Reason:                                                Method:
I 2
A Equipment Failure (Explain)                           I Manual B Maintenance or Test                                   2 Manual TriplScram C Refueling                                             3 Automatic TriplScram D Regulatory Restriction                               4 Continuation E Operator Training & License Examination               5 Other (Explain)
Reason:
F Administration G Operational Error (Explain)
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of 1}}
Page 1 of 1}}

Latest revision as of 03:26, 16 January 2025

March 2004 Monthly Operating Report for Seabrook, Unit 1
ML041130510
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/15/2004
From: St.Pierre G
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NYN-04034
Download: ML041130510 (2)


Text

-' FPL Energy

- P

~g FPL Energy Seabrook Station

-Seabrook Station P.O. Box 300 Scalbrook, NIl 03874 (603) 773-7000 APR 15 2004 Docket No. 50-443 NYN-04034 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station March 2004 Monthly Operating Report Enclosed please find Monthly Operating Report 04-03. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of March, 2004 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.

Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Station Director cc:

H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate I-2 G.T. Dentel, NRC Senior Resident Inspector

OPERATING DATA REPORT I OCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-443 Seabrook 1 Aprie 052004 Pete Nardone (603) 773-7074 March 2004 1.

2.

Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 1 148.00 1,155.30 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month Yr-to-Date 744.00 2,184.00 744.00 2,184.00 0.00 0.00 861,942.75 2.528,891.82 Cumulative 105,013.80 102,098.29 0.00 114,983,223.04 UNIT SHUTDOWNS Type Method of No.

Date F: Forced Duration Reason Shutting Cause & Corrective Action S: Scheduled (Hours)

Down 2 Comments

SUMMARY

The unit operated at 100% power for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.28% based on the MDC value of 1155.3 Net MWe.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

Page 1 of 1