{{#Wiki_filter:Ad ministrative Documents
{{#Wiki_filter:Ad mi n istrative Documents  
              OCONEE JUNE 2004 EXAM
OCONEE JUNE 2004 EXAM  
                      50-269/2004-301,
50-269/2004-301,  
                    50-270/2004-301, &
50-270/2004-301, &  
                        50-28712004-301
50-28712004-301  
                JUNE 14 18 & 25,2004 -
JUNE 14 - 18 & 25,2004  
1.d Exam Preparation Checklist . . . . . . . . . . . . . . . . . . . .                   ES-20?-1/
1 .d Exam Preparation Checklist ....................  
2.   Exam Outline Quality Checklist . . . . . . . . . . . . . . . . . ES-201-2                    /
ES-20?-1/  
3.  ~xam    Security Agreement . . . . . . . . . . . . . . . . . . . . .               ES-201-3
3.
                                                                                                      ,
~ x a m 
4. J Administrative Topics Outline (Finai) . . . . . . . . . . . . . ES-301-1/
Security Agreement .....................  
5. JControl ~ s o m    Syste          and Facility Walk-through Test Outline
ES-201-3  
      (Final) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .     ES-301-2  /*
4. J Administrative Topics Outline (Finai) . . . . . . . . . . . . . ES-301-1/  
6. /Operating Test Quality check Sheet                         . . . . . . . . . . . . . ES-302 -3 w
(Final) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7. / Simulator Scenario Quality Check Sheet . . . . . . . . . . E S - 3 0 1 d
ES-301-2 /*
8.J   Transient and Ev             Checklist         . . . . . . . . . . . . . . . . . . ES-301-5 /
2.
9. , Competencies C             klist . . . . . . . . . . . . . . . . . . . . . .       ES-301-6 /
Exam Outline Quality Checklist . . . . . . . . . . . . . . . . . ES-201-2 /  
10. /Written Exam Quality Cheek Sheet . . . . . . . . . . . . . . ES-401-                       6J   /,
,
11, /Written Exam R                      orksheet . . . . . . . . . . . . . . . . ES-401-9
5. JControl ~ s o m 
                                      Quality Checklist
Syste
                                            ......................
6. /Operating Test Quality check Sheet . . . . . . . . . . . . . ES-302 -3 w  
                                                                      . . . . . . . . . . ES-403-1
7. / Simulator Scenario Quality Check Sheet . . . . . . . . . . E S - 3 0 1 d
                                                                                          ES-501-1
and Facility Walk-through Test Outline
                                                                                                  ?J
/
bewb-~    o g R ~c ~~- 7 7 6D R   ATED        V - J B - Q ~3 u B M i r 9 i 1 3 6     ,EXAM
8.J Transient and Ev  
Checklist . . . . . . . . . . . . . . . . . . ES-301-5  
/  
9. , Competencies C  
klist ......................  
ES-301-6
10. /Written Exam Quality Cheek Sheet . . . . . . . . . . . . . . ES-401- 6J /,  
. . . . . . . . . . . . . . . . ?
1 1, /Written Exam R
orksheet
ES-401-9  
Quality Checklist . . . . . . . . . . ES-403-1
ES-501-1 J
......................  
bewb-  
~
o
g
R
c
~
~ ~ - 7 7 6 R
D A T E D  V - J B - Q ~ 3 u B M i r 9 i 1 3 6 ,EXAM  


          -...                                                                             ...
...  
cs-20' ....
-...
__.             ..            .....-Exan-inztiorl
__.  
                                      ...         Prepars!!m%ck(sist                     FO[XES:rn
cs-20' . . . .  
  Facility:   13krCaLaca                                             Date of Examination:
. .  
                                                                                                  Chief
. . . . .- Exan-inztiorl  
                                      Task Description I Reference                             xamlner's
...  
                                                                                                initials
Prepars!!m%ck(sist  
                                                ; assignment sheet updated: waiver
F O [ X E S : r n 
                                            orization granted to give written exams
Facility:  
        Target dates are keyed to the examination date identified in the corporate ;~$kz:zh? letter.
13krCaLaca  
        They are for planning purposes and may be adjusted on a case-by-case basis in coordinatioi
Date of Examination:  
        with the facility licensee.
Task Description I Reference  
        Applies only to examinations prepared by the NWC.
Chief
                                                  23 of 25             NUREG-1021, Draft Revision 9
xamlner's  
initials  
; assignment sheet updated: waiver  
orization granted to give written exams  
Target dates are keyed to the examination date identified in the corporate ;~$kz:zh? letter.  
They are for planning purposes and may be adjusted on a case-by-case basis in coordinatioi  
with the facility licensee.  
Applies only to examinations prepared by the NWC.  
23 of 25  
NUREG-1021, Draft Revision 9  


3-201                                       Examination Outline Quality Checklist                                   F C JES-20'1-2
Task Description
                                                                                                                          ~
3-201  
  nitial Submittal
Examination Outline Quality Checklist  
  .~
F C J ~ 
    Item                                                   Task Description
ES-20'1-2  
~
nitial Submittal  
      1.
.~  
      w
Item  
      R
~  
      i
1.  
      T
w  
      T
R  
      E
i  
      N
T  
      2.
T  
      S       b.   Assess whether there are enouah scenario sets land wares) to test the woiected number
E  
                  and m,x of appikonis in awoidance w th t:ie expectao c r w compos lion and rotatior.
N  
                                                                                                                    I  I -  I    11
2.  
      i
S  
      hl          sched,le fi:lhoit compiom s.ng exaiii integrity, ensure cam appiicant an be taoled Jsllly
i
                  a i east one new or signitcanily niwifiad sceliaiic, that n@scenar,ns are dwl'ca1t.d lrC:it (lie i
hl
__
__
      3.    a. Verify that:
3.
              (1) the outline@)contain(s) the required number of control room and in-piant tasks,
W
    W        (2) no more than 30% of the test material is repeated from the last NRC examination,
/
      /      f3P no tasks are duolicated from the aooiicants'audit tesUsl. and
T
                                                                                                                    I
4.
              ~I
G
      T      (4) no mRie than 86% of any operating'test is taken direcil; from the licensee's exam banks.
E
                            are distributed among the safety function groupings as specified in ESdOl,
N
                            is conducted in a low-power or shutdown condition,
E
                            for SRO-Uj of the tasks require the applicant to implement an alternate path
R
      4.
A
      G
L
      E
a. Author
      N
b. Facility Reviewer ('j
      E
c. NHC Chief Examiner (t)
      R
d. NRC Supervisor
      A
Note:
      L
* Not appiicab!e for NRC-developed examinations.
  a. Author
b.
  b. Facility Reviewer ('j
Assess whether there are enouah scenario sets land wares) to test the woiected number  
  c. NHC Chief Examiner ( t )
I
  d. NRC Supervisor
I -
  Note:      * Not appiicab!e for NRC-developed examinations.
I
                                              NUREG-I 02t. Draft Revision 9
11
and m,x of appikonis in awoidance w th t:ie expectao c r w compos lion and rotatior.  
sched,le  
fi:lhoit compiom s.ng exaiii integrity, ensure cam appiicant an be taoled Jsllly  
ai east one new or signitcanily niwifiad sceliaiic, that n@ scenar,ns are dwl'ca1t.d lrC:it (lie i  
a. Verify that:  
(1) the outline@) contain(s) the required number of control room and in-piant tasks,  
(2) no more than 30% of the test material is repeated from the last NRC examination,  
f3P no tasks are duolicated from the aooiicants'audit tesUsl. and  
I  
~I  
(4) no mRie than 86% of any operating'test is taken direcil; from the licensee's exam banks.  
are distributed among the safety function groupings as specified in ESdOl,  
is conducted in a low-power or shutdown condition,  
for SRO-Uj of the tasks require the applicant to implement an alternate path  
NUREG-I 02t. Draft Revision 9  


E§-201                                                           Examination Security Agreement                                                     Form E§-201-3
E§-201  
1.       Pre-Examination
Examination Security Agreement  
I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 6-14/21-2004 as of the date of my
Form E§-201-3  
signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief
1.  
examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing
Pre-Examination  
examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC. Furthermore. I am
I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 6-14/21-2004 as of the date of my  
aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of
signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief  
this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility
examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing  
management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC. Furthermore. I am  
2.       Post-Examination
aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of  
To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the
this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility  
week(s) of 6-i4/21-2004 From the date that I entered into this security agreement until the completion of examination administration, I did net instruct, evaluate, or
management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.  
provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the
2.  
NRC.
Post-Examination  
        PRINTED NAME               JOB TITLE / RESPONSIBILITY                                                                                     DATE       NOTE
To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the  
1.   &s;dWSHCW
week(s) of 6-i4/21-2004 From the date that I entered into this security agreement until the completion of examination administration, I did net instruct, evaluate, or  
2.
provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the  
3.
NRC.  
4.
PRINTED NAME  
5.
JOB TITLE / RESPONSIBILITY  
6.
DATE  
7.
NOTE  
a.
1. & s ; d W S H C W 
9.
2.  
IO.
3.  
11.
4.  
12.
5.  
13.
6.  
14.
7.  
15.                               ____
a.  
                                    Y=L3   /   l/AcI\Bplk&
9.  
NOTES:
IO.  
                                                                                                                                      NUREG-1021. Draft Revision 9
11.  
12.  
13.  
14.  
15.  
____  
Y=L3 / l/AcI\\Bplk&  
NOTES:  
NUREG-1021. Draft Revision 9  


ES-201                                                           Examination Security Agreement                                                     Form ES-201-3
ES-201  
1.       Pre-Examination
Examination Security Agreement  
I acknowledge that I have acquired specializsd knowledge about the NRC licensing examinations scheduled for the week(s) of 6-14/22-2004 as of the date of my
Form ES-201-3  
signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief
1.  
examiner. I understand that I am not to inshuct. evaluate. or provide performance feedback to those applicants scheduled to be administered these licensing
Pre-Examination  
examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC. Furthermore, I am
I acknowledge that I have acquired specializsd knowledge about the NRC licensing examinations scheduled for the week(s) of 6-14/22-2004 as of the date of my  
aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of
signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief  
this agreement may result in cancellation of the examinations andlor an enforcement action against me or the facility licensee. I will immediately report to facility
examiner. I understand that I am not to inshuct. evaluate. or provide performance feedback to those applicants scheduled to be administered these licensing  
management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC. Furthermore, I am  
2.       Post-Examination
aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of  
To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the
this agreement may result in cancellation of the examinations andlor an enforcement action against me or the facility licensee. I will immediately report to facility  
week(?.) of 6-64\21-2004 From the date that I entered intc this security agreement until the completion of examination administration, I did not instruct, evaluate, or
management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.  
provide performance feedback to those applicants who were administered these licensing examinations. except as specifically noted below and authorized by the
2.  
NRC.
Post-Examination  
                                    JOB TITLE I RE
To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the  
1.
week(?.)  
2.
of 6-64\\21-2004 From the date that I entered intc this security agreement until the completion of examination administration, I did not instruct, evaluate, or  
3.
provide performance feedback to those applicants who were administered these licensing examinations. except as specifically noted below and authorized by the  
4.
NRC.  
5.
JOB TITLE I RE  
6.
1.  
7.
2.  
8.
3.  
9.
4.  
                                                                                                                                      NUREG-1021. Draft Revision 9
5.  
6.  
7.  
8.  
9.  
NUREG-1021. Draft Revision 9  


1 Facility: Qconee                               Date of Examination: June, 2004
11 Facility: Qconee  
  Examination Level (circle one): RQ / SRQ       Operating Test Number:
Date of Examination: June, 2004  
                                        Describe activity to be performed
Examination Level (circle one): RQ / SRQ  
                            Admin-100, Deterrnlne SDM with a Dropped Control
Operating Test Number:  
  Conduct of Operations
Conduct of Operations
                            Rod
GEN 2.1.23 (3.9/4.0)
  GEN 2.1.23 (3.9/4.0)      PT/f/N1103/15, Reactivity Balance (10 min)
Conduct of Operations
                            Admin-103, Perform Manual RCS Leakage Calculation;
GEN 2.1.7 (3.7/4.4)
  Conduct of Operations    PT/0600/01Q (RQ Only)
Equipment Control
  GEN 2.1.7 (3.7/4.4)      (last exam) (group activity) (18 rnin)
GEN 2.2.12 (3.0/3.4)
                            Admin-202, Perform Surveillance to Verify SSF RCMUP
Radiation Control
  Equipment Control        Operability
GEN 2.3.4 (2.5131)
  GEN 2.2.12 (3.0/3.4)      PT16001001 Encl. 13.1 (Mode 1 & 2) (new) (15 rnin)
Emergency Plan
  Radiation Control
GEN 2.4.39 (3.3/3.1)
  GEN 2.3.4 (2.5131)
Describe activity to be performed  
                            Admin-402, Perform Actions for Medical Emergency
Admin-100, Deterrnlne SDM with a Dropped Control  
  Emergency Plan
Rod  
                            RP/1000/016, Encl. 4.1 (Medical Response)
PT/f/N1103/15, Reactivity Balance (1 0 min)  
  GEN 2.4.39(3.3/3.1)
Admin-103, Perform Manual RCS Leakage Calculation;  
                            (RO Only) (15 min)
PT/0600/01 Q (RQ Only)  
                        are required for SROs. RO applicants require only 4 items
(last exam) (group activity) (18 rnin)  
  unless they are retaking only the administrative topics, when 5 are required.
Admin-202, Perform Surveillance to Verify SSF RCMUP  
                              NUREG-1021, Draft Revision 9
Operability  
PT16001001 Encl. 13.1 (Mode 1 & 2) (new) (15 rnin)  
Admin-402, Perform Actions for Medical Emergency  
RP/1000/016, Encl. 4.1 (Medical Response)  
(RO Only) (15 min)  
are required for SROs. RO applicants require only 4 items  
unless they are retaking only the administrative topics, when 5 are required.  
NUREG-1021, Draft Revision 9  


ES-301                       Administrative Topics Outline               Form ES-304-1
ES-301  
Final Submittal
Administrative Topics Outline  
                        le one): RO / SRO       Operating Test Number:
Form ES-304 -1  
                                        Describe activity to be performed
Final Submittal  
                          Admin-100, Determine SBM with a Dropped Control
le one): RO / SRO  
  Conduct of Operations
Operating Test Number:  
                          Rod
Conduct of Operations
  GEN 2.1.23 (3.Wl.O)
GEN 2.1.23 (3.Wl.O)
                          PT/l/A/1103/15, Reactivity Balance (18 min)
Conduct of Operations
  Conduct of Operations  Admin-110, Determine Minimum Shift Staffing
GEN 2.1.4 (2.3/3.4)
    GEN 2.1.4 (2.3/3.4)  SLC 16.13.1, Minimum Station Staffing Requirements
Equipment Control
                          (new) (SRO only) (15 min)
GEN 2.2.12 (3.0/3.4)
                          Admin-202, Perform surveillance to verify SSF RCMUP
Radiation Control
  Equipment Control
GEM 2.3.4 (2.5/3.1)
                          Operability
GEN 2.4.38 (2.Z4.0)
  GEN 2.2.12 (3.0/3.4)
I
                          PT/600/001, End. 13.1 (Mode 7 & 2) (new) (15 min)
Describe activity to be performed  
  Radiation Control      Admin-300, Calculate the Maximum Permissible Stay
Admin-100, Determine SBM with a Dropped Control  
  GEM 2.3.4 (2.5/3.1)    Time Within Emergency Dose Limits
Rod  
                          (last exam) (Sa0 only) (20min)
PT/l/A/1103/15, Reactivity Balance (1 8 min)  
                          Admin-403, Determine Emergency Classification and
Admin-110, Determine Minimum Shift Staffing  
                          Protective Action Recommendations
SLC 16.13.1, Minimum Station Staffing Requirements  
I  GEN 2.4.38(2.Z4.0)    (SRO only) (group activity) (20 min)
(new) (SRO only) (1 5 min)  
                        are required for SROs. RO applicants require only 4 items
Admin-202, Perform surveillance to verify SSF RCMUP  
                        only the administrative topics, when 5 are required.
Operability  
                            NUREG-1021, Draft Revision 9
PT/600/001, End. 13.1 (Mode 7 & 2) (new) (15 min)  
Admin-300, Calculate the Maximum Permissible Stay  
Time Within Emergency Dose Limits  
(last exam) (Sa0 only) (20 min)  
Admin-403, Determine Emergency Classification and  
Protective Action Recommendations  
(SRO only) (group activity) (20 min)  
are required for SROs. RO applicants require only 4 items  
only the administrative topics, when 5 are required.  
NUREG-1021, Draft Revision 9  


  E§-301                             Control Roodln-Plant Outline                         Form ES-301-2
E§-301  
                            System / JPM Title
Control Roodln-Plant Outline  
      APilIAI1700/15, OP/O/AI1105/09, Encl4.10
Form ES-301-2  
      IKA: EPE-009 EA1. I 3 (4.4/4.4)1 (6 min)
System / JPM Title  
c. CRO-97, Transfer ECCS Suction to the Emergency Sump (1LP-I5
APilIAI1700/15, OP/O/AI1105/09, Encl4.10  
      Failed Closed)                                                           I D.. A.. S.
IKA: EPE-009 EA1 .I3 (4.4/4.4)1 (6 min)  
                                                                                          .L
c. CRO-97, Transfer ECCS Suction to the Emergency Sump (1LP-I5  
[I    EOP, Enclosure 5.12 [KA:BW/E08 EA1 .I (4.0/3.7)] (PRA) (9 min)
11
    d. CRO-015, Establish EFDW Flow Through Startup Valves
Failed Closed)  
      EOP Enclosure 5.27, Alternate Methods for Controlling EFDW Flow
I D. A. S. L
      IKA: BW/A02 AAl.l (4.0/3.8)1 (new) (20 min)
. . . 
  f. CRO-060, Perform Required Actions For Turbine Building Flood
I[  
      AP/lO (Turbine Building Flood)                                             B, s             8
EOP, Enclosure 5.12 [KA:BW/E08 EA1 .I (4.0/3.7)] (PRA) (9 min)  
      IKA: APE BW/A07 AAI .3(3.3/3.5)1 (7 min)
d. CRO-015, Establish EFDW Flow Through Startup Valves  
    g. CRO-900, Release GWD Tank
EOP Enclosure 5.27, Alternate Methods for Controlling EFDW Flow  
      OW1&2/AI1104/018 Encl. 4.9 (GWD Tank Release)
IKA: BW/A02 AAl.l (4.0/3.8)1 (new) (20 min)  
  In-Plant Systems (3 for 8 0 ; 3 for SRO-I; 3 or 2 for SRO-U)
f.  
    i. NLO-039, Prime The Spent Fuel Pool Fill Line
CRO-060, Perform Required Actions For Turbine Building Flood  
      EOP Encl. 5.7, HPI Pump Operations from ASW Pump Switchgear
AP/lO (Turbine Building Flood)  
1      [KA: APE022 AK3.02 (3.5/3.8)] (16 min)                                                   1
B, s  
  j. CRO-053, Bypass Coolant Pump Starting Interlocks
8  
      OP/I 107/004 Enclosure 4.2 IKA: 062 A3.04 (2.7/2.9)1(9 rnin))
IKA: APE BW/A07 AAI .3 (3.3/3.5)1 (7 min)  
  * Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (6)ontroi room,
g. CRO-900, Release GWD Tank  
  (S)imulator, (L)ow-Power, (R)CA
OW1 &2/AI1104/018 Encl. 4.9 (GWD Tank Release)  
                                    NUWEG-1021, Draft Revision 9
In-Plant Systems (3 for 80; 3 for SRO-I; 3 or 2 for SRO-U)  
i.  
NLO-039, Prime The Spent Fuel Pool Fill Line  
EOP Encl. 5.7, HPI Pump Operations from ASW Pump Switchgear  
11
[KA: APE022 AK3.02 (3.5/3.8)] (16 min)  
1  
j.  
CRO-053, Bypass Coolant Pump Starting Interlocks  
OP/I 107/004 Enclosure 4.2 IKA: 062 A3.04 (2.7/2.9)1(9 rnin))  
* Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (6)ontroi room,  
(S)imulator, (L)ow-Power, (R)CA  
NUWEG-1021, Draft Revision 9  


ES-301                             Control Room/ln-Plant Outline                       Form ES-301-2
ES-301  
Facility: Oconee                                           Date of Examination: June, 2004
Control Room/ln-Plant Outline  
Exam bevel (circle one): RO / SRO(I) / SRO(U) Operating Test No.:
Form ES-301-2  
Control Room Systems (8for RO; 7 for SRQ-1; 2 or 3 for   SRO-U)
Facility: Oconee  
                          System / JPM Title                                 Type Code         Safety
Date of Examination: June, 2004  
                                                                                                Function
Exam bevel (circle one): RO / SRO(I) / SRO(U) Operating Test No.:  
a. CRO-O12A, Recover a dropped rod
Control Room Systems (8 for RO; 7 for SRQ-1; 2 or 3 for SRO-U)  
    AP/l/Af1700/15, OP/O/Af1105/09, Encl 4.10
System / JPM Title  
    [KA: 005 AA2.03 (3.5/4.4)] (20 min)
Type Code  
b. CRO- 067, Perform Required Actions for ES Actuation (> 3psig)
Safety  
    EQP Enclosure 5.1 (ES Actuation)
Function  
    [KA: EPE-009 EAl.13 (4.4/4.4)] (6 min)
a. CRO-O12A, Recover a dropped rod  
    Failed Closed)
AP/l/Af1700/15, OP/O/Af1105/09, Encl 4.10  
    EBP, Enclosure 5.12 [KA:BW/E08 E A l . l (4.0/3.7)] (PRA) (9 min)
[KA: 005 AA2.03 (3.5/4.4)] (20 min)  
d. CRO-015, Establish EFBW Flow Through Startup Valves
b. CRO- 067, Perform Required Actions for ES Actuation (> 3psig)  
    EOP Enclosure 5.27, Alternate Methods for Controlling EFBW Flow          B, S,L              4s
EQP Enclosure 5.1 (ES Actuation)  
    [APE-054 AA2.04 (4.2/4.3)] (20 rnin)
[KA: EPE-009 EAl.13 (4.4/4.4)] (6 min)  
e. CRO-700, Place ICS In Auto following Loss Of Auto Power
Failed Closed)  
    AP/23 (Loss Of ICs Power) Enclosure 5.5 (Placing ICs In Auto)                                 7
EBP, Enclosure 5.12 [KA:BW/E08 EAl.l (4.0/3.7)] (PRA) (9 min)  
    [W BWIA02 AAl.l (4.0/3.8)] (new) 15 min)
d. CRO-015, Establish EFBW Flow Through Startup Valves  
f.  CRO-060, Perform Required Actions For Turbine Building Flood
[APE-054 AA2.04 (4.2/4.3)] (20 rnin)  
    AP/lO (Turbine Building Flood)                                                                 8
EOP Enclosure 5.27, Alternate Methods for Controlling EFBW Flow
    I K A APE BW/A07 AA1.3 (3.3/3.5)1 f7 min)
B, S,
g. CRO-900, Release GWD Tank
L
    OP/1&YN1104/018 End. 4.9 (GWB Tank Release)
4s
In-Plant Svstems
e. CRO-700, Place ICS In Auto following Loss Of Auto Power  
          ~*      (3 for RO:3 for SRO-I: 3 or 2 for SRO-U)
AP/23 (Loss Of ICs Power) Enclosure 5.5 (Placing ICs In Auto)  
i. NLO-039, Prime The Spent Fuel Pool Fill Line
[W BWIA02 AAl.l (4.0/3.8)] (new) 15 min)  
    EOP Encl. 5.7, #PI Pump Operations from ASW Pump Switchgear           I D, L, R       1     2
CRO-060, Perform Required Actions For Turbine Building Flood  
    [KA: APE022 AK3.02 (3.5/3.8)] (16 min)
AP/lO (Turbine Building Flood)  
i. CRO-053, Bypass Coolant Pump Starting interlocks
I K A APE BW/A07 AA1.3 (3.3/3.5)1 f7 min)  
    EOP Encl. 5.14 [KA: EPE074 AAl .Ol (3.6/3.9)1 (7 min)
f.
k. NLO-036, Startup A Vital Bus Inverter
7
    OW1107/004 Enclosure 4.2 [KA: 062 A3.04 (2.7/2.9)] (9 min))             B                    6
8
*Type Codes: (B)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room,
g. CRO-900, Release GWD Tank  
(S)imtilator, &)ow-Power, (R)CA
OP/1&YN1104/018 End. 4.9 (GWB Tank Release)  
                                NUREG-1021, Draft Revision 9
In-Plant Svstems (3 for RO: 3 for SRO-I: 3 or 2 for SRO-U)  
~*
i.  
NLO-039, Prime The Spent Fuel Pool Fill Line  
EOP Encl. 5.7, #PI Pump Operations from ASW Pump Switchgear  
I D, L, R  
1
2
[KA: APE022 AK3.02 (3.5/3.8)] (16 min)  
i.  
CRO-053, Bypass Coolant Pump Starting interlocks  
EOP Encl. 5.14 [KA: EPE074 AAl .Ol (3.6/3.9)1 (7 min)  
k.  
NLO-036, Startup A Vital Bus Inverter  
OW1 107/004 Enclosure 4.2 [KA: 062 A3.04 (2.7/2.9)] (9 min))  
*Type Codes: (B)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room,  
(S)imtilator, &)ow-Power, (R)CA  
B
6
NUREG-1021, Draft Revision 9  


ES-301                             Control Room/ln-Plant Outline                   Form ES-301-2
Facility: Oconee                                         Bate of Examination: June, 2004
ES-301  
Exam Level (circle one): RO / SRO(I) / SRQ(U) Operating Test No.:
Control Room/ln-Plant Outline  
Control Room Systems (& for RO;7 for SRO-I; 2 or 3 for SRO-U)
Form ES-301-2  
                        System / JPM Title                                 Type Code*         Safety
Facility: Oconee  
                                                                                              Function
Bate of Examination: June, 2004  
                                .......     ..I
Exam Level (circle one): RO / SRO(I) / SRQ(U) Operating Test No.:  
                                              ...
Control Room Systems (& for RO;  
                                                ...
7 for SRO-I; 2 or 3 for SRO-U)  
                                                  ..L
System / JPM Title  
                                                    -                                        ..............
Type Code*  
b. CRO- 067, Perform Required Actions for ES Actuation (> 3psig)
Safety  
    EOP Enclosure 5.1 (ES Actuation)
Function  
    [KA: EPE-009 EA1.13 (4.4/4.4)] (6 min)
.......  
d. CRO-015, Establish EFDW Flow Through Startup Valves
..I........- L  
                                                                          ! D,A, Ss        I
......... . . . .  
    EOP Enclosure 5.27, Alternate Methods for Controlling EFDW Flow         D, s, L             4s
.  
    [APE-054 AA2.04 14.2/4.3)1(6
b. CRO- 067, Perform Required Actions for ES Actuation (> 3psig)  
                            I. . mid                                    I                I
EOP Enclosure 5.1 (ES Actuation)  
e. CRO-700, Place IC§ In Auto following Loss of Auto Power               I N, A, S
[KA: EPE-009 EA1.13 (4.4/4.4)] (6 min)  
    AP/23 (Loss Of ICs Power) Enclosure 5.5 (Placing iCS In Auto)         I
! D,A, Ss
    EQP Encl. 5.7, #PI Pump Operations from ASW Pump Switchgear
I
    [KA: APE022 AK3.02 (3.5/3.8)](16 min)
d. CRO-015, Establish EFDW Flow Through Startup Valves  
k. NLO-036, Startup A Vital Bus Inverter
[APE-054 AA2.04 14.2/4.3)1(6 mid
    OP/1407/004 Enclosure 4.2 IKA: 062 A3.04 (2.7/2.9)1 (9 min))         I D
EOP Enclosure 5.27, Alternate Methods for Controlling EFDW Flow  
*Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (AJlternatepath, (C)ontrol room,
D, s, L  
(S)imulator, &)ow-Power, (R)CA
4s  
                                  NUREG-1027, Draft Revision 9
I. .  
I  
I  
e.  
CRO-700, Place IC§ In Auto following Loss of Auto Power  
I N, A, S  
AP/23 (Loss Of ICs Power) Enclosure 5.5 (Placing iCS In Auto)  
I  
EQP Encl. 5.7, #PI Pump Operations from ASW Pump Switchgear  
[KA: APE022 AK3.02 (3.5/3.8)] (16 min)  
k. NLO-036, Startup A Vital Bus Inverter  
OP/1407/004 Enclosure 4.2 IKA: 062 A3.04 (2.7/2.9)1 (9 min))  
I D
*Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (AJlternate path, (C)ontrol room,  
(S)imulator, &)ow-Power, (R)CA  
NUREG-1027, Draft Revision 9  


-. .. ...                                   .
-. . . . . .  
                                            -              ..                                     ......-.       ....-.......-
.-
ES-301                   .....         .. ..
..  
                                                    Operaring Tesi'auality Checklist .....-.       .....-.       .....Form FjS-301-3
. . . . . . -.  
  iitial Submittal
. . . . -  
  ___yi_...
.. . . . . .-  
  Facilily: Oconee                                               Dat@of Examination: June 14,2004       Operating Test Number: 1
Operaring Tesi'auality Checklist
                                                                                                                            nitiais
Form FjS-301-3
                                                  1. GENERAL CRlTERlA                                                       1-
.....  
              1I:e cpcral'ng lest confornls win the preuiu.lsly aDprovea 0Llii:ie cnanges ard cons~S1dnlM!h
.. ..  
              sarnp:ina rest. rements (e.$. :O CF4 55.45. overat ona imponance. snfery funct on i!istnnvt.an).
. . . . . -.  
  b.         There is no day-to-day repetition belween this and other operating tests to be administered
. . . . . -.  
              during this examinatin.
. . . . .  
  c.         The operating test shall not duplicate items from the applicants' zudit test(s)(see Sectior D.l .a).
ES-301  
  d.          Overlap with the written examinatior and between different pans of the Operating test is within
iitial Submittal  
              acceptable limits.
___yi_...  
  R           It dpzars that lie oper31 ng le51 .,,I.udferent ate vetweeti competeiit ai80 less-Inan-c@m~elenl
Facilily: Oconee  
              app cinw a1 Inr des a r d t c :censo leve
Dat@ of Examination: June 14,2004  
                                              2. WALK-THROUGH CRITERIA
Operating Test Number: 1  
  a.         Each JPM includes the following, as applicable:
1. GENERAL CRlTERlA  
                  initial mditions
1I:e cpcral'ng lest confornls win the preuiu.lsly aDprovea 0Llii:ie cnanges ard cons~S1dnl M!h  
              .  initiating cues
sarnp:ina rest. rements (e.$. :O CF4 55.45. overat ona imponance. snfery funct on i!istnnvt.an).  
                  references and toois. including assosiated procedures
b.  
                  rea--   able and validated time lifits (average time allowed For completion) and specific
There is no day-to-day repetition belween this and other operating tests to be administered  
                designation if deemed to be time critical by the facility licensee
during this examinatin.  
                  specific performance criteria that include:
c.  
                    - detailed expected actions N,ith sxact criteria and nomenclature
d.
                      - system response and other examiner cues
The operating test shall not duplicate items from the applicants' zudit test(s)(see Sectior D.l .a).  
                      - Statements describing important observations to be made by the applicant
Overlap with the written examinatior and between different pans of the Operating test is within  
                      - criteria for successful completion of the task
acceptable limits.  
                      - identificationof critical steps and their associated performance standards
R  
                      - restrictions on the sequence of steps, if applicable
It dpzars that lie oper31 ng le51 .,,I. udferent ate vetweeti competeiit ai80 less-Inan-c@m~elenl  
  b.         Repetitionfrom operating tests used during the pievioirs licensing examination is within
app cinw a1 Inr des a r d t c :censo leve  
              acceptable limits (30% for the walk-through) and do not compromise test integrity
2. WALK-THROUGH CRITERIA  
  C.        At least 20 percent of the JPMs on each test are new or significantly modified.
a.  
                                                  3. SIMULATOR CRITERIA
Each JPM includes the following, as applicable:  
  a.         The associated simulator operating tests (scenario sets) have been reviewed in accordance with
initial mditions  
              Form E§-301-4 and a copy is attached.
references and toois. including assosiated procedures  
                                                      Printed Name / Signature                                               Dat@
rea--able and validated time lifits (average time allowed For completion) and specific  
  a. Author
designation if deemed to be time critical by the facility licensee  
  b. Facility Reviewerr)
specific performance criteria that include:  
  c. NRC Chief Examiner (#)
. initiating cues
  9. NRC Supervisor
- detailed expected actions N,ith sxact criteria and nomenclature  
  NOTE:     * The facility signature is not applicable for NRC-developed tests.
- system response and other examiner cues  
              # Independent NRC reviewer initial items in Column "c: chief examiner concurrence required.
- Statements describing important observations to be made by the applicant  
                                                  NUREG-1021. Draft Revision 9
- criteria for successful completion of the task  
- identification of critical steps and their associated performance standards  
- restrictions on the sequence of steps, if applicable  
b.  
Repetition from operating tests used during the pievioirs licensing examination is within  
acceptable limits (30% for the walk-through) and do not compromise test integrity  
At least 20 percent of the JPMs on each test are new or significantly modified.  
C.
3. SIMULATOR CRITERIA  
a.  
The associated simulator operating tests (scenario sets) have been reviewed in accordance with  
Form E§-301-4 and a copy is attached.  
Printed Name / Signature  
a. Author  
b. Facility Reviewerr)  
c. NRC Chief Examiner (#)  
9. NRC Supervisor  
nitiais
1-
Dat@
NOTE:  
* The facility signature is not applicable for NRC-developed tests.  
# Independent NRC reviewer initial items in Column "c: chief examiner concurrence required.  
NUREG-1021. Draft Revision 9  


                  .                   ..                 .                   ..       ..     .           .        .
.  
:sa01
..  
~.                            .. ...
.  
                                            Simulator
..  
                                                  . .
..  
                                                            Scenaric
.  
                                                                  . . .....Quality
.  
                                                                            .       Cqecklist
.  
                                                                                    .     .
Simulator Scenaric  
                                                                                                        .
. . . . . . . Quality  
                                                                                                                Form ES-301.:4-
.  
'inal Submittal
Cqecklist  
_p____
.
Facility: Qconee                 Date of Exam: June 14,1004             Scenario Numbers: 1 I2 t 3             Operating Test No.: f
.
1.         The itiitiaJ conditions are realistic, in that some equipment andlor instrumentationmay be out of
            service, but it does not cue the operators into expected events.
.  
2.         The scenarios consist mostly of related events.                                                                           I
Form ES-301.:4 -  
3.
.. ...
            -
.
            Each event description consists of:
.
                  the point in the scenario when it is to be initiated
                  the malfunction(s)that are entered to initiate the event
:sa01
                  the syrnptmslcues that will be visible to the crew
~.
                  the expected operator actions (by shin position)
'inal Submittal  
                  the event termination point (if applicable)
_p____  
4.          No more than one non-meehanistic failure (e.g.. Ppe break) is incorporated into the scenario
Facility: Qconee  
            without a credible precediny incident such as a seismic event.
Date of Exam: June 14,1004  
                                                                                          tion team to obtain
Scenario Numbers: 1 I
            have sufficient time to carry out expected adivities without undue time constraints. Cues are
2 t 3  
            given.
Operating Test No.: f  
8.         The simulator modeling is not altered.
1.  
                                                ed. Pursuant to 10 CFR 55.46(d). any open simulator
The itiitiaJ conditions are realistic, in that some equipment andlor instrumentation may be out of  
                                                eeri evaluated to ensure that functional fidelity is maintained
service, but it does not cue the operators into expected events.  
10         Every ocerator w I % evalilatea :.jng a! :east one new or s yn.f conGy mod feo srznar a. A
2.  
            orhc; sceim os liaie m e n B Iereo .n accordance witn QPC!.U.I D.5 of ES. 301
The scenarios consist mostly of related events.  
            All individual operator competencies can be evaluated, as verified usinQForm ES-301-6(submit
3.  
            the form along with the slmulatoi scenarios).
Each event description consists of:  
12.       Each applicant will be significantly invoived in the minimum number of transients and events
-
1.         Total malfunctions (5-6)
the point in the scenario when it is to be initiated  
2.         Malfunctions afler EOP entry (1-2)
the malfunction(s) that are entered to initiate the event  
3.         Ahnormal events (2-4)
the syrnptmslcues that will be visible to the crew  
4.         Major transients (1-2)
the expected operator actions (by shin position)  
                                              NUREG-1021 Draft Revision 9
the event termination point (if applicable)  
                                                                    ~
No more than one non-meehanistic failure (e.g.. Ppe break) is incorporated into the scenario  
without a credible precediny incident such as a seismic event.  
4.
tion team to obtain  
have sufficient time to carry out expected adivities without undue time constraints. Cues are  
given.  
8.  
The simulator modeling is not altered.  
ed. Pursuant to 10 CFR 55.46(d). any open simulator  
eeri evaluated to ensure that functional fidelity is maintained  
10  
Every ocerator w I % evalilatea :.j ng a! :east one new or s yn.f conGy mod feo srznar a. A  
orhc; sceim os liaie men B Iereo .n accordance witn QPC!.U.I D.5 of ES. 301  
All individual operator competencies can be evaluated, as verified usinQ Form ES-301-6  
(submit  
the form along with the slmulatoi scenarios).  
12.  
Each applicant will be significantly invoived in the minimum number of transients and events  
1.  
Total malfunctions (5-6)  
2.  
Malfunctions afler EOP entry (1-2)  
3.  
Ahnormal events (2-4)  
4.  
Major transients (1-2)  
I
NUREG-1 021
~ Draft Revision 9  


~.                             . . ~ ~   ~ ~   ~   . ~             .. ~                          .... ~...
.... ~...  
E S - ~                               .Transientand
~.
                                      . ~ ~ ~Event       ~ Checklist
.
                                                                - .         -. . . .           Form ES-301-5
.
                                                                                              ~'..           ..
~
                                                                                                              .. ..-
~
Final Subrniikl
~
                                          OPERATING TEST NO.: 1
~
                    .. .
~
AsSRO         !: Instrument/             2*         2, 3
.
              j Component
~
                                                                                8 i
   
Instructions:     (1)     Enter the operating test number and Form ES-D-1 event numbers for each evolution
. .  
                  (2)    %t&tivity manipulations ma be conducted under normal or controlled abnormal
~  
                          conditions refer to Section 8.5.d) but must be significant per Section 6.2.a of
E S - ~
                          Append!x
Final Subrniikl
                            ~~~    ~
.. Transientand  
                                      d.
~ ~ ~ ~ - . 
                                      ~
Event Checklist -. . . .
                                        *Reactivity and normal evolutions may be replaced with additional
~'..  
                          instrument or comoonent malfunctions on a one-for-onn
Form ES-301-5  
                                                                            ~. . .   basis
.... . .-  
                  (3:     Wnenever praci cat. both insltynent arid component ma:fLnclions s h o ~ ! dbe
OPERATING TEST NO.: 1  
                          included; only those that require verifiable actiow that provide insight to the
. . .  
                          app1;cant's competerice count toward rtie r i i n i m m i'euuireinenl.
AsSRO ! : Instrument/  
Author:
2*  
NRC Reviewer:
2, 3  
                                      NUREG-1021, Draft Revision 9
j Component  
8
i
Instructions:  
(1)  
Enter the operating test number and Form ES-D-1 event numbers for each evolution  
%t&tivity manipulations ma be conducted under normal or controlled abnormal  
conditions refer to Section 8.5.d) but must be significant per Section 6.2.a of  
Append!x d. *Reactivity and normal evolutions may be replaced with additional  
instrument or comoonent malfunctions on a one-for-onn basis
(2)
~.  
. .  
~~~
~
~
(3:  
Wnenever praci cat. both insltynent arid component ma:fLnclions sho~!d be
included; only those that require verifiable actiow that provide insight to the  
app1;cant's competerice count toward rtie r i i n i m m i'euuireinenl.  
Author:  
NRC Reviewer:  
NUREG-1021, Draft Revision 9  


E§-304                                 Competencies Checklist                           Form ES-301-6
E§-304  
Final Submittal
Final Submittal
                                      SRO                     RO                        BOP
Competencies
      Competencies                SCENARIO
Interpret / Diagnose
                                    -
Events and Conditions
                                        2
Comply With and
                                    -
Use Procedures (1)
  Interpret / Diagnose                2,3.4
Operate Control
  Events and Conditions
Boards (2)
  Comply With and                    2,3.4    2,3,4
Communicate and
                                      5, 6. 7  5,6, 7
lnteract
  Use Procedures (1)                    8       8
Demonstrate
  Operate Control
Supervisory
  Boards (2)
Ability (3)
                                      1, 2,3
Comply With and
  Communicate and                    4. 5,6
Use Tech. Specs. (3)
                                      7. 8
Competencies Checklist  
  lnteract
Form ES-301-6  
  Demonstrate                3,4,5
SRO  
  Supervisory                6.7,8
SCENARIO  
                                9
3,4,
  Ability (3)
5
  Comply With and            3, 5
6.7,
  Use Tech. Specs. (3)
8
  Notes:
9
  (1) Includes Technical Specification compliance for an RO.
3, 5
  (2) Optional for an §BO-U.
-  
  (3) Only applicable to SROs.
2  
Instructions:
2, 3.4  
Circle the applicant's license type and enter one or more event numbers that will ailow the examiners to
-
evaluate every applicable competency for every applicant.
2, 3.4  
Author:
5, 6. 7  
NRC Reviewer:
8  
NUREG-1021, Draft Revision 9
1, 2, 3  
4. 5, 6  
7. 8  
2, 3,4  
5, 6, 7  
8  
RO
BOP
Notes:  
(1) Includes Technical Specification compliance for an RO.  
(2) Optional for an §BO-U.  
(3) Only applicable to SROs.  
Instructions:  
Circle the applicant's license type and enter one or more event numbers that will ailow the examiners to  
evaluate every applicable competency for every applicant.  
Author:  
NRC Reviewer:  
NUREG-1021, Draft Revision 9  


ES-401                                           Written Examination                           Form ES-401-6
ES-401  
                                                    Qualitv Checklist
Written Examination  
                                                      ~~ ~
Qualitv Checklist
Final Submittal
Form ES-401-6  
3.         SRO questions are appropriate per Section D.2.d of ES-401
~~  
            Question duplication from the license screening/audit exam was controlled as
~  
          indicated below (ch@&the item that applies) and appears appropriate:
Final Submittal  
              the audit exam was systematically and randomly developed; or
3.  
              the audit exam was completed before the license exam was started; 01
SRO questions are appropriate per Section D.2.d of ES-401  
          g t h e examinations were developed independently; or
Question duplication from the license screening/audit exam was controlled as  
              the licensee certifies that there is no duplication; or
indicated below (ch@& the item that applies) and appears appropriate:  
6.         Bank use meets limits (nu more than 75 percent
the audit exam was systematically and randomly developed; or  
          from the bank at least 10 percent new, and the
the audit exam was completed before the license exam was started; 01  
          rest madified); enter the actual RO / SRO-only
g t h e examinations were developed independently; or  
          question distribution(s) at right
the licensee certifies that there is no duplication; or  
7.       Belween 50 and 60 percent of the questions on
6.  
          the 80 exam are written at the
Bank use meets limits (nu more than 75 percent  
          comprehensionianalysislevel; the SRO exam may               32 / 8          43 i 17
from the bank at least 10 percent new, and the  
          exceed 60 percent if the randomly selected WAS
rest madified); enter the actual RO / SRO-only  
          suppart the higher cognitive levels; enter the
question distribution(s) at right  
          actual RB / SRO question distribution(s) at right
7.  
          Referencedhandoutsprovided do not give away answers                                               I
Belween 50 and 60 percent of the questions on  
          approved examination outline and is appropriate fur the Tier to which they are
the 80 exam are written at the  
          assioned: deviations are iustitied
comprehensionianalysis level; the SRO exam may  
IO.       Question psychometric quality and format meet ES, Appendix B, guiddlnes
exceed 60 percent if the randomly selected WAS  
b. Facility Reviewer (')
suppart the higher cognitive levels; enter the  
c. NRC Chief Examiner (#)
actual RB / SRO question distribution(s) at right  
d. NRC Regional Supervisor
32 / 8
NUREG-1021, Draft Revision 9
43 i 17
I
Referencedhandouts provided do not give away answers  
approved examination outline and is appropriate fur the Tier to which they are  
assioned: deviations are iustitied  
IO.  
Question psychometric quality and format meet ES, Appendix B, guiddlnes  
b. Facility Reviewer (')  
c. NRC Chief Examiner (#)  
d. NRC Regional Supervisor  
NUREG-1 021, Draft Revision 9  


ES-401                                           Written Examination                                 Form 3-401-6
ES-401  
                                                    Quality Checklist
Written Examination  
nitial Submittal
Quality Checklist
Facility: Oeonee                               Date of Exam: June 14,2004                       Exam Level: RQ/SRO
Form 3-401-6  
                                                                                    -               I
nitial Submittal  
4.       Question selection and duplication from the last two NRC licensing exams
Facility: Oeonee  
          indicated below (check the item that applies) and appears appropriate:
Date of Exam: June 14,2004  
          -the audit exam was systematically and randomly developed: or
Exam Level: RQ/SRO  
              the audit exam was completed before the license exam was started; or
-  
          z t h e examinations were developed independently:or
I  
          -the licensee certifies that there is no duplication; or
4.  
          support the higher cognitive levels: enter the
Question selection and duplication from the last two NRC licensing exams  
          actual RO ISRQ question distribution@)at right
indicated below (check the item that applies) and appears appropriate:  
e.         Referenceslhandouts provided do not give away answers
-  
9.       Question content conforms with specific KIA statements in the previously
the audit exam was systematically and randomly developed: or  
11.       The exam contains. the required number of one-point, multiple choice items:
z t h e examinations were developed independently: or  
                                                    Prlnted Name I Si                                         Date
-  
a. Author                                                                                                 Jgr.&Ef
the licensee certifies that there is no duplication; or  
b. Facility Reviewer (*)                                                                                 Y*$
the audit exam was completed before the license exam was started; or
c. NRC Chief Examiner (#)                                                                                   5 5 0
support the higher cognitive levels: enter the  
d . NRC Regional Supervisor                                                                               d-I-2oei'
actual RO I
                                                                                                            -
SRQ question distribution@) at right  
Note:     * The facility reviewer's initialdsignature are not applicable for NRC-developedexaminations.
e.  
NUREG-1021, Draft Revision 9
Referenceslhandouts provided do not give away answers  
9.  
Question content conforms with specific KIA statements in the previously  
11.  
The exam contains. the required number of one-point, multiple choice items:  
Prlnted Name I Si  
Date  
a. Author  
Jgr.&Ef  
b. Facility Reviewer (*)  
$*Y  
c. NRC Chief Examiner (#)  
5 5 0
d. NRC Regional Supervisor  
d-I-2oei'  
-  
Note:  
* The facility reviewer's initialdsignature are not applicable for NRC-developed examinations.  
NUREG-1021, Draft Revision 9  


ES-401     OCONEE 2004-301                                                     Written Examination                                                               Form ES-401-9
ES-401  
                                                                                Review Worksheet
OCONEE 2004-301  
                                                                                        Instructions
Written Examination  
                                !Refer to Section D of ES-401 and Appendix El for additional information regarding each of the following concepts.]
Form ES-401-9  
1.   Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
Review Worksheet  
2.    Enter the level 01 difficulty (LOB) of sack question using a t ~ 5 (easy - difficult) rating scaie (questions in the 2 4 range are acceptable).
Instructions  
                                                                                                                              ~
!Refer to Section D of ES-401 and Appendix El for additional information regarding each of the following concepts.]  
3.   Check the appropriate box if a psychmetric fiaw is identified:
1.  
                The stem lacks sufficient focus to elicit the Correct enswer (e.g., unclear intent, more information is needed, or too much needless information).
2.
                The stem or distractors wntain cues (i.e.. clues, specific determiners, phrasing, longth, etc).
Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.  
                The answer choices are a coilection of unreialed truelfalse statements.
Enter the level 01 difficulty (LOB) of sack question using a t  
                  One or more distractors is not credible.
~ 5 (easy - difficult) rating scaie (questions in the 2 ~ 4 range are acceptable).  
                  One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
3.  
4.   Check the appropriate box if a job content error is identified:
Check the appropriate box if a psychmetric fiaw is identified:  
                The question is not linked to the job requirements (is.,     the question has a valid WA but, as written. is not operational in content).
The stem lacks sufficient focus to elicit the Correct enswer (e.g., unclear intent, more information is needed, or too much needless information).  
                  The question requires the recall of knowledgp that is too specific for the closed reference test mode (Le., it IS not required to be known from memory)
The stem or distractors wntain cues (i.e.. clues, specific determiners, phrasing, longth, etc).  
                  The question contains data with an unrealistic !eve1 of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
The answer choices are a coilection of unreialed truelfalse statements.  
                  The question requires reverse logic or application compared to the job requirements.
One or more distractors is not credible.  
5.   Check questions that are sampled for conformance with ttla approved W A and thoso that are desiqnated SRO-only (K/A and license level mismatches are unacceptable).
One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).  
6.    Based on the reviewer's judgment, is the question as Writt@n(U)nacceptable(requiring repair or replacement), in need of (E,!ditorial enhancement. M (S)atisfactory?
4.  
7.  At a minimum. exprain any "u" ratings (e.g., how
Check the appropriate box if a job content error is identified:  
                                                          t                                                              h                                               y
The question is not linked to the job requirements (is.,  
                                                                              ROISRO Combined Question
the question has a valid WA but, as written. is not operational in content).  
                                                                                                            S 1008~~3.05         Matches WA. New
The question requires the recall of knowledgp that is too specific for the closed reference test mode (Le., it IS not required to be known from memory)  
The question contains data with an unrealistic !eve1 of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).  
The question requires reverse logic or application compared to the job requirements.  
5.  
6.
7.
Check questions that are sampled for conformance with ttla approved WA and thoso that are desiqnated SRO-only (K/A and license level mismatches are unacceptable).  
Based on the reviewer's judgment, is the question as Writt@n (U)nacceptable (requiring repair or replacement), in need of (E,!ditorial enhancement. M (S)atisfactory?  
At a minimum. exprain any "u" ratings (e.g., how t
h
y
ROISRO Combined Question  
S 1008~~3.05  
Matches WA. New  


3. Psychometric Flaws 4. Job Content Flaws
3. Psychometric Flaws  
                                              U!E/S I                           7.
4. Job Content Flaws  
                                                                            Exolanatim
U!E/S I  
                                                    Licensee claims to have had pump impeller
7.  
                                                      dama.ge similar fo this. OK
Exolanatim  
                                                      Licensee will work on new question (Offered to
Licensee claims to have had pump impeller  
                                                S help write a question) Question rewrftten. SAT
dama.ge similar fo this. OK  
                                          I IS    1026AA2.03 ADDearS to match the WA Bank
Licensee will work on new question (Offered to  
                                            I IU 029EK3.11WA not matched. The WA asks for
help write a question) Question rewrftten. SAT  
                                                      reasons whv actions are taken. This auestion ask
S
                                                      for correct &tion. Bank
I
                                          I   S     038EK1.02 Very Simple Bank
I S 1026AA2.03 ADDearS to match the WA Bank  
U 029EK3.11 WA not matched. The WA asks for  
I
I reasons whv actions are taken. This auestion ask  
for correct &tion. Bank  
I  
S  
038EK1.02 Very Simple Bank  


  I                             7,
I  
  I
7,  
S   040AK2.02 very simple New is it a valid assumption
I  
  lthat RCPs are still oDeratina?
S 040AK2.02 very simple New is it a valid assumption  
U   054AK1.01 Meets WA do not believe that B is a
lthat RCPs are still oDeratina?  
    credible distractor. Bank
U 054AK1.01 Meets WA do not believe that B is a  
    Licensee thinks that the distractor is credible.
credible distractor. Bank  
Still think it needs to be replaced. Chanued RB
Licensee thinks that the distractor is credible.  
  pressure. SAT
Still think it needs to be replaced. Chanued RB  
    Licensee will change initial conditions. ChaRQeC
pressure. SAT  
U   058AA1.03 does not appear to have credible
S
    distractors. (With the units separated unit two
Licensee will change initial conditions. ChaRQeC  
    cannot supply power to the DC bus. And the back ul:
U  
    char er not being in service is not credible. Very
058AA1.03 does not appear to have credible  
    Simikr to question 4 on SRQ exam. Bank
distractors. (With the units separated unit two  
    Licensee to replace question. New Question $A'
cannot supply power to the DC bus. And the back ul:  
S IBEIOEA2.1 Matches WA New
char er not being in service is not credible. Very  
Simikr to question 4 on SRQ exam. Bank  
Licensee to replace question. New Question $A'  
S IBEIOEA2.1 Matches WA New  


  4. Job COI
4. Job COI  
                6.
Link
              I/E/S
6. I
                    II                            7,
7,
                                              Explanation
I/E/S I
Link
Explanation  
              U IBE05EAI .3 matches WA Stem somewhat confusing
U IBE05EAI .3 matches WA Stem somewhat confusing  
                      could lead one to believe that question has more
could lead one to believe that question has more  
                      than one correct answer. New
than one correct answer. New  
                      Discussed wifh Licensee, wil/ change initial
Discussed wifh Licensee, wil/ change initial  
                      conditions to allow onlv one correct answer.
conditions to allow onlv one correct answer.  
              U     BE04EA1.lAppears to match WA. Is 220 inches the
U BE04EA1 .lAppears to match WA. Is 220 inches the  
                      level that the pressurizer normally decreases to aftei
level that the pressurizer normally decreases to aftei  
                      a trip? Same question for pressure. If not, these ari
a trip? Same question for pressure. If not, these ari  
                      not credible distractors. New
not credible distractors. New  
                      Licensee asked for us to take another look at the
Licensee asked for us to take another look at the  
                      question, the feel like the distractors are
question, the feel like the distractors are  
                      credible. WiIydiscuss on 41%.
Discussed and auestion acceDted.  
              S
QQIAG2.4.31 If rods are withdrawing on there own  
                      Discussed and auestion acceDted.
this meets the WA if not we need to change the  
              U      QQIAG2.4.31If rods are withdrawing on there own
guestion. Does a boration ever occur if the deborate  
                      this meets the WA if not we need to change the
credible. Wi Iy discuss on 41%.
                      guestion. Does a boration ever occur if the deborate
S
              U     005AG2.4.6 Will one rod stuck at 63% give you the
U  
                      conditions listed in the stem? This must be a very
U
                      reactive rod. New
S
                S      Licensee changed power level, question Sat.
005AG2.4.6 Will one rod stuck at 63% give you the  
              U 032AA2.04 Does not meet WA there is not a loss of
conditions listed in the stem? This must be a very  
                      SR detector. New
reactive rod. New  
                      bicensee will rewrite question
Licensee changed power level, question Sat.  
U 032AA2.04 Does not meet WA there is not a loss of  
SR detector. New  
bicensee will rewrite question  


3. Psvchometric Flaws 4. Job Content Flaws                                       7.
3. Psvchometric Flaws  
                                                                            Explanation
4. Job Content Flaws  
                                          X     U 067AK3.04 WA is for knowledge of reasons for
7.  
                                                    actions in the EOP for plant fire. There are no
Explanation  
                                                    reasons asked for in this question. Bank
X  
                                                    Licensee claims that they have no actions in
U 067AK3.04 WA is for knowledge of reasons for  
                                                    EOPs that deal with a fire. Will discuss on 4/28.
actions in the EOP for plant fire. There are no  
                                                    Question retJlaced SAT
reasons asked for in this question. Bank  
                                            I   s
Licensee claims that they have no actions in  
                                                    The reason is listed in the stem. Should be in the
EOPs that deal with a fire. Will discuss on 4/28.  
                                                    responses. How can 532 degrees be credible? Is
Question retJlaced SAT  
                                                    there a special reason for this temperature? New
I  
                                                S 069AG2.1.2 appears to match WA Bank
s  
                                                    076AA1.04 appears to Match WA if there are no
The reason is listed in the stem. Should be in the  
                                                    other installed monitors that can inform the operator
responses. How can 532 degrees be credible? Is  
                                                    that the fuel clad is leaking. Some of the distractsis
there a special reason for this temperature? New  
                                                    do not appear to be credible. Explanations needed.
S  
                                                    New
069AG2.1.2 appears to match WA Bank  
                                                    Licensee will work on last two distractors.
076AA1.04 appears to Match WA if there are no  
                                                    Chanued distratctors and stern
other installed monitors that can inform the operator  
                                            1 I S IBE13EK1.2 Aaaears to meet the WA. Bank
that the fuel clad is leaking. Some of the distractsis  
do not appear to be credible. Explanations needed.  
New  
Licensee will work on last two distractors.  
Chanued distratctors and stern  
1  
I S IBE13EK1.2 Aaaears to meet the WA. Bank  


iq-5
iq-5  
F/H) (1-5)
F/H)  
                                              7.
(1-5)  
                                          Explanation
7.  
                  I
Explanation  
                    ues not appear to be credible. New
I  
                                            anging distractor D
ues not appear to be credible. New  
                              Appears to meet the WA Distractor B is
anging distractor D  
                  not credible. (120VAC vital power to CC pumps)?
Appears to meet the WA Distractor B is  
          I I    Licensee will replace two disfractors. Chanaed
not credible. (120VAC vital power to CC pumps)?  
                  distractors.
Licensee will replace two disfractors. Chanaed  
                  Changed Question added RB pressure and two
I I
          1 I S 1006K6.01 ADDearS to match WA Bank
distractors.  
                E 007A1.03 Appears to match WA Distractor A does
Changed Question added RB pressure and two  
                  nut appear to be credible, think about replacing with
1  
                  a value > 303 degrees. New
I S 1006K6.01 ADDearS to match WA Bank  
                  Licensee will replace distractor A.
E 007A1.03 Appears to match WA Distractor A does  
              -S
nut appear to be credible, think about replacing with  
                  Changed distractor SAT
a value > 303 degrees. New  
                  minimum level in the CCWS surge tank, not the
Licensee will replace distractor A.  
                  normal control levels. New (does the CRB return
Changed distractor SAT  
                  value ensure a minimum level?)
-
S
minimum level in the CCWS surge tank, not the  
normal control levels. New (does the CRB return  
value ensure a minimum level?)  


3.Psychometric Flaws I 4. Job Content Flaws I 5. Other
3. Psychometric Flaws  
                                                          steam tables are required to answer question. Only
I  
                                                          a knowledge of the system setpoints are required.
4. Job Content Flaws I 5. Other  
                                                          This question helps answer question # 29 by giving
steam tables are required to answer question. Only  
                                                          the applicant a situation > 260 inches in the
a knowledge of the system setpoints are required.  
                                                          pressurizer with the unit still on line. Bank
This question helps answer question # 29 by giving  
                                                          Licensee will replace question with # 8. §AT
the applicant a situation > 260 inches in the  
                                                          distractors. §AT
pressurizer with the unit still on line. Bank  
                                                      U 022A3.01 Matches WA Question # 36 provides the
Licensee will replace question with # 8. §AT  
                                                          answer for this question. Distractors A and B do not
distractors. §AT  
                                                      S appear to be credible. New
U 022A3.01 Matches WA Question # 36 provides the  
                                                          Licensee to rewrite question. Replaced SAT
answer for this question. Distractors A and B do not  
                                                      U 026A2.07 Appears to match W A Distractor A is not
S appear to be credible. New  
                                                          credible. If answer b was correct then A would be
Licensee to rewrite question. Replaced SAT  
                                                          correct also. Need to work with the distractors. New
U 026A2.07 Appears to match WA Distractor A is not  
                                                          Licensee to replace distractor(s).
credible. If answer b was correct then A would be  
                                                          Chanued ail disrtactors. SAT
correct also. Need to work with the distractors. New  
                                                          ..........................................................................................
Licensee to replace distractor(s).  
                                                      E 1039G2.1.28 Appears to match WA appears to be a
Chanued ail disrtactors. SAT  
                                                      S
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  
                                                        Iseries of T/F it&tements reword stem.and
.  
                                                          distractors. Bank
E 1039G2.1.28 Appears to match WA appears to be a  
                                                          Licensee to rewrite quesfion. Fiepkced Questjoj
series of T/F it&tements reword stem.and  
distractors. Bank  
I
S
Licensee to rewrite quesfion. Fiepkced Questjoj  


qz
qz  
F/H) (1-5)
F/H)  
          3. Psychometric Flaws 1   4. Jobcontent Flaws
(1-5)  
                                  Link          units
3. Psychometric Flaws  
                                                                I 5. Other I 6. I                                     7.
1  
                                                                                                                Explanation
4. Jobcontent Flaws I 5. Other I 6. I  
                                                                I I I        S   064A3.07 Boes not really test load sequencing.
7.  
                                                                                  ISank
Link
                                                                                    Oconee does not have load sequencin (no
units
                                                                                    diesels) but they do have load shed. &;ref
Explanation  
                                                        ..................... __    Examiner gave approval for satisfying the MA.
S  
                                                                              U  073G2.1.33 ADpears !o match WA A aqd H
064A3.07 Boes not really test load sequencing.  
                                                                                  d:stractors may not be creoihlo. New
I I I
                                                                                    Licensee will to look at repiacing distractor E. A
ISank  
                                                                              S   is sat. Accepted SAT
Oconee does not have load sequencin (no  
                                                                                                  ...............................................................
diesels) but they do have load shed. &;ref  
                                                                              S  076A2.02 Ariooars to match WA Bank
Examiner gave approval for satisfying the MA.  
                                                                    X          U   078K4.03 Does not meet WA Knowledge of the
073G2.1.33 ADpears !o match WA A aqd H  
                                                                                  desi n features and or interlocks which provide for
d:stractors may not be creoihlo. New  
                                                                                  the 8llowing Securing of SAS upon loss of cooling
Licensee will to look at repiacing distractor E. A  
                                                                                  water. The compressor trips on High Temperature.
076A2.02 Ariooars to match WA Bank
                                                                                  All this question IS askin is what is the normal
.....................
                                                                                  supply and backup suppgy. Needs to ask when does
__
                                                                                  Service air isolate. New
U
                                                                                    Licensee re uested to Pick B new KLA due to
S  
                                                                                                7
is sat. Accepted SAT  
                                                                                    SAS not is0 ating. Will select one. Randomly
S
                                                                                  reDIaced with 078K4.02
...............................................................  
X
U 078K4.03 Does not meet WA Knowledge of the  
desi n features and or interlocks which provide for  
the 8llowing Securing of SAS upon loss of cooling  
water. The compressor trips on High Temperature.  
All this question IS askin is what is the normal  
supply and backup suppgy. Needs to ask when does  
Service air isolate. New  
Licensee re uested to Pick B new KLA due to  
reDIaced with 078K4.02
SAS not is0 7 ating. Will select one. Randomly  


    I   I
I  
I I 1 U 1103K3.03 Aooears to match W A Distractors Band D
I  
          not credible: hew.
I  
I I I S b 3 A 4 . 0 2 Appears to match WA Bank
I  
x     U 026K4.06 Only artiaily meets WA. Sodium
1 U 11 03K3.03 Aooears to match WA Distractors Band D  
                          P
not credible: hew.  
          Hydroxide shou d be somewhere in the question or
I  
          answer. If it was not added the scavenging would
I  
          not take place. Bank
I S b 3 A 4 . 0 2 Appears to match WA Bank  
          Licensee to look at rewording question
x  
          Reworded Question SAT
U  
I I I  U 103K4.06 a ears to match WA Distractors A and E3
026K4.06 Only artiaily meets WA. Sodium  
          are not creJgie. New
Hydroxide shou P d be somewhere in the question or  
          NRC Po work on auestion Wrote net
answer. If it was not added the scavenging would  
      U 007K1.01 appears to match WA. Several of the
not take place. Bank  
          distractors could be correct with the indications
Licensee to look at rewording question  
          given. Need to make distractors more incorrect or
Reworded Question SAT  
          change conditions in the stem. New
U  
      S  Licensee to work on distractors.
103K4.06 a ears to match WA Distractors A and E3  
          Rewrote uuestion SAT.
NRC Po work on auestion Wrote net  
      U 005K2.03 appears to match WA distractor B is not
I I I
          credible (what is the voltage on this bus)? Should
are not creJgie. New
          have another bus with SF in it. New
U  
      S  Licensee to change distractor B.
007K1.01 appears to match WA. Several of the  
  I     Chanaed uuestion SAT
distractors could be correct with the indications  
given. Need to make distractors more incorrect or  
change conditions in the stem. New  
Licensee to work on distractors.  
Rewrote uuestion SAT.  
S
U  
005K2.03 appears to match WA distractor B is not  
credible (what is the voltage on this bus)? Should  
have another bus with SF in it. New  
Licensee to change distractor B.  
S
I  
Chanaed uuestion SAT  


3. Psvchotnetric Flaws I 4. Job Content Flaws
3. Psvchotnetric Flaws  
                                              3I
I  
                                              1= SXO U/E/S
4. Job Content Flaws  
                                                        6'
1= 3
                                                                                        7.
SXO U/E/S  
                                                                                    Emlanation
6' I
                                                            Question rewritten SAT.
7.  
                                                            029K4.03A pears to match WA. D is not a credible
Emlanation  
                                                            distractor. Epew
Question rewritten SAT.  
                                                            Licensee to replace distractor. Re~laced
029K4.03 A pears to match WA. D is not a credible  
                                                      S     Distractor.
distractor. Ep ew
                                                        S   041 K6.03 Appears to match WA Mew
Licensee to replace distractor. Re~laced  
                                                1   I S   1045A2.17 amears to match WA to make D more
S  
                                                            incorrect oumay want to add IAW ... procedure
Distractor.  
                                                I I I      name or I h A s etc. Bank On 2003 Initial Exam
S 041 K6.03 Appears to match WA Mew  
                                                            Licensee to add IA W IMAs to the stem.
1  
I S 1045A2.17 amears to match WA to make D more  
incorrect oumay want to add IAW ... procedure  
name or IhAs etc. Bank On 2003 Initial Exam  
I Licensee to add IA W IMAs to the stem.  
I I 


4. Jab Content Raws                               7.
4. Jab Content Raws  
                                              Explanation
7.  
                      S 002K1.04 Appears to meet WA Distractor I3 does nc
Explanation  
                        appear tu be credible. Bank
S  
                        Discussed with licensee, question is SAT.
002K1.04 Appears to meet WA Distractor I3 does nc  
                      S G2.1 .I 1 Appears to match KIA. Bank
appear tu be credible. Bank  
                    I S lG2.1.27 Aneears to match WA.     Bank
Discussed with licensee, question is SAT.  
                    I S IG2.1.21 Appears to match WA. New
S  
                      U 62.2.13 Appears tu match KIA. Distractor C does
G2.1 .I 1 Appears to match KIA. Bank  
                        not appear to be a credible distractor. Bank
I S lG2.1.27 Aneears to match WA. Bank  
                        Licensee to replace distractor C. RetJlaced all
I S IG2.1.21 Appears to match WA. New  
                      S  distractors SAT
U  
                      U  G 2.2.1 1 Appears to match WA. Distractors A and B
S
                        do not appear to be credible. New
distractors SAT
                        Licensee to replace distractors A and B. (With
U
                      S  white tags) ReDlaced A and B SAT
S
                    I S lG2.2.30 Aeeears to match WA.     Bank
62.2.13 Appears tu match KIA. Distractor C does  
not appear to be a credible distractor. Bank  
Licensee to replace distractor C. RetJlaced all  
G 2.2.1 1 Appears to match WA. Distractors A and B  
do not appear to be credible. New  
Licensee to replace distractors A and B. (With  
white tags) ReDlaced A and B SAT  
I S lG2.2.30 Aeeears to match WA. Bank  


3. PS) met    4. Job Coi                                       7.
3. PS)  
      -
m e t 
      TIF                                                  Explanstion
TIF -
          Link
4. Job Coi  
                                  S lG2.3.4 Appears to match WA.       New
Link
                        SRO ONLY
SRO ONLY
                        I        U
7.  
                                  S
Explanstion  
                                    008AG2.2.25 Does not match WA Knowledge of
S lG2.3.4 Appears to match WA. New  
                                    bases in technical specifications for limitin
I
                                    conditions for operations and safety limitsy2.5/3.3.7)
U 008AG2.2.25 Does not match WA Knowledge of  
                                    As slated the question is asking how to appl tech
bases in technical specifications for limitin  
                                    spec. Need to rework to fit in bases. Bank duestior
conditions for operations and safety limitsy2.5/3.3.7)  
                                    Licensee undersfancfs comment will continue to
As slated the question is asking how to appl tech  
                                    work on develomnent of auesticn fhat test
spec. Need to rework to fit in bases. Bank duestior  
                                    Bases. 4/28 redaced auektion satisfied WA and
Licensee undersfancfs comment will continue to  
                                    SRO onlv changed distractor I3 and added 1.8 gpm
work on develomnent of auesticn fhat test  
                                    to stem.
S
Bases. 4/28 redaced auektion satisfied WA and  
SRO onlv changed distractor I3 and added 1.8 gpm  
to stem.  


3.Psvchornetric Flaws
3. Psvchornetric Flaws  
                      -
-  
                      linutia                           Explanation
linutia  
                                credible if Unit 3 is unable to be connected to Unit I
Explanation  
                                Distractor B to be replaced.
credible if Unit 3 is unable to be connected to Unit I  
                                4/28 Distractor B reDiaced and.acf!on.s.tg
Distractor B to be replaced.  
                                a&c.totraie to SRO level.
4/28 Distractor B reDiaced and.acf!on.s.tg  
                                Sfem to be modified to include pump trip in
a&c.totraie to SRO level.  
                                Licensee stated that they did not ex ect R sgt
Sfem to be modified to include pump trip in  
                                know amkabilifv IModes) on F/S. fieed to
know amkabilifv IModes) on F/S. fieed to  
                                                                              l8
Licensee stated that they did not ex ect l 8 
                              S decide iiow to prikeed. Piof 8 direct hook u1)
R s tg
                                attachment okav. Chanued stem to $fate that
S  
                                pumD trimed. Question SAT
decide iiow to prikeed. Piof 8 direct hook u1)  
attachment okav. Chanued stem to $fate that  
pumD trimed. Question SAT  


rI-r 3. Psychometric Flaws
3. Psychometric Flaws  
,tern Cue:   T/F   Cred.
I 4. Job Content Flaws
                    Oist.
t 5. Other
                          I   4. Job Content Flaws
,tern Cue: r
                            Link
T/F  
                                                    t 5. Other
Cred. I
                                                                l/WS
Oist.  
                                                                    I                          7.
Link -r
                                                                                            Explanation
I  
                                                                      No changes of cmmenfs. Question SAT
7.  
                                                                U   BEO5EG2.2.6 This is not really a change to
l/WS  
                                                                      procedures, but how to use procedures. It really
Explanation  
                                                                      does not taik abut the procedure change process.
No changes of cmmenfs. Question SAT  
                                                                      New Question.
U BEO5EG2.2.6 This is not really a change to  
                                                                    Idi&actors C and
procedures, but how to use procedures. It really  
                                                                                                      -
does not taik abut the procedure change process.  
New Question.  
-
Idi&actors C and  


3. Psychometric Flaws I 4. Job Content Flaws I 5.Other                             7.
3. Psychometric Flaws  
                                                      'WS                    Explanation
I  
                                                          Licensee made comment that this was a difficult
4. Job Content Flaws I 5. Other  
                                                          KLA to w r k an SRO question to. Discussed
7.  
                                                          changing some of the conditions in the stem to
' W S 
                                                          allow the SRO to make a determination of what
Explanation  
                                                          all ICs hand and auto liqhts extinguish.
Licensee made comment that this was a difficult  
                                                          Question SAT
KLA to w r k an SRO question to. Discussed  
                                                                                  distractor More
changing some of the conditions in the stem to  
                                                                                  SRO only topics.
allow the SRO to make a determination of what  
                                                          Licensee wiEI work on changing diStraCtQrS.
all ICs hand and auto liqhts extinguish.  
                                                                                  estion on. Question
Question SAT  
distractor More  
SRO only topics.  
Licensee wiEI work on changing diStraCtQrS.  
estion on. Question  


ometric Flaws I 4. Jab Content Flaws i 5 . Other I 6. I                             7.
ometric Flaws  
                                                                                Explanation
I  
                                I I l l I        S   003A2.01 WA appears to match. SRO only OK
4. Jab Content Flaws  
                                                        Modified
i 5. Other I 6. I  
                                                        Licensee to re lace Question. Question
7.  
                                                  S   ffenlaced. SA   P
Explanation  
                                I ill I          S   078G2.4.49 KIA appears to match. New
S 003A2.01 WA appears to match. SRO only OK  
                                                        No Comments
I I l l  I Modified  
                                                  S 064A2.16 Appears to meet the WA.(sorne difficulty
Licensee to re lace Question. Question  
                                                              totally with the B part) otherwise okay. New
S  
                                                        X'ing
ffenlaced. SA P  
                                                          o Comments
S 078G2.4.49 KIA appears to match. New  
                                I I Ix/ I        U 071A2.02 meets the b portion of the WA but is not
I i l l  I No Comments  
                                                        SRO onlv These are merator actions. Listed in
S 064A2.16 Appears to meet the WA.(sorne difficulty  
                                I I l l I.        S
ing totally with the B part) otherwise okay. New  
                                                        stern. Binink
X' o Comments  
                                                        Licensee and NffC to think about question and il
U 071A2.02 meets the b portion of the WA but is not  
                                                                    - _-
I
                                                        it can &e salvaged Question accented with no
I I x /  I SRO onlv These are merator actions. Listed in  
stern. Binink  
Licensee and NffC to think about question and il  
I I l l 
S I . 
it can &e salvaged  
- _-
Question accented with no  


                I
.OK
                                          7.
LOD
.OK
WH)  
WH)
(1-5)  
    I LOD
I
      (1-5) I/WS
I/WS  
              §'
§' I
                I
7.
                                      Explanation
Explanation  
                  Licensee wiN change question. Replaced
I
                  Question
Licensee wiN change question. Replaced  
                            SAT
Question  
                  G2.1.33Ap ears to match WA Very simple. Not
SAT  
                  SROOnly ew R
G2.1.33 Ap ears to match WA Very simple. Not  
                  Licensee wili add parameter and reason to
Licensee wili add parameter and reason to  
                  choices. Added bash to distractors. Question
choices. Added bash to distractors. Question  
                  SAT
SROOnly R ew
                                      write new question.
SAT  
                  Licensee to write new question. Question kept a:
write new question.  
Licensee to write new question. Question kept a:  


                        I
3. Psvchometric Flau  
3.Psvchometric Flau                                 7.
IIWS  
                    IIWS                       Explanation
6' I
                    6'
7.
                        I                                                 I
Explanation
                          from memory. With attachment this would be a 1.
I  
                          Much discussion about allowing attachment for
I  
                          reference. If Licensee will not remove
from memory. With attachment this would be a 1.  
                          i3fti3ChmeRt, suggest selecting new U A and
Much discussion about allowing attachment for  
                          replacing que&&.   Continue-to look at Georae
reference. If Licensee will not remove  
                          to decide.
i3fti3ChmeRt, suggest selecting new U A and  
replacing que&&.  
Continue-to look at Georae  
to decide.  




ES-403                           Written Examination Grading                   Form ES-403-1
ES-403  
                                        Quality Checklist
Written Examination Grading  
6.   Performance on missed questions checked for training
Form ES-403-1  
                                      Printed Name i Signature                       Date
Quality Checklist  
                                                                        ,
6.  
a. Grader             Ronald F. Aiello                                         -07/01/04-
Performance on missed questions checked for training  
b. Facility Reviewer(*)                         NIA                             -NIA-
Printed Name i Signature  
c. NRC Chief Examiner (*) George T. Hoppe                                       -07/01/04-
Date  
d. NRC Supervisor (") Michael E. Ernstes                                         7/,/Qv
,  
(*)   The facility reviewer's signature is not appllcable for examinations graded by the
a. Grader  
                                              6of5               NUREG-1021, Draft Revision 9
Ronald F. Aiello  
- 07/01 /04-  
NIA-
b. Facility Reviewer(*)  
NIA  
-  
- 07/01 /04-  
c. NRC Chief Examiner (*) George T. Hoppe  
d. NRC Supervisor (") Michael E. Ernstes  
7/,/Qv  
(*)  
The facility reviewer's signature is not appllcable for examinations graded by the  
6of5  
NUREG-1021, Draft Revision 9  


ES-403                         Written Examination Grading                   Form ES-403-1
ES-403  
                                        Quality Checklist
Written Examination Grading  
2.     Answer key changes and question deletions justified and
Form ES-403-1  
                                                to ensure that grades
Quality Checklist  
  a. Grader             Ronald F. Aiello
2.  
  b. Facility Reviewer(*)
Answer key changes and question deletions justified and  
  c. NRC Chief Examiner (*) George T. Hopper
to ensure that grades  
  d. NRC Supervisor (*) Michael E. Ernstes
a. Grader  
                                              5of5                NUREG-1021, Draft Revision 9
Ronald F. Aiello  
b. Facility Reviewer(*)  
c. NRC Chief Examiner (*) George T. Hopper  
d. NRC Supervisor (*) Michael E. Ernstes  
5 o f 5 
NUREG-1021, Draft Revision 9  


.....     ..........                                       ..........               .........
.....  
ES..50!                               Post.ExaminationCheck .Sheet  ............               Form ES-501-1
..........  
II                                                                                                           II
..........  
                                    Task Description
.........  
                                                                                                Complete
ES..50!  
I.   Facility written exam comments or graded exams received and
Post.Examination Check .............  
        verified comolete                                                                                   /I
Sheet
                                            ents reviewed and incorporated and
Form ES-501-1  
  3.   Operating tests graded by NRC examiners
II  
  4.   NRC Chief examiner review of written exam and operating test
II  
        grading completed
Complete
                              ....
Task Description  
        Management (lice
/I
                            .....         ......
I.  
                          .....
Facility written exam comments or graded exams received and  
  0.  Faciiity notified of results
II
                        ....
verified comolete  
  9.   Examirlation report issued (refe
ents reviewed and incorporated and  
                            .......-   .........
3.  
                                                  21 of 23                     NUREG-402f. Draft Revision 9
Operating tests graded by NRC examiners  
4.  
NRC Chief examiner review of written exam and operating test  
grading completed  
....  
Management (lice  
.....  
......  
.....  
Faciiity notified of results  
0.  
9.  
Examirlation report issued (refe  
....
...... .-  
.........  
21 of 23  
NUREG-402f. Draft Revision 9  


                                                                              Duke Energy
Duke Energy  
                                                                              Oconer Nuclear Station
Oconer Nuclear Station  
                                                                              7600 Rochester Highway
7600 Rochester Highway  
                                                                              Seneca, S C 29672
Seneca, S C 29672  
                                                                              (867) 88S-.ZOOO 0PP:CE
(867) 88S-.ZOOO 0PP:CE  
April 28, 2004
April 28, 2004  
NRC REGION II
NRC REGION II  
SAM NUNN ATLANTA FEDERAL CENTER
SAM NUNN ATLANTA FEDERAL CENTER  
61 FORSYTH STREET, S.W.
61 FORSYTH STREET, S.W.  
SUITE 23T85
SUITE 23T85  
ATLANTA, GA. 30303-8932
ATLANTA, GA. 30303-8932  
Re:     OCONEE NUCLEAR STATION
Re:  
        Completed Operating Exam
OCONEE NUCLEAR STATION  
Dear Mr. Ernstes:
Completed Operating Exam  
We are enclosing the Completed Operating Exam and applicable quality checklists, as
Dear Mr. Ernstes:  
required, for the Initial License exam scheduled for the weeks of June 14 and June 22,
We are enclosing the Completed Operating Exam and applicable quality checklists, as  
2004, at the Operator Training Center, Oconee Nuclear Site. Enclosed for your review
required, for the Initial License exam scheduled for the weeks of June 14 and June 22,  
are:
2004, at the Operator Training Center, Oconee Nuclear Site. Enclosed for your review  
0   Four Scenarios
are:  
    One RQ Administrative Exam
0  
    One SRO Administrative Exam
Four Scenarios  
    One RO Control Roomlln-Plant Test
One RQ Administrative Exam  
    One SRQ (I) Control Room/ln-Plant Test
One SRO Administrative Exam  
    One SRO (U) Control Roomlln-Plant Test
One RO Control Roomlln-Plant Test  
e   Form ES-301-6, Competencies Checklist
One SRQ (I) Control Room/ln-Plant Test  
If you require any additional information, or have further questions, please feel free to
One SRO (U) Control Roomlln-Plant Test  
contact Gabriel Washburn at (864) 885-4490, or J.R. Steely at (864) 885-3446.
e Form ES-301-6, Competencies Checklist  
Neil E. Constance Ji.,
If you require any additional information, or have further questions, please feel free to  
contact Gabriel Washburn at (864) 885-4490, or J.R. Steely at (864) 885-3446.  
Neil E. Constance Ji.,  
Manager of Operator Training
Manager of Operator Training
}}
}}

Latest revision as of 01:55, 16 January 2025

June 2004 Exam 50-269/2004-301 Sinal Simulator Scenarios
ML042190118
Person / Time
Site: Browns Ferry, Oconee  Tennessee Valley Authority icon.png
Issue date: 08/17/2004
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Bradley Jones
Duke Energy Corp
References
50-269/04-301, 50-270/04-301, 50-287/04-301
Download: ML042190118 (39)


See also: IR 05000269/2004301

Text

Ad mi n istrative Documents

OCONEE JUNE 2004 EXAM

50-269/2004-301,

50-270/2004-301, &

50-28712004-301

JUNE 14 - 18 & 25,2004

1 .d Exam Preparation Checklist ....................

ES-20?-1/

3.

~ x a m

Security Agreement .....................

ES-201-3

4. J Administrative Topics Outline (Finai) . . . . . . . . . . . . . ES-301-1/

(Final) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

ES-301-2 /*

2.

Exam Outline Quality Checklist . . . . . . . . . . . . . . . . . ES-201-2 /

,

5. JControl ~ s o m

Syste

6. /Operating Test Quality check Sheet . . . . . . . . . . . . . ES-302 -3 w

7. / Simulator Scenario Quality Check Sheet . . . . . . . . . . E S - 3 0 1 d

and Facility Walk-through Test Outline

/

8.J Transient and Ev

Checklist . . . . . . . . . . . . . . . . . . ES-301-5

/

9. , Competencies C

klist ......................

ES-301-6

10. /Written Exam Quality Cheek Sheet . . . . . . . . . . . . . . ES-401- 6J /,

. . . . . . . . . . . . . . . .  ?

1 1, /Written Exam R

orksheet

ES-401-9

Quality Checklist . . . . . . . . . . ES-403-1

ES-501-1 J

......................

bewb-

~

o

g

R

c

~

~ ~ - 7 7 6 R

D A T E D V - J B - Q ~ 3 u B M i r 9 i 1 3 6 ,EXAM

...

-...

__.

cs-20' . . . .

. .

. . . . .- Exan-inztiorl

...

Prepars!!m%ck(sist

F O [ X E S : r n

Facility:

13krCaLaca

Date of Examination:

Task Description I Reference

Chief

xamlner's

initials

assignment sheet updated
waiver

orization granted to give written exams

Target dates are keyed to the examination date identified in the corporate ;~$kz:zh? letter.

They are for planning purposes and may be adjusted on a case-by-case basis in coordinatioi

with the facility licensee.

Applies only to examinations prepared by the NWC.

23 of 25

NUREG-1021, Draft Revision 9

Task Description

3-201

Examination Outline Quality Checklist

F C J ~

ES-20'1-2

nitial Submittal

.~

Item

~

1.

w

R

i

T

T

E

N

2.

S

i

hl

__

3.

W

/

T

4.

G

E

N

E

R

A

L

a. Author

b. Facility Reviewer ('j

c. NHC Chief Examiner (t)

d. NRC Supervisor

Note:

  • Not appiicab!e for NRC-developed examinations.

b.

Assess whether there are enouah scenario sets land wares) to test the woiected number

I

I -

I

11

and m,x of appikonis in awoidance w th t:ie expectao c r w compos lion and rotatior.

sched,le

fi:lhoit compiom s.ng exaiii integrity, ensure cam appiicant an be taoled Jsllly

ai east one new or signitcanily niwifiad sceliaiic, that n@ scenar,ns are dwl'ca1t.d lrC:it (lie i

a. Verify that:

(1) the outline@) contain(s) the required number of control room and in-piant tasks,

(2) no more than 30% of the test material is repeated from the last NRC examination,

f3P no tasks are duolicated from the aooiicants'audit tesUsl. and

I

~I

(4) no mRie than 86% of any operating'test is taken direcil; from the licensee's exam banks.

are distributed among the safety function groupings as specified in ESdOl,

is conducted in a low-power or shutdown condition,

for SRO-Uj of the tasks require the applicant to implement an alternate path

NUREG-I 02t. Draft Revision 9

E§-201

Examination Security Agreement

Form E§-201-3

1.

Pre-Examination

I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 6-14/21-2004 as of the date of my

signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief

examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing

examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC. Furthermore. I am

aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of

this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility

management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.

2.

Post-Examination

To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the

week(s) of 6-i4/21-2004 From the date that I entered into this security agreement until the completion of examination administration, I did net instruct, evaluate, or

provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the

NRC.

PRINTED NAME

JOB TITLE / RESPONSIBILITY

DATE

NOTE

1. & s ; d W S H C W

2.

3.

4.

5.

6.

7.

a.

9.

IO.

11.

12.

13.

14.

15.

____

Y=L3 / l/AcI\\Bplk&

NOTES:

NUREG-1021. Draft Revision 9

ES-201

Examination Security Agreement

Form ES-201-3

1.

Pre-Examination

I acknowledge that I have acquired specializsd knowledge about the NRC licensing examinations scheduled for the week(s) of 6-14/22-2004 as of the date of my

signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief

examiner. I understand that I am not to inshuct. evaluate. or provide performance feedback to those applicants scheduled to be administered these licensing

examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC. Furthermore, I am

aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of

this agreement may result in cancellation of the examinations andlor an enforcement action against me or the facility licensee. I will immediately report to facility

management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.

2.

Post-Examination

To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the

week(?.)

of 6-64\\21-2004 From the date that I entered intc this security agreement until the completion of examination administration, I did not instruct, evaluate, or

provide performance feedback to those applicants who were administered these licensing examinations. except as specifically noted below and authorized by the

NRC.

JOB TITLE I RE

1.

2.

3.

4.

5.

6.

7.

8.

9.

NUREG-1021. Draft Revision 9

11 Facility: Qconee

Date of Examination: June, 2004

Examination Level (circle one): RQ / SRQ

Operating Test Number:

Conduct of Operations

GEN 2.1.23 (3.9/4.0)

Conduct of Operations

GEN 2.1.7 (3.7/4.4)

Equipment Control

GEN 2.2.12 (3.0/3.4)

Radiation Control

GEN 2.3.4 (2.5131)

Emergency Plan

GEN 2.4.39 (3.3/3.1)

Describe activity to be performed

Admin-100, Deterrnlne SDM with a Dropped Control

Rod

PT/f/N1103/15, Reactivity Balance (1 0 min)

Admin-103, Perform Manual RCS Leakage Calculation;

PT/0600/01 Q (RQ Only)

(last exam) (group activity) (18 rnin)

Admin-202, Perform Surveillance to Verify SSF RCMUP

Operability

PT16001001 Encl. 13.1 (Mode 1 & 2) (new) (15 rnin)

Admin-402, Perform Actions for Medical Emergency

RP/1000/016, Encl. 4.1 (Medical Response)

(RO Only) (15 min)

are required for SROs. RO applicants require only 4 items

unless they are retaking only the administrative topics, when 5 are required.

NUREG-1021, Draft Revision 9

ES-301

Administrative Topics Outline

Form ES-304 -1

Final Submittal

le one): RO / SRO

Operating Test Number:

Conduct of Operations

GEN 2.1.23 (3.Wl.O)

Conduct of Operations

GEN 2.1.4 (2.3/3.4)

Equipment Control

GEN 2.2.12 (3.0/3.4)

Radiation Control

GEM 2.3.4 (2.5/3.1)

GEN 2.4.38 (2.Z4.0)

I

Describe activity to be performed

Admin-100, Determine SBM with a Dropped Control

Rod

PT/l/A/1103/15, Reactivity Balance (1 8 min)

Admin-110, Determine Minimum Shift Staffing

SLC 16.13.1, Minimum Station Staffing Requirements

(new) (SRO only) (1 5 min)

Admin-202, Perform surveillance to verify SSF RCMUP

Operability

PT/600/001, End. 13.1 (Mode 7 & 2) (new) (15 min)

Admin-300, Calculate the Maximum Permissible Stay

Time Within Emergency Dose Limits

(last exam) (Sa0 only) (20 min)

Admin-403, Determine Emergency Classification and

Protective Action Recommendations

(SRO only) (group activity) (20 min)

are required for SROs. RO applicants require only 4 items

only the administrative topics, when 5 are required.

NUREG-1021, Draft Revision 9

E§-301

Control Roodln-Plant Outline

Form ES-301-2

System / JPM Title

APilIAI1700/15, OP/O/AI1105/09, Encl4.10

IKA: EPE-009 EA1 .I3 (4.4/4.4)1 (6 min)

c. CRO-97, Transfer ECCS Suction to the Emergency Sump (1LP-I5

11

Failed Closed)

I D. A. S. L

. . .

I[

EOP, Enclosure 5.12 [KA:BW/E08 EA1 .I (4.0/3.7)] (PRA) (9 min)

d. CRO-015, Establish EFDW Flow Through Startup Valves

EOP Enclosure 5.27, Alternate Methods for Controlling EFDW Flow

IKA: BW/A02 AAl.l (4.0/3.8)1 (new) (20 min)

f.

CRO-060, Perform Required Actions For Turbine Building Flood

AP/lO (Turbine Building Flood)

B, s

8

IKA: APE BW/A07 AAI .3 (3.3/3.5)1 (7 min)

g. CRO-900, Release GWD Tank

OW1 &2/AI1104/018 Encl. 4.9 (GWD Tank Release)

In-Plant Systems (3 for 80; 3 for SRO-I; 3 or 2 for SRO-U)

i.

NLO-039, Prime The Spent Fuel Pool Fill Line

EOP Encl. 5.7, HPI Pump Operations from ASW Pump Switchgear

11

[KA: APE022 AK3.02 (3.5/3.8)] (16 min)

1

j.

CRO-053, Bypass Coolant Pump Starting Interlocks

OP/I 107/004 Enclosure 4.2 IKA: 062 A3.04 (2.7/2.9)1(9 rnin))

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (6)ontroi room,

(S)imulator, (L)ow-Power, (R)CA

NUWEG-1021, Draft Revision 9

ES-301

Control Room/ln-Plant Outline

Form ES-301-2

Facility: Oconee

Date of Examination: June, 2004

Exam bevel (circle one): RO / SRO(I) / SRO(U) Operating Test No.:

Control Room Systems (8 for RO; 7 for SRQ-1; 2 or 3 for SRO-U)

System / JPM Title

Type Code

Safety

Function

a. CRO-O12A, Recover a dropped rod

AP/l/Af1700/15, OP/O/Af1105/09, Encl 4.10

[KA: 005 AA2.03 (3.5/4.4)] (20 min)

b. CRO- 067, Perform Required Actions for ES Actuation (> 3psig)

EQP Enclosure 5.1 (ES Actuation)

[KA: EPE-009 EAl.13 (4.4/4.4)] (6 min)

Failed Closed)

EBP, Enclosure 5.12 [KA:BW/E08 EAl.l (4.0/3.7)] (PRA) (9 min)

d. CRO-015, Establish EFBW Flow Through Startup Valves

[APE-054 AA2.04 (4.2/4.3)] (20 rnin)

EOP Enclosure 5.27, Alternate Methods for Controlling EFBW Flow

B, S,

L

4s

e. CRO-700, Place ICS In Auto following Loss Of Auto Power

AP/23 (Loss Of ICs Power) Enclosure 5.5 (Placing ICs In Auto)

[W BWIA02 AAl.l (4.0/3.8)] (new) 15 min)

CRO-060, Perform Required Actions For Turbine Building Flood

AP/lO (Turbine Building Flood)

I K A APE BW/A07 AA1.3 (3.3/3.5)1 f7 min)

f.

7

8

g. CRO-900, Release GWD Tank

OP/1&YN1104/018 End. 4.9 (GWB Tank Release)

In-Plant Svstems (3 for RO: 3 for SRO-I: 3 or 2 for SRO-U)

~*

i.

NLO-039, Prime The Spent Fuel Pool Fill Line

EOP Encl. 5.7, #PI Pump Operations from ASW Pump Switchgear

I D, L, R

1

2

[KA: APE022 AK3.02 (3.5/3.8)] (16 min)

i.

CRO-053, Bypass Coolant Pump Starting interlocks

EOP Encl. 5.14 [KA: EPE074 AAl .Ol (3.6/3.9)1 (7 min)

k.

NLO-036, Startup A Vital Bus Inverter

OW1 107/004 Enclosure 4.2 [KA: 062 A3.04 (2.7/2.9)] (9 min))

  • Type Codes: (B)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room,

(S)imtilator, &)ow-Power, (R)CA

B

6

NUREG-1021, Draft Revision 9

ES-301

Control Room/ln-Plant Outline

Form ES-301-2

Facility: Oconee

Bate of Examination: June, 2004

Exam Level (circle one): RO / SRO(I) / SRQ(U) Operating Test No.:

Control Room Systems (& for RO;

7 for SRO-I; 2 or 3 for SRO-U)

System / JPM Title

Type Code*

Safety

Function

.......

..I........- L

......... . . . .

.

b. CRO- 067, Perform Required Actions for ES Actuation (> 3psig)

EOP Enclosure 5.1 (ES Actuation)

[KA: EPE-009 EA1.13 (4.4/4.4)] (6 min)

! D,A, Ss

I

d. CRO-015, Establish EFDW Flow Through Startup Valves

[APE-054 AA2.04 14.2/4.3)1(6 mid

EOP Enclosure 5.27, Alternate Methods for Controlling EFDW Flow

D, s, L

4s

I. .

I

I

e.

CRO-700, Place IC§ In Auto following Loss of Auto Power

I N, A, S

AP/23 (Loss Of ICs Power) Enclosure 5.5 (Placing iCS In Auto)

I

EQP Encl. 5.7, #PI Pump Operations from ASW Pump Switchgear

[KA: APE022 AK3.02 (3.5/3.8)] (16 min)

k. NLO-036, Startup A Vital Bus Inverter

OP/1407/004 Enclosure 4.2 IKA: 062 A3.04 (2.7/2.9)1 (9 min))

I D

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (AJlternate path, (C)ontrol room,

(S)imulator, &)ow-Power, (R)CA

NUREG-1027, Draft Revision 9

-. . . . . .

.-

..

. . . . . . -.

. . . . -

.. . . . . .-

Operaring Tesi'auality Checklist

Form FjS-301-3

.....

.. ..

. . . . . -.

. . . . . -.

. . . . .

ES-301

iitial Submittal

___yi_...

Facilily: Oconee

Dat@ of Examination: June 14,2004

Operating Test Number: 1

1. GENERAL CRlTERlA

1I:e cpcral'ng lest confornls win the preuiu.lsly aDprovea 0Llii:ie cnanges ard cons~S1dnl M!h

sarnp:ina rest. rements (e.$. :O CF4 55.45. overat ona imponance. snfery funct on i!istnnvt.an).

b.

There is no day-to-day repetition belween this and other operating tests to be administered

during this examinatin.

c.

d.

The operating test shall not duplicate items from the applicants' zudit test(s)(see Sectior D.l .a).

Overlap with the written examinatior and between different pans of the Operating test is within

acceptable limits.

R

It dpzars that lie oper31 ng le51 .,,I. udferent ate vetweeti competeiit ai80 less-Inan-c@m~elenl

app cinw a1 Inr des a r d t c :censo leve

2. WALK-THROUGH CRITERIA

a.

Each JPM includes the following, as applicable:

initial mditions

references and toois. including assosiated procedures

rea--able and validated time lifits (average time allowed For completion) and specific

designation if deemed to be time critical by the facility licensee

specific performance criteria that include:

. initiating cues

- detailed expected actions N,ith sxact criteria and nomenclature

- system response and other examiner cues

- Statements describing important observations to be made by the applicant

- criteria for successful completion of the task

- identification of critical steps and their associated performance standards

- restrictions on the sequence of steps, if applicable

b.

Repetition from operating tests used during the pievioirs licensing examination is within

acceptable limits (30% for the walk-through) and do not compromise test integrity

At least 20 percent of the JPMs on each test are new or significantly modified.

C.

3. SIMULATOR CRITERIA

a.

The associated simulator operating tests (scenario sets) have been reviewed in accordance with

Form E§-301-4 and a copy is attached.

Printed Name / Signature

a. Author

b. Facility Reviewerr)

c. NRC Chief Examiner (#)

9. NRC Supervisor

nitiais

1-

Dat@

NOTE:

  • The facility signature is not applicable for NRC-developed tests.
  1. Independent NRC reviewer initial items in Column "c: chief examiner concurrence required.

NUREG-1021. Draft Revision 9

.

..

.

..

..

.

.

.

Simulator Scenaric

. . . . . . . Quality

.

Cqecklist

.

.

.

Form ES-301.:4 -

.. ...

.

.

sa01

~.

'inal Submittal

_p____

Facility: Qconee

Date of Exam: June 14,1004

Scenario Numbers: 1 I

2 t 3

Operating Test No.: f

1.

The itiitiaJ conditions are realistic, in that some equipment andlor instrumentation may be out of

service, but it does not cue the operators into expected events.

2.

The scenarios consist mostly of related events.

3.

Each event description consists of:

-

the point in the scenario when it is to be initiated

the malfunction(s) that are entered to initiate the event

the syrnptmslcues that will be visible to the crew

the expected operator actions (by shin position)

the event termination point (if applicable)

No more than one non-meehanistic failure (e.g.. Ppe break) is incorporated into the scenario

without a credible precediny incident such as a seismic event.

4.

tion team to obtain

have sufficient time to carry out expected adivities without undue time constraints. Cues are

given.

8.

The simulator modeling is not altered.

ed. Pursuant to 10 CFR 55.46(d). any open simulator

eeri evaluated to ensure that functional fidelity is maintained

10

Every ocerator w I % evalilatea :.j ng a! :east one new or s yn.f conGy mod feo srznar a. A

orhc; sceim os liaie men B Iereo .n accordance witn QPC!.U.I D.5 of ES. 301

All individual operator competencies can be evaluated, as verified usinQ Form ES-301-6

(submit

the form along with the slmulatoi scenarios).

12.

Each applicant will be significantly invoived in the minimum number of transients and events

1.

Total malfunctions (5-6)

2.

Malfunctions afler EOP entry (1-2)

3.

Ahnormal events (2-4)

4.

Major transients (1-2)

I

NUREG-1 021

~ Draft Revision 9

.... ~...

~.

.

.

~

~

~

~

~

.

~

. .

~

E S - ~

Final Subrniikl

.. Transientand

~ ~ ~ ~ - .

Event Checklist -. . . .

~'..

Form ES-301-5

.... . .-

OPERATING TEST NO.: 1

. . .

AsSRO ! : Instrument/

2*

2, 3

j Component

8

i

Instructions:

(1)

Enter the operating test number and Form ES-D-1 event numbers for each evolution

%t&tivity manipulations ma be conducted under normal or controlled abnormal

conditions refer to Section 8.5.d) but must be significant per Section 6.2.a of

Append!x d. *Reactivity and normal evolutions may be replaced with additional

instrument or comoonent malfunctions on a one-for-onn basis

(2)

~.

. .

~~~

~

~

(3:

Wnenever praci cat. both insltynent arid component ma:fLnclions sho~!d be

included; only those that require verifiable actiow that provide insight to the

app1;cant's competerice count toward rtie r i i n i m m i'euuireinenl.

Author:

NRC Reviewer:

NUREG-1021, Draft Revision 9

E§-304

Final Submittal

Competencies

Interpret / Diagnose

Events and Conditions

Comply With and

Use Procedures (1)

Operate Control

Boards (2)

Communicate and

lnteract

Demonstrate

Supervisory

Ability (3)

Comply With and

Use Tech. Specs. (3)

Competencies Checklist

Form ES-301-6

SRO

SCENARIO

3,4,

5

6.7,

8

9

3, 5

-

2

2, 3.4

-

2, 3.4

5, 6. 7

8

1, 2, 3

4. 5, 6

7. 8

2, 3,4

5, 6, 7

8

RO

BOP

Notes:

(1) Includes Technical Specification compliance for an RO.

(2) Optional for an §BO-U.

(3) Only applicable to SROs.

Instructions:

Circle the applicant's license type and enter one or more event numbers that will ailow the examiners to

evaluate every applicable competency for every applicant.

Author:

NRC Reviewer:

NUREG-1021, Draft Revision 9

ES-401

Written Examination

Qualitv Checklist

Form ES-401-6

~~

~

Final Submittal

3.

SRO questions are appropriate per Section D.2.d of ES-401

Question duplication from the license screening/audit exam was controlled as

indicated below (ch@& the item that applies) and appears appropriate:

the audit exam was systematically and randomly developed; or

the audit exam was completed before the license exam was started; 01

g t h e examinations were developed independently; or

the licensee certifies that there is no duplication; or

6.

Bank use meets limits (nu more than 75 percent

from the bank at least 10 percent new, and the

rest madified); enter the actual RO / SRO-only

question distribution(s) at right

7.

Belween 50 and 60 percent of the questions on

the 80 exam are written at the

comprehensionianalysis level; the SRO exam may

exceed 60 percent if the randomly selected WAS

suppart the higher cognitive levels; enter the

actual RB / SRO question distribution(s) at right

32 / 8

43 i 17

I

Referencedhandouts provided do not give away answers

approved examination outline and is appropriate fur the Tier to which they are

assioned: deviations are iustitied

IO.

Question psychometric quality and format meet ES, Appendix B, guiddlnes

b. Facility Reviewer (')

c. NRC Chief Examiner (#)

d. NRC Regional Supervisor

NUREG-1 021, Draft Revision 9

ES-401

Written Examination

Quality Checklist

Form 3-401-6

nitial Submittal

Facility: Oeonee

Date of Exam: June 14,2004

Exam Level: RQ/SRO

-

I

4.

Question selection and duplication from the last two NRC licensing exams

indicated below (check the item that applies) and appears appropriate:

-

the audit exam was systematically and randomly developed: or

z t h e examinations were developed independently: or

-

the licensee certifies that there is no duplication; or

the audit exam was completed before the license exam was started; or

support the higher cognitive levels: enter the

actual RO I

SRQ question distribution@) at right

e.

Referenceslhandouts provided do not give away answers

9.

Question content conforms with specific KIA statements in the previously

11.

The exam contains. the required number of one-point, multiple choice items:

Prlnted Name I Si

Date

a. Author

Jgr.&Ef

b. Facility Reviewer (*)

$*Y

c. NRC Chief Examiner (#)

5 5 0

d. NRC Regional Supervisor

d-I-2oei'

-

Note:

  • The facility reviewer's initialdsignature are not applicable for NRC-developed examinations.

NUREG-1021, Draft Revision 9

ES-401

OCONEE 2004-301

Written Examination

Form ES-401-9

Review Worksheet

Instructions

!Refer to Section D of ES-401 and Appendix El for additional information regarding each of the following concepts.]

1.

2.

Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.

Enter the level 01 difficulty (LOB) of sack question using a t

~ 5 (easy - difficult) rating scaie (questions in the 2 ~ 4 range are acceptable).

3.

Check the appropriate box if a psychmetric fiaw is identified:

The stem lacks sufficient focus to elicit the Correct enswer (e.g., unclear intent, more information is needed, or too much needless information).

The stem or distractors wntain cues (i.e.. clues, specific determiners, phrasing, longth, etc).

The answer choices are a coilection of unreialed truelfalse statements.

One or more distractors is not credible.

One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).

4.

Check the appropriate box if a job content error is identified:

The question is not linked to the job requirements (is.,

the question has a valid WA but, as written. is not operational in content).

The question requires the recall of knowledgp that is too specific for the closed reference test mode (Le., it IS not required to be known from memory)

The question contains data with an unrealistic !eve1 of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).

The question requires reverse logic or application compared to the job requirements.

5.

6.

7.

Check questions that are sampled for conformance with ttla approved WA and thoso that are desiqnated SRO-only (K/A and license level mismatches are unacceptable).

Based on the reviewer's judgment, is the question as Writt@n (U)nacceptable (requiring repair or replacement), in need of (E,!ditorial enhancement. M (S)atisfactory?

At a minimum. exprain any "u" ratings (e.g., how t

h

y

ROISRO Combined Question

S 1008~~3.05

Matches WA. New

3. Psychometric Flaws

4. Job Content Flaws

U!E/S I

7.

Exolanatim

Licensee claims to have had pump impeller

dama.ge similar fo this. OK

Licensee will work on new question (Offered to

help write a question) Question rewrftten. SAT

S

I

I S 1026AA2.03 ADDearS to match the WA Bank

U 029EK3.11 WA not matched. The WA asks for

I

I reasons whv actions are taken. This auestion ask

for correct &tion. Bank

I

S

038EK1.02 Very Simple Bank

I

7,

I

S 040AK2.02 very simple New is it a valid assumption

lthat RCPs are still oDeratina?

U 054AK1.01 Meets WA do not believe that B is a

credible distractor. Bank

Licensee thinks that the distractor is credible.

Still think it needs to be replaced. Chanued RB

pressure. SAT

S

Licensee will change initial conditions. ChaRQeC

U

058AA1.03 does not appear to have credible

distractors. (With the units separated unit two

cannot supply power to the DC bus. And the back ul:

char er not being in service is not credible. Very

Simikr to question 4 on SRQ exam. Bank

Licensee to replace question. New Question $A'

S IBEIOEA2.1 Matches WA New

4. Job COI

Link

6. I

7,

I/E/S I

Explanation

U IBE05EAI .3 matches WA Stem somewhat confusing

could lead one to believe that question has more

than one correct answer. New

Discussed wifh Licensee, wil/ change initial

conditions to allow onlv one correct answer.

U BE04EA1 .lAppears to match WA. Is 220 inches the

level that the pressurizer normally decreases to aftei

a trip? Same question for pressure. If not, these ari

not credible distractors. New

Licensee asked for us to take another look at the

question, the feel like the distractors are

Discussed and auestion acceDted.

QQIAG2.4.31 If rods are withdrawing on there own

this meets the WA if not we need to change the

guestion. Does a boration ever occur if the deborate

credible. Wi Iy discuss on 41%.

S

U

U

S

005AG2.4.6 Will one rod stuck at 63% give you the

conditions listed in the stem? This must be a very

reactive rod. New

Licensee changed power level, question Sat.

U 032AA2.04 Does not meet WA there is not a loss of

SR detector. New

bicensee will rewrite question

3. Psvchometric Flaws

4. Job Content Flaws

7.

Explanation

X

U 067AK3.04 WA is for knowledge of reasons for

actions in the EOP for plant fire. There are no

reasons asked for in this question. Bank

Licensee claims that they have no actions in

EOPs that deal with a fire. Will discuss on 4/28.

Question retJlaced SAT

I

s

The reason is listed in the stem. Should be in the

responses. How can 532 degrees be credible? Is

there a special reason for this temperature? New

S

069AG2.1.2 appears to match WA Bank

076AA1.04 appears to Match WA if there are no

other installed monitors that can inform the operator

that the fuel clad is leaking. Some of the distractsis

do not appear to be credible. Explanations needed.

New

Licensee will work on last two distractors.

Chanued distratctors and stern

1

I S IBE13EK1.2 Aaaears to meet the WA. Bank

iq-5

F/H)

(1-5)

7.

Explanation

I

ues not appear to be credible. New

anging distractor D

Appears to meet the WA Distractor B is

not credible. (120VAC vital power to CC pumps)?

Licensee will replace two disfractors. Chanaed

I I

distractors.

Changed Question added RB pressure and two

1

I S 1006K6.01 ADDearS to match WA Bank

E 007A1.03 Appears to match WA Distractor A does

nut appear to be credible, think about replacing with

a value > 303 degrees. New

Licensee will replace distractor A.

Changed distractor SAT

-

S

minimum level in the CCWS surge tank, not the

normal control levels. New (does the CRB return

value ensure a minimum level?)

3. Psychometric Flaws

I

4. Job Content Flaws I 5. Other

steam tables are required to answer question. Only

a knowledge of the system setpoints are required.

This question helps answer question # 29 by giving

the applicant a situation > 260 inches in the

pressurizer with the unit still on line. Bank

Licensee will replace question with # 8. §AT

distractors. §AT

U 022A3.01 Matches WA Question # 36 provides the

answer for this question. Distractors A and B do not

S appear to be credible. New

Licensee to rewrite question. Replaced SAT

U 026A2.07 Appears to match WA Distractor A is not

credible. If answer b was correct then A would be

correct also. Need to work with the distractors. New

Licensee to replace distractor(s).

Chanued ail disrtactors. SAT

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

.

E 1039G2.1.28 Appears to match WA appears to be a

series of T/F it&tements reword stem.and

distractors. Bank

I

S

Licensee to rewrite quesfion. Fiepkced Questjoj

qz

F/H)

(1-5)

3. Psychometric Flaws

1

4. Jobcontent Flaws I 5. Other I 6. I

7.

Link

units

Explanation

S

064A3.07 Boes not really test load sequencing.

I I I

ISank

Oconee does not have load sequencin (no

diesels) but they do have load shed. &;ref

Examiner gave approval for satisfying the MA.

073G2.1.33 ADpears !o match WA A aqd H

d:stractors may not be creoihlo. New

Licensee will to look at repiacing distractor E. A

076A2.02 Ariooars to match WA Bank

.....................

__

U

S

is sat. Accepted SAT

S

...............................................................

X

U 078K4.03 Does not meet WA Knowledge of the

desi n features and or interlocks which provide for

the 8llowing Securing of SAS upon loss of cooling

water. The compressor trips on High Temperature.

All this question IS askin is what is the normal

supply and backup suppgy. Needs to ask when does

Service air isolate. New

Licensee re uested to Pick B new KLA due to

reDIaced with 078K4.02

SAS not is0 7 ating. Will select one. Randomly

I

I

I

I

1 U 11 03K3.03 Aooears to match WA Distractors Band D

not credible: hew.

I

I

I S b 3 A 4 . 0 2 Appears to match WA Bank

x

U

026K4.06 Only artiaily meets WA. Sodium

Hydroxide shou P d be somewhere in the question or

answer. If it was not added the scavenging would

not take place. Bank

Licensee to look at rewording question

Reworded Question SAT

U

103K4.06 a ears to match WA Distractors A and E3

NRC Po work on auestion Wrote net

I I I

are not creJgie. New

U

007K1.01 appears to match WA. Several of the

distractors could be correct with the indications

given. Need to make distractors more incorrect or

change conditions in the stem. New

Licensee to work on distractors.

Rewrote uuestion SAT.

S

U

005K2.03 appears to match WA distractor B is not

credible (what is the voltage on this bus)? Should

have another bus with SF in it. New

Licensee to change distractor B.

S

I

Chanaed uuestion SAT

3. Psvchotnetric Flaws

I

4. Job Content Flaws

1= 3

SXO U/E/S

6' I

7.

Emlanation

Question rewritten SAT.

029K4.03 A pears to match WA. D is not a credible

distractor. Ep ew

Licensee to replace distractor. Re~laced

S

Distractor.

S 041 K6.03 Appears to match WA Mew

1

I S 1045A2.17 amears to match WA to make D more

incorrect oumay want to add IAW ... procedure

name or IhAs etc. Bank On 2003 Initial Exam

I Licensee to add IA W IMAs to the stem.

I I

4. Jab Content Raws

7.

Explanation

S

002K1.04 Appears to meet WA Distractor I3 does nc

appear tu be credible. Bank

Discussed with licensee, question is SAT.

S

G2.1 .I 1 Appears to match KIA. Bank

I S lG2.1.27 Aneears to match WA. Bank

I S IG2.1.21 Appears to match WA. New

U

S

distractors SAT

U

S

62.2.13 Appears tu match KIA. Distractor C does

not appear to be a credible distractor. Bank

Licensee to replace distractor C. RetJlaced all

G 2.2.1 1 Appears to match WA. Distractors A and B

do not appear to be credible. New

Licensee to replace distractors A and B. (With

white tags) ReDlaced A and B SAT

I S lG2.2.30 Aeeears to match WA. Bank

3. PS)

m e t

TIF -

4. Job Coi

Link

SRO ONLY

7.

Explanstion

S lG2.3.4 Appears to match WA. New

I

U 008AG2.2.25 Does not match WA Knowledge of

bases in technical specifications for limitin

conditions for operations and safety limitsy2.5/3.3.7)

As slated the question is asking how to appl tech

spec. Need to rework to fit in bases. Bank duestior

Licensee undersfancfs comment will continue to

work on develomnent of auesticn fhat test

S

Bases. 4/28 redaced auektion satisfied WA and

SRO onlv changed distractor I3 and added 1.8 gpm

to stem.

3. Psvchornetric Flaws

-

linutia

Explanation

credible if Unit 3 is unable to be connected to Unit I

Distractor B to be replaced.

4/28 Distractor B reDiaced and.acf!on.s.tg

a&c.totraie to SRO level.

Sfem to be modified to include pump trip in

know amkabilifv IModes) on F/S. fieed to

Licensee stated that they did not ex ect l 8

R s tg

S

decide iiow to prikeed. Piof 8 direct hook u1)

attachment okav. Chanued stem to $fate that

pumD trimed. Question SAT

3. Psychometric Flaws

I 4. Job Content Flaws

t 5. Other

,tern Cue: r

T/F

Cred. I

Oist.

Link -r

I

7.

l/WS

Explanation

No changes of cmmenfs. Question SAT

U BEO5EG2.2.6 This is not really a change to

procedures, but how to use procedures. It really

does not taik abut the procedure change process.

New Question.

-

Idi&actors C and

3. Psychometric Flaws

I

4. Job Content Flaws I 5. Other

7.

' W S

Explanation

Licensee made comment that this was a difficult

KLA to w r k an SRO question to. Discussed

changing some of the conditions in the stem to

allow the SRO to make a determination of what

all ICs hand and auto liqhts extinguish.

Question SAT

distractor More

SRO only topics.

Licensee wiEI work on changing diStraCtQrS.

estion on. Question

ometric Flaws

I

4. Jab Content Flaws

i 5. Other I 6. I

7.

Explanation

S 003A2.01 WA appears to match. SRO only OK

I I l l I Modified

Licensee to re lace Question. Question

S

ffenlaced. SA P

S 078G2.4.49 KIA appears to match. New

I i l l I No Comments

S 064A2.16 Appears to meet the WA.(sorne difficulty

ing totally with the B part) otherwise okay. New

X' o Comments

U 071A2.02 meets the b portion of the WA but is not

I

I I x / I SRO onlv These are merator actions. Listed in

stern. Binink

Licensee and NffC to think about question and il

I I l l

S I .

it can &e salvaged

- _-

Question accented with no

.OK

LOD

WH)

(1-5)

I

I/WS

§' I

7.

Explanation

I

Licensee wiN change question. Replaced

Question

SAT

G2.1.33 Ap ears to match WA Very simple. Not

Licensee wili add parameter and reason to

choices. Added bash to distractors. Question

SROOnly R ew

SAT

write new question.

Licensee to write new question. Question kept a:

3. Psvchometric Flau

IIWS

6' I

7.

Explanation

I

I

from memory. With attachment this would be a 1.

Much discussion about allowing attachment for

reference. If Licensee will not remove

i3fti3ChmeRt, suggest selecting new U A and

replacing que&&.

Continue-to look at Georae

to decide.

ES-403

Written Examination Grading

Form ES-403-1

Quality Checklist

6.

Performance on missed questions checked for training

Printed Name i Signature

Date

,

a. Grader

Ronald F. Aiello

- 07/01 /04-

NIA-

b. Facility Reviewer(*)

NIA

-

- 07/01 /04-

c. NRC Chief Examiner (*) George T. Hoppe

d. NRC Supervisor (") Michael E. Ernstes

7/,/Qv

(*)

The facility reviewer's signature is not appllcable for examinations graded by the

6of5

NUREG-1021, Draft Revision 9

ES-403

Written Examination Grading

Form ES-403-1

Quality Checklist

2.

Answer key changes and question deletions justified and

to ensure that grades

a. Grader

Ronald F. Aiello

b. Facility Reviewer(*)

c. NRC Chief Examiner (*) George T. Hopper

d. NRC Supervisor (*) Michael E. Ernstes

5 o f 5

NUREG-1021, Draft Revision 9

.....

..........

..........

.........

ES..50!

Post.Examination Check .............

Sheet

Form ES-501-1

II

II

Complete

Task Description

/I

I.

Facility written exam comments or graded exams received and

II

verified comolete

ents reviewed and incorporated and

3.

Operating tests graded by NRC examiners

4.

NRC Chief examiner review of written exam and operating test

grading completed

....

Management (lice

.....

......

.....

Faciiity notified of results

0.

9.

Examirlation report issued (refe

....

...... .-

.........

21 of 23

NUREG-402f. Draft Revision 9

Duke Energy

Oconer Nuclear Station

7600 Rochester Highway

Seneca, S C 29672

(867) 88S-.ZOOO 0PP:CE

April 28, 2004

NRC REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, S.W.

SUITE 23T85

ATLANTA, GA. 30303-8932

Re:

OCONEE NUCLEAR STATION

Completed Operating Exam

Dear Mr. Ernstes:

We are enclosing the Completed Operating Exam and applicable quality checklists, as

required, for the Initial License exam scheduled for the weeks of June 14 and June 22,

2004, at the Operator Training Center, Oconee Nuclear Site. Enclosed for your review

are:

0

Four Scenarios

One RQ Administrative Exam

One SRO Administrative Exam

One RO Control Roomlln-Plant Test

One SRQ (I) Control Room/ln-Plant Test

One SRO (U) Control Roomlln-Plant Test

e Form ES-301-6, Competencies Checklist

If you require any additional information, or have further questions, please feel free to

contact Gabriel Washburn at (864) 885-4490, or J.R. Steely at (864) 885-3446.

Neil E. Constance Ji.,