{{#Wiki_filter:.- t1503                                                                    Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC October 7, 2004 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
 
==Subject:==
Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244 As requested, enclosed are Ginna Station Emergency Operating Procedures.
Very truly yours, Thomas A. Marlow TAM/jdw xc:    U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):
ATT Index ATT-5.2, Rev 4
 
C                                                            C        t NPSP0200                                                    Ginna Nuclear Power Plant                          Tue 10/1212004 10:23:38 am E66429                                                          PROCEDURE INDE)                                                  Page I of 2 INPUT PARAMETERS: TYPE:      PRATT                          STATUSVALUE(S):  EF,QU          5 YEARS ONLY:
PRATT          EOP ATTACHMENTS PROCEDURE                                                                                  EFFECT          LAST          NEXT NUMBER            PROCEDURE TITLE                                                    REV  DATE          REVIEW          REVIEW      ST ATT-1.0            ATTACHMENT AT POCHER CCWAIJGNMENT                                  003 02112/2003    02/12/2003      02112/2008      EF ATT-1.1            ATTACHMENT NORMAL CCW FLOW                                        000 05/18/2000    05/18/2000      05/18/2005      EF ATT-2.1            ATTACHMENT MIN SW                                                  005 02/01/2001    02/03/2003      02/03/2008      EF ATT-2.2            ATTACHMENT SW ISOLATION                                            008 03106/2002    03/27/2003      03/2712008      EF ATT-2.3            ATTACHMENT SW LOADS IN CNMT                                        004 03/06/2002    04106/2004      04/06/2009      EF ATT-2.4            ATTACHMENT NO SW PUMPS                                            002 05/3012003    10/31/2001      10/31/2006      EF ATT-2.5            ATTACHMENT SPUT SW HEADERS                                        000 06/26/2002    06126/2002      06/26/2007. EF ATT-3.0            ATTACHMENT CUCIA                                                  007 02/17/2004    02/1712004      02/1712009      EF ATT-3.1            ATTACHMENT CNMT CLOSURE                                            005 02/17/2004    02117/2004      02117/2009      EF ATT-4.0            ATTACHMENT CNMT RECIRC FANS                                        003 07126/1994    03/27/2003      03127/2008      EF ATT-5.0            ATTACHMENT COND TO S/G                                            006 10/10/2003    04/06/2004      04/06/2009      EF ATT-5.1            ATTACHMENT SAFW                                                    008 05/3012002    041062004      04/06/2009      EF ATT-5.2            ATTACHMENT FIRE WATER COOUNG TO TDAFW PUMP                        004 10/07/2004    81120151/2      01/28/2009 ATT-6.0            ATTACHMENT COND VACUUM                                            003 12/18/1996    02/03/2003      02/03/2008      6:
EF ATT-7.0            ATTACHMENT CR EVAC                                                006 03/06/2002    02/03/2003      02/03/2008      6:
EF ATT-8.0            ATTACHMENT DC LOADS                                                007 02/04/2004    02/04/2004      02/04/2009 ATT-8.1            ATTACHMENT DIG STOP                                                005 03/06/2002    02/03/2003      02103/2008      EF ATT-8.2            ATTACHMENT GEN DEGAS                                              008 06/20/2002    05/28/2004      05/28/2009      EF ATT-8.3            ATTACHMENT NONVITAL                                                004 03/06/2002    02/03/2003      02/03/2008      EF ATT-8.4            ATTACHMENT SWV                                                    005 03/06/2002    02/03/2003      02/03/2008      EF ATT-8.5            ATTACHMENT LOSS OF OFFSITE POWER                                  001 08/26/2003    05/02/2002      05/02/2007      EF ATT-9.0            ATTACHMENT LETIDCOhI                                              009 01/07/2004    03/06/2002      03/06/2007      EF ATT-9.1            ATTACHMENT EXCESS L/D                                              006 07/28/2004    10/31/2001      10/31/2006      EF ATT-10.0            ATTACHMENT FAULTED S/K                                            006 03/06/2002    03/27/2003      03/27/2008      EF ATT-11.0            ATTACHMENT IA CONCERNS                                            004 09/01/2004    03/27/2003      03/27/2008      EF ATT-11.1            ATTACHMENT IA SUPPLY                                              003 03/06/2002    03/27/2003      03/27/2008      EF ATT-11.2            ATTACHMENT DIESEL AIR COMPRESSOR                                  004 11/18/2002    03/10/2003      03/10/2008      EF ATT-12.0            ATTACHMENT N2 PORVS                                                005 02/12/2003    02112/2003      02/12V2008      6:
ATT-13.0            ATTACHMENT NC                                                      003 02/12/2003  02/12/2003      02/12/2008      6:
ATT-14.0            ATTACHMENT NORMAL RHR COOUNG                                      003 03/06/2002    04/06/2004      04/06/2009      6:
 
(I                                                        (7A NPSP0200                                                    Ginna Nuclear Power Plant                        Tue 10/121200410:23:38 am  {f E66429                                                        PROCEDURE INDE)                                                Page 2 of 2 INPUT PARAMETERS: TYPE:      PRATT                        STATUSVALUE(S):  EFQU          5YEARS ONLY:
PRATT          EOP ATTACHMENTS PROCEDURE                                                                                EFFECT        LAST          NEXT NUMBER            PROCEDURE TITLE                                                  REV  DATE        REVIEW        REVIEW      ST ATT-14.1            ATTACHMENT RHR COOL                                              007 0910112004  0110812002      01108/2007      EF ATT-14.2            ATTACHMENT RHR ISOL                                              003 02112V2003  02112V2003      02112/2008      EF ATT-14.3            ATTACHMENT RHR NPSH                                              003 03/06/2002  01/28/2004      01/2812009      EF ATT-14.5            ATTACHMENT RHR SYSTEM                                            003 03/2012003  02o0312003      02103/2008      EF ATT-14.6            ATTACHMENT RHR PRESS REDUCTlON                                    002 03106/2002  01/28/2004      01/282009      EF ATT-14.7            ATTACHMENT ADJUST RHR FLOW                                      000 02117/2004  02117/2004    02117/2009      EF ATT-15.0            ATTACHMENT RCP START                                              009 03106/2002  03117/2000      03/17/2005      EF ATT-15.1            ATTACHMENT RCP DIAGNOSTICS                                      003 04/2411997  02103/2003    02103/2008      EF ATT-15.2            ATTACHMENT SEAL COOUNG                                            005 03/06/2002  02103/2003      02103/2008      EF ATT-16.0            ATTACHMENT RUPTUREDS/G                                            012 04/2912004  01/11/2000    01111/2005      EF ATT-1 6.1          ATTACHMENT SGTL                                                  003 09101/2004  09/08/2000      09/082005      EF ATT-16.2            ATTACHMENT RCS BORON FOR SGTL                                    003 11/26/2003  09/08/2000      09/0812005      EF ATT-17.0            ATTACHMENT SD-1                                                  017 09/01/2004  02/29/2000      02/28/2005      EF ATT-17.1            ATTACHMENT SD-2                                                  007 09/01/2004  01/30/2001      01/30/2006      EF ATT-1 8.0          ATTACHMENT SFP - RWST                                            005 03/06/2002  02103/2003      02103/2008      EF ATT-20.0            ATTACHMENTVENTTIME                                                004 09/01/2004  02V03/2003      02103/2008      EF ATT-21.0            ATTACHMENT RCS ISOLATION                                          002 03/06/2002  02103/2003      02103/2008      EF ATT-22.0            ATTACHMENT RESTORING FEED FLOW                                    003 05/02/2002  01/2212002      01/22/2007      EF ATT-23.0            ATTACHMENT TRANSFER 4160V LOADS                                  000 02/26/1999  01/28/2004      01/2812009      EF ATT-24.0            ATTACHMENT TRANSFER BATTERY TO TSC                                000 09/08/2000  09/08/2000      09/0812005      EF ATT-26.0            ATTACHMENT RETURN TO NORMAL OPERATIONS                            000 10/31/2001  10/31/2001    1031/2006      EF PRATT        TOTAL      51 GRAND TOTAL 51
 
Responsible Manager J                                          - Date  1070                                        CAUTION MAXIMUM ALLOWED TDAFW PUMP OPERATION WITH NO COOLING IS 2 HOURS.
NOTE:      o  IF fire water is available for TDAFW pump cooling, THEN perform Part A.
o  IF fire water is NOT available, THEN perform Part B.
A.      Aligning Fire Water Cooling to the TDAFW Pump
: 1. Obtain the hose from the Turbine Bldg. hose locker                        (top floor).
: 2. CLOSE service water root valve to the TDAFW pump thrust bearing and lube oil cooler V-4087C (located on the south side of the pump below MOV-4013).
: 3. Ensure SW inlet block vlv to Turbine Aux FW Pump Lube Oil Cooler, V-4085, is OPEN.
: 4. Ensure Service Wtr Bypass Isol from Turb Driven AFW Pump Lube Oil Clr, V-4085B, is CLOSED.
: 5. Check OPEN instrument root valve to PI-2134 SW inlet to TDAFW oil cooler V-4288 (located at the north west corner of the oil sump).
: 6. Connect one end of the hose to PI-2134.
: 7. Connect the other end of the hose to the Fire Water Main at valve V-9226.                    (V-9226 is located by the S/G blowdown CNMT Isol Valves)
NOTE:      The following action may result in an automatic start of the Diesel Driven Fire Pump.
: 8. OPEN Containment hose reel supply drain & test connection valve V-9226.
: 9. VERIFY water is being supplied to the TDAFW pump thrust bearing by observing flow past valve V-4089A TDAFW Thrust bearing SW outlet block valve.
: 10. Verify PI-2134 indicates less than 150 psig.
: 11. Notify the Control Room fire water cooling is aligned to the TDAFW pump.
 
_4 _  EDP:              TITLE:                                                                            REV4 iII ATT-5.2          ATTACHMENT FIRE WATER COOLING TO TDAFW PUMP PAGE 2 of 2 B. Aligning Self Cooling to the TDAFW Pump CAUTION THIS ALTERNATE COOLING METHOD DEPLETES CST INVENTORY.
THEREFORE, THIS METHOD OF COOLING SHOULD BE DELAYED AS LONG AS POSSIBLE, BUT NOT TO EXCEED A TDAFP RUN TIME OF 2 HOURS WITH NO COOLING.
NOTE:        Locked valve key is required.                                                              I
: 1.      Close service water root valve to the TDAFW pump thrust                                          I bearing and lube oil cooler, V-4087C (south side of pump below MOV-4013).                                                                                l
: 2.      Ensure open SW inlet block valve to TDAFW pump lube oil                                          I cooler, V-4085.                                                                                  I
: 3.      Ensure closed SW bypass isol from TDAFW pump lube oil cooler, V-4085B.
: 4.      Ensure closed V-4299D, TDAFW pump casing drain valve.                                            I
: 5.      Open V-4299K, TDAFW pump self cooling outer isolation valve.                                                                                          I
: 6.      Open V-4299L, TDAFW pump self cooing inner isolation                                            I valve.
: 7.      Notify the Control Room that the TDAFW pump is in the                                            I self-cooling alignment.                                                                          I}}

Revision as of 09:35, 24 March 2020

R. E. Ginna Nuclear Power Plant, Emergency Operating Procedures
ML042940551
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/07/2004
From: Marlow T
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML042940551 (5)


Text

.- t1503 Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC October 7, 2004 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Emergency Operating Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244 As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very truly yours, Thomas A. Marlow TAM/jdw xc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Ginna USNRC Senior Resident Inspector Enclosure(s):

ATT Index ATT-5.2, Rev 4

C C t NPSP0200 Ginna Nuclear Power Plant Tue 10/1212004 10:23:38 am E66429 PROCEDURE INDE) Page I of 2 INPUT PARAMETERS: TYPE: PRATT STATUSVALUE(S): EF,QU 5 YEARS ONLY:

PRATT EOP ATTACHMENTS PROCEDURE EFFECT LAST NEXT NUMBER PROCEDURE TITLE REV DATE REVIEW REVIEW ST ATT-1.0 ATTACHMENT AT POCHER CCWAIJGNMENT 003 02112/2003 02/12/2003 02112/2008 EF ATT-1.1 ATTACHMENT NORMAL CCW FLOW 000 05/18/2000 05/18/2000 05/18/2005 EF ATT-2.1 ATTACHMENT MIN SW 005 02/01/2001 02/03/2003 02/03/2008 EF ATT-2.2 ATTACHMENT SW ISOLATION 008 03106/2002 03/27/2003 03/2712008 EF ATT-2.3 ATTACHMENT SW LOADS IN CNMT 004 03/06/2002 04106/2004 04/06/2009 EF ATT-2.4 ATTACHMENT NO SW PUMPS 002 05/3012003 10/31/2001 10/31/2006 EF ATT-2.5 ATTACHMENT SPUT SW HEADERS 000 06/26/2002 06126/2002 06/26/2007. EF ATT-3.0 ATTACHMENT CUCIA 007 02/17/2004 02/1712004 02/1712009 EF ATT-3.1 ATTACHMENT CNMT CLOSURE 005 02/17/2004 02117/2004 02117/2009 EF ATT-4.0 ATTACHMENT CNMT RECIRC FANS 003 07126/1994 03/27/2003 03127/2008 EF ATT-5.0 ATTACHMENT COND TO S/G 006 10/10/2003 04/06/2004 04/06/2009 EF ATT-5.1 ATTACHMENT SAFW 008 05/3012002 041062004 04/06/2009 EF ATT-5.2 ATTACHMENT FIRE WATER COOUNG TO TDAFW PUMP 004 10/07/2004 81120151/2 01/28/2009 ATT-6.0 ATTACHMENT COND VACUUM 003 12/18/1996 02/03/2003 02/03/2008 6:

EF ATT-7.0 ATTACHMENT CR EVAC 006 03/06/2002 02/03/2003 02/03/2008 6:

EF ATT-8.0 ATTACHMENT DC LOADS 007 02/04/2004 02/04/2004 02/04/2009 ATT-8.1 ATTACHMENT DIG STOP 005 03/06/2002 02/03/2003 02103/2008 EF ATT-8.2 ATTACHMENT GEN DEGAS 008 06/20/2002 05/28/2004 05/28/2009 EF ATT-8.3 ATTACHMENT NONVITAL 004 03/06/2002 02/03/2003 02/03/2008 EF ATT-8.4 ATTACHMENT SWV 005 03/06/2002 02/03/2003 02/03/2008 EF ATT-8.5 ATTACHMENT LOSS OF OFFSITE POWER 001 08/26/2003 05/02/2002 05/02/2007 EF ATT-9.0 ATTACHMENT LETIDCOhI 009 01/07/2004 03/06/2002 03/06/2007 EF ATT-9.1 ATTACHMENT EXCESS L/D 006 07/28/2004 10/31/2001 10/31/2006 EF ATT-10.0 ATTACHMENT FAULTED S/K 006 03/06/2002 03/27/2003 03/27/2008 EF ATT-11.0 ATTACHMENT IA CONCERNS 004 09/01/2004 03/27/2003 03/27/2008 EF ATT-11.1 ATTACHMENT IA SUPPLY 003 03/06/2002 03/27/2003 03/27/2008 EF ATT-11.2 ATTACHMENT DIESEL AIR COMPRESSOR 004 11/18/2002 03/10/2003 03/10/2008 EF ATT-12.0 ATTACHMENT N2 PORVS 005 02/12/2003 02112/2003 02/12V2008 6:

ATT-13.0 ATTACHMENT NC 003 02/12/2003 02/12/2003 02/12/2008 6:

ATT-14.0 ATTACHMENT NORMAL RHR COOUNG 003 03/06/2002 04/06/2004 04/06/2009 6:

(I (7A NPSP0200 Ginna Nuclear Power Plant Tue 10/121200410:23:38 am {f E66429 PROCEDURE INDE) Page 2 of 2 INPUT PARAMETERS: TYPE: PRATT STATUSVALUE(S): EFQU 5YEARS ONLY:

PRATT EOP ATTACHMENTS PROCEDURE EFFECT LAST NEXT NUMBER PROCEDURE TITLE REV DATE REVIEW REVIEW ST ATT-14.1 ATTACHMENT RHR COOL 007 0910112004 0110812002 01108/2007 EF ATT-14.2 ATTACHMENT RHR ISOL 003 02112V2003 02112V2003 02112/2008 EF ATT-14.3 ATTACHMENT RHR NPSH 003 03/06/2002 01/28/2004 01/2812009 EF ATT-14.5 ATTACHMENT RHR SYSTEM 003 03/2012003 02o0312003 02103/2008 EF ATT-14.6 ATTACHMENT RHR PRESS REDUCTlON 002 03106/2002 01/28/2004 01/282009 EF ATT-14.7 ATTACHMENT ADJUST RHR FLOW 000 02117/2004 02117/2004 02117/2009 EF ATT-15.0 ATTACHMENT RCP START 009 03106/2002 03117/2000 03/17/2005 EF ATT-15.1 ATTACHMENT RCP DIAGNOSTICS 003 04/2411997 02103/2003 02103/2008 EF ATT-15.2 ATTACHMENT SEAL COOUNG 005 03/06/2002 02103/2003 02103/2008 EF ATT-16.0 ATTACHMENT RUPTUREDS/G 012 04/2912004 01/11/2000 01111/2005 EF ATT-1 6.1 ATTACHMENT SGTL 003 09101/2004 09/08/2000 09/082005 EF ATT-16.2 ATTACHMENT RCS BORON FOR SGTL 003 11/26/2003 09/08/2000 09/0812005 EF ATT-17.0 ATTACHMENT SD-1 017 09/01/2004 02/29/2000 02/28/2005 EF ATT-17.1 ATTACHMENT SD-2 007 09/01/2004 01/30/2001 01/30/2006 EF ATT-1 8.0 ATTACHMENT SFP - RWST 005 03/06/2002 02103/2003 02103/2008 EF ATT-20.0 ATTACHMENTVENTTIME 004 09/01/2004 02V03/2003 02103/2008 EF ATT-21.0 ATTACHMENT RCS ISOLATION 002 03/06/2002 02103/2003 02103/2008 EF ATT-22.0 ATTACHMENT RESTORING FEED FLOW 003 05/02/2002 01/2212002 01/22/2007 EF ATT-23.0 ATTACHMENT TRANSFER 4160V LOADS 000 02/26/1999 01/28/2004 01/2812009 EF ATT-24.0 ATTACHMENT TRANSFER BATTERY TO TSC 000 09/08/2000 09/08/2000 09/0812005 EF ATT-26.0 ATTACHMENT RETURN TO NORMAL OPERATIONS 000 10/31/2001 10/31/2001 1031/2006 EF PRATT TOTAL 51 GRAND TOTAL 51

Responsible Manager J - Date 1070 CAUTION MAXIMUM ALLOWED TDAFW PUMP OPERATION WITH NO COOLING IS 2 HOURS.

NOTE: o IF fire water is available for TDAFW pump cooling, THEN perform Part A.

o IF fire water is NOT available, THEN perform Part B.

A. Aligning Fire Water Cooling to the TDAFW Pump

1. Obtain the hose from the Turbine Bldg. hose locker (top floor).
2. CLOSE service water root valve to the TDAFW pump thrust bearing and lube oil cooler V-4087C (located on the south side of the pump below MOV-4013).
3. Ensure SW inlet block vlv to Turbine Aux FW Pump Lube Oil Cooler, V-4085, is OPEN.
4. Ensure Service Wtr Bypass Isol from Turb Driven AFW Pump Lube Oil Clr, V-4085B, is CLOSED.
5. Check OPEN instrument root valve to PI-2134 SW inlet to TDAFW oil cooler V-4288 (located at the north west corner of the oil sump).
6. Connect one end of the hose to PI-2134.
7. Connect the other end of the hose to the Fire Water Main at valve V-9226. (V-9226 is located by the S/G blowdown CNMT Isol Valves)

NOTE: The following action may result in an automatic start of the Diesel Driven Fire Pump.

8. OPEN Containment hose reel supply drain & test connection valve V-9226.
9. VERIFY water is being supplied to the TDAFW pump thrust bearing by observing flow past valve V-4089A TDAFW Thrust bearing SW outlet block valve.
10. Verify PI-2134 indicates less than 150 psig.
11. Notify the Control Room fire water cooling is aligned to the TDAFW pump.

_4 _ EDP: TITLE: REV4 iII ATT-5.2 ATTACHMENT FIRE WATER COOLING TO TDAFW PUMP PAGE 2 of 2 B. Aligning Self Cooling to the TDAFW Pump CAUTION THIS ALTERNATE COOLING METHOD DEPLETES CST INVENTORY.

THEREFORE, THIS METHOD OF COOLING SHOULD BE DELAYED AS LONG AS POSSIBLE, BUT NOT TO EXCEED A TDAFP RUN TIME OF 2 HOURS WITH NO COOLING.

NOTE: Locked valve key is required. I

1. Close service water root valve to the TDAFW pump thrust I bearing and lube oil cooler, V-4087C (south side of pump below MOV-4013). l
2. Ensure open SW inlet block valve to TDAFW pump lube oil I cooler, V-4085. I
3. Ensure closed SW bypass isol from TDAFW pump lube oil cooler, V-4085B.
4. Ensure closed V-4299D, TDAFW pump casing drain valve. I
5. Open V-4299K, TDAFW pump self cooling outer isolation valve. I
6. Open V-4299L, TDAFW pump self cooing inner isolation I valve.
7. Notify the Control Room that the TDAFW pump is in the I self-cooling alignment. I