ML14225A138: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML14225A138
| number = ML14225A138
| issue date = 08/12/2014
| issue date = 08/12/2014
| title = Ir 05000313-14-008 and 05000368-14-008, Arkansas Nuclear One, Units 1 and 2 - Response to Notice of Violation
| title = IR 05000313-14-008 and 05000368-14-008, Arkansas Nuclear One, Units 1 and 2 - Response to Notice of Violation
| author name = Werner G E
| author name = Werner G E
| author affiliation = NRC/RGN-IV/DRP/RPB-E
| author affiliation = NRC/RGN-IV/DRP/RPB-E

Revision as of 10:05, 13 February 2018

IR 05000313-14-008 and 05000368-14-008, Arkansas Nuclear One, Units 1 and 2 - Response to Notice of Violation
ML14225A138
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/12/2014
From: Werner G E
NRC/RGN-IV/DRP/RPB-E
To: Jeremy G. Browning
Entergy Operations
Werner G E
References
IR-14-008
Download: ML14225A138 (3)


See also: IR 05000313/2014008

Text

August 12, 2014

EA-14-008 Jeremy Browning, Site Vice President Entergy Operations, Inc. Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802-0967

SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 RESPONSE TO NOTICE OF VIOLATION (NRC INSPECTION REPORT 05000313/2014008 AND 05000368/2014008)

Dear Mr. Browning:

On June 23, 2014, the NRC cited failure to accomplish a move of the Unit 1 main turbine generator stator in accordance with documented instructions and procedures as required by 10 CFR 50, Appendix B, Criterion VInstructions, Procedures, and Drawings. The Notice of Violation, enclosed with Inspection Report 05000313/2014008 and 05000368/2014008 (ML14174A832), required you to respond in writing within 30 days. You responded by letter dated July 18, 2014 (ML14199A412). We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We will review your corrective actions during a future inspection. We also noted that your response included a discussion regarding safety-related equipment not being damaged by the March 31, 2013, Unit 1 stator drop event. It is acknowledged that no safety-related components were damaged by the crane collapse and resulting drop of the main turbine generator stator. The statement contained in our June 23, 2014, letter that safety-related equipment was affected by the event was based on the damage caused by the event affecting safety-related systems such as: (1) the loss of the operating decay heat removal pump in Unit 1 resulting in a temporary loss of shutdown cooling to the reactor; and (2) a loss of one Unit 2 safety-related electrical bus that had to be re-energized by a standby emergency diesel generator. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs Agencywide Documents Access Management System (ADAMS), which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Gregory E. Werner, Chief Project Branch E Division of Reactor Projects Docket No. 50-313 and 50-368 License No. DPR-51 and NPF-6 DISTRIBUTION: See next page ADAMS ACCESSION NUMBER: SUNSI Review By: GWerner ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive OFFICE RIV/DRP RIV/DRP NAME CYoung/dll GWerner SIGNATURE /RA/ /RA/ DATE 8/7/14 8/13/14 OFFICIAL RECORD COPY Letter to Jeremy Browning from Gregory E. Werner dated August 12, 2014 SUBJECT: ANNUAL ASSESSMENT LETTER FOR ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 (REPORT 05000313/2014006 AND 05000368/2014006) DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Brian.Tindell@nrc.gov) Resident Inspector (Abin.Fairbanks@nrc.gov) Resident Inspector (Matt.Young@nrc.gov) Administrative Assistant (Gloria.Hatfield@nrc.gov) Branch Chief (Greg.Werner@nrc.gov) Senior Project Engineer (Cale.Young@nrc.gov) Project Engineer (Jim.Melfi@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) RIV State Liaison Officer (Bill.Maier@nrc.gov) Branch Chief, TSB (Geoffrey.Miller@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) R4AllegationResource@nrc.gov ROPreports@nrc.gov Distribution via Listserv for Arkansas Nuclear One