{{#Wiki_filter:Initial License Exam                       03/2005                     Job Performance Measure JPM: SRO/RO A1.a                               KEY System:       Conduct of Operations                                 JTA Task #: (New)
{{#Wiki_filter:Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY System:
Conduct of Operations JTA Task #: (New)
Task
Task


==Title:==
==Title:==
Determine Pressurizer Heater Operability KSA Ref: 2.1.33                                 PEO:               RO: 3.4               SRO: 4.0 Operators Name:
Determine Pressurizer Heater Operability KSA Ref:
Performance Environment:               CLASSROOM             CONTROL ROOM                 SIMULATOR Performance Method:                   PERFORMED             SIMULATED                     DISCUSSED Time to complete JPM:       Estimated     15 minutes             Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
2.1.33 PEO:
SATISFACTORY                                     UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                       Date:
3.4 SRO:
Comments (list all steps not satisfactorily completed):
4.0 Operators Name:
Performance Environment:
CLASSROOM CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
IPO-001A Plant Heatup from Cold Shutdown to Hot Standby Tools, Equipment, Job Aids, etc:
IPO-001A Plant Heatup from Cold                    Selected parameters from the plant, captured on Shutdown to Hot Standby                            Attachment 1 of this JPM, and a calculator.
Selected parameters from the plant, captured on of this JPM, and a calculator.
Page 1 of 5                           Rev Date: 1/19/05
Page 1 of 5 Rev Date: 1/19/05  


Initial License Exam                         03/2005                   Job Performance Measure JPM: SRO/RO A1.a                                 KEY Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 50: Line 59:
Terminating Conditions:
Terminating Conditions:
Calculations are complete and an Operability determination has been made.
Calculations are complete and an Operability determination has been made.
Page 2 of 5                         Rev Date: 1/19/05
Page 2 of 5 Rev Date: 1/19/05  


Initial License Exam                     03/2005                 Job Performance Measure JPM: SRO/RO A1.a                             KEY STEP#                                                                                   SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY STEP#  
*Critical             ELEMENT                   STANDARD             NOTES           UNSAT 1       Provide the candidate with the                         Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
initiating cue, the plant data sheet, and a copy of IPO-001A step 5.3.1.
UNSAT 1
2       Candidate correctly transfers   See Attached Key data to the procedure.
Provide the candidate with the initiating cue, the plant data sheet, and a copy of IPO-001A step 5.3.1.
3       Candidate performs               See Attached Key calculations.
Note Start time.
  *4     Candidate determines             B/U Heater Groups A, operability                      B and Control Heater Group C are OPERABLE. B/U Heater Group D is INOPERABLE TASK COMPLETE.                  Note Completion time.
2 Candidate correctly transfers data to the procedure.
Page 3 of 5                       Rev Date: 1/19/05
See Attached Key 3
Candidate performs calculations.
See Attached Key  
*4 Candidate determines operability TASK COMPLETE.
B/U Heater Groups A, B and Control Heater Group C are OPERABLE. B/U Heater Group D is INOPERABLE Note Completion time.
Page 3 of 5 Rev Date: 1/19/05  


Initial License Exam                       03/2005                     Job Performance Measure JPM: SRO/RO A1.a                               KEY INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY INITIATING CUE:
The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determine the operability of the Pressurizer Heaters by performing step 5.3.1 of IPO-001A, Plant Heatup from Cold Shutdown to Hot Standby. Plant data is provided.
The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determine the operability of the Pressurizer Heaters by performing step 5.3.1 of IPO-001A, Plant Heatup from Cold Shutdown to Hot Standby. Plant data is provided.
Plant Data Parameter         Value from Last Reading           Current Value Sheets (OPT-XXX) 1/1-PCPR1 Amps                   580                         580 1/1-PCPR Amps                     0                         200 1/1-PCPR2 Amps                   565                         565 1/1P-CPR3 Amps                     0                         176 1B1 Volts                         474                         468 1B2 Volts                         483                         476 1B3 Volts                         476                         470 1B4 Volts                         485                         480 PC point V6303A                 487.2                       486.9 PC point V6302A                 488.1                       487.1 PC point V6301A                 487.2                       486.9 PC point V6304A                 488.3                       487.1 PC point A6801A                 571.2                       570.1 PC point A6802A                   0                         193 PC point A6803A                 559.8                       560 PC point A6804A                   0                         176 1EA1 Amps                       282.7                       261.4 1EA2 Amps                       358.5                       423.7 NOTE: The candidate can use either the MCB meter amperages or the plant computer values for heater amperages. The IPO allows both and there is no significant difference.
Plant Data Parameter Value from Last Reading Sheets (OPT-XXX)
Current Value 1/1-PCPR1 Amps 580 580 1/1-PCPR Amps 0
200 1/1-PCPR2 Amps 565 565 1/1P-CPR3 Amps 0
176 1B1 Volts 474 468 1B2 Volts 483 476 1B3 Volts 476 470 1B4 Volts 485 480 PC point V6303A 487.2 486.9 PC point V6302A 488.1 487.1 PC point V6301A 487.2 486.9 PC point V6304A 488.3 487.1 PC point A6801A 571.2 570.1 PC point A6802A 0
193 PC point A6803A 559.8 560 PC point A6804A 0
176 1EA1 Amps 282.7 261.4 1EA2 Amps 358.5 423.7 NOTE: The candidate can use either the MCB meter amperages or the plant computer values for heater amperages. The IPO allows both and there is no significant difference.
NOTE: The shaded parameters should NOT be used. The following problems exist with the shaded data:
NOTE: The shaded parameters should NOT be used. The following problems exist with the shaded data:
: 1. The pressurizer heaters are supplied by 1EB1-4, NOT 1B1-4
: 1. The pressurizer heaters are supplied by 1EB1-4, NOT 1B1-4
: 2. 1EA1/2 amperage is not necessary to complete the calculations.
: 2. 1EA1/2 amperage is not necessary to complete the calculations.
: 3. Data from the last set of logs should NOT be used for the Operability determination. Plant conditions could have changed significantly since the readings were taken. The IPO wants current plant data to determine Operability.
: 3. Data from the last set of logs should NOT be used for the Operability determination. Plant conditions could have changed significantly since the readings were taken. The IPO wants current plant data to determine Operability.
Page 4 of 5                         Rev Date: 1/19/05
Page 4 of 5 Rev Date: 1/19/05  


Initial License Exam                           03/2005                       Job Performance Measure JPM: SRO/RO A1.a                                   KEY Circle the correct status for each Bank of Pressurizer Heaters Heater Bank                               Status                                 Status B/U Heater Grp. A                                   Operable                             Inoperable B/U Heater Grp. B                                   Operable                             Inoperable Control Grp. C                                       Operable                             Inoperable B/U Heater Grp. D                                   Operable                             Inoperable Example of the completed procedure:
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Page 5 of 5 Rev Date: 1/19/05 Circle the correct status for each Bank of Pressurizer Heaters Heater Bank Status Status B/U Heater Grp. A Operable Inoperable B/U Heater Grp. B Operable Inoperable Control Grp. C Operable Inoperable B/U Heater Grp. D Operable Inoperable Example of the completed procedure:
5.3 Heatup And Pressurization For MODE 3 Entry
5.3 Heatup And Pressurization For MODE 3 Entry
[C]
[C]
This section describes steps for heatup and pressurization to enter MODE 3.
This section describes steps for heatup and pressurization to enter MODE 3.
5.3.1 Verify at least two groups of pressurizer heaters have a capacity of at least 150KW each.(TS SR 3.4.9.2)
5.3.1 Verify at least two groups of pressurizer heaters have a capacity of at least 150KW each.(TS SR 3.4.9.2)
A. Energize each group of heaters, as required, to measure current.                 _____
A. Energize each group of heaters, as required, to measure current. _____
B. Record voltage and current AND calculate power for each group of heaters.
B. Record voltage and current AND calculate power for each group of heaters.
(Voltage x current x 0.001732 = power)
(Voltage x current x 0.001732 = power)
* Backup Heater Group A 1EB3             1-II-PCPR1or Or 486.9__x     or _570.1 _ x       0.001732 =         480.77   KW                   _____
Backup Heater Group A 1EB3 1-II-PCPR1or Or 486.9__x or _570.1 _ x 0.001732 =
V6303A           A6801A
480.77 KW V6303A A6801A Backup Heater Group B 1EB2-1-II-PCPR2 or 487.1 x or _193 _ x 0.001732 =
* Backup Heater Group B 1EB2-           1-II-PCPR2 or 487.1     x   or _193 _ x       0.001732 =         162.8   KW                   _____
162.8 KW V6302A A6803A  
V6302A           A6803A
! Control Heater Group C 1EB1 1-II-PCPR or 486.9 x or __560 x 0.001732 =
                *  ! Control Heater Group C 1EB1             1-II-PCPR or 486.9   x   or __560     x     0.001732 =         _472.54_ KW                   _____
_472.54_ KW V6301A A6803A  
V6301A           A6803A
! Backup Heater Group D 1EB4 1-II-PCPR3 or 487.1 x or _176 x 0.001732 =
                *  ! Backup Heater Group D 1EB4             1-II-PCPR3 or 487.1   x   or _176       x   0.001732 =         __148.5__ KW                   _____
__148.5__ KW V6304A A6804A C. Operate pressurizer heaters as needed for plant conditions. _____
V6304A           A6804A C. Operate pressurizer heaters as needed for plant conditions.                       _____
D. IF any group(s) of pressurizer heaters does NOT have a capacity of > 150KW, THEN initiate a LCOAR per ODA-308. _____  
D. IF any group(s) of pressurizer heaters does NOT have a capacity of > 150KW, THEN initiate a LCOAR per ODA-308.                                                   _____
Page 5 of 5                              Rev Date: 1/19/05


Initial License Exam                       03/2005                     Job Performance Measure JPM: RO A1.b                             KEY System:       Conduct of Operations                                 JTA Task #: (New)
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 1 of 5 Rev Date: 1/24/05 System:
Conduct of Operations JTA Task #: (New)
Task
Task


==Title:==
==Title:==
Calculate RCS Leakrate KSA Ref: 2.1.23                                 PEO:               RO: 3.9               SRO: 4.0 Operators Name:
Calculate RCS Leakrate KSA Ref:
Performance Environment:               CLASSROOM             CONTROL ROOM                 SIMULATOR Performance Method:                   PERFORMED             SIMULATED                     DISCUSSED Time to complete JPM:       Estimated     15 minutes             Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
2.1.23 PEO:
SATISFACTORY                                     UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                       Date:
3.9 SRO:
Comments (list all steps not satisfactorily completed):
4.0 Operators Name:
Performance Environment:
CLASSROOM CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
ABN-103 Excessive Reactor Coolant Leakage Tools, Equipment, Job Aids, etc:
ABN-103 Excessive Reactor Coolant Leakage          Selected parameters from the plant, captured on Attachment 1 of this JPM, and a calculator.
Selected parameters from the plant, captured on of this JPM, and a calculator.  
Page 1 of 5                          Rev Date: 1/24/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: RO A1.b                               KEY Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 2 of 5 Rev Date: 1/24/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 120: Line 145:
The plant is operating at 100% power, BOL. The crew is responding to the indications of a Reactor Coolant System leak. The Unit Supervisor has directed you to determine the size of the leak by performing Attachment 1 of ABN-103, Excessive Reactor Coolant Leakage. Plant data is provided.
The plant is operating at 100% power, BOL. The crew is responding to the indications of a Reactor Coolant System leak. The Unit Supervisor has directed you to determine the size of the leak by performing Attachment 1 of ABN-103, Excessive Reactor Coolant Leakage. Plant data is provided.
Terminating Conditions:
Terminating Conditions:
Calculations are complete and a RCS Leak Rate determination has been made.
Calculations are complete and a RCS Leak Rate determination has been made.  
Page 2 of 5                        Rev Date: 1/24/05


Initial License Exam                       03/2005                   Job Performance Measure JPM: RO A1.b                             KEY STEP#                                                                                       SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 3 of 5 Rev Date: 1/24/05 STEP#  
*Critical             ELEMENT                     STANDARD               NOTES           UNSAT 1       Provide the candidate with the                             Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
initiating cue, the plant data sheet, and a copy of ABN-103 Attachment 1.
UNSAT 1
2       Candidate correctly transfers     See Attached Key data to the procedure.
Provide the candidate with the initiating cue, the plant data sheet, and a copy of ABN-103.
3       Candidate performs               See Attached Key calculations.
Note Start time.
  *4     Candidate determines             Leak rate is determined operability                      to be approx 5 gpm.
2 Candidate correctly transfers data to the procedure.
See key for allowed variances in parameters TASK COMPLETE.                    Note Completion time.
See Attached Key 3
Page 3 of 5                          Rev Date: 1/24/05
Candidate performs calculations.
See Attached Key  
*4 Candidate determines operability TASK COMPLETE.
Leak rate is determined to be approx 5 gpm.
See key for allowed variances in parameters Note Completion time.  


Initial License Exam               03/2005                   Job Performance Measure JPM: RO A1.b                     KEY INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 4 of 5 Rev Date: 1/24/05 INITIATING CUE:
Parameter               Value at 1429               Value at 1446 CHG FLO (F6138A)                   140.7                         143.8 LTDN FLO (F6134A)                   130.9                         130.9 FR-157 (RCP 1 Leak Off)               2.8                           2.8 FR-156 (RCP 1 Leak Off)               2.8                           2.8 FR-155 (RCP 1 Leak Off)               2.8                           2.8 FR-154 (RCP 1 Leak Off)               2.8                           2.8 VCT LVL (L6112A)                     52.8                         50.4 T0400A (Loop 1 Tave)               589.8                         589.8 T0420A (Loop 2 Tave)               588.6                         588.6 T0440A (Loop 3 Tave)               589.7                         589.7 T0460A (Loop 4 Tave)               588.7                         588.7 L6480A (PZR Level 1)                 60                           59.5 L6481A (PZR Level 2)                 60                           59.5 L6482A (PZR Level 3)                 60                           59.5 NOTE: There was no VCT auto make-up. There were no diversions of letdown flow during this period.
Parameter Value at 1429 Value at 1446 CHG FLO (F6138A) 140.7 143.8 LTDN FLO (F6134A) 130.9 130.9 FR-157 (RCP 1 Leak Off) 2.8 2.8 FR-156 (RCP 1 Leak Off) 2.8 2.8 FR-155 (RCP 1 Leak Off) 2.8 2.8 FR-154 (RCP 1 Leak Off) 2.8 2.8 VCT LVL (L6112A) 52.8 50.4 T0400A (Loop 1 Tave) 589.8 589.8 T0420A (Loop 2 Tave) 588.6 588.6 T0440A (Loop 3 Tave) 589.7 589.7 T0460A (Loop 4 Tave) 588.7 588.7 L6480A (PZR Level 1) 60 59.5 L6481A (PZR Level 2) 60 59.5 L6482A (PZR Level 3) 60 59.5 NOTE: There was no VCT auto make-up. There were no diversions of letdown flow during this period.  
Page 4 of 5                      Rev Date: 1/24/05


Initial License Exam                                 03/2005                       Job Performance Measure JPM: RO A1.b                                       KEY Attachment 1 CPSES                                     UNIT 1 AND 2       PROCEDURE NO.
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 5 of 5 Rev Date: 1/24/05 CPSES ABNORMAL CONDITIONS PROCEDURES MANUAL UNIT 1 AND 2 PROCEDURE NO.
ABNORMAL CONDITIONS PROCEDURES MANUAL                                                    ABN-103 EXCESSIVE REACTOR COOLANT LEAKAGE                             REVISION NO 8       PAGE 22 OF 28 ATTACHMENT 1 PAGE 2 OF 2 PARAMETER                   INITIAL VALUE FINAL VALUE                           AVERAGE VALUE TIME                         (-) __1429____ + __1446____                         = ____17___ t
ABN-103 EXCESSIVE REACTOR COOLANT LEAKAGE REVISION NO 8 PAGE 22 OF 28 ATTACHMENT 1 PAGE 2 OF 2 PARAMETER INITIAL VALUE FINAL VALUE AVERAGE VALUE TIME
* CHRG FLO                             __140.7____ + ___143.8___
(-) __1429____ + __1446____  
(F6138A)                            ( __________284.5____________)               = __142.25___ GPM 2
= ____17___ t
* LTDN HX OUT FLOW                       ___130.9__ + ___130.9___
* CHRG FLO (F6138A)
(F6134A)                        (__________261.8______________)                 = __130.9__ GPM 2
__140.7____ + ___143.8___
* RCP SEAL LKOFF FLO                 ___11.2______ + ____11.2____
(__________284.5____________)
(FR-157, 156, 155                (___________5.6______________.)               = ___11.2___ GPM
2
& 154)                                                  2
= __142.25___ GPM
* VCT LVL                         (_52.8___ - __50.4___)(19.4gal/%)
* LTDN HX OUT FLOW (F6134A)
(L6112A)                      (_________46.56__________________)                 = __2.74___ GPM
___130.9__ + ___130.9___
(__17____)t in MIN)
(__________261.8______________)
RC LOOP 1-4 TAVE                     (________ - ________)(93gal/°F)
2
(T0400A,T0420A,T0440A        ( _____________0__________________)                 = ____0___ GPM OR T0460A)                                (_____17_____)t in MIN)
= __130.9__ GPM
PRZR LVL                               (_60___ - ___59.5__)(65gal/%)
* RCP SEAL LKOFF FLO (FR-157, 156, 155
(L6480A,L6481A OR            ( _________32.5___________________)               = ___1.9___ GPM L6482A)                                      (__17_____)t in MIN)
& 154)
Shaded areas NOT REQUIRED CALCULATION FORMULA Flow adjust method:
___11.2______ + ____11.2____
(+) ________     -________          -________          -( )_________   +( )________   = ______GPM CHRG FLO      LTDN FLOW            SEAL LKOFF        TAVG ADJUST      PRZR LVL    RCS LEAKAGE FLO                              ADJUST OR VCT level adjust method
(___________5.6______________.)
( )__2.74___     -( )_0___         +(+ )__1.9__       = __4.65_GPM    Allowed (4.1 VCT LVL ADJUST        TAVG                                                    - 5.2)
2
Allowed (2.5-3.0)  ADJUST              PRZR LVL        RCS LEAKAGE ADJUST Allowed (1.6 -
= ___11.2___ GPM
2.2)
* VCT LVL (L6112A)
* Either Chrg Flo, Ltdn Flow, and RCP Seal Lkoff Flo (Flow adjust method) OR VCT Lvl (VCT level adjust method) should be used, but NOT both.
(_52.8___ - __50.4___)(19.4gal/%)
Page 5 of 5                            Rev Date: 1/24/05
(_________46.56__________________)
(__17____)t in MIN)  
= __2.74___ GPM RC LOOP 1-4 TAVE (T0400A,T0420A,T0440A OR T0460A)
(________ - ________)(93gal/°F)
(_____________0__________________)
(_____17_____)t in MIN)  
= ____0___ GPM PRZR LVL (L6480A,L6481A OR L6482A)
(_60___ - ___59.5__)(65gal/%)
(_________32.5___________________)
(__17_____)t in MIN)  
= ___1.9___ GPM Shaded areas NOT REQUIRED CALCULATION FORMULA Flow adjust method:
(+) ________
CHRG FLO LTDN FLOW SEAL LKOFF FLO
-( )_________
TAVG ADJUST
+( )________
PRZR LVL ADJUST
= ______GPM RCS LEAKAGE OR VCT level adjust method
( )__2.74___
VCT LVL ADJUST Allowed (2.5-3.0)
-( )_0___
TAVG ADJUST
+(+ )__1.9__
PRZR LVL ADJUST Allowed (1.6 -
2.2)  
= __4.65_GPM RCS LEAKAGE Allowed (4.1  
- 5.2)
* Either Chrg Flo, Ltdn Flow, and RCP Seal Lkoff Flo (Flow adjust method) OR VCT Lvl (VCT level adjust method) should be used, but NOT both.  


Initial License Exam 03/2005         Job Performance Measure JPM: RO A1.b         KEY Page 6 of 5           Rev Date: 1/24/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 6 of 5 Rev Date: 1/24/05  


Initial License Exam                       03/2005                     Job Performance Measure JPM: RO A2 System:       Equipment Control                                     JTA Task #: (New)
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 1 of 13 Rev Date: 1/25/05 System:
Equipment Control JTA Task #: (New)
Task
Task


==Title:==
==Title:==
Check Completed Surveillance Procedure for Accuracy KSA Ref: 2.2.12                                 PEO:               RO: 3.0               SRO: 3.4 Operators Name:
Check Completed Surveillance Procedure for Accuracy KSA Ref:
Performance Environment:               CLASSROOM             CONTROL ROOM                 SIMULATOR Performance Method:                   PERFORMED             SIMULATED                     DISCUSSED Time to complete JPM:       Estimated     15 minutes             Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
2.2.12 PEO:
SATISFACTORY                                     UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                       Date:
3.0 SRO:
Comments (list all steps not satisfactorily completed):
3.4 Operators Name:
Performance Environment:
CLASSROOM CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
OPT-207A Service Water System Tools, Equipment, Job Aids, etc:
OPT-207A Service Water System                      Selected parameters from the plant, captured on Attachment 1 of this JPM..
Selected parameters from the plant, captured on of this JPM..  
Page 1 of 13                          Rev Date: 1/25/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: RO A2 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 2 of 13 Rev Date: 1/25/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 194: Line 256:
The plant is operating at 100% power, BOL. You are the CPC RO. The Unit Supervisor has directed you to review the just completed OPT-207 A, Service Water System, for accuracy. Circle any mistakes in the OPT and return the marked up copy to the Lead Examiner.
The plant is operating at 100% power, BOL. You are the CPC RO. The Unit Supervisor has directed you to review the just completed OPT-207 A, Service Water System, for accuracy. Circle any mistakes in the OPT and return the marked up copy to the Lead Examiner.
Terminating Conditions:
Terminating Conditions:
The OPT has been reviewed and 2 of the three errors have been correctly identified.
The OPT has been reviewed and 2 of the three errors have been correctly identified.  
Page 2 of 13                        Rev Date: 1/25/05


Initial License Exam                     03/2005                   Job Performance Measure JPM: RO A2 STEP#                                                                                         SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 3 of 13 Rev Date: 1/25/05 STEP#  
*Critical             ELEMENT                     STANDARD                 NOTES             UNSAT 1       Provide the candidate with the                           Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
initiating cue.
UNSAT 1
2       Candidate reviews completed     See Attached Key data sheet.
Provide the candidate with the initiating cue.
  *3     Candidate determines the         Two of the three errors  NOTE: The errors in the completed OPT. are identified. See     vibration alert Attached Key for the     error should be three errors.            noted in 4 places.
Note Start time.
It is critical that the ODA -308 Tracking LOCAR be noted. The others are less TASK COMPLETE.                  Note Completion time. important.
2 Candidate reviews completed data sheet.
Page 3 of 13                            Rev Date: 1/25/05
See Attached Key  
*3 Candidate determines the errors in the completed OPT.
TASK COMPLETE.
Two of the three errors are identified. See Attached Key for the three errors.
Note Completion time.
NOTE: The vibration alert error should be noted in 4 places.
It is critical that the ODA -308 Tracking LOCAR be noted. The others are less important.  


Initial License Exam                   03/2005                   Job Performance Measure JPM: RO A2 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 4 of 13 Rev Date: 1/25/05 INITIATING CUE:
The plant is operating at 100% power, BOL. You are the CPC RO. The Unit Supervisor has directed you to review the just completed OPT-207A, Service Water System, for accuracy. Circle any mistakes in the OPT and return the marked up copy to the Lead Examiner.
The plant is operating at 100% power, BOL. You are the CPC RO. The Unit Supervisor has directed you to review the just completed OPT-207A, Service Water System, for accuracy. Circle any mistakes in the OPT and return the marked up copy to the Lead Examiner.  
Page 4 of 13                        Rev Date: 1/25/05


Initial License Exam         03/2005                     Job Performance Measure JPM: RO A2 . Completed OPT.
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 5 of 13 Rev Date: 1/25/05
NOTE TO EXAMINER: Ensure candidate is provided the filled out OPT. This must be done manually.
. Completed OPT.
Page 5 of 13                        Rev Date: 1/25/05
NOTE TO EXAMINER: Ensure candidate is provided the filled out OPT. This must be done manually.  


Initial License Exam                                       03/2005                               Job Performance Measure JPM: RO A2 ROUTINE TEST-SURVEILLANCE                                                   page 1 WORK ORDER Resp. Group: POSS OPS SHIFT MANAGER                                                                             WO # : 5-05-505395-AA Tag #: CP1-SWAPSW-01                                           Unit: 1                         Train (Sys) : A See Equipment List                                     System: SW                             Train (Elect) : NA More Tags and Locations                             Bldg/Elev : SI 0796                               Room: X-275 Tag Desc: STATION SERVICE WATER PUMP 1-01 Compt Quality: Y             Safety Class: 3                 SEIS CAT: I           MOV XI: N         PVO: A EQ: M
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 6 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE page 1 WORK ORDER Resp. Group: POSS OPS SHIFT MANAGER WO # : 5-05-505395-AA Tag #: CP1-SWAPSW-01 Unit: 1 Train (Sys) : A See Equipment List System: SW Train (Elect) : NA More Tags and Locations Bldg/Elev : SI 0796 Room: X-275 Tag Desc: STATION SERVICE WATER PUMP 1-01 Compt Quality: Y Safety Class: 3 SEIS CAT: I MOV XI: N PVO: A EQ: M  
***************************************** SURVEILLANCE  
***************************************** SURVEILLANCE  


==SUMMARY==
==SUMMARY==
DESC: OPT-207A, TRN A STATION SERVICE WATER PMP/VLV OPERBILITY TEST Compliance Date/Time : 03/21/2005 10:05                                   Source Doct :              IST Violation Date/Time           : 04/05/2005 10:05                         Test Section         :      8.2 Adj Schedule Date/Time: __/__/____                                       Test Procedure: OPT-207A Work Week                                                                           Test Type         :        FI Frequency         :        92 Days Last Performed Date/Time                 : 01/09/2005 10:005 Last Perf. WO                 : 5-04-505395-AE
DESC: OPT-207A, TRN A STATION SERVICE WATER PMP/VLV OPERBILITY TEST Compliance Date/Time : 03/21/2005 10:05 Source Doct IST Violation Date/Time
: 04/05/2005 10:05 Test Section 8.2 Adj Schedule Date/Time : __/__/____
Test Procedure: OPT-207A Work Week Test Type FI Frequency 92 Days Last Performed Date/Time
: 01/09/2005 10:005 Last Perf. WO
: 5-04-505395-AE  
************************************************SPECIAL INSTRUCTIONS***************************************************
************************************************SPECIAL INSTRUCTIONS***************************************************
Permit-RWP         : N #: ____________________                           Confined Space               : N #: ____________________
Permit-RWP
Fire Permit         : N #: ____________________                           Combust. Loading             : N #: ____________________
: N #: ____________________
Fire Impair         : N #: ____________________                           Cleanliness Class: C Housekeeping Zone: IV Clearance/MTD : N #: ____________________                                 STA-720 Reqd : No           Barrier Impair Form: No Postwork Testing Reqt: N                                                             Ventilation Pressure Boundary Breach: No
Confined Space
: N #: ____________________
Fire Permit
: N #: ____________________
Combust. Loading
: N #: ____________________
Fire Impair
: N #: ____________________
Cleanliness Class: C Housekeeping Zone: IV Clearance/MTD : N #: ____________________
STA-720 Reqd : No Barrier Impair Form: No Postwork Testing Reqt: N Ventilation Pressure Boundary Breach: No  
******************************************APPROVAL/AUTHORIZATION TO START***************************************
******************************************APPROVAL/AUTHORIZATION TO START***************************************
Ops-Shift Manager Technical                         : _____________________________ Date: __/__/____
Ops-Shift Manager Technical Date: __/__/____
Radiation Protection                               : _____________________________ Date: __/__/____
Radiation Protection Date: __/__/____
Shift Manager                                       : _____________________________ Date: __/__/____
Shift Manager Date: __/__/____
Ops-Shift Manager Safety                                       : _____________________________ Date: __/__/____
Ops-Shift Manager Safety Date: __/__/____
Revisions                 1         2         3         4         5         6 POSS                 ______ ______ ______ ______ ______ ______
Revisions 1
QC                   ______ ______ ______ ______ ______ ______
2 3
ANII                 ______ ______ ______ ______ ______ ______
4 5
RP                   ______ ______ ______ ______ ______ ______
6 POSS QC ANII RP Ops SM  
Ops SM                         ______ ______ ______ ______ ______ ______
********************************************INITIAL SURVEILLANCE RESULTS**********************************************
********************************************INITIAL SURVEILLANCE RESULTS**********************************************
As Found Condition: _____ Unsat (Sign&Date) ____________________________ Date: __/__/____
As Found Condition: _____ Unsat (Sign&Date) ____________________________ Date: __/__/____
Shift Manage Informed                 (Sign&Date) _________________________________ Date: __/__/____
Shift Manage Informed (Sign&Date) _________________________________ Date: __/__/____  
***************************************FINAL SURVEILLANCE RESULTS***************************************************
***************************************FINAL SURVEILLANCE RESULTS***************************************************
Duration (Est/Act)             7 / ___             Start Time ____                 Date: __/__/____
Duration (Est/Act) 7 / ___
Test Completed: ___ Sat ___ Unsat Tech Spec Acceptance Checked: ___ Sat ___ Unsat Test Completed by: ________________________________________ Time: ____ Date: __/__/____
Start Time ____
Date: __/__/____
Test Completed: ___ Sat ___ Unsat Tech Spec Acceptance Checked: ___ Sat ___ Unsat Test Completed by: ________________________________________ Time: ____ Date: __/__/____  
************************************SURVEILLANCE ACCEPTANCE*******************************************************
************************************SURVEILLANCE ACCEPTANCE*******************************************************
Tech Spec Acceptance Criteria Met: ___ Sat ___ Unsat Shift Manager: ________________________________________ Date: __/__/____ Time: ____
Tech Spec Acceptance Criteria Met: ___ Sat ___ Unsat Shift Manager: ________________________________________ Date: __/__/____ Time: ____  
************************************** SURVEILLANCE REVIEWS********************************************************
************************************** SURVEILLANCE REVIEWS********************************************************
Ops-Shift Manager                       : _____________________________ Date: __/__/____
Ops-Shift Manager Date: __/__/____
Ops-Shift Manager                       : _____________________________ Date: __/__/____
Ops-Shift Manager Date: __/__/____
Ops-Shift Manager                       : _____________________________ Date: __/__/____
Ops-Shift Manager Date: __/__/____
Ops-Shift Manager                       : _____________________________ Date: __/__/____
Ops-Shift Manager Date: __/__/____  
Page 6 of 13                                      Rev Date: 1/25/05


Initial License Exam                                 03/2005                           Job Performance Measure JPM: RO A2 ROUTINE TEST-SURVEILLANCE                             page 2 WORK ORDER Tag # CP1-SWAPSW-01                                                                                 WO # : 5-04-505395-AA
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 7 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE page 2 WORK ORDER Tag # CP1-SWAPSW-01 WO # : 5-04-505395-AA  
********************************************** WORK PLAN ****************************************************************
********************************************** WORK PLAN ****************************************************************
MANPOWER ESTIMATES                                   MEASURING AND TEST EQUIPMENT (enter actual manhours)
MANPOWER ESTIMATES MEASURING AND TEST EQUIPMENT (enter actual manhours)
Discipline     MANHOURS                                           CAL DUE                   CAL DUE Code           Est/Act                         M&TE TAG# DATE                   M&TE TAG# DATE IWCM             0/ ___                         ___________ __/__/__             ___________ __/__/__
Discipline MANHOURS CAL DUE CAL DUE Code Est/Act M&TE TAG# DATE M&TE TAG# DATE IWCM 0/ ___
POS               0/ ___                       ___________ __/__/__             ___________ __/__/__
___________ __/__/__ ___________ __/__/__
POSS             0/ _1_                         ___________ __/__/__             ___________ __/__/__
POS 0/ ___
______         ___ / ___                       ___________ __/__/__               ___________ __/__/__
___________ __/__/__ ___________ __/__/__
______         ___ / ___                       ___________ __/__/__               ___________ __/__/__
POSS 0/ _1_
______         ___ / ___                       ___________ __/__/__               ___________ __/__/__
___________ __/__/__ ___________ __/__/__
______         ___ / ___                       ___________ __/__/__               ___________ __/__/__
______ ___ / ___
______         ___ / ___                       ___________ __/__/__               ___________ __/__/__
___________ __/__/__ ___________ __/__/__
______         ___ / ___                       ___________ __/__/__               ___________ __/__/__
______ ___ / ___
___________ __/__/__ ___________ __/__/__
______ ___ / ___
___________ __/__/__ ___________ __/__/__
______ ___ / ___
___________ __/__/__ ___________ __/__/__
______ ___ / ___
___________ __/__/__ ___________ __/__/__
______ ___ / ___
___________ __/__/__ ___________ __/__/__  
*********************************** SPECIAL PARTS AND SPECIAL TOOLS *******************************************
*********************************** SPECIAL PARTS AND SPECIAL TOOLS *******************************************
Enter actual quantity used and unique identifier such as Serial #, Heat #
Enter actual quantity used and unique identifier such as Serial #, Heat #
RR#, RIR #, QAT # etc. if applicable Unique ID                                         ISSUE/
RR#, RIR #, QAT # etc. if applicable Unique ID ISSUE/
Qnty     UI       Qnty     It ID)   (SN, RR, RIR,                                     STAGED       PMMS Reqd               Used     (TSN)   QAT, HT# etc)     Description                   Flag           STATUS N/A     ___      ___      ____    ___________        __________________            ___        ______
Qnty UI Qnty It ID)
N/A     ___      ___      ____    ___________        __________________            ___        ______
(SN, RR, RIR, STAGED PMMS Reqd Used (TSN) QAT, HT# etc) Description Flag STATUS N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A  
N/A     ___      ___      ____    ___________        __________________            ___        ______
N/A     ___      ___      ____    ___________        __________________            ___        ______
N/A     ___      ___      ____    ___________        __________________            ___        ______
N/A     ___      ___      ____    ___________        __________________            ___        ______
N/A     ___      ___      ____    ___________        __________________            ___        ______
N/A     ___      ___      ____    ___________        __________________            ___        ______
N/A     ___      ___      ____    ___________        __________________            ___        ______
N/A     ___      ___      ____    ___________        __________________            ___        ______
N/A     ___      ___      ____    ___________        __________________            ___        ______
N/A     ___      ___      ____    ___________        __________________            ___        ______
Page 7 of 13                                  Rev Date: 1/25/05


Initial License Exam                               03/2005                           Job Performance Measure JPM: RO A2 ROUTINE TEST-SURVEILLANCE                                             page 3 WORK ORDER Tag # CP1-SWAPSW-01                                                                         WO # : 5-05-505395-AA
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 8 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE page 3 WORK ORDER Tag # CP1-SWAPSW-01 WO # : 5-05-505395-AA  
************************************RELATED EQUIPMENT / VERIFICATION LIST***********************************
************************************RELATED EQUIPMENT / VERIFICATION LIST***********************************  
        + Stop + Locate + Touch +Verify + Anticipate + Manipulate + Observe +
+ Stop + Locate + Touch +Verify + Anticipate + Manipulate + Observe +
Verify the Equipment Tags being worked / tested relate to the work order. Verify W.O. tags using the following related equipment / verification list.
Verify the Equipment Tags being worked / tested relate to the work order. Verify W.O. tags using the following related equipment / verification list.
Tag Number                 Bldg-El           Room Tag           Sys     Elec     ASME Saf           Seis     Q       E Description                                           Stat     Trn     Trn     III/XI   CL       CTGY R           Q CP1-SWAPSW-01               SI-0796           X-275 ACT         A       N/A     3 N 3             I       Y       M Un: 1 Sys: SW Station Service Water Pump 1-01 Specific Loc: SSW PMP 1-01 Bay Comments: _______________________________________________________________ Failure Code: NA 1-HV-4286                   SI-0796           X-275 ACT         A       N/A     3 N 3             I       Y       M Un: 1 Sys: SSW PMP 1-01 DISCH VLV Specific Loc:
Tag Number Bldg-El Room Tag Sys Elec ASME Saf Seis Q
Comments: _______________________________________________________________ Failure Code: NA 1-HV-4393                   SG-810           1-082             A       N/A     3 N 3             I       Y       M Un: 1 Sys: Hallway Comments: _______________________________________________________________ Failure Code: NA 1-SW-0374                   SG-810           1-082             A       N/A     3 N 3             I       Y       M Un: 1 Sys: DISCH OF PMP Comments: _______________________________________________________________ Failure Code: NA Other Tags / Comments:
E Description Stat Trn Trn III/XI CL CTGY R Q
CP1-SWAPSW-01 SI-0796 X-275 ACT A
N/A 3 N 3
I Y
M Un: 1 Sys: SW Station Service Water Pump 1-01 Specific Loc: SSW PMP 1-01 Bay Comments: _______________________________________________________________ Failure Code: NA 1-HV-4286 SI-0796 X-275 ACT A
N/A 3 N 3
I Y
M Un: 1 Sys: SSW PMP 1-01 DISCH VLV Specific Loc:
Comments: _______________________________________________________________ Failure Code: NA 1-HV-4393 SG-810 1-082 A
N/A 3 N 3
I Y
M Un: 1 Sys: Hallway Comments: _______________________________________________________________ Failure Code: NA 1-SW-0374 SG-810 1-082 A
N/A 3 N 3
I Y
M Un: 1 Sys: DISCH OF PMP Comments: _______________________________________________________________ Failure Code: NA Other Tags / Comments:  
**********************************************PROCEDURES***************************************************************
**********************************************PROCEDURES***************************************************************
OPT-207A                             SERVICE WATER SYSTEM
OPT-207A SERVICE WATER SYSTEM  
**********************************************INSTRUCTIONS*************************************************************
**********************************************INSTRUCTIONS*************************************************************
Resp Planner: Harold (Chuck) Jackson X 5953 This test will verify the Service Water System; Train A, Pump and Valve operability as defined by ASME, Section XI requirements. This test will be performed at least once per ninety-two days in all operation Modes.
Resp Planner: Harold (Chuck) Jackson X 5953 This test will verify the Service Water System; Train A, Pump and Valve operability as defined by ASME, Section XI requirements. This test will be performed at least once per ninety-two days in all operation Modes.
Step Instructions continued on next page --------- >
Step Instructions continued on next page --------- >  
Page 8 of 13                                    Rev Date: 1/25/05


Initial License Exam                               03/2005                           Job Performance Measure JPM: RO A2 ROUTINE TEST-SURVEILLANCE                                           page 4 WORK ORDER Tag # CP1-SWAPSW-01                                                                         WO #: 5-05-505395-AA INSTUCTIONS (continued)
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 9 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE page 4 WORK ORDER Tag # CP1-SWAPSW-01 WO #: 5-05-505395-AA INSTUCTIONS (continued)  
< ---------------- Step Instruction Continued from Previous Page
< ---------------- Step Instruction Continued from Previous Page This test may be performed in any mode.
* This test may be performed in any mode.
Performance of this test satisfies RI-IST requirements:
* Performance of this test satisfies RI-IST requirements:
CP1-SWAPSW-01 (PT/3M) 1-HV-4286 (ET-0/ET-C/18M) 1-HV-4393 (ET-0/18M) 1SW-0374 (CV-C/CV0/3M)
CP1-SWAPSW-01 (PT/3M) 1-HV-4286 (ET-0/ET-C/18M) 1-HV-4393 (ET-0/18M) 1SW-0374 (CV-C/CV0/3M)
* QC Support required for acoustic monitoring per STA-750.
QC Support required for acoustic monitoring per STA-750.
Required Contacted: _____________________/ ____                                             Yes____ No ____
Required Contacted: _____________________/ ____
* PROMPT TEAM support required to monitor pump vibration
Yes____ No ____
* Both Trains of SSW are in service (SOP-501A).
PROMPT TEAM support required to monitor pump vibration Both Trains of SSW are in service (SOP-501A).
* Computer is available to obtain flow data and observe bearing temperatures.
Computer is available to obtain flow data and observe bearing temperatures.
* Data Sheet OPT-207A-4.
Data Sheet OPT-207A-4.
: 1.       QC or other applicable test personnel install acoustic                                     QC/OPS ____
: 1.
QC or other applicable test personnel install acoustic QC/OPS ____
emission test equipment in accordance with STA-750 if required.
emission test equipment in accordance with STA-750 if required.
: 2.       Perform OPT-207A, Section 8.2, Train A, Station                                               OPS ____
: 2.
Perform OPT-207A, Section 8.2, Train A, Station OPS ____
Service Water Pump 1-01 Operability Test
Service Water Pump 1-01 Operability Test
: 3.       QC record acoustic emission data in accordance                                             QC/OPS ____
: 3.
QC record acoustic emission data in accordance QC/OPS ____
with STA-750 if required.
with STA-750 if required.
: 4.       PROMPT TEAM record pump vibration data.                                                     PT/OPS ____
: 4.
: 5.       QC remove acoustic emission test equipment                                                 QC/OPS ____
PROMPT TEAM record pump vibration data.
if installed.
PT/OPS ____
Page 9 of 13                                    Rev Date: 1/25/05
: 5.
QC remove acoustic emission test equipment QC/OPS ____
if installed.  


Initial License Exam                               03/2005                           Job Performance Measure JPM: RO A2 ROUTINE TEST-SURVEILLANCE                                         page 5 WORK ORDER Tag # CP1-SWAPSW-01                                                                         WO #: 5-05-505395-AA
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 10 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE page 5 WORK ORDER Tag # CP1-SWAPSW-01 WO #: 5-05-505395-AA  
************************************** WORK PERFORMED / PROBABLE CAUSE *************************************
************************************** WORK PERFORMED / PROBABLE CAUSE *************************************
As found condition:_________________________________________________________________________________
As found condition:_________________________________________________________________________________
Line 319: Line 413:
Work Duration (Est./Act.) 7.0 / ___
Work Duration (Est./Act.) 7.0 / ___
Work Completed by: ______________________________________ Date: __/__/__
Work Completed by: ______________________________________ Date: __/__/__
Work Supervisor: _________________________________________ Date: __/__/__
Work Supervisor: _________________________________________ Date: __/__/__  
Page 10 of 13                                    Rev Date: 1/25/05


Initial License Exam                               03/2005                     Job Performance Measure JPM: RO A2 ROUTINE TEST-SURVEILLANCE                                   page 6 WORK ORDER Tag # CP1-SWAPSW-01                                                                           WO #: 5-05-505395-AA
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 11 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE page 6 WORK ORDER Tag # CP1-SWAPSW-01 WO #: 5-05-505395-AA  
********************************************RELATED WORK ORDERS*************************************************
********************************************RELATED WORK ORDERS*************************************************  
** NO RELATED WORK ORDERS **
** NO RELATED WORK ORDERS **  
*********************************************RELATED ACTIVITIES*******************************************************
*********************************************RELATED ACTIVITIES*******************************************************  
** NO RELATED ACTIVITIES **
** NO RELATED ACTIVITIES **  
********************************************OTHER RELATIONSHIPS****************************************************
********************************************OTHER RELATIONSHIPS****************************************************
Rel                                                                                                   Rel Type               Related Item Number Sheet #                       Related Item Description                 Class DOC               OPT-207A                                           Service Water System                     Proc SPTOOL             Accelerometer, 196                                 1 EA                                     XREF SPTOOL             Pocket Dial, Therm                                 1 EA                                     XREF SPTOOL             Smartmeter, 1330                                   1 EA                                     XREF SPTOOL             Stopwatch                                         1 EA                                     XREF SPTOOL             Therm, Type 3 +/ - 5D                             1 EA or Better                           XREF
Rel Rel Type Related Item Number Sheet #
********************************************RELATED CLEARANCE******************************************************
Related Item Description Class DOC OPT-207A Service Water System Proc SPTOOL Accelerometer, 196 1 EA XREF SPTOOL Pocket Dial, Therm 1 EA XREF SPTOOL Smartmeter, 1330 1 EA XREF SPTOOL Stopwatch 1 EA XREF SPTOOL Therm, Type 3 +/ - 5D 1 EA or Better XREF  
** NO OTHER CLEARANCE **
********************************************RELATED CLEARANCE******************************************************  
** NO OTHER CLEARANCE **  
****************************************SURVEILLANCE REQUIREMENTS**********************************************
****************************************SURVEILLANCE REQUIREMENTS**********************************************
Surveillance Requirement                                             Surveillance Requirement Description 5.5.8                                                                 Refer to Tech Spec Manual
Surveillance Requirement Surveillance Requirement Description 5.5.8 Refer to Tech Spec Manual  
                                                  ** END OF REPORT**
** END OF REPORT**  
***************************************************BOTTOM OF DATA*****************************************************
***************************************************BOTTOM OF DATA*****************************************************
Page 11 of 13                          Rev Date: 1/25/05


Initial License Exam                         03/2005                       Job Performance Measure JPM: RO A2 SSWP 1-01 DATA SHEET NOTE: This for is used to record test data as required by section 8.2 STEP                                           OBSERVED         ACCEPTANCE             INITIALS CRITERA 6.2     PREREQUISITES MET                           N/A               N/A               _____
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 12 of 13 Rev Date: 1/25/05 SSWP 1-01 DATA SHEET NOTE: This for is used to record test data as required by section 8.2 STEP OBSERVED ACCEPTANCE CRITERA INITIALS 6.2 PREREQUISITES MET N/A N/A 8.2 D. X-LI-4288 LEVEL N/A E. Reference Discharge Pressure PSIG N/A G. P3251A Discharge Pressure PSIG N/A And Time N/A I. F6258A SSWP 1 DISCH FLO
8.2     D. X-LI-4288 LEVEL                         _____              N/A               _____
E. Reference Discharge                                         N/A               _____
Pressure                                        PSIG G. P3251A Discharge Pressure                 PSIG           N/A               _____
And Time                           _____                  N/A               _____
I. F6258A SSWP 1 DISCH FLO
________ + ________ + ________ + ________ + ________ +
________ + ________ + ________ + ________ + ________ +
GPM         GPM         GPM             GPM       GPM
GPM GPM GPM GPM GPM
________ + ________ + ________ + ________ + ________ =
________ + ________ + ________ + ________ + ________ =
GPM       GPM           GPM             GPM       GPM
GPM GPM GPM GPM GPM
_______TOTAL _____
_______TOTAL _____
J. AVERAGE FLOW
J. AVERAGE FLOW
___________ &#xf7; 10 = _________ GPM                                                     _____
___________ &#xf7; 10 = _________ GPM (Total Step 8.2.1) Average Refer Action Limit Alert Limit Average Action Limit Units Value Low Low Value High 12.918 <12,014  
(Total Step 8.2.1)     Average Refer   Action Limit   Alert Limit     Average         Action Limit   Units Value   Low             Low             Value           High 12.918 <12,014           <12,272         ________         >14,210       GPM       _____
<12,272
K. VIBRATION AMPLITUDE Test             Refer   Calculated       Alert Limit     Action Limit Parameter       Value   Value           High             High     Units Initials MOH             0.064   _____            >0.160           >0.384     in/sec pk       _____
________ >14,210 GPM K. VIBRATION AMPLITUDE Test Refer Calculated Alert Limit Action Limit Parameter Value Value High High Units Initials MOH 0.064  
MOV             0.071   _____            >0.178           >0.426     in/sec pk       _____
>0.160  
MOA             0.054   _____            >0.135           >0.324     in/sec pk       _____
>0.384 in/sec pk MOV 0.071  
OPT-207A-4 Page 1 of 2 R-11 Page 12 of 13                              Rev Date: 1/25/05
>0.178  
>0.426 in/sec pk MOA 0.054  
>0.135  
>0.324 in/sec pk OPT-207A-4 Page 1 of 2 R-11  


Initial License Exam                         03/2005                         Job Performance Measure JPM: RO A2 SSWP 1-01 DATA SHEET STEP                                       OBSERVED             ACCEPTANCE CRITERIA         INITIALS 8.2     O 1-HV-4286                     Open/Closed               OPEN               _____
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 13 of 13 Rev Date: 1/25/05 SSWP 1-01 DATA SHEET STEP OBSERVED ACCEPTANCE CRITERIA INITIALS 8.2 O 1-HV-4286 Open/Closed OPEN P
SSWP 1 (NOTE 1)               ____ sec /           < 5 sec Reverse Reverse Rotation         Rotation            _____
SSWP 1 (NOTE 1)
Q 1-SW-0023                     Locked Open/               N/A Closed                                        _____
____ sec /
R 1-HV-4286                     10% Open/Open           10% Open             _____
Reverse Rotation
1-HV-4286                     Open/ 10%Open               Open               _____
< 5 sec Reverse Rotation Q 1-SW-0023 Locked Open/
U 1 FI-4258A Flow (NOTE 2)
Closed N/A R 1-HV-4286 10% Open/Open 10% Open T
________ GPM           16,456 GPM           _____
1-HV-4286 Open/ 10%Open Open U 1 FI-4258A Flow (NOTE 2)
V 1-HV-4393                     Open/Closed               OPEN               _____
________ GPM 16,456 GPM V
W Measured Data within                 Yes / No               N/A Limits                                                                      _____
1-HV-4393 Open/Closed OPEN W Measured Data within Limits Yes / No N/A ODA-308 Initiated Yes / No N/A Technical Specification Action Required Yes / No N/A COMPONENT OSBSERVED POSITION REQUIRED VERIFIED 9.0 B
ODA-308 Initiated                   Yes / No               N/A               _____
1-SW-0023 Locked Open/___
Technical Specification Action Required                     Yes / No               N/A               _____
Locked Open 1-HS-4286 Auto Open/_____
COMPONENT               OSBSERVED                     REQUIRED         VERIFIED POSITION 9.0     B 1-SW-0023               Locked Open/___             Locked Open           _____
Auto Open NOTE 1: SSWP rotating in the reverse direction 5 sec satisfies the full closure stroke of 1SW-0374.
1-HS-4286               Auto Open/_____               Auto Open             _____
NOTE 2: Flow 16,456 gpm satisfied the fill open stroke of 1SW-0374.
NOTE 1: SSWP rotating in the reverse direction 5 sec satisfies the full closure stroke of 1SW-0374.
NOTE 2: Flow 16,456 gpm satisfied the fill open stroke of 1SW-0374.
Comments/Discepancies:____________________________________________________________________
Comments/Discepancies:____________________________________________________________________
Corrective Actions:__________________________________________________________________________________
Corrective Actions:__________________________________________________________________________________
Performed by: ____________________________________________ Date: __________
Performed by: ____________________________________________ Date: __________
Reviewed by: ____________________________________________ Date: __________
Reviewed by: ____________________________________________ Date: __________
OPT-207A-4 Page 1 of 2 R-11 Page 13 of 13                              Rev Date: 1/25/05
OPT-207A-4 Page 1 of 2 R-11  


Initial License Exam                       03/2005                     Job Performance Measure JPM: RO A3 System:       Radiation Control                                     JTA Task #: (New)
Initial License Exam 03/2005 Job Performance Measure JPM: RO A3 Page 1 of 4 Rev Date: 2/7/05 System:
Radiation Control JTA Task #: (New)
Task
Task


==Title:==
==Title:==
Evaluate Radiological Condition for Task Performance KSA Ref: 2.3.10                                 PEO:                 RO: 2.9             SRO: 3.3 Operators Name:
Evaluate Radiological Condition for Task Performance KSA Ref:
Performance Environment:               CLASSROOM               CONTROL ROOM               SIMULATOR Performance Method:                   PERFORMED               SIMULATED                 DISCUSSED Time to complete JPM:       Estimated     15 minutes             Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
2.3.10 PEO:
SATISFACTORY                                     UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                         Date:
2.9 SRO:
Comments (list all steps not satisfactorily completed):
3.3 Operators Name:
Performance Environment:
CLASSROOM CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
GAP# 2005-01 STA-656 RPI-606 Tools, Equipment, Job Aids, etc:
Copy of the GAP and the applicable Survey Map for GAP# 2005-01                                        the task.
Copy of the GAP and the applicable Survey Map for the task.  
STA-656 RPI-606 Page 1 of 4                          Rev Date: 2/7/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: RO A3 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: RO A3 Page 2 of 4 Rev Date: 2/7/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 410: Line 507:
You are to evaluate the radiological condition in the area and provide the requested information.
You are to evaluate the radiological condition in the area and provide the requested information.
Terminating Conditions:
Terminating Conditions:
Answers to questions are provided to the evaluator.
Answers to questions are provided to the evaluator.  
Page 2 of 4                          Rev Date: 2/7/05


Initial License Exam                     03/2005               Job Performance Measure JPM: RO A3 STEP#                                                                                 SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: RO A3 Page 3 of 4 Rev Date: 2/7/05 STEP#  
*Critical             ELEMENT                   STANDARD             NOTES           UNSAT 1       Provide the candidate with the                         Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
initiating cue, the GAP and the Survey Map.
UNSAT 1
  *2     Candidate correctly answers     See Attached Key two of the three questions.
Provide the candidate with the initiating cue, the GAP and the Survey Map.
Note Completion time TASK COMPLETE.
Note Start time.
Page 3 of 4                        Rev Date: 2/7/05
*2 Candidate correctly answers two of the three questions.
TASK COMPLETE.
See Attached Key Note Completion time


Initial License Exam                         03/2005                     Job Performance Measure JPM: RO A3 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: RO A3 Page 4 of 4 Rev Date: 2/7/05 INITIATING CUE:
You are on tour in the Safeguards Building. The US directs you to isolate the air to HV-8152.
You are on tour in the Safeguards Building. The US directs you to isolate the air to HV-8152.
You are to evaluate the radiological condition in the area and provide the requested information.
You are to evaluate the radiological condition in the area and provide the requested information.
NOTE: Circle the correct answers to the following questions and provide the evaluator with your completed paperwork.
NOTE: Circle the correct answers to the following questions and provide the evaluator with your completed paperwork.
: 1. The area where the valve is located is a:
: 1. The area where the valve is located is a:
A) Locked High Radiation Area B) Contaminated Area C) Posted High Radiation Area D) General Radiation Area
A) Locked High Radiation Area B) Contaminated Area C) Posted High Radiation Area D) General Radiation Area
: 2. If the area where the air isolation valve is located is a 60 mr/hr field, how long before your dosimeter will alarm if it is at the lower setting allowed by the GAP.
: 2. If the area where the air isolation valve is located is a 60 mr/hr field, how long before your dosimeter will alarm if it is at the lower setting allowed by the GAP.
A) 50 minutes B) 5 minutes C) 25 minutes D) 2.5 minutes
A) 50 minutes B) 5 minutes C) 25 minutes D) 2.5 minutes
: 3. Circle three areas on the Survey Map that require contact with RP prior to entry.
: 3. Circle three areas on the Survey Map that require contact with RP prior to entry.  
Page 4 of 4                            Rev Date: 2/7/05


Initial License Exam                         03/2005                       Job Performance Measure JPM: RO A3
Initial License Exam 03/2005 Job Performance Measure JPM: RO A3 Page 5 of 4 Rev Date: 2/7/05
                                                  - KEY-INITIATING CUE:
-KEY-INITIATING CUE:
You are on tour in the Safeguards Building. The US directs you to isolate the air to HV-8152. You are to evaluate the radiological condition in the area and provide the requested information.
You are on tour in the Safeguards Building. The US directs you to isolate the air to HV-8152. You are to evaluate the radiological condition in the area and provide the requested information.
NOTE: Circle the correct answers to the following questions and provide the evaluator with your completed paperwork.
NOTE: Circle the correct answers to the following questions and provide the evaluator with your completed paperwork.
: 1. The area where the valve is located is a:
: 1. The area where the valve is located is a:
E)   Locked High Radiation Area F)   Contaminated Area G)   Posted High Radiation Area H)   General Radiation Area
E) Locked High Radiation Area F) Contaminated Area G) Posted High Radiation Area H) General Radiation Area
: 2. If the area where the air isolation valve is located is a 60 mr/hr field, how long before your dosimeter will alarm if it is at the lower setting allowed by the GAP.
: 2. If the area where the air isolation valve is located is a 60 mr/hr field, how long before your dosimeter will alarm if it is at the lower setting allowed by the GAP.
E)   50 minutes F)   5 minutes G)   25 minutes H)   2.5 minutes
E) 50 minutes F) 5 minutes G) 25 minutes H) 2.5 minutes
: 3. Circle three areas on the Survey Map that require contact with RP prior to entry.
: 3. Circle three areas on the Survey Map that require contact with RP prior to entry.
: 1) The area where the valve to be operated is.
: 1) The area where the valve to be operated is.
: 2) The CA I/S Pit
: 2) The CA I/S Pit
: 3) The contaminated area.
: 3) The contaminated area.  
Page 5 of 4                          Rev Date: 2/7/05


The RWP map was removed from this page of the exam by the chief examiner because it was considered potential SUNSI material due to the equipment locations on the map.
The RWP map was removed from this page of the exam by the chief examiner because it was considered potential SUNSI material due to the equipment locations on the map.  


Initial License Exam                       03/2005                     Job Performance Measure JPM: SRO/RO A1.a                               KEY System:       Conduct of Operations                                 JTA Task #: (New)
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Page 1 of 5 Rev Date: 1/19/05 System:
Conduct of Operations JTA Task #: (New)
Task
Task


==Title:==
==Title:==
Determine Pressurizer Heater Operability KSA Ref: 2.1.33                                 PEO:               RO: 3.4               SRO: 4.0 Operators Name:
Determine Pressurizer Heater Operability KSA Ref:
Performance Environment:               CLASSROOM             CONTROL ROOM                 SIMULATOR Performance Method:                   PERFORMED             SIMULATED                     DISCUSSED Time to complete JPM:       Estimated     15 minutes             Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
2.1.33 PEO:
SATISFACTORY                                     UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                       Date:
3.4 SRO:
Comments (list all steps not satisfactorily completed):
4.0 Operators Name:
Performance Environment:
CLASSROOM CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
IPO-001A Plant Heatup from Cold Shutdown to Hot Standby Tools, Equipment, Job Aids, etc:
IPO-001A Plant Heatup from Cold                    Selected parameters from the plant, captured on Shutdown to Hot Standby                            Attachment 1 of this JPM, and a calculator.
Selected parameters from the plant, captured on of this JPM, and a calculator.  
Page 1 of 5                          Rev Date: 1/19/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: SRO/RO A1.a                                 KEY Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Page 2 of 5 Rev Date: 1/19/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 479: Line 583:
The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determine the operability of the Pressurizer Heaters by performing step 5.3.1 of IPO-001A, Plant Heatup from Cold Shutdown to Hot Standby. Plant data is provided.
The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determine the operability of the Pressurizer Heaters by performing step 5.3.1 of IPO-001A, Plant Heatup from Cold Shutdown to Hot Standby. Plant data is provided.
Terminating Conditions:
Terminating Conditions:
Calculations are complete and an Operability determination has been made.
Calculations are complete and an Operability determination has been made.  
Page 2 of 5                        Rev Date: 1/19/05


Initial License Exam                     03/2005                 Job Performance Measure JPM: SRO/RO A1.a                             KEY STEP#                                                                                   SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Page 3 of 5 Rev Date: 1/19/05 STEP#  
*Critical             ELEMENT                   STANDARD             NOTES           UNSAT 1       Provide the candidate with the                         Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
initiating cue, the plant data sheet, and a copy of IPO-001A step 5.3.1.
UNSAT 1
2       Candidate correctly transfers   See Attached Key data to the procedure.
Provide the candidate with the initiating cue, the plant data sheet, and a copy of IPO-001A step 5.3.1.
3       Candidate performs               See Attached Key calculations.
Note Start time.
  *4     Candidate determines             B/U Heater Groups A, operability                      B and Control Heater Group C are OPERABLE. B/U Heater Group D is INOPERABLE TASK COMPLETE.                  Note Completion time.
2 Candidate correctly transfers data to the procedure.
Page 3 of 5                        Rev Date: 1/19/05
See Attached Key 3
Candidate performs calculations.
See Attached Key  
*4 Candidate determines operability TASK COMPLETE.
B/U Heater Groups A, B and Control Heater Group C are OPERABLE. B/U Heater Group D is INOPERABLE Note Completion time.  


Initial License Exam                       03/2005                     Job Performance Measure JPM: SRO/RO A1.a                               KEY INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Page 4 of 5 Rev Date: 1/19/05 INITIATING CUE:
The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determine the operability of the Pressurizer Heaters by performing step 5.3.1 of IPO-001A, Plant Heatup from Cold Shutdown to Hot Standby. Plant data is provided.
The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determine the operability of the Pressurizer Heaters by performing step 5.3.1 of IPO-001A, Plant Heatup from Cold Shutdown to Hot Standby. Plant data is provided.
Plant Data Parameter         Value from Last Reading           Current Value Sheets (OPT-XXX) 1/1-PCPR1 Amps                   580                         580 1/1-PCPR Amps                     0                         200 1/1-PCPR2 Amps                   565                         565 1/1P-CPR3 Amps                     0                         176 1B1 Volts                         474                         468 1B2 Volts                         483                         476 1B3 Volts                         476                         470 1B4 Volts                         485                         480 PC point V6303A                 487.2                       486.9 PC point V6302A                 488.1                       487.1 PC point V6301A                 487.2                       486.9 PC point V6304A                 488.3                       487.1 PC point A6801A                 571.2                       570.1 PC point A6802A                   0                         193 PC point A6803A                 559.8                       560 PC point A6804A                   0                         176 1EA1 Amps                       282.7                       261.4 1EA2 Amps                       358.5                       423.7 NOTE: The candidate can use either the MCB meter amperages or the plant computer values for heater amperages. The IPO allows both and there is no significant difference.
Plant Data Parameter Value from Last Reading Sheets (OPT-XXX)
Current Value 1/1-PCPR1 Amps 580 580 1/1-PCPR Amps 0
200 1/1-PCPR2 Amps 565 565 1/1P-CPR3 Amps 0
176 1B1 Volts 474 468 1B2 Volts 483 476 1B3 Volts 476 470 1B4 Volts 485 480 PC point V6303A 487.2 486.9 PC point V6302A 488.1 487.1 PC point V6301A 487.2 486.9 PC point V6304A 488.3 487.1 PC point A6801A 571.2 570.1 PC point A6802A 0
193 PC point A6803A 559.8 560 PC point A6804A 0
176 1EA1 Amps 282.7 261.4 1EA2 Amps 358.5 423.7 NOTE: The candidate can use either the MCB meter amperages or the plant computer values for heater amperages. The IPO allows both and there is no significant difference.
NOTE: The shaded parameters should NOT be used. The following problems exist with the shaded data:
NOTE: The shaded parameters should NOT be used. The following problems exist with the shaded data:
: 1. The pressurizer heaters are supplied by 1EB1-4, NOT 1B1-4
: 1. The pressurizer heaters are supplied by 1EB1-4, NOT 1B1-4
: 2. 1EA1/2 amperage is not necessary to complete the calculations.
: 2. 1EA1/2 amperage is not necessary to complete the calculations.
: 3. Data from the last set of logs should NOT be used for the Operability determination. Plant conditions could have changed significantly since the readings were taken. The IPO wants current plant data to determine Operability.
: 3. Data from the last set of logs should NOT be used for the Operability determination. Plant conditions could have changed significantly since the readings were taken. The IPO wants current plant data to determine Operability.  
Page 4 of 5                          Rev Date: 1/19/05


Initial License Exam                           03/2005                       Job Performance Measure JPM: SRO/RO A1.a                                   KEY Circle the correct status for each Bank of Pressurizer Heaters Heater Bank                               Status                                 Status B/U Heater Grp. A                                   Operable                             Inoperable B/U Heater Grp. B                                   Operable                             Inoperable Control Grp. C                                       Operable                             Inoperable B/U Heater Grp. D                                   Operable                             Inoperable Example of the completed procedure:
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Page 5 of 5 Rev Date: 1/19/05 Circle the correct status for each Bank of Pressurizer Heaters Heater Bank Status Status B/U Heater Grp. A Operable Inoperable B/U Heater Grp. B Operable Inoperable Control Grp. C Operable Inoperable B/U Heater Grp. D Operable Inoperable Example of the completed procedure:
5.3 Heatup And Pressurization For MODE 3 Entry
5.3 Heatup And Pressurization For MODE 3 Entry
[C]
[C]
This section describes steps for heatup and pressurization to enter MODE 3.
This section describes steps for heatup and pressurization to enter MODE 3.
5.3.1 Verify at least two groups of pressurizer heaters have a capacity of at least 150KW each.(TS SR 3.4.9.2)
5.3.1 Verify at least two groups of pressurizer heaters have a capacity of at least 150KW each.(TS SR 3.4.9.2)
A. Energize each group of heaters, as required, to measure current.                 _____
A. Energize each group of heaters, as required, to measure current. _____
B. Record voltage and current AND calculate power for each group of heaters.
B. Record voltage and current AND calculate power for each group of heaters.
(Voltage x current x 0.001732 = power)
(Voltage x current x 0.001732 = power)
* Backup Heater Group A 1EB3             1-II-PCPR1or Or 486.9__x     or _570.1 _ x       0.001732 =         480.77   KW                   _____
Backup Heater Group A 1EB3 1-II-PCPR1or Or 486.9__x or _570.1 _ x 0.001732 =
V6303A           A6801A
480.77 KW V6303A A6801A Backup Heater Group B 1EB2-1-II-PCPR2 or 487.1 x or _193 _ x 0.001732 =
* Backup Heater Group B 1EB2-           1-II-PCPR2 or 487.1     x   or _193 _ x       0.001732 =         162.8   KW                   _____
162.8 KW V6302A A6803A  
V6302A           A6803A
! Control Heater Group C 1EB1 1-II-PCPR or 486.9 x or __560 x 0.001732 =
                *  ! Control Heater Group C 1EB1             1-II-PCPR or 486.9   x   or __560     x     0.001732 =         _472.54_ KW                   _____
_472.54_ KW V6301A A6803A  
V6301A           A6803A
! Backup Heater Group D 1EB4 1-II-PCPR3 or 487.1 x or _176 x 0.001732 =
                *  ! Backup Heater Group D 1EB4             1-II-PCPR3 or 487.1   x   or _176       x   0.001732 =         __148.5__ KW                   _____
__148.5__ KW V6304A A6804A C. Operate pressurizer heaters as needed for plant conditions. _____
V6304A           A6804A C. Operate pressurizer heaters as needed for plant conditions.                       _____
D. IF any group(s) of pressurizer heaters does NOT have a capacity of > 150KW, THEN initiate a LCOAR per ODA-308. _____  
D. IF any group(s) of pressurizer heaters does NOT have a capacity of > 150KW, THEN initiate a LCOAR per ODA-308.                                                   _____
Page 5 of 5                              Rev Date: 1/19/05


Initial License Exam                       03/2005                   Job Performance Measure JPM: SRO A1.b System:       Administrative Procedures                             JTA Task #: (Bank 2001)
Initial License Exam 03/2005 Job Performance Measure JPM: SRO A1.b Page 1 of 4 Rev Date: 1/19/05 System:
Administrative Procedures JTA Task #: (Bank 2001)
Task
Task


==Title:==
==Title:==
Determine Staff Working Hours KSA Ref: 2.1.5                                 PEO:               RO: 2.3             SRO: 3.4 Operators Name:
Determine Staff Working Hours KSA Ref:
Performance Environment:               CLASSROOM             CONTROL ROOM               SIMULATOR Performance Method:                   PERFORMED             SIMULATED                   DISCUSSED Time to complete JPM:       Estimated     10 minutes           Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
2.1.5 PEO:
SATISFACTORY                                       UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                       Date:
2.3 SRO:
Comments (list all steps not satisfactorily completed):
3.4 Operators Name:
Performance Environment:
CLASSROOM CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
Technical Specifications STA-615, Staff Work Hours Tools, Equipment, Job Aids, etc:
Technical Specifications                            Technical Specifications STA-615, Staff Work Hours                         STA-615, Staff Work Hours Page 1 of 4                          Rev Date: 1/19/05
Technical Specifications STA-615, Staff Work Hours  


Initial License Exam                       03/2005                     Job Performance Measure JPM: SRO A1.b Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: SRO A1.b Page 2 of 4 Rev Date: 1/19/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 554: Line 672:
: 5. On March 22, RO5 worked from 0630 until 1930 (includes a 1/2 hour shift turnover).
: 5. On March 22, RO5 worked from 0630 until 1930 (includes a 1/2 hour shift turnover).
Terminating Conditions:
Terminating Conditions:
Determine that 2 out of the 5 ROs available meet the work hour requirement to relieve the shift.
Determine that 2 out of the 5 ROs available meet the work hour requirement to relieve the shift.  
Page 2 of 4                          Rev Date: 1/19/05


Initial License Exam                     03/2005                 Job Performance Measure JPM: SRO A1.b STEP#                                                                                     SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: SRO A1.b Page 3 of 4 Rev Date: 1/19/05 STEP#  
*Critical             ELEMENT                     STANDARD               NOTES           UNSAT Provide candidate with 1                                      Candidate should      Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
completed copy of the review Admin JPM and initiating cue initiating cue RO1 - no, would work  Pass criteria is 4
UNSAT 1
  *2     Review work hour history and 16.5 hrs straight      of the 5 ROs determine that only 2 of the 5 work hour status ROs could work without RO2 - Yes, would work being correctly advanced approval.
Provide candidate with completed copy of the initiating cue Candidate should review Admin JPM and initiating cue Note Start time.
24 hrs in 48 hrs       determined RO3 - No, less than 8 No - cannot work hours between work periods Yes - can work RO4 - Yes, would work 70 hrs in 7 days RO5 - No, would work 24.5 hrs in 48 hrs.
*2 Review work hour history and determine that only 2 of the 5 ROs could work without advanced approval.
Note Completion TASK COMPLETE                                          time.
TASK COMPLETE RO1 - no, would work 16.5 hrs straight RO2 - Yes, would work 24 hrs in 48 hrs RO3 - No, less than 8 hours between work periods RO4 - Yes, would work 70 hrs in 7 days RO5 - No, would work 24.5 hrs in 48 hrs.
Page 3 of 4                        Rev Date: 1/19/05
Pass criteria is 4 of the 5 ROs work hour status being correctly determined No - cannot work Yes - can work Note Completion time.  


Initial License Exam                     03/2005                     Job Performance Measure JPM: SRO A1.b INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: SRO A1.b Page 4 of 4 Rev Date: 1/19/05 INITIATING CUE:
You are the Unit Supervisor and one of the assigned ROs called in sick. You need to find a replacement RO. Assuming today is March 23 (0630), based on the work hour history, determine which of the following 5 ROs could perform safety-related functions until 1830 without advanced approval.
You are the Unit Supervisor and one of the assigned ROs called in sick. You need to find a replacement RO. Assuming today is March 23 (0630), based on the work hour history, determine which of the following 5 ROs could perform safety-related functions until 1830 without advanced approval.
: 1. RO1 has been on-shift since 0200 (March 23).
: 1. RO1 has been on-shift since 0200 (March 23).
Line 571: Line 688:
: 3. RO3 worked from 1430 on March 22 to 0030 on March 23.
: 3. RO3 worked from 1430 on March 22 to 0030 on March 23.
: 4. RO4 has been on vacation for the past two days (March 21 and 22), but worked 12 hours on March 17, 16 hours on March 18, 16 hours on March 19, and 14 hours on March 20.
: 4. RO4 has been on vacation for the past two days (March 21 and 22), but worked 12 hours on March 17, 16 hours on March 18, 16 hours on March 19, and 14 hours on March 20.
: 5. On March 22, RO5 worked from 0630 until 1930 (includes a 1/2 hour shift turnover).
: 5. On March 22, RO5 worked from 0630 until 1930 (includes a 1/2 hour shift turnover).  
Page 4 of 4                          Rev Date: 1/19/05


Initial License Exam                       0312005                   Job Performance Measure JPM: SROA2                                  KEY system:       Equipment Control                                     JTA Task #: (New)
Initial License Exam JPM: SROA2 0312005 KEY Job Performance Measure system:
Equipment Control JTA Task #:
(New)
Task
Task


==Title:==
==Title:==
Complete Technical Specification Paperwork for INOP PZR Heaters (Tracking LOCAR)
Complete Technical Specification Paperwork for INOP PZR Heaters (Tracking LOCAR)
KSA Ref:     2.2-23                             PEO:               RO: 2.6             SRO: 3.8 Operators Name:
KSA Ref:
Performance Environment:               CLASSROOM             CONTROL ROOM               SIMULATOR Performance Method:                   PERFORMED             SIMULATED                 DISCUSSED Time to complete JPM:       Estimated       15 minutes           Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
2.2-23 PEO:
SATISFACTORY                                     UNSATISFACTORY Reason, if unsatisfactory:
RO: 2.6 SRO: 3.8 Operators Name:
Evaluators Signature:                                       Date:
Performance Environment:
Comments (list     steps not satisfactorily completed):
CLASSROOM CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
ODA-308 Technical Specification 3.4.9 Tools, Equipment, Job Aids, etc:
Blank LOCAR Form.
Blank LOCAR Form.
ODA-308 Technical Specification 3.4.9 Page 1 of 4                         Rev Date: 2/7/05
Page 1 of 4 Rev Date: 2/7/05  


Initial License Exam                                                 Job Performance Measure PM: SROA2 Safety Considerations:
Initial License Exam Job Performance Measure PM: SROA2 Safety Considerations:
If this JPM is to be performed in the planthontrol room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the planthontrol room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 600: Line 724:
Terminating Conditions:
Terminating Conditions:
Completed Tracking LOCAR provided to the evaluator.
Completed Tracking LOCAR provided to the evaluator.
Page 2 of 4                           Rev Date: 2/7/05
Page 2 of 4 Rev Date: 2/7/05  


Initial License Exam                     03/2005                Job Performance Measure JPM: SROA2 P
Initial License Exam JPM: SROA2 P
STEP#                                                                                 SAT/
STEP#  
*Critical           ELEMENT                     STANDARD            NOTES          IJNSAT 1      Provide the candidate with the                         Note Start time.
*Critical 1
initiating cue, the applicable Technical specification and the blank LOCAR form..
"2 03/2005 Job Performance Measure ELEMENT Provide the candidate with the initiating cue, the applicable Technical specification and the blank LOCAR form..
  "2      Candidate correctly fills out   See Attached Key the form. The KEY indicates the required minimum fields.
Candidate correctly fills out the form. The KEY indicates the required minimum fields.
Three of the four minimum fields must be correct to pass   Note Completion time the JPM.
Three of the four minimum fields must be correct to pass the JPM.
TASK COMPLETE.
TASK COMPLETE.
Page 3 of 4                       Rev Date: 2/7/05
STANDARD See Attached Key Note Completion time NOTES Note Start time.
SAT/
IJNSAT Page 3 of 4 Rev Date: 2/7/05  


Initial License Exam                   03/2005                 Job Performance Measure JPM: SROA2 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: SROA2 INITIATING CUE:
Bank D of the Pressurizer Heaters was declared INOPERABLE today at 083 1 due to KW output less than minimum. You have been directed to fill out the Tracking LOCAR. Because of a server problem, the electronic LOCAR system is unavailable. The SM has called the Prompt team and they will call with the LOCAR number when it is generated.
Bank D of the Pressurizer Heaters was declared INOPERABLE today at 083 1 due to KW output less than minimum. You have been directed to fill out the Tracking LOCAR. Because of a server problem, the electronic LOCAR system is unavailable. The SM has called the Prompt team and they will call with the LOCAR number when it is generated.
Page 4 of 4                         Rev Date: 2/7/05
Page 4 of 4 Rev Date: 2/7/05  


Pressurizer 3.4.9 ACTIONS (continued)
Pressurizer 3.4.9 SURVEILLANCE SR 3.4.9.1 Verify pressurizer water ievel is 592%.
CONDITION                       REQUIRED ACTION            COMPLETION TIME B. One required group of           B. 1     Restore required group of 72 hours pressurizer heaters                      pressurizer heaters to inoperable.                              OPERABLE status.
ACTIONS (continued)
C. Required Action and            c.1     Be in MODE 3.            6 hours associated Completion Time of Condition B not met.
FREQUENCY 12 hours CONDITION SR 3.4.9.2 Verify capacity of each required group of pressurizer heaters is 2 150 kW.
c.2     Be in MODE 4.             12 hours SURVEILLANCE                                    FREQUENCY SR 3.4.9.1    Verify pressurizer water ievel is 592%.                    12 hours SR 3.4.9.2    Verify capacity of each required group of pressurizer      18 months heaters is 2 150 kW.
B. One required group of pressurizer heaters inoperable.
COMANCHE PEAK - UNITS 1 AND 2               3.4-20                       Amendment No. 64
18 months C. Required Action and associated Completion Time of Condition B not met.
REQUIRED ACTION B. 1 Restore required group of pressurizer heaters to OPERABLE status.
: c. 1 Be in MODE 3.
c.2 Be in MODE 4.
COMPLETION TIME 72 hours 6 hours 12 hours COMANCHE PEAK - UNITS 1 AND 2 3.4-20 Amendment No. 64  


Pressurizer 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Pressurizer LCO 3.4.9           The pressurizer shall be OPERABLE with:
Pressurizer 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Pressurizer LCO 3.4.9 The pressurizer shall be OPERABLE with:
: a. Pressurizer water level 592%; and
: a. Pressurizer water level 592%; and
: b. Two groups of pressurizer heaters OPERABLE with the capacity of each group 2 150 kW.
: b. Two groups of pressurizer heaters OPERABLE with the capacity of each group 2 150 kW.
APPLICABILITY:       MODES 1, 2, and 3 ACT IONS CONDITION                     REQUIRED ACTION          COMPLETION TIME A. Pressurizer water level not   A. 1     Be in MODE 3.          6 hours within limit.
APPLICABILITY:
A.2       Fully insert all rods. 6 hours A.3       Place Rod Control     6 hours System in a condition incapable of rod withdrawal.
MODES 1, 2, and 3 ACT IONS CONDITION A. Pressurizer water level not within limit.
A.4       Be in MODE 4.         12 hours (continued)
REQUIRED ACTION A. 1 Be in MODE 3.
COMANCHE PEAK - UNITS 1 AND 2               3.4-19                    Amendment No. 64
A.2 Fully insert all rods.
A.3 Place Rod Control System in a condition incapable of rod withdrawal.
A.4 Be in MODE 4.
COMANCHE PEAK - UNITS 1 AND 2 3.4-1 9 COMPLETION TIME 6 hours 6 hours 6 hours 12 hours (con tin ued)
Amendment No. 64  


a 0
a 0
0
0  


a 8
a 8  


Ys P
Y s P
ol In 01 E     .
ol In 01 E I
i I = -
=
\
3
3 0"
\\
C
0" s
.-0
C 0
-anJ Y
aJ.-
U s
Y -
v)
n U  
E l-
. i v)
E l-  


I     I   I     I     I     I     I     I I I     I   I     I     I     I     I     I I I     I   I     I     I     I     I     I I I     I   I     I     I   I     I     I I 1     1   1     1     1     1     1     1 I I     I   I     I     I     I     I     I I I     I   I     I   I     I     I     I   I I     I   I     I   I     I     I     I   I i     i   i     i     i     i     i     i i I     I   I     I   I     I     I     I   I I     I   I     I   I     I     I     I   I I     I   I     I   I     I     I     I   I I     I   I     I   I     I     I     I   I
c a,
        \
a, 6
QI I I I                 I     I     I I I AI I I I                 I     I     I I I
I I
* I l I I                 I   I     I I I I     I .I   .I   .I   .I   .I   .I     .I I     I   I     I   I     I     I     I   I 8.1      I   I     I   I     I     I     I   I 4       I   I     I   I     I     I     I   I YJl           I     I   I     I     I     I   I
I I
  \ I   ,
I I
* I     I   I     t    I     I   I c
I I
a, a,
I I
6 3 3 4 I PI I 4 I I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
1 1
1 1
1 1
1 1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
i i
i i
i i
i i
i I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I QI I
I I
I I
I I
I AI I
I I
I I
I I
I I
l I
I I
I I
I I
I I  
.I  
.I  
.I  
.I  
.I  
.I.
I I
I I
I I
I I
I I
81. \\
I I
I I
I I
I I
4 I
I I
I I
I I
I YJl I
I I
I I
I I  
\\
I I
I I
t I
I I
I I
~
I I
I I
I 3
1 I
1 I
I I
I I
I ~ I I I I I I I I I I I I I I I I I I I I I I I
I I I I I    I    I    I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
4 I I
I I
I I
I I
4 I
I I
I I
I I
I 3
PI I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I


                                    -rnm c
rn m -
    .    .                        0
c -
                                    ?                         cv 5                       T LL O
0  
E 5E                        . . ...
? 5 E
i=
d i=.
c a,
3                      d d                      D
                                  - 1 u  E P
El i:
a, c
a, c
5 4 .= -.=s m a,       a,                                   m zE Ez c       c
D 1
                  . c                    D 5 5 r"
E u
      $m 2     8 g!
P El 0
0 m
a D E!
-0       a    m
8 El D
-a 1, B B d                                 Ea 0
a,  
.K 0 2
c a,  
.K
: 0)
K 0
3 K
c c s 0
I-z w 5 E
2 B
a:
3 CY z I- 0 w
I-E 5 d
3 a,
E 2
8 B
B d
c z
c m
a m
cv L L T
O i:
a, m
m r"
a, z
E.
c
.- 5 E
a D
a D
E!
0 g!
8
f d
                    .. .a., a ..,
El ..
r n r n  a,            D  a, c
z z c    c 56
                                  .K 0 d
2 c 0
z                                .K 0) a, E            ..
          .-    .-                  K c    c U
b        K    K                .-c0 3    3
!T        ..                    .-c 3
K 0        D c
D a,
m s
9 rn g0                      0 m                      I-z w
5a:        f
  ..                              3        c a,
z0                                E CY dK z        .-
c 0
0          m I-        .-
2 a,
2 a,
I-Bw        0 I-       2
c K
0 m
c a,
I-0 4 - s
.=.=
5 5 c ;
-0 m
a,
-1 0
z E
b U
T! 0 0
z a,
c d
r n r n 56 a, a,
c c
z z c
c K
K 3
3 D
a, m
D c
9 rn g 0
m


Initial License Exam                       03/2005                     Job Performance Measure JPM: SRO A3 System:       Radiation Control                                     JTA Task #: (New)
Initial License Exam 03/2005 Job Performance Measure JPM: SRO A3 Page 1 of 4 Rev Date: 2/7/05 System:
Radiation Control JTA Task #: (New)
Task
Task


==Title:==
==Title:==
Evaluate Radiological Condition for Task Performance KSA Ref: 2.3.10                                 PEO:                 RO: 2.9             SRO: 3.3 Operators Name:
Evaluate Radiological Condition for Task Performance KSA Ref:
Performance Environment:               CLASSROOM               CONTROL ROOM               SIMULATOR Performance Method:                   PERFORMED               SIMULATED                 DISCUSSED Time to complete JPM:       Estimated     15 minutes             Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
2.3.10 PEO:
SATISFACTORY                                     UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                         Date:
2.9 SRO:
Comments (list all steps not satisfactorily completed):
3.3 Operators Name:
Performance Environment:
CLASSROOM CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
GAP# 2005-01 STA-656 RPI-606 Tools, Equipment, Job Aids, etc:
Copy of the GAP and the applicable Survey Map for GAP# 2005-01                                        the task.
Copy of the GAP and the applicable Survey Map for the task.  
STA-656 RPI-606 Page 1 of 4                          Rev Date: 2/7/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: SRO A3 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: SRO A3 Page 2 of 4 Rev Date: 2/7/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 740: Line 1,025:
You are to evaluate the radiological condition in the area and provide the requested information.
You are to evaluate the radiological condition in the area and provide the requested information.
Terminating Conditions:
Terminating Conditions:
Answers to questions are provided to the evaluator.
Answers to questions are provided to the evaluator.  
Page 2 of 4                          Rev Date: 2/7/05


Initial License Exam                     03/2005               Job Performance Measure JPM: SRO A3 STEP#                                                                                 SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: SRO A3 Page 3 of 4 Rev Date: 2/7/05 STEP#  
*Critical             ELEMENT                   STANDARD             NOTES           UNSAT 1       Provide the candidate with the                         Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
initiating cue, the GAP and the Survey Map.
UNSAT 1
  *2     Candidate correctly answers     See Attached Key two of the three questions.
Provide the candidate with the initiating cue, the GAP and the Survey Map.
Note Completion time TASK COMPLETE.
Note Start time.
Page 3 of 4                        Rev Date: 2/7/05
*2 Candidate correctly answers two of the three questions.
TASK COMPLETE.
See Attached Key Note Completion time


Initial License Exam                         03/2005                     Job Performance Measure JPM: SRO A3 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: SRO A3 Page 4 of 4 Rev Date: 2/7/05 INITIATING CUE:
You are on tour in the Safeguards Building. The US directs you to isolate the air to HV-8152.
You are on tour in the Safeguards Building. The US directs you to isolate the air to HV-8152.
You are to evaluate the radiological condition in the area and provide the requested information.
You are to evaluate the radiological condition in the area and provide the requested information.
NOTE: Circle the correct answers to the following questions and provide the evaluator with your completed paperwork.
NOTE: Circle the correct answers to the following questions and provide the evaluator with your completed paperwork.
: 1. The area where the valve is located is a:
: 1. The area where the valve is located is a:
A) Locked High Radiation Area B) Contaminated Area C) Posted High Radiation Area D) General Radiation Area
A) Locked High Radiation Area B) Contaminated Area C) Posted High Radiation Area D) General Radiation Area
: 2. If the area where the air isolation valve is located is a 60 mr/hr field, how long before your dosimeter will alarm if it is at the lower setting allowed by the GAP.
: 2. If the area where the air isolation valve is located is a 60 mr/hr field, how long before your dosimeter will alarm if it is at the lower setting allowed by the GAP.
A) 50 minutes B) 5 minutes C) 25 minutes D) 2.5 minutes
A) 50 minutes B) 5 minutes C) 25 minutes D) 2.5 minutes
: 3. Circle three areas on the Survey Map that require contact with RP prior to entry.
: 3. Circle three areas on the Survey Map that require contact with RP prior to entry.  
Page 4 of 4                            Rev Date: 2/7/05


Initial License Exam                         03/2005                       Job Performance Measure JPM: SRO A3
Initial License Exam 03/2005 Job Performance Measure JPM: SRO A3 Page 5 of 4 Rev Date: 2/7/05
                                                  - KEY-INITIATING CUE:
-KEY-INITIATING CUE:
You are on tour in the Safeguards Building. The US directs you to isolate the air to HV-8152. You are to evaluate the radiological condition in the area and provide the requested information.
You are on tour in the Safeguards Building. The US directs you to isolate the air to HV-8152. You are to evaluate the radiological condition in the area and provide the requested information.
NOTE: Circle the correct answers to the following questions and provide the evaluator with your completed paperwork.
NOTE: Circle the correct answers to the following questions and provide the evaluator with your completed paperwork.
: 1. The area where the valve is located is a:
: 1. The area where the valve is located is a:
E)   Locked High Radiation Area F)   Contaminated Area G)   Posted High Radiation Area H)   General Radiation Area
E) Locked High Radiation Area F) Contaminated Area G) Posted High Radiation Area H) General Radiation Area
: 2. If the area where the air isolation valve is located is a 60 mr/hr field, how long before your dosimeter will alarm if it is at the lower setting allowed by the GAP.
: 2. If the area where the air isolation valve is located is a 60 mr/hr field, how long before your dosimeter will alarm if it is at the lower setting allowed by the GAP.
E)   50 minutes F)   5 minutes G)   25 minutes H)   2.5 minutes
E) 50 minutes F) 5 minutes G) 25 minutes H) 2.5 minutes
: 3. Circle three areas on the Survey Map that require contact with RP prior to entry.
: 3. Circle three areas on the Survey Map that require contact with RP prior to entry.
: 1) The area where the valve to be operated is.
: 1) The area where the valve to be operated is.
: 2) The CA I/S Pit
: 2) The CA I/S Pit
: 3) The contaminated area.
: 3) The contaminated area.  
Page 5 of 4                          Rev Date: 2/7/05


The RWP map was removed from this page of the exam by the chief examiner because it was considered potential SUNSI material due to the equipment locations on the map.
The RWP map was removed from this page of the exam by the chief examiner because it was considered potential SUNSI material due to the equipment locations on the map.  


Initial License Exam                       03/2005                     Job Performance Measure JPM: A4.1 System:       Emergency Plan                                         JTA Task #: SRO A4.1 Task
Initial License Exam 03/2005 Job Performance Measure JPM: A4.1 Page 1 of 4 Rev Date: 1/18/05 System:
Emergency Plan JTA Task #: SRO A4.1 Task


==Title:==
==Title:==
Event Classification KSA Ref: 2.4.41 EAL Classification             PEO:                 RO: 2.3               SRO: 4.1 Operators Name:
Event Classification KSA Ref:
Performance Environment:               PLANT                   CONTROL ROOM                 SIMULATOR Performance Method:                   PERFORMED               SIMULATED                     DISCUSSED Time to complete JPM:       Estimated     10 minutes             Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
2.4.41 EAL Classification PEO:
SATISFACTORY                                       UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                         Date:
2.3 SRO:
Comments (list all steps not satisfactorily completed):
4.1 Operators Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
EPP-201 Assessment of Emergency Action Levels, Emergency Classification, and Plan Activation Tools, Equipment, Job Aids, etc:
EPP-201 Assessment of Emergency Action              Static simulator at the completion of Scenario #1.
Static simulator at the completion of Scenario #1.  
Levels, Emergency Classification, and Plan Activation Page 1 of 4                            Rev Date: 1/18/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: A4.1 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: A4.1 Page 2 of 4 Rev Date: 1/18/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 808: Line 1,100:
The simulator is in freeze. Based on current plant conditions and events during the scenario, determine the emergency classification.
The simulator is in freeze. Based on current plant conditions and events during the scenario, determine the emergency classification.
Terminating Conditions:
Terminating Conditions:
Event is classified as a Site Area Emergency.
Event is classified as a Site Area Emergency.  
Page 2 of 4                        Rev Date: 1/18/05


Initial License Exam                     03/2005                 Job Performance Measure JPM: A4.1 STEP#                                                                                   SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: A4.1 Page 3 of 4 Rev Date: 1/18/05 STEP#  
*Critical           ELEMENT                     STANDARD                 NOTES         UNSAT 1       Candidate diagnoses plant       Referencing Chart 6 of Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
conditions and determines the  EPP-201, the candidate emergency classification for    determines that 6A is Safety System Malfunction or    TRUE, 6B is TRUE, Failure                        6C is FALSE, 6F is False
UNSAT 1
  *2     Candidate declares Site Area   Site Are Emergency Emergency based on Chart 6     declared IAW Chart 6 Note Completion TASK COMPLETE                                          time.
Candidate diagnoses plant conditions and determines the emergency classification for Safety System Malfunction or Failure Referencing Chart 6 of EPP-201, the candidate determines that 6A is TRUE, 6B is TRUE, 6C is FALSE, 6F is False Note Start time.
Page 3 of 4                        Rev Date: 1/18/05
*2 Candidate declares Site Area Emergency based on Chart 6 TASK COMPLETE Site Are Emergency declared IAW Chart 6 Note Completion time.  


Initial License Exam                     03/2005                     Job Performance Measure JPM: A4.1 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: A4.1 Page 4 of 4 Rev Date: 1/18/05 INITIATING CUE:
The simulator is in freeze. Based on current plant conditions and events during the scenario, determine the emergency classification.
The simulator is in freeze. Based on current plant conditions and events during the scenario, determine the emergency classification.  
Page 4 of 4                          Rev Date: 1/18/05


Initial License Exam                       03/2005                     Job Performance Measure JPM: A4.2 System:       Emergency Plan                                         JTA Task #: SRO A4.2 Task
Initial License Exam 03/2005 Job Performance Measure JPM: A4.2 Page 1 of 4 Rev Date: 1/18/05 System:
Emergency Plan JTA Task #: SRO A4.2 Task


==Title:==
==Title:==
Event Classification KSA Ref: 2.4.41 EAL Classification             PEO:                 RO: 2.3               SRO: 4.1 Operators Name:
Event Classification KSA Ref:
Performance Environment:               PLANT                   CONTROL ROOM                 SIMULATOR Performance Method:                   PERFORMED               SIMULATED                     DISCUSSED Time to complete JPM:       Estimated     10 minutes             Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
2.4.41 EAL Classification PEO:
SATISFACTORY                                       UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                         Date:
2.3 SRO:
Comments (list all steps not satisfactorily completed):
4.1 Operators Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
EPP-201 Assessment of Emergency Action Levels, Emergency Classification, and Plan Activation Tools, Equipment, Job Aids, etc:
EPP-201 Assessment of Emergency Action              Static simulator at the completion of Scenario #1.
Static simulator at the completion of Scenario #1.  
Levels, Emergency Classification, and Plan Activation Page 1 of 4                            Rev Date: 1/18/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: A4.2 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: A4.2 Page 2 of 4 Rev Date: 1/18/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 852: Line 1,150:
The simulator is in freeze. Based on current plant conditions and events during the scenario, determine the emergency classification.
The simulator is in freeze. Based on current plant conditions and events during the scenario, determine the emergency classification.
Terminating Conditions:
Terminating Conditions:
Event is classified as a Site Area Emergency.
Event is classified as a Site Area Emergency.  
Page 2 of 4                        Rev Date: 1/18/05


Initial License Exam                       03/2005                   Job Performance Measure JPM: A4.2 STEP#                                                                                       SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: A4.2 Page 3 of 4 Rev Date: 1/18/05 STEP#  
*Critical             ELEMENT                     STANDARD                 NOTES         UNSAT 1       Candidate diagnoses plant         Referencing Chart 2 of   Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
conditions and determines the    EPP-201, the candidate emergency classification for      determines that 2A is Loss of Reactor or Secondary      TRUE, 2B is FALSE Coolant 2       Candidate declares               Notification of Unusual Notification of Unusual Event     Event declared IAW based on Chart 2.                 Chart 2 NOTE: Depending on the actual scenario times, this classification may not be necessary. If the 12 gpm leak was not present for > 15 min, it is not reasonable to expect the candidate to recognize this initial classification.
UNSAT 1
3       Candidate diagnoses plant         Referencing Chart 2 of conditions and determines the    EPP-201, the candidate emergency classification for      determines that 2A is Loss of Reactor or Secondary      TRUE, 2B is TRUE, Coolant                          2C is TRUE, 2D is FALSE, 2G is FALSE.
Candidate diagnoses plant conditions and determines the emergency classification for Loss of Reactor or Secondary Coolant Referencing Chart 2 of EPP-201, the candidate determines that 2A is TRUE, 2B is FALSE Note Start time.
  *4     Candidate declares Site Area     Site Are Emergency Emergency based on Chart 2.       declared IAW Chart 2.
2 Candidate declares Notification of Unusual Event based on Chart 2.
Note Completion TASK COMPLETE                                              time.
NOTE: Depending on the actual scenario times, this classification may not be necessary. If the 12 gpm leak was not present for > 15 min, it is not reasonable to expect the candidate to recognize this initial classification.
Page 3 of 4                          Rev Date: 1/18/05
Notification of Unusual Event declared IAW Chart 2 3
Candidate diagnoses plant conditions and determines the emergency classification for Loss of Reactor or Secondary Coolant Referencing Chart 2 of EPP-201, the candidate determines that 2A is TRUE, 2B is TRUE, 2C is TRUE, 2D is FALSE, 2G is FALSE.  
*4 Candidate declares Site Area Emergency based on Chart 2.
TASK COMPLETE Site Are Emergency declared IAW Chart 2.
Note Completion time.  


Initial License Exam                     03/2005                     Job Performance Measure JPM: A4.2 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: A4.2 Page 4 of 4 Rev Date: 1/18/05 INITIATING CUE:
The simulator is in freeze. Based on current plant conditions and events during the scenario, determine the emergency classification.
The simulator is in freeze. Based on current plant conditions and events during the scenario, determine the emergency classification.  
Page 4 of 4                          Rev Date: 1/18/05


Initial License Exam                       03/2005                   Job Performance Measure JPM: P1 System:       118 AC Distribution System & Inverters               JTA Task #: (NEW)
Initial License Exam 03/2005 Job Performance Measure JPM: P1 Page 1 of 4 Rev Date: 1/27/05 System:
118 AC Distribution System & Inverters JTA Task #: (NEW)
Task
Task


==Title:==
==Title:==
Bypass Inverter KSA Ref: APE.057.EA1.01                         PEO:               RO: 3.7           SRO:       3.7 Operators Name:
Bypass Inverter KSA Ref:
Performance Environment:               PLANT                 CONTROL ROOM               SIMULATOR Performance Method:                   PERFORMED             SIMULATED                   DISCUSSED Time to complete JPM:       Estimated     5 minutes             Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
APE.057.EA1.01 PEO:
SATISFACTORY                                     UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                       Date:
3.7 SRO:
Comments (list all steps not satisfactorily completed):
3.7 Operators Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 5 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
SOP-607A, 118 VAC Distribution System and Inverters Tools, Equipment, Job Aids, etc:
SOP-607A, 118 VAC Distribution System and          Working copy of SOP-607A, Section 5.5.5 (1 page)
Working copy of SOP-607A, Section 5.5.5 (1 page)  
Inverters Page 1 of 4                          Rev Date: 1/27/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: P1 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: P1 Page 2 of 4 Rev Date: 1/27/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 899: Line 1,207:
The Unit Supervisor has directed you to transfer distribution panel 1PC1 to its alternate power supply using SOP-607A, Section 5.5.5. A crew brief has been held and the Reactor Operator is ready to assist you. Proceed directly to the Inverter and make the transfer.
The Unit Supervisor has directed you to transfer distribution panel 1PC1 to its alternate power supply using SOP-607A, Section 5.5.5. A crew brief has been held and the Reactor Operator is ready to assist you. Proceed directly to the Inverter and make the transfer.
Terminating Conditions:
Terminating Conditions:
Distribution panel 1PC1 is energized from the alternate power supply.
Distribution panel 1PC1 is energized from the alternate power supply.  
Page 2 of 4                          Rev Date: 1/27/05


Initial License Exam                   03/2005                   Job Performance Measure JPM: P1 STEP#                                                                                   SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: P1 Page 3 of 4 Rev Date: 1/27/05 STEP#  
*Critical           ELEMENT                 STANDARD                 NOTES           UNSAT 1     Ensure 1EC3/2/BKR, 118       The breaker operator is  Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
VAC INSTRUMENT DISTR         pointing to the ON PANEL 1PC1 FEEDER             position.
UNSAT 1
BREAKER is ON CUE: Breaker position is ON.
Ensure 1EC3/2/BKR, 118 VAC INSTRUMENT DISTR PANEL 1PC1 FEEDER BREAKER is ON CUE: Breaker position is ON.
CSR 807 South Wall Perform the following
The breaker operator is pointing to the ON position.
  *2                                    At Panel 1PC1:
CSR 807 South Wall Note Start time.
SIMULTANEOUSLY to transfer Panel 1PC1 to the alternate source:
*2 Perform the following SIMULTANEOUSLY to transfer Panel 1PC1 to the alternate source:
Turn OFF 1PC1/00/BKR-1,       1PC1/00/BKR-1 is        NOTE: Breakers IV1PC1 TO 118 VAC             moved to the OFF        are interlocked INSTRUMENT DISTR             position.                via a slide bar PANEL 1PC1 PREFERRED                                   such when BKR FEEDER BREAKER.                                        1is opened, BKR 2 closes.
Turn OFF 1PC1/00/BKR-1, IV1PC1 TO 118 VAC INSTRUMENT DISTR PANEL 1PC1 PREFERRED FEEDER BREAKER.
Turn ON 1PC1/00/BKR-2,       1PC1/00/BKR-2 is 1EC3 TO 118 VAC               moved to the ON INSTRUMENT DISTR             position.
Turn ON 1PC1/00/BKR-2, 1EC3 TO 118 VAC INSTRUMENT DISTR PANEL 1PC1 ALTERNATE FEEDER BREAKER.
PANEL 1PC1 ALTERNATE FEEDER BREAKER.
CUE : Breaker 1 indicates OFF and Breaker 2 indicates ON TASK COMPLETE At Panel 1PC1:
CUE : Breaker 1 indicates OFF Note Completion time.
1PC1/00/BKR-1 is moved to the OFF position.
and Breaker 2 indicates ON TASK COMPLETE Page 3 of 4                          Rev Date: 1/27/05
1PC1/00/BKR-2 is moved to the ON position.
Note Completion time.
NOTE: Breakers are interlocked via a slide bar such when BKR 1is opened, BKR 2 closes.


Initial License Exam                     03/2005                     Job Performance Measure JPM: P1 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: P1 Page 4 of 4 Rev Date: 1/27/05 INITIATING CUE:
The Unit Supervisor has directed you to transfer distribution panel 1PC1 to its alternate power supply using SOP-607A, Section 5.5.5. A crew brief has been held and the Reactor Operator is ready to assist you. Proceed directly to the Inverter and make the transfer.
The Unit Supervisor has directed you to transfer distribution panel 1PC1 to its alternate power supply using SOP-607A, Section 5.5.5. A crew brief has been held and the Reactor Operator is ready to assist you. Proceed directly to the Inverter and make the transfer.  
Page 4 of 4                            Rev Date: 1/27/05


Initial License Exam                       03/2005                   Job Performance Measure JPM: P2 System:       Control Room Evacuation                           JTA Task #:       (Direct)AO5412C Task
Initial License Exam 03/2005 Job Performance Measure JPM: P2 Page 1 of 6 Rev Date: 1/26/05 System:
Control Room Evacuation JTA Task #:
(Direct)AO5412C Task


==Title:==
==Title:==
Transfer Charging Pump Suction and Isolate Dilution Paths (Alternate Path)
Transfer Charging Pump Suction and Isolate Dilution Paths (Alternate Path)
KSA Ref: APE.068.AA1.22                         PEO:             RO:     4.0         SRO:     4.3 Operators Name:
KSA Ref:
Performance Environment:               PLANT                 CONTROL ROOM                 SIMULATOR Performance Method:                   PERFORMED             SIMULATED                     DISCUSSED Time to complete JPM:       Estimated     20 minutes           Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
APE.068.AA1.22 PEO:
SATISFACTORY                                     UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                       Date:
4.0 SRO:
Comments (list all steps not satisfactorily completed):
4.3 Operators Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
ABN-905A/B, Loss of Control Room Habitability, Attachment 4.
ABN-905A/B, Loss of Control Room                   Attachment 4 of ABN-905A/B (working copy)
Tools, Equipment, Job Aids, etc: of ABN-905A/B (working copy)  
Habitability, Attachment 4.
Page 1 of 6                          Rev Date: 1/26/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: P2 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: P2 Page 2 of 6 Rev Date: 1/26/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 954: Line 1,270:
The control room has been evacuated per ABN-905A (B). You are requested to align the charging pump suction to the RWST and isolate RCS dilution paths per Attachment 4.
The control room has been evacuated per ABN-905A (B). You are requested to align the charging pump suction to the RWST and isolate RCS dilution paths per Attachment 4.
NOTE: The Control Room has been evacuated and is inaccessible Terminating Conditions:
NOTE: The Control Room has been evacuated and is inaccessible Terminating Conditions:
Charging pump suction has been transferred to the RWST and the RCS dilution paths have been isolated. Attachment 4 is complete.
Charging pump suction has been transferred to the RWST and the RCS dilution paths have been isolated. Attachment 4 is complete.  
Page 2 of 6                        Rev Date: 1/26/05


Initial License Exam                   03/2005                 Job Performance Measure JPM: P2 STEP#                                                                                   SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: P2 Page 3 of 6 Rev Date: 1/26/05 STEP#  
*Critical           ELEMENT                   STANDARD                 NOTES           UNSAT 1       Open RWST u-01 to CHRG         u-EB3-1/8C/BKR,        Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
PMP SUCT VLV u-LCV-           switch rotated to LEFT 112D MOT BKR.                  (OFF position).        SFGD 790-South (North for U2)
UNSAT 1
CUE: Breaker indicates in the                          Hallway West OFF position.                                          Side.
Open RWST u-01 to CHRG PMP SUCT VLV u-LCV-112D MOT BKR.
U1-Room 1-070 U2-Room 2-070 2      Open VCT CTRL u-01 to          u-EB3-1/5F/BKR CHRG PMP SUCT VLV u-          switch rotated to LEFT LCV-112B MOT BKR              (OFF position).
CUE: Breaker indicates in the OFF position.
3      Open RWST u-01 to CHRG        1EB4-1/8F/BKR          AB 790-By FDT PMP SUCT VLV 112E MOT          (2EB4-1/9F/BKR)        #3 Door for U1.
BKR                            switch rotated to LEFT  U2-810Room X-(OFF position).        207.
CUE: Breaker indicates in the OFF position.
CUE: Breaker indicates in the OFF position.
4      Open VCT u-01 to CHRG         1EB4-1/8C/BKR PMP SUCT VLV 0112C MOT         (2EB4-1/9C/BKR)
u-EB3-1/8C/BKR, switch rotated to LEFT (OFF position).
BKR.                          switch rotated to LEFT (OFF position).
Note Start time.
SFGD 790-South (North for U2)
Hallway West Side.
U1-Room 1-070 U2-Room 2-070 2
Open VCT CTRL u-01 to CHRG PMP SUCT VLV u-LCV-112B MOT BKR CUE: Breaker indicates in the OFF position.
u-EB3-1/5F/BKR switch rotated to LEFT (OFF position).
3 Open RWST u-01 to CHRG PMP SUCT VLV 112E MOT BKR CUE: Breaker indicates in the OFF position.
1EB4-1/8F/BKR (2EB4-1/9F/BKR) switch rotated to LEFT (OFF position).
AB 790-By FDT
#3 Door for U1.
U2-810Room X-207.
4 Open VCT u-01 to CHRG PMP SUCT VLV 0112C MOT BKR.
CUE: Breaker indicates in the OFF position.
CUE: Breaker indicates in the OFF position.
  *5     Manually open valve u-LCV-     u-LCV-112D clutch      NOTE: Either 0112D RWST 1-01 TO CHRG       lever depressed while  step 5 or 6 is PMP SUCT VLV.                  hand wheel is turned    critical, not both.
1EB4-1/8C/BKR (2EB4-1/9C/BKR) switch rotated to LEFT (OFF position).
counter clockwise and CUE: u-LCV-112D has           position indication is  AB 810 stopped moving and indicates   checked.                Southside in the OPEN position.                                 Corridor about halfway down the corridor outside room.
*5 Manually open valve u-LCV-0112D RWST 1-01 TO CHRG PMP SUCT VLV.
  *6     Manually open valve u-LCV-     u-LCV-112E clutch      LCV-112E is 0112E RWST 1-01 TO CHRG       lever depressed while  Southeast of PMP SUCT VLV.                  hand wheel is turned    LCV-112D.
CUE: u-LCV-112D has stopped moving and indicates in the OPEN position.
counter clockwise and  Unit 2 next to CUE: u-LCV-112E has           position indication is  Room X-207.
u-LCV-112D clutch lever depressed while hand wheel is turned counter clockwise and position indication is checked.
stopped moving and indicates   checked.
NOTE: Either step 5 or 6 is critical, not both.
in the OPEN position.
AB 810 Southside Corridor about halfway down the corridor outside room.  
Page 3 of 6                          Rev Date: 1/26/05
*6 Manually open valve u-LCV-0112E RWST 1-01 TO CHRG PMP SUCT VLV.
CUE: u-LCV-112E has stopped moving and indicates in the OPEN position.
u-LCV-112E clutch lever depressed while hand wheel is turned counter clockwise and position indication is checked.
LCV-112E is Southeast of LCV-112D.
Unit 2 next to Room X-207.


Initial License Exam                     03/2005                 Job Performance Measure JPM: P2 STEP#                                                                                     SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: P2 Page 4 of 6 Rev Date: 1/26/05 STEP#  
*Critical           ELEMENT                   STANDARD                 NOTES           UNSAT
*Critical ELEMENT STANDARD NOTES SAT/
  *7     Manually close valve u-LCV-     u-LCV-112B clutch      NOTE: Either 0112B VCT u-01 to CHRG          lever depressed while   step 7 or 8 is PMP UPSTRM LVL CTRL            hand wheel is turned    critical, not both.
UNSAT  
VLV.                            clockwise and position indication is checked  AB 810 charging CUE: u-LCV-112B has                                    pump valve room stopped moving and indicates                            South end, inside in the CLOSED position.                                the Contaminated area for Unit 1.
*7 Manually close valve u-LCV-0112B VCT u-01 to CHRG PMP UPSTRM LVL CTRL VLV.
CUE: u-LCV-112B has stopped moving and indicates in the CLOSED position.
u-LCV-112B clutch lever depressed while hand wheel is turned clockwise and position indication is checked NOTE: Either step 7 or 8 is critical, not both.
AB 810 charging pump valve room South end, inside the Contaminated area for Unit 1.
Unit 2 - Room X-207.
Unit 2 - Room X-207.
CUE: Remote Shutdown Panel reports ZL-8220 and ZL-8221 were verified closed.
CUE: Remote Shutdown Panel reports ZL-8220 and ZL-8221 were verified closed.  
  *8     Manually close valve u-LCV-    u-LCV-112C clutch      Next to LCV-112C VCT u-01 to CHRG           lever depressed while  112B.
*8 Manually close valve u-LCV-112C VCT u-01 to CHRG PMP DNSTRM LVL CTRL VLV.
PMP DNSTRM LVL CTRL             hand wheel is turned VLV.                            clockwise and position  .
indication is checked.
CUE: u-LCV-112C has stopped moving and indicates in the CLOSED position.
CUE: u-LCV-112C has stopped moving and indicates in the CLOSED position.
9       Isolate dilution paths by       uCS-8455 hand wheel    AUX 822 closing uCS-8455 RMUW to       rotated clockwise      blender room SE CVCS BA BLNDR u-01                                     corner 1 above UPSTRM ISOL VLV.                                       floor CUE: uCS-8455 hand wheel turns but the stem does not move.
u-LCV-112C clutch lever depressed while hand wheel is turned clockwise and position indication is checked.
  *10     Closes uCS-8560-RO, u CVCS uCS-8560 remote              AUX 822 CHRG PMP SUCT MU ISOL operator rotated                  blender room.
Next to LCV-112B.
VLV RMT OPER                   clockwise.
9 Isolate dilution paths by closing uCS-8455 RMUW to CVCS BA BLNDR u-01 UPSTRM ISOL VLV.
Order of valve CUE: uCS-8560 remote                                   operation in operator has stopped moving                             following steps and indicates CLOSED                                   not critical.
CUE: uCS-8455 hand wheel turns but the stem does not move.
Page 4 of 6                          Rev Date: 1/26/05
uCS-8455 hand wheel rotated clockwise AUX 822 blender room SE corner 1 above floor
*10 Closes uCS-8560-RO, u CVCS CHRG PMP SUCT MU ISOL VLV RMT OPER CUE: uCS-8560 remote operator has stopped moving and indicates CLOSED uCS-8560 remote operator rotated clockwise.
AUX 822 blender room.
Order of valve operation in following steps not critical.  


Initial License Exam                   03/2005                 Job Performance Measure JPM: P2 STEP#                                                                                 SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: P2 Page 5 of 6 Rev Date: 1/26/05 STEP#  
*Critical           ELEMENT                   STANDARD               NOTES       UNSAT Closes u-FCV-0111B (fail air), u-0111B-AS1 is rotated
*Critical ELEMENT STANDARD NOTES SAT/
  *11      RCS MU TO VCT u-01 ISOL       clockwise and vent on VLV by closing u-FCV-         bottom of regulator is 0111B-AS1 and depressurizing   rotated air regulator.                counterclockwise.
UNSAT  
CUE: u-0111B-AS1 closed and no air is escaping.                               SFGD 832, RM u-090, VCT VLV RM
*11 Closes u-FCV-0111B (fail air),
  *12     Closes uCS-8439-RO, Uu         uCS-8439-RO rotated    AUX 822 CVCS CHRG PMP EMER             clockwise.              blender room.
RCS MU TO VCT u-01 ISOL VLV by closing u-FCV-0111B-AS1 and depressurizing air regulator.
BORATE MAN VLV RMT OPER.
CUE: u-0111B-AS1 closed and no air is escaping.
u-0111B-AS1 is rotated clockwise and vent on bottom of regulator is rotated counterclockwise.
SFGD 832, RM u-090, VCT VLV RM  
*12 Closes uCS-8439-RO, Uu CVCS CHRG PMP EMER BORATE MAN VLV RMT OPER.
CUE: uCS-8439-RO has stopped moving and indicates closed.
CUE: uCS-8439-RO has stopped moving and indicates closed.
  *13     Closes uCS-8441, Uu RMUW       uCS-8441 rotated        AUX 822 TO EMER BORATE FLSH           clockwise.              blender room.
uCS-8439-RO rotated clockwise.
VLV.
AUX 822 blender room.
CUE: uCS-8441 has stopped moving and indicates CLOSED
*13 Closes uCS-8441, Uu RMUW TO EMER BORATE FLSH VLV.
  *14     Closes uCS-8453, CVCS         uCS-8453 rotated        AUX 822 CHEM MIX TK u-01 IN VLV       clockwise.              blender room.
CUE: uCS-8441 has stopped moving and indicates CLOSED uCS-8441 rotated clockwise.
CUE: uCS-8453 has stopped moving and indicates CLOSED 15     Notify the Reactor Operator   RO at the RSP notified that charging pump suction has that charging pump been transferred to the RWST   suction has been and dilution paths have been   transferred to the isolated.                      RWST and dilution paths have been isolated.
AUX 822 blender room.
Note Completion TASK COMPLETE                                          time.
*14 Closes uCS-8453, CVCS CHEM MIX TK u-01 IN VLV CUE: uCS-8453 has stopped moving and indicates CLOSED uCS-8453 rotated clockwise.
Page 5 of 6                      Rev Date: 1/26/05
AUX 822 blender room.
15 Notify the Reactor Operator that charging pump suction has been transferred to the RWST and dilution paths have been isolated.
TASK COMPLETE RO at the RSP notified that charging pump suction has been transferred to the RWST and dilution paths have been isolated.
Note Completion time.  


Initial License Exam                   03/2005                   Job Performance Measure JPM: P2 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: P2 Page 6 of 6 Rev Date: 1/26/05 INITIATING CUE:
The Control Room has been evacuated per ABN-905A (B). You are requested to align the charging pump suction to the RWST and isolate RCS dilution paths per Attachment 4.
The Control Room has been evacuated per ABN-905A (B). You are requested to align the charging pump suction to the RWST and isolate RCS dilution paths per Attachment 4.
NOTE: The Control Room has been evacuated and is inaccessible.
NOTE: The Control Room has been evacuated and is inaccessible.  
Page 6 of 6                        Rev Date: 1/26/05


Initial License Exam                       03/2005                   Job Performance Measure JPM: P3 System:       Auxiliary Feedwater System                           JTA Task #: AO 6415 Task
Initial License Exam 03/2005 Job Performance Measure JPM: P3 Page 1 of 7 Rev Date: 1/15/05 System:
Auxiliary Feedwater System JTA Task #: AO 6415 Task


==Title:==
==Title:==
Fill the CST from the Fire Protection Header KSA Ref: EPE.074.EA1.107                       PEO:               RO: 4.2             SRO: 4.3 Operators Name:
Fill the CST from the Fire Protection Header KSA Ref:
Performance Environment:               PLANT                 CONTROL ROOM               SIMULATOR Performance Method:                   PERFORMED             SIMULATED                   DISCUSSED Time to complete JPM:       Estimated     20 minutes           Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
EPE.074.EA1.107 PEO:
SATISFACTORY                                     UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                       Date:
4.2 SRO:
Comments (list all steps not satisfactorily completed):
4.3 Operators Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
ABN-305 Auxiliary Feedwater System Malfunction Tools, Equipment, Job Aids, etc:
ABN-305 Auxiliary Feedwater System                  None Malfunction Page 1 of 7                          Rev Date: 1/15/05
None  


Initial License Exam                         03/2005                   Job Performance Measure JPM: P3 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: P3 Page 2 of 7 Rev Date: 1/15/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 1,043: Line 1,387:
While responding to an Inadequate Core Cooling problem CST level dropped below 10%. The US has directed you to align the Fire Protection Header to the CST by completing the first 4 steps of Attachment 4 of ABN-305. In addition, the US has directed you that 1FP-0627 SFGD BLDG EL 800 DG FP HOSE STA 1-22 is the preferred source of water, and it should be connected to the CT pump discharge vent valve.
While responding to an Inadequate Core Cooling problem CST level dropped below 10%. The US has directed you to align the Fire Protection Header to the CST by completing the first 4 steps of Attachment 4 of ABN-305. In addition, the US has directed you that 1FP-0627 SFGD BLDG EL 800 DG FP HOSE STA 1-22 is the preferred source of water, and it should be connected to the CT pump discharge vent valve.
Terminating Conditions:
Terminating Conditions:
One fire protection hose is simulated run from the fire protection header to the effected AFW pump.
One fire protection hose is simulated run from the fire protection header to the effected AFW pump.  
Page 2 of 7                          Rev Date: 1/15/05


Initial License Exam                   03/2005                   Job Performance Measure JPM: P3 STEP#                                                                                     SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: P3 Page 3 of 7 Rev Date: 1/15/05 STEP#  
*Critical           ELEMENT                   STANDARD                 NOTES           UNSAT 1     Ensure the following valves                             Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
are closed.
UNSAT 1
Ensure the following valves are closed.
NOTE: All AF valves are located in the Condensate Storage Tank Room.
NOTE: All AF valves are located in the Condensate Storage Tank Room.
1.a     1AF-0108, CNDS TO CT           The handwheel is PMP 1-01 SUCT UPSTRM           rotated in the clockwise ISOL VLV                       direction until handwheel will not turn CUE: The handwheel will       and valve stem is in the not turn any further, and the closed position.
Note Start time.
valve stem is all the way down.
1.a 1AF-0108, CNDS TO CT PMP 1-01 SUCT UPSTRM ISOL VLV CUE: The handwheel will not turn any further, and the valve stem is all the way down.
1.b     1AF-0109, CNDS TO CT 1-       The handwheel is 01 SUCT DNSTRM ISOL           rotated in the clockwise VLV                           direction until handwheel will not turn CUE: The handwheel will       and valve stem is in the not turn any further, and the closed position.
The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.
valve stem is all the way down.
1.b 1AF-0109, CNDS TO CT 1-01 SUCT DNSTRM ISOL VLV CUE: The handwheel will not turn any further, and the valve stem is all the way down.
1.c     1AF-0200, 1-01 CT PMP         The handwheel is DISCH ISOL VLV                 rotated in the clockwise direction until CUE: The handwheel will        handwheel will not turn not turn any further, and the and valve stem is in the valve stem is all the way      closed position.
The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.
down.
1.c 1AF-0200, 1-01 CT PMP DISCH ISOL VLV CUE: The handwheel will not turn any further, and the valve stem is all the way down.
Page 3 of 7                          Rev Date: 1/15/05
The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.  


Initial License Exam                   03/2005                   Job Performance Measure JPM: P3 STEP#                                                                                 SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: P3 Page 4 of 7 Rev Date: 1/15/05 STEP#  
*Critical           ELEMENT                     STANDARD               NOTES       UNSAT 1.d     1AF-0110 CST TO CT PMP         The handwheel is 1-01 SUCT UPSTRM ISOL         rotated in the clockwise VLV                           direction until handwheel will not turn CUE: The handwheel will       and valve stem is in the turn clockwise, and the valve closed position.
*Critical ELEMENT STANDARD NOTES SAT/
stem is all the way up.
UNSAT 1.d 1AF-0110 CST TO CT PMP 1-01 SUCT UPSTRM ISOL VLV CUE: The handwheel will turn clockwise, and the valve stem is all the way up.
2nd CUE: the handwheel will not turn any further, and the  NOTE: After the valve stem is all the way     operator starts to close down.                          the valve, give the 2nd CUE.
2nd CUE: the handwheel will not turn any further, and the valve stem is all the way down.
1.e     1AF-0111 CST TO CT PMP         The Locking device is 1-01 SUCT DNSTRM ISOL         verified installed. The VLV                           handwheel is rotated in the clockwise direction CUE: The handwheel will        until handwheel will turn clockwise, and the valve  not turn and valve stem stem is all the way up.        is in the closed position.
The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.
2nd CUE: the handwheel will not turn any further, and the  NOTE: After the valve stem is all the way     operator starts to close down.                          the valve, give the 2nd CUE.
NOTE: After the operator starts to close the valve, give the 2nd CUE.
1.f     1AF-0156, CT PMP 1-01         The handwheel is DISCH VNT VLV                 rotated in the clockwise direction until CUE: The handwheel will       handwheel will not turn turn clockwise, and the valve and valve stem is in the stem is all the way up.        closed position.
1.e 1AF-0111 CST TO CT PMP 1-01 SUCT DNSTRM ISOL VLV CUE: The handwheel will turn clockwise, and the valve stem is all the way up.
2nd CUE: the handwheel will   NOTE: After the not turn any further, and the operator starts to close valve stem is all the way     the valve, give the 2nd down.                          CUE.
2nd CUE: the handwheel will not turn any further, and the valve stem is all the way down.
Page 4 of 7                      Rev Date: 1/15/05
The Locking device is verified installed. The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.
NOTE: After the operator starts to close the valve, give the 2nd CUE.
1.f 1AF-0156, CT PMP 1-01 DISCH VNT VLV CUE: The handwheel will turn clockwise, and the valve stem is all the way up.
2nd CUE: the handwheel will not turn any further, and the valve stem is all the way down.
The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.
NOTE: After the operator starts to close the valve, give the 2nd CUE.  


Initial License Exam                     03/2005                   Job Performance Measure JPM: P3 STEP#                                                                                   SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: P3 Page 5 of 7 Rev Date: 1/15/05 STEP#  
*Critical           ELEMENT                     STANDARD               NOTES       UNSAT 1.g     1AF-0113, CT PMP 1-01           The handwheel is DISCH TD DRN VLV                 rotated in the clockwise direction until CUE: The handwheel will         handwheel will not turn not turn any further, and the   and valve stem is in the valve stem is all the way        closed position.
*Critical ELEMENT STANDARD NOTES SAT/
down.
UNSAT 1.g 1AF-0113, CT PMP 1-01 DISCH TD DRN VLV CUE: The handwheel will not turn any further, and the valve stem is all the way down.
1.h     1AF-0112, CT PMP 1-01           The handwheel is DISCH TD DRN VLV                 rotated in the clockwise direction until CUE: The handwheel will          handwheel will not turn not turn any further, and the   and valve stem is in the valve stem is all the way        closed position.
The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.
down.
1.h 1AF-0112, CT PMP 1-01 DISCH TD DRN VLV CUE: The handwheel will not turn any further, and the valve stem is all the way down.
2       Connect selected fire protection supply lines from Page 2 or 3 of the attachment to one or more of the following AFW valves.
The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.
  *2.a     1AF-0156, CT PMP 1-01           The operator correctly DISCH VNT VLV                    identifies the preferred Hose Station (1FP-0627 SFGD BLDG EL 800 DG FP HOSE STA CUE: The hose is flaked out      1-22) and simulates and the connection to the vent  running the hose from valve is made. Continue with    the station to the CT step 3.                          pump. The operator will need to procure a 3/4 NPT connection for the AF connection.
2 Connect selected fire protection supply lines from Page 2 or 3 of the attachment to one or more of the following AFW valves.  
Page 5 of 7                      Rev Date: 1/15/05
*2.a 1AF-0156, CT PMP 1-01 DISCH VNT VLV CUE: The hose is flaked out and the connection to the vent valve is made. Continue with step 3.
The operator correctly identifies the preferred Hose Station (1FP-0627 SFGD BLDG EL 800 DG FP HOSE STA 1-22) and simulates running the hose from the station to the CT pump. The operator will need to procure a 3/4 NPT connection for the AF connection.  


Initial License Exam                     03/2005                   Job Performance Measure JPM: P3 STEP#                                                                                   SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: P3 Page 6 of 7 Rev Date: 1/15/05 STEP#  
*Critical           ELEMENT                     STANDARD                 NOTES       UNSAT 3       OPEN the following valves:
*Critical ELEMENT STANDARD NOTES SAT/
  *3.a     1AF-0110 CST TO CT PMP         The handwheel is 1-01 SUCT UPSTRM ISOL           rotated in the counter VLV                             clockwise direction until handwheel will CUE: The handwheel will         not turn and valve stem not turn any further and the   is in the open position.
UNSAT 3
stem is in the open position.
OPEN the following valves:  
  *3.b     1AF-0111 CST TO CT PMP         The handwheel is 1-01 SUCT DNSTRM ISOL           rotated in the counter VLV                             clockwise direction until handwheel will CUE: The handwheel will         not turn and valve stem not turn any further and the   is in the open position.
*3.a 1AF-0110 CST TO CT PMP 1-01 SUCT UPSTRM ISOL VLV CUE: The handwheel will not turn any further and the stem is in the open position.
stem is in the open position.
The handwheel is rotated in the counter clockwise direction until handwheel will not turn and valve stem is in the open position.  
4       OPEN the selected AF fill valves:
*3.b 1AF-0111 CST TO CT PMP 1-01 SUCT DNSTRM ISOL VLV CUE: The handwheel will not turn any further and the stem is in the open position.
  *4.a     1AF-0156, CT PMP 1-01           The handwheel is DISCH VNT VLV                   rotated in the counter clockwise direction CUE: The handwheel will        until handwheel will not turn any further and the   not turn and valve stem stem is in the open position. is in the open position.
The handwheel is rotated in the counter clockwise direction until handwheel will not turn and valve stem is in the open position.
5       Informs the Control Room that steps 1-4 of attachment 4 of ABN-305 is complete.                                     Note Completion time.
4 OPEN the selected AF fill valves:  
TASK COMPLETE Page 6 of 7                        Rev Date: 1/15/05
*4.a 1AF-0156, CT PMP 1-01 DISCH VNT VLV CUE: The handwheel will not turn any further and the stem is in the open position.
The handwheel is rotated in the counter clockwise direction until handwheel will not turn and valve stem is in the open position.
5 Informs the Control Room that steps 1-4 of attachment 4 of ABN-305 is complete.
TASK COMPLETE Note Completion time.  


Initial License Exam                       03/2005                   Job Performance Measure JPM: P3 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: P3 Page 7 of 7 Rev Date: 1/15/05 INITIATING CUE:
While responding to an Inadequate Core Cooling problem CST level dropped below 10%. The US has directed you to align the Fire Protection Header to the CST by completing the first 4 steps of of ABN-305. In addition, the US has directed you that 1FP-0627 SFGD BLDG EL 800 DG FP HOSE STA 1-22 is the preferred source of water, and it should be connected to the CT pump discharge vent valve.
While responding to an Inadequate Core Cooling problem CST level dropped below 10%. The US has directed you to align the Fire Protection Header to the CST by completing the first 4 steps of of ABN-305. In addition, the US has directed you that 1FP-0627 SFGD BLDG EL 800 DG FP HOSE STA 1-22 is the preferred source of water, and it should be connected to the CT pump discharge vent valve.  
Page 7 of 7                            Rev Date: 1/15/05


Initial License Exam                       03/2005                     Job Performance Measure JPM: S-1 System:       Reactor Coolant System                                 JTA Task #: RO*1111 Task
Initial License Exam 03/2005 Job Performance Measure JPM: S-1 Page 1 of 5 Rev Date: 12/23/04 System:
Reactor Coolant System JTA Task #: RO*1111 Task


==Title:==
==Title:==
Verify Natural Circulation (Alternate Path)
Verify Natural Circulation (Alternate Path)
KSA Ref: EPE.011.EA2.09                         PEO:                 RO: 4.2                 SRO: 4.3 Operators Name:
KSA Ref:
Performance Environment:               PLANT                   CONTROL ROOM                   SIMULATOR Performance Method:                   PERFORMED               SIMULATED                       DISCUSSED Time to complete JPM:       Estimated     10 minutes             Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
EPE.011.EA2.09 PEO:
SATISFACTORY                                         UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                         Date:
4.2 SRO:
Comments (list all steps not satisfactorily completed):
4.3 Operators Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
EOS-0.1A Reactor Trip Response (Rev 7)
Tools, Equipment, Job Aids, etc:
Tools, Equipment, Job Aids, etc:
EOS-0.1A Reactor Trip Response (Rev 7)              Reset to IC 20 and then:
Reset to IC 20 and then:
Trip the Reactor, Enter Malfunction ED01, Start Emergency boration, Stop the TDAFWP when SG levels are @ 25%, Throttle remaining AFW to 120 per SG, manually control ARVs until Auct. CET start to increase. Ensure the simulator remains in FREEZE until right before the candidate starts the task. Ensure Steam Tables are available.
Trip the Reactor, Enter Malfunction ED01, Start Emergency boration, Stop the TDAFWP when SG levels are @ 25%, Throttle remaining AFW to 120 per SG, manually control ARVs until Auct. CET start to increase. Ensure the simulator remains in FREEZE until right before the candidate starts the task. Ensure Steam Tables are available.  
Page 1 of 5                            Rev Date: 12/23/04


Initial License Exam                         03/2005                   Job Performance Measure JPM: S-1 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: S-1 Page 2 of 5 Rev Date: 12/23/04 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 1,126: Line 1,487:
The crew is responding to a loss of offsite power. Safety Injection is not actuated or required. The RCPs cannot be restarted. The US directs you to verify Natural Circulation per EOS 0.1A step 8 and Attachment 3 of the same procedure. (Provide candidate a copy of EOS-0.1A)
The crew is responding to a loss of offsite power. Safety Injection is not actuated or required. The RCPs cannot be restarted. The US directs you to verify Natural Circulation per EOS 0.1A step 8 and Attachment 3 of the same procedure. (Provide candidate a copy of EOS-0.1A)
Terminating Conditions:
Terminating Conditions:
Attachment 3 is complete and the candidate has increased steam flow rate from the ARVs.
is complete and the candidate has increased steam flow rate from the ARVs.  
Page 2 of 5                          Rev Date: 12/23/04


Initial License Exam                   03/2005                   Job Performance Measure JPM: S-1 STEP#                                                                                   SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S-1 Page 3 of 5 Rev Date: 12/23/04 STEP#  
*Critical           ELEMENT                   STANDARD                 NOTES           UNSAT 1       Verify RCS subcooling > 25&#xba;F. Operator verifies        Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
subcooling using 1-TI-CUE: Subcooling is 35&#xba;F.     3611/3612-1 on CB-05.
UNSAT 1
2       Check Steam Generator         Operator checks SG Pressures-STABLE OR           pressures using 1-PI-DECREASING                    514/524/534/544A on CB-08 CUE: All SG pressures are INCREASING.
Verify RCS subcooling > 25&#xba;F.
3      Check RCS Hot Leg            Operator checks hot leg Temperatures- STABLE OR      temperatures using 1-DECREASING                    TR-433/434A on CB-06.
CUE: Subcooling is 35&#xba;F.
CUE: All Hot Leg Temperatures are stable.
Operator verifies subcooling using 1-TI-3611/3612-1 on CB-05.
4       Check core exit TCs-         Operator checks core     Note: Candidate STABLE OR DECREASING          exit TCs on plant       may immediately computer,               increase steam flow from OR           ARVs.
Note Start time.
1-TI-3611/3612-2 on CUE: Core Exit TCs are 605&#xba; CB-05 and slowly increasing.
2 Check Steam Generator Pressures-STABLE OR DECREASING CUE: All SG pressures are INCREASING.
5      Check RCS cold leg            Operator checks RCS temperatures-AT              cold leg temperatures SATURATION                    using 1-TR-413B/23B TEMPERATURE FOR SG            and 433B/43B on PRESSURE                      CB05 and compares to SG pressures using 1-CUE: Cold leg temperatures    PI-514/524/534/544A are 551&#xba; F and SG pressures  on CB-08 are 1050 psig.
Operator checks SG pressures using 1-PI-514/524/534/544A on CB-08 3
Page 3 of 5                        Rev Date: 12/23/04
Check RCS Hot Leg Temperatures-STABLE OR DECREASING CUE: All Hot Leg Temperatures are stable.
Operator checks hot leg temperatures using 1-TR-433/434A on CB-
: 06.
4 Check core exit TCs-STABLE OR DECREASING CUE: Core Exit TCs are 605&#xba; and slowly increasing.
Operator checks core exit TCs on plant computer, OR 1-TI-3611/3612-2 on CB-05 Note: Candidate may immediately increase steam flow from ARVs.
5 Check RCS cold leg temperatures-AT SATURATION TEMPERATURE FOR SG PRESSURE CUE: Cold leg temperatures are 551&#xba; F and SG pressures are 1050 psig.
Operator checks RCS cold leg temperatures using 1-TR-413B/23B and 433B/43B on CB05 and compares to SG pressures using 1-PI-514/524/534/544A on CB-08  


Initial License Exam                   03/2005             Job Performance Measure JPM: S-1 STEP#                                                                           SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S-1 Page 4 of 5 Rev Date: 12/23/04 STEP#  
*Critical           ELEMENT                   STANDARD           NOTES       UNSAT
*Critical ELEMENT STANDARD NOTES SAT/
  *6     Natural Circulation is NOT     Operator opens SG verifed, Increase Steam Flow   ARVs using 1-PK-from SG ARVs.                2325/26/27/28 on CB08.
UNSAT  
*6 Natural Circulation is NOT verifed, Increase Steam Flow from SG ARVs.
CUE: Core Exit TC are trending lower.
CUE: Core Exit TC are trending lower.
Note Completion TASK COMPLETE                                    time.
TASK COMPLETE Operator opens SG ARVs using 1-PK-2325/26/27/28 on CB08.
Page 4 of 5                Rev Date: 12/23/04
Note Completion time.  


Initial License Exam                       03/2005                     Job Performance Measure JPM: S-1 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: S-1 Page 5 of 5 Rev Date: 12/23/04 INITIATING CUE:
The crew is responding to a loss of offsite power. Safety Injection is not actuated or required. The RCPs cannot be restarted. The US directs you to verify Natural Circulation per EOS 0.1A step 8 and of the same procedure.
The crew is responding to a loss of offsite power. Safety Injection is not actuated or required. The RCPs cannot be restarted. The US directs you to verify Natural Circulation per EOS 0.1A step 8 and of the same procedure.  
Page 5 of 5                            Rev Date: 12/23/04


Initial License Exam                       03/2005                     Job Performance Measure JPM: S2 System:       Pressurizer Pressure Control System                   JTA Task #: (Modified) RO*1209 Task
Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 1 of 8 Rev Date: 1/27/05 System:
Pressurizer Pressure Control System JTA Task #: (Modified) RO*1209 Task


==Title:==
==Title:==
Control Pressurizer Pressure KSA Ref: SF3.010.A1.07                         PEO:                 RO: 3.7           SRO:       3.7 Operators Name:
Control Pressurizer Pressure KSA Ref:
Performance Environment:               PLANT                   CONTROL ROOM                 SIMULATOR Performance Method:                   PERFORMED               SIMULATED                   DISCUSSED Time to complete JPM:       Estimated     30 minutes             Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SF3.010.A1.07 PEO:
SATISFACTORY                                       UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                         Date:
3.7 SRO:
Comments (list all steps not satisfactorily completed):
3.7 Operators Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 30 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
IPO-005A, Step 5.1.5 Tools, Equipment, Job Aids, etc:
IPO-005A, Step 5.1.5                                Reset to IC 5 with Tave appx. 557 B F, RCS Pressure appx. 2235 psig, and a small cooldown in progress.
Reset to IC 5 with Tave appx. 557 B F, RCS Pressure appx. 2235 psig, and a small cooldown in progress.  
Page 1 of 8                          Rev Date: 1/27/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: S2 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 2 of 8 Rev Date: 1/27/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 1,183: Line 1,557:
557B F and 2235 psig. You are currently in IPO-005A, at step 5.1.5 with a 50B F/Hr cooldown in progress. The BOP is controlling the cooldown. The US has instructed you to initiate a reduction of RCS Pressure per step 5.1.5 and 5.1.6 and stabilize pressure at 1925 psig (+ or-25 psig), and then BLOCK SI, while the RCS Cooldown is continuing. The Extra RO will perform OPT-407 and RCP data monitoring.
557B F and 2235 psig. You are currently in IPO-005A, at step 5.1.5 with a 50B F/Hr cooldown in progress. The BOP is controlling the cooldown. The US has instructed you to initiate a reduction of RCS Pressure per step 5.1.5 and 5.1.6 and stabilize pressure at 1925 psig (+ or-25 psig), and then BLOCK SI, while the RCS Cooldown is continuing. The Extra RO will perform OPT-407 and RCP data monitoring.
Terminating Conditions:
Terminating Conditions:
Przr Spray Valve Controllers in MANUAL (AMBER & GREEN) Lights with zero (0) output, ZL Lights GREEN, and RCS Pressure at 1925 + or - 25 psig Page 2 of 8                        Rev Date: 1/27/05
Przr Spray Valve Controllers in MANUAL (AMBER & GREEN) Lights with zero (0) output, ZL Lights GREEN, and RCS Pressure at 1925 + or - 25 psig  


Initial License Exam                     03/2005                 Job Performance Measure JPM: S2 STEP#                                                                                   SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 3 of 8 Rev Date: 1/27/05 STEP#  
*Critical           ELEMENT                     STANDARD               NOTES           UNSAT
*Critical ELEMENT STANDARD NOTES SAT/
  *1     Place Pressurizer Spray Valve   Depress AMBER        Note Start time Controller(s) in MANUAL         P/B on PK-455B and PK-455C and verify    PK-455B and PK-controllers are in     455C are located MANUAL by             on CB-05 observing the AMBER   (VERTICAL Light ON and the       BOARD)
UNSAT  
WHITE (Auto) Light CUE: Przr Spray Valve            OFF.                   Controller output Controllers u-PK-455B and u-                           should be zero (0)
*1 Place Pressurizer Spray Valve Controller(s) in MANUAL CUE: Przr Spray Valve Controllers u-PK-455B and u-PK-455C indicate zero (0) output with AMBER and GREEN Lights ON.
PK-455C indicate zero (0)                               with GREEN output with AMBER and                                  Light ON.
Depress AMBER P/B on PK-455B and PK-455C and verify controllers are in MANUAL by observing the AMBER Light ON and the WHITE (Auto) Light OFF.
GREEN Lights ON.
Note Start time PK-455B and PK-455C are located on CB-05 (VERTICAL BOARD)
  *2     THROTTLE OPEN one or             Depress the RED P/B   When the RED both pressurizer spray valve to  on either PK-455B     P/B is depressed begin a slow RCS Pressure        and/or PK-455C and     the GREEN P/B reduction.                      verify controller     Light should go response by observing OUT and the the controller output output meter and indicating lights should begin to CUE: The Przr Spray              (ZL-455B or ZL-455C)   increase (from Valve(s) ZL lights are RED      on Control Board      9% toward and GREEN for the Spray          (Vertical Board        100%). As the Valve operated.                  Section).              valve begins to throttle the ZL LIGHTS (ZL-455A or ZL-455B) will indicate THROTTLED by having both RED and GREEN LIGHTS ON Page 3 of 8                        Rev Date: 1/27/05
Controller output should be zero (0) with GREEN Light ON.  
*2 THROTTLE OPEN one or both pressurizer spray valve to begin a slow RCS Pressure reduction.
CUE: The Przr Spray Valve(s) ZL lights are RED and GREEN for the Spray Valve operated.
Depress the RED P/B on either PK-455B and/or PK-455C and verify controller response by observing the controller output and indicating lights (ZL-455B or ZL-455C) on Control Board (Vertical Board Section).
When the RED P/B is depressed the GREEN P/B Light should go OUT and the output meter should begin to increase (from 9% toward 100%). As the valve begins to throttle the ZL LIGHTS (ZL-455A or ZL-455B) will indicate THROTTLED by having both RED and GREEN LIGHTS ON  


Initial License Exam                     03/2005                   Job Performance Measure JPM: S2 STEP#                                                                                       SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 4 of 8 Rev Date: 1/27/05 STEP#  
*Critical           ELEMENT                       STANDARD                 NOTES           UNSAT 3     Monitor RCS Pressure for         Verify RCS Pressure      RCS Press (NR)
*Critical ELEMENT STANDARD NOTES SAT/
DECREASE                         decrease using Narrow    instruments u-PI-Range Pressure            455A, u-PI-456, Instruments or            u-PI-457, and/or Recorder.                u-PI-458 located
UNSAT 3
* u-PI-455A              on CB-05 OR
Monitor RCS Pressure for DECREASE CUE: RCS pressure is decreasing and ALARMS 1.6 and 2.6 on ALB-5B have annunciated.
* u-PI-456                RCS Press
Verify RCS Pressure decrease using Narrow Range Pressure Instruments or Recorder.
* u-PI-457                Recorder u-PR-
* u-PI-455A
* u-PI-458                455 located on
* u-PI-455                CB-05 NOTE: ALB-5B CUE: RCS pressure is                                       1.6 & 2.6 decreasing and ALARMS 1.6                                 annunciate at and 2.6 on ALB-5B have                                     2185 psig annunciated.
4      ACKNOWLEDGE                      Depress the Annunciators 1.6 and 2.6 on      ACKNOWLEDGE P/B ALB-5B.                          at the Annunciator Controls on CB-05
  *5      As PRZR PRESS channels          Verify RCS Pressure approach 1925 psig, adjust      decrease using Narrow pressurizer heaters              Range Pressure and spray valves as necessary    Instruments or to maintain RCS pressure        Recorder.
between1900 psig and 1950
* u-PI-455A psig.
* u-PI-456
* u-PI-456
          .
* u-PI-457
* u-PI-457
* u-PI-458
* u-PI-458
* u-PI-455 CUE: RCS Pressure indicates     Manually controls        The US 1925 psig on u-PI-455A, u-PI-   pressurizer sprays and    DIRECTS you to 456, 457, 458, and recorder u-   heaters to stabilize RCS stabilize RCS PR-455.                          pressure at 1925 psig. pressure and Block SI per the
* u-PI-455 RCS Press (NR) instruments u-PI-455A, u-PI-456, u-PI-457, and/or u-PI-458 located on CB-05 OR RCS Press Recorder u-PR-455 located on CB-05 NOTE: ALB-5B 1.6 & 2.6 annunciate at 2185 psig 4
* If RCS pressure         IPO step in effect.
ACKNOWLEDGE Annunciators 1.6 and 2.6 on ALB-5B.
decreases to below 1820 psig, SI will actuate and will result in a failure of the JPM.
Depress the ACKNOWLEDGE P/B at the Annunciator Controls on CB-05
Page 4 of 8                          Rev Date: 1/27/05
*5 As PRZR PRESS channels approach 1925 psig, adjust pressurizer heaters and spray valves as necessary to maintain RCS pressure between1900 psig and 1950 psig.
CUE: RCS Pressure indicates 1925 psig on u-PI-455A, u-PI-456, 457, 458, and recorder u-PR-455.
Verify RCS Pressure decrease using Narrow Range Pressure Instruments or Recorder.
* u-PI-455A
* u-PI-456
* u-PI-457
* u-PI-458
* u-PI-455 Manually controls pressurizer sprays and heaters to stabilize RCS pressure at 1925 psig.
* If RCS pressure decreases to below 1820 psig, SI will actuate and will result in a failure of the JPM.
The US DIRECTS you to stabilize RCS pressure and Block SI per the IPO step in effect.


Initial License Exam                   03/2005                 Job Performance Measure JPM: S2 STEP#                                                                               SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 5 of 8 Rev Date: 1/27/05 STEP#  
*Critical           ELEMENT                   STANDARD             NOTES       UNSAT 6       WHEN RCS pressure is below     The RCS is borated for 1960 psig, THEN perform the   SDM for 350&deg;F following:
*Critical ELEMENT STANDARD NOTES SAT/
UNSAT 6
WHEN RCS pressure is below 1960 psig, THEN perform the following:
A. Ensure RCS has been borated to a Shutdown Margin for RCS #350&deg;F(reference Step 5.2.3 A).
A. Ensure RCS has been borated to a Shutdown Margin for RCS #350&deg;F(reference Step 5.2.3 A).
CUE: The US informs the RO that the RCS is borated for SDM for 350&deg;F 7       Verify 1-PCIP, 2.6, PRZR       CB-07, PCIP alarm PRESS SI BLK PERM P-11 is     window 2.6 is lit ON.                            (blue).
CUE: The US informs the RO that the RCS is borated for SDM for 350&deg;F The RCS is borated for SDM for 350&deg;F 7
Verify 1-PCIP, 2.6, PRZR PRESS SI BLK PERM P-11 is ON.
CUE: CB-07, PCIP alarm window 2.6 is lit.
CUE: CB-07, PCIP alarm window 2.6 is lit.
8       Verify the following status   On CB-04, 1-TSLB-9, lights are OFF:                windows:
CB-07, PCIP alarm window 2.6 is lit (blue).
1-TSLB-9, 1.3, PRZR PRESS     1.3 is dark SI PERM PB-455B 1-TSLB-9, 2.3, PRZR PRESS     2.3 is dark SI PERM PB-456B 1-TSLB-9, 3.3, PRZR PRESS     3.3 is dark SI PERM PB-457B CUE: Windows 1.3, 2.3, and 3.3 on TSLB 9 are dark.
8 Verify the following status lights are OFF:
Page 5 of 8                    Rev Date: 1/27/05
1-TSLB-9, 1.3, PRZR PRESS SI PERM PB-455B 1-TSLB-9, 2.3, PRZR PRESS SI PERM PB-456B 1-TSLB-9, 3.3, PRZR PRESS SI PERM PB-457B CUE: Windows 1.3, 2.3, and 3.3 on TSLB 9 are dark.
On CB-04, 1-TSLB-9, windows:
1.3 is dark 2.3 is dark 3.3 is dark


Initial License Exam                   03/2005                 Job Performance Measure JPM: S2 STEP#                                                                             SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 6 of 8 Rev Date: 1/27/05 STEP#  
*Critical           ELEMENT                   STANDARD             NOTES       UNSAT
*Critical ELEMENT STANDARD NOTES SAT/
  *9     Turn BOTH MSL ISOL SI         On CB-08, in the MSL RESET/BLOCK switches to       Isolation section:
UNSAT  
BLOCK and release:
*9 Turn BOTH MSL ISOL SI RESET/BLOCK switches to BLOCK and release:
1/1-SLSIRBA, MSL ISOL SI       Turns handswitch 1/1-RESET/BLOCK                   SLSIRBA counter clockwise to block 1/1-SLSIRBB, MSL ISOL SI       Turns handswitch 1/1-RESET/BLOCK                   SLSIRBA counter clockwise to block CUE: The handswitch moved counterclockwise and stopped.
1/1-SLSIRBA, MSL ISOL SI RESET/BLOCK 1/1-SLSIRBB, MSL ISOL SI RESET/BLOCK CUE: The handswitch moved counterclockwise and stopped.
10     Verify the following are ON:  CB-07, PCIP alarm window:
On CB-08, in the MSL Isolation section:
1-PCIP, 3.8, MSL PRESS LO     3.8 is ON.
Turns handswitch 1/1-SLSIRBA counter clockwise to block Turns handswitch 1/1-SLSIRBA counter clockwise to block 10 Verify the following are ON:
TRN A SI BLK 1-PCIP, 4.8, MSL PRESS LO     4.8 is ON.
1-PCIP, 3.8, MSL PRESS LO TRN A SI BLK 1-PCIP, 4.8, MSL PRESS LO TRN B SI BLK CUE: PCIP windows 3.8 and 4.8 are LIT.
TRN B SI BLK CUE: PCIP windows 3.8 and 4.8 are LIT.
CB-07, PCIP alarm window:
  *11     Turn BOTH PRZR PRESS SI        On CB-08, in the SI RESET/BLOCK switches to       BLOCK section:
3.8 is ON.
BLOCK and release:
4.8 is ON.
1/1-PPSIRBA, PRZR PRESS       Turns handswitch 1/1-SI RESET/BLOCK                 PPSIRBA counter clockwise to block 1/1-PPSIRBB, PRZR PRESS       Turns handswitch 1/1-SI RESET/BLOCK                 PPSIRBB counter clockwise to block CUE: The handswitch moved counterclockwise and stopped.
*11 Turn BOTH PRZR PRESS SI RESET/BLOCK switches to BLOCK and release:
Page 6 of 8                    Rev Date: 1/27/05
1/1-PPSIRBA, PRZR PRESS SI RESET/BLOCK 1/1-PPSIRBB, PRZR PRESS SI RESET/BLOCK CUE: The handswitch moved counterclockwise and stopped.
On CB-08, in the SI BLOCK section:
Turns handswitch 1/1-PPSIRBA counter clockwise to block Turns handswitch 1/1-PPSIRBB counter clockwise to block


Initial License Exam                     03/2005                     Job Performance Measure JPM: S2 STEP#                                                                                   SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 7 of 8 Rev Date: 1/27/05 STEP#  
*Critical           ELEMENT                     STANDARD                 NOTES       UNSAT 12     Verify the following are ON:    CB-07, PCIP alarm window:
*Critical ELEMENT STANDARD NOTES SAT/
1-PCIP, 3.7, PRZR PRESS LO       3.7 is ON.
UNSAT 12 Verify the following are ON:
TRN A SI BLK 1-PCIP, 4.7, PRZR PRESS LO       4.7 is ON.
1-PCIP, 3.7, PRZR PRESS LO TRN A SI BLK 1-PCIP, 4.7, PRZR PRESS LO TRN B SI BLK CB-07, PCIP alarm window:
TRN B SI BLK 13     Report that RCS pressure is      RCS pressure is stable stable at 1925 psig and that   or slightly decreasing at SI has been blocked. IPO-       less than 1950 psig.
3.7 is ON.
005A step 5.1.5 has been completed.
4.7 is ON.
TASK COMPLETE                   Note completion time.
13 Report that RCS pressure is stable at 1925 psig and that SI has been blocked. IPO-005A step 5.1.5 has been completed.
Page 7 of 8                        Rev Date: 1/27/05
TASK COMPLETE RCS pressure is stable or slightly decreasing at less than 1950 psig.
Note completion time.  


Initial License Exam                     03/2005                   Job Performance Measure JPM: S2 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 8 of 8 Rev Date: 1/27/05 INITIATING CUE:
A plant shutdown and cooldown for REFUELING is in progress. The RCS is currently at appx. 557B F and 2235 psig. You are currently in IPO-005A, at step 5.1.5 with a 50B F/Hr cooldown in progress.
A plant shutdown and cooldown for REFUELING is in progress. The RCS is currently at appx. 557B F and 2235 psig. You are currently in IPO-005A, at step 5.1.5 with a 50B F/Hr cooldown in progress.
The BOP is controlling the cooldown.
The BOP is controlling the cooldown.
The US has instructed you to initiate a reduction of RCS Pressure per step 5.1.5 and 5.1.6 and stabilize pressure at 1925 psig (+ or- 20 psig), and then BLOCK SI, while the RCS Cooldown is continuing. The Extra RO will perform OPT-407 and RCP data monitoring.
The US has instructed you to initiate a reduction of RCS Pressure per step 5.1.5 and 5.1.6 and stabilize pressure at 1925 psig (+ or-20 psig), and then BLOCK SI, while the RCS Cooldown is continuing. The Extra RO will perform OPT-407 and RCP data monitoring.  
Page 8 of 8                          Rev Date: 1/27/05


Initial License Exam                       03/2005                       Job Performance Measure JPM: S3 System:       CVCS                                                     JTA Task #: (NEW)
Initial License Exam 03/2005 Job Performance Measure JPM: S3 Page 1 of 5 Rev Date: 1/28/05 System:
CVCS JTA Task #: (NEW)
Task
Task


==Title:==
==Title:==
Emergency Borate Using Chemical And Volume Control System (Alternate Path)
Emergency Borate Using Chemical And Volume Control System (Alternate Path)
KSA Ref: SF1.004.A4.18                         PEO:                   RO: 4.3         SRO:     4.1 Operators Name:
KSA Ref:
Performance Environment:               PLANT                   CONTROL ROOM               SIMULATOR Performance Method:                   PERFORMED               SIMULATED                   DISCUSSED Time to complete JPM:       Estimated     10 minutes               Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SF1.004.A4.18 PEO:
SATISFACTORY                                       UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                         Date:
4.3 SRO:
Comments (list all steps not satisfactorily completed):
4.1 Operators Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
ABN-107, "Emergency Boration",
Tools, Equipment, Job Aids, etc:
Tools, Equipment, Job Aids, etc:
ABN-107, "Emergency Boration",                      Initialize into any shutdown IC above 550&deg;F Tave.
Initialize into any shutdown IC above 550&deg;F Tave.
Insert Malf. CV19A(Boric Acid Transfer Pump 1 Trip)
Insert Malf. CV19A(Boric Acid Transfer Pump 1 Trip)
Insert Override LOCVAPBA1 to ON. (Boric Acid Transfer Pump 1 Green Light)
Insert Override LOCVAPBA1 to ON. (Boric Acid Transfer Pump 1 Green Light)
ABN-107, Attachment 2 Page 1 of 5                          Rev Date: 1/28/05
ABN-107, Attachment 2  


Initial License Exam                         03/2005                   Job Performance Measure JPM: S3 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: S3 Page 2 of 5 Rev Date: 1/28/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 1,285: Line 1,682:
Instructions:
Instructions:
You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:
You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:
You have been directed by the Unit Supervisor to commence Emergency Boration using Attachment 2 of ABN-107, Emergency Boration. Inform the Unit Supervisor when the attachment is complete.
You have been directed by the Unit Supervisor to commence Emergency Boration using of ABN-107, Emergency Boration. Inform the Unit Supervisor when the attachment is complete.
Terminating Conditions:
Terminating Conditions:
Emergency boration established through the Normal Boration valves.
Emergency boration established through the Normal Boration valves.  
Page 2 of 5                        Rev Date: 1/28/05


Initial License Exam                   03/2005                   Job Performance Measure JPM: S3 STEP#                                                                                   SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S3 Page 3 of 5 Rev Date: 1/28/05 STEP#  
*Critical             ELEMENT                 STANDARD                   NOTES         UNSAT 1     Place 1/u-MU, RCS MU MAN     1/u-MU rotated in the    Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
ACT switch in - STOP.         counterclockwise direction until it is in CUE: 1/u-MU is in the STOP   the STOP position.
UNSAT 1
position
Place 1/u-MU, RCS MU MAN ACT switch in - STOP.
  *2     Open 1/u-FCV-110B, RCS       1/u-FCV-110B rotated MU TO CHRG PMP SUCT           in the clockwise ISOL VLV.                    position from AUTO to OPEN.
CUE: 1/u-MU is in the STOP position 1/u-MU rotated in the counterclockwise direction until it is in the STOP position.
Note Start time.
*2 Open 1/u-FCV-110B, RCS MU TO CHRG PMP SUCT ISOL VLV.
CUE: 1/u-FCV-110B is in the OPEN position and the red light is LIT.
CUE: 1/u-FCV-110B is in the OPEN position and the red light is LIT.
  *3     Start a boric acid transfer pump:
1/u-FCV-110B rotated in the clockwise position from AUTO to OPEN.
Rotates handswitch        The green light is 1/u-APBA1, BA XFER PMP 1 1/u-APBA1 in the          ON (normal) but
*3 Start a boric acid transfer pump:
          - AUTO (AFTER START) clockwise direction to    the pump will not the START position.      start. The candidate must CUE: The green light is ON take the pump 02 and the red light is OFF.
1/u-APBA1, BA XFER PMP 1  
out of Pull Out Rotates handswitch        and start it.
- AUTO (AFTER START)
1/u-APBA2, BA XFER PMP 2
CUE: The green light is ON and the red light is OFF.
          - AUTO (AFTER START)         1/u-APBA1 from the Pull Out position in the clockwise direction to the START position.
1/u-APBA2, BA XFER PMP 2  
- AUTO (AFTER START)
CUE: The green light is OFF and the red light is ON.
CUE: The green light is OFF and the red light is ON.
  *4     Open 1/u-FCV-110A, BA         1/u-FCV-110A rotated BLNDR FLO CTRL VLV.           in the clockwise position from AUTO to CUE: 1/u-FCV-110B is in the   OPEN.
Rotates handswitch 1/u-APBA1 in the clockwise direction to the START position.
OPEN position and the red light is ON.
Rotates handswitch 1/u-APBA1 from the Pull Out position in the clockwise direction to the START position.
Page 3 of 5                          Rev Date: 1/28/05
The green light is ON (normal) but the pump will not start. The candidate must take the pump 02 out of Pull Out and start it.
*4 Open 1/u-FCV-110A, BA BLNDR FLO CTRL VLV.
CUE: 1/u-FCV-110B is in the OPEN position and the red light is ON.
1/u-FCV-110A rotated in the clockwise position from AUTO to OPEN.


Initial License Exam                   03/2005                 Job Performance Measure JPM: S3 STEP#                                                                               SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S3 Page 4 of 5 Rev Date: 1/28/05 STEP#  
*Critical           ELEMENT                   STANDARD                 NOTES       UNSAT 5       Verify flow on u-FR-110       Using the RED pen on (RED PEN), BA FLOW TO         u-FR-110, verify that BLNDR                          flow is between 35 and 40 gpm.
*Critical ELEMENT STANDARD NOTES SAT/
CUE: Boric acid flow is 38 gpm.
UNSAT 5
6       Verify flow on u-FI-121A,     Using u-FI-121A, CHRG FLOW                      verifies that Charging flow is going to the RCS.
Verify flow on u-FR-110 (RED PEN), BA FLOW TO BLNDR CUE: Boric acid flow is 38 gpm.
Note Completion CUE: Charging flow indicates                          time.
Using the RED pen on u-FR-110, verify that flow is between 35 and 40 gpm.
130 gpm.
6 Verify flow on u-FI-121A, CHRG FLOW CUE: Charging flow indicates 130 gpm.
TASK COMPLETE Page 4 of 5                      Rev Date: 1/28/05
TASK COMPLETE Using u-FI-121A, verifies that Charging flow is going to the RCS.
Note Completion time.  


Initial License Exam                   03/2005                 Job Performance Measure JPM: S3 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: S3 Page 5 of 5 Rev Date: 1/28/05 INITIATING CUE:
You have been directed by the Unit Supervisor to commence Emergency Boration using Attachment 2 of ABN-107, Emergency Boration. Inform the Unit Supervisor when the attachment is complete.
You have been directed by the Unit Supervisor to commence Emergency Boration using Attachment 2 of ABN-107, Emergency Boration. Inform the Unit Supervisor when the attachment is complete.  
Page 5 of 5                      Rev Date: 1/28/05


Initial License Exam                       03/2005                       Job Performance Measure JPM: S4 System:       Small Break LOCA                                         JTA Task #: (NEW)
Initial License Exam 03/2005 Job Performance Measure JPM: S4 Page 1 of 5 Rev Date: 1/27/05 System:
Small Break LOCA JTA Task #: (NEW)
Task
Task


==Title:==
==Title:==
Perform Attachment 2 of EOP-0.0A (Alternate Path)
Perform Attachment 2 of EOP-0.0A (Alternate Path)
KSA Ref: EPE.009.EA1.08                         PEO:                   RO: 4.0             SRO: 4.1 Operators Name:
KSA Ref:
Performance Environment:               PLANT                   CONTROL ROOM                 SIMULATOR Performance Method:                   PERFORMED               SIMULATED                     DISCUSSED Time to complete JPM:       Estimated     20 minutes               Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
EPE.009.EA1.08 PEO:
SATISFACTORY                                       UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                         Date:
4.0 SRO:
Comments (list all steps not satisfactorily completed):
4.1 Operators Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
EOP-0.0A Reactor Trip or Safety Injection Tools, Equipment, Job Aids, etc:
EOP-0.0A Reactor Trip or Safety Injection          Initialize into IC-15. Enter the following Malfunctions: RP09A and RP09B, RH01B. (Make trigger file to remove Malf when H/S to start) Insert Overrides LOCHHS 5729 2, and LOCCHS 6202 5 to ON. Use Malf. RC08A1 to cause a Reactor Trip and SI. After the Seq has timed out FREEZE.
Initialize into IC-15. Enter the following Malfunctions: RP09A and RP09B, RH01B. (Make trigger file to remove Malf when H/S to start) Insert Overrides LOCHHS 5729 2, and LOCCHS 6202 5 to ON. Use Malf. RC08A1 to cause a Reactor Trip and SI. After the Seq has timed out FREEZE. of EOP-0.0A, Safety Injection Actuation Alignment.  
Attachment 2 of EOP-0.0A, Safety Injection Actuation Alignment.
Page 1 of 5                            Rev Date: 1/27/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: S4 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: S4 Page 2 of 5 Rev Date: 1/27/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 1,354: Line 1,763:
Automatic Reactor Trip and Safety Injection have occurred The crew is at step 5 of EOP-0.0A.
Automatic Reactor Trip and Safety Injection have occurred The crew is at step 5 of EOP-0.0A.
The Unit Supervisor has directed you to perform Attachment 2 of EOP-0.0A. Inform the Unit Supervisor when the attachment is complete.
The Unit Supervisor has directed you to perform Attachment 2 of EOP-0.0A. Inform the Unit Supervisor when the attachment is complete.
Terminating Conditions:       Attachment 2 is complete with the following exceptions:
Terminating Conditions: is complete with the following exceptions:
* Phase A was manually actuated.
* Phase A was manually actuated.
* The B RHR pump did not auto start and was manually started.
* The B RHR pump did not auto start and was manually started.
* The Primary Plant Supply Fan 20 is running.
* The Primary Plant Supply Fan 20 is running.
* The Spent Fuel Pool Exhaust fan 36 is running.
* The Spent Fuel Pool Exhaust fan 36 is running.  
Page 2 of 5                          Rev Date: 1/27/05


Initial License Exam                     03/2005                     Job Performance Measure JPM: S4 STEP#                                                                                       SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S4 Page 3 of 5 Rev Date: 1/27/05 STEP#  
*Critical           ELEMENT                   STANDARD                   NOTES         UNSAT 1     Provide the candidate with a   The candidates are        Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
working copy of EOP-0.0A,       expected to complete attachment 2.                   Attachment 2              It is managements independently and          expectation that without error.            the candidate will place keep the procedure by marking completed steps and indicating any exceptions.
UNSAT 1
  *2     Step 3. Verify Containment     The RED LIGHTS will Isolation Phase A-Appropriate   be dark. The candidate MLB LIGHT INDICATION            must manually initiate (RED WINDOWS)                  Phase using HS 1/1-CIPAA1 on CB-02 in CUE: The RED LIGHTS on          the SFGD MAN the MLBs 1A1, 1A2, 1B1,        ACT/RESET section, and 1B2 are dark. All others    by rotating the switch are LIT.                        in the clockwise direction to ACT.
Provide the candidate with a working copy of EOP-0.0A, attachment 2.
  *3     Step 6. Verify RHR pumps-       For RHR Pump 1-02         .
The candidates are expected to complete independently and without error.
RUNNING.                        the red light will be off and green light will be on. The candidate must attempt a manual start CUE: The red light is lit and  by rotating 1/1-APRH2 the green light is dark.        in the clockwise direction to the START position.
Note Start time.
Page 3 of 5                            Rev Date: 1/27/05
It is managements expectation that the candidate will place keep the procedure by marking completed steps and indicating any exceptions.  
*2 Step 3. Verify Containment Isolation Phase A-Appropriate MLB LIGHT INDICATION (RED WINDOWS)
CUE: The RED LIGHTS on the MLBs 1A1, 1A2, 1B1, and 1B2 are dark. All others are LIT.
The RED LIGHTS will be dark. The candidate must manually initiate Phase using HS 1/1-CIPAA1 on CB-02 in the SFGD MAN ACT/RESET section, by rotating the switch in the clockwise direction to ACT.  
*3 Step 6. Verify RHR pumps-RUNNING.
CUE: The red light is lit and the green light is dark.
For RHR Pump 1-02 the red light will be off and green light will be on. The candidate must attempt a manual start by rotating 1/1-APRH2 in the clockwise direction to the START position.  


Initial License Exam                   03/2005                   Job Performance Measure JPM: S4 STEP#                                                                                     SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S4 Page 4 of 5 Rev Date: 1/27/05 STEP#  
*Critical           ELEMENT                   STANDARD                 NOTES           UNSAT
*Critical ELEMENT STANDARD NOTES SAT/
  *4     Step 13, Attachment 1. X-HS-   On Ventilation Panel    NOTE: It is not 6202 on CV-01, STOPPED.       CV-01 Primary Plant     critical that the Supply Fan 20 will       candidate rotate indicate RUNNING.       the switch, but the The candidate must       exception MUST attempt to stop the fan be documented, by rotating X-HS-6202   either by oral counterclockwise        report or place direction to the STOP    keeping the position.                procedure.
UNSAT  
  *5     Step 13, Attachment 1. X-HS-   On Ventilation Panel    NOTE: It is not 5729 on CV-03, STOPPED.       CV-03 Spent Fuel Pool   critical that the Exhaust fan will         candidate rotate indicate RUNNING.       the switch, but the The candidate must       exception MUST attempt to stop the fan be documented, by rotating X-HS-5729   either by oral counterclockwise        report or place direction to the STOP    keeping the position.                procedure.
*4 Step 13, Attachment 1. X-HS-6202 on CV-01, STOPPED.
6     Report the completion of       Candidate must Attachment 2 to the Unit       indicate the above Supervisor and note exceptions exceptions.              Note Completion to the requirements of the                             time.
On Ventilation Panel CV-01 Primary Plant Supply Fan 20 will indicate RUNNING.
Attachment.
The candidate must attempt to stop the fan by rotating X-HS-6202 counterclockwise direction to the STOP position.
TASK COMPLETE Page 4 of 5                            Rev Date: 1/27/05
NOTE: It is not critical that the candidate rotate the switch, but the exception MUST be documented, either by oral report or place keeping the procedure.  
*5 Step 13, Attachment 1. X-HS-5729 on CV-03, STOPPED.
On Ventilation Panel CV-03 Spent Fuel Pool Exhaust fan will indicate RUNNING.
The candidate must attempt to stop the fan by rotating X-HS-5729 counterclockwise direction to the STOP position.
NOTE: It is not critical that the candidate rotate the switch, but the exception MUST be documented, either by oral report or place keeping the procedure.
6 Report the completion of to the Unit Supervisor and note exceptions to the requirements of the Attachment.
TASK COMPLETE Candidate must indicate the above exceptions.
Note Completion time.


Initial License Exam                     03/2005                 Job Performance Measure JPM: S4 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: S4 Page 5 of 5 Rev Date: 1/27/05 INITIATING CUE:
Automatic Reactor Trip and Safety Injection have occurred. The crew is at step 5 of EOP-0.0A. The Unit Supervisor has directed you to perform Attachment 2 of EOP-0.0A. Inform the Unit Supervisor when the attachment is complete.
Automatic Reactor Trip and Safety Injection have occurred. The crew is at step 5 of EOP-0.0A. The Unit Supervisor has directed you to perform Attachment 2 of EOP-0.0A. Inform the Unit Supervisor when the attachment is complete.  
Page 5 of 5                          Rev Date: 1/27/05


Initial License Exam                       03/2005                   Job Performance Measure JPM: S5 System:       Containment Spray                                     JTA Task #: (Modified) RO2003 Task
Initial License Exam 03/2005 Job Performance Measure JPM: S5 Page 1 of 5 Rev Date: 1/27/05 System:
Containment Spray JTA Task #: (Modified) RO2003 Task


==Title:==
==Title:==
Operate the Containment Spray System (Alternate Path)
Operate the Containment Spray System (Alternate Path)
KSA Ref:       SF6.026.A4.01                   PEO:               RO: 4.5           SRO:     4.3 Operators Name:
KSA Ref:
Performance Environment:               PLANT                 CONTROL ROOM               SIMULATOR Performance Method:                   PERFORMED             SIMULATED                   DISCUSSED Time to complete JPM:       Estimated     5 minutes             Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SF6.026.A4.01 PEO:
SATISFACTORY                                       UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                       Date:
4.5 SRO:
Comments (list all steps not satisfactorily completed):
4.3 Operators Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 5 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
SOP-204A/B, Containment Spray System, u-ALB-2B, ALM-0022A/B Tools, Equipment, Job Aids, etc:
SOP-204A/B, Containment Spray System, u-           Simulator Setup: OVERRIDE 1TI-4793 (RWST ALB-2B, ALM-0022A/B                                Temperature) to 45&deg;F, activate HS-4776 override after CSPs have been started.
Simulator Setup: OVERRIDE 1TI-4793 (RWST Temperature) to 45&deg;F, activate HS-4776 override after CSPs have been started.  
Page 1 of 5                          Rev Date: 1/27/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: S5 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: S5 Page 2 of 5 Rev Date: 1/27/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 1,414: Line 1,842:
Crew briefing is completed and PCS trends are initiated.
Crew briefing is completed and PCS trends are initiated.
Terminating Conditions:
Terminating Conditions:
Containment Spray Pumps have been stopped.
Containment Spray Pumps have been stopped.  
Page 2 of 5                        Rev Date: 1/27/05


Initial License Exam                       03/2005                 Job Performance Measure JPM: S5 STEP#                                                                                     SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S5 Page 3 of 5 Rev Date: 1/27/05 STEP#  
*Critical             ELEMENT                     STANDARD               NOTES           UNSAT 1       Place CS HX1 Outlet Vlv to       Pull-outs 1-HS-4776,   Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
Pull-Out                          acknowledges SSII Train A                SSII alarms 2       Verify chemical additive tanks   Checks u-HS-4754 discharge valve is closed         closed.
UNSAT 1
CUE: u-HS-4754 green light lit 3       Contact PEO to Unlock and                               Reverse Operated Open uCT-0050                                           Valve CUE: PEO reports uCT-0050 open 4       Initiate a trend of selected     This has already been pump parameters on the plant     done by extra RO computer.
Place CS HX1 Outlet Vlv to Pull-Out Pull-outs 1-HS-4776, acknowledges SSII Train A Note Start time.
CUE: The extra RO has initiated the trend of the pump parameters
SSII alarms 2
  *5     Start Containment Spray Pump     Places u-HS-4764 1-01 Steps 5 and 6 can 1-01                              Containment Spray      be done in either Pump in START on    order CUE: RED light lit on u-       and checks flow and HS-4764, u-FI-4772-1 (0           pressure gpm), u-PI-4774-1 (300 psig)
Verify chemical additive tanks discharge valve is closed CUE: u-HS-4754 green light lit Checks u-HS-4754 closed.
  *6      Start Containment Spray Pump      Places u-HS-4765 1-03  Override HS-1-03                              Containment Spray in   4776 to OPEN, START and checks     via the CUE: RED light lit on u-       flow and pressure      handswitch on HS-4765, u-FI-4772-2 (0                                 mimic display gpm), u-PI-4774-2 (300 psig)                             CB02 CUE: Alarm window 3.5 CS HX 1 OUT VLV NOT CLOSE HV-4776 on ALB 2B Page 3 of 5                        Rev Date: 1/27/05
3 Contact PEO to Unlock and Open uCT-0050 CUE: PEO reports uCT-0050 open Reverse Operated Valve 4
Initiate a trend of selected pump parameters on the plant computer.
CUE: The extra RO has initiated the trend of the pump parameters This has already been done by extra RO
*5 Start Containment Spray Pump 1-01 CUE: RED light lit on u-HS-4764, u-FI-4772-1 (0 gpm), u-PI-4774-1 (300 psig)
Places u-HS-4764 1-01 Containment Spray Pump in START on and checks flow and pressure Steps 5 and 6 can be done in either order
*6 Start Containment Spray Pump 1-03 CUE: RED light lit on u-HS-4765, u-FI-4772-2 (0 gpm), u-PI-4774-2 (300 psig)
CUE: Alarm window 3.5 CS HX 1 OUT VLV NOT CLOSE HV-4776 on ALB 2B Places u-HS-4765 1-03 Containment Spray in START and checks flow and pressure Override HS-4776 to OPEN, via the handswitch on mimic display CB02


Initial License Exam                     03/2005                 Job Performance Measure JPM: S5 STEP#                                                                               SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S5 Page 4 of 5 Rev Date: 1/27/05 STEP#  
*Critical           ELEMENT                   STANDARD               NOTES       UNSAT 7       Monitor CSP discharge flow     Monitors u-FI-4772-1, u-FI-4772-2 flow CUE: u-FI-4772-1 indicates      indicators 3000 gpm, u-FI-4772-2 indicates 3100 gpm 8       Ensure CS HX OUT VLV is         Checks position of u-closed                         HS-4776 CUE: u-HS-4776 red light LIT CUE: CNTMT SMP 1, 2 FILL RATE INCREASE and ANY CNTMT SMP PMP RUN alarm ON MCB
*Critical ELEMENT STANDARD NOTES SAT/
  *9     Stop CNMT Spray Pumps           Go to stop (or PULL OUT) on u-HS-4764 CUE: u-HS-4764 and u-HS-       and u-HS-4765 4765 red and green lights are dark TASK COMPLETE                                         Note Completion time.
UNSAT 7
Page 4 of 5                    Rev Date: 1/27/05
Monitor CSP discharge flow CUE: u-FI-4772-1 indicates 3000 gpm, u-FI-4772-2 indicates 3100 gpm Monitors u-FI-4772-1, u-FI-4772-2 flow indicators 8
Ensure CS HX OUT VLV is closed CUE: u-HS-4776 red light LIT CUE: CNTMT SMP 1, 2 FILL RATE INCREASE and ANY CNTMT SMP PMP RUN alarm ON MCB Checks position of u-HS-4776
*9 Stop CNMT Spray Pumps CUE: u-HS-4764 and u-HS-4765 red and green lights are dark TASK COMPLETE Go to stop (or PULL OUT) on u-HS-4764 and u-HS-4765 Note Completion time.  


Initial License Exam                     03/2005                   Job Performance Measure JPM: S5 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: S5 Page 5 of 5 Rev Date: 1/27/05 INITIATING CUE:
Temperature is 45&deg;F in the RWST, the Unit Supervisor directs you to recirc the RWST with Train "A" Containment Spray Pumps. Containment Spray is in Standby per SOP-204A/B Section 5.1.1. Crew briefing is completed and PCS trends are initiated.
Temperature is 45&deg;F in the RWST, the Unit Supervisor directs you to recirc the RWST with Train "A" Containment Spray Pumps. Containment Spray is in Standby per SOP-204A/B Section 5.1.1. Crew briefing is completed and PCS trends are initiated.  
Page 5 of 5                      Rev Date: 1/27/05


Initial License Exam                       03/2005                     Job Performance Measure JPM: S6 System:       Emergency Diesel Generator                             JTA Task #: (Modifed)RO4032 Task
Initial License Exam 03/2005 Job Performance Measure JPM: S6 Page 1 of 7 Rev Date: 1/26/05 System:
Emergency Diesel Generator JTA Task #: (Modifed)RO4032 Task


==Title:==
==Title:==
Load Diesel Generator (Alternate Path)
Load Diesel Generator (Alternate Path)
KSA Ref: SF6.064.A4.06                         PEO:                 RO: 3.9           SRO:       3.9 Operators Name:
KSA Ref:
Performance Environment:               PLANT                 CONTROL ROOM                 SIMULATOR Performance Method:                   PERFORMED             SIMULATED                     DISCUSSED Time to complete JPM:       Estimated     20 minutes             Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SF6.064.A4.06 PEO:
SATISFACTORY                                       UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                       Date:
3.9 SRO:
Comments (list all steps not satisfactorily completed):
3.9 Operators Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
SOP-609A OPT-214A ABN-501 Tools, Equipment, Job Aids, etc:
SOP-609A                                            OPT-214A (Working Copy)
OPT-214A (Working Copy)
OPT-214A                                            Simulator set-up: Any at power IC, go to RUN, ABN-501                                              START DG 1. Set up trigger file to insert malfunction SW01A when EDG load is 2.7 MW.
Simulator set-up: Any at power IC, go to RUN, START DG 1. Set up trigger file to insert malfunction SW01A when EDG load is 2.7 MW.  
Page 1 of 7                          Rev Date: 1/26/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: S6 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: S6 Page 2 of 7 Rev Date: 1/26/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 1,467: Line 1,909:
OPT-214A, Diesel Generator Operability Test is being performed on DG 1 for a normal 30 day test. You are on step 8.1.S, the DG is running at 60 Hz and 6.9 kV. The PEO at the DG has reported that the DG is running properly. Continue with the test.
OPT-214A, Diesel Generator Operability Test is being performed on DG 1 for a normal 30 day test. You are on step 8.1.S, the DG is running at 60 Hz and 6.9 kV. The PEO at the DG has reported that the DG is running properly. Continue with the test.
Terminating Conditions:
Terminating Conditions:
The Emergency Diesel Generator has been placed in Pull Out.
The Emergency Diesel Generator has been placed in Pull Out.  
Page 2 of 7                        Rev Date: 1/26/05


Initial License Exam                       03/2005                 Job Performance Measure JPM: S6 STEP#                                                                                     SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S6 Page 3 of 7 Rev Date: 1/26/05 STEP#  
*Critical           ELEMENT                       STANDARD               NOTES         UNSAT 1       Refer to OPT-214A, Step           OPT-214A entered at    Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
8.1.S.                           step 8.1.S
UNSAT 1
  *2     Turn the Synchroscope for         Synchroscope Switch    The operating DG1 to the ON position.         (SS-1EG1) in the ON     handle is STAR-position.              shaped. The CUE: The synchroscope                                    Synchroscope switch is in the ON position.                            Switch (SS-1EG1) is located above DG1 output breaker on CB-11 (Beveled Section). The switch is 2-Position MAINTAIN SWITCH. The ON position is to the right.
Refer to OPT-214A, Step 8.1.S.
3       Compare incoming voltage to       V-1EG1 and V-1EA1       V-IN and V-RUN running voltage.                  checked.                are preferred, any indications listed CUE: V-1EG1 reads 6900                                    in OPT-214A are volts and V-1EA1 reads 7000                              acceptable for volts.                                                    use.
OPT-214A entered at step 8.1.S Note Start time.
4       Adjust the DG voltage to         Voltage control switch  The DG output slightly greater than that on the (90-1EG1) taken to     voltage (6900 BUS.                              RAISE or LOWER         Volts) is to agree until DG 1 volts (V-   with 1EA1-1 CUE: DG voltage slightly          1DG1) is 50 - 100       BUS Voltage greater than BUS voltage (50-     volts greater than BUS (6900 Volts).
*2 Turn the Synchroscope for DG1 to the ON position.
100v)                            1EA1 volts (V-1EA1). These meters are located on CB-11 (Vertical Section). The DG Voltage Control Handswitch (90-1EG1) is a 3-POSITION SRING RETURN to OFF type switch. Located on CB-11 (A SEC)
CUE: The synchroscope switch is in the ON position.
Page 3 of 7                        Rev Date: 1/26/05
Synchroscope Switch (SS-1EG1) in the ON position.
The operating handle is STAR-shaped. The Synchroscope Switch (SS-1EG1) is located above DG1 output breaker on CB-11 (Beveled Section). The switch is 2-Position MAINTAIN SWITCH. The ON position is to the right.
3 Compare incoming voltage to running voltage.
CUE: V-1EG1 reads 6900 volts and V-1EA1 reads 7000 volts.
V-1EG1 and V-1EA1 checked.
V-IN and V-RUN are preferred, any indications listed in OPT-214A are acceptable for use.
4 Adjust the DG voltage to slightly greater than that on the BUS.
CUE: DG voltage slightly greater than BUS voltage (50-100v)
Voltage control switch (90-1EG1) taken to RAISE or LOWER until DG 1 volts (V-1DG1) is 50 - 100 volts greater than BUS 1EA1 volts (V-1EA1).
The DG output voltage (6900 Volts) is to agree with 1EA1-1 BUS Voltage (6900 Volts).
These meters are located on CB-11 (Vertical Section). The DG Voltage Control Handswitch (90-1EG1) is a 3-POSITION SRING RETURN to OFF type switch. Located on CB-11 (A SEC)  


Initial License Exam                       03/2005               Job Performance Measure JPM: S6 STEP#                                                                                     SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S6 Page 4 of 7 Rev Date: 1/26/05 STEP#  
*Critical             ELEMENT                     STANDARD             NOTES           UNSAT 5       Check DG speed                   Synchroscope checked Lights are a (On CB-11)           backup to the CUE: Synchroscope is                                  sync scope (OFF rotating in counter-clockwise                          when in phase, direction.                                              ON when out of phase).
*Critical ELEMENT STANDARD NOTES SAT/
6       Adjust the speed so the           Speed Control        Handswitch (65-Synchroscope is moving           Handswitch (65-1EG1)  1EG1) is a 3-slowly in the fast direction. taken to RAISE and    POSITION synchroscope checked  SPRING CUE: Synchroscope is             until rotating        RETURN TO rotating 2-4 RPM in the fast     SLOWLY in FAST       OFF type switch direction.                        direction (2-4 RPM_. located on CB-11 (65-uEG1 taken to     (Apron Section).
UNSAT 5
LOWER if speed too    The INCREASE fast.)                position is to the RIGHT. The FAST Direction is CLOCKWISE.
Check DG speed CUE: Synchroscope is rotating in counter-clockwise direction.
  *7     Close the DG breaker when the     DG Breaker (CS-      Handswitch (65-Synchroscope is slightly before   uEG1) is closed and  1EG1) is a 3 the 12 OCLOCK position and       position is checked. POSITION, moving slowly in the FAST         (Indicated by        SPRING Direction.                       Annunciator Alarm    RETURN TO (ALB-10B 3.5),        AUTO type CUE: ALB-10B 3.5 alarm            Handswitch FLAG       switch. Located has annunciated and the          (RED FLAG) and       on CB-11 (Apron breaker red light lit and green  indication Lights. Section).
Synchroscope checked (On CB-11)
light off.                                              Indicating lights on Handswitch should be RED (Green Light out) with RED FLAG indication.
Lights are a backup to the sync scope (OFF when in phase, ON when out of phase).
6 Adjust the speed so the Synchroscope is moving slowly in the fast direction.
CUE: Synchroscope is rotating 2-4 RPM in the fast direction.
Speed Control Handswitch (65-1EG1) taken to RAISE and synchroscope checked until rotating SLOWLY in FAST direction (2-4 RPM_.
(65-uEG1 taken to LOWER if speed too fast.)
Handswitch (65-1EG1) is a 3-POSITION SPRING RETURN TO OFF type switch located on CB-11 (Apron Section).
The INCREASE position is to the RIGHT. The FAST Direction is CLOCKWISE.  
*7 Close the DG breaker when the Synchroscope is slightly before the 12 OCLOCK position and moving slowly in the FAST Direction.
CUE: ALB-10B 3.5 alarm has annunciated and the breaker red light lit and green light off.
DG Breaker (CS-uEG1) is closed and position is checked.
(Indicated by Annunciator Alarm (ALB-10B 3.5),
Handswitch FLAG (RED FLAG) and indication Lights.
Handswitch (65-1EG1) is a 3
: POSITION, SPRING RETURN TO AUTO type switch. Located on CB-11 (Apron Section).
Indicating lights on Handswitch should be RED (Green Light out) with RED FLAG indication.
Annunciator ALB-10B 3.5 (6.9KV BUS 1EA1/1EA2 PARALELLED)
Annunciator ALB-10B 3.5 (6.9KV BUS 1EA1/1EA2 PARALELLED)
ON (energized).
ON (energized).  
Page 4 of 7                        Rev Date: 1/26/05


Initial License Exam                     03/2005                 Job Performance Measure JPM: S6 STEP#                                                                                   SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S6 Page 5 of 7 Rev Date: 1/26/05 STEP#  
*Critical           ELEMENT                   STANDARD               NOTES           UNSAT
*Critical ELEMENT STANDARD NOTES SAT/
  *8     Immediately pick-up at least   SPEED CONTROL          DG1 MW Meter 2.2-2.5 MW for stability       HANDSWITCH 65-        (W-1EG1) 1EG1, taken to RAISE  located on CB-11 CUE: When load is first         to pick up sufficient  (Vertical checked, DG1 MW Meter (W-       load to prevent a      Section).
UNSAT  
1EG1) indicates ZERO MW;       reverse power trip of  Handswitch (65-when load is checked after     DG 1.                  1EG1) is a 3-going to RAISE, W-1EG1                                 Position Spring indicates 2.1 MW.                                     Return to OFF type switch.
*8 Immediately pick-up at least 2.2-2.5 MW for stability CUE: When load is first checked, DG1 MW Meter (W-1EG1) indicates ZERO MW; when load is checked after going to RAISE, W-1EG1 indicates 2.1 MW.
SPEED CONTROL HANDSWITCH 65-1EG1, taken to RAISE to pick up sufficient load to prevent a reverse power trip of DG 1.
DG1 MW Meter (W-1EG1) located on CB-11 (Vertical Section).
Handswitch (65-1EG1) is a 3-Position Spring Return to OFF type switch.
Located on CB-11 (Apron Section). The RAISE position is to the RIGHT.
Located on CB-11 (Apron Section). The RAISE position is to the RIGHT.
9     Turn the Synchroscope to the   Synchroscope Switch    The OFF position.                 (SS-1EG1) in the OFF   Synchroscope position.             Switch (SS-CUE: The                                              1EG1) is located Synchroscope switch is in the                          above DG1 OFF position.                                          output breaker on CB-11 (Beveled Section). The switch is a 2-Position MAINTAIN Switch. The OFF position is to the LEFT.
9 Turn the Synchroscope to the OFF position.
10     Maintain 0-500 KVAR OUT,       Reactive load maintained 0-500 CUE: When KVARS first           KVAR OUT; DG1 checked, meter indicate 500     Voltage Control KVARS (to left of ). When     Handswitch (90-1EG1) switch is taken to RAISE and   taken to RAISE to KVARS checked, give             increase KVARS or readings indicating KVAR       LOWER to decrease increasing or for LOWER<       KVARS as on DG1 KVAR decreasing.                KILOVAR Meter (VAR-1EG1) checked.
CUE: The Synchroscope switch is in the OFF position.
(This step should be repeated as the DG is loaded.)
Synchroscope Switch (SS-1EG1) in the OFF position.
Page 5 of 7                        Rev Date: 1/26/05
The Synchroscope Switch (SS-1EG1) is located above DG1 output breaker on CB-11 (Beveled Section). The switch is a 2-Position MAINTAIN Switch. The OFF position is to the LEFT.
10 Maintain 0-500 KVAR OUT, CUE: When KVARS first checked, meter indicate 500 KVARS (to left of ). When switch is taken to RAISE and KVARS checked, give readings indicating KVAR increasing or for LOWER<
KVAR decreasing.
Reactive load maintained 0-500 KVAR OUT; DG1 Voltage Control Handswitch (90-1EG1) taken to RAISE to increase KVARS or LOWER to decrease KVARS as on DG1 KILOVAR Meter (VAR-1EG1) checked.
(This step should be repeated as the DG is loaded.)  


Initial License Exam                     03/2005                   Job Performance Measure JPM: S6 STEP#                                                                                     SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S6 Page 6 of 7 Rev Date: 1/26/05 STEP#  
*Critical           ELEMENT                     STANDARD                 NOTES         UNSAT 11     Load the selected DG to 6.0   DG1 loaded to 6.0 MW    Speed Control MW over a 20 minute period. over a 20 minute period  Handswitch (65-( .3 MW/min) by         uEG1) located on CUE: Us informs you to load    moving the Speed         CB-11 (Apron DG to 6 MW immediately.        Control Handswitch       Section) DG1 (65-1EG1) to RAISE       MW Meter (W-CUE: When switch is taken      direction and observing  1EG1) located on to RAISE and W-uEG2 is          the DG1 MW Meter         CB-11 (Vertical observed, give reading          (W-1EG1).                Section). As indication increasing MW or                              LOAD is for Lower, decreasing MW.                                increased the KILOVARS will decrease toward 0 (zero).
*Critical ELEMENT STANDARD NOTES SAT/
12     Acknowledge and respond to     Refer to ALM-01-1.8 1-ALB-01 window 1.8 SSWP      and/or ABN-501.
UNSAT 11 Load the selected DG to 6.0 MW over a 20 minute period.
1/2 OVRLOAD/TRIP
CUE: Us informs you to load DG to 6 MW immediately.
  *13     Determines that EDG 1-01       Places EDG 1-01 in should be in Pull Out .       Pull Out using CS-ALM -01 (1.8) and Initial       1EG1.
CUE: When switch is taken to RAISE and W-uEG2 is observed, give reading indication increasing MW or for Lower, decreasing MW.
Operator Action from ABN-501, Service Water Malfunction.
DG1 loaded to 6.0 MW over a 20 minute period
Note Completion TASK COMPLETE                                            time.
(.3 MW/min) by moving the Speed Control Handswitch (65-1EG1) to RAISE direction and observing the DG1 MW Meter (W-1EG1).
Page 6 of 7                          Rev Date: 1/26/05
Speed Control Handswitch (65-uEG1) located on CB-11 (Apron Section) DG1 MW Meter (W-1EG1) located on CB-11 (Vertical Section). As LOAD is increased the KILOVARS will decrease toward 0 (zero).
12 Acknowledge and respond to 1-ALB-01 window 1.8 SSWP 1/2 OVRLOAD/TRIP Refer to ALM-01-1.8 and/or ABN-501.  
*13 Determines that EDG 1-01 should be in Pull Out.
ALM -01 (1.8) and Initial Operator Action from ABN-501, Service Water Malfunction.
TASK COMPLETE Places EDG 1-01 in Pull Out using CS-1EG1.
Note Completion time.  


Initial License Exam                     03/2005                   Job Performance Measure JPM: S6 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: S6 Page 7 of 7 Rev Date: 1/26/05 INITIATING CUE:
OPT-214A, Diesel Generator Operability Test is being performed on DG 1 for a normal 30 day test.
OPT-214A, Diesel Generator Operability Test is being performed on DG 1 for a normal 30 day test.
You are on step 8.1.S, the DG is running at 60 Hz and 6.9 kV. The PEO at the DG has reported that the DG is running properly. Continue with the test.
You are on step 8.1.S, the DG is running at 60 Hz and 6.9 kV. The PEO at the DG has reported that the DG is running properly. Continue with the test.  
Page 7 of 7                      Rev Date: 1/26/05


Initial License Exam                       03/2005                     Job Performance Measure JPM: S7 System:       Nuclear Instrumentation System                         JTA Task #: NEW Task
Initial License Exam 03/2005 Job Performance Measure JPM: S7 Page 1 of 5 Rev Date: 1/26/05 System:
Nuclear Instrumentation System JTA Task #: NEW Task


==Title:==
==Title:==
Respond To Source Range Instrumentation Malfunction (Alternate Path)
Respond To Source Range Instrumentation Malfunction (Alternate Path)
KSA Ref: APE.032.AK3.01                         PEO:                 RO: 3.2             SRO:       3.6 Operators Name:
KSA Ref:
Performance Environment:               PLANT                 CONTROL ROOM                   SIMULATOR Performance Method:                   PERFORMED             SIMULATED                       DISCUSSED Time to complete JPM:       Estimated     8 minutes             Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
APE.032.AK3.01 PEO:
SATISFACTORY                                         UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                       Date:
3.2 SRO:
Comments (list all steps not satisfactorily completed):
3.6 Operators Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 8 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
IPO-002A, "Plant Startup from Hot Standby to Minimum Load", ABN-701, ALM-0064A Tools, Equipment, Job Aids, etc:
IPO-002A, "Plant Startup from Hot Standby to         IPO-002A, ABN-701, Simulator: Load IC 7, actuate Minimum Load", ABN-701, ALM-0064A                    malfunction RP01. Following initiating CUE, go to run. Actuate Malf N101A @ severity 1E6 when the candidate start to dilute or when referencing the SOP.
IPO-002A, ABN-701, Simulator: Load IC 7, actuate malfunction RP01. Following initiating CUE, go to run. Actuate Malf N101A @ severity 1E6 when the candidate start to dilute or when referencing the SOP.  
Page 1 of 5                            Rev Date: 1/26/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: S7 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: S7 Page 2 of 5 Rev Date: 1/26/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 1,545: Line 2,028:
Preparations are underway for RX startup. You are at step 5.2.1 of IPO-002. You have been directed to dilute 200 gallons to reach critical boron concentration.
Preparations are underway for RX startup. You are at step 5.2.1 of IPO-002. You have been directed to dilute 200 gallons to reach critical boron concentration.
Terminating Conditions:
Terminating Conditions:
The Reactor has been tripped by de energizing the Rod Drive MGs.
The Reactor has been tripped by de energizing the Rod Drive MGs.  
Page 2 of 5                        Rev Date: 1/26/05


Initial License Exam                   03/2005                   Job Performance Measure JPM: S7 STEP#                                                                                   SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S7 Page 3 of 5 Rev Date: 1/26/05 STEP#  
*Critical           ELEMENT                   STANDARD               NOTES           UNSAT 1       Prepare for Dilution.         Refers to SOP-104A       Note Start Time step 5.1.3.
*Critical ELEMENT STANDARD NOTES SAT/
2       Recognize First Out alarm is   Respond to SR FLUX LIT Red and the need for a     HI RX TRIP Alarm 6C Reactor Trip.                 (1.5)
UNSAT 1
Prepare for Dilution.
Refers to SOP-104A step 5.1.3.
Note Start Time 2
Recognize First Out alarm is LIT Red and the need for a Reactor Trip.
CUE: SR FLUX HI RX TRIP Alarm 6C (1.5) is in Alarm and lit RED.
CUE: SR FLUX HI RX TRIP Alarm 6C (1.5) is in Alarm and lit RED.
3       Manually trips Reactor.       On CB07 turns 1/1-RTC Rx Trip Bkr in the counter clockwise direction CUE: 1/1-RTC rotated but the Trip Breakers did not open.
Respond to SR FLUX HI RX TRIP Alarm 6C (1.5) 3 Manually trips Reactor.
4      Manually trips Reactor.        On CB010 turns 1/1-RT Rx Trip in the counter       clockwise direction CUE: 1/1-RTC rotated but the Trip Breakers did not open.
CUE: 1/1-RTC rotated but the Trip Breakers did not open.
  *5     Momentarily deenergizes the   Rotates CS-1B3-1 Rod Drive MG sets by opening   counterclockwise to 480 VAC MCC supply             open and then breakers 1B3 and 1B4.         clockwise back to close.
On CB07 turns 1/1-RTC Rx Trip Bkr in the counter clockwise direction 4
Rotates CS-1B4-1 counterclockwise to open and then CUE: All DRPI rod bottom      clockwise back to lights are LIT.                close.
Manually trips Reactor.
TASK COMPLETE                  Note Completion Time Page 3 of 5                        Rev Date: 1/26/05
CUE: 1/1-RTC rotated but the Trip Breakers did not open.
On CB010 turns 1/1-RT Rx Trip in the counter clockwise direction  
*5 Momentarily deenergizes the Rod Drive MG sets by opening 480 VAC MCC supply breakers 1B3 and 1B4.
CUE: All DRPI rod bottom lights are LIT.
TASK COMPLETE Rotates CS-1B3-1 counterclockwise to open and then clockwise back to close.
Rotates CS-1B4-1 counterclockwise to open and then clockwise back to close.
Note Completion Time  


Initial License Exam                       03/2005                 Job Performance Measure JPM: S7 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: S7 Page 4 of 5 Rev Date: 1/26/05 INITIATING CUE:
Preparations are underway for RX startup. You are at step 5.2.1 of IPO-002. You have been directed to dilute 200 gallons to reach critical boron concentration.
Preparations are underway for RX startup. You are at step 5.2.1 of IPO-002. You have been directed to dilute 200 gallons to reach critical boron concentration.  
Page 4 of 5                      Rev Date: 1/26/05


Initial License Exam                       03/2005                     Job Performance Measure JPM: S-8 System:       Component Cooling Water System                         JTA Task #: (Bank NRC 2002)
Initial License Exam 03/2005 Job Performance Measure JPM: S-8 Page 1 of 5 Rev Date: 1/19/05 System:
Component Cooling Water System JTA Task #: (Bank NRC 2002)
Task
Task


==Title:==
==Title:==
Shift CCW Pumps with CCW Pump Trip (ALTERNATE PATH)
Shift CCW Pumps with CCW Pump Trip (ALTERNATE PATH)
KSA Ref: APE.026.AK3.04                         PEO:                 RO: 3.5               SRO: 3.7 Operators Name:
KSA Ref:
Performance Environment:               PLANT                   CONTROL ROOM                 SIMULATOR Performance Method:                   PERFORMED               SIMULATED                     DISCUSSED Time to complete JPM:       Estimated     9 minutes               Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
APE.026.AK3.04 PEO:
SATISFACTORY                                       UNSATISFACTORY Reason, if unsatisfactory:
RO:
Evaluators Signature:                                         Date:
3.5 SRO:
Comments (list all steps not satisfactorily completed):
3.7 Operators Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 9 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature:
Date:
Comments (list all steps not satisfactorily completed):  


==References:==
==References:==
Tools, Equipment, Job Aids, etc:
SOP-502A, CCW System ABN-502, Component Cooling Water System Malfunction Tools, Equipment, Job Aids, etc:
SOP-502A, CCW System                               Simulator:
Simulator:
ABN-502, Component Cooling Water System
: 1) Any IC above Mode 4.
: 1) Any IC above Mode 4.
Malfunction
: 2) Insert and activate MALF-CC03B
: 2) Insert and activate MALF-CC03B
: 3) Insert MALF-CC02B on a key. When CCW pump 1-01 is stopped, activate malfunction.
: 3) Insert MALF-CC02B on a key. When CCW pump 1-01 is stopped, activate malfunction.  
Page 1 of 5                            Rev Date: 1/19/05


Initial License Exam                         03/2005                   Job Performance Measure JPM: S-8 Safety Considerations:
Initial License Exam 03/2005 Job Performance Measure JPM: S-8 Page 2 of 5 Rev Date: 1/19/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
Human Performance Measures:
Line 1,601: Line 2,098:
The Unit Supervisor directs you to shift CCW pumps (start CCWP1-02, and secure CCWP1-01 per SOP-502) in preparation for maintenance.
The Unit Supervisor directs you to shift CCW pumps (start CCWP1-02, and secure CCWP1-01 per SOP-502) in preparation for maintenance.
Terminating Conditions:
Terminating Conditions:
CCWP1 Running again (after CCWP2 trips off)
CCWP1 Running again (after CCWP2 trips off)  
Page 2 of 5                        Rev Date: 1/19/05


Initial License Exam                   03/2005                   Job Performance Measure JPM: S-8 STEP#                                                                                   SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S-8 Page 3 of 5 Rev Date: 1/19/05 STEP#  
*Critical           ELEMENT                   STANDARD               NOTES           UNSAT Ensure SSWP2 is running 1                                    Operator visually       Note Start time.
*Critical ELEMENT STANDARD NOTES SAT/
verifies SSWP2 is CUE: SSWP2 indication is      running by verifying     Give applicant a RED.                          handswitch indication    copy of SOP-is RED.                  502A Ensure oil level in bearing 2                                    Operator directs PEO housings for CCWP2 are to verify oil level for normal.
UNSAT 1
CCWP2.
Ensure SSWP2 is running CUE: SSWP2 indication is RED.
Operator visually verifies SSWP2 is running by verifying handswitch indication is RED.
Note Start time.
Give applicant a copy of SOP-502A 2
Ensure oil level in bearing housings for CCWP2 are normal.
CUE: bearing housing oil levels are normal.
CUE: bearing housing oil levels are normal.
Start CCWP2
Operator directs PEO to verify oil level for CCWP2.
  *3                                   Take handswitch u-HS-4519A to the start CUE: u-HS-4519A handswitch    position and verify red light indication is RED.      light indication on the handswitch.
*3 Start CCWP2 CUE: u-HS-4519A handswitch light indication is RED.
Ensure the following 4                                    Same as Element.        RHR and CS equipment are removed from pumps that are service before securing loads supplied CCWP1:
Take handswitch u-HS-4519A to the start position and verify red light indication on the handswitch.
from the CCWP1 RHR Pumps 1-01, should be secured CS Pumps 1-01/03/
4 Ensure the following equipment are removed from service before securing CCWP1:
before securing the CCWP1.
RHR Pumps 1-01, CS Pumps 1-01/03/
CUE: Listed Pumps are removed from service.
CUE: Listed Pumps are removed from service.
Page 3 of 5                          Rev Date: 1/19/05
Same as Element.
RHR and CS pumps that are loads supplied from the CCWP1 should be secured before securing the CCWP1.


Initial License Exam                       03/2005                   Job Performance Measure JPM: S-8 STEP#                                                                                         SAT/
Initial License Exam 03/2005 Job Performance Measure JPM: S-8 Page 4 of 5 Rev Date: 1/19/05 STEP#  
*Critical             ELEMENT                       STANDARD                 NOTES           UNSAT Stop CCWP1                                                 WARNING:
*Critical ELEMENT STANDARD NOTES SAT/
5                                        Operator holds the u-Operator MAY HS-4518A handswitch CUE: u-HS-4518A handswitch                                 attempt to trip RX in STOP until flow and light indication is green.                                 (per section 6.0 of pressure stabilize and (CCWP2 trips): u-HS-4519A                                   ABN-502A Loss then releases green light and white trip light                           of all CCW handswitch.
UNSAT 5
lit.                                                        Flow) when CCWP2 trips; Annunciator Alarms: CCWP BUT, operator 1/2 OVRLOAD/TRIP, CCW SHOULD go to TRN A/B SFGD LOOP section 2.0 PRESS LO, CCW HX 1/2 ofABN-502A OUT & RECIRC FLO LO, CCW Pump CCW HX 1/2 SPLY FLO LO Trip and attempt to start CCWP1; DO NOT allow operator to trip RX (it would interfere with JPMS3 running concurrently).
Stop CCWP1 CUE: u-HS-4518A handswitch light indication is green.
Verify unaffected train CCW 6                                        Operator recognizes      If operator Pump - RUNNING.
(CCWP2 trips): u-HS-4519A green light and white trip light lit.
that CCWP 1 is not      attempts to trip NOTE: CCWP1 fails to auto running by noting u-    the RX, DO start, and must be manually HS-4518A handswitch     NOT allow RX restarted.
Annunciator Alarms: CCWP 1/2 OVRLOAD/TRIP, CCW TRN A/B SFGD LOOP PRESS LO, CCW HX 1/2 OUT & RECIRC FLO LO, CCW HX 1/2 SPLY FLO LO Operator holds the u-HS-4518A handswitch in STOP until flow and pressure stabilize and then releases handswitch.
indication is GREEN      trip, and CUE: u-HS-4518A handswitch         on CB-3                 terminate the light indication is green.                                  JPM.
WARNING:
Manually Start u-HS-4518A
Operator MAY attempt to trip RX (per section 6.0 of ABN-502A Loss of all CCW Flow) when CCWP2 trips; BUT, operator SHOULD go to section 2.0 ofABN-502A CCW Pump Trip and attempt to start CCWP1; DO NOT allow operator to trip RX (it would interfere with JPMS3 running concurrently).
  *7                                        Take handswitch u-HS-   Give applicant a CCWP 1 4518A to the start       copy of ABN-502 CUE: u-HS-4518A RED light          position and verify red  if he/she wishes lit and flow restored.            light indication on the  to refer to it.
6 Verify unaffected train CCW Pump - RUNNING.
handswitch and flow restored.
NOTE: CCWP1 fails to auto start, and must be manually restarted.
TASK COMPLETE                                              Note Completion time.
CUE: u-HS-4518A handswitch light indication is green.
Page 4 of 5                          Rev Date: 1/19/05
Operator recognizes that CCWP 1 is not running by noting u-HS-4518A handswitch indication is GREEN on CB-3 If operator attempts to trip the RX, DO NOT allow RX trip, and terminate the JPM.  
*7 Manually Start u-HS-4518A CCWP 1 CUE: u-HS-4518A RED light lit and flow restored.
TASK COMPLETE Take handswitch u-HS-4518A to the start position and verify red light indication on the handswitch and flow restored.
Give applicant a copy of ABN-502 if he/she wishes to refer to it.
Note Completion time.  


Initial License Exam                     03/2005               Job Performance Measure JPM: S-8 INITIATING CUE:
Initial License Exam 03/2005 Job Performance Measure JPM: S-8 Page 5 of 5 Rev Date: 1/19/05 INITIATING CUE:
The Unit Supervisor directs you to shift CCW pumps (start CCWP1-02, and secure CCWP1-01 per SOP-502) in preparation for maintenance.
The Unit Supervisor directs you to shift CCW pumps (start CCWP1-02, and secure CCWP1-01 per SOP-502) in preparation for maintenance.  
Page 5 of 5                      Rev Date: 1/19/05


Revision 0 Appendix D                                 Scenario Outline                           Form ES-D-1 Facility:             CPSES         Scenario No.:         1       Op-Test No.:           1 Examiners:                                             Operators:
Revision 0 Appendix D Scenario Outline Form ES-D-1 Facility:
Note:     (NEW) Do SRO Admin A.4.1, Emerg. Class. with this Scenario (SAE).
CPSES Scenario No.:
Initial Conditions:     BOL, 100% power Eq. Xenon. Unit 2 is at 100% power. The A MDAFWP is OOS for oil contamination. ( 6 hours into LCO)
1 Op-Test No.:
1 Examiners:
Operators:
Note:
(NEW) Do SRO Admin A.4.1, Emerg. Class. with this Scenario (SAE).
Initial Conditions:
BOL, 100% power Eq. Xenon. Unit 2 is at 100% power. The A MDAFWP is OOS for oil contamination. ( 6 hours into LCO)
IC-15, REMF FWR20 in Rackout with H/S in P.O and Red Tagged.
IC-15, REMF FWR20 in Rackout with H/S in P.O and Red Tagged.
Turnover: Unit 1 and Unit 2 are at 100% power. U1 has been at 100% for the last 15 days following refueling. The A MDAFWP is OOS due to contamination in the oil.
Turnover:
Unit 1 and Unit 2 are at 100% power. U1 has been at 100% for the last 15 days following refueling. The A MDAFWP is OOS due to contamination in the oil.
Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. There are no surveillances planned for this shift and the orders are to maintain current load and unit availability.
Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. There are no surveillances planned for this shift and the orders are to maintain current load and unit availability.
Event Malf. No.           Event                               Event No.                    Type*                             Description 1         MS13D         I (RO)     SG Pressure channel for ARV #4 fails high. (ARV fails full T=1                      I (BOP) open)
Event No.
I (SRO) 2          RX15A        C (RO)      PZR Spray valve fails open. (Set up trigger to remove Malf T=7        @ 100% C (SRO) when the Manual PB is selected) 3         ED05F         M (ALL) Loss of 1EA2 (86-2)
Malf. No.
T=13 4          FW09A         C (BOP) TDAFWP Overspeed. (will not come in until pump starts)
Event Type*
T=13                    C (SRO) 5                        N (BOP) Perform Plant Shutdown due to loss of 2 AFWPs. (Directed T=28                    R (RO)      by SM)
Event Description 1
N (SRO) 6         FW25C M (ALL) Feedline Break ORC T=43       @ 4e6 7          ED05I         C (ALL) Loss of 1EA2 (86-1)
T=1 MS13D I (RO)
T=43 8          SI04A         C (BOP) SI pump fails to start on Safety Injection. (Must be manually T=43                    C (SRO) started. Set up trigger file to remove Malf when HS is turned.)
I (BOP)
  * (N)ormal,     (R)eactivity,   (I)nstrument, (C)omponent,     (M)ajor
I (SRO)
SG Pressure channel for ARV #4 fails high. (ARV fails full open) 2 T=7 RX15A
@ 100%
C (RO)
C (SRO)
PZR Spray valve fails open. (Set up trigger to remove Malf when the Manual PB is selected) 3 T=13 ED05F M (ALL)
Loss of 1EA2 (86-2) 4 T=13 FW09A C (BOP)
C (SRO)
TDAFWP Overspeed. (will not come in until pump starts) 5 T=28 N (BOP)
R (RO)
N (SRO)
Perform Plant Shutdown due to loss of 2 AFWPs. (Directed by SM) 6 T=43 FW25C  
@ 4e6 M (ALL)
Feedline Break ORC 7
T=43 ED05I C (ALL)
Loss of 1EA2 (86-1) 8 T=43 SI04A C (BOP)
C (SRO)
SI pump fails to start on Safety Injection. (Must be manually started. Set up trigger file to remove Malf when HS is turned.)  
  * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor  


Revision 0 Appendix D                                     Narrative Description Op-Test No:       1           Scenario No: 1     Event No:                       Page   2   of   16 The objective of this scenario is to evaluate the operators ability to change Reactor power in a controlled manner when required by plant conditions, respond to various instrument and component failures, and to carry out the requisite emergency procedures to mitigate the consequences of a Loss of Heat Sink event.
Revision 0 Appendix D Narrative Description Op-Test No:
1 Scenario No:
1 Event No:
Page 2
of 16 The objective of this scenario is to evaluate the operators ability to change Reactor power in a controlled manner when required by plant conditions, respond to various instrument and component failures, and to carry out the requisite emergency procedures to mitigate the consequences of a Loss of Heat Sink event.
Event One.
Event One.
A failure high of the Main Steam Line Pressure channel that feeds the #4 SG ARV occurs. This failure will cause the ARV to open. Operator feedback for this event is an unexpected increase in Reactor Power that can exceed licensed limits and a decrease in RCS temperature with constant Turbine Load.
A failure high of the Main Steam Line Pressure channel that feeds the #4 SG ARV occurs. This failure will cause the ARV to open. Operator feedback for this event is an unexpected increase in Reactor Power that can exceed licensed limits and a decrease in RCS temperature with constant Turbine Load.
It is expected that the operators will:
It is expected that the operators will:
* Recognize that Reactor Power is increasing
Recognize that Reactor Power is increasing Take steps to reduce Reactor Power in accordance with Management Expectations and Pre Shift Briefings Diagnose plant conditions and determine that the ARV should NOT be open Enter the correct ABN procedure Place the controller in manual and close the valve Make the necessary notifications and refer to Technical Specifications.
* Take steps to reduce Reactor Power in accordance with Management Expectations and Pre Shift Briefings
* Diagnose plant conditions and determine that the ARV should NOT be open
* Enter the correct ABN procedure
* Place the controller in manual and close the valve
* Make the necessary notifications and refer to Technical Specifications.
Event Two.
Event Two.
One of the two Pressurizer Spray valves fails fully open. This is a failure of the valve in automatic and manual control remains available. Feedback to the operators is evidenced by a decrease in Reactor Coolant system pressure that is not explained by plant conditions and can lead to a Reactor Protection System actuation. It is expected that the operators will:
One of the two Pressurizer Spray valves fails fully open. This is a failure of the valve in automatic and manual control remains available. Feedback to the operators is evidenced by a decrease in Reactor Coolant system pressure that is not explained by plant conditions and can lead to a Reactor Protection System actuation. It is expected that the operators will:
* Recognize that RCS pressure is decreasing
Recognize that RCS pressure is decreasing Diagnose plant conditions and determine that RCS pressure should NOT be decreasing.
* Diagnose plant conditions and determine that RCS pressure should NOT be decreasing.
Determine that the cause of the decrease is the Spray valve failure.
* Determine that the cause of the decrease is the Spray valve failure.
Take manual control of the spray valve and close it Enter the correct ABN procedure Make the necessary notifications and refer to Technical Specifications Event Three and Four.
* Take manual control of the spray valve and close it
* Enter the correct ABN procedure
* Make the necessary notifications and refer to Technical Specifications Event Three and Four.
Safeguards bus 1EA2 deenergizes due to an 86-2 lockout relay. An 86-2 lockout is caused by a phase to ground fault on the bus. The bus normal supply breaker will open, the EDG will start, and the bus will be re-energized from the EDG. The bus will remain powered by the EDG for the remainder of the scenario. Operator feedback is provided by alarm annunciation and equipment started by the Blackout Sequencer. It is expected that the operators will:
Safeguards bus 1EA2 deenergizes due to an 86-2 lockout relay. An 86-2 lockout is caused by a phase to ground fault on the bus. The bus normal supply breaker will open, the EDG will start, and the bus will be re-energized from the EDG. The bus will remain powered by the EDG for the remainder of the scenario. Operator feedback is provided by alarm annunciation and equipment started by the Blackout Sequencer. It is expected that the operators will:
* Respond to Alarms and determine the loss of bus 1EA2.
Respond to Alarms and determine the loss of bus 1EA2.
* Determine that the BOS has actuated.
Determine that the BOS has actuated.
* Evaluate plant conditions and determine if the start of the TDAFWP has caused Reactor Power to increase above license limits and meet management expectations to reduce power
Evaluate plant conditions and determine if the start of the TDAFWP has caused Reactor Power to increase above license limits and meet management expectations to reduce power Enter the correct ABN procedure Stop unnecessary equipment started by the BOS Make the necessary notifications and refer to Technical Specifications Determine that the TDAFWP oversped on the BOS start signal It is expected that the SRO will recognize the loss of 2 AFW pumps and determine the need to shutdown the plant per the Limiting Conditions for Operations.  
* Enter the correct ABN procedure
* Stop unnecessary equipment started by the BOS
* Make the necessary notifications and refer to Technical Specifications
* Determine that the TDAFWP oversped on the BOS start signal
* It is expected that the SRO will recognize the loss of 2 AFW pumps and determine the need to shutdown the plant per the Limiting Conditions for Operations.


Revision 0 Appendix D                                       Narrative Description Op-Test No:         1           Scenario No:   1       Event No:                   Page   3   of   16 Event Five.
Revision 0 Appendix D Narrative Description Op-Test No:
1 Scenario No:
1 Event No:
Page 3
of 16 Event Five.
Inoperable equipment requires a forced down power maneuver to meet license requirements. In order to preclude unnecessary delay while the SRO communicates with plant management about plant conditions and make recommendations, the lead evaluator may direct the staff to act as SM and instruct the SRO to commence an immediate plant shutdown. Operator feedback for the need to shutdown the plant will be Technical Specification LCOs or plant management direction. It is expected that the crew will:
Inoperable equipment requires a forced down power maneuver to meet license requirements. In order to preclude unnecessary delay while the SRO communicates with plant management about plant conditions and make recommendations, the lead evaluator may direct the staff to act as SM and instruct the SRO to commence an immediate plant shutdown. Operator feedback for the need to shutdown the plant will be Technical Specification LCOs or plant management direction. It is expected that the crew will:
* Refer to the appropriate plant procedure
Refer to the appropriate plant procedure Complete a reactivity brief.
* Complete a reactivity brief.
Commence boration and reduce power using the Turbine Digital Control System Event Six, and Seven and Eight.
* Commence boration and reduce power using the Turbine Digital Control System Event Six, and Seven and Eight.
When power has been reduced enough to meet the requirements of NUREG 1021 and at the lead examiners discretion, a Main Feed System leak will occur outside the Reactor Containment Building.
When power has been reduced enough to meet the requirements of NUREG 1021 and at the lead examiners discretion, a Main Feed System leak will occur outside the Reactor Containment Building.
Operator feedback for this event is decreasing steam generator levels and increasing Main Feed Pump Speed. Annunciation will occur at the designed parameters. Concurrent with the Main Feedline Break, bus IEA2, (earlier energized by the EDG) will fault in such a manner that it cannot be re-energized.
Operator feedback for this event is decreasing steam generator levels and increasing Main Feed Pump Speed. Annunciation will occur at the designed parameters. Concurrent with the Main Feedline Break, bus IEA2, (earlier energized by the EDG) will fault in such a manner that it cannot be re-energized.
Note:
Note:
* Noteworthy is that at this point there are NO AFW pumps available, the Main Feed and Condensate systems are unavailable due to the feed break, and that heat removal by the secondary system is not possible.
Noteworthy is that at this point there are NO AFW pumps available, the Main Feed and Condensate systems are unavailable due to the feed break, and that heat removal by the secondary system is not possible.
* It is inevitable that the crew will have to initiate feed and bleed of the RCS to remove decay heat.
It is inevitable that the crew will have to initiate feed and bleed of the RCS to remove decay heat.
When FRH-0.1A is entered, step 2 asks if BOTH CCPs are available. Due to the loss of 1EA2, the CCP 1-02 is unavailable. The crew should trip the RCPs and immediately go to step 11 and initiate feed and bleed. The crew will note at step 12 of FRH-0.1A that no SIPs are operating and take action to start at least one SIP.
When FRH-0.1A is entered, step 2 asks if BOTH CCPs are available. Due to the loss of 1EA2, the CCP 1-02 is unavailable. The crew should trip the RCPs and immediately go to step 11 and initiate feed and bleed. The crew will note at step 12 of FRH-0.1A that no SIPs are operating and take action to start at least one SIP.
It is expected that the crew will:
It is expected that the crew will:
* Recognize the need to trip the Reactor and initiate Safety Injection or respond to the automatic actuations.
Recognize the need to trip the Reactor and initiate Safety Injection or respond to the automatic actuations.
* Enter the correct EOP and carry out the Immediate Actions
Enter the correct EOP and carry out the Immediate Actions Verify automatic actions have occurred, or take actions to compensate for the lack of automatic actions Initiate monitoring of the Critical Safety Function Status Trees Transition to the correct FRG when conditions are met.
* Verify automatic actions have occurred, or take actions to compensate for the lack of automatic actions
Initiate Feed and Bleed to remove decay heat from the core.
* Initiate monitoring of the Critical Safety Function Status Trees
Start SIP per step 12 of the FRG.  
* Transition to the correct FRG when conditions are met.
* Initiate Feed and Bleed to remove decay heat from the core.
* Start SIP per step 12 of the FRG.


Revision 0 Appendix D                                   Narrative Description Op-Test No:       1         Scenario No: 1     Event No:                   Page   4   of   16 Note: In the CPSES Probabilistic Risk Analysis, important operator actions are evaluated in Table 9 of the PRA Summary Document. Operator action to establish feed and bleed is the most important action listed with a normalized value of 100.
Revision 0 Appendix D Narrative Description Op-Test No:
1 Scenario No:
1 Event No:
Page 4
of 16 Note: In the CPSES Probabilistic Risk Analysis, important operator actions are evaluated in Table 9 of the PRA Summary Document. Operator action to establish feed and bleed is the most important action listed with a normalized value of 100.
The scenario may be terminated when safety injection is providing cooling to the core and the Pressurizer PORVs are open to remove decay heat.
The scenario may be terminated when safety injection is providing cooling to the core and the Pressurizer PORVs are open to remove decay heat.
Recommended Critical Tasks:
Recommended Critical Tasks:
* Fails to control Pressurizer Pressure resulting in a Reactor Trip or Safety Injection.
Fails to control Pressurizer Pressure resulting in a Reactor Trip or Safety Injection.
* Fails to start a Safety Injection Pump prior to the initiation of Feed and Bleed.
Fails to start a Safety Injection Pump prior to the initiation of Feed and Bleed.
* Fails to establish core cooling through initiation of Feed and Bleed when plant conditions are met.
Fails to establish core cooling through initiation of Feed and Bleed when plant conditions are met.  


Revision 0 Appendix D Op-Test No:       1       Scenario No:     1   Event No:   1               Page   5     of 16 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
1 Event No:
1 Page 5
of 16 Event


== Description:==
== Description:==
SG Pressure channel for ARV #4 fails high. (ARV fails full open)
SG Pressure channel for ARV #4 fails high. (ARV fails full open)
Time   RO   BOP   SRO                           Applicant's Actions or Behavior Recognizes that plant conditions are not normal by observation of
Time RO BOP SRO Applicant's Actions or Behavior Recognizes that plant conditions are not normal by observation of Nuclear power increasing RCS temperature decreasing ALB-6D, window 1.10 AVE TAVE-TREF DEV Lit Turbine Load is constant.
* Nuclear power increasing
* RCS temperature decreasing
* ALB-6D, window 1.10 AVE TAVE-TREF DEV Lit
* Turbine Load is constant.
Diagnose plant conditions and determines that SG #4 ARV is open by its RED light, LIT and green light OFF.
Diagnose plant conditions and determines that SG #4 ARV is open by its RED light, LIT and green light OFF.
Determine that the ARV should be closed. MSL pressure is normal, and one channel indicates failure HIGH. (1-PI-2328, MSL 4 PRESS)
Determine that the ARV should be closed. MSL pressure is normal, and one channel indicates failure HIGH. (1-PI-2328, MSL 4 PRESS)
Line 1,723: Line 2,247:
: c. GO TO Step 11.
: c. GO TO Step 11.
Step 11. Refer to Technical Specifications per Attachment 6.
Step 11. Refer to Technical Specifications per Attachment 6.
Attachment 6 indicates TS are NA.
Attachment 6 indicates TS are NA.  
                                                                  *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1       Scenario No:   1     Event No:   2               Page 6     of 16 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
1 Event No:
2 Page 6
of 16 Event


== Description:==
== Description:==
PZR Spray valve fails open.
PZR Spray valve fails open.
Time   RO   BOP   SRO                         Applicant's Actions or Behavior 3.1 Symptoms
Time RO BOP SRO Applicant's Actions or Behavior 3.1 Symptoms
: a. Annunciator Alarms
: a. Annunciator Alarms PRZR 1 OF 4 PRESS LO (5B-3.4)
* PRZR 1 OF 4 PRESS LO (5B-3.4)
PRZR 1 OF 4 SI PRESS LO (5B-4.4)
* PRZR 1 OF 4 SI PRESS LO (5B-4.4)
PRZR LO PRESS PORV 456 BLK (5B-1.6)
* PRZR LO PRESS PORV 456 BLK (5B-1.6)
PRZR LO PRESS PORV 455A BLK (5B-2.6
* PRZR LO PRESS PORV 455A BLK (5B-2.6
: b. Plant Indication Spray valve indicated open when not called for by master controller.
: b. Plant Indication
* Spray valve indicated open when not called for by master controller.
3.2 Automatic Actions
3.2 Automatic Actions
: a. Control response for failed open spray valve(s)
: a. Control response for failed open spray valve(s)
: 1) Control and backup heaters come on.
: 1) Control and backup heaters come on.
* 1/u-PCPR, PRZR CTRL HTR GROUP C
1/u-PCPR, PRZR CTRL HTR GROUP C 1/u-PCPR1, PRZR BACKUP HTR GROUP A 1/u-PCPR2, PRZR BACKUP HTR GROUP B 1/u-PCPR3, PRZR BACKUP HTR GROUP D
* 1/u-PCPR1, PRZR BACKUP HTR GROUP A
* 1/u-PCPR2, PRZR BACKUP HTR GROUP B
* 1/u-PCPR3, PRZR BACKUP HTR GROUP D
: 2) Reactor trip at 1880 psig.
: 2) Reactor trip at 1880 psig.
: 3) Safety Injection at 1820 psig.
: 3) Safety Injection at 1820 psig.
Enter section ABN-705, section 3, Pressurizer Spray Valve Failure Step 1. CLOSE Pressurizer Spray Valve(s)
Enter section ABN-705, section 3, Pressurizer Spray Valve Failure Step 1. CLOSE Pressurizer Spray Valve(s) u-PK-455B, RC LOOP 1 PRZR SPR VLV CTRL u-PK-455C, RC LOOP 4 PRZR SPR VLV CTRL Step 2. Check RCS pressure stable or increasing.
* u-PK-455B, RC LOOP 1 PRZR SPR VLV CTRL
* u-PK-455C, RC LOOP 4 PRZR SPR VLV CTRL Step 2. Check RCS pressure stable or increasing.
Sep 3. Verify RCS pressure returning to 2235 psig.
Sep 3. Verify RCS pressure returning to 2235 psig.
Step 4. Refer to the following Technical Specifications:
Step 4. Refer to the following Technical Specifications:
* 3.3.1, Reactor Trip System (RTS) Instrumentation
3.3.1, Reactor Trip System (RTS) Instrumentation 3.3.2, Engineered Safety Features Actuation System (ESFAS)
* 3.3.2, Engineered Safety Features Actuation System (ESFAS)
Instrumentation 3.3.3, Post Accident Monitoring (PAM) Instrumentation 3.3.4, Remote Shutdown Instrumentation 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB)
Instrumentation
Limits 3.4.14, RCS Pressure Isolation Valves (PIV) Leakage 13.4.14, Reactor Coolant System Pressure Isolation Valves  
* 3.3.3, Post Accident Monitoring (PAM) Instrumentation 3.3.4, Remote Shutdown Instrumentation
*BOLD INDICATES CRITICAL STEP
* 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB)
* Limits
* 3.4.14, RCS Pressure Isolation Valves (PIV) Leakage
* 13.4.14, Reactor Coolant System Pressure Isolation Valves
                                                                  *BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1       Scenario No:     1     Event No:   3               Page   7   of   16 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
1 Event No:
3 Page 7
of 16 Event


== Description:==
== Description:==
86-2 LOR on Bus 1EA2 (Bus will be powered by the EDG)
86-2 LOR on Bus 1EA2 (Bus will be powered by the EDG)
Time   RO   BOP   SRO                             Applicant's Actions or Behavior 2.1 Symptoms
Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms
: a. Annunciator Alarms:
: a. Annunciator Alarms:
* 6.9 KV BUS uEA1 LOR TRIP (10B-1.5)
6.9 KV BUS uEA1 LOR TRIP (10B-1.5) 6.9 KV ANY BUS LOR LOSS OF CONTINUITY (10B-1.7) 6.9 KV ANY 1E XFMR BKR OPEN (10B-1.11) 6.9 KV BUS uEA2 LOR TRIP (10B-2.5) 6.9 KV BUS uEA1/uEA2 VOLTLOSS (10B-2.6) 6.9 KV BUS uEA1/uEA2 NOT PWRD FROM PREF OFFSITE PWR (10B-3.6) 6.9 KV/480V ANY 1E SECOND LVL UNDRVOLT (10B-4.5)
* 6.9 KV ANY BUS LOR LOSS OF CONTINUITY (10B-1.7)
: b. Plant Indications 345 KV supply outside of 340-361 KV 138 KV supply outside of 135-144 KV 6.9 KV or 480 V buses outside normal voltage limits 6.9 KV Voltage Limits = 6480 V to 7150 V 480 V Voltage Limits = 455 V to 508 V Slow transfer of a 6.9 KV safeguard bus Diesel generator supplying power to the bus Loss of transformer XST1, XST2, or XST1/2 6.9 KV bus uEA1 or uEA2 de-energized Lockout relay (LOR) trip of any 6.9 KV safeguard bus A 6.9 KV bus de-energized with no apparent causes.
* 6.9 KV ANY 1E XFMR BKR OPEN (10B-1.11)
2.2 Automatic Actions Second level undervoltage at 6192 V (6.9 KV bus) or 442.4 V (480 V bus) will trip 6.9 KV safeguard bus preferred and alternate feeds. lists specific undervoltage response.
* 6.9 KV BUS uEA2 LOR TRIP (10B-2.5)
Diesel generators auto-start and energize affected safeguard bus, loading via blackout sequencer. Attachment 2 lists specific sequence.
* 6.9 KV BUS uEA1/uEA2 VOLTLOSS (10B-2.6)
Transformer XST2 or XST1/2 faults isolate 1EA1 and 1EA2 preferred source, causing slow transfer.
* 6.9 KV BUS uEA1/uEA2 NOT PWRD FROM PREF OFFSITE PWR (10B-3.6)
Transformer 1ST fault momentarily de-energizes XST2, causing a slow transfer.
* 6.9 KV/480V ANY 1E SECOND LVL UNDRVOLT (10B-4.5)
Transformer XST1 fault isolates 2EA1 and 2EA2 preferred source, causing slow transfer.
: b. Plant Indications
Both affected 6.9 KV safeguard bus offsite feeder breakers open.
* 345 KV supply outside of 340-361 KV
Associated diesel generator starts Equipment powered from affected bus de-energizes.  
* 138 KV supply outside of 135-144 KV
*BOLD INDICATES CRITICAL STEP
* 6.9 KV or 480 V buses outside normal voltage limits 6.9 KV Voltage Limits = 6480 V to 7150 V 480 V Voltage Limits = 455 V to 508 V
* Slow transfer of a 6.9 KV safeguard bus
* Diesel generator supplying power to the bus
* Loss of transformer XST1, XST2, or XST1/2
* 6.9 KV bus uEA1 or uEA2 de-energized
* Lockout relay (LOR) trip of any 6.9 KV safeguard bus
* A 6.9 KV bus de-energized with no apparent causes.
2.2 Automatic Actions
* Second level undervoltage at 6192 V (6.9 KV bus) or 442.4 V (480 V bus) will trip 6.9 KV safeguard bus preferred and alternate feeds.
Attachment 3 lists specific undervoltage response.
* Diesel generators auto-start and energize affected safeguard bus, loading via blackout sequencer. Attachment 2 lists specific sequence.
* Transformer XST2 or XST1/2 faults isolate 1EA1 and 1EA2 preferred source, causing slow transfer.
* Transformer 1ST fault momentarily de-energizes XST2, causing a slow transfer.
* Transformer XST1 fault isolates 2EA1 and 2EA2 preferred source, causing slow transfer.
* Both affected 6.9 KV safeguard bus offsite feeder breakers open.
* Associated diesel generator starts
* Equipment powered from affected bus de-energizes.
                                                                    *BOLD INDICATES CRITICAL STEP


Revision 2 Appendix D Op-Test No:       1       Scenario No:     1     Event No:   3               Page   8   of   16 Event
Revision 2 Appendix D Op-Test No:
1 Scenario No:
1 Event No:
3 Page 8
of 16 Event


== Description:==
== Description:==
LOR on 1EA2 (Bus will be de-energized resulting in loss of all AFW)
LOR on 1EA2 (Bus will be de-energized resulting in loss of all AFW)
Time   RO   BOP   SRO                           Applicant's Actions or Behavior CAUTION:
Time RO BOP SRO Applicant's Actions or Behavior CAUTION:
* Only ONE attempt to close a tripped breaker should be allowed; provided NO obvious
Only ONE attempt to close a tripped breaker should be allowed; provided NO obvious equipment damage or fault is indicated. Further attempts should NOT be made until checked by Electrical Maintenance.
* equipment damage or fault is indicated. Further attempts should NOT be made until checked by Electrical Maintenance.
When a 6.9 KV safeguard bus fault prevents running a SSWP, DG run time should be limited to approximately 15 minutes unloaded, 1 minute loaded to prevent damage due to loss of cooling.
* When a 6.9 KV safeguard bus fault prevents running a SSWP, DG run time should be limited to approximately 15 minutes unloaded, 1 minute loaded to prevent damage due to loss of cooling.
Following overcurrent or instantaneous overcurrent relay operations, the CTs should be checked by Meter & Relay for proper operation.
* Following overcurrent or instantaneous overcurrent relay operations, the CTs should be checked by Meter & Relay for proper operation.
(ONE 97-806)
(ONE 97-806)
* After approximately 120 seconds BOS Operator Lockout (OL) signal automatically resets, as indicated by associated BOS OL light OFF and RMUW pump restart when BOS has timed out. Should an OL not automatically reset, resetting the sequencer may correct the condition.
After approximately 120 seconds BOS Operator Lockout (OL) signal automatically resets, as indicated by associated BOS OL light OFF and RMUW pump restart when BOS has timed out. Should an OL not automatically reset, resetting the sequencer may correct the condition.
NOTE: It is probable that the crew will decrease Turbine Load approx. 50 MW in response the AFW pump start.
NOTE: It is probable that the crew will decrease Turbine Load approx. 50 MW in response the AFW pump start.
Step 1 Check Unit MODE - 1, 2, 3 OR 4 Step 2 Check 6.9 KV safeguard bus - AT LEAST ONE ENERGIZED CAUTION:
Step 1 Check Unit MODE - 1, 2, 3 OR 4 Step 2 Check 6.9 KV safeguard bus - AT LEAST ONE ENERGIZED CAUTION:
* If power is greater than 10%. MDAFW should be allowed to run until the sequencer times out. The pumps will be stopped in Section 8.0, if not required. DO NOT throttle AFW above 10% power.
If power is greater than 10%. MDAFW should be allowed to run until the sequencer times out. The pumps will be stopped in Section 8.0, if not required. DO NOT throttle AFW above 10% power.
* The AFWP flow control and isolation valves are required to be fully open when above 10% power per TS 3.7.5.
The AFWP flow control and isolation valves are required to be fully open when above 10% power per TS 3.7.5.
NOTE:
NOTE:
* An emergency start will allow DG breaker to automatically close on a phase to ground bus
An emergency start will allow DG breaker to automatically close on a phase to ground bus DG breaker will not automatically or manually close when a phase to phase bus fault (LOR An Operator Lockout signal from Blackout Sequencer (BOS) opens TDAFWP steam supply valves. The BOS also starts associated train MDAFWP. It may be necessary to limit AFW flow to prevent excessive RCS cooldown, or other adverse condition. Placing the TDAFW Pump in PULL-OUT with one safeguards bus de-energized will result in two inoperable AFW Pumps per TS 3.7.5. Throttling any train of AFW above 10% power renders the train
* DG breaker will not automatically or manually close when a phase to phase bus fault (LOR
* contains steps to deenergize the sequencer if the bus will not be needed. This would restore common equipment available to the other unit (e.g CRACs, UPS).  
* An Operator Lockout signal from Blackout Sequencer (BOS) opens TDAFWP steam supply valves. The BOS also starts associated train MDAFWP. It may be necessary to limit AFW flow to prevent excessive RCS cooldown, or other adverse condition. Placing the TDAFW Pump in PULL-OUT with one safeguards bus de-energized will result in two inoperable AFW
*BOLD INDICATES CRITICAL STEP
* Pumps per TS 3.7.5. Throttling any train of AFW above 10% power renders the train
* Attachment 4 contains steps to deenergize the sequencer if the bus will not be needed. This would restore common equipment available to the other unit (e.g CRACs, UPS).
                                                                  *BOLD INDICATES CRITICAL STEP


Revision 2 Appendix D Op-Test No:       1       Scenario No:     1     Event No:   3               Page   9 of 16 Event
Revision 2 Appendix D Op-Test No:
1 Scenario No:
1 Event No:
3 Page 9
of 16 Event


== Description:==
== Description:==
LOR on 1EA2 (Bus will be de-energized resulting in loss of all AFW)
LOR on 1EA2 (Bus will be de-energized resulting in loss of all AFW)
Time   RO   BOP   SRO                           Applicant's Actions or Behavior Step 3 Check 6.9 KV safeguard buses - BOTH ENERGIZED
Time RO BOP SRO Applicant's Actions or Behavior Step 3 Check 6.9 KV safeguard buses - BOTH ENERGIZED
: a. Bus voltage, 6500-7100 volts
: a. Bus voltage, 6500-7100 volts
: b. Bus frequency, 59.5-60.5 Hz
: b. Bus frequency, 59.5-60.5 Hz
Line 1,830: Line 2,336:
Step 5 Monitor blackout sequencer status:
Step 5 Monitor blackout sequencer status:
: a. Affected bus - ENERGIZED
: a. Affected bus - ENERGIZED
: b. Verify Blackout Sequencer -OPERATED
: b. Verify Blackout Sequencer -OPERATED OUTPUT-STEP TIME lights -ALL LIT OR Automatic lockouts AL light -LIT
* OUTPUT-STEP TIME lights -ALL LIT OR
* Automatic lockouts AL light -LIT
: c. Verify all required equipment actuated per Attachment 2.
: c. Verify all required equipment actuated per Attachment 2.
: d. Recover from blackout sequencer operation per Section 8 while continuing.
: d. Recover from blackout sequencer operation per Section 8 while continuing.
NOTE: After crew completes Att 2, and the SM is notified that the TD AFW Pump is INOPERABLE, the Booth Operator calls US as Shift Manager and inform the crew that the CPC RO will take over the ABN.
NOTE: After crew completes Att 2, and the SM is notified that the TD AFW Pump is INOPERABLE, the Booth Operator calls US as Shift Manager and inform the crew that the CPC RO will take over the ABN.
The crew should focus on the plant Shutdown.
The crew should focus on the plant Shutdown.  
                                                                  *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1       Scenario No:   1                   4               Page 10   of 16 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
1 4
Page 10 of 16 Event


== Description:==
== Description:==
TDAWP Overspeeds on Auto Start Time   RO   BOP   SRO                           Applicant's Actions or Behavior 4.1 Symptoms
TDAWP Overspeeds on Auto Start Time RO BOP SRO Applicant's Actions or Behavior 4.1 Symptoms
: a. Annunciator Alarms
: a. Annunciator Alarms TD AFWP OVRSPD TRIP (8B-4.6)
* TD AFWP OVRSPD TRIP (8B-4.6)
: b. Plant Indications Rapidly fluctuating AFWPT speed u-SI-2452A, AFWPT SPD 4.2 Automatic Action None Enter ABN-305 Aux Feedwater Malfunction Step1 Verify Turbine Driven Auxiliary Feedwater Pump malfunctioning by one or more of the following indications:
: b. Plant Indications
AFWPT TRIP light on u-HS-2452F - LIT Step 2 Verify Turbine Driven Auxiliary Feedwater Pump - NOT TRIPPED Step 2 RNO. Perform the following:
* Rapidly fluctuating AFWPT speed u-SI-2452A, AFWPT SPD 4.2 Automatic Action None Enter ABN-305 Aux Feedwater Malfunction Step1 Verify Turbine Driven Auxiliary Feedwater Pump malfunctioning by one or more of the following indications:
* AFWPT TRIP light on u-HS-2452F - LIT Step 2 Verify Turbine Driven Auxiliary Feedwater Pump - NOT TRIPPED Step 2 RNO. Perform the following:
: a. Ensure at least one steam supply valve open:
: a. Ensure at least one steam supply valve open:
* u-HS-2452-1, AFWPT STM SPLYVLV-MSL 4
u-HS-2452-1, AFWPT STM SPLYVLV-MSL 4 u-HS-2452-2, AFWPT STM SPLYVLV-MSL 1
* u-HS-2452-2, AFWPT STM SPLYVLV-MSL 1
: b. Lower u-SK-2452A, AFWPT SPD CTRL to 0% output.
: b. Lower u-SK-2452A, AFWPT SPD CTRL to 0% output.
: c. Direct Plant Equipment Operator to perform the following per Attachment 1
: c. Direct Plant Equipment Operator to perform the following per Attachment 1
Line 1,857: Line 2,361:
: d. Verify u-HS-2452 G/H, AFWPT TRIP & THROTTLE VALVE open AND valve red lights are lit.
: d. Verify u-HS-2452 G/H, AFWPT TRIP & THROTTLE VALVE open AND valve red lights are lit.
: e. Adjust u-SK-2452A, AFWPT SPD CTRL to desired output.
: e. Adjust u-SK-2452A, AFWPT SPD CTRL to desired output.
: f. Return to procedure and step in effect.
: f. Return to procedure and step in effect.  
                                                                  *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1       Scenario No:     1   Event No:     5               Page   11   of   16 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
1 Event No:
5 Page 11 of 16 Event


== Description:==
== Description:==
Power Reduction (Directed by the Shift Manager)
Power Reduction (Directed by the Shift Manager)
Time   RO   BOP   SRO                           Applicant's Actions or Behavior Review IPO-003A, Power Operations Notifies Generation Controller prior to reducing load.
Time RO BOP SRO Applicant's Actions or Behavior Review IPO-003A, Power Operations Notifies Generation Controller prior to reducing load.
Notifies Chemistry and Radiation Protection if power will be reduction will be
Notifies Chemistry and Radiation Protection if power will be reduction will be  
                          > 15% in one hour Notifies Reactor Engineering of power reduction > 25%.
> 15% in one hour Notifies Reactor Engineering of power reduction > 25%.
Calculates the amount of boration required Calculates the rate of boration Reviews AFD guidance Initiates boration Sets in the desired unloading rate and amount using the Digital Control System Maintains AFD in the target band Maintains rods above the Rod Insertion Limit Maintains Tave with 1 degree of Tref
Calculates the amount of boration required Calculates the rate of boration Reviews AFD guidance Initiates boration Sets in the desired unloading rate and amount using the Digital Control System Maintains AFD in the target band Maintains rods above the Rod Insertion Limit Maintains Tave with 1 degree of Tref  
                                                                  *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No:     1     Event No: 6&7                 Page 12     of 16 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
1 Event No: 6&7 Page 12 of 16 Event


== Description:==
== Description:==
Feedline Break Outside Containment/LOR on 1EA2 Time   RO   BOP   SRO                             Applicant's Actions or Behavior Annunciators
Feedline Break Outside Containment/LOR on 1EA2 Time RO BOP SRO Applicant's Actions or Behavior Annunciators ALB-08A, SG3 FW NZL FLO HI ALB-08A, SG3 STM & FW FLO MISMATCH ALB-08A, SG3 LLVL DEV ALB-08A, SG3 LVL LO Plant Indications Tave decreasing Bank D rods moving out Nuclear Power increasing MFP speed increasing Diagnose plant conditions and determines that a Feedwater Leak is occurring outside the Reactor Containment Building.
* ALB-08A, SG3 FW NZL FLO HI
* ALB-08A, SG3 STM & FW FLO MISMATCH
* ALB-08A, SG3 LLVL DEV
* ALB-08A, SG3 LVL LO Plant Indications
* Tave decreasing
* Bank D rods moving out
* Nuclear Power increasing
* MFP speed increasing Diagnose plant conditions and determines that a Feedwater Leak is occurring outside the Reactor Containment Building.
Orders a reactor trip and enters EOP-0.0A.
Orders a reactor trip and enters EOP-0.0A.
Step 1. Verify Reactor Trip
Step 1. Verify Reactor Trip
: a. Verfiy the following:
: a. Verfiy the following:
* Reactor Trip and bypass breakers- OPEN, AND
Reactor Trip and bypass breakers-OPEN, AND Neutron Flux-DECREASING
* Neutron Flux- DECREASING
: b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
: b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
: a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
: a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
: a. AC safeguards busses - AT LEAST ONE ENERGIXED
: a. AC safeguards busses - AT LEAST ONE ENERGIXED AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
* AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
: b. AC safeguards busses - BOTH ENERGIZED Step b. RNO Restore power to de-energized AC Safeguards bus per ABN-601 or 602, when time permits.
: b. AC safeguards busses - BOTH ENERGIZED Step b. RNO Restore power to de-energized AC Safeguards bus per ABN-601 or 602, when time permits.
NOTE: It is probable that the crew will place the B EDG in Pull Out.
NOTE: It is probable that the crew will place the B EDG in Pull Out.  
                                                                      *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No:   1     Event No: 6&7                 Page 13 of 16 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
1 Event No: 6&7 Page 13 of 16 Event


== Description:==
== Description:==
Feedline Break Outside Containment/LOR on 1EA2 Time   RO   BOP   SRO                           Applicant's Actions or Behavior Step 4. Check SI Status:
Feedline Break Outside Containment/LOR on 1EA2 Time RO BOP SRO Applicant's Actions or Behavior Step 4. Check SI Status:
: a. Check If SI is Actuated:
: a. Check If SI is Actuated:
* SI actuation as indicated on the First Out Ann 1-ALB-6C
SI actuation as indicated on the First Out Ann 1-ALB-6C SI Actuated blue status light - ON
* SI Actuated blue status light - ON
: b. Verify Both Trains DI Actuated:
: b. Verify Both Trains DI Actuated:
* SI Actuated blue status light - ON NOT FLASHING Step 4, RNO. IF SI is NOT required, THEN go to EOS-0.1 A, REACTOR TRIP RESPONSE The CPC RO will refer to ABN-602 for 1EA2 Bus LOR
SI Actuated blue status light - ON NOT FLASHING Step 4, RNO. IF SI is NOT required, THEN go to EOS-0.1 A, REACTOR TRIP RESPONSE The CPC RO will refer to ABN-602 for 1EA2 Bus LOR  
                                                                    *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No:     1     Event No: 6&7                 Page 14   of   16 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
1 Event No: 6&7 Page 14 of 16 Event


== Description:==
== Description:==
Feedline Break Outside Containment/LOR on 1EA2 Time   RO   BOP   SRO                             Applicant's Actions or Behavior Transitions to EOS-0.1A, Reactor Trip Response Step 1. Check RcCS Average Temperature - STABLE AT OR TRENDING TO 557&deg; F.
Feedline Break Outside Containment/LOR on 1EA2 Time RO BOP SRO Applicant's Actions or Behavior Transitions to EOS-0.1A, Reactor Trip Response Step 1. Check RcCS Average Temperature - STABLE AT OR TRENDING TO 557&deg; F.
Step 2. Check FW Status:
Step 2. Check FW Status:
: a. Verify reactor trip and bypass breaker - OPEN
: a. Verify reactor trip and bypass breaker - OPEN
Line 1,925: Line 2,427:
: a. Narrow Range Level - GREATER THAN 5%
: a. Narrow Range Level - GREATER THAN 5%
: b. Control Feed flow to maintain narrow range level between 5% and 50%.
: b. Control Feed flow to maintain narrow range level between 5% and 50%.
NOTE: The crew may get to this point or even further before the Heat Sink Red Path come in.
NOTE: The crew may get to this point or even further before the Heat Sink Red Path come in.  
                                                                    *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D                                 Operator Actions Op-Test No:       1         Scenario No:     1     Event No:   8               Page     15 of   16 Event
Revision 0 Appendix D Operator Actions Op-Test No:
1 Scenario No:
1 Event No:
8 Page 15 of 16 Event


== Description:==
== Description:==
Loss of Heat Sink ( with SI Pump Failure)
Loss of Heat Sink ( with SI Pump Failure)
Time   RO   BOP   SRO                           Applicant's Actions or Behavior Steam Generator Levels will continue to decrease. There is no AFW flow and the plant condition continues to degrade. As it becomes clear to the crew that the location of the feed break precludes the establishment of normal feed to the Steam Generators the crew will enter FRH-0.1A, Response to a Loss of Secondary Heat Sink.
Time RO BOP SRO Applicant's Actions or Behavior Steam Generator Levels will continue to decrease. There is no AFW flow and the plant condition continues to degrade. As it becomes clear to the crew that the location of the feed break precludes the establishment of normal feed to the Steam Generators the crew will enter FRH-0.1A, Response to a Loss of Secondary Heat Sink.
At approximately 8 minutes after the Feed break, AFW flow to the SGs will still be 0 and the narrow range level will be <5%.
At approximately 8 minutes after the Feed break, AFW flow to the SGs will still be 0 and the narrow range level will be <5%.
Enter FRH-0.1A Loss of Heat Sink Step 1 Check If Secondary Heat Sink is Required:
Enter FRH-0.1A Loss of Heat Sink Step 1 Check If Secondary Heat Sink is Required:
Line 1,944: Line 2,449:
Step 12. Verify RCS Feed Path:
Step 12. Verify RCS Feed Path:
: a. Check Pump Status:
: a. Check Pump Status:
* CCPs BOTH RUNNING OR
CCPs BOTH RUNNING OR AT LEAST ON CCP AND AT LEAST ONE SI PUMP-RUNNING B. Check valve alignment for operating pumps - PROPER EMERGENCY ALIGNMENT PER ATTACHMENT 3.
* AT LEAST ON CCP AND AT LEAST ONE SI PUMP-RUNNING B. Check valve alignment for operating pumps - PROPER EMERGENCY ALIGNMENT PER ATTACHMENT 3.
Step 12, RNO. Manually start pumps and align valves as necessary to establish feed path.
Step 12, RNO. Manually start pumps and align valves as necessary to establish feed path.
Step 13. IF the Diesels are Running, THEN place Both DG EMERG STOP/START Handswitches in START.
Step 13. IF the Diesels are Running, THEN place Both DG EMERG STOP/START Handswitches in START.  
                                                                *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D                                 Operator Actions Op-Test No:       1         Scenario No:     1   Event No:   8               Page   16     of 16 Event
Revision 0 Appendix D Operator Actions Op-Test No:
1 Scenario No:
1 Event No:
8 Page 16 of 16 Event


== Description:==
== Description:==
Loss of Heat Sink ( with SI Pump Failure)
Loss of Heat Sink ( with SI Pump Failure)
Time   RO   BOP     SRO                         Applicant's Actions or Behavior Step 14. Reset SI Step 15. Reset SI Sequencers Step 16. Reset Containment Isolation Phase A and B.
Time RO BOP SRO Applicant's Actions or Behavior Step 14. Reset SI Step 15. Reset SI Sequencers Step 16. Reset Containment Isolation Phase A and B.
Step 17. Reset Containment Spray Signal Step 18. Establish Instrument Air And Nitrogen to Containment.
Step 17. Reset Containment Spray Signal Step 18. Establish Instrument Air And Nitrogen to Containment.
: a. Establish instrument air:
: a. Establish instrument air:
Line 1,966: Line 2,473:
: c. Open both - PRZR PORVs.
: c. Open both - PRZR PORVs.
Step 20. Verify Adequate RCS Bleed Path:
Step 20. Verify Adequate RCS Bleed Path:
* PRZR PORVs - BOTH OPEN
PRZR PORVs - BOTH OPEN PRZR PORV block valves - BOTH OPEN The Scenario may be terminated at the Lead Examiners discretion.  
* PRZR PORV block valves - BOTH OPEN The Scenario may be terminated at the Lead Examiners discretion.
*BOLD INDICATES CRITICAL STEP
                                                              *BOLD INDICATES CRITICAL STEP


SHIFT TURNOVER INFORMATION 1.0     INITIAL CONDTIONS:
SHIFT TURNOVER INFORMATION 1.0 INITIAL CONDTIONS:
Time in Core Life: BOL                   Tavg: 589oF Reactor Power: 100%                     RCS Pressure: 2235 psig Turbine Load:1200 Mwe                   Xenon: Equil Boron Concentration:1263 ppm             Rod Control:       AUTO Rod Height: CB D @ 215steps 2.0     LCOAR/TECHNICAL SPECIFICATION ACTIONS IN EFFECT:
Time in Core Life: BOL Tavg: 589oF Reactor Power: 100%
TS#     Description Reason 3.7.5 AFW               AFW Pump 1-01 OOS for Oil Sample 3.0     CLEARANCES IN EFFECT:
RCS Pressure: 2235 psig Turbine Load:1200 Mwe Xenon: Equil Boron Concentration:1263 ppm Rod Control: AUTO Rod Height: CB D @ 215steps 2.0 LCOAR/TECHNICAL SPECIFICATION ACTIONS IN EFFECT:
TS#
Description Reason 3.7.5 AFW AFW Pump 1-01 OOS for Oil Sample 3.0 CLEARANCES IN EFFECT:
AFW Pump 1-01 OOS for Oil Sample 4.0 SAFETY SYSTEM SETTING BYPASS/MALFUNCTIONS None 5.0 DEGRADED EQUIPMENT 6.0 PLANNED EVOLUTIONS:
AFW Pump 1-01 OOS for Oil Sample 4.0 SAFETY SYSTEM SETTING BYPASS/MALFUNCTIONS None 5.0 DEGRADED EQUIPMENT 6.0 PLANNED EVOLUTIONS:
Return AFW Pump 1-01 to service when the oil sample is complete.
Return AFW Pump 1-01 to service when the oil sample is complete.
7.0     TURNOVER INFORMATION:
7.0 TURNOVER INFORMATION:
Unit 1 and Unit 2 are at 100% power. U1 has been at 100% for the last 15 days following refueling. The A MDAFWP is OOS due to contamination in the oil. Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. There are no surveillances planned for this shift and the orders are to maintain current load and unit availability.
Unit 1 and Unit 2 are at 100% power. U1 has been at 100% for the last 15 days following refueling. The A MDAFWP is OOS due to contamination in the oil. Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. There are no surveillances planned for this shift and the orders are to maintain current load and unit availability.  


Revision 0 Appendix D                                   Scenario Outline                       Form ES-D-1 Facility:             CPSES         Scenario No.:           2       Op-Test No.:         1 Examiners:                                               Operators:
Revision 0 Appendix D Scenario Outline Form ES-D-1 Facility:
Note:     (NEW) Do SRO Admin A.4.2, Emerg. Class. With this Scenario (SAE).
CPSES Scenario No.:
Initial Conditions:     40% power, Xenon building in, plant start-up in progress. Unit 2 is at 100%. (IC-13. Preload malfunctions RP07A, and RP07B Train A/B Auto SI failure.)
2 Op-Test No.:
Turnover: Unit 1 is at 40% power and increasing per IPO-003A, step 5.4.19. Shift orders are to increase reactor power during the shift. The A MDAFWP is OOS due to contamination in the oil. Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. The expectation is that the ALERT will last until midnight. There are no surveillances planned for this shift.
1 Examiners:
Event Malf. No.         Event                                 Event No.                    Type*                               Description 1                       N (SRO) Increase Reactor Power T=0                    R (RO)
Operators:
N (BOP) 2         RX04B       I (SRO) SG level transmitter LT-552 fails high.
Note:
T=13      @ 100% I (BOP) 3          CV01B        C (RO)       Trip of Running CCP T=23                    C (SRO) 4          CV13A        C (SRO) Letdown Leak inside containment T=33      @12gpm C (RO) 5          RC15A       C (ALL) RCP Seized Shaft T=40 6          RC09A2 M (ALL) LBLOCA T=45 7          RH01B       C(ALL)       RHRP1-2 Trip T=45 NOTE: Make new IC that has second MFP running and equil xenon.
(NEW) Do SRO Admin A.4.2, Emerg. Class. With this Scenario (SAE).
* (N)ormal,     (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor
Initial Conditions:
40% power, Xenon building in, plant start-up in progress. Unit 2 is at 100%. (IC-13. Preload malfunctions RP07A, and RP07B Train A/B Auto SI failure.)
Turnover:
Unit 1 is at 40% power and increasing per IPO-003A, step 5.4.19. Shift orders are to increase reactor power during the shift. The A MDAFWP is OOS due to contamination in the oil. Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. The expectation is that the ALERT will last until midnight. There are no surveillances planned for this shift.
Event No.
Malf. No.
Event Type*
Event Description 1
T=0 N (SRO)
R (RO)
N (BOP)
Increase Reactor Power 2
T=13 RX04B  
@ 100%
I (SRO)
I (BOP)
SG level transmitter LT-552 fails high.
3 T=23 CV01B C (RO)
C (SRO)
Trip of Running CCP 4
T=33 CV13A
@12gpm C (SRO)
C (RO)
Letdown Leak inside containment 5
T=40 RC15A C (ALL)
RCP Seized Shaft 6
T=45 RC09A2 M (ALL)
LBLOCA 7
T=45 RH01B C(ALL)
RHRP1-2 Trip NOTE: Make new IC that has second MFP running and equil xenon.  
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor  


Revision 0 Appendix D                                       Narrative Description Op-Test No:         1           Scenario No: 2     Event No:                   Page   2   of   24 The objective of this scenario is to evaluate the operators ability to change Reactor power in a controlled manner, respond to various instrument and component failures, and to carry out the requisite emergency procedures to mitigate the consequences of a Loss of Coolant Accident.
Revision 0 Appendix D Narrative Description Op-Test No:
1 Scenario No:
2 Event No:
Page 2
of 24 The objective of this scenario is to evaluate the operators ability to change Reactor power in a controlled manner, respond to various instrument and component failures, and to carry out the requisite emergency procedures to mitigate the consequences of a Loss of Coolant Accident.
Event One.
Event One.
The operators are directed to continue the plant startup. In order to preclude unnecessary delay, the shift turnover will direct the crew to start the power increase immediately upon taking the watch. The customary reactivity brief will be allowed, but due to the ALERT for grid conditions, an extensive pre job brief will not be held. Operator feedback for the need to increase power will be the ALERT condition or plant management direction. It is expected that the crew will:
The operators are directed to continue the plant startup. In order to preclude unnecessary delay, the shift turnover will direct the crew to start the power increase immediately upon taking the watch. The customary reactivity brief will be allowed, but due to the ALERT for grid conditions, an extensive pre job brief will not be held. Operator feedback for the need to increase power will be the ALERT condition or plant management direction. It is expected that the crew will:
* Refer to the appropriate plant procedure
Refer to the appropriate plant procedure Complete a reactivity brief.
* Complete a reactivity brief.
Commence dilution and increase power using the Turbine Digital Control System Event Two.
* Commence dilution and increase power using the Turbine Digital Control System Event Two.
When power has been increased enough to meet the requirements of NUREG 1021 and at the lead examiners discretion, the controlling level channel on SG 1-02 will fail high. This will cause the feed regulating valve to go closed more than normal due to the high indicated SG level. Operator feedback for this event is SG level alarms, steam flow/feed flow mismatch alarms and increasing Reactor Coolant Average temperature due to lower than normal SG level. It is expected that the crew will:
When power has been increased enough to meet the requirements of NUREG 1021 and at the lead examiners discretion, the controlling level channel on SG 1-02 will fail high. This will cause the feed regulating valve to go closed more than normal due to the high indicated SG level. Operator feedback for this event is SG level alarms, steam flow/feed flow mismatch alarms and increasing Reactor Coolant Average temperature due to lower than normal SG level. It is expected that the crew will:
* Evaluate plant conditions and determine that SG 1-02 level is NOT normal
Evaluate plant conditions and determine that SG 1-02 level is NOT normal Recognize that the feed flow does not match steam flow Determine that the level indicator LI-552 is reading higher than the other channels Take manual control of the FRV and match steam and feed flow Refer to the correct ABN procedure Make the necessary notifications and refer to Technical Specifications. It is expected that the SRO will stop the power increase during this event.
* Recognize that the feed flow does not match steam flow
* Determine that the level indicator LI-552 is reading higher than the other channels
* Take manual control of the FRV and match steam and feed flow
* Refer to the correct ABN procedure
* Make the necessary notifications and refer to Technical Specifications. It is expected that the SRO will stop the power increase during this event.
Event Three.
Event Three.
The running CCP (CCP 1-01) trips. All charging and seal injection flow is lost. Without charging flow to cool the regenerative heat exchanger, letdown will flash and cause the letdown relief to lift. Operator feedback for this event is provided by annunciation for the CCP trip and various annunciations due to loss of letdown. It is expected that the operator will:
The running CCP (CCP 1-01) trips. All charging and seal injection flow is lost. Without charging flow to cool the regenerative heat exchanger, letdown will flash and cause the letdown relief to lift. Operator feedback for this event is provided by annunciation for the CCP trip and various annunciations due to loss of letdown. It is expected that the operator will:
* Verify that CCW is at least 35 gpm to the RCP Thermal Barrier Heat Exchangers (Initial Operator Action)
Verify that CCW is at least 35 gpm to the RCP Thermal Barrier Heat Exchangers (Initial Operator Action)
* Isolate letdown (Initial Operator Action)
Isolate letdown (Initial Operator Action)
* Refer to the correct ABN procedure.
Refer to the correct ABN procedure.
* Start the CCP 1-02
Start the CCP 1-02 Establish charging flow to support letdown flow Establish letdown Make the necessary notifications and refer to Technical Specifications  
* Establish charging flow to support letdown flow
* Establish letdown
* Make the necessary notifications and refer to Technical Specifications


Revision 0 Appendix D                                       Narrative Description Op-Test No:       1             Scenario No: 2     Event No:                 Page   3     of 24 Event Four.
Revision 0 Appendix D Narrative Description Op-Test No:
1 Scenario No:
2 Event No:
Page 3
of 24 Event Four.
Due to the previous valve, temperature and pressure cycles on the letdown system, a small leak occurs on the Letdown Isolation Valve LCV-460. The leak size is 12 gpm and is evidenced by, increasing charging flow, decreasing VCT level, increased make up to the VCT, and increasing radioactive gas levels inside the Containment. Due to the plant startup in progress, which results in large dilutions and RCS tave leading turbine load, a decrease in PZR level may not be the first indication of the loss of inventory. It is expected that the crew will:
Due to the previous valve, temperature and pressure cycles on the letdown system, a small leak occurs on the Letdown Isolation Valve LCV-460. The leak size is 12 gpm and is evidenced by, increasing charging flow, decreasing VCT level, increased make up to the VCT, and increasing radioactive gas levels inside the Containment. Due to the plant startup in progress, which results in large dilutions and RCS tave leading turbine load, a decrease in PZR level may not be the first indication of the loss of inventory. It is expected that the crew will:
* Respond to alarms and determine that pressurizer level is decreasing.
Respond to alarms and determine that pressurizer level is decreasing.
* Verify that charging flow has increased to maintain pressurizer level
Verify that charging flow has increased to maintain pressurizer level Refer to the correct ABN procedure Increase charging and/or decrease letdown to maintain pressurizer level.
* Refer to the correct ABN procedure
Evaluate plant conditions and determine that the leak is greater than allowed by Technical Specifications and comply with the Limiting Condition for Operation.
* Increase charging and/or decrease letdown to maintain pressurizer level.
* Evaluate plant conditions and determine that the leak is greater than allowed by Technical Specifications and comply with the Limiting Condition for Operation.
Event Five Failure of the seal package caused by the cycling of seal injection lead to the RCP 1-01 experiencing a seized shaft. If reactor power is <48%, then the operator feedback will be MCB alarms for low flow and RCP trip. The operators should trip the Reactor to meet the requirements of the ABN procedures. If reactor power is > 48%, then a Reactor Trip will occur. Automatic Reactor Trips were blocked in the scenario setup.
Event Five Failure of the seal package caused by the cycling of seal injection lead to the RCP 1-01 experiencing a seized shaft. If reactor power is <48%, then the operator feedback will be MCB alarms for low flow and RCP trip. The operators should trip the Reactor to meet the requirements of the ABN procedures. If reactor power is > 48%, then a Reactor Trip will occur. Automatic Reactor Trips were blocked in the scenario setup.
NOTE: The evaluator should also note the crews response to the SG level in the 1-01 SG. RCS flow will be reversed and SG level will be abnormally high. It is not uncommon for a crew to believe that a SGTR has occurred due to this thermo hydraulic behavior.
NOTE: The evaluator should also note the crews response to the SG level in the 1-01 SG. RCS flow will be reversed and SG level will be abnormally high. It is not uncommon for a crew to believe that a SGTR has occurred due to this thermo hydraulic behavior.
It is expected that the operator will:
It is expected that the operator will:
* Respond to alarms and determine that the RCP has tripped.
Respond to alarms and determine that the RCP has tripped.
* Trip the reactor (Initial Operator Action)
Trip the reactor (Initial Operator Action)
* Refer to the correct ABN procedure
Refer to the correct ABN procedure Enter the correct EOP and continue with the ABN procedure.
* Enter the correct EOP and continue with the ABN procedure.
Perform the Immediate Operator Actions from memory.
* Perform the Immediate Operator Actions from memory.
Evaluate plant conditions and determine what Technical Specification Limiting Condition for Operations apply.
* Evaluate plant conditions and determine what Technical Specification Limiting Condition for Operations apply.
Evaluate the level change in the 1-01 SG and determine that the level increase is due to reverse RCS flow through the SG.  
* Evaluate the level change in the 1-01 SG and determine that the level increase is due to reverse RCS flow through the SG.


Revision 0 Appendix D                                     Narrative Description Op-Test No:       1           Scenario No:   2       Event No:                 Page     4   of   24 Event Six and Seven.
Revision 0 Appendix D Narrative Description Op-Test No:
1 Scenario No:
2 Event No:
Page 4
of 24 Event Six and Seven.
On the loop with the tripped RCP, a Large Break LOCA occurs. Safety Injection first out alarms will come in. The pressurizer will rapidly empty and containment pressure will rapidly increase to the HI-3 setpoint and containment spray will actuate. It is expected that the crew will:
On the loop with the tripped RCP, a Large Break LOCA occurs. Safety Injection first out alarms will come in. The pressurizer will rapidly empty and containment pressure will rapidly increase to the HI-3 setpoint and containment spray will actuate. It is expected that the crew will:
* Recognize that a Safety Injection is required and initiate a Manual SI.
Recognize that a Safety Injection is required and initiate a Manual SI.
* Enter the correct EOP.
Enter the correct EOP.
* Perform the Immediate Operator Actions from memory.
Perform the Immediate Operator Actions from memory.
* Verify automatic actions, and determine that the RHR pump 1-02 has tripped.
Verify automatic actions, and determine that the RHR pump 1-02 has tripped.
* Trip RCPs when plant conditions meet those listed on the Fold Out page.
Trip RCPs when plant conditions meet those listed on the Fold Out page.
* Transition to the correct EOP
Transition to the correct EOP Transition to the correct EOS Procedure when conditions are met Establishes at least one train of cold leg recirculation NOTE: In the CPSES Probabilistic Risk Analysis, important operator actions are evaluated in Table 9 of the PRA Summary Document. For this scenario, it is important that the Operators establish cold leg recirculation when required. Failure to establish long term cooling for the LBLOCA are major contributors to both the CDF and LERF considerations The scenario may be terminated when one train of cold leg recirculation has been established or at the discretion of the Lead Evlauator.
* Transition to the correct EOS Procedure when conditions are met
Recommended Critical Tasks Fails to manually control SG level, resulting in a Reactor Trip on SG Level.
* Establishes at least one train of cold leg recirculation NOTE: In the CPSES Probabilistic Risk Analysis, important operator actions are evaluated in Table 9 of the PRA Summary Document. For this scenario, it is important that the Operators establish cold leg recirculation when required. Failure to establish long term cooling for the LBLOCA are major contributors to both the CDF and LERF considerations The scenario may be terminated when one train of cold leg recirculation has been established or at the discretion of the Lead Evlauator.
Fails to manually initiate Safety Injection when required by plant conditions.
Recommended Critical Tasks
Fails to trip RCPs when required by plant conditions.  
* Fails to manually control SG level, resulting in a Reactor Trip on SG Level.
* Fails to manually initiate Safety Injection when required by plant conditions.
* Fails to trip RCPs when required by plant conditions.


Revision 0 Appendix D                                   Operator Actions Op-Test No:       1           Scenario No:   2     Event No:   1                 Page 5   of   24 Event
Revision 0 Appendix D Operator Actions Op-Test No:
1 Scenario No:
2 Event No:
1 Page 5
of 24 Event


== Description:==
== Description:==
Increase Reactor Power Time   RO     BOP     SRO                         Applicant's Actions or Behavior Review IPO-003A, Power Operations Notifies Generation Controller prior to increasing load.
Increase Reactor Power Time RO BOP SRO Applicant's Actions or Behavior Review IPO-003A, Power Operations Notifies Generation Controller prior to increasing load.
Calculates the amount of dilution required Calculates the rate of dilution Reviews AFD guidance Initiates boration Sets in the desired loading rate and amount using the Digital Control System Maintains AFD in the target band Maintains rods above the Rod Insertion Limit Maintains Tave with 1 degree of Tref
Calculates the amount of dilution required Calculates the rate of dilution Reviews AFD guidance Initiates boration Sets in the desired loading rate and amount using the Digital Control System Maintains AFD in the target band Maintains rods above the Rod Insertion Limit Maintains Tave with 1 degree of Tref  
                                                                *BOLD INDICATES CRITICAL STEP Revision 0
*BOLD INDICATES CRITICAL STEP Revision 0  


Appendix D Op-Test No:       1         Scenario No:   2     Event No:   2               Page   6   of   24 Event
Appendix D Op-Test No:
1 Scenario No:
2 Event No:
2 Page 6
of 24 Event


== Description:==
== Description:==
SG Level Transmitter LT-552 Fails High Time   RO     BOP     SRO                         Applicant's Actions or Behavior 2.1 Symptoms
SG Level Transmitter LT-552 Fails High Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms
: a. Annunciator Alarms
: a. Annunciator Alarms SG 2 LVL LO (8A-2.6)
* SG 2 LVL LO (8A-2.6)
SG 2 LVL DEV (8A-2.12)
* SG 2 LVL DEV (8A-2.12)
SG 2 STEM & FW FLO MISMATCH
* SG 2 STEM & FW FLO MISMATCH
: b. Plant Indications
: b. Plant Indications
: 1) One steam generator level instrument indicating higher or lower than the other steamgenerators level instruments.
: 1) One steam generator level instrument indicating higher or lower than the other steamgenerators level instruments.
* u-LI-552, SG 2 LVL (NR) CHAN II 2.2 Automatic Actions NOTE: Control responses will occur only if the failed channel is selected for control.
u-LI-552, SG 2 LVL (NR) CHAN II 2.2 Automatic Actions NOTE: Control responses will occur only if the failed channel is selected for control.
* Steam Generator Level Channel failing HIGH will cause the feedwater control valve to CLOSE, thereby decreasing steam generator level.
Steam Generator Level Channel failing HIGH will cause the feedwater control valve to CLOSE, thereby decreasing steam generator level.
(Unit 1 LO LEVEL REACTOR TRIP at 25%)
(Unit 1 LO LEVEL REACTOR TRIP at 25%)
(Unit 2 LO LEVEL REACTOR TRIP at 35.4%)
(Unit 2 LO LEVEL REACTOR TRIP at 35.4%)
Line 2,067: Line 2,609:
Step 1 Verify controlling level channel -FAILED.
Step 1 Verify controlling level channel -FAILED.
Step 2 Manually control the following, as necessary to maintain SG - 2 AT PROGRAMMED LEVEL.
Step 2 Manually control the following, as necessary to maintain SG - 2 AT PROGRAMMED LEVEL.
* u-FK-520, SG 2 FW FLO CTRL
u-FK-520, SG 2 FW FLO CTRL u-SK-509A, FWPT MASTERSPD CTRL Step 3 Verify instruments on common instrument line - NORMAL (See )
* u-SK-509A, FWPT MASTERSPD CTRL Step 3 Verify instruments on common instrument line - NORMAL (See Attachment 1)
CAUTION:
CAUTION:
* Turbine Trip AND Feedwater Isolation will occur if 2 or more of the 3 HI-HI level bistables for the SAME steam generator are TRIPPED.
Turbine Trip AND Feedwater Isolation will occur if 2 or more of the 3 HI-HI level bistables for the SAME steam generator are TRIPPED.
* IF preferred level control channel has failed (551, 552, 553, or 554)
IF preferred level control channel has failed (551, 552, 553, or 554)
AND automatic steam generator water level control is restored using alternate levelcontrol channel, THEN Step 9 must be completed within SIX hours for requiredchannel protection coincidence.
AND automatic steam generator water level control is restored using alternate levelcontrol channel, THEN Step 9 must be completed within SIX hours for requiredchannel protection coincidence.
Step 4 Verify ALL other HI-HI level bistable windows on TSLB-3 for affected SG- DARK
Step 4 Verify ALL other HI-HI level bistable windows on TSLB-3 for affected SG-DARK SG 2(Channels 527, 528, and 529)windows 1.3, 3.3, and 4.3  
* SG 2(Channels 527, 528, and 529)windows 1.3, 3.3, and 4.3
*BOLD INDICATES CRITICAL STEP Revision 0  
                                                                *BOLD INDICATES CRITICAL STEP Revision 0


Appendix D Op-Test No:       1         Scenario No:   2       Event No: 2                 Page   7   of   24 Event
Appendix D Op-Test No:
1 Scenario No:
2 Event No:
2 Page 7
of 24 Event


== Description:==
== Description:==
SG Level Transmitter LT-552 Fails High (cont)
SG Level Transmitter LT-552 Fails High (cont)
Time   RO     BOP     SRO                       Applicant's Actions or Behavior Step 5 Verify automatic SG level control - DESIRED
Time RO BOP SRO Applicant's Actions or Behavior Step 5 Verify automatic SG level control - DESIRED
: a. Alternate level control channel responding normally.
: a. Alternate level control channel responding normally.
: b. Automatic level control desired,as determined by UnitSupervisor.
: b. Automatic level control desired,as determined by UnitSupervisor.
Step 6 Select alternate channel:
Step 6 Select alternate channel:
* u-LS-529C, SG 2 LVL CHAN SELECT Step 7 Verify affected SG conditions for auto level control.
u-LS-529C, SG 2 LVL CHAN SELECT Step 7 Verify affected SG conditions for auto level control.
* Feedwater and steam flows matched.
Feedwater and steam flows matched.
* SG level stable at program.
SG level stable at program.
Step 8 Place Feedwater Flow OR Feedwater Bypass Control Valve in automatic AND ensure proper control.
Step 8 Place Feedwater Flow OR Feedwater Bypass Control Valve in automatic AND ensure proper control.
Step 9 Within 6 hours, have an I&C Technician place bistable test switches for failed level channel in CLOSE utilizing Attachments 2 and 3.
Step 9 Within 6 hours, have an I&C Technician place bistable test switches for failed level channel in CLOSE utilizing Attachments 2 and 3.
Step 10 Verify appropriate Alarms AND Trip Status Lights LIT per Attachment 3 AND note this verification in the Unit Log.
Step 10 Verify appropriate Alarms AND Trip Status Lights LIT per AND note this verification in the Unit Log.
Step 11 Refer to Technical Specifications, per Attachment 4.
Step 11 Refer to Technical Specifications, per Attachment 4.
RX trip Inst. Table 3.3.1-1               item #14 ESF Inst Table 3.3.2-1                   item 6C Accidnet Monitoring Table 3.3.3-1         item # 13
RX trip Inst. Table 3.3.1-1 item #14 ESF Inst Table 3.3.2-1 item 6C Accidnet Monitoring Table 3.3.3-1 item # 13  
                                                                *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1           Scenario No:   2     Event No:   3               Page   8   of   24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 Event No:
3 Page 8
of 24 Event


== Description:==
== Description:==
Trip of Running CCP Time   RO     BOP     SRO                         Applicant's Actions or Behavior 3.1 Symptoms
Trip of Running CCP Time RO BOP SRO Applicant's Actions or Behavior 3.1 Symptoms
: a. Annunciator Alarms
: a. Annunciator Alarms ANY RCP SEAL WTR INJ FLO LO (5A-1.6)
* ANY RCP SEAL WTR INJ FLO LO (5A-1.6)
PRZR LVL DEV LO (5C-1.2)
* PRZR LVL DEV LO (5C-1.2)
ANY CHRG PMP OVRLOAD/TRIP (6A-1.7)
* ANY CHRG PMP OVRLOAD/TRIP (6A-1.7)
REGEN HX LTDN OUT TEMP HI (6A-1.4)
* REGEN HX LTDN OUT TEMP HI (6A-1.4)
CHRG FLO HI/LO (6A-3.4)
* CHRG FLO HI/LO (6A-3.4)
: b. Plant Indications
: b. Plant Indications
: 1. Amber MISMATCH or trip light(s) ON at the charging pump control switch.
: 1. Amber MISMATCH or trip light(s) ON at the charging pump control switch.
* 1/u-APPD, PDP
1/u-APPD, PDP 1/u-APCH1, CCP 1 1/u-APCH2, CCP 2
* 1/u-APCH1, CCP 1
* 1/u-APCH2, CCP 2
: 2. Pressurizer level indicating lower than program level during steady state conditions.
: 2. Pressurizer level indicating lower than program level during steady state conditions.
* u-LR-459, PRZR LVL/PRZR LVL SET PT
u-LR-459, PRZR LVL/PRZR LVL SET PT u-LI-459A, PRZR LVL CHAN I u-LI-460A, PRZR LVL CHAN II u-LI-461, PRZR LVL CHAN III
* u-LI-459A, PRZR LVL CHAN I
: 3. Charging Flow will indicate 0 gpm u-FI-121A, CHRG FLO 3.2 Automatic Actions
* u-LI-460A, PRZR LVL CHAN II
* u-LI-461, PRZR LVL CHAN III
: 3. Charging Flow will indicate 0 gpm
* u-FI-121A, CHRG FLO 3.2 Automatic Actions
: a. Letdown line isolation occurs at 17% pressurizer level AND pressurizer heaters will deenergize.
: a. Letdown line isolation occurs at 17% pressurizer level AND pressurizer heaters will deenergize.
Diagnose CCP Trip and Enter ABN-105 NOTE: Step 1 and 2 may be performed concurrently.
Diagnose CCP Trip and Enter ABN-105 NOTE: Step 1 and 2 may be performed concurrently.
Step 1. (Initial Operator Action ) Verify Component Cooling Water flow to RCP Thermal Barrier HX(s)-GREATER THAN 35 GPM:
Step 1. (Initial Operator Action ) Verify Component Cooling Water flow to RCP Thermal Barrier HX(s)-GREATER THAN 35 GPM:
* u-FI-4678, RCP 1 THBR CLR CCW RET FLO
u-FI-4678, RCP 1 THBR CLR CCW RET FLO u-FI-4682, RCP 2 THBR CLR CCW RET FLO u-FI-4686, RCP 3 THBR CLR CCW RET FLO u-FI-4690, RCP 4 THBR CLR CCW RET FLO  
* u-FI-4682, RCP 2 THBR CLR CCW RET FLO
*BOLD INDICATES CRITICAL STEP
* u-FI-4686, RCP 3 THBR CLR CCW RET FLO
* u-FI-4690, RCP 4 THBR CLR CCW RET FLO
                                                                *BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1           Scenario No:   2                 3               Page   9   of 24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 3
Page 9
of 24 Event


== Description:==
== Description:==
Trip of Running CCP Time   RO     BOP     SRO                         Applicant's Actions or Behavior Step 2. (Initial Operator Action ) Verify Letdown Flow - ISOLATED
Trip of Running CCP Time RO BOP SRO Applicant's Actions or Behavior Step 2. (Initial Operator Action ) Verify Letdown Flow - ISOLATED 1/u-8149A, LTDN ORIFICE ISOL VLV (45 GPM) - CLOSED 1/u-8149B, LTDN ORIFICE ISOL VLV (75 GPM) - CLOSED 1/u-8149C, LTDN ORIFICE ISOLVLV (75 GPM) -CLOSED 1/u-LCV-459, LTDN ISOL VLV -CLOSED 1/u-LCV-460, LTDN ISOL VLV -CLOSED Step 3. Verify at least one Charging Pump - RUNNING Step 3. (RNO)
* 1/u-8149A, LTDN ORIFICE ISOL VLV (45 GPM) - CLOSED
* 1/u-8149B, LTDN ORIFICE ISOL VLV (75 GPM) - CLOSED
* 1/u-8149C, LTDN ORIFICE ISOLVLV (75 GPM) -CLOSED
* 1/u-LCV-459, LTDN ISOL VLV -CLOSED
* 1/u-LCV-460, LTDN ISOL VLV -CLOSED Step 3. Verify at least one Charging Pump - RUNNING Step 3. (RNO)
Start a Charging Pump.
Start a Charging Pump.
Step 4 Verify Seal Injection Flow to each RCP - BETWEEN 6 GPM AND 13 GPM Step 5 Verify RCP Parameters in - NORMAL OPERATING RANGE:
Step 4 Verify Seal Injection Flow to each RCP - BETWEEN 6 GPM AND 13 GPM Step 5 Verify RCP Parameters in - NORMAL OPERATING RANGE:
6 Verify PRZR level-GREATER THAN 17% AND INCREASING Step 7 Establish normal Letdown:
6 Verify PRZR level-GREATER THAN 17% AND INCREASING Step 7 Establish normal Letdown:
: a. OPEN Letdown Isolation Valves:
: a. OPEN Letdown Isolation Valves:
* 1/u-LCV-460, LTDN ISOL VLV
1/u-LCV-460, LTDN ISOL VLV 1/u-LCV-459, LTDN ISOL VLV 1/u-8152, LTDN CNTMT ISOL VLV ORC 1/u-8160, LTDN CNTMT ISOL VLV IRC  
* 1/u-LCV-459, LTDN ISOL VLV
*BOLD INDICATES CRITICAL STEP
* 1/u-8152, LTDN CNTMT ISOL VLV ORC
* 1/u-8160, LTDN CNTMT ISOL VLV IRC
                                                                  *BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1           Scenario No:   2                   3             Page   10   of   24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 3
Page 10 of 24 Event


== Description:==
== Description:==
Trip of Running CCP Time   RO     BOP     SRO                           Applicant's Actions or Behavior
Trip of Running CCP Time RO BOP SRO Applicant's Actions or Behavior
: b. Manually OPEN u-PK-131, LTDN HX OUT PRESS CTRL to 30%
: b. Manually OPEN u-PK-131, LTDN HX OUT PRESS CTRL to 30%
DEMAND (50% if restoring two orifice valves).
DEMAND (50% if restoring two orifice valves).
Line 2,161: Line 2,698:
: b. Charging flow less than 15 GPM above letdown flow.
: b. Charging flow less than 15 GPM above letdown flow.
Step 9 Refer to Technical Specifications listed in Section 9.1, this procedure.
Step 9 Refer to Technical Specifications listed in Section 9.1, this procedure.
9.1 Technical Specifications/Requirements
9.1 Technical Specifications/Requirements 3.4.13, RCS Operational Leakage 3.4.14, RCS Pressure Isolation Valve (PIV) Leakage 3.4.15, RCS Leakage Detection Instrumentation 3.5.2, ECCS - Operating 3.5.3, ECCS - Shutdown 13.1.31, Boration Injection System - Operating 13.1.32, Boration Injection System - Shutdown  
* 3.4.13, RCS Operational Leakage
*BOLD INDICATES CRITICAL STEP
* 3.4.14, RCS Pressure Isolation Valve (PIV) Leakage
* 3.4.15, RCS Leakage Detection Instrumentation
* 3.5.2, ECCS - Operating
* 3.5.3, ECCS - Shutdown
* 13.1.31, Boration Injection System - Operating
* 13.1.32, Boration Injection System - Shutdown
                                                                  *BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1           Scenario No: 2                   4                 Page 11     of 24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 4
Page 11 of 24 Event


== Description:==
== Description:==
Letdown Leak Inside Containment Time   RO     BOP     SRO                         Applicant's Actions or Behavior 2.1 Symptoms
Letdown Leak Inside Containment Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms
: a. Annunciator Alarms
: a. Annunciator Alarms CNTMT SMP 1 FILL RATE INCREASE (2A-1.6)
* CNTMT SMP 1 FILL RATE INCREASE (2A-1.6)
CNTMT SMP 1 LVL HI-HI (2A-1.7)
* CNTMT SMP 1 LVL HI-HI (2A-1.7)
CNTMT SMP 2 LVL HI-HI (2A-1.8)
* CNTMT SMP 2 LVL HI-HI (2A-1.8)
CNTMT SMP 2 FILL RATE INCREASE (2A-2.6)
* CNTMT SMP 2 FILL RATE INCREASE (2A-2.6)
RX CAV SMP LVL HI-HI (2A-2.7)
* RX CAV SMP LVL HI-HI (2A-2.7)
CNTNT FAN CLR 3 & 4 CNDS FILL RATE HI (2B-3.12)
* CNTNT FAN CLR 3 & 4 CNDS FILL RATE HI (2B-3.12)
CNTNT FAN CLR 1 & 2 CNDS FILL RATE HI (2B-4.12)
* CNTNT FAN CLR 1 & 2 CNDS FILL RATE HI (2B-4.12)
PRZR LVL DEV LO (5C-1.2)
* PRZR LVL DEV LO (5C-1.2)
CHRG FLO HI/LO (6A-3.4) 2.1 b. Plant Indications Containment humidity high or increasing Containment radiation levels high or increasing Incore instrument leakage alarm Containment temperature high or increasing Containment pressure high or increasing Containment dew point increasing Increased reactor coolant make-up frequency VCT level decreasing Charging flow increasing Pressurizer relief and safety valve temperature high Pressurizer level decreasing Condenser off gas radiation level increasing 2.2 Automatic Actions
* CHRG FLO HI/LO (6A-3.4) 2.1 b. Plant Indications
* Containment humidity high or increasing
* Containment radiation levels high or increasing
* Incore instrument leakage alarm
* Containment temperature high or increasing
* Containment pressure high or increasing
* Containment dew point increasing
* Increased reactor coolant make-up frequency
* VCT level decreasing
* Charging flow increasing
* Pressurizer relief and safety valve temperature high
* Pressurizer level decreasing
* Condenser off gas radiation level increasing 2.2 Automatic Actions
: a. IF pressurizer level decreases to the low level alarm (5B-3.6), THEN letdown will isolate and pressurizer heaters will be blocked.
: a. IF pressurizer level decreases to the low level alarm (5B-3.6), THEN letdown will isolate and pressurizer heaters will be blocked.
: b. IF VCT level decreases to the lo-lo level alarm (6A-4.5), THEN charging pump suction will transfer to the RWST.
: b. IF VCT level decreases to the lo-lo level alarm (6A-4.5), THEN charging pump suction will transfer to the RWST.
Enters ABN-103 RCS Leak Step 1 Verify charging pump - AT LEAST ONE RUNNING
Enters ABN-103 RCS Leak Step 1 Verify charging pump - AT LEAST ONE RUNNING 1/u-APPD, PDP 1/u-APCH1, CCP 1 1/u-APCH2, CCP 2  
* 1/u-APPD, PDP
*BOLD INDICATES CRITICAL STEP
* 1/u-APCH1, CCP 1
* 1/u-APCH2, CCP 2
                                                                *BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1           Scenario No: 2     Event No:   4                 Page 12     of   24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 Event No:
4 Page 12 of 24 Event


== Description:==
== Description:==
Letdown Leak Inside Containment Time   RO     BOP     SRO                       Applicant's Actions or Behavior Step 2 Ensure Pressurizer level - AT OR TRENDING TO PROGRAM LEVEL SETPOINT
Letdown Leak Inside Containment Time RO BOP SRO Applicant's Actions or Behavior Step 2 Ensure Pressurizer level - AT OR TRENDING TO PROGRAM LEVEL SETPOINT
: a. Verify running charging pump controller automatically maintaining Pressurizer level at program setpoint
: a. Verify running charging pump controller automatically maintaining Pressurizer level at program setpoint u-FK-121, CCP CHRG FLOCTRL u-SK-459A, PDP SPD CTRL Step 2 (RNO). Place the running charging pump controller in MANUAL AND adjust charging flow to maintain pressurizer level at program level setpoint Step 3 Check PRZR Status
* u-FK-121, CCP CHRG FLOCTRL
: a. PRZR PORVs - CLOSED 1/u-PCV-455A, PRZR PORV 1/u-PCV-456, PRZR PORV
* u-SK-459A, PDP SPD CTRL Step 2 (RNO). Place the running charging pump controller in MANUAL AND adjust charging flow to maintain pressurizer level at program level setpoint Step 3 Check PRZR Status
: b. PRZR Safety Valves - CLOSED u-ZL-8010A, PRZR SFTY VLV A u-ZL-8010B, PRZR SFTY VLV B u-ZL-8010C, PRZR SFTY VLV C
: a. PRZR PORVs - CLOSED
: c. PRZR Spray Valves - RESPONDING NORMALLY TO CONTROL PRESSURE u-ZL-455B, RC LOOP 1 PRZRSPR VLV u-ZL-455C, RC LOOP 4 PRZR SPR VLV
* 1/u-PCV-455A, PRZR PORV
: d. Pressurizer Relief Tank level AND temperature - NO SIGNIFICANT INCREASE u-TI-468, PRT TEMP u-LI-470, PRT LVL u-PI-469, PRT PRESS
* 1/u-PCV-456, PRZR PORV
: b. PRZR Safety Valves - CLOSED
* u-ZL-8010A, PRZR SFTY VLV A
* u-ZL-8010B, PRZR SFTY VLV B
* u-ZL-8010C, PRZR SFTY VLV C
: c. PRZR Spray Valves - RESPONDING NORMALLY TO CONTROL PRESSURE
* u-ZL-455B, RC LOOP 1 PRZRSPR VLV
* u-ZL-455C, RC LOOP 4 PRZR SPR VLV
: d. Pressurizer Relief Tank level AND temperature - NO SIGNIFICANT INCREASE
* u-TI-468, PRT TEMP
* u-LI-470, PRT LVL
* u-PI-469, PRT PRESS
: d. Check PRZR PORV AND Safety Valves for indication of leakage:
: d. Check PRZR PORV AND Safety Valves for indication of leakage:
* u-TI-463, PRZR PORV OUT TEMP
u-TI-463, PRZR PORV OUT TEMP u-TI-464, PRZR SFTY VLV C OUT TEMP u-TI-465, PRZR SFTY VLV B OUT TEMP Step 4 Verify AUTO makeup in service 1/u-MU, RCS MU MAN ACT -START 43/u-MU, RCS MU MODE SELECT-AUTO Step 5 Verify 1/u-LCV-112A, VCT LVL CTRL VLV - ALIGNED TO VCT.
* u-TI-464, PRZR SFTY VLV C OUT TEMP
* u-TI-465, PRZR SFTY VLV B OUT TEMP Step 4 Verify AUTO makeup in service
* 1/u-MU, RCS MU MAN ACT -START
* 43/u-MU, RCS MU MODE SELECT- AUTO Step 5 Verify 1/u-LCV-112A, VCT LVL CTRL VLV - ALIGNED TO VCT.
Step 6 Check Steam Generator status:
Step 6 Check Steam Generator status:
: a. All Steam Generator levels - NORMAL
: a. All Steam Generator levels - NORMAL
: b. Verify SG feedwater/steam flow - NO SIGNIFICANT MISMATCH
: b. Verify SG feedwater/steam flow - NO SIGNIFICANT MISMATCH
: c. Monitor PC-11 trends on affected Steam Generators for increased radioactivity.
: c. Monitor PC-11 trends on affected Steam Generators for increased radioactivity.  
                                                                *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No:   2     Event No:   4               Page   13     of 24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 Event No:
4 Page 13 of 24 Event


== Description:==
== Description:==
Letdown Leak Inside Containment Time   RO     BOP     SRO                         Applicant's Actions or Behavior Step 7 Verify primary sampling valves closed - u-MLB-1A2- LIGHTS DARK
Letdown Leak Inside Containment Time RO BOP SRO Applicant's Actions or Behavior Step 7 Verify primary sampling valves closed - u-MLB-1A2-LIGHTS DARK 1.1 u-HV-4165, PRZR STM SMPL ISOL VLV OPEN 2.1 u-HV-4166, PRZR LIQ SMPL ISOL OPEN 3.1 u-HV-4168, HL 1 SMPL ISOL OPEN 4.1 u-HV-4169, HL 4 SMPL ISOL OPEN Step 8 Announce over plant page:  
* 1.1 u-HV-4165, PRZR STM SMPL ISOL VLV OPEN
"ATTENTION ALL PERSONNEL. WE HAVE INDICATION OF A LEAK FROM THE UNIT RCS. BE AWARE OF POSSIBLE INCREASED RADIATION LEVELS OUTSIDE CONTAINMENT BUILDING. REPORT ANY WATER SPILLAGE, OBSERVED LEAKS, OR UNEXPECTED TANK OR SUMP LEVEL INCREASES TO UNIT u CONTROL ROOM".
* 2.1 u-HV-4166, PRZR LIQ SMPL ISOL OPEN
* 3.1 u-HV-4168, HL 1 SMPL ISOL OPEN
* 4.1 u-HV-4169, HL 4 SMPL ISOL OPEN Step 8 Announce over plant page:
                            "ATTENTION ALL PERSONNEL. WE HAVE INDICATION OF A LEAK FROM THE UNIT RCS. BE AWARE OF POSSIBLE INCREASED RADIATION LEVELS OUTSIDE CONTAINMENT BUILDING. REPORT ANY WATER SPILLAGE, OBSERVED LEAKS, OR UNEXPECTED TANK OR SUMP LEVEL INCREASES TO UNIT u CONTROL ROOM".
Step 9 Dispatch personnel to search for leak while continuing with this procedure:
Step 9 Dispatch personnel to search for leak while continuing with this procedure:
: a. Check the following:
: a. Check the following:
: 1) Residual Heat Removal
: 1) Residual Heat Removal Line pressure - NORMAL FOR CONDITIONS Piping temperature - AMBIENT NO piping leaks
* Line pressure - NORMAL FOR CONDITIONS
: 2) Safety Injection NO piping leaks Piping temperature - AMBIENT
* Piping temperature - AMBIENT
: 3) RCS Letdown and Makeup NO piping leaks Filter Drains - CLOSED NO pump leakage NO BTRS drain valve or diaphragm valve leakage.
* NO piping leaks
: 4) Auxiliary Building AND SFGD building sump levels - NO UNEXPECTED INCREASE  
: 2) Safety Injection
*BOLD INDICATES CRITICAL STEP
* NO piping leaks
* Piping temperature - AMBIENT
: 3) RCS Letdown and Makeup
* NO piping leaks
* Filter Drains - CLOSED
* NO pump leakage
* NO BTRS drain valve or diaphragm valve leakage.
: 4) Auxiliary Building AND SFGD building sump levels - NO UNEXPECTED INCREASE
                                                                *BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1           Scenario No: 2       Event No:   4               Page   14   of 24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 Event No:
4 Page 14 of 24 Event


== Description:==
== Description:==
Letdown Leak Inside Containment Time   RO     BOP     SRO                       Applicant's Actions or Behavior Step 10. Check areas AND systems for signs of leakage:
Letdown Leak Inside Containment Time RO BOP SRO Applicant's Actions or Behavior Step 10. Check areas AND systems for signs of leakage:
: a. Verify PC-11 Trends - NORMAL
: a. Verify PC-11 Trends - NORMAL Main Steam Line Monitors SFGDs Building ARMs Auxiliary Building ARMs Containment Building ARMs AND PIG Component Cooling Water Process Monitors
* Main Steam Line Monitors
* SFGDs Building ARMs
* Auxiliary Building ARMs
* Containment Building ARMs AND PIG
* Component Cooling Water Process Monitors
: b. Verify Accumulator Tank levels - NORMAL c.Verify Containment Building Sumps - NOT INCREASING:
: b. Verify Accumulator Tank levels - NORMAL c.Verify Containment Building Sumps - NOT INCREASING:
* u-LI-5160, CNTMT SMP 1 LVL
u-LI-5160, CNTMT SMP 1 LVL u-LI-5161, CNTMT SMP 2 LVL u-LI-5164, RX CAV SMP LVL
* u-LI-5161, CNTMT SMP 2 LVL
* u-LI-5164, RX CAV SMP LVL
: d. Verify Reactor Coolant Drain Tank level AND discharge flow - NORMAL Step 11 Check letdown and normal charging for leakage.
: d. Verify Reactor Coolant Drain Tank level AND discharge flow - NORMAL Step 11 Check letdown and normal charging for leakage.
: a. Area Radiation Monitor in vicinity of letdown and charging - NORMAL
: a. Area Radiation Monitor in vicinity of letdown and charging - NORMAL PPAu21, HRAM PIPE PENET N(S). 810 (u-RE-6259B)
* PPAu21, HRAM PIPE PENET N(S). 810 (u-RE-6259B)
: b. Check FFLu60, FAILED FUEL (u-RE-0406) for loss of flow.
: b. Check FFLu60, FAILED FUEL (u-RE-0406) for loss of flow.
: c. Verify VCT level - NORMAL
: c. Verify VCT level - NORMAL
Line 2,288: Line 2,777:
: 2) Isolate Letdown and normal charging as follows:
: 2) Isolate Letdown and normal charging as follows:
A) Close Orifice Isolation Valves:
A) Close Orifice Isolation Valves:
* 1/u-8149A, LTDN ORIFICE ISOL VLV (45 GPM)
1/u-8149A, LTDN ORIFICE ISOL VLV (45 GPM) 1/u-8149B, LTDN ORIFICE ISOL VLV (75 GPM) 1/u-8149C, LTDN ORIFICE ISOL VLV (75 GPM)
* 1/u-8149B, LTDN ORIFICE ISOL VLV (75 GPM)
* 1/u-8149C, LTDN ORIFICE ISOL VLV (75 GPM)
B) Close Letdown Isolation Valves:
B) Close Letdown Isolation Valves:
* 1/u-LCV-460, LTDN ISOL VLV
1/u-LCV-460, LTDN ISOL VLV 1/u-LCV-459, LTDN ISOL VLV Note: The crew may not get to this point. The next event will happen at the discretion of the lead evaluator.  
* 1/u-LCV-459, LTDN ISOL VLV Note: The crew may not get to this point. The next event will happen at the discretion of the lead evaluator.
*BOLD INDICATES CRITICAL STEP
                                                                *BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1           Scenario No:   2     Event No: 5                 Page 15   of   24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 Event No:
5 Page 15 of 24 Event


== Description:==
== Description:==
RCP Seized Shaft Time   RO     BOP     SRO                         Applicant's Actions or Behavior 2.1 Symptoms
RCP Seized Shaft Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms
: a. Annunciators Alarm
: a. Annunciators Alarm ANY RCP TRIP (5B-1.1) 1 OF 4 RCP UNDRVOLT (5B-1.2)
* ANY RCP TRIP (5B-1.1)
RC LOOP 1 1 OF 3 FLO LO (5A-1.3) 1 OF 4 RCP UNDRFREQ (5B-2.2)
* 1 OF 4 RCP UNDRVOLT (5B-1.2)
RC LOOP 2 1 OF 3 FLO LO (5A-2.3)
* RC LOOP 1 1 OF 3 FLO LO (5A-1.3)
RC LOOP 3 1 OF 3 FLO LO (5A-3.3)
* 1 OF 4 RCP UNDRFREQ (5B-2.2)
RC LOOP 4 1 OF 3 FLO LO (5A-4.3)
* RC LOOP 2 1 OF 3 FLO LO (5A-2.3)
: b. Plant Indications Low flow indication on any reactor coolant loop.
* RC LOOP 3 1 OF 3 FLO LO (5A-3.3)
Breaker TRIP or MISMATCH light illuminated on any RCP handswitch.
* RC LOOP 4 1 OF 3 FLO LO (5A-4.3)
Motor amps on any RCP motor reading zero.
: b. Plant Indications
2.2 Automatic Actions Reactor trip occurs in the event of one reactor coolant pump trip with reactor power greater than 48% (P-8 permissive annunciator NOT LIT).
* Low flow indication on any reactor coolant loop.
Reactor trip occurs in the event of two reactor coolant pumps trip with reactor power orturbine power greater than 10% (P-7 permissive annunciator NOT LIT).
* Breaker TRIP or MISMATCH light illuminated on any RCP handswitch.
* Motor amps on any RCP motor reading zero.
2.2 Automatic Actions
* Reactor trip occurs in the event of one reactor coolant pump trip with reactor power greater than 48% (P-8 permissive annunciator NOT LIT).
* Reactor trip occurs in the event of two reactor coolant pumps trip with reactor power orturbine power greater than 10% (P-7 permissive annunciator NOT LIT).
If the crew enters ABN-101 the first step is:
If the crew enters ABN-101 the first step is:
Step 1. (Initial Operator Action) Check Plant status
Step 1. (Initial Operator Action) Check Plant status
: a. Verify Reactor - Tripped
: a. Verify Reactor - Tripped
: b. GO TO EOP-0.0A/B while other qualified operators continue with this procedure.
: b. GO TO EOP-0.0A/B while other qualified operators continue with this procedure.  
                                                                *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No:   2       Event No:   5             Page 16     of 24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 Event No:
5 Page 16 of 24 Event


== Description:==
== Description:==
RCP Seized Shaft Time   RO     BOP     SRO                         Applicant's Actions or Behavior 2.1 Symptoms
RCP Seized Shaft Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms
: a. Annunciators Alarm
: a. Annunciators Alarm RX> 48% PWR 1 OF 4 RC LOOP FLO LO (6C-4.2)
* RX> 48% PWR 1 OF 4 RC LOOP FLO LO (6C-4.2)
RX> 10% PWR PRZR PRSS LO (6C-1.3)
* RX> 10% PWR PRZR PRSS LO (6C-1.3)
SG2 LVL LO (6C-2.6)
* SG2 LVL LO (6C-2.6)
Plant Indications Various First Out Annunciator alarms and changing plant conditions Automatic Actions Reactor Trip breakers open and the turbine trips Orders a reactor trip and enters EOP-0.0A.
Plant Indications Various First Out Annunciator alarms and changing plant conditions Automatic Actions Reactor Trip breakers open and the turbine trips Orders a reactor trip and enters EOP-0.0A.
Step 1. Verify Reactor Trip
Step 1. Verify Reactor Trip
: a. Verfiy the following:
: a. Verfiy the following:
* Reactor Trip and bypass breakers- OPEN, AND
Reactor Trip and bypass breakers-OPEN, AND Neutron Flux-DECREASING
* Neutron Flux- DECREASING
: b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
: b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
: a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
: a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
: a. AC safeguards busses - AT LEAST ONE ENERGIXED
: a. AC safeguards busses - AT LEAST ONE ENERGIXED AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
* AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
: b. AC safeguards busses - BOTH ENERGIZED Step 4. Check SI Status:
: b. AC safeguards busses - BOTH ENERGIZED Step 4. Check SI Status:
: a. Check If SI is Actuated:
: a. Check If SI is Actuated:
* SI actuation as indicated on the First Out Ann 1-ALB-6C
SI actuation as indicated on the First Out Ann 1-ALB-6C SI Actuated blue status light - ON
* SI Actuated blue status light - ON
: b. Verify Both Trains DI Actuated:
: b. Verify Both Trains DI Actuated:
* SI Actuated blue status light - ON NOT FLASHING Step 4, RNO. IF SI is NOT required, THEN go to EOS-0.1 A, REACTOR TRIP RESPONSE
SI Actuated blue status light - ON NOT FLASHING Step 4, RNO. IF SI is NOT required, THEN go to EOS-0.1 A, REACTOR TRIP RESPONSE  
                                                                  *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No:   2     Event No:   5               Page   17   of   24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 Event No:
5 Page 17 of 24 Event


== Description:==
== Description:==
Reactor Trip Response Time   RO     BOP     SRO                         Applicant's Actions or Behavior Transitions to EOS-0.1A, Reactor Trip Response Step 1. Check RCS Average Temperature - STABLE AT OR TRENDING TO 557&deg; F.
Reactor Trip Response Time RO BOP SRO Applicant's Actions or Behavior Transitions to EOS-0.1A, Reactor Trip Response Step 1. Check RCS Average Temperature - STABLE AT OR TRENDING TO 557&deg; F.
Step 2. Check FW Status:
Step 2. Check FW Status:
: a. Verify reactor trip and bypass breaker - OPEN
: a. Verify reactor trip and bypass breaker - OPEN
Line 2,365: Line 2,851:
: a. Narrow Range Level - GREATER THAN 5%
: a. Narrow Range Level - GREATER THAN 5%
: b. Control Feed flow to maintain narrow range level between 5% and 50%.
: b. Control Feed flow to maintain narrow range level between 5% and 50%.
NOTE: Because of the RCP Trip, the level in the #1 SG will be higher than in the other SGs. The crew should NOT believe that this is indication of a SGTR. If they do, however, it will not effect the outcome of the scenario
NOTE: Because of the RCP Trip, the level in the #1 SG will be higher than in the other SGs. The crew should NOT believe that this is indication of a SGTR. If they do, however, it will not effect the outcome of the scenario  
                                                                *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No:   2       Event No: 6&7               Page   18     of 24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 Event No: 6 & 7 Page 18 of 24 Event


== Description:==
== Description:==
LB LOCA (Auto SI Fails)
LB LOCA (Auto SI Fails)
Time   RO     BOP     SRO                         Applicant's Actions or Behavior 2.1 Symptoms
Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms
: a. Annunciators Alarm
: a. Annunciators Alarm PRZR PRESS LO SI ACT (6C-2.7)
* PRZR PRESS LO SI ACT (6C-2.7)
CNTMT PRESS HI SI ACT (6C-4.7)
* CNTMT PRESS HI SI ACT (6C-4.7)
Plant Indications RCS pressure and temperature rapidly dropping, Pressurizer level and pressure dropping and Containment Temperature and Pressure increasing rapidly.
Plant Indications RCS pressure and temperature rapidly dropping, Pressurizer level and pressure dropping and Containment Temperature and Pressure increasing rapidly.
Automatic Actions Automatic SI will not function and RHR Pump 1-02 fails to start.
Automatic Actions Automatic SI will not function and RHR Pump 1-02 fails to start.
Line 2,382: Line 2,869:
Step 1. Verify Reactor Trip
Step 1. Verify Reactor Trip
: a. Verfiy the following:
: a. Verfiy the following:
* Reactor Trip and bypass breakers- OPEN, AND
Reactor Trip and bypass breakers-OPEN, AND Neutron Flux-DECREASING
* Neutron Flux- DECREASING
: b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
: b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
: a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
: a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
: a. AC safeguards busses - AT LEAST ONE ENERGIXED
: a. AC safeguards busses - AT LEAST ONE ENERGIXED AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
* AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
: b. AC safeguards busses - BOTH ENERGIZED Step 4. Check SI Status:
: b. AC safeguards busses - BOTH ENERGIZED Step 4. Check SI Status:
: a. Check If SI is Actuated:
: a. Check If SI is Actuated:
* SI actuation as indicated on the First Out Ann 1-ALB-6C
SI actuation as indicated on the First Out Ann 1-ALB-6C SI Actuated blue status light - ON
* SI Actuated blue status light - ON
: b. Verify Both Trains DI Actuated:
: b. Verify Both Trains DI Actuated:
* SI Actuated blue status light - ON NOT FLASHING Step 4 RNO. Check if SI required (YES)
SI Actuated blue status light - ON NOT FLASHING Step 4 RNO. Check if SI required (YES)
Manually Initiate SI.
Manually Initiate SI.  
                                                                *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No:   2     Event No: 6&7               Page 19   of   24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 Event No: 6 & 7 Page 19 of 24 Event


== Description:==
== Description:==
LB LOCA (Auto SI Fails)
LB LOCA (Auto SI Fails)
Time   RO     BOP     SRO                       Applicant's Actions or Behavior Step 5. Ensure Proper Safeguards Equipment Operation Per Attachment 2.
Time RO BOP SRO Applicant's Actions or Behavior Step 5. Ensure Proper Safeguards Equipment Operation Per Attachment 2.
NOTE: It is expected that the RHR pump trip will be noticed and documented during the performance of Attachment 2.
NOTE: It is expected that the RHR pump trip will be noticed and documented during the performance of Attachment 2.
Step 6. Verify AFW Alignment
Step 6. Verify AFW Alignment
Line 2,418: Line 2,904:
Step 8. Check if Main Steamlines should be Isolated:
Step 8. Check if Main Steamlines should be Isolated:
: a. Verify the following:
: a. Verify the following:
* Containment Pressure - GREATER THAN 6 PSIG (YES)
Containment Pressure - GREATER THAN 6 PSIG (YES)
: b. Verify main steam isolation complete.
: b. Verify main steam isolation complete.
Step 9. Check RCS Average Temperature - STABLE AT OR TRENDING TO 557&deg;F.
Step 9. Check RCS Average Temperature - STABLE AT OR TRENDING TO 557&deg;F.
Line 2,427: Line 2,913:
: c. PORVs - CLOSED
: c. PORVs - CLOSED
: d. Power to at least one block valve - AVAILABLE
: d. Power to at least one block valve - AVAILABLE
: e. Block valves - AT LEAST ONE OPEN
: e. Block valves - AT LEAST ONE OPEN  
                                                                *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No: 2     Event No: 6&7               Page   20   of   24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 Event No: 6 & 7 Page 20 of 24 Event


== Description:==
== Description:==
LB LOCA (Auto SI Fails)
LB LOCA (Auto SI Fails)
Time   RO     BOP     SRO                     Applicant's Actions or Behavior Step 11. Check if RCPs should be stopped:
Time RO BOP SRO Applicant's Actions or Behavior Step 11. Check if RCPs should be stopped:
: a. ECCS pumps - AT LEAST ONE RUNNING
: a. ECCS pumps - AT LEAST ONE RUNNING CCP  
* CCP
-OR-SI pump
                                          -OR-
* SI pump
: b. RCS subcooling - LESS THAN 25&deg; F (55&deg; F FOR ADVERSE CONTAINMENT)
: b. RCS subcooling - LESS THAN 25&deg; F (55&deg; F FOR ADVERSE CONTAINMENT)
: c. Stop all RCPs.
: c. Stop all RCPs.
Step 12. Check if any SG is Faulted:
Step 12. Check if any SG is Faulted:
: a. Check pressures in all SGs:
: a. Check pressures in all SGs:
* ANY SG DECREASING IN AN UNCONTROLLED MANNER
ANY SG DECREASING IN AN UNCONTROLLED MANNER  
                                              -OR-
-OR-ANY SG COMPLETELY DEPRESSURIZED Step a RNO, Go to Step 13.
* ANY SG COMPLETELY DEPRESSURIZED Step a RNO, Go to Step 13.
: b. Go to EOP-2.0A, FAULTED STEAM GENERATOR ISOLATION, Step 1.
: b. Go to EOP-2.0A, FAULTED STEAM GENERATOR ISOLATION, Step 1.
Step 13.Check if SG Tubes Are Not Ruptured:
Step 13.Check if SG Tubes Are Not Ruptured:
* Condenser off gas radiation - NORMAL (COG-182, 1RE-2959)
Condenser off gas radiation - NORMAL (COG-182, 1RE-2959)
* Main steamline radiation - NORMAL (MSL-178-181, 1RE-2325 -
Main steamline radiation - NORMAL (MSL-178-181, 1RE-2325 -
2328)
2328)
* SG blowdown and sample radiation monitor - NORMAL (SGS-164, 1RE-4200)
SG blowdown and sample radiation monitor - NORMAL (SGS-164, 1RE-4200)
* No Steam Generator level increasing in an uncontrolled manner NOTE: See previous note about SG level response to a tripped RCP Step 14. Check If RCS Is Intact:
No Steam Generator level increasing in an uncontrolled manner NOTE: See previous note about SG level response to a tripped RCP Step 14. Check If RCS Is Intact:
* Containment pressure - LESS THAN 1.3 PSIG
Containment pressure - LESS THAN 1.3 PSIG Containment recirculation sump levels - NORMAL Containment radiation - NORMAL (GRID 4)
* Containment recirculation sump levels - NORMAL
Step 14 RNO, Got to EOP-1.0A, LOSS OF REACTOR OR SECONDARY COOLANT  
* Containment radiation - NORMAL (GRID 4)
*BOLD INDICATES CRITICAL STEP
Step 14 RNO, Got to EOP-1.0A, LOSS OF REACTOR OR SECONDARY COOLANT
                                                              *BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No: 2       Event No: 6 & 7             Page 21       of 24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 Event No: 6 & 7 Page 21 of 24 Event


== Description:==
== Description:==
LB LOCA (Auto SI Fails) EOP 1.0A Loss of Reactor or Secondary Coolant Time   RO     BOP     SRO                       Applicant's Actions or Behavior NOTE: It is expected that the RWST level will be at 45% within 17 minutes of the LBLOCA. The progress through EOP-1.0A will vary with each crew dependent upon how fast they proceed. Actual progress is not important, but the transition to EOS-1.3 A, Transfer to Cold Leg Recirculation, when plant conditions require, is.
LB LOCA (Auto SI Fails) EOP 1.0A Loss of Reactor or Secondary Coolant Time RO BOP SRO Applicant's Actions or Behavior NOTE: It is expected that the RWST level will be at 45% within 17 minutes of the LBLOCA. The progress through EOP-1.0A will vary with each crew dependent upon how fast they proceed. Actual progress is not important, but the transition to EOS-1.3 A, Transfer to Cold Leg Recirculation, when plant conditions require, is.
Transitions to EOP-1.0A, Loss of Reactor or Secondary Coolant Step 1. Check if RCPs should be stopped:
Transitions to EOP-1.0A, Loss of Reactor or Secondary Coolant Step 1. Check if RCPs should be stopped:
: a. ECCS pumps - AT LEAST ONE RUNNING
: a. ECCS pumps - AT LEAST ONE RUNNING CCP  
* CCP
-OR-SI pump
                                            -OR-
* SI pump
: b. RCS subcooling - LESS THAN 25&deg; F (55&deg; F FOR ADVERSE CONTAINMENT)
: b. RCS subcooling - LESS THAN 25&deg; F (55&deg; F FOR ADVERSE CONTAINMENT)
: c. Stop all RCPs.
: c. Stop all RCPs.
Line 2,473: Line 2,956:
Step 2. Check if any SG is Faulted:
Step 2. Check if any SG is Faulted:
: a. Check pressures in all SGs:
: a. Check pressures in all SGs:
* ANY SG DECREASING IN AN UNCONTROLLED MANNER
ANY SG DECREASING IN AN UNCONTROLLED MANNER  
                                                -OR-
-OR-ANY SG COMPLETELY DEPRESSURIZED Step a RNO, Go to Step 3.
* ANY SG COMPLETELY DEPRESSURIZED Step a RNO, Go to Step 3.
: b. Go to EOP-2.0A, FAULTED STEAM GENERATOR ISOLATION, Step 1.
: b. Go to EOP-2.0A, FAULTED STEAM GENERATOR ISOLATION, Step 1.
Step 3. Check SG Levels:
Step 3. Check SG Levels:
: a. Narrow Range Level - GREATER THAN 5%
: a. Narrow Range Level - GREATER THAN 5%
: b. Control Feed flow to maintain narrow range level between 5% and 50%.
: b. Control Feed flow to maintain narrow range level between 5% and 50%.
Step 4.Check Secondary Radiation - NORMAL
Step 4.Check Secondary Radiation - NORMAL Condenser off gas radiation - NORMAL (COG-182, 1RE-2959)
* Condenser off gas radiation - NORMAL (COG-182, 1RE-2959)
Main steamline radiation - NORMAL (MSL-178-181, 1RE-2325 -
* Main steamline radiation - NORMAL (MSL-178-181, 1RE-2325 -
2328)
2328)
* SG blowdown and sample radiation monitor - NORMAL (SGS-164, 1RE-4200)
SG blowdown and sample radiation monitor - NORMAL (SGS-164, 1RE-4200)
When RWST LVL LO-LO Alarm comes in, transition to EOS-1.3A, Transfer to Cold Leg Recirculation. (Reference EOP-1.0A fold out page and ALM 1-ALB-4B, 3.7)
When RWST LVL LO-LO Alarm comes in, transition to EOS-1.3A, Transfer to Cold Leg Recirculation. (Reference EOP-1.0A fold out page and ALM 1-ALB-4B, 3.7)  
                                                                *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No: 2     Event No: 6 & 7           Page 22   of 24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 Event No: 6 & 7 Page 22 of 24 Event


== Description:==
== Description:==
LB LOCA (Auto SI Fails) EO2 1.3A Transfer to Cold Leg Recirculation Time   RO     BOP     SRO                     Applicant's Actions or Behavior Caution: Steps 1 through 3 should be performed without delay. FRGs should not be implemented prior to completion of these steps.
LB LOCA (Auto SI Fails) EO2 1.3A Transfer to Cold Leg Recirculation Time RO BOP SRO Applicant's Actions or Behavior Caution: Steps 1 through 3 should be performed without delay. FRGs should not be implemented prior to completion of these steps.
Step 1. Reset SI Step 2. Verify CCW Flow From RHR And Containment Spray Heat Exchangers.
Step 1. Reset SI Step 2. Verify CCW Flow From RHR And Containment Spray Heat Exchangers.
Caution: Any ECCS pump taking suction from RWST should be stopped upon RWST EMPTY alarm at 12% level. Any Containment Spray pump taking suction from RWST should be stopped when RWST level reaches 6%.
Caution: Any ECCS pump taking suction from RWST should be stopped upon RWST EMPTY alarm at 12% level. Any Containment Spray pump taking suction from RWST should be stopped when RWST level reaches 6%.
Line 2,498: Line 2,981:
Step 3. Align ECCS For Cold Leg Recirculation
Step 3. Align ECCS For Cold Leg Recirculation
: a. Check open CNTMT SMP TO RHRP 1 AND 2 SUCT ISOL VLVS:
: a. Check open CNTMT SMP TO RHRP 1 AND 2 SUCT ISOL VLVS:
* 1/1-8811A
1/1-8811A 1/1-8811B
* 1/1-8811B
: b. Close RWST TO RHRP 1 AND RHRP 2 SUCT VLVS 1/1-8812A 1/1-8812B
: b. Close RWST TO RHRP 1 AND RHRP 2 SUCT VLVS
* 1/1-8812A
* 1/1-8812B
: c. Close SIP 1 AND SIP 2 MINIFLO VLVS:
: c. Close SIP 1 AND SIP 2 MINIFLO VLVS:
* 1/1-8814A
1/1-8814A 1/1-8814B 1/1-8813
* 1/1-8814B
* 1/1-8813
: d. Close RHRP 1 AND RHRP 2 XTIE VLVS:
: d. Close RHRP 1 AND RHRP 2 XTIE VLVS:
* 1/1-8716A
1/1-8716A 1/1-8716B  
* 1/1-8716B
*BOLD INDICATES CRITICAL STEP
                                                            *BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No: 2   Event No: 6 & 7           Page 23     of 24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 Event No: 6 & 7 Page 23 of 24 Event


== Description:==
== Description:==
LB LOCA (Auto SI Fails) EO2 1.3A Transfer to Cold Leg Recirculation Time   RO     BOP     SRO                     Applicant's Actions or Behavior
LB LOCA (Auto SI Fails) EO2 1.3A Transfer to Cold Leg Recirculation Time RO BOP SRO Applicant's Actions or Behavior
: e. Close the CCP ALT MINIFLO ISOL VLVS:
: e. Close the CCP ALT MINIFLO ISOL VLVS:
* 1/1-8511A
1/1-8511A 1/1-8512B 1/1-8511B 1/1-8512A
* 1/1-8512B
* 1/1-8511B
* 1/1-8512A
: f. Open SI < -- > CHRG SUCT HDR XTIE VLVS:
: f. Open SI < -- > CHRG SUCT HDR XTIE VLVS:
* 1/1-8807A
1/1-8807A 1/1-8807B
* 1/1-8807B
: g. Open RHRPs TO CCP/SIP SUCT VLVS:
: g. Open RHRPs TO CCP/SIP SUCT VLVS:
* 1/1-8804A
1/1-8804A 1/1-8804B NOTE: Due to the RHR pump trip, only one train will be lined up for Cold Leg Recirculation.
* 1/1-8804B NOTE: Due to the RHR pump trip, only one train will be lined up for Cold Leg Recirculation.
Step 4. Align Containment Spray System for Recirculation:
Step 4. Align Containment Spray System for Recirculation:
: a. Check RWST level - LESS THAN 24%.
: a. Check RWST level - LESS THAN 24%.
Line 2,532: Line 3,006:
: b. Realign Containment Spray System as follows:
: b. Realign Containment Spray System as follows:
: 1) Open CNTMT SMP TO CSP 1 & 3 AND 2 & 4 SUCT ISOL VLVS:
: 1) Open CNTMT SMP TO CSP 1 & 3 AND 2 & 4 SUCT ISOL VLVS:
* 1-HS-4782
1-HS-4782 1-HS-4783
* 1-HS-4783
: 2) Close RWST TO CSP 1 & 3 AND 2 & 4 SUCT VLVS 1-HS-4758 1-HS-4759
: 2) Close RWST TO CSP 1 & 3 AND 2 & 4 SUCT VLVS
: 3) IF the containment spray pumps have been stopped due to RWST level, THEN perform the following:  
* 1-HS-4758
*BOLD INDICATES CRITICAL STEP
* 1-HS-4759
: 3) IF the containment spray pumps have been stopped due to RWST level, THEN perform the following:
                                                            *BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No: 2       Event No: 6 & 7               Page 24   of   24 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
2 Event No: 6 & 7 Page 24 of 24 Event


== Description:==
== Description:==
LB LOCA (Auto SI Fails) EO2 1.3A Transfer to Cold Leg Recirculation Time   RO     BOP     SRO                     Applicant's Actions or Behavior A) Ensure CS HX 1 AND 2 OUT VLVs closed, and handswitches in PULL-OUT:
LB LOCA (Auto SI Fails) EO2 1.3A Transfer to Cold Leg Recirculation Time RO BOP SRO Applicant's Actions or Behavior A) Ensure CS HX 1 AND 2 OUT VLVs closed, and handswitches in PULL-OUT:
* 1-HS-4776
1-HS-4776 1-HS-4777 B) Perform steps C) and D) simultaneously.
* 1-HS-4777 B) Perform steps C) and D) simultaneously.
C) Open CS HS 1 AND 2 OUT VLVS:
C) Open CS HS 1 AND 2 OUT VLVS:
* 1-HS-4776
1-HS-4776 1-HS-4777 D) WHEN CS HX OUT VLVs begin to open, THEN start CS PUMPS:
* 1-HS-4777 D) WHEN CS HX OUT VLVs begin to open, THEN start CS PUMPS:
1-HS-4764 AND 1-HS-4765 1-HS-4766 AND 1-HS-4767
* 1-HS-4764 AND 1-HS-4765
* 1-HS-4766 AND 1-HS-4767
: 4) Verify containment spray flow.
: 4) Verify containment spray flow.
The scenario may be terminated at the discretion of the Lead Examiner.
The scenario may be terminated at the discretion of the Lead Examiner.  
                                                              *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


SHIFT TURNOVER INFORMATION 1.0     INITIAL CONDTIONS:
SHIFT TURNOVER INFORMATION 1.0 INITIAL CONDTIONS:
Time in Core Life: BOL           Tavg: 572.6oF Reactor Power: 40%               RCS Pressure: 2251 psig Turbine Load: 425 Mwe             Xenon: Equil Boron Concentration: 2251 ppm                             Rod Control:     MAN Rod Height: CB D @ 189 steps 2.0     LCOAR/TECHNICAL SPECIFICATION ACTIONS IN EFFECT:
Time in Core Life: BOL Tavg: 572.6oF Reactor Power: 40%
3.0     CLEARANCES IN EFFECT:
RCS Pressure: 2251 psig Turbine Load: 425 Mwe Xenon: Equil Boron Concentration: 2251 ppm Rod Control: MAN Rod Height: CB D @ 189 steps 2.0 LCOAR/TECHNICAL SPECIFICATION ACTIONS IN EFFECT:
TS#     Description Reason 3.7.5 AFW               AFW Pump 1-01 OOS for Oil Sample 3.0     CLEARANCES IN EFFECT:
3.0 CLEARANCES IN EFFECT:
TS#
Description Reason 3.7.5 AFW AFW Pump 1-01 OOS for Oil Sample 3.0 CLEARANCES IN EFFECT:
4.0 SAFETY SYSTEM SETTING BYPASS/MALFUNCTIONS None 5.0 DEGRADED EQUIPMENT 6.0 PLANNED EVOLUTIONS:
4.0 SAFETY SYSTEM SETTING BYPASS/MALFUNCTIONS None 5.0 DEGRADED EQUIPMENT 6.0 PLANNED EVOLUTIONS:
Return AFW Pump 1-01 to service when the oil sample is complete.
Return AFW Pump 1-01 to service when the oil sample is complete.
7.0     TURNOVER INFORMATION:
7.0 TURNOVER INFORMATION:
Unit 1 is at 40% power and increasing per IPO-003A, step 5.4.19. Shift orders are to increase reactor power during the shift. The A MDAFWP is OOS due to contamination in the oil. Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. The expectation is that the ALERT will last until midnight. There are no surveillances planned for this shift.
Unit 1 is at 40% power and increasing per IPO-003A, step 5.4.19. Shift orders are to increase reactor power during the shift. The A MDAFWP is OOS due to contamination in the oil. Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. The expectation is that the ALERT will last until midnight. There are no surveillances planned for this shift.  


Revision 0 Appendix D                                 Scenario Outline                         Form ES-D-1 Facility:             CPSES         Scenario No.:         3       Op-Test No.:         1 Examiners:                                               Operators:
Revision 0 Appendix D Scenario Outline Form ES-D-1 Facility:
Note:     (NEW)
CPSES Scenario No.:
Initial Conditions:     BOL, 100% power Eq Xenon. The A MDAFWP is OOS for oil contamination. ( 6 hours into LCO)
3 Op-Test No.:
1 Examiners:
Operators:
Note:
(NEW)
Initial Conditions:
BOL, 100% power Eq Xenon. The A MDAFWP is OOS for oil contamination. ( 6 hours into LCO)
IC-15, REMF FWR20 in Rackout with H/S in P.O and Red Tagged.
IC-15, REMF FWR20 in Rackout with H/S in P.O and Red Tagged.
Turnover: Unit 1 and Unit 2 are at 100% power. U1 has been at 100% for the last 15 days following refueling. The A MDAFWP is OOS due to contamination in the oil.
Turnover:
Unit 1 and Unit 2 are at 100% power. U1 has been at 100% for the last 15 days following refueling. The A MDAFWP is OOS due to contamination in the oil.
Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. There are no surveillances planned for this shift and the orders are to maintain current load and unit availability.
Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. There are no surveillances planned for this shift and the orders are to maintain current load and unit availability.
Event Malf. No.           Event                               Event No.                    Type*                             Description 1         SG01C         C (SRO) SGTL on #3 Steam Generator T=0        @ 8 gpm C (RO) 2          RP06D@ I (SRO) Loop 4 N-16 Instrument fails high.
Event No.
T= 7       150%          I (RO) 3          RD08          C (SRO) Rods move in the opposite direction (Auto only)
Malf. No.
T=7                      C (RO) 4                        N (SRO) Plant Shutdown Required by Steam Generator Tube Leak >
Event Type*
T=20                    R (RO)      150 gpd. (May be directed by Duty Manager)
Event Description 1
N (BOP) 5          RD13B8 C (SRO) Two rods misaligned by more than 12 steps (Manual Rx trip T=34      @6            C (RO)      required). CBC Rod B8 slips to 6 steps and CBA rod F-8 RD03F8                    drops to the bottom.
T=0 SG01C  
6         SG01C         M (ALL) SGTL increases to SGTR at 675 gpm T=38       @
@ 8 gpm C (SRO)
675gpm 7          RP09A & C (SRO) Phase A fails to actuate on SIS T=38      B            C (BOP) 8          MS13C        I (SRO) The ARV on the ruptured SG fails open due to Main Steam T=46*      @ 100% I (BOP) line pressure xmtr failure. May be manually closed.
C (RO)
* (N)ormal,     (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor
SGTL on #3 Steam Generator 2
T= 7 RP06D@
150%
I (SRO)
I (RO)
Loop 4 N-16 Instrument fails high.
3 T=7 RD08 C (SRO)
C (RO)
Rods move in the opposite direction (Auto only) 4 T=20 N (SRO)
R (RO)
N (BOP)
Plant Shutdown Required by Steam Generator Tube Leak >
150 gpd. (May be directed by Duty Manager) 5 T=34 RD13B8
@ 6 RD03F8 C (SRO)
C (RO)
Two rods misaligned by more than 12 steps (Manual Rx trip required). CBC Rod B8 slips to 6 steps and CBA rod F-8 drops to the bottom.
6 T=38 SG01C 675gpm M (ALL)
SGTL increases to SGTR at 675 gpm 7
T=38 RP09A &
B C (SRO)
C (BOP)
Phase A fails to actuate on SIS 8
T=46*
MS13C
@ 100%
I (SRO)
I (BOP)
The ARV on the ruptured SG fails open due to Main Steam line pressure xmtr failure. May be manually closed.  
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor  


Revision 0 Appendix D                                     Narrative Description Op-Test No:         1         Scenario No:   3     Event No:                     Page   2   of 19 The objective of this scenario is to evaluate the operators ability to change Reactor power in a controlled manner, respond to various instrument and component failures, and to carry out the requisite emergency procedures to mitigate the consequences of a Steam Generator Tube Rupture Accident.
Revision 0 Appendix D Narrative Description Op-Test No:
1 Scenario No:
3 Event No:
Page 2
of 19 The objective of this scenario is to evaluate the operators ability to change Reactor power in a controlled manner, respond to various instrument and component failures, and to carry out the requisite emergency procedures to mitigate the consequences of a Steam Generator Tube Rupture Accident.
Event One.
Event One.
The 1-03 Steam Generator develops a tube leak at 8 gpm. This small leak will not be able to be diagnosed by comparing steam flow and feed flow for a mismatch. Operator feedback for the SGTL will be the Radiation Monitoring system and further investigation by the crew will reveal a small mismatch between charging flow and letdown flows that is larger than usual. The first indication will be a Radiation Monitor alarm from the Main Steam line N-16 monitors. Subsequent to the N-16 alarms, the Condenser Off Gas monitor will alarm followed by the less sensitive MSL radiation monitors. It is expected that the operators will:
The 1-03 Steam Generator develops a tube leak at 8 gpm. This small leak will not be able to be diagnosed by comparing steam flow and feed flow for a mismatch. Operator feedback for the SGTL will be the Radiation Monitoring system and further investigation by the crew will reveal a small mismatch between charging flow and letdown flows that is larger than usual. The first indication will be a Radiation Monitor alarm from the Main Steam line N-16 monitors. Subsequent to the N-16 alarms, the Condenser Off Gas monitor will alarm followed by the less sensitive MSL radiation monitors. It is expected that the operators will:
* Respond to the Radiation Monitor alarms
Respond to the Radiation Monitor alarms Determine the SG 1-03 has a tube leak Refer to the correct ABN procedure Evaluate plant conditions and determine that conditions require a plant shutdown to less than 50% in one hour and Mode 3 in two hours Make the necessary notifications and refer to Technical Specifications.
* Determine the SG 1-03 has a tube leak
* Refer to the correct ABN procedure
* Evaluate plant conditions and determine that conditions require a plant shutdown to less than 50% in one hour and Mode 3 in two hours
* Make the necessary notifications and refer to Technical Specifications.
NOTE: The SRO will find that two ABN procedures apply. ABN-106, High Secondary Activity and ABN-103, Excessive RCS Leakage are both applicable to this event. ABN-106 is constructed to evaluate SGTL size and then directs the crew to take actions based on leak size. ABN-103 is a diagnostic tool used to locate and isolate the leak. ABN-106 will not DIRECT the operator to ABN-103 because the leak is < 15gpm. It is expected that the crew will recognize the leak is in a steam generator and cannot be isolated, determine the need to shutdown the plant and proceed to IPO-003A for guidance to shutdown the plant.
NOTE: The SRO will find that two ABN procedures apply. ABN-106, High Secondary Activity and ABN-103, Excessive RCS Leakage are both applicable to this event. ABN-106 is constructed to evaluate SGTL size and then directs the crew to take actions based on leak size. ABN-103 is a diagnostic tool used to locate and isolate the leak. ABN-106 will not DIRECT the operator to ABN-103 because the leak is < 15gpm. It is expected that the crew will recognize the leak is in a steam generator and cannot be isolated, determine the need to shutdown the plant and proceed to IPO-003A for guidance to shutdown the plant.
Event Two and Three.
Event Two and Three.
Line 2,592: Line 3,099:
This failure will cause the Control Banks for the Rod Control System to demand an inward sequence.
This failure will cause the Control Banks for the Rod Control System to demand an inward sequence.
This failure is further compounded by a problem in the Rod Control system that causes the rods to move out when inward direction is required. Operator feedback for these events will be various alarms generated by the N-16 failure, turbine load and reactor stable, and rods moving in the outward direction with power matched and no significant RCS temperature indication. It is expected that the operators will:
This failure is further compounded by a problem in the Rod Control system that causes the rods to move out when inward direction is required. Operator feedback for these events will be various alarms generated by the N-16 failure, turbine load and reactor stable, and rods moving in the outward direction with power matched and no significant RCS temperature indication. It is expected that the operators will:
* Evaluate plant conditions and determine that Rod Motion is not warranted.
Evaluate plant conditions and determine that Rod Motion is not warranted.
* Determine that Rod Control has malfunctioned and that rods are moving in the WRONG direction
Determine that Rod Control has malfunctioned and that rods are moving in the WRONG direction Place Rod Control in MANUAL Refer to the correct ABN procedure Select out the failed channel Make the necessary notifications and refer to Technical Specifications.
* Place Rod Control in MANUAL
Determine that Rod Control should remain in MANUAL.
* Refer to the correct ABN procedure
NOTE: Rod Control will remain in Manual for the rest of the scenario. It is not expected that the Operators will initiate a Reactor Trip for these events. For the case of an unexpected RX trip, the scenario has been evaluated against the requirement and still exceeds minimum requirements if the next event is NOT completed,(misaligned rods) but may need to be evaluated to ensure Normal and Reactivity requirements for the candidates are met with respect to the plant shutdown.  
* Select out the failed channel
* Make the necessary notifications and refer to Technical Specifications.
* Determine that Rod Control should remain in MANUAL.
NOTE: Rod Control will remain in Manual for the rest of the scenario. It is not expected that the Operators will initiate a Reactor Trip for these events. For the case of an unexpected RX trip, the scenario has         been evaluated against the requirement and still exceeds minimum requirements if the next event is         NOT completed,(misaligned rods) but may need to be evaluated to ensure Normal and Reactivity           requirements for the candidates are met with respect to the plant shutdown.


Revision 0 Appendix D                                     Narrative Description Op-Test No:         1         Scenario No:   3     Event No:                       Page   3     of   19 Event Four.
Revision 0 Appendix D Narrative Description Op-Test No:
1 Scenario No:
3 Event No:
Page 3
of 19 Event Four.
The SGTL requires a forced down power maneuver to meet management expectations and license requirements. In order to preclude unnecessary delay while the SRO communicates with plant management about plant conditions and make recommendations, the lead evaluator may direct the staff to act as SM and instruct the SRO to commence an immediate plant shutdown. Operator feedback for the need to shutdown the plant will be ABN procedure requirements, Technical Specification LCOs, or plant management direction. It is expected that the crew will:
The SGTL requires a forced down power maneuver to meet management expectations and license requirements. In order to preclude unnecessary delay while the SRO communicates with plant management about plant conditions and make recommendations, the lead evaluator may direct the staff to act as SM and instruct the SRO to commence an immediate plant shutdown. Operator feedback for the need to shutdown the plant will be ABN procedure requirements, Technical Specification LCOs, or plant management direction. It is expected that the crew will:
* Refer to the appropriate plant procedure
Refer to the appropriate plant procedure Complete a reactivity brief.
* Complete a reactivity brief.
Commence boration and reduce power using the Turbine Digital Control System Event Five When power has been reduced enough to meet the requirements of NUREG 1021 and at the lead examiners discretion, a continuation of the previous problem with Rod Control will be encountered. One Control Rod, CBA, Rod F-8, drops to the bottom and Control Rod CBC, Rod B8 slips to 6 steps.
* Commence boration and reduce power using the Turbine Digital Control System Event Five When power has been reduced enough to meet the requirements of NUREG 1021 and at the lead examiners discretion, a continuation of the previous problem with Rod Control will be encountered. One Control Rod, CBA, Rod F-8, drops to the bottom and Control Rod CBC, Rod B8 slips to 6 steps.
Feedback to the operators for this event will be alarms that indicate rods are misaligned by more than 12 steps and one control rod is at the bottom of the core. It is expected that the operators will:
Feedback to the operators for this event will be alarms that indicate rods are misaligned by more than 12 steps and one control rod is at the bottom of the core. It is expected that the operators will:
* Evaluate plant conditions and determine that more than one control rod is misaligned by more than 12 steps
Evaluate plant conditions and determine that more than one control rod is misaligned by more than 12 steps Recognize that ABN procedures require a Manual Reactor Trip or enter the correct ABN and comply with direction to trip the reactor.
* Recognize that ABN procedures require a Manual Reactor Trip or enter the correct ABN and comply with direction to trip the reactor.
Manually trip the reactor Enter the appropriate Emergency Procedure Complete the required Immediate Actions from memory.
* Manually trip the reactor
Determine that Safety Injection is NOT required.
* Enter the appropriate Emergency Procedure
Transition to the appropriate Optimal Recovery procedure.
* Complete the required Immediate Actions from memory.
* Determine that Safety Injection is NOT required.
* Transition to the appropriate Optimal Recovery procedure.
Event Six and Seven.
Event Six and Seven.
Shortly after the reactor trip, due to stresses caused by the trip, the tube that started to leak finally severs completely. The failure results in a Steam Generator Tube Rupture event at 675 gpm. Concurrent with the SGTR, both trains of Containment Isolation Phase A system fail to respond in auto. Manual operation is available and it is expected that the operator manually initiate the Phase A using the manual handswitches. Operator feedback for this event is rapidly decreasing pressurizer pressure and level, and increasing level in SG 1-03. The Phase A failure will be evidenced by numerous components indicated on the Monitor Light Boxes not being in the positions called for in Attachment 2 of EOP-0.0A. It is expected that the operators will:
Shortly after the reactor trip, due to stresses caused by the trip, the tube that started to leak finally severs completely. The failure results in a Steam Generator Tube Rupture event at 675 gpm. Concurrent with the SGTR, both trains of Containment Isolation Phase A system fail to respond in auto. Manual operation is available and it is expected that the operator manually initiate the Phase A using the manual handswitches. Operator feedback for this event is rapidly decreasing pressurizer pressure and level, and increasing level in SG 1-03. The Phase A failure will be evidenced by numerous components indicated on the Monitor Light Boxes not being in the positions called for in Attachment 2 of EOP-0.0A. It is expected that the operators will:
* Evaluate pressurizer and SG parameters and determine the need for Safety Injection or respond to the automatic SI
Evaluate pressurizer and SG parameters and determine the need for Safety Injection or respond to the automatic SI Refer to correct Emergency procedure Complete Immediate Operator actions from memory Verify automatic actions have occurred.
* Refer to correct Emergency procedure
Take actions to compensate for lack of automatic actions if required.
* Complete Immediate Operator actions from memory
Diagnose Plant conditions and transition to the correct Optimal Recovery Procedure Identify the ruptured Steam Generator Isolate the ruptured Steam Generator Cool down and depressurize the RCS to minimize RCS leakage.  
* Verify automatic actions have occurred.
* Take actions to compensate for lack of automatic actions if required.
* Diagnose Plant conditions and transition to the correct Optimal Recovery Procedure
* Identify the ruptured Steam Generator
* Isolate the ruptured Steam Generator
* Cool down and depressurize the RCS to minimize RCS leakage.


Revision 0 Appendix D                                     Narrative Description Op-Test No:       1           Scenario No:   3     Event No:                   Page   4     of   19 Event Eight.
Revision 0 Appendix D Narrative Description Op-Test No:
1 Scenario No:
3 Event No:
Page 4
of 19 Event Eight.
After the SGTR has been diagnosed, and at the Lead Examiners discretion, the Main Steam Line pressure transmitter for the Ruptured Steam Generator fails high. This will cause the ARV to go fully open. The valve will go open regardless of whether or not the operator has adjusted the setpoint to 1160 psig as required by EOP-3.0A. Operator feedback will be decreasing pressure in the ruptured steam generator, valve position indicating lights on the MCB, and RCS temperature decrease. It is expected that the operators will:
After the SGTR has been diagnosed, and at the Lead Examiners discretion, the Main Steam Line pressure transmitter for the Ruptured Steam Generator fails high. This will cause the ARV to go fully open. The valve will go open regardless of whether or not the operator has adjusted the setpoint to 1160 psig as required by EOP-3.0A. Operator feedback will be decreasing pressure in the ruptured steam generator, valve position indicating lights on the MCB, and RCS temperature decrease. It is expected that the operators will:
* Evaluate plant conditions and determine that an uncontrolled RCS cooldown is in progress.
Evaluate plant conditions and determine that an uncontrolled RCS cooldown is in progress.
* Recognize that SG 1-03 pressure is not high enough for the ARV to be fully open.
Recognize that SG 1-03 pressure is not high enough for the ARV to be fully open.
* Recognize that the ruptured SG is no longer ISOLATED.
Recognize that the ruptured SG is no longer ISOLATED.
* Take manual control of the ARV and close it.
Take manual control of the ARV and close it.
* Make the necessary notifications NOTE: The Lead Evaluator should carefully consider when to insert the ARV malfunction. If it is entered after the operator controlled cool down has been started, an important aspect of the feedback consideration will be lost.
Make the necessary notifications NOTE: The Lead Evaluator should carefully consider when to insert the ARV malfunction. If it is entered after the operator controlled cool down has been started, an important aspect of the feedback consideration will be lost.
NOTE: The CPSES PRA Assessment Summary document contains the following paragraph:
NOTE: The CPSES PRA Assessment Summary document contains the following paragraph:
A SGTR event represents a unique challenge to the RCS safety systems. The SGTR combines a very small LOCA and an interfacing system LOCA. A rupture of the SG tubes results in leakage fro the RCS to the secondary-side which allows RCS inventory to bypass the containment. Thus, SGTR are important to both the CDF and LERF considerations. The operator must reduce RCS pressure and isolate the affected steam generator in order to re-establish adequate RCS integrity. One difference between the SGTR and the very small LOCA is that any water lost through the break to the SG will be lost from the containment and will become unavailable for recirculation. Therefore, it is important that the leakage from the RCS be minimized as soon as possible to preclude long term inventory problems. The loss of a steam generator reduces the number of steam generators available for decay heat removal and can lead to a loss of the auxiliary feedwater steam driven pump if the faulted steam generator is not isolated from the steam supply line .
A SGTR event represents a unique challenge to the RCS safety systems. The SGTR combines a very small LOCA and an interfacing system LOCA. A rupture of the SG tubes results in leakage fro the RCS to the secondary-side which allows RCS inventory to bypass the containment. Thus, SGTR are important to both the CDF and LERF considerations. The operator must reduce RCS pressure and isolate the affected steam generator in order to re-establish adequate RCS integrity. One difference between the SGTR and the very small LOCA is that any water lost through the break to the SG will be lost from the containment and will become unavailable for recirculation. Therefore, it is important that the leakage from the RCS be minimized as soon as possible to preclude long term inventory problems. The loss of a steam generator reduces the number of steam generators available for decay heat removal and can lead to a loss of the auxiliary feedwater steam driven pump if the faulted steam generator is not isolated from the steam supply line.
The scenario may be terminated when the RCS has been cooled down and depressurized to less than ruptured SG pressure or at the discretion of the Lead Evaluator.
The scenario may be terminated when the RCS has been cooled down and depressurized to less than ruptured SG pressure or at the discretion of the Lead Evaluator.
Recommended Critical Tasks
Recommended Critical Tasks Fails to identify and isolate the ruptured Steam Generator when required by plant conditions.
* Fails to identify and isolate the ruptured Steam Generator when required by plant conditions.
Fails to manually initiate Phase A when required by plant conditions.
* Fails to manually initiate Phase A when required by plant conditions.
Fails to manually close the failed open ARV on the ruptured Steam Generator.  
* Fails to manually close the failed open ARV on the ruptured Steam Generator.


Revision 0 Appendix D                                 Operator Actions Op-Test No:       1         Scenario No:   3     Event No:   1               Page 5   of   19 Event
Revision 0 Appendix D Operator Actions Op-Test No:
1 Scenario No:
3 Event No:
1 Page 5
of 19 Event


== Description:==
== Description:==
Steam Generator Tube Leak on #3 SG Time   RO     BOP     SRO                       Applicant's Actions or Behavior 2.1 Symptoms
Steam Generator Tube Leak on #3 SG Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms
: a. Annunciator Alarms None
: a. Annunciator Alarms None
: b. Plant Indications
: b. Plant Indications An abnormal increase in steam generator specific activity as reported by Chemistry.
* An abnormal increase in steam generator specific activity as reported by Chemistry.
An abnormal increase in steam generator sampling radiation as indicated by u-RE-4200 (SGS-u64).
* An abnormal increase in steam generator sampling radiation as indicated by u-RE-4200 (SGS-u64).
An abnormal increase in condenser off-gas radiation as indicated by u-RE-2959(COG-u82).
* An abnormal increase in condenser off-gas radiation as indicated by u-RE-2959(COG-u82).
An abnormal increase in main steamline leak rate as indicated on u-RE-2325A (N16-u74), u-RE-2326A (N16-u75), u-RE-2327A (N16-u76), and u-RE-2328A (N16-u77). Computer points R7749A(R7753A) thru R7752A(R7756A).
* An abnormal increase in main steamline leak rate as indicated on u-RE-2325A (N16-u74), u-RE-2326A (N16-u75), u-RE-2327A (N16-u76), and u-RE-2328A (N16-u77). Computer points R7749A(R7753A) thru R7752A(R7756A).
2.2 Automatic Actions Steam Generator Blowdown will isolate on high radiation as indicated on u-RE-4200 (SGS-u64).
2.2 Automatic Actions Steam Generator Blowdown will isolate on high radiation as indicated on u-RE-4200 (SGS-u64).
* u-HS-2397, SG 1 BLDN ISOL VLV
u-HS-2397, SG 1 BLDN ISOL VLV u-HS-2398, SG 2 BLDN ISOL VLV u-HS-2399, SG 3 BLDN ISOL VLV u-HS-2400, SG 4 BLDN ISOL VLV 2.3 Operator Actions Step 1. Verify main steamline radiation alarms - CLEAR u-RE-2325 (MSL-u78) u-RE-2326 (MSL-u79) u-RE-2327 (MSL-u80) u-RE-2328 (MSL-u81)
* u-HS-2398, SG 2 BLDN ISOL VLV
* u-HS-2399, SG 3 BLDN ISOL VLV
* u-HS-2400, SG 4 BLDN ISOL VLV 2.3 Operator Actions Step 1. Verify main steamline radiation alarms - CLEAR
* u-RE-2325 (MSL-u78)
* u-RE-2326 (MSL-u79)
* u-RE-2327 (MSL-u80)
* u-RE-2328 (MSL-u81)
NOTE: u-RE-2327 (MSL-u80) will be in alarm on the PC-11 Step 1 RNO. Go to Section 3 of this procedure.
NOTE: u-RE-2327 (MSL-u80) will be in alarm on the PC-11 Step 1 RNO. Go to Section 3 of this procedure.
Section 3 Step 1. Verify main steamline radiation alarms - CLEAR
Section 3 Step 1. Verify main steamline radiation alarms - CLEAR u-RE-2325 (MSL-u78) u-RE-2326 (MSL-u79) u-RE-2327 (MSL-u80) u-RE-2328 (MSL-u81)
* u-RE-2325 (MSL-u78)
* u-RE-2326 (MSL-u79)
* u-RE-2327 (MSL-u80)
* u-RE-2328 (MSL-u81)
Step 1 RNO.
Step 1 RNO.
: a. Reduce power to 50% in 1 hour AND Be in MODE 3 in the next 2 hours.
: a. Reduce power to 50% in 1 hour AND Be in MODE 3 in the next 2 hours.
: b. GO TO Step 5.
: b. GO TO Step 5.  
                                                                *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No:   3     Event No:   1                 Page   6     of   19 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
3 Event No:
1 Page 6
of 19 Event


== Description:==
== Description:==
Steam Generator Tube Leak on #3 SG Time   RO     BOP     SRO                       Applicant's Actions or Behavior Step 5 Check plant conditions:
Steam Generator Tube Leak on #3 SG Time RO BOP SRO Applicant's Actions or Behavior Step 5 Check plant conditions:
: a. Turbine-Generator load - STEADY AT DESIRED POWER
: a. Turbine-Generator load - STEADY AT DESIRED POWER
: b. Verify charging flow within 15 gpm of letdown flow AND both flows STABLE
: b. Verify charging flow within 15 gpm of letdown flow AND both flows STABLE u-FI-121A, CHRG FLO u-FI-132, LTDN FLO
* u-FI-121A, CHRG FLO
: c. Verify PRZR level - STABLE OR TRENDING TO NORMAL LEVEL u-LI-459A, PRZR LVL CHAN I u-LI-461, PRZR LVL CHAN III u-LI-460A, PRZR LVL CHAN II Step 6. Adjust affected Steam Generator Atmospheric Relief Controller setpoint to 1160 PSIG per TDM-501A/B.
* u-FI-132, LTDN FLO
: c. Verify PRZR level - STABLE OR TRENDING TO NORMAL LEVEL
* u-LI-459A, PRZR LVL CHAN I
* u-LI-461, PRZR LVL CHAN III
* u-LI-460A, PRZR LVL CHAN II Step 6. Adjust affected Steam Generator Atmospheric Relief Controller setpoint to 1160 PSIG per TDM-501A/B.
Step 7. Verify affected Steam Generator - NOT SG #1 or SG #4 Step 8. Isolate Auxiliary Steam supplied from the affected unit by closing the applicable valves:
Step 7. Verify affected Steam Generator - NOT SG #1 or SG #4 Step 8. Isolate Auxiliary Steam supplied from the affected unit by closing the applicable valves:
NOTE: The US will call the PEO to isolate the appropriate valves.
NOTE: The US will call the PEO to isolate the appropriate valves.
Step 9 Verify NO significant increase exists, as indicated on PC-11, from system(s) drains that discharge to the LVW:
Step 9 Verify NO significant increase exists, as indicated on PC-11, from system(s) drains that discharge to the LVW:
* u-RE-4200, (SGS-u64) BLOWDOWN SMPL
u-RE-4200, (SGS-u64) BLOWDOWN SMPL u-RE-2959, (COG-u82) CONDENSER OFF GAS u-RE-2325, (MSL-u78) MAIN STEAM LINE #1 u-RE-2326, (MSL-u79) MAIN STEAM LINE #2 u-RE-2327, (MSL-u80) MAIN STEAM LINE #3 u-RE-2328, (MSL-u81) MAIN STEAM LINE #4 u-RE-2325A, (N16-u74) MAIN STEAM LINE #1 LEAK RATE u-RE-2326A, (N16-u75) MAIN STEAM LINE #2 LEAK RATE u-RE-2327A, (N16-u76) MAIN STEAM LINE #3 LEAK RATE u-RE-2328A, (N16-u77) MAIN STEAM LINE #4 LEAK RATE Step 10 Monitor position of Steam Generator Atmospheric Relief AND Safety Valves during performance of this procedure:
* u-RE-2959, (COG-u82) CONDENSER OFF GAS
: a. Verify relief AND safety valves remain - CLOSED  
* u-RE-2325, (MSL-u78) MAIN STEAM LINE #1
*BOLD INDICATES CRITICAL STEP
* u-RE-2326, (MSL-u79) MAIN STEAM LINE #2
* u-RE-2327, (MSL-u80) MAIN STEAM LINE #3
* u-RE-2328, (MSL-u81) MAIN STEAM LINE #4
* u-RE-2325A, (N16-u74) MAIN STEAM LINE #1 LEAK RATE
* u-RE-2326A, (N16-u75) MAIN STEAM LINE #2 LEAK RATE
* u-RE-2327A, (N16-u76) MAIN STEAM LINE #3 LEAK RATE
* u-RE-2328A, (N16-u77) MAIN STEAM LINE #4 LEAK RATE Step 10 Monitor position of Steam Generator Atmospheric Relief AND Safety Valves during performance of this procedure:
: a. Verify relief AND safety valves remain - CLOSED
                                                                *BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No: 3         Event No: 2 & 3             Page 7       of   19 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
3 Event No: 2 & 3 Page 7
of 19 Event


== Description:==
== Description:==
Loop 4 N-16 Instrument Fails High and Rods move the wrong way Time   RO     BOP     SRO                       Applicant's Actions or Behavior 2.1 Symptoms
Loop 4 N-16 Instrument Fails High and Rods move the wrong way Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms
: a. Annunciator Alarms
: a. Annunciator Alarms ANY N16 DEV HI/LO (5C-1.5) 1 of 4 OT N16 HI (5C-2.5)
* ANY N16 DEV HI/LO (5C-1.5)
ANY Tave DEV HI/LO (5C-3.5) 1 of 4 OP N16 HI (5C-2.6)
* 1 of 4 OT N16 HI (5C-2.5)
AVE Tave-Tref DEV (6D-1.10)
* ANY Tave DEV HI/LO (5C-3.5)
AVE Tave HI (6D-2.10) 1 of 4 Tave LO-LO (6D-3.10)
* 1 of 4 OP N16 HI (5C-2.6)
Tref-AUCT LO TAVE MISMATCH (6D-3.13)
* AVE Tave-Tref DEV (6D-1.10)
AUCT TAVE LO (6D-4.13) 1 of 4 OT N16 ROD STOP & TURB RUNBACK (6D-3.14) 1 of 4 OP N16 ROD STOP & TURB RUNBACK (6D-2.13)
* AVE Tave HI (6D-2.10)
* 1 of 4 Tave LO-LO (6D-3.10)
* Tref-AUCT LO TAVE MISMATCH (6D-3.13)
* AUCT TAVE LO (6D-4.13)
* 1 of 4 OT N16 ROD STOP & TURB RUNBACK (6D-3.14)
* 1 of 4 OP N16 ROD STOP & TURB RUNBACK (6D-2.13)
: b. Plant Indications:
: b. Plant Indications:
: 3) One N-16 channel higher or lower than the other three.
: 3) One N-16 channel higher or lower than the other three.
* u-JI-411A/B, RC LOOP 1 N16 PWR CHAN I
u-JI-411A/B, RC LOOP 1 N16 PWR CHAN I u-JI-421A/B, RC LOOP 2 N16 PWR CHAN II u-JI-431A/B, RC LOOP 3 N16 PWR CHAN III u-JI-441A/B, RC LOOP 4 N16 PWR CHAN IV 2.2 Automatic Actions
* u-JI-421A/B, RC LOOP 2 N16 PWR CHAN II
* u-JI-431A/B, RC LOOP 3 N16 PWR CHAN III
* u-JI-441A/B, RC LOOP 4 N16 PWR CHAN IV 2.2 Automatic Actions
: a. Any failure that results in an increased Loop Tave will cause Average Tave to be higher with the following actions:
: a. Any failure that results in an increased Loop Tave will cause Average Tave to be higher with the following actions:
* Rapid control rod insertion due to Tave-Tref mismatch if in AUTO.
Rapid control rod insertion due to Tave-Tref mismatch if in AUTO.
* Steam dumps will open if armed with a C-7 (loss of load).
Steam dumps will open if armed with a C-7 (loss of load).
* Pressurizer reference level increase (to a maximum of 60%) with charging flow increase when in auto.
Pressurizer reference level increase (to a maximum of 60%) with charging flow increase when in auto.
NOTE: This should alert the crew that rods moving OUT is a malfunction and action should be taken.
NOTE: This should alert the crew that rods moving OUT is a malfunction and action should be taken.
NOTE:
NOTE:
* Rod Control should remain in MANUAL until all channels are operable. This does not preclude placing rods in AUTO during rapidly changing transient conditions such as runbacks, etc. as long as rod control is returned to MANUAL when the plant is stabilized.
Rod Control should remain in MANUAL until all channels are operable. This does not preclude placing rods in AUTO during rapidly changing transient conditions such as runbacks, etc. as long as rod control is returned to MANUAL when the plant is stabilized.  
                                                                  *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1           Scenario No: 3       Event No: 2 & 3             Page 8         of 19 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
3 Event No: 2 & 3 Page 8
of 19 Event


== Description:==
== Description:==
Loop 4 N-16 Instrument Fails High and Rods move the wrong way Time   RO     BOP     SRO                       Applicant's Actions or Behavior Step 1 Place Control Rods in - MANUAL NOTE: The RO should recognize that rods moved the wrong way, report this to the US, and recommend driving rods IN to match Tave to Tref.
Loop 4 N-16 Instrument Fails High and Rods move the wrong way Time RO BOP SRO Applicant's Actions or Behavior Step 1 Place Control Rods in - MANUAL NOTE: The RO should recognize that rods moved the wrong way, report this to the US, and recommend driving rods IN to match Tave to Tref.
Step 2 Select the failed channel on:
Step 2 Select the failed channel on:
u-TS-412T, Tave CHAN DEFEAT Step 3 Verify Steam Dump System:
u-TS-412T, Tave CHAN DEFEAT Step 3 Verify Steam Dump System:
* NOT actuated
NOT actuated NOT armed.
* NOT armed.
Step 4 Restore Tave to within 1&deg;F of Tref.
Step 4 Restore Tave to within 1&deg;F of Tref.
Step 5 Select the failed channel on:
Step 5 Select the failed channel on:
Line 2,744: Line 3,222:
TURB LOAD REJ STM DMP ARMED C-7 (PCIP - 3.4)
TURB LOAD REJ STM DMP ARMED C-7 (PCIP - 3.4)
Step 8 IF Steam Dumps were blocked in Step 2, THEN restore to service by returning following switches to ON:
Step 8 IF Steam Dumps were blocked in Step 2, THEN restore to service by returning following switches to ON:
* 43/u-SDA, STM DMP INTLK SELECT
43/u-SDA, STM DMP INTLK SELECT 43/u-SDB, STM DMP INTLK SELECT Step 9 Within 6 hours, have I&C place bistable test switches for failed channel in CLOSED position per Attachments 1 and 2.  
* 43/u-SDB, STM DMP INTLK SELECT Step 9 Within 6 hours, have I&C place bistable test switches for failed channel in CLOSED position per Attachments 1 and 2.
*BOLD INDICATES CRITICAL STEP
                                                                *BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No: 3       Event No: 2 & 3               Page 9       of 19 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
3 Event No: 2 & 3 Page 9
of 19 Event


== Description:==
== Description:==
Loop 4 N-16 Instrument Fails High and Rods move the wrong way Time   RO     BOP     SRO                       Applicant's Actions or Behavior Step 10 Verify appropriate alarms and trip status lights ON per Attachment 3 AND note verification in Unit Log.
Loop 4 N-16 Instrument Fails High and Rods move the wrong way Time RO BOP SRO Applicant's Actions or Behavior Step 10 Verify appropriate alarms and trip status lights ON per Attachment 3 AND note verification in Unit Log.
Step 11 Refer to Technical Specifications listed in Section 3.1 of this procedure to determine applicable LCOAR conditions.
Step 11 Refer to Technical Specifications listed in Section 3.1 of this procedure to determine applicable LCOAR conditions.
3.1 Technical Specifications/Requirements
3.1 Technical Specifications/Requirements 3.3.1, Reactor Trip System (RTS) Instrumentation 13.1.38, Control Bank Insertion Limits  
* 3.3.1, Reactor Trip System (RTS) Instrumentation
*BOLD INDICATES CRITICAL STEP
* 13.1.38, Control Bank Insertion Limits
                                                                *BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1         Scenario No:   3     Event No:   4               Page 10     of   19 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
3 Event No:
4 Page 10 of 19 Event


== Description:==
== Description:==
Power Reduction Time   RO     BOP     SRO                       Applicant's Actions or Behavior Review IPO-003A, Power Operations Notifies Generation Controller prior to reducing load.
Power Reduction Time RO BOP SRO Applicant's Actions or Behavior Review IPO-003A, Power Operations Notifies Generation Controller prior to reducing load.
Notifies Chemistry and Radiation Protection if power reduction will be > 15%
Notifies Chemistry and Radiation Protection if power reduction will be > 15%
in one hour Notifies Reactor Engineering of power reduction > 25%.
in one hour Notifies Reactor Engineering of power reduction > 25%.
Calculates the amount of boration required Calculates the rate of boration Reviews AFD guidance Initiates boration Sets in the desired unloading rate and amount using the Digital Control System Maintains AFD in the target band Maintains rods above the Rod Insertion Limit Maintains Tave with 1 degree of Tref
Calculates the amount of boration required Calculates the rate of boration Reviews AFD guidance Initiates boration Sets in the desired unloading rate and amount using the Digital Control System Maintains AFD in the target band Maintains rods above the Rod Insertion Limit Maintains Tave with 1 degree of Tref  
                                                                *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1           Scenario No:   3     Event No:   5                 Page   11 of   19 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
3 Event No:
5 Page 11 of 19 Event


== Description:==
== Description:==
Two dropped rods (Manual Reactor Trip Required)
Two dropped rods (Manual Reactor Trip Required)
Time   RO     BOP     SRO                       Applicant's Actions or Behavior 3.1 Symptoms
Time RO BOP SRO Applicant's Actions or Behavior 3.1 Symptoms
: a. Annunciator Alarms
: a. Annunciator Alarms PR CHAN DEV (6D-3.4)
* PR CHAN DEV (6D-3.4)
DRPI ROD DEV (6D-3.5)
* DRPI ROD DEV (6D-3.5)
ANY ROD AT BOT (6D-3.7)  
* ANY ROD AT BOT (6D-3.7)
> 2 ROD AT BOT (6D-4.7)
                                *  > 2 ROD AT BOT (6D-4.7)
QUADRANT PWR TILT (6D-4.10)
* QUADRANT PWR TILT (6D-4.10)
: b. Plant Indications Plant parameters changing abnormally during rod position changes NIS Power Range instruments power or AFD indications disagree DRPI Rod Bottom Light(s) lit for rods which should be withdrawn DRPIs in a bank disagree by greater than 12 steps DRPI disagrees with its group step counter by greater than 12 steps 3.2 Automatic Actions Possible Reactor trip Automatic control rod motion Ensure 1/u-RBSS, CONTROL ROD BANK SELECT - NOT IN AUTO.
: b. Plant Indications
* Plant parameters changing abnormally during rod position changes
* NIS Power Range instruments power or AFD indications disagree
* DRPI Rod Bottom Light(s) lit for rods which should be withdrawn
* DRPIs in a bank disagree by greater than 12 steps
* DRPI disagrees with its group step counter by greater than 12 steps 3.2 Automatic Actions
* Possible Reactor trip
* Automatic control rod motion Ensure 1/u-RBSS, CONTROL ROD BANK SELECT - NOT IN AUTO.
2 Check Reactor - CRITICAL.
2 Check Reactor - CRITICAL.
Verify Number of Rods Misaligned from Step Counter by >12 steps - < ONE Step 3 RNO:
Verify Number of Rods Misaligned from Step Counter by >12 steps - < ONE Step 3 RNO:
Line 2,791: Line 3,267:
b) Within 1 hour verify SDM OR initiate boration to restore SDM.
b) Within 1 hour verify SDM OR initiate boration to restore SDM.
c) Within 6 hours place unit in HOT STANDBY per IPO-003A/B (TS 3.1.4).
c) Within 6 hours place unit in HOT STANDBY per IPO-003A/B (TS 3.1.4).
NOTE: Crew should trip the Reactor and go to EOP-0.0A
NOTE: Crew should trip the Reactor and go to EOP-0.0A  
                                                                *BOLD INDICATES CRITICAL STEP Revision 0
*BOLD INDICATES CRITICAL STEP Revision 0  


Appendix D Op-Test No:       1         Scenario No: 3         Event No: 5               Page 12     of 19 Event
Appendix D Op-Test No:
1 Scenario No:
3 Event No:
5 Page 12 of 19 Event


== Description:==
== Description:==
Two dropped rods (Manual Reactor Trip Required) EOP-0.0A Time   RO     BOP     SRO                         Applicant's Actions or Behavior 2.1 Symptoms
Two dropped rods (Manual Reactor Trip Required) EOP-0.0A Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms
: a. Annunciators Alarm
: a. Annunciators Alarm MAN RX TRIP (6C-1.1)
* MAN RX TRIP (6C-1.1)
Plant Indications Various First Out Annunciator alarms and changing plant conditions Automatic Actions Reactor Trip breakers open and the turbine trips Orders a reactor trip and enters EOP-0.0A.
Plant Indications Various First Out Annunciator alarms and changing plant conditions Automatic Actions Reactor Trip breakers open and the turbine trips Orders a reactor trip and enters EOP-0.0A.
Step 1. Verify Reactor Trip
Step 1. Verify Reactor Trip
: a. Verify the following:
: a. Verify the following:
* Reactor Trip and bypass breakers- OPEN, AND
Reactor Trip and bypass breakers-OPEN, AND Neutron Flux-DECREASING
* Neutron Flux- DECREASING
: b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
: b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
: a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
: a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
: a. AC safeguards busses - AT LEAST ONE ENERGIXED
: a. AC safeguards busses - AT LEAST ONE ENERGIXED AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
* AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
: b. AC safeguards busses - BOTH ENERGIZED Step 4. Check SI Status:
: b. AC safeguards busses - BOTH ENERGIZED Step 4. Check SI Status:
: a. Check If SI is Actuated:
: a. Check If SI is Actuated:
* SI actuation as indicated on the First Out Ann 1-ALB-6C
SI actuation as indicated on the First Out Ann 1-ALB-6C SI Actuated blue status light - ON
* SI Actuated blue status light - ON
: b. Verify Both Trains DI Actuated:
: b. Verify Both Trains DI Actuated:
* SI Actuated blue status light - ON NOT FLASHING Step 4, RNO. IF SI is NOT required, THEN go to EOS-0.1 A, REACTOR TRIP RESPONSE
SI Actuated blue status light - ON NOT FLASHING Step 4, RNO. IF SI is NOT required, THEN go to EOS-0.1 A, REACTOR TRIP RESPONSE  
                                                                *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D Op-Test No:       1           Scenario No:   3     Event No:   5               Page 13   of 19 Event
Revision 0 Appendix D Op-Test No:
1 Scenario No:
3 Event No:
5 Page 13 of 19 Event


== Description:==
== Description:==
EOS-0.1 A, REACTOR TRIP RESPONSE Time   RO     BOP     SRO                         Applicant's Actions or Behavior Transitions to EOS-0.1A, Reactor Trip Response Step 1. Check RCS Average Temperature - STABLE AT OR TRENDING TO 557&deg; F.
EOS-0.1 A, REACTOR TRIP RESPONSE Time RO BOP SRO Applicant's Actions or Behavior Transitions to EOS-0.1A, Reactor Trip Response Step 1. Check RCS Average Temperature - STABLE AT OR TRENDING TO 557&deg; F.
Step 2. Check FW Status:
Step 2. Check FW Status:
: a. Verify reactor trip and bypass breaker - OPEN
: a. Verify reactor trip and bypass breaker - OPEN
Line 2,836: Line 3,314:
: a. Narrow Range Level - GREATER THAN 5%
: a. Narrow Range Level - GREATER THAN 5%
: b. Control Feed flow to maintain narrow range level between 5% and 50%.
: b. Control Feed flow to maintain narrow range level between 5% and 50%.
NOTE: 4 minutes after the manual RX Trip, the SGTR becomes active at 675 GPM. If not done automatically, the crew should Initiate a Safety Injection and transition to EOP-0.0A, step 1.
NOTE: 4 minutes after the manual RX Trip, the SGTR becomes active at 675 GPM. If not done automatically, the crew should Initiate a Safety Injection and transition to EOP-0.0A, step 1.  
                                                                *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D                                 Operator Actions Op-Test No:       1         Scenario No:   3       Event No: 6&7             Page 14     of 19 Event
Revision 0 Appendix D Operator Actions Op-Test No:
1 Scenario No:
3 Event No: 6 & 7 Page 14 of 19 Event


== Description:==
== Description:==
SGTR with failure of Phase A to auto actuate Time   RO     BOP     SRO                         Applicant's Actions or Behavior 2.1 Symptoms
SGTR with failure of Phase A to auto actuate Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms
: a. Annunciators Alarm
: a. Annunciators Alarm PRZR PRESS LO SI ACT (6C-2.7)
* PRZR PRESS LO SI ACT (6C-2.7)
Plant Indications Various First Out Annunciator alarms and changing plant conditions Automatic Actions Safety Injection and ECCS actuations Step 1. Verify Reactor Trip
Plant Indications Various First Out Annunciator alarms and changing plant conditions Automatic Actions Safety Injection and ECCS actuations Step 1. Verify Reactor Trip
: a. Verify the following:
: a. Verify the following:
* Reactor Trip and bypass breakers- OPEN, AND
Reactor Trip and bypass breakers-OPEN, AND Neutron Flux-DECREASING
* Neutron Flux- DECREASING
: b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
: b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
: a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
: a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
: a. AC safeguards busses - AT LEAST ONE ENERGIXED
: a. AC safeguards busses - AT LEAST ONE ENERGIXED AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
* AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
: b. AC safeguards busses - BOTH ENERGIZED Step 4. Check SI Status:
: b. AC safeguards busses - BOTH ENERGIZED Step 4. Check SI Status:
: a. Check If SI is Actuated:
: a. Check If SI is Actuated:
* SI actuation as indicated on the First Out Ann 1-ALB-6C
SI actuation as indicated on the First Out Ann 1-ALB-6C SI Actuated blue status light - ON
* SI Actuated blue status light - ON
: b. Verify Both Trains SI Actuated:
: b. Verify Both Trains SI Actuated:
* SI Actuated blue status light - ON NOT FLASHING
SI Actuated blue status light - ON NOT FLASHING  
                                                                *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D                                 Operator Actions Op-Test No:       1         Scenario No:   3     Event No: 6&7               Page 15     of   19 Event
Revision 0 Appendix D Operator Actions Op-Test No:
1 Scenario No:
3 Event No: 6 & 7 Page 15 of 19 Event


== Description:==
== Description:==
SGTR with failure of Phase A to auto actuate Time   RO     BOP     SRO                       Applicant's Actions or Behavior Step 5. Ensure Proper Safeguards Equipment Operation Per Attachment 2.
SGTR with failure of Phase A to auto actuate Time RO BOP SRO Applicant's Actions or Behavior Step 5. Ensure Proper Safeguards Equipment Operation Per.
NOTE: It is expected that the failure of Phase A to actuate will be noted and a manual Phase A initiated while Attachment 2 is being performed.
NOTE: It is expected that the failure of Phase A to actuate will be noted and a manual Phase A initiated while Attachment 2 is being performed.
Step 6. Verify AFW Alignment
Step 6. Verify AFW Alignment
Line 2,873: Line 3,351:
: 1) a. Containment Pressure - HAS REMAINED LESS THAN 18 PSIG Step 8. Check if Main Steamlines should be Isolated:
: 1) a. Containment Pressure - HAS REMAINED LESS THAN 18 PSIG Step 8. Check if Main Steamlines should be Isolated:
: a. verify the following:
: a. verify the following:
* Containment Pressure - GREATER THAN 6 PSIG (YES)
Containment Pressure - GREATER THAN 6 PSIG (YES)
: b. Verify main steam isolation complete.
: b. Verify main steam isolation complete.
Step 9. Check RCS Average Temperatue - STABLE AT OR TRENDING TO 557&deg;F.
Step 9. Check RCS Average Temperatue - STABLE AT OR TRENDING TO 557&deg;F.
Line 2,882: Line 3,360:
: c. PORVs - CLOSED
: c. PORVs - CLOSED
: d. Power to at least one block valve - AVAILABLE
: d. Power to at least one block valve - AVAILABLE
: e. Block valves - AT LEAST ONE OPEN
: e. Block valves - AT LEAST ONE OPEN  
                                                              *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D                                 Operator Actions Op-Test No:       1         Scenario No: 3     Event No: 6&7               Page   16   of   19 Event
Revision 0 Appendix D Operator Actions Op-Test No:
1 Scenario No:
3 Event No: 6 & 7 Page 16 of 19 Event


== Description:==
== Description:==
SGTR with failure of Phase A to auto actuate Time   RO     BOP     SRO                       Applicant's Actions or Behavior Step 11. Check if RCPs should be stopped:
SGTR with failure of Phase A to auto actuate Time RO BOP SRO Applicant's Actions or Behavior Step 11. Check if RCPs should be stopped:
: a. ECCS pumps - AT LEAST ONE RUNNING
: a. ECCS pumps - AT LEAST ONE RUNNING CCP  
* CCP
-OR-SI pump
                                          -OR-
* SI pump
: b. RCS subcooling - LESS THAN 25&deg; F (55&deg; F FOR ADVERSE CONTAINMENT)
: b. RCS subcooling - LESS THAN 25&deg; F (55&deg; F FOR ADVERSE CONTAINMENT)
: c. Stop all RCPs.
: c. Stop all RCPs.
Step 12. Check if any SG is Faulted:
Step 12. Check if any SG is Faulted:
: a. Check pressures in all SGs:
: a. Check pressures in all SGs:
* ANY SG DECREASING IN AN UNCONTROLLED MANNER
ANY SG DECREASING IN AN UNCONTROLLED MANNER  
                                                -OR-
-OR-ANY SG COMPLETELY DEPRESSURIZED Step a RNO, Go to Step 13.
* ANY SG COMPLETELY DEPRESSURIZED Step a RNO, Go to Step 13.
: b. Go to EOP-2.0A, FAULTED STEAM GENERATOR ISOLATION, Step 1.
: b. Go to EOP-2.0A, FAULTED STEAM GENERATOR ISOLATION, Step 1.
Step 13.Check if SG Tubes Are Not Ruptured:
Step 13.Check if SG Tubes Are Not Ruptured:
* Condenser off gas radiation - NORMAL (COG-182, 1RE-2959)
Condenser off gas radiation - NORMAL (COG-182, 1RE-2959)
* Main steamline radiation - NORMAL (MSL-178-181, 1RE-2325 -
Main steamline radiation - NORMAL (MSL-178-181, 1RE-2325 -
2328)
2328)
* SG blowdown and sample radiation monitor - NORMAL (SGS-164, 1RE-4200)
SG blowdown and sample radiation monitor - NORMAL (SGS-164, 1RE-4200)
* No Steam Generator level increasing in an uncontrolled manner Note: Steam Generator #3 is ruptured at 675 GPM. The crew should transistion to EOP-3.0A, Steam Generator Tube Rupture
No Steam Generator level increasing in an uncontrolled manner Note: Steam Generator #3 is ruptured at 675 GPM. The crew should transistion to EOP-3.0A, Steam Generator Tube Rupture  
                                                              *BOLD INDICATES CRITICAL STEP Revision 0
*BOLD INDICATES CRITICAL STEP Revision 0  


Appendix D                                 Operator Actions Op-Test No:       1         Scenario No: 3       Event No: 6&7               Page   17   of 19 Event
Appendix D Operator Actions Op-Test No:
1 Scenario No:
3 Event No: 6 & 7 Page 17 of 19 Event


== Description:==
== Description:==
SGTR EOP-3.0A Steam Generator Tube Rupture Time   RO     BOP     SRO                       Applicant's Actions or Behavior Step 1. Check if RCPs should be stopped:
SGTR EOP-3.0A Steam Generator Tube Rupture Time RO BOP SRO Applicant's Actions or Behavior Step 1. Check if RCPs should be stopped:
: a. ECCS pumps - AT LEAST ONE RUNNING
: a. ECCS pumps - AT LEAST ONE RUNNING CCP  
* CCP
-OR-SI pump
                                          -OR-
* SI pump
: b. RCS subcooling - LESS THAN 25&deg; F (55&deg; F FOR ADVERSE CONTAINMENT)
: b. RCS subcooling - LESS THAN 25&deg; F (55&deg; F FOR ADVERSE CONTAINMENT)
: c. Stop all RCPs.
: c. Stop all RCPs.
Step 2. Identify Ruptured SG (s):
Step 2. Identify Ruptured SG (s):
* Unexpected increase in any SG narrow range level
Unexpected increase in any SG narrow range level  
                                                        -OR-
-OR-High Radiation form any SG blowdown sample line (SGS-164, 1 RE-4200)  
* High Radiation form any SG blowdown sample line (SGS-164, 1 RE-4200)
-OR-High Radiaiton from any Main steamline. (MSL-178-181, 1 RE-2325-2328)
                                                        -OR-
* High Radiaiton from any Main steamline. (MSL-178-181, 1 RE-2325-2328)
Step 3 Isolate Flow From Ruptured SG(s):
Step 3 Isolate Flow From Ruptured SG(s):
: a. Adjust ruptured SG(s) atmospheric controller setpoint to 1160 PSIG.
: a. Adjust ruptured SG(s) atmospheric controller setpoint to 1160 PSIG.
Line 2,934: Line 3,409:
: a. Narrow range level - GREATER THAN 5% (26% FOR ADVERSE CONTAINMENT)
: a. Narrow range level - GREATER THAN 5% (26% FOR ADVERSE CONTAINMENT)
: b. Stop AFW flow to ruptured SG(s).
: b. Stop AFW flow to ruptured SG(s).
Notes that the #3 ARV is open. Verify the SG pressure is less than 1160, places the controller in manual, and closes the ARV.
Notes that the #3 ARV is open. Verify the SG pressure is less than 1160, places the controller in manual, and closes the ARV.  
                                                                *BOLD INDICATES CRITICAL STEP
*BOLD INDICATES CRITICAL STEP


Revision 0 Appendix D                                 Operator Actions Op-Test No:       1         Scenario No: 3     Event No: 6&7               Page 18   of   19 Event
Revision 0 Appendix D Operator Actions Op-Test No:
1 Scenario No:
3 Event No: 6 & 7 Page 18 of 19 Event


== Description:==
== Description:==
 
Time RO BOP SRO Applicant's Actions or Behavior Step 5 Check Ruptured SG(s) Pressure - GREATER THAN 420 PSIG.
Time   RO     BOP     SRO                       Applicant's Actions or Behavior Step 5 Check Ruptured SG(s) Pressure - GREATER THAN 420 PSIG.
Step 6 Initiate RCS Cooldown:
Step 6 Initiate RCS Cooldown:
: a. When PRZR pressure decreases to less than 1960 psig, block the low steamline pressure SI signal.
: a. When PRZR pressure decreases to less than 1960 psig, block the low steamline pressure SI signal.
Line 2,961: Line 3,437:
Step 11. Reset SI sequencers.
Step 11. Reset SI sequencers.
Step 12. Reset Containment Isolation Phase A and B.
Step 12. Reset Containment Isolation Phase A and B.
Step 13. Reset Containment Spray Signal.
Step 13. Reset Containment Spray Signal.  
 
* BOLD INDICATES CRITICAL STEP Revision 0 Appendix D Operator Actions Op-Test No:
                                                                *BOLD INDICATES CRITICAL STEP Revision 0 Appendix D                                 Operator Actions Op-Test No:       1       Scenario No:   3     Event No: 6&7               Page 19     of 19 Event
1 Scenario No:
3 Event No: 6 & 7 Page 19 of 19 Event


== Description:==
== Description:==
 
Time RO BOP SRO Applicant's Actions or Behavior Step 14. Establish Instrument Air And Nitrogen to Containment.
Time   RO     BOP     SRO                       Applicant's Actions or Behavior Step 14. Establish Instrument Air And Nitrogen to Containment.
: a. Establish instrument air:
: a. Establish instrument air:
: 1) Verify air compressor running and establish instrument air to containment.
: 1) Verify air compressor running and establish instrument air to containment.
Line 2,987: Line 3,463:
: 1) RCS pressure - LESS THAN RUPTURED SG(s)
: 1) RCS pressure - LESS THAN RUPTURED SG(s)
PRESSURE
PRESSURE
: 2) PRZR level - GREATER THAN 6% (34% FOR ADVERSE CONTAINMENT
: 2) PRZR level - GREATER THAN 6% (34% FOR ADVERSE CONTAINMENT  
                                                                -OR-PRZR level GREATER THAN 74% (65% FOR ADVERSE CONTAINMENT)
-OR-PRZR level GREATER THAN 74% (65% FOR ADVERSE CONTAINMENT)  
                                                                -OR-RCS subcooling - At 25&deg;F (55&deg;F FOR ADVERSE CONTAINMENT)
-OR-RCS subcooling - At 25&deg;F (55&deg;F FOR ADVERSE CONTAINMENT)
The scenario may be terminated at the discretion of the lead examiner.
The scenario may be terminated at the discretion of the lead examiner.  
 
* BOLD INDICATES CRITICAL STEP SHIFT TURNOVER INFORMATION 1.0 INITIAL CONDTIONS:
                                                        *BOLD INDICATES CRITICAL STEP SHIFT TURNOVER INFORMATION 1.0     INITIAL CONDTIONS:
Time in Core Life: BOL Tavg: 589oF Reactor Power: 100%
Time in Core Life: BOL             Tavg: 589oF Reactor Power: 100%               RCS Pressure: 2235 psig Turbine Load:1200 Mwe             Xenon: Equil Boron Concentration:1263 ppm       Rod Control:       AUTO Rod Height: CB D @ 215steps 2.0     LCOAR/TECHNICAL SPECIFICATION ACTIONS IN EFFECT:
RCS Pressure: 2235 psig Turbine Load:1200 Mwe Xenon: Equil Boron Concentration:1263 ppm Rod Control: AUTO Rod Height: CB D @ 215steps 2.0 LCOAR/TECHNICAL SPECIFICATION ACTIONS IN EFFECT:
TS#     Description Reason 3.7.5 AFW               AFW Pump 1-01 OOS for Oil Sample 3.0     CLEARANCES IN EFFECT:
TS#
Description Reason 3.7.5 AFW AFW Pump 1-01 OOS for Oil Sample 3.0 CLEARANCES IN EFFECT:
AFW Pump 1-01 OOS for Oil Sample 4.0 SAFETY SYSTEM SETTING BYPASS/MALFUNCTIONS None 5.0 DEGRADED EQUIPMENT 6.0 PLANNED EVOLUTIONS:
AFW Pump 1-01 OOS for Oil Sample 4.0 SAFETY SYSTEM SETTING BYPASS/MALFUNCTIONS None 5.0 DEGRADED EQUIPMENT 6.0 PLANNED EVOLUTIONS:
Return AFW Pump 1-01 to service when the oil sample is complete.
Return AFW Pump 1-01 to service when the oil sample is complete.
7.0     TURNOVER INFORMATION:
7.0 TURNOVER INFORMATION:
Unit 1 and Unit 2 are at 100% power. U1 has been at 100% for the last 15 days following refueling. The A MDAFWP is OOS due to contamination in the oil.
Unit 1 and Unit 2 are at 100% power. U1 has been at 100% for the last 15 days following refueling. The A MDAFWP is OOS due to contamination in the oil.
Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. There are no surveillances planned for this shift and the orders are to maintain current load and unit availability.}}
Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. There are no surveillances planned for this shift and the orders are to maintain current load and unit availability.}}

Latest revision as of 19:47, 15 January 2025

03-2005-Draft-Operating Exam
ML051250478
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/28/2005
From:
Operations Branch IV
To:
TXU Power
References
50-445/05-301, 50-446/05-301 50-445/05-301, 50-446/05-301
Download: ML051250478 (195)


Text

Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY System:

Conduct of Operations JTA Task #: (New)

Task

Title:

Determine Pressurizer Heater Operability KSA Ref:

2.1.33 PEO:

RO:

3.4 SRO:

4.0 Operators Name:

Performance Environment:

CLASSROOM CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

IPO-001A Plant Heatup from Cold Shutdown to Hot Standby Tools, Equipment, Job Aids, etc:

Selected parameters from the plant, captured on of this JPM, and a calculator.

Page 1 of 5 Rev Date: 1/19/05

Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determine the operability of the Pressurizer Heaters by performing step 5.3.1 of IPO-001A, Plant Heatup from Cold Shutdown to Hot Standby. Plant data is provided.

Terminating Conditions:

Calculations are complete and an Operability determination has been made.

Page 2 of 5 Rev Date: 1/19/05

Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Provide the candidate with the initiating cue, the plant data sheet, and a copy of IPO-001A step 5.3.1.

Note Start time.

2 Candidate correctly transfers data to the procedure.

See Attached Key 3

Candidate performs calculations.

See Attached Key

  • 4 Candidate determines operability TASK COMPLETE.

B/U Heater Groups A, B and Control Heater Group C are OPERABLE. B/U Heater Group D is INOPERABLE Note Completion time.

Page 3 of 5 Rev Date: 1/19/05

Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY INITIATING CUE:

The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determine the operability of the Pressurizer Heaters by performing step 5.3.1 of IPO-001A, Plant Heatup from Cold Shutdown to Hot Standby. Plant data is provided.

Plant Data Parameter Value from Last Reading Sheets (OPT-XXX)

Current Value 1/1-PCPR1 Amps 580 580 1/1-PCPR Amps 0

200 1/1-PCPR2 Amps 565 565 1/1P-CPR3 Amps 0

176 1B1 Volts 474 468 1B2 Volts 483 476 1B3 Volts 476 470 1B4 Volts 485 480 PC point V6303A 487.2 486.9 PC point V6302A 488.1 487.1 PC point V6301A 487.2 486.9 PC point V6304A 488.3 487.1 PC point A6801A 571.2 570.1 PC point A6802A 0

193 PC point A6803A 559.8 560 PC point A6804A 0

176 1EA1 Amps 282.7 261.4 1EA2 Amps 358.5 423.7 NOTE: The candidate can use either the MCB meter amperages or the plant computer values for heater amperages. The IPO allows both and there is no significant difference.

NOTE: The shaded parameters should NOT be used. The following problems exist with the shaded data:

1. The pressurizer heaters are supplied by 1EB1-4, NOT 1B1-4
2. 1EA1/2 amperage is not necessary to complete the calculations.
3. Data from the last set of logs should NOT be used for the Operability determination. Plant conditions could have changed significantly since the readings were taken. The IPO wants current plant data to determine Operability.

Page 4 of 5 Rev Date: 1/19/05

Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Page 5 of 5 Rev Date: 1/19/05 Circle the correct status for each Bank of Pressurizer Heaters Heater Bank Status Status B/U Heater Grp. A Operable Inoperable B/U Heater Grp. B Operable Inoperable Control Grp. C Operable Inoperable B/U Heater Grp. D Operable Inoperable Example of the completed procedure:

5.3 Heatup And Pressurization For MODE 3 Entry

[C]

This section describes steps for heatup and pressurization to enter MODE 3.

5.3.1 Verify at least two groups of pressurizer heaters have a capacity of at least 150KW each.(TS SR 3.4.9.2)

A. Energize each group of heaters, as required, to measure current. _____

B. Record voltage and current AND calculate power for each group of heaters.

(Voltage x current x 0.001732 = power)

Backup Heater Group A 1EB3 1-II-PCPR1or Or 486.9__x or _570.1 _ x 0.001732 =

480.77 KW V6303A A6801A Backup Heater Group B 1EB2-1-II-PCPR2 or 487.1 x or _193 _ x 0.001732 =

162.8 KW V6302A A6803A

! Control Heater Group C 1EB1 1-II-PCPR or 486.9 x or __560 x 0.001732 =

_472.54_ KW V6301A A6803A

! Backup Heater Group D 1EB4 1-II-PCPR3 or 487.1 x or _176 x 0.001732 =

__148.5__ KW V6304A A6804A C. Operate pressurizer heaters as needed for plant conditions. _____

D. IF any group(s) of pressurizer heaters does NOT have a capacity of > 150KW, THEN initiate a LCOAR per ODA-308. _____

Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 1 of 5 Rev Date: 1/24/05 System:

Conduct of Operations JTA Task #: (New)

Task

Title:

Calculate RCS Leakrate KSA Ref:

2.1.23 PEO:

RO:

3.9 SRO:

4.0 Operators Name:

Performance Environment:

CLASSROOM CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

ABN-103 Excessive Reactor Coolant Leakage Tools, Equipment, Job Aids, etc:

Selected parameters from the plant, captured on of this JPM, and a calculator.

Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 2 of 5 Rev Date: 1/24/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

The plant is operating at 100% power, BOL. The crew is responding to the indications of a Reactor Coolant System leak. The Unit Supervisor has directed you to determine the size of the leak by performing Attachment 1 of ABN-103, Excessive Reactor Coolant Leakage. Plant data is provided.

Terminating Conditions:

Calculations are complete and a RCS Leak Rate determination has been made.

Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 3 of 5 Rev Date: 1/24/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Provide the candidate with the initiating cue, the plant data sheet, and a copy of ABN-103.

Note Start time.

2 Candidate correctly transfers data to the procedure.

See Attached Key 3

Candidate performs calculations.

See Attached Key

  • 4 Candidate determines operability TASK COMPLETE.

Leak rate is determined to be approx 5 gpm.

See key for allowed variances in parameters Note Completion time.

Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 4 of 5 Rev Date: 1/24/05 INITIATING CUE:

Parameter Value at 1429 Value at 1446 CHG FLO (F6138A) 140.7 143.8 LTDN FLO (F6134A) 130.9 130.9 FR-157 (RCP 1 Leak Off) 2.8 2.8 FR-156 (RCP 1 Leak Off) 2.8 2.8 FR-155 (RCP 1 Leak Off) 2.8 2.8 FR-154 (RCP 1 Leak Off) 2.8 2.8 VCT LVL (L6112A) 52.8 50.4 T0400A (Loop 1 Tave) 589.8 589.8 T0420A (Loop 2 Tave) 588.6 588.6 T0440A (Loop 3 Tave) 589.7 589.7 T0460A (Loop 4 Tave) 588.7 588.7 L6480A (PZR Level 1) 60 59.5 L6481A (PZR Level 2) 60 59.5 L6482A (PZR Level 3) 60 59.5 NOTE: There was no VCT auto make-up. There were no diversions of letdown flow during this period.

Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 5 of 5 Rev Date: 1/24/05 CPSES ABNORMAL CONDITIONS PROCEDURES MANUAL UNIT 1 AND 2 PROCEDURE NO.

ABN-103 EXCESSIVE REACTOR COOLANT LEAKAGE REVISION NO 8 PAGE 22 OF 28 ATTACHMENT 1 PAGE 2 OF 2 PARAMETER INITIAL VALUE FINAL VALUE AVERAGE VALUE TIME

(-) __1429____ + __1446____

= ____17___ t

  • CHRG FLO (F6138A)

__140.7____ + ___143.8___

(__________284.5____________)

2

= __142.25___ GPM

  • LTDN HX OUT FLOW (F6134A)

___130.9__ + ___130.9___

(__________261.8______________)

2

= __130.9__ GPM

  • RCP SEAL LKOFF FLO (FR-157, 156, 155

& 154)

___11.2______ + ____11.2____

(___________5.6______________.)

2

= ___11.2___ GPM

  • VCT LVL (L6112A)

(_52.8___ - __50.4___)(19.4gal/%)

(_________46.56__________________)

(__17____)t in MIN)

= __2.74___ GPM RC LOOP 1-4 TAVE (T0400A,T0420A,T0440A OR T0460A)

(________ - ________)(93gal/°F)

(_____________0__________________)

(_____17_____)t in MIN)

= ____0___ GPM PRZR LVL (L6480A,L6481A OR L6482A)

(_60___ - ___59.5__)(65gal/%)

(_________32.5___________________)

(__17_____)t in MIN)

= ___1.9___ GPM Shaded areas NOT REQUIRED CALCULATION FORMULA Flow adjust method:

(+) ________

CHRG FLO LTDN FLOW SEAL LKOFF FLO

-( )_________

TAVG ADJUST

+( )________

PRZR LVL ADJUST

= ______GPM RCS LEAKAGE OR VCT level adjust method

( )__2.74___

VCT LVL ADJUST Allowed (2.5-3.0)

-( )_0___

TAVG ADJUST

+(+ )__1.9__

PRZR LVL ADJUST Allowed (1.6 -

2.2)

= __4.65_GPM RCS LEAKAGE Allowed (4.1

- 5.2)

  • Either Chrg Flo, Ltdn Flow, and RCP Seal Lkoff Flo (Flow adjust method) OR VCT Lvl (VCT level adjust method) should be used, but NOT both.

Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 6 of 5 Rev Date: 1/24/05

Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 1 of 13 Rev Date: 1/25/05 System:

Equipment Control JTA Task #: (New)

Task

Title:

Check Completed Surveillance Procedure for Accuracy KSA Ref:

2.2.12 PEO:

RO:

3.0 SRO:

3.4 Operators Name:

Performance Environment:

CLASSROOM CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

OPT-207A Service Water System Tools, Equipment, Job Aids, etc:

Selected parameters from the plant, captured on of this JPM..

Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 2 of 13 Rev Date: 1/25/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

The plant is operating at 100% power, BOL. You are the CPC RO. The Unit Supervisor has directed you to review the just completed OPT-207 A, Service Water System, for accuracy. Circle any mistakes in the OPT and return the marked up copy to the Lead Examiner.

Terminating Conditions:

The OPT has been reviewed and 2 of the three errors have been correctly identified.

Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 3 of 13 Rev Date: 1/25/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Provide the candidate with the initiating cue.

Note Start time.

2 Candidate reviews completed data sheet.

See Attached Key

  • 3 Candidate determines the errors in the completed OPT.

TASK COMPLETE.

Two of the three errors are identified. See Attached Key for the three errors.

Note Completion time.

NOTE: The vibration alert error should be noted in 4 places.

It is critical that the ODA -308 Tracking LOCAR be noted. The others are less important.

Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 4 of 13 Rev Date: 1/25/05 INITIATING CUE:

The plant is operating at 100% power, BOL. You are the CPC RO. The Unit Supervisor has directed you to review the just completed OPT-207A, Service Water System, for accuracy. Circle any mistakes in the OPT and return the marked up copy to the Lead Examiner.

Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 5 of 13 Rev Date: 1/25/05

. Completed OPT.

NOTE TO EXAMINER: Ensure candidate is provided the filled out OPT. This must be done manually.

Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 6 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE page 1 WORK ORDER Resp. Group: POSS OPS SHIFT MANAGER WO # : 5-05-505395-AA Tag #: CP1-SWAPSW-01 Unit: 1 Train (Sys) : A See Equipment List System: SW Train (Elect) : NA More Tags and Locations Bldg/Elev : SI 0796 Room: X-275 Tag Desc: STATION SERVICE WATER PUMP 1-01 Compt Quality: Y Safety Class: 3 SEIS CAT: I MOV XI: N PVO: A EQ: M

                                                                                  • SURVEILLANCE

SUMMARY

DESC: OPT-207A, TRN A STATION SERVICE WATER PMP/VLV OPERBILITY TEST Compliance Date/Time : 03/21/2005 10:05 Source Doct IST Violation Date/Time

04/05/2005 10:05 Test Section 8.2 Adj Schedule Date/Time : __/__/____

Test Procedure: OPT-207A Work Week Test Type FI Frequency 92 Days Last Performed Date/Time

01/09/2005 10:005 Last Perf. WO
5-04-505395-AE
                                                                                                • SPECIAL INSTRUCTIONS***************************************************

Permit-RWP

N #: ____________________

Confined Space

N #: ____________________

Fire Permit

N #: ____________________

Combust. Loading

N #: ____________________

Fire Impair

N #: ____________________

Cleanliness Class: C Housekeeping Zone: IV Clearance/MTD : N #: ____________________

STA-720 Reqd : No Barrier Impair Form: No Postwork Testing Reqt: N Ventilation Pressure Boundary Breach: No

                                                                                    • APPROVAL/AUTHORIZATION TO START***************************************

Ops-Shift Manager Technical Date: __/__/____

Radiation Protection Date: __/__/____

Shift Manager Date: __/__/____

Ops-Shift Manager Safety Date: __/__/____

Revisions 1

2 3

4 5

6 POSS QC ANII RP Ops SM

                                                                                        • INITIAL SURVEILLANCE RESULTS**********************************************

As Found Condition: _____ Unsat (Sign&Date) ____________________________ Date: __/__/____

Shift Manage Informed (Sign&Date) _________________________________ Date: __/__/____

                                                                              • FINAL SURVEILLANCE RESULTS***************************************************

Duration (Est/Act) 7 / ___

Start Time ____

Date: __/__/____

Test Completed: ___ Sat ___ Unsat Tech Spec Acceptance Checked: ___ Sat ___ Unsat Test Completed by: ________________________________________ Time: ____ Date: __/__/____

                                                                        • SURVEILLANCE ACCEPTANCE*******************************************************

Tech Spec Acceptance Criteria Met: ___ Sat ___ Unsat Shift Manager: ________________________________________ Date: __/__/____ Time: ____

                                                                            • SURVEILLANCE REVIEWS********************************************************

Ops-Shift Manager Date: __/__/____

Ops-Shift Manager Date: __/__/____

Ops-Shift Manager Date: __/__/____

Ops-Shift Manager Date: __/__/____

Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 7 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE page 2 WORK ORDER Tag # CP1-SWAPSW-01 WO # : 5-04-505395-AA

                                                                                            • WORK PLAN ****************************************************************

MANPOWER ESTIMATES MEASURING AND TEST EQUIPMENT (enter actual manhours)

Discipline MANHOURS CAL DUE CAL DUE Code Est/Act M&TE TAG# DATE M&TE TAG# DATE IWCM 0/ ___

___________ __/__/__ ___________ __/__/__

POS 0/ ___

___________ __/__/__ ___________ __/__/__

POSS 0/ _1_

___________ __/__/__ ___________ __/__/__

______ ___ / ___

___________ __/__/__ ___________ __/__/__

______ ___ / ___

___________ __/__/__ ___________ __/__/__

______ ___ / ___

___________ __/__/__ ___________ __/__/__

______ ___ / ___

___________ __/__/__ ___________ __/__/__

______ ___ / ___

___________ __/__/__ ___________ __/__/__

______ ___ / ___

___________ __/__/__ ___________ __/__/__

                                                                      • SPECIAL PARTS AND SPECIAL TOOLS *******************************************

Enter actual quantity used and unique identifier such as Serial #, Heat #

RR#, RIR #, QAT # etc. if applicable Unique ID ISSUE/

Qnty UI Qnty It ID)

(SN, RR, RIR, STAGED PMMS Reqd Used (TSN) QAT, HT# etc) Description Flag STATUS N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 8 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE page 3 WORK ORDER Tag # CP1-SWAPSW-01 WO # : 5-05-505395-AA

                                                                        • RELATED EQUIPMENT / VERIFICATION LIST***********************************

+ Stop + Locate + Touch +Verify + Anticipate + Manipulate + Observe +

Verify the Equipment Tags being worked / tested relate to the work order. Verify W.O. tags using the following related equipment / verification list.

Tag Number Bldg-El Room Tag Sys Elec ASME Saf Seis Q

E Description Stat Trn Trn III/XI CL CTGY R Q

CP1-SWAPSW-01 SI-0796 X-275 ACT A

N/A 3 N 3

I Y

M Un: 1 Sys: SW Station Service Water Pump 1-01 Specific Loc: SSW PMP 1-01 Bay Comments: _______________________________________________________________ Failure Code: NA 1-HV-4286 SI-0796 X-275 ACT A

N/A 3 N 3

I Y

M Un: 1 Sys: SSW PMP 1-01 DISCH VLV Specific Loc:

Comments: _______________________________________________________________ Failure Code: NA 1-HV-4393 SG-810 1-082 A

N/A 3 N 3

I Y

M Un: 1 Sys: Hallway Comments: _______________________________________________________________ Failure Code: NA 1-SW-0374 SG-810 1-082 A

N/A 3 N 3

I Y

M Un: 1 Sys: DISCH OF PMP Comments: _______________________________________________________________ Failure Code: NA Other Tags / Comments:

                                                                                            • PROCEDURES***************************************************************

OPT-207A SERVICE WATER SYSTEM

                                                                                            • INSTRUCTIONS*************************************************************

Resp Planner: Harold (Chuck) Jackson X 5953 This test will verify the Service Water System; Train A, Pump and Valve operability as defined by ASME,Section XI requirements. This test will be performed at least once per ninety-two days in all operation Modes.

Step Instructions continued on next page --------- >

Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 9 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE page 4 WORK ORDER Tag # CP1-SWAPSW-01 WO #: 5-05-505395-AA INSTUCTIONS (continued)

< ---------------- Step Instruction Continued from Previous Page This test may be performed in any mode.

Performance of this test satisfies RI-IST requirements:

CP1-SWAPSW-01 (PT/3M) 1-HV-4286 (ET-0/ET-C/18M) 1-HV-4393 (ET-0/18M) 1SW-0374 (CV-C/CV0/3M)

QC Support required for acoustic monitoring per STA-750.

Required Contacted: _____________________/ ____

Yes____ No ____

PROMPT TEAM support required to monitor pump vibration Both Trains of SSW are in service (SOP-501A).

Computer is available to obtain flow data and observe bearing temperatures.

Data Sheet OPT-207A-4.

1.

QC or other applicable test personnel install acoustic QC/OPS ____

emission test equipment in accordance with STA-750 if required.

2.

Perform OPT-207A, Section 8.2, Train A, Station OPS ____

Service Water Pump 1-01 Operability Test

3.

QC record acoustic emission data in accordance QC/OPS ____

with STA-750 if required.

4.

PROMPT TEAM record pump vibration data.

PT/OPS ____

5.

QC remove acoustic emission test equipment QC/OPS ____

if installed.

Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 10 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE page 5 WORK ORDER Tag # CP1-SWAPSW-01 WO #: 5-05-505395-AA

                                                                            • WORK PERFORMED / PROBABLE CAUSE *************************************

As found condition:_________________________________________________________________________________

Corrective Action Taken:___________________________________________________________________________________

As Left Condition:________________________________________________________________________________

Probable Cause of Problem/Failure:___________________________________________________________________________

Work Duration (Est./Act.) 7.0 / ___

Work Completed by: ______________________________________ Date: __/__/__

Work Supervisor: _________________________________________ Date: __/__/__

Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 11 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE page 6 WORK ORDER Tag # CP1-SWAPSW-01 WO #: 5-05-505395-AA

                                                                                        • RELATED WORK ORDERS*************************************************
    • NO RELATED WORK ORDERS **
                                                                                          • RELATED ACTIVITIES*******************************************************
    • NO RELATED ACTIVITIES **
                                                                                        • OTHER RELATIONSHIPS****************************************************

Rel Rel Type Related Item Number Sheet #

Related Item Description Class DOC OPT-207A Service Water System Proc SPTOOL Accelerometer, 196 1 EA XREF SPTOOL Pocket Dial, Therm 1 EA XREF SPTOOL Smartmeter, 1330 1 EA XREF SPTOOL Stopwatch 1 EA XREF SPTOOL Therm, Type 3 +/ - 5D 1 EA or Better XREF

                                                                                        • RELATED CLEARANCE******************************************************
    • NO OTHER CLEARANCE **
                                                                                • SURVEILLANCE REQUIREMENTS**********************************************

Surveillance Requirement Surveillance Requirement Description 5.5.8 Refer to Tech Spec Manual

    • END OF REPORT**
                                                                                                      • BOTTOM OF DATA*****************************************************

Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 12 of 13 Rev Date: 1/25/05 SSWP 1-01 DATA SHEET NOTE: This for is used to record test data as required by section 8.2 STEP OBSERVED ACCEPTANCE CRITERA INITIALS 6.2 PREREQUISITES MET N/A N/A 8.2 D. X-LI-4288 LEVEL N/A E. Reference Discharge Pressure PSIG N/A G. P3251A Discharge Pressure PSIG N/A And Time N/A I. F6258A SSWP 1 DISCH FLO

________ + ________ + ________ + ________ + ________ +

GPM GPM GPM GPM GPM

________ + ________ + ________ + ________ + ________ =

GPM GPM GPM GPM GPM

_______TOTAL _____

J. AVERAGE FLOW

___________ ÷ 10 = _________ GPM (Total Step 8.2.1) Average Refer Action Limit Alert Limit Average Action Limit Units Value Low Low Value High 12.918 <12,014

<12,272

________ >14,210 GPM K. VIBRATION AMPLITUDE Test Refer Calculated Alert Limit Action Limit Parameter Value Value High High Units Initials MOH 0.064

>0.160

>0.384 in/sec pk MOV 0.071

>0.178

>0.426 in/sec pk MOA 0.054

>0.135

>0.324 in/sec pk OPT-207A-4 Page 1 of 2 R-11

Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 13 of 13 Rev Date: 1/25/05 SSWP 1-01 DATA SHEET STEP OBSERVED ACCEPTANCE CRITERIA INITIALS 8.2 O 1-HV-4286 Open/Closed OPEN P

SSWP 1 (NOTE 1)

____ sec /

Reverse Rotation

< 5 sec Reverse Rotation Q 1-SW-0023 Locked Open/

Closed N/A R 1-HV-4286 10% Open/Open 10% Open T

1-HV-4286 Open/ 10%Open Open U 1 FI-4258A Flow (NOTE 2)

________ GPM 16,456 GPM V

1-HV-4393 Open/Closed OPEN W Measured Data within Limits Yes / No N/A ODA-308 Initiated Yes / No N/A Technical Specification Action Required Yes / No N/A COMPONENT OSBSERVED POSITION REQUIRED VERIFIED 9.0 B

1-SW-0023 Locked Open/___

Locked Open 1-HS-4286 Auto Open/_____

Auto Open NOTE 1: SSWP rotating in the reverse direction 5 sec satisfies the full closure stroke of 1SW-0374.

NOTE 2: Flow 16,456 gpm satisfied the fill open stroke of 1SW-0374.

Comments/Discepancies:____________________________________________________________________

Corrective Actions:__________________________________________________________________________________

Performed by: ____________________________________________ Date: __________

Reviewed by: ____________________________________________ Date: __________

OPT-207A-4 Page 1 of 2 R-11

Initial License Exam 03/2005 Job Performance Measure JPM: RO A3 Page 1 of 4 Rev Date: 2/7/05 System:

Radiation Control JTA Task #: (New)

Task

Title:

Evaluate Radiological Condition for Task Performance KSA Ref:

2.3.10 PEO:

RO:

2.9 SRO:

3.3 Operators Name:

Performance Environment:

CLASSROOM CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

GAP# 2005-01 STA-656 RPI-606 Tools, Equipment, Job Aids, etc:

Copy of the GAP and the applicable Survey Map for the task.

Initial License Exam 03/2005 Job Performance Measure JPM: RO A3 Page 2 of 4 Rev Date: 2/7/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

You are on tour in the Safeguards Building. The US directs you to isolate the air to HV-8152.

You are to evaluate the radiological condition in the area and provide the requested information.

Terminating Conditions:

Answers to questions are provided to the evaluator.

Initial License Exam 03/2005 Job Performance Measure JPM: RO A3 Page 3 of 4 Rev Date: 2/7/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Provide the candidate with the initiating cue, the GAP and the Survey Map.

Note Start time.

  • 2 Candidate correctly answers two of the three questions.

TASK COMPLETE.

See Attached Key Note Completion time

Initial License Exam 03/2005 Job Performance Measure JPM: RO A3 Page 4 of 4 Rev Date: 2/7/05 INITIATING CUE:

You are on tour in the Safeguards Building. The US directs you to isolate the air to HV-8152.

You are to evaluate the radiological condition in the area and provide the requested information.

NOTE: Circle the correct answers to the following questions and provide the evaluator with your completed paperwork.

1. The area where the valve is located is a:

A) Locked High Radiation Area B) Contaminated Area C) Posted High Radiation Area D) General Radiation Area

2. If the area where the air isolation valve is located is a 60 mr/hr field, how long before your dosimeter will alarm if it is at the lower setting allowed by the GAP.

A) 50 minutes B) 5 minutes C) 25 minutes D) 2.5 minutes

3. Circle three areas on the Survey Map that require contact with RP prior to entry.

Initial License Exam 03/2005 Job Performance Measure JPM: RO A3 Page 5 of 4 Rev Date: 2/7/05

-KEY-INITIATING CUE:

You are on tour in the Safeguards Building. The US directs you to isolate the air to HV-8152. You are to evaluate the radiological condition in the area and provide the requested information.

NOTE: Circle the correct answers to the following questions and provide the evaluator with your completed paperwork.

1. The area where the valve is located is a:

E) Locked High Radiation Area F) Contaminated Area G) Posted High Radiation Area H) General Radiation Area

2. If the area where the air isolation valve is located is a 60 mr/hr field, how long before your dosimeter will alarm if it is at the lower setting allowed by the GAP.

E) 50 minutes F) 5 minutes G) 25 minutes H) 2.5 minutes

3. Circle three areas on the Survey Map that require contact with RP prior to entry.
1) The area where the valve to be operated is.
2) The CA I/S Pit
3) The contaminated area.

The RWP map was removed from this page of the exam by the chief examiner because it was considered potential SUNSI material due to the equipment locations on the map.

Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Page 1 of 5 Rev Date: 1/19/05 System:

Conduct of Operations JTA Task #: (New)

Task

Title:

Determine Pressurizer Heater Operability KSA Ref:

2.1.33 PEO:

RO:

3.4 SRO:

4.0 Operators Name:

Performance Environment:

CLASSROOM CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

IPO-001A Plant Heatup from Cold Shutdown to Hot Standby Tools, Equipment, Job Aids, etc:

Selected parameters from the plant, captured on of this JPM, and a calculator.

Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Page 2 of 5 Rev Date: 1/19/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determine the operability of the Pressurizer Heaters by performing step 5.3.1 of IPO-001A, Plant Heatup from Cold Shutdown to Hot Standby. Plant data is provided.

Terminating Conditions:

Calculations are complete and an Operability determination has been made.

Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Page 3 of 5 Rev Date: 1/19/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Provide the candidate with the initiating cue, the plant data sheet, and a copy of IPO-001A step 5.3.1.

Note Start time.

2 Candidate correctly transfers data to the procedure.

See Attached Key 3

Candidate performs calculations.

See Attached Key

  • 4 Candidate determines operability TASK COMPLETE.

B/U Heater Groups A, B and Control Heater Group C are OPERABLE. B/U Heater Group D is INOPERABLE Note Completion time.

Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Page 4 of 5 Rev Date: 1/19/05 INITIATING CUE:

The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determine the operability of the Pressurizer Heaters by performing step 5.3.1 of IPO-001A, Plant Heatup from Cold Shutdown to Hot Standby. Plant data is provided.

Plant Data Parameter Value from Last Reading Sheets (OPT-XXX)

Current Value 1/1-PCPR1 Amps 580 580 1/1-PCPR Amps 0

200 1/1-PCPR2 Amps 565 565 1/1P-CPR3 Amps 0

176 1B1 Volts 474 468 1B2 Volts 483 476 1B3 Volts 476 470 1B4 Volts 485 480 PC point V6303A 487.2 486.9 PC point V6302A 488.1 487.1 PC point V6301A 487.2 486.9 PC point V6304A 488.3 487.1 PC point A6801A 571.2 570.1 PC point A6802A 0

193 PC point A6803A 559.8 560 PC point A6804A 0

176 1EA1 Amps 282.7 261.4 1EA2 Amps 358.5 423.7 NOTE: The candidate can use either the MCB meter amperages or the plant computer values for heater amperages. The IPO allows both and there is no significant difference.

NOTE: The shaded parameters should NOT be used. The following problems exist with the shaded data:

1. The pressurizer heaters are supplied by 1EB1-4, NOT 1B1-4
2. 1EA1/2 amperage is not necessary to complete the calculations.
3. Data from the last set of logs should NOT be used for the Operability determination. Plant conditions could have changed significantly since the readings were taken. The IPO wants current plant data to determine Operability.

Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Page 5 of 5 Rev Date: 1/19/05 Circle the correct status for each Bank of Pressurizer Heaters Heater Bank Status Status B/U Heater Grp. A Operable Inoperable B/U Heater Grp. B Operable Inoperable Control Grp. C Operable Inoperable B/U Heater Grp. D Operable Inoperable Example of the completed procedure:

5.3 Heatup And Pressurization For MODE 3 Entry

[C]

This section describes steps for heatup and pressurization to enter MODE 3.

5.3.1 Verify at least two groups of pressurizer heaters have a capacity of at least 150KW each.(TS SR 3.4.9.2)

A. Energize each group of heaters, as required, to measure current. _____

B. Record voltage and current AND calculate power for each group of heaters.

(Voltage x current x 0.001732 = power)

Backup Heater Group A 1EB3 1-II-PCPR1or Or 486.9__x or _570.1 _ x 0.001732 =

480.77 KW V6303A A6801A Backup Heater Group B 1EB2-1-II-PCPR2 or 487.1 x or _193 _ x 0.001732 =

162.8 KW V6302A A6803A

! Control Heater Group C 1EB1 1-II-PCPR or 486.9 x or __560 x 0.001732 =

_472.54_ KW V6301A A6803A

! Backup Heater Group D 1EB4 1-II-PCPR3 or 487.1 x or _176 x 0.001732 =

__148.5__ KW V6304A A6804A C. Operate pressurizer heaters as needed for plant conditions. _____

D. IF any group(s) of pressurizer heaters does NOT have a capacity of > 150KW, THEN initiate a LCOAR per ODA-308. _____

Initial License Exam 03/2005 Job Performance Measure JPM: SRO A1.b Page 1 of 4 Rev Date: 1/19/05 System:

Administrative Procedures JTA Task #: (Bank 2001)

Task

Title:

Determine Staff Working Hours KSA Ref:

2.1.5 PEO:

RO:

2.3 SRO:

3.4 Operators Name:

Performance Environment:

CLASSROOM CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

Technical Specifications STA-615, Staff Work Hours Tools, Equipment, Job Aids, etc:

Technical Specifications STA-615, Staff Work Hours

Initial License Exam 03/2005 Job Performance Measure JPM: SRO A1.b Page 2 of 4 Rev Date: 1/19/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs with the exeption of the Plant Computer. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

You are the Unit Supervisor and one of the assigned ROs called in sick. You need to find a replacement RO. Assuming today is March 23 (0630), based on the work hour history, determine which of the following 5 ROs could perform safety-related functions until 1830 without advanced approval.

1. RO1 has been on-shift since 0200 (March 23).
2. On March 22, RO2 worked from 0630 until 1900 (includes a 1/2 hour shift turnover).
3. RO3 worked from 1430 on March 22 to 0030 on March 23.
4. RO4 has been on vacation for the past two days (March 21 and 22), but worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> on March 17, 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> on March 18, 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> on March 19, and 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> on March 20.
5. On March 22, RO5 worked from 0630 until 1930 (includes a 1/2 hour shift turnover).

Terminating Conditions:

Determine that 2 out of the 5 ROs available meet the work hour requirement to relieve the shift.

Initial License Exam 03/2005 Job Performance Measure JPM: SRO A1.b Page 3 of 4 Rev Date: 1/19/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Provide candidate with completed copy of the initiating cue Candidate should review Admin JPM and initiating cue Note Start time.

  • 2 Review work hour history and determine that only 2 of the 5 ROs could work without advanced approval.

TASK COMPLETE RO1 - no, would work 16.5 hrs straight RO2 - Yes, would work 24 hrs in 48 hrs RO3 - No, less than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> between work periods RO4 - Yes, would work 70 hrs in 7 days RO5 - No, would work 24.5 hrs in 48 hrs.

Pass criteria is 4 of the 5 ROs work hour status being correctly determined No - cannot work Yes - can work Note Completion time.

Initial License Exam 03/2005 Job Performance Measure JPM: SRO A1.b Page 4 of 4 Rev Date: 1/19/05 INITIATING CUE:

You are the Unit Supervisor and one of the assigned ROs called in sick. You need to find a replacement RO. Assuming today is March 23 (0630), based on the work hour history, determine which of the following 5 ROs could perform safety-related functions until 1830 without advanced approval.

1. RO1 has been on-shift since 0200 (March 23).
2. On March 22, RO2 worked from 0630 until 1900 (includes a 1/2 hour shift turnover).
3. RO3 worked from 1430 on March 22 to 0030 on March 23.
4. RO4 has been on vacation for the past two days (March 21 and 22), but worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> on March 17, 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> on March 18, 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> on March 19, and 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> on March 20.
5. On March 22, RO5 worked from 0630 until 1930 (includes a 1/2 hour shift turnover).

Initial License Exam JPM: SROA2 0312005 KEY Job Performance Measure system:

Equipment Control JTA Task #:

(New)

Task

Title:

Complete Technical Specification Paperwork for INOP PZR Heaters (Tracking LOCAR)

KSA Ref:

2.2-23 PEO:

RO: 2.6 SRO: 3.8 Operators Name:

Performance Environment:

CLASSROOM CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list steps not satisfactorily completed):

References:

ODA-308 Technical Specification 3.4.9 Tools, Equipment, Job Aids, etc:

Blank LOCAR Form.

Page 1 of 4 Rev Date: 2/7/05

Initial License Exam Job Performance Measure PM: SROA2 Safety Considerations:

If this JPM is to be performed in the planthontrol room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

Peer checking Three-way communications Phonetic alphabet Self checking ALM use Unit designators Conservative decision making Procedure place keeping Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all writtedoral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switcheshdications you would use Initiating Cue:

Bank D of the Pressurizer Heaters was declared INOPERABLE today at 083 1 due to KW output less than minimum. You have been directed to fill out the Tracking LOCAR. Because of a server problem, the electronic LOCAR system is unavailable. The SM has called the Prompt team and they will call with the LOCAR number when it is generated.

Terminating Conditions:

Completed Tracking LOCAR provided to the evaluator.

Page 2 of 4 Rev Date: 2/7/05

Initial License Exam JPM: SROA2 P

STEP#

  • Critical 1

"2 03/2005 Job Performance Measure ELEMENT Provide the candidate with the initiating cue, the applicable Technical specification and the blank LOCAR form..

Candidate correctly fills out the form. The KEY indicates the required minimum fields.

Three of the four minimum fields must be correct to pass the JPM.

TASK COMPLETE.

STANDARD See Attached Key Note Completion time NOTES Note Start time.

SAT/

IJNSAT Page 3 of 4 Rev Date: 2/7/05

Initial License Exam 03/2005 Job Performance Measure JPM: SROA2 INITIATING CUE:

Bank D of the Pressurizer Heaters was declared INOPERABLE today at 083 1 due to KW output less than minimum. You have been directed to fill out the Tracking LOCAR. Because of a server problem, the electronic LOCAR system is unavailable. The SM has called the Prompt team and they will call with the LOCAR number when it is generated.

Page 4 of 4 Rev Date: 2/7/05

Pressurizer 3.4.9 SURVEILLANCE SR 3.4.9.1 Verify pressurizer water ievel is 592%.

ACTIONS (continued)

FREQUENCY 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> CONDITION SR 3.4.9.2 Verify capacity of each required group of pressurizer heaters is 2 150 kW.

B. One required group of pressurizer heaters inoperable.

18 months C. Required Action and associated Completion Time of Condition B not met.

REQUIRED ACTION B. 1 Restore required group of pressurizer heaters to OPERABLE status.

c. 1 Be in MODE 3.

c.2 Be in MODE 4.

COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 6 hours 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> COMANCHE PEAK - UNITS 1 AND 2 3.4-20 Amendment No. 64

Pressurizer 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Pressurizer LCO 3.4.9 The pressurizer shall be OPERABLE with:

a. Pressurizer water level 592%; and
b. Two groups of pressurizer heaters OPERABLE with the capacity of each group 2 150 kW.

APPLICABILITY:

MODES 1, 2, and 3 ACT IONS CONDITION A. Pressurizer water level not within limit.

REQUIRED ACTION A. 1 Be in MODE 3.

A.2 Fully insert all rods.

A.3 Place Rod Control System in a condition incapable of rod withdrawal.

A.4 Be in MODE 4.

COMANCHE PEAK - UNITS 1 AND 2 3.4-1 9 COMPLETION TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 6 hours 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 12 hours (con tin ued)

Amendment No. 64

a 0

0

a 8

Y s P

ol In 01 E I

=

3

\\

0" s

C 0

aJ.-

Y -

n U

. i v)

E l-

c a,

a, 6

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

1 1

1 1

1 1

1 1

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

i i

i i

i i

i i

i I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I QI I

I I

I I

I I

I AI I

I I

I I

I I

I I

l I

I I

I I

I I

I I

.I

.I

.I

.I

.I

.I.

I I

I I

I I

I I

I I

81. \\

I I

I I

I I

I I

4 I

I I

I I

I I

I YJl I

I I

I I

I I

\\

I I

I I

t I

I I

I I

~

I I

I I

I 3

1 I

I I

I I

I I

I I

I I

I I

I I

4 I I

I I

I I

I I

4 I

I I

I I

I I

I 3

PI I I

I I

I I

I I

I I

I I

I I

I I

I

rn m -

c -

0

? 5 E

d i=.

a, c

D 1

E u

P El 0

a D E!

8 El D

a,

.K 0 2

c a,

.K

0)

K 0

3 K

c c s 0

I-z w 5 E

2 B

a:

3 CY z I- 0 w

I-E 5 d

3 a,

E 2

8 B

B d

c z

c m

a m

cv L L T

O i:

a, m

m r"

a, z

E.

c

.- 5 E

a D

0 g!

f d

2 a,

c K

0 m

c a,

I-0 4 - s

.=.=

5 5 c ;

-0 m

a,

-1 0

z E

b U

T! 0 0

z a,

c d

r n r n 56 a, a,

c c

z z c

c K

K 3

3 D

a, m

D c

9 rn g 0

m

Initial License Exam 03/2005 Job Performance Measure JPM: SRO A3 Page 1 of 4 Rev Date: 2/7/05 System:

Radiation Control JTA Task #: (New)

Task

Title:

Evaluate Radiological Condition for Task Performance KSA Ref:

2.3.10 PEO:

RO:

2.9 SRO:

3.3 Operators Name:

Performance Environment:

CLASSROOM CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

GAP# 2005-01 STA-656 RPI-606 Tools, Equipment, Job Aids, etc:

Copy of the GAP and the applicable Survey Map for the task.

Initial License Exam 03/2005 Job Performance Measure JPM: SRO A3 Page 2 of 4 Rev Date: 2/7/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

You are on tour in the Safeguards Building. The US directs you to isolate the air to HV-8152.

You are to evaluate the radiological condition in the area and provide the requested information.

Terminating Conditions:

Answers to questions are provided to the evaluator.

Initial License Exam 03/2005 Job Performance Measure JPM: SRO A3 Page 3 of 4 Rev Date: 2/7/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Provide the candidate with the initiating cue, the GAP and the Survey Map.

Note Start time.

  • 2 Candidate correctly answers two of the three questions.

TASK COMPLETE.

See Attached Key Note Completion time

Initial License Exam 03/2005 Job Performance Measure JPM: SRO A3 Page 4 of 4 Rev Date: 2/7/05 INITIATING CUE:

You are on tour in the Safeguards Building. The US directs you to isolate the air to HV-8152.

You are to evaluate the radiological condition in the area and provide the requested information.

NOTE: Circle the correct answers to the following questions and provide the evaluator with your completed paperwork.

1. The area where the valve is located is a:

A) Locked High Radiation Area B) Contaminated Area C) Posted High Radiation Area D) General Radiation Area

2. If the area where the air isolation valve is located is a 60 mr/hr field, how long before your dosimeter will alarm if it is at the lower setting allowed by the GAP.

A) 50 minutes B) 5 minutes C) 25 minutes D) 2.5 minutes

3. Circle three areas on the Survey Map that require contact with RP prior to entry.

Initial License Exam 03/2005 Job Performance Measure JPM: SRO A3 Page 5 of 4 Rev Date: 2/7/05

-KEY-INITIATING CUE:

You are on tour in the Safeguards Building. The US directs you to isolate the air to HV-8152. You are to evaluate the radiological condition in the area and provide the requested information.

NOTE: Circle the correct answers to the following questions and provide the evaluator with your completed paperwork.

1. The area where the valve is located is a:

E) Locked High Radiation Area F) Contaminated Area G) Posted High Radiation Area H) General Radiation Area

2. If the area where the air isolation valve is located is a 60 mr/hr field, how long before your dosimeter will alarm if it is at the lower setting allowed by the GAP.

E) 50 minutes F) 5 minutes G) 25 minutes H) 2.5 minutes

3. Circle three areas on the Survey Map that require contact with RP prior to entry.
1) The area where the valve to be operated is.
2) The CA I/S Pit
3) The contaminated area.

The RWP map was removed from this page of the exam by the chief examiner because it was considered potential SUNSI material due to the equipment locations on the map.

Initial License Exam 03/2005 Job Performance Measure JPM: A4.1 Page 1 of 4 Rev Date: 1/18/05 System:

Emergency Plan JTA Task #: SRO A4.1 Task

Title:

Event Classification KSA Ref:

2.4.41 EAL Classification PEO:

RO:

2.3 SRO:

4.1 Operators Name:

Performance Environment:

PLANT CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

EPP-201 Assessment of Emergency Action Levels, Emergency Classification, and Plan Activation Tools, Equipment, Job Aids, etc:

Static simulator at the completion of Scenario #1.

Initial License Exam 03/2005 Job Performance Measure JPM: A4.1 Page 2 of 4 Rev Date: 1/18/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

The simulator is in freeze. Based on current plant conditions and events during the scenario, determine the emergency classification.

Terminating Conditions:

Event is classified as a Site Area Emergency.

Initial License Exam 03/2005 Job Performance Measure JPM: A4.1 Page 3 of 4 Rev Date: 1/18/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Candidate diagnoses plant conditions and determines the emergency classification for Safety System Malfunction or Failure Referencing Chart 6 of EPP-201, the candidate determines that 6A is TRUE, 6B is TRUE, 6C is FALSE, 6F is False Note Start time.

  • 2 Candidate declares Site Area Emergency based on Chart 6 TASK COMPLETE Site Are Emergency declared IAW Chart 6 Note Completion time.

Initial License Exam 03/2005 Job Performance Measure JPM: A4.1 Page 4 of 4 Rev Date: 1/18/05 INITIATING CUE:

The simulator is in freeze. Based on current plant conditions and events during the scenario, determine the emergency classification.

Initial License Exam 03/2005 Job Performance Measure JPM: A4.2 Page 1 of 4 Rev Date: 1/18/05 System:

Emergency Plan JTA Task #: SRO A4.2 Task

Title:

Event Classification KSA Ref:

2.4.41 EAL Classification PEO:

RO:

2.3 SRO:

4.1 Operators Name:

Performance Environment:

PLANT CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

EPP-201 Assessment of Emergency Action Levels, Emergency Classification, and Plan Activation Tools, Equipment, Job Aids, etc:

Static simulator at the completion of Scenario #1.

Initial License Exam 03/2005 Job Performance Measure JPM: A4.2 Page 2 of 4 Rev Date: 1/18/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

The simulator is in freeze. Based on current plant conditions and events during the scenario, determine the emergency classification.

Terminating Conditions:

Event is classified as a Site Area Emergency.

Initial License Exam 03/2005 Job Performance Measure JPM: A4.2 Page 3 of 4 Rev Date: 1/18/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Candidate diagnoses plant conditions and determines the emergency classification for Loss of Reactor or Secondary Coolant Referencing Chart 2 of EPP-201, the candidate determines that 2A is TRUE, 2B is FALSE Note Start time.

2 Candidate declares Notification of Unusual Event based on Chart 2.

NOTE: Depending on the actual scenario times, this classification may not be necessary. If the 12 gpm leak was not present for > 15 min, it is not reasonable to expect the candidate to recognize this initial classification.

Notification of Unusual Event declared IAW Chart 2 3

Candidate diagnoses plant conditions and determines the emergency classification for Loss of Reactor or Secondary Coolant Referencing Chart 2 of EPP-201, the candidate determines that 2A is TRUE, 2B is TRUE, 2C is TRUE, 2D is FALSE, 2G is FALSE.

  • 4 Candidate declares Site Area Emergency based on Chart 2.

TASK COMPLETE Site Are Emergency declared IAW Chart 2.

Note Completion time.

Initial License Exam 03/2005 Job Performance Measure JPM: A4.2 Page 4 of 4 Rev Date: 1/18/05 INITIATING CUE:

The simulator is in freeze. Based on current plant conditions and events during the scenario, determine the emergency classification.

Initial License Exam 03/2005 Job Performance Measure JPM: P1 Page 1 of 4 Rev Date: 1/27/05 System:

118 AC Distribution System & Inverters JTA Task #: (NEW)

Task

Title:

Bypass Inverter KSA Ref:

APE.057.EA1.01 PEO:

RO:

3.7 SRO:

3.7 Operators Name:

Performance Environment:

PLANT CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 5 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

SOP-607A, 118 VAC Distribution System and Inverters Tools, Equipment, Job Aids, etc:

Working copy of SOP-607A, Section 5.5.5 (1 page)

Initial License Exam 03/2005 Job Performance Measure JPM: P1 Page 2 of 4 Rev Date: 1/27/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

The Unit Supervisor has directed you to transfer distribution panel 1PC1 to its alternate power supply using SOP-607A, Section 5.5.5. A crew brief has been held and the Reactor Operator is ready to assist you. Proceed directly to the Inverter and make the transfer.

Terminating Conditions:

Distribution panel 1PC1 is energized from the alternate power supply.

Initial License Exam 03/2005 Job Performance Measure JPM: P1 Page 3 of 4 Rev Date: 1/27/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Ensure 1EC3/2/BKR, 118 VAC INSTRUMENT DISTR PANEL 1PC1 FEEDER BREAKER is ON CUE: Breaker position is ON.

The breaker operator is pointing to the ON position.

CSR 807 South Wall Note Start time.

  • 2 Perform the following SIMULTANEOUSLY to transfer Panel 1PC1 to the alternate source:

Turn OFF 1PC1/00/BKR-1, IV1PC1 TO 118 VAC INSTRUMENT DISTR PANEL 1PC1 PREFERRED FEEDER BREAKER.

Turn ON 1PC1/00/BKR-2, 1EC3 TO 118 VAC INSTRUMENT DISTR PANEL 1PC1 ALTERNATE FEEDER BREAKER.

CUE : Breaker 1 indicates OFF and Breaker 2 indicates ON TASK COMPLETE At Panel 1PC1:

1PC1/00/BKR-1 is moved to the OFF position.

1PC1/00/BKR-2 is moved to the ON position.

Note Completion time.

NOTE: Breakers are interlocked via a slide bar such when BKR 1is opened, BKR 2 closes.

Initial License Exam 03/2005 Job Performance Measure JPM: P1 Page 4 of 4 Rev Date: 1/27/05 INITIATING CUE:

The Unit Supervisor has directed you to transfer distribution panel 1PC1 to its alternate power supply using SOP-607A, Section 5.5.5. A crew brief has been held and the Reactor Operator is ready to assist you. Proceed directly to the Inverter and make the transfer.

Initial License Exam 03/2005 Job Performance Measure JPM: P2 Page 1 of 6 Rev Date: 1/26/05 System:

Control Room Evacuation JTA Task #:

(Direct)AO5412C Task

Title:

Transfer Charging Pump Suction and Isolate Dilution Paths (Alternate Path)

KSA Ref:

APE.068.AA1.22 PEO:

RO:

4.0 SRO:

4.3 Operators Name:

Performance Environment:

PLANT CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

ABN-905A/B, Loss of Control Room Habitability, Attachment 4.

Tools, Equipment, Job Aids, etc: of ABN-905A/B (working copy)

Initial License Exam 03/2005 Job Performance Measure JPM: P2 Page 2 of 6 Rev Date: 1/26/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

NOTE TO EXAMINER: Review note at step 8 of JPM to ensure candidate is notified by RSP.

This JPM is designed to work on either Unit for ease of scheduling. Note which Unit is used in the comment section.

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

The control room has been evacuated per ABN-905A (B). You are requested to align the charging pump suction to the RWST and isolate RCS dilution paths per Attachment 4.

NOTE: The Control Room has been evacuated and is inaccessible Terminating Conditions:

Charging pump suction has been transferred to the RWST and the RCS dilution paths have been isolated. Attachment 4 is complete.

Initial License Exam 03/2005 Job Performance Measure JPM: P2 Page 3 of 6 Rev Date: 1/26/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Open RWST u-01 to CHRG PMP SUCT VLV u-LCV-112D MOT BKR.

CUE: Breaker indicates in the OFF position.

u-EB3-1/8C/BKR, switch rotated to LEFT (OFF position).

Note Start time.

SFGD 790-South (North for U2)

Hallway West Side.

U1-Room 1-070 U2-Room 2-070 2

Open VCT CTRL u-01 to CHRG PMP SUCT VLV u-LCV-112B MOT BKR CUE: Breaker indicates in the OFF position.

u-EB3-1/5F/BKR switch rotated to LEFT (OFF position).

3 Open RWST u-01 to CHRG PMP SUCT VLV 112E MOT BKR CUE: Breaker indicates in the OFF position.

1EB4-1/8F/BKR (2EB4-1/9F/BKR) switch rotated to LEFT (OFF position).

AB 790-By FDT

  1. 3 Door for U1.

U2-810Room X-207.

4 Open VCT u-01 to CHRG PMP SUCT VLV 0112C MOT BKR.

CUE: Breaker indicates in the OFF position.

1EB4-1/8C/BKR (2EB4-1/9C/BKR) switch rotated to LEFT (OFF position).

  • 5 Manually open valve u-LCV-0112D RWST 1-01 TO CHRG PMP SUCT VLV.

CUE: u-LCV-112D has stopped moving and indicates in the OPEN position.

u-LCV-112D clutch lever depressed while hand wheel is turned counter clockwise and position indication is checked.

NOTE: Either step 5 or 6 is critical, not both.

AB 810 Southside Corridor about halfway down the corridor outside room.

  • 6 Manually open valve u-LCV-0112E RWST 1-01 TO CHRG PMP SUCT VLV.

CUE: u-LCV-112E has stopped moving and indicates in the OPEN position.

u-LCV-112E clutch lever depressed while hand wheel is turned counter clockwise and position indication is checked.

LCV-112E is Southeast of LCV-112D.

Unit 2 next to Room X-207.

Initial License Exam 03/2005 Job Performance Measure JPM: P2 Page 4 of 6 Rev Date: 1/26/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT

  • 7 Manually close valve u-LCV-0112B VCT u-01 to CHRG PMP UPSTRM LVL CTRL VLV.

CUE: u-LCV-112B has stopped moving and indicates in the CLOSED position.

u-LCV-112B clutch lever depressed while hand wheel is turned clockwise and position indication is checked NOTE: Either step 7 or 8 is critical, not both.

AB 810 charging pump valve room South end, inside the Contaminated area for Unit 1.

Unit 2 - Room X-207.

CUE: Remote Shutdown Panel reports ZL-8220 and ZL-8221 were verified closed.

  • 8 Manually close valve u-LCV-112C VCT u-01 to CHRG PMP DNSTRM LVL CTRL VLV.

CUE: u-LCV-112C has stopped moving and indicates in the CLOSED position.

u-LCV-112C clutch lever depressed while hand wheel is turned clockwise and position indication is checked.

Next to LCV-112B.

9 Isolate dilution paths by closing uCS-8455 RMUW to CVCS BA BLNDR u-01 UPSTRM ISOL VLV.

CUE: uCS-8455 hand wheel turns but the stem does not move.

uCS-8455 hand wheel rotated clockwise AUX 822 blender room SE corner 1 above floor

  • 10 Closes uCS-8560-RO, u CVCS CHRG PMP SUCT MU ISOL VLV RMT OPER CUE: uCS-8560 remote operator has stopped moving and indicates CLOSED uCS-8560 remote operator rotated clockwise.

AUX 822 blender room.

Order of valve operation in following steps not critical.

Initial License Exam 03/2005 Job Performance Measure JPM: P2 Page 5 of 6 Rev Date: 1/26/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT

  • 11 Closes u-FCV-0111B (fail air),

RCS MU TO VCT u-01 ISOL VLV by closing u-FCV-0111B-AS1 and depressurizing air regulator.

CUE: u-0111B-AS1 closed and no air is escaping.

u-0111B-AS1 is rotated clockwise and vent on bottom of regulator is rotated counterclockwise.

SFGD 832, RM u-090, VCT VLV RM

  • 12 Closes uCS-8439-RO, Uu CVCS CHRG PMP EMER BORATE MAN VLV RMT OPER.

CUE: uCS-8439-RO has stopped moving and indicates closed.

uCS-8439-RO rotated clockwise.

AUX 822 blender room.

  • 13 Closes uCS-8441, Uu RMUW TO EMER BORATE FLSH VLV.

CUE: uCS-8441 has stopped moving and indicates CLOSED uCS-8441 rotated clockwise.

AUX 822 blender room.

  • 14 Closes uCS-8453, CVCS CHEM MIX TK u-01 IN VLV CUE: uCS-8453 has stopped moving and indicates CLOSED uCS-8453 rotated clockwise.

AUX 822 blender room.

15 Notify the Reactor Operator that charging pump suction has been transferred to the RWST and dilution paths have been isolated.

TASK COMPLETE RO at the RSP notified that charging pump suction has been transferred to the RWST and dilution paths have been isolated.

Note Completion time.

Initial License Exam 03/2005 Job Performance Measure JPM: P2 Page 6 of 6 Rev Date: 1/26/05 INITIATING CUE:

The Control Room has been evacuated per ABN-905A (B). You are requested to align the charging pump suction to the RWST and isolate RCS dilution paths per Attachment 4.

NOTE: The Control Room has been evacuated and is inaccessible.

Initial License Exam 03/2005 Job Performance Measure JPM: P3 Page 1 of 7 Rev Date: 1/15/05 System:

Auxiliary Feedwater System JTA Task #: AO 6415 Task

Title:

Fill the CST from the Fire Protection Header KSA Ref:

EPE.074.EA1.107 PEO:

RO:

4.2 SRO:

4.3 Operators Name:

Performance Environment:

PLANT CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

ABN-305 Auxiliary Feedwater System Malfunction Tools, Equipment, Job Aids, etc:

None

Initial License Exam 03/2005 Job Performance Measure JPM: P3 Page 2 of 7 Rev Date: 1/15/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

While responding to an Inadequate Core Cooling problem CST level dropped below 10%. The US has directed you to align the Fire Protection Header to the CST by completing the first 4 steps of Attachment 4 of ABN-305. In addition, the US has directed you that 1FP-0627 SFGD BLDG EL 800 DG FP HOSE STA 1-22 is the preferred source of water, and it should be connected to the CT pump discharge vent valve.

Terminating Conditions:

One fire protection hose is simulated run from the fire protection header to the effected AFW pump.

Initial License Exam 03/2005 Job Performance Measure JPM: P3 Page 3 of 7 Rev Date: 1/15/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Ensure the following valves are closed.

NOTE: All AF valves are located in the Condensate Storage Tank Room.

Note Start time.

1.a 1AF-0108, CNDS TO CT PMP 1-01 SUCT UPSTRM ISOL VLV CUE: The handwheel will not turn any further, and the valve stem is all the way down.

The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.

1.b 1AF-0109, CNDS TO CT 1-01 SUCT DNSTRM ISOL VLV CUE: The handwheel will not turn any further, and the valve stem is all the way down.

The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.

1.c 1AF-0200, 1-01 CT PMP DISCH ISOL VLV CUE: The handwheel will not turn any further, and the valve stem is all the way down.

The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.

Initial License Exam 03/2005 Job Performance Measure JPM: P3 Page 4 of 7 Rev Date: 1/15/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1.d 1AF-0110 CST TO CT PMP 1-01 SUCT UPSTRM ISOL VLV CUE: The handwheel will turn clockwise, and the valve stem is all the way up.

2nd CUE: the handwheel will not turn any further, and the valve stem is all the way down.

The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.

NOTE: After the operator starts to close the valve, give the 2nd CUE.

1.e 1AF-0111 CST TO CT PMP 1-01 SUCT DNSTRM ISOL VLV CUE: The handwheel will turn clockwise, and the valve stem is all the way up.

2nd CUE: the handwheel will not turn any further, and the valve stem is all the way down.

The Locking device is verified installed. The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.

NOTE: After the operator starts to close the valve, give the 2nd CUE.

1.f 1AF-0156, CT PMP 1-01 DISCH VNT VLV CUE: The handwheel will turn clockwise, and the valve stem is all the way up.

2nd CUE: the handwheel will not turn any further, and the valve stem is all the way down.

The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.

NOTE: After the operator starts to close the valve, give the 2nd CUE.

Initial License Exam 03/2005 Job Performance Measure JPM: P3 Page 5 of 7 Rev Date: 1/15/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1.g 1AF-0113, CT PMP 1-01 DISCH TD DRN VLV CUE: The handwheel will not turn any further, and the valve stem is all the way down.

The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.

1.h 1AF-0112, CT PMP 1-01 DISCH TD DRN VLV CUE: The handwheel will not turn any further, and the valve stem is all the way down.

The handwheel is rotated in the clockwise direction until handwheel will not turn and valve stem is in the closed position.

2 Connect selected fire protection supply lines from Page 2 or 3 of the attachment to one or more of the following AFW valves.

  • 2.a 1AF-0156, CT PMP 1-01 DISCH VNT VLV CUE: The hose is flaked out and the connection to the vent valve is made. Continue with step 3.

The operator correctly identifies the preferred Hose Station (1FP-0627 SFGD BLDG EL 800 DG FP HOSE STA 1-22) and simulates running the hose from the station to the CT pump. The operator will need to procure a 3/4 NPT connection for the AF connection.

Initial License Exam 03/2005 Job Performance Measure JPM: P3 Page 6 of 7 Rev Date: 1/15/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 3

OPEN the following valves:

  • 3.a 1AF-0110 CST TO CT PMP 1-01 SUCT UPSTRM ISOL VLV CUE: The handwheel will not turn any further and the stem is in the open position.

The handwheel is rotated in the counter clockwise direction until handwheel will not turn and valve stem is in the open position.

  • 3.b 1AF-0111 CST TO CT PMP 1-01 SUCT DNSTRM ISOL VLV CUE: The handwheel will not turn any further and the stem is in the open position.

The handwheel is rotated in the counter clockwise direction until handwheel will not turn and valve stem is in the open position.

4 OPEN the selected AF fill valves:

  • 4.a 1AF-0156, CT PMP 1-01 DISCH VNT VLV CUE: The handwheel will not turn any further and the stem is in the open position.

The handwheel is rotated in the counter clockwise direction until handwheel will not turn and valve stem is in the open position.

5 Informs the Control Room that steps 1-4 of attachment 4 of ABN-305 is complete.

TASK COMPLETE Note Completion time.

Initial License Exam 03/2005 Job Performance Measure JPM: P3 Page 7 of 7 Rev Date: 1/15/05 INITIATING CUE:

While responding to an Inadequate Core Cooling problem CST level dropped below 10%. The US has directed you to align the Fire Protection Header to the CST by completing the first 4 steps of of ABN-305. In addition, the US has directed you that 1FP-0627 SFGD BLDG EL 800 DG FP HOSE STA 1-22 is the preferred source of water, and it should be connected to the CT pump discharge vent valve.

Initial License Exam 03/2005 Job Performance Measure JPM: S-1 Page 1 of 5 Rev Date: 12/23/04 System:

Reactor Coolant System JTA Task #: RO*1111 Task

Title:

Verify Natural Circulation (Alternate Path)

KSA Ref:

EPE.011.EA2.09 PEO:

RO:

4.2 SRO:

4.3 Operators Name:

Performance Environment:

PLANT CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

EOS-0.1A Reactor Trip Response (Rev 7)

Tools, Equipment, Job Aids, etc:

Reset to IC 20 and then:

Trip the Reactor, Enter Malfunction ED01, Start Emergency boration, Stop the TDAFWP when SG levels are @ 25%, Throttle remaining AFW to 120 per SG, manually control ARVs until Auct. CET start to increase. Ensure the simulator remains in FREEZE until right before the candidate starts the task. Ensure Steam Tables are available.

Initial License Exam 03/2005 Job Performance Measure JPM: S-1 Page 2 of 5 Rev Date: 12/23/04 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Evaluator should ensure the simulator remains in FREEZE until right before the candidates starts the task.

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

The crew is responding to a loss of offsite power. Safety Injection is not actuated or required. The RCPs cannot be restarted. The US directs you to verify Natural Circulation per EOS 0.1A step 8 and Attachment 3 of the same procedure. (Provide candidate a copy of EOS-0.1A)

Terminating Conditions:

is complete and the candidate has increased steam flow rate from the ARVs.

Initial License Exam 03/2005 Job Performance Measure JPM: S-1 Page 3 of 5 Rev Date: 12/23/04 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Verify RCS subcooling > 25ºF.

CUE: Subcooling is 35ºF.

Operator verifies subcooling using 1-TI-3611/3612-1 on CB-05.

Note Start time.

2 Check Steam Generator Pressures-STABLE OR DECREASING CUE: All SG pressures are INCREASING.

Operator checks SG pressures using 1-PI-514/524/534/544A on CB-08 3

Check RCS Hot Leg Temperatures-STABLE OR DECREASING CUE: All Hot Leg Temperatures are stable.

Operator checks hot leg temperatures using 1-TR-433/434A on CB-

06.

4 Check core exit TCs-STABLE OR DECREASING CUE: Core Exit TCs are 605º and slowly increasing.

Operator checks core exit TCs on plant computer, OR 1-TI-3611/3612-2 on CB-05 Note: Candidate may immediately increase steam flow from ARVs.

5 Check RCS cold leg temperatures-AT SATURATION TEMPERATURE FOR SG PRESSURE CUE: Cold leg temperatures are 551º F and SG pressures are 1050 psig.

Operator checks RCS cold leg temperatures using 1-TR-413B/23B and 433B/43B on CB05 and compares to SG pressures using 1-PI-514/524/534/544A on CB-08

Initial License Exam 03/2005 Job Performance Measure JPM: S-1 Page 4 of 5 Rev Date: 12/23/04 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT

  • 6 Natural Circulation is NOT verifed, Increase Steam Flow from SG ARVs.

CUE: Core Exit TC are trending lower.

TASK COMPLETE Operator opens SG ARVs using 1-PK-2325/26/27/28 on CB08.

Note Completion time.

Initial License Exam 03/2005 Job Performance Measure JPM: S-1 Page 5 of 5 Rev Date: 12/23/04 INITIATING CUE:

The crew is responding to a loss of offsite power. Safety Injection is not actuated or required. The RCPs cannot be restarted. The US directs you to verify Natural Circulation per EOS 0.1A step 8 and of the same procedure.

Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 1 of 8 Rev Date: 1/27/05 System:

Pressurizer Pressure Control System JTA Task #: (Modified) RO*1209 Task

Title:

Control Pressurizer Pressure KSA Ref:

SF3.010.A1.07 PEO:

RO:

3.7 SRO:

3.7 Operators Name:

Performance Environment:

PLANT CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 30 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

IPO-005A, Step 5.1.5 Tools, Equipment, Job Aids, etc:

Reset to IC 5 with Tave appx. 557 B F, RCS Pressure appx. 2235 psig, and a small cooldown in progress.

Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 2 of 8 Rev Date: 1/27/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

A plant shutdown and cooldown for REFUELING is in progress. The RCS is currently at appx.

557B F and 2235 psig. You are currently in IPO-005A, at step 5.1.5 with a 50B F/Hr cooldown in progress. The BOP is controlling the cooldown. The US has instructed you to initiate a reduction of RCS Pressure per step 5.1.5 and 5.1.6 and stabilize pressure at 1925 psig (+ or-25 psig), and then BLOCK SI, while the RCS Cooldown is continuing. The Extra RO will perform OPT-407 and RCP data monitoring.

Terminating Conditions:

Przr Spray Valve Controllers in MANUAL (AMBER & GREEN) Lights with zero (0) output, ZL Lights GREEN, and RCS Pressure at 1925 + or - 25 psig

Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 3 of 8 Rev Date: 1/27/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT

  • 1 Place Pressurizer Spray Valve Controller(s) in MANUAL CUE: Przr Spray Valve Controllers u-PK-455B and u-PK-455C indicate zero (0) output with AMBER and GREEN Lights ON.

Depress AMBER P/B on PK-455B and PK-455C and verify controllers are in MANUAL by observing the AMBER Light ON and the WHITE (Auto) Light OFF.

Note Start time PK-455B and PK-455C are located on CB-05 (VERTICAL BOARD)

Controller output should be zero (0) with GREEN Light ON.

  • 2 THROTTLE OPEN one or both pressurizer spray valve to begin a slow RCS Pressure reduction.

CUE: The Przr Spray Valve(s) ZL lights are RED and GREEN for the Spray Valve operated.

Depress the RED P/B on either PK-455B and/or PK-455C and verify controller response by observing the controller output and indicating lights (ZL-455B or ZL-455C) on Control Board (Vertical Board Section).

When the RED P/B is depressed the GREEN P/B Light should go OUT and the output meter should begin to increase (from 9% toward 100%). As the valve begins to throttle the ZL LIGHTS (ZL-455A or ZL-455B) will indicate THROTTLED by having both RED and GREEN LIGHTS ON

Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 4 of 8 Rev Date: 1/27/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 3

Monitor RCS Pressure for DECREASE CUE: RCS pressure is decreasing and ALARMS 1.6 and 2.6 on ALB-5B have annunciated.

Verify RCS Pressure decrease using Narrow Range Pressure Instruments or Recorder.

  • u-PI-455A
  • u-PI-456
  • u-PI-457
  • u-PI-458
  • u-PI-455 RCS Press (NR) instruments u-PI-455A, u-PI-456, u-PI-457, and/or u-PI-458 located on CB-05 OR RCS Press Recorder u-PR-455 located on CB-05 NOTE: ALB-5B 1.6 & 2.6 annunciate at 2185 psig 4

ACKNOWLEDGE Annunciators 1.6 and 2.6 on ALB-5B.

Depress the ACKNOWLEDGE P/B at the Annunciator Controls on CB-05

  • 5 As PRZR PRESS channels approach 1925 psig, adjust pressurizer heaters and spray valves as necessary to maintain RCS pressure between1900 psig and 1950 psig.

CUE: RCS Pressure indicates 1925 psig on u-PI-455A, u-PI-456, 457, 458, and recorder u-PR-455.

Verify RCS Pressure decrease using Narrow Range Pressure Instruments or Recorder.

  • u-PI-455A
  • u-PI-456
  • u-PI-457
  • u-PI-458
  • u-PI-455 Manually controls pressurizer sprays and heaters to stabilize RCS pressure at 1925 psig.
  • If RCS pressure decreases to below 1820 psig, SI will actuate and will result in a failure of the JPM.

The US DIRECTS you to stabilize RCS pressure and Block SI per the IPO step in effect.

Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 5 of 8 Rev Date: 1/27/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 6

WHEN RCS pressure is below 1960 psig, THEN perform the following:

A. Ensure RCS has been borated to a Shutdown Margin for RCS #350°F(reference Step 5.2.3 A).

CUE: The US informs the RO that the RCS is borated for SDM for 350°F The RCS is borated for SDM for 350°F 7

Verify 1-PCIP, 2.6, PRZR PRESS SI BLK PERM P-11 is ON.

CUE: CB-07, PCIP alarm window 2.6 is lit.

CB-07, PCIP alarm window 2.6 is lit (blue).

8 Verify the following status lights are OFF:

1-TSLB-9, 1.3, PRZR PRESS SI PERM PB-455B 1-TSLB-9, 2.3, PRZR PRESS SI PERM PB-456B 1-TSLB-9, 3.3, PRZR PRESS SI PERM PB-457B CUE: Windows 1.3, 2.3, and 3.3 on TSLB 9 are dark.

On CB-04, 1-TSLB-9, windows:

1.3 is dark 2.3 is dark 3.3 is dark

Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 6 of 8 Rev Date: 1/27/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT

  • 9 Turn BOTH MSL ISOL SI RESET/BLOCK switches to BLOCK and release:

1/1-SLSIRBA, MSL ISOL SI RESET/BLOCK 1/1-SLSIRBB, MSL ISOL SI RESET/BLOCK CUE: The handswitch moved counterclockwise and stopped.

On CB-08, in the MSL Isolation section:

Turns handswitch 1/1-SLSIRBA counter clockwise to block Turns handswitch 1/1-SLSIRBA counter clockwise to block 10 Verify the following are ON:

1-PCIP, 3.8, MSL PRESS LO TRN A SI BLK 1-PCIP, 4.8, MSL PRESS LO TRN B SI BLK CUE: PCIP windows 3.8 and 4.8 are LIT.

CB-07, PCIP alarm window:

3.8 is ON.

4.8 is ON.

  • 11 Turn BOTH PRZR PRESS SI RESET/BLOCK switches to BLOCK and release:

1/1-PPSIRBA, PRZR PRESS SI RESET/BLOCK 1/1-PPSIRBB, PRZR PRESS SI RESET/BLOCK CUE: The handswitch moved counterclockwise and stopped.

On CB-08, in the SI BLOCK section:

Turns handswitch 1/1-PPSIRBA counter clockwise to block Turns handswitch 1/1-PPSIRBB counter clockwise to block

Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 7 of 8 Rev Date: 1/27/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 12 Verify the following are ON:

1-PCIP, 3.7, PRZR PRESS LO TRN A SI BLK 1-PCIP, 4.7, PRZR PRESS LO TRN B SI BLK CB-07, PCIP alarm window:

3.7 is ON.

4.7 is ON.

13 Report that RCS pressure is stable at 1925 psig and that SI has been blocked. IPO-005A step 5.1.5 has been completed.

TASK COMPLETE RCS pressure is stable or slightly decreasing at less than 1950 psig.

Note completion time.

Initial License Exam 03/2005 Job Performance Measure JPM: S2 Page 8 of 8 Rev Date: 1/27/05 INITIATING CUE:

A plant shutdown and cooldown for REFUELING is in progress. The RCS is currently at appx. 557B F and 2235 psig. You are currently in IPO-005A, at step 5.1.5 with a 50B F/Hr cooldown in progress.

The BOP is controlling the cooldown.

The US has instructed you to initiate a reduction of RCS Pressure per step 5.1.5 and 5.1.6 and stabilize pressure at 1925 psig (+ or-20 psig), and then BLOCK SI, while the RCS Cooldown is continuing. The Extra RO will perform OPT-407 and RCP data monitoring.

Initial License Exam 03/2005 Job Performance Measure JPM: S3 Page 1 of 5 Rev Date: 1/28/05 System:

CVCS JTA Task #: (NEW)

Task

Title:

Emergency Borate Using Chemical And Volume Control System (Alternate Path)

KSA Ref:

SF1.004.A4.18 PEO:

RO:

4.3 SRO:

4.1 Operators Name:

Performance Environment:

PLANT CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

ABN-107, "Emergency Boration",

Tools, Equipment, Job Aids, etc:

Initialize into any shutdown IC above 550°F Tave.

Insert Malf. CV19A(Boric Acid Transfer Pump 1 Trip)

Insert Override LOCVAPBA1 to ON. (Boric Acid Transfer Pump 1 Green Light)

ABN-107, Attachment 2

Initial License Exam 03/2005 Job Performance Measure JPM: S3 Page 2 of 5 Rev Date: 1/28/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

You have been directed by the Unit Supervisor to commence Emergency Boration using of ABN-107, Emergency Boration. Inform the Unit Supervisor when the attachment is complete.

Terminating Conditions:

Emergency boration established through the Normal Boration valves.

Initial License Exam 03/2005 Job Performance Measure JPM: S3 Page 3 of 5 Rev Date: 1/28/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Place 1/u-MU, RCS MU MAN ACT switch in - STOP.

CUE: 1/u-MU is in the STOP position 1/u-MU rotated in the counterclockwise direction until it is in the STOP position.

Note Start time.

  • 2 Open 1/u-FCV-110B, RCS MU TO CHRG PMP SUCT ISOL VLV.

CUE: 1/u-FCV-110B is in the OPEN position and the red light is LIT.

1/u-FCV-110B rotated in the clockwise position from AUTO to OPEN.

1/u-APBA1, BA XFER PMP 1

- AUTO (AFTER START)

CUE: The green light is ON and the red light is OFF.

1/u-APBA2, BA XFER PMP 2

- AUTO (AFTER START)

CUE: The green light is OFF and the red light is ON.

Rotates handswitch 1/u-APBA1 in the clockwise direction to the START position.

Rotates handswitch 1/u-APBA1 from the Pull Out position in the clockwise direction to the START position.

The green light is ON (normal) but the pump will not start. The candidate must take the pump 02 out of Pull Out and start it.

  • 4 Open 1/u-FCV-110A, BA BLNDR FLO CTRL VLV.

CUE: 1/u-FCV-110B is in the OPEN position and the red light is ON.

1/u-FCV-110A rotated in the clockwise position from AUTO to OPEN.

Initial License Exam 03/2005 Job Performance Measure JPM: S3 Page 4 of 5 Rev Date: 1/28/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 5

Verify flow on u-FR-110 (RED PEN), BA FLOW TO BLNDR CUE: Boric acid flow is 38 gpm.

Using the RED pen on u-FR-110, verify that flow is between 35 and 40 gpm.

6 Verify flow on u-FI-121A, CHRG FLOW CUE: Charging flow indicates 130 gpm.

TASK COMPLETE Using u-FI-121A, verifies that Charging flow is going to the RCS.

Note Completion time.

Initial License Exam 03/2005 Job Performance Measure JPM: S3 Page 5 of 5 Rev Date: 1/28/05 INITIATING CUE:

You have been directed by the Unit Supervisor to commence Emergency Boration using Attachment 2 of ABN-107, Emergency Boration. Inform the Unit Supervisor when the attachment is complete.

Initial License Exam 03/2005 Job Performance Measure JPM: S4 Page 1 of 5 Rev Date: 1/27/05 System:

Small Break LOCA JTA Task #: (NEW)

Task

Title:

Perform Attachment 2 of EOP-0.0A (Alternate Path)

KSA Ref:

EPE.009.EA1.08 PEO:

RO:

4.0 SRO:

4.1 Operators Name:

Performance Environment:

PLANT CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

EOP-0.0A Reactor Trip or Safety Injection Tools, Equipment, Job Aids, etc:

Initialize into IC-15. Enter the following Malfunctions: RP09A and RP09B, RH01B. (Make trigger file to remove Malf when H/S to start) Insert Overrides LOCHHS 5729 2, and LOCCHS 6202 5 to ON. Use Malf. RC08A1 to cause a Reactor Trip and SI. After the Seq has timed out FREEZE. of EOP-0.0A, Safety Injection Actuation Alignment.

Initial License Exam 03/2005 Job Performance Measure JPM: S4 Page 2 of 5 Rev Date: 1/27/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

NOTE TO EXAMINER: This JPM is constructed to list the failures that the candidate will encounter while performing Attachment 2. It will only list the critical steps. To follow along as the candidate performs the attachment, utilize and INFO ONLY copy of Attachment 2.

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

Automatic Reactor Trip and Safety Injection have occurred The crew is at step 5 of EOP-0.0A.

The Unit Supervisor has directed you to perform Attachment 2 of EOP-0.0A. Inform the Unit Supervisor when the attachment is complete.

Terminating Conditions: is complete with the following exceptions:

  • Phase A was manually actuated.
  • The B RHR pump did not auto start and was manually started.
  • The Primary Plant Supply Fan 20 is running.
  • The Spent Fuel Pool Exhaust fan 36 is running.

Initial License Exam 03/2005 Job Performance Measure JPM: S4 Page 3 of 5 Rev Date: 1/27/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Provide the candidate with a working copy of EOP-0.0A, attachment 2.

The candidates are expected to complete independently and without error.

Note Start time.

It is managements expectation that the candidate will place keep the procedure by marking completed steps and indicating any exceptions.

  • 2 Step 3. Verify Containment Isolation Phase A-Appropriate MLB LIGHT INDICATION (RED WINDOWS)

CUE: The RED LIGHTS on the MLBs 1A1, 1A2, 1B1, and 1B2 are dark. All others are LIT.

The RED LIGHTS will be dark. The candidate must manually initiate Phase using HS 1/1-CIPAA1 on CB-02 in the SFGD MAN ACT/RESET section, by rotating the switch in the clockwise direction to ACT.

  • 3 Step 6. Verify RHR pumps-RUNNING.

CUE: The red light is lit and the green light is dark.

For RHR Pump 1-02 the red light will be off and green light will be on. The candidate must attempt a manual start by rotating 1/1-APRH2 in the clockwise direction to the START position.

Initial License Exam 03/2005 Job Performance Measure JPM: S4 Page 4 of 5 Rev Date: 1/27/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT

  • 4 Step 13, Attachment 1. X-HS-6202 on CV-01, STOPPED.

On Ventilation Panel CV-01 Primary Plant Supply Fan 20 will indicate RUNNING.

The candidate must attempt to stop the fan by rotating X-HS-6202 counterclockwise direction to the STOP position.

NOTE: It is not critical that the candidate rotate the switch, but the exception MUST be documented, either by oral report or place keeping the procedure.

  • 5 Step 13, Attachment 1. X-HS-5729 on CV-03, STOPPED.

On Ventilation Panel CV-03 Spent Fuel Pool Exhaust fan will indicate RUNNING.

The candidate must attempt to stop the fan by rotating X-HS-5729 counterclockwise direction to the STOP position.

NOTE: It is not critical that the candidate rotate the switch, but the exception MUST be documented, either by oral report or place keeping the procedure.

6 Report the completion of to the Unit Supervisor and note exceptions to the requirements of the Attachment.

TASK COMPLETE Candidate must indicate the above exceptions.

Note Completion time.

Initial License Exam 03/2005 Job Performance Measure JPM: S4 Page 5 of 5 Rev Date: 1/27/05 INITIATING CUE:

Automatic Reactor Trip and Safety Injection have occurred. The crew is at step 5 of EOP-0.0A. The Unit Supervisor has directed you to perform Attachment 2 of EOP-0.0A. Inform the Unit Supervisor when the attachment is complete.

Initial License Exam 03/2005 Job Performance Measure JPM: S5 Page 1 of 5 Rev Date: 1/27/05 System:

Containment Spray JTA Task #: (Modified) RO2003 Task

Title:

Operate the Containment Spray System (Alternate Path)

KSA Ref:

SF6.026.A4.01 PEO:

RO:

4.5 SRO:

4.3 Operators Name:

Performance Environment:

PLANT CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 5 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

SOP-204A/B, Containment Spray System, u-ALB-2B, ALM-0022A/B Tools, Equipment, Job Aids, etc:

Simulator Setup: OVERRIDE 1TI-4793 (RWST Temperature) to 45°F, activate HS-4776 override after CSPs have been started.

Initial License Exam 03/2005 Job Performance Measure JPM: S5 Page 2 of 5 Rev Date: 1/27/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

Temperature is 45°F in the RWST, the Unit Supervisor directs you to recirc the RWST with Train "A" Containment Spray Pumps. Containment Spray is in Standby per SOP-204A/B Section 5.1.1.

Crew briefing is completed and PCS trends are initiated.

Terminating Conditions:

Containment Spray Pumps have been stopped.

Initial License Exam 03/2005 Job Performance Measure JPM: S5 Page 3 of 5 Rev Date: 1/27/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Place CS HX1 Outlet Vlv to Pull-Out Pull-outs 1-HS-4776, acknowledges SSII Train A Note Start time.

SSII alarms 2

Verify chemical additive tanks discharge valve is closed CUE: u-HS-4754 green light lit Checks u-HS-4754 closed.

3 Contact PEO to Unlock and Open uCT-0050 CUE: PEO reports uCT-0050 open Reverse Operated Valve 4

Initiate a trend of selected pump parameters on the plant computer.

CUE: The extra RO has initiated the trend of the pump parameters This has already been done by extra RO

  • 5 Start Containment Spray Pump 1-01 CUE: RED light lit on u-HS-4764, u-FI-4772-1 (0 gpm), u-PI-4774-1 (300 psig)

Places u-HS-4764 1-01 Containment Spray Pump in START on and checks flow and pressure Steps 5 and 6 can be done in either order

  • 6 Start Containment Spray Pump 1-03 CUE: RED light lit on u-HS-4765, u-FI-4772-2 (0 gpm), u-PI-4774-2 (300 psig)

CUE: Alarm window 3.5 CS HX 1 OUT VLV NOT CLOSE HV-4776 on ALB 2B Places u-HS-4765 1-03 Containment Spray in START and checks flow and pressure Override HS-4776 to OPEN, via the handswitch on mimic display CB02

Initial License Exam 03/2005 Job Performance Measure JPM: S5 Page 4 of 5 Rev Date: 1/27/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 7

Monitor CSP discharge flow CUE: u-FI-4772-1 indicates 3000 gpm, u-FI-4772-2 indicates 3100 gpm Monitors u-FI-4772-1, u-FI-4772-2 flow indicators 8

Ensure CS HX OUT VLV is closed CUE: u-HS-4776 red light LIT CUE: CNTMT SMP 1, 2 FILL RATE INCREASE and ANY CNTMT SMP PMP RUN alarm ON MCB Checks position of u-HS-4776

  • 9 Stop CNMT Spray Pumps CUE: u-HS-4764 and u-HS-4765 red and green lights are dark TASK COMPLETE Go to stop (or PULL OUT) on u-HS-4764 and u-HS-4765 Note Completion time.

Initial License Exam 03/2005 Job Performance Measure JPM: S5 Page 5 of 5 Rev Date: 1/27/05 INITIATING CUE:

Temperature is 45°F in the RWST, the Unit Supervisor directs you to recirc the RWST with Train "A" Containment Spray Pumps. Containment Spray is in Standby per SOP-204A/B Section 5.1.1. Crew briefing is completed and PCS trends are initiated.

Initial License Exam 03/2005 Job Performance Measure JPM: S6 Page 1 of 7 Rev Date: 1/26/05 System:

Emergency Diesel Generator JTA Task #: (Modifed)RO4032 Task

Title:

Load Diesel Generator (Alternate Path)

KSA Ref:

SF6.064.A4.06 PEO:

RO:

3.9 SRO:

3.9 Operators Name:

Performance Environment:

PLANT CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

SOP-609A OPT-214A ABN-501 Tools, Equipment, Job Aids, etc:

OPT-214A (Working Copy)

Simulator set-up: Any at power IC, go to RUN, START DG 1. Set up trigger file to insert malfunction SW01A when EDG load is 2.7 MW.

Initial License Exam 03/2005 Job Performance Measure JPM: S6 Page 2 of 7 Rev Date: 1/26/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

OPT-214A, Diesel Generator Operability Test is being performed on DG 1 for a normal 30 day test. You are on step 8.1.S, the DG is running at 60 Hz and 6.9 kV. The PEO at the DG has reported that the DG is running properly. Continue with the test.

Terminating Conditions:

The Emergency Diesel Generator has been placed in Pull Out.

Initial License Exam 03/2005 Job Performance Measure JPM: S6 Page 3 of 7 Rev Date: 1/26/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Refer to OPT-214A, Step 8.1.S.

OPT-214A entered at step 8.1.S Note Start time.

  • 2 Turn the Synchroscope for DG1 to the ON position.

CUE: The synchroscope switch is in the ON position.

Synchroscope Switch (SS-1EG1) in the ON position.

The operating handle is STAR-shaped. The Synchroscope Switch (SS-1EG1) is located above DG1 output breaker on CB-11 (Beveled Section). The switch is 2-Position MAINTAIN SWITCH. The ON position is to the right.

3 Compare incoming voltage to running voltage.

CUE: V-1EG1 reads 6900 volts and V-1EA1 reads 7000 volts.

V-1EG1 and V-1EA1 checked.

V-IN and V-RUN are preferred, any indications listed in OPT-214A are acceptable for use.

4 Adjust the DG voltage to slightly greater than that on the BUS.

CUE: DG voltage slightly greater than BUS voltage (50-100v)

Voltage control switch (90-1EG1) taken to RAISE or LOWER until DG 1 volts (V-1DG1) is 50 - 100 volts greater than BUS 1EA1 volts (V-1EA1).

The DG output voltage (6900 Volts) is to agree with 1EA1-1 BUS Voltage (6900 Volts).

These meters are located on CB-11 (Vertical Section). The DG Voltage Control Handswitch (90-1EG1) is a 3-POSITION SRING RETURN to OFF type switch. Located on CB-11 (A SEC)

Initial License Exam 03/2005 Job Performance Measure JPM: S6 Page 4 of 7 Rev Date: 1/26/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 5

Check DG speed CUE: Synchroscope is rotating in counter-clockwise direction.

Synchroscope checked (On CB-11)

Lights are a backup to the sync scope (OFF when in phase, ON when out of phase).

6 Adjust the speed so the Synchroscope is moving slowly in the fast direction.

CUE: Synchroscope is rotating 2-4 RPM in the fast direction.

Speed Control Handswitch (65-1EG1) taken to RAISE and synchroscope checked until rotating SLOWLY in FAST direction (2-4 RPM_.

(65-uEG1 taken to LOWER if speed too fast.)

Handswitch (65-1EG1) is a 3-POSITION SPRING RETURN TO OFF type switch located on CB-11 (Apron Section).

The INCREASE position is to the RIGHT. The FAST Direction is CLOCKWISE.

  • 7 Close the DG breaker when the Synchroscope is slightly before the 12 OCLOCK position and moving slowly in the FAST Direction.

CUE: ALB-10B 3.5 alarm has annunciated and the breaker red light lit and green light off.

DG Breaker (CS-uEG1) is closed and position is checked.

(Indicated by Annunciator Alarm (ALB-10B 3.5),

Handswitch FLAG (RED FLAG) and indication Lights.

Handswitch (65-1EG1) is a 3

POSITION, SPRING RETURN TO AUTO type switch. Located on CB-11 (Apron Section).

Indicating lights on Handswitch should be RED (Green Light out) with RED FLAG indication.

Annunciator ALB-10B 3.5 (6.9KV BUS 1EA1/1EA2 PARALELLED)

ON (energized).

Initial License Exam 03/2005 Job Performance Measure JPM: S6 Page 5 of 7 Rev Date: 1/26/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT

  • 8 Immediately pick-up at least 2.2-2.5 MW for stability CUE: When load is first checked, DG1 MW Meter (W-1EG1) indicates ZERO MW; when load is checked after going to RAISE, W-1EG1 indicates 2.1 MW.

SPEED CONTROL HANDSWITCH 65-1EG1, taken to RAISE to pick up sufficient load to prevent a reverse power trip of DG 1.

DG1 MW Meter (W-1EG1) located on CB-11 (Vertical Section).

Handswitch (65-1EG1) is a 3-Position Spring Return to OFF type switch.

Located on CB-11 (Apron Section). The RAISE position is to the RIGHT.

9 Turn the Synchroscope to the OFF position.

CUE: The Synchroscope switch is in the OFF position.

Synchroscope Switch (SS-1EG1) in the OFF position.

The Synchroscope Switch (SS-1EG1) is located above DG1 output breaker on CB-11 (Beveled Section). The switch is a 2-Position MAINTAIN Switch. The OFF position is to the LEFT.

10 Maintain 0-500 KVAR OUT, CUE: When KVARS first checked, meter indicate 500 KVARS (to left of ). When switch is taken to RAISE and KVARS checked, give readings indicating KVAR increasing or for LOWER<

KVAR decreasing.

Reactive load maintained 0-500 KVAR OUT; DG1 Voltage Control Handswitch (90-1EG1) taken to RAISE to increase KVARS or LOWER to decrease KVARS as on DG1 KILOVAR Meter (VAR-1EG1) checked.

(This step should be repeated as the DG is loaded.)

Initial License Exam 03/2005 Job Performance Measure JPM: S6 Page 6 of 7 Rev Date: 1/26/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 11 Load the selected DG to 6.0 MW over a 20 minute period.

CUE: Us informs you to load DG to 6 MW immediately.

CUE: When switch is taken to RAISE and W-uEG2 is observed, give reading indication increasing MW or for Lower, decreasing MW.

DG1 loaded to 6.0 MW over a 20 minute period

(.3 MW/min) by moving the Speed Control Handswitch (65-1EG1) to RAISE direction and observing the DG1 MW Meter (W-1EG1).

Speed Control Handswitch (65-uEG1) located on CB-11 (Apron Section) DG1 MW Meter (W-1EG1) located on CB-11 (Vertical Section). As LOAD is increased the KILOVARS will decrease toward 0 (zero).

12 Acknowledge and respond to 1-ALB-01 window 1.8 SSWP 1/2 OVRLOAD/TRIP Refer to ALM-01-1.8 and/or ABN-501.

  • 13 Determines that EDG 1-01 should be in Pull Out.

ALM -01 (1.8) and Initial Operator Action from ABN-501, Service Water Malfunction.

TASK COMPLETE Places EDG 1-01 in Pull Out using CS-1EG1.

Note Completion time.

Initial License Exam 03/2005 Job Performance Measure JPM: S6 Page 7 of 7 Rev Date: 1/26/05 INITIATING CUE:

OPT-214A, Diesel Generator Operability Test is being performed on DG 1 for a normal 30 day test.

You are on step 8.1.S, the DG is running at 60 Hz and 6.9 kV. The PEO at the DG has reported that the DG is running properly. Continue with the test.

Initial License Exam 03/2005 Job Performance Measure JPM: S7 Page 1 of 5 Rev Date: 1/26/05 System:

Nuclear Instrumentation System JTA Task #: NEW Task

Title:

Respond To Source Range Instrumentation Malfunction (Alternate Path)

KSA Ref:

APE.032.AK3.01 PEO:

RO:

3.2 SRO:

3.6 Operators Name:

Performance Environment:

PLANT CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 8 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

IPO-002A, "Plant Startup from Hot Standby to Minimum Load", ABN-701, ALM-0064A Tools, Equipment, Job Aids, etc:

IPO-002A, ABN-701, Simulator: Load IC 7, actuate malfunction RP01. Following initiating CUE, go to run. Actuate Malf N101A @ severity 1E6 when the candidate start to dilute or when referencing the SOP.

Initial License Exam 03/2005 Job Performance Measure JPM: S7 Page 2 of 5 Rev Date: 1/26/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

Preparations are underway for RX startup. You are at step 5.2.1 of IPO-002. You have been directed to dilute 200 gallons to reach critical boron concentration.

Terminating Conditions:

The Reactor has been tripped by de energizing the Rod Drive MGs.

Initial License Exam 03/2005 Job Performance Measure JPM: S7 Page 3 of 5 Rev Date: 1/26/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Prepare for Dilution.

Refers to SOP-104A step 5.1.3.

Note Start Time 2

Recognize First Out alarm is LIT Red and the need for a Reactor Trip.

CUE: SR FLUX HI RX TRIP Alarm 6C (1.5) is in Alarm and lit RED.

Respond to SR FLUX HI RX TRIP Alarm 6C (1.5) 3 Manually trips Reactor.

CUE: 1/1-RTC rotated but the Trip Breakers did not open.

On CB07 turns 1/1-RTC Rx Trip Bkr in the counter clockwise direction 4

Manually trips Reactor.

CUE: 1/1-RTC rotated but the Trip Breakers did not open.

On CB010 turns 1/1-RT Rx Trip in the counter clockwise direction

  • 5 Momentarily deenergizes the Rod Drive MG sets by opening 480 VAC MCC supply breakers 1B3 and 1B4.

CUE: All DRPI rod bottom lights are LIT.

TASK COMPLETE Rotates CS-1B3-1 counterclockwise to open and then clockwise back to close.

Rotates CS-1B4-1 counterclockwise to open and then clockwise back to close.

Note Completion Time

Initial License Exam 03/2005 Job Performance Measure JPM: S7 Page 4 of 5 Rev Date: 1/26/05 INITIATING CUE:

Preparations are underway for RX startup. You are at step 5.2.1 of IPO-002. You have been directed to dilute 200 gallons to reach critical boron concentration.

Initial License Exam 03/2005 Job Performance Measure JPM: S-8 Page 1 of 5 Rev Date: 1/19/05 System:

Component Cooling Water System JTA Task #: (Bank NRC 2002)

Task

Title:

Shift CCW Pumps with CCW Pump Trip (ALTERNATE PATH)

KSA Ref:

APE.026.AK3.04 PEO:

RO:

3.5 SRO:

3.7 Operators Name:

Performance Environment:

PLANT CONTROL ROOM SIMULATOR Performance Method:

PERFORMED SIMULATED DISCUSSED Time to complete JPM:

Estimated 9 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:

SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:

Evaluators Signature:

Date:

Comments (list all steps not satisfactorily completed):

References:

SOP-502A, CCW System ABN-502, Component Cooling Water System Malfunction Tools, Equipment, Job Aids, etc:

Simulator:

1) Any IC above Mode 4.
2) Insert and activate MALF-CC03B
3) Insert MALF-CC02B on a key. When CCW pump 1-01 is stopped, activate malfunction.

Initial License Exam 03/2005 Job Performance Measure JPM: S-8 Page 2 of 5 Rev Date: 1/19/05 Safety Considerations:

If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.

Human Performance Measures:

During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:

  • Peer checking
  • Three-way communications
  • Phonetic alphabet
  • Self checking
  • ALM use
  • Unit designators
  • Conservative decision making
  • Procedure place keeping
  • Procedure rules of usage Comments:

NOTE to EXAMINER: during the CCWP shift, CCWP2 will trip off after CCWP1 has been secured. CCWP1 fails to autostart when CCWP2 trips, so the operator will have to manually restart CCWP1. The operator may attempt to trip the reactor based on loss of CCW instead of attempting to restart CCWP1; if he attempts a reactor trip, stop him and end the JPM (failure). The Reactor must not be tripped because it would interfere with another JPM being conducting concurrently.

Instructions:

You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:

The Unit Supervisor directs you to shift CCW pumps (start CCWP1-02, and secure CCWP1-01 per SOP-502) in preparation for maintenance.

Terminating Conditions:

CCWP1 Running again (after CCWP2 trips off)

Initial License Exam 03/2005 Job Performance Measure JPM: S-8 Page 3 of 5 Rev Date: 1/19/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 1

Ensure SSWP2 is running CUE: SSWP2 indication is RED.

Operator visually verifies SSWP2 is running by verifying handswitch indication is RED.

Note Start time.

Give applicant a copy of SOP-502A 2

Ensure oil level in bearing housings for CCWP2 are normal.

CUE: bearing housing oil levels are normal.

Operator directs PEO to verify oil level for CCWP2.

  • 3 Start CCWP2 CUE: u-HS-4519A handswitch light indication is RED.

Take handswitch u-HS-4519A to the start position and verify red light indication on the handswitch.

4 Ensure the following equipment are removed from service before securing CCWP1:

RHR Pumps 1-01, CS Pumps 1-01/03/

CUE: Listed Pumps are removed from service.

Same as Element.

RHR and CS pumps that are loads supplied from the CCWP1 should be secured before securing the CCWP1.

Initial License Exam 03/2005 Job Performance Measure JPM: S-8 Page 4 of 5 Rev Date: 1/19/05 STEP#

  • Critical ELEMENT STANDARD NOTES SAT/

UNSAT 5

Stop CCWP1 CUE: u-HS-4518A handswitch light indication is green.

(CCWP2 trips): u-HS-4519A green light and white trip light lit.

Annunciator Alarms: CCWP 1/2 OVRLOAD/TRIP, CCW TRN A/B SFGD LOOP PRESS LO, CCW HX 1/2 OUT & RECIRC FLO LO, CCW HX 1/2 SPLY FLO LO Operator holds the u-HS-4518A handswitch in STOP until flow and pressure stabilize and then releases handswitch.

WARNING:

Operator MAY attempt to trip RX (per section 6.0 of ABN-502A Loss of all CCW Flow) when CCWP2 trips; BUT, operator SHOULD go to section 2.0 ofABN-502A CCW Pump Trip and attempt to start CCWP1; DO NOT allow operator to trip RX (it would interfere with JPMS3 running concurrently).

6 Verify unaffected train CCW Pump - RUNNING.

NOTE: CCWP1 fails to auto start, and must be manually restarted.

CUE: u-HS-4518A handswitch light indication is green.

Operator recognizes that CCWP 1 is not running by noting u-HS-4518A handswitch indication is GREEN on CB-3 If operator attempts to trip the RX, DO NOT allow RX trip, and terminate the JPM.

  • 7 Manually Start u-HS-4518A CCWP 1 CUE: u-HS-4518A RED light lit and flow restored.

TASK COMPLETE Take handswitch u-HS-4518A to the start position and verify red light indication on the handswitch and flow restored.

Give applicant a copy of ABN-502 if he/she wishes to refer to it.

Note Completion time.

Initial License Exam 03/2005 Job Performance Measure JPM: S-8 Page 5 of 5 Rev Date: 1/19/05 INITIATING CUE:

The Unit Supervisor directs you to shift CCW pumps (start CCWP1-02, and secure CCWP1-01 per SOP-502) in preparation for maintenance.

Revision 0 Appendix D Scenario Outline Form ES-D-1 Facility:

CPSES Scenario No.:

1 Op-Test No.:

1 Examiners:

Operators:

Note:

(NEW) Do SRO Admin A.4.1, Emerg. Class. with this Scenario (SAE).

Initial Conditions:

BOL, 100% power Eq. Xenon. Unit 2 is at 100% power. The A MDAFWP is OOS for oil contamination. ( 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> into LCO)

IC-15, REMF FWR20 in Rackout with H/S in P.O and Red Tagged.

Turnover:

Unit 1 and Unit 2 are at 100% power. U1 has been at 100% for the last 15 days following refueling. The A MDAFWP is OOS due to contamination in the oil.

Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. There are no surveillances planned for this shift and the orders are to maintain current load and unit availability.

Event No.

Malf. No.

Event Type*

Event Description 1

T=1 MS13D I (RO)

I (BOP)

I (SRO)

SG Pressure channel for ARV #4 fails high. (ARV fails full open) 2 T=7 RX15A

@ 100%

C (RO)

C (SRO)

PZR Spray valve fails open. (Set up trigger to remove Malf when the Manual PB is selected) 3 T=13 ED05F M (ALL)

Loss of 1EA2 (86-2) 4 T=13 FW09A C (BOP)

C (SRO)

TDAFWP Overspeed. (will not come in until pump starts) 5 T=28 N (BOP)

R (RO)

N (SRO)

Perform Plant Shutdown due to loss of 2 AFWPs. (Directed by SM) 6 T=43 FW25C

@ 4e6 M (ALL)

Feedline Break ORC 7

T=43 ED05I C (ALL)

Loss of 1EA2 (86-1) 8 T=43 SI04A C (BOP)

C (SRO)

SI pump fails to start on Safety Injection. (Must be manually started. Set up trigger file to remove Malf when HS is turned.)

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Revision 0 Appendix D Narrative Description Op-Test No:

1 Scenario No:

1 Event No:

Page 2

of 16 The objective of this scenario is to evaluate the operators ability to change Reactor power in a controlled manner when required by plant conditions, respond to various instrument and component failures, and to carry out the requisite emergency procedures to mitigate the consequences of a Loss of Heat Sink event.

Event One.

A failure high of the Main Steam Line Pressure channel that feeds the #4 SG ARV occurs. This failure will cause the ARV to open. Operator feedback for this event is an unexpected increase in Reactor Power that can exceed licensed limits and a decrease in RCS temperature with constant Turbine Load.

It is expected that the operators will:

Recognize that Reactor Power is increasing Take steps to reduce Reactor Power in accordance with Management Expectations and Pre Shift Briefings Diagnose plant conditions and determine that the ARV should NOT be open Enter the correct ABN procedure Place the controller in manual and close the valve Make the necessary notifications and refer to Technical Specifications.

Event Two.

One of the two Pressurizer Spray valves fails fully open. This is a failure of the valve in automatic and manual control remains available. Feedback to the operators is evidenced by a decrease in Reactor Coolant system pressure that is not explained by plant conditions and can lead to a Reactor Protection System actuation. It is expected that the operators will:

Recognize that RCS pressure is decreasing Diagnose plant conditions and determine that RCS pressure should NOT be decreasing.

Determine that the cause of the decrease is the Spray valve failure.

Take manual control of the spray valve and close it Enter the correct ABN procedure Make the necessary notifications and refer to Technical Specifications Event Three and Four.

Safeguards bus 1EA2 deenergizes due to an 86-2 lockout relay. An 86-2 lockout is caused by a phase to ground fault on the bus. The bus normal supply breaker will open, the EDG will start, and the bus will be re-energized from the EDG. The bus will remain powered by the EDG for the remainder of the scenario. Operator feedback is provided by alarm annunciation and equipment started by the Blackout Sequencer. It is expected that the operators will:

Respond to Alarms and determine the loss of bus 1EA2.

Determine that the BOS has actuated.

Evaluate plant conditions and determine if the start of the TDAFWP has caused Reactor Power to increase above license limits and meet management expectations to reduce power Enter the correct ABN procedure Stop unnecessary equipment started by the BOS Make the necessary notifications and refer to Technical Specifications Determine that the TDAFWP oversped on the BOS start signal It is expected that the SRO will recognize the loss of 2 AFW pumps and determine the need to shutdown the plant per the Limiting Conditions for Operations.

Revision 0 Appendix D Narrative Description Op-Test No:

1 Scenario No:

1 Event No:

Page 3

of 16 Event Five.

Inoperable equipment requires a forced down power maneuver to meet license requirements. In order to preclude unnecessary delay while the SRO communicates with plant management about plant conditions and make recommendations, the lead evaluator may direct the staff to act as SM and instruct the SRO to commence an immediate plant shutdown. Operator feedback for the need to shutdown the plant will be Technical Specification LCOs or plant management direction. It is expected that the crew will:

Refer to the appropriate plant procedure Complete a reactivity brief.

Commence boration and reduce power using the Turbine Digital Control System Event Six, and Seven and Eight.

When power has been reduced enough to meet the requirements of NUREG 1021 and at the lead examiners discretion, a Main Feed System leak will occur outside the Reactor Containment Building.

Operator feedback for this event is decreasing steam generator levels and increasing Main Feed Pump Speed. Annunciation will occur at the designed parameters. Concurrent with the Main Feedline Break, bus IEA2, (earlier energized by the EDG) will fault in such a manner that it cannot be re-energized.

Note:

Noteworthy is that at this point there are NO AFW pumps available, the Main Feed and Condensate systems are unavailable due to the feed break, and that heat removal by the secondary system is not possible.

It is inevitable that the crew will have to initiate feed and bleed of the RCS to remove decay heat.

When FRH-0.1A is entered, step 2 asks if BOTH CCPs are available. Due to the loss of 1EA2, the CCP 1-02 is unavailable. The crew should trip the RCPs and immediately go to step 11 and initiate feed and bleed. The crew will note at step 12 of FRH-0.1A that no SIPs are operating and take action to start at least one SIP.

It is expected that the crew will:

Recognize the need to trip the Reactor and initiate Safety Injection or respond to the automatic actuations.

Enter the correct EOP and carry out the Immediate Actions Verify automatic actions have occurred, or take actions to compensate for the lack of automatic actions Initiate monitoring of the Critical Safety Function Status Trees Transition to the correct FRG when conditions are met.

Initiate Feed and Bleed to remove decay heat from the core.

Start SIP per step 12 of the FRG.

Revision 0 Appendix D Narrative Description Op-Test No:

1 Scenario No:

1 Event No:

Page 4

of 16 Note: In the CPSES Probabilistic Risk Analysis, important operator actions are evaluated in Table 9 of the PRA Summary Document. Operator action to establish feed and bleed is the most important action listed with a normalized value of 100.

The scenario may be terminated when safety injection is providing cooling to the core and the Pressurizer PORVs are open to remove decay heat.

Recommended Critical Tasks:

Fails to control Pressurizer Pressure resulting in a Reactor Trip or Safety Injection.

Fails to start a Safety Injection Pump prior to the initiation of Feed and Bleed.

Fails to establish core cooling through initiation of Feed and Bleed when plant conditions are met.

Revision 0 Appendix D Op-Test No:

1 Scenario No:

1 Event No:

1 Page 5

of 16 Event

Description:

SG Pressure channel for ARV #4 fails high. (ARV fails full open)

Time RO BOP SRO Applicant's Actions or Behavior Recognizes that plant conditions are not normal by observation of Nuclear power increasing RCS temperature decreasing ALB-6D, window 1.10 AVE TAVE-TREF DEV Lit Turbine Load is constant.

Diagnose plant conditions and determines that SG #4 ARV is open by its RED light, LIT and green light OFF.

Determine that the ARV should be closed. MSL pressure is normal, and one channel indicates failure HIGH. (1-PI-2328, MSL 4 PRESS)

Enter ABN-709, section 2. STEAM LINE PRESSURE INSTRUMENT MALFUNCTION Step 1. Check ONE Main Steamline Pressure Channel indicating -

GREATER THAN 60 psig difference between remaining channels.

NOTE: 1-PI-2328, MSL 4 PRESS is failed high.

Step 2. Verify Steam Generator Atmospheric Relief Valves - CLOSED:

NO Step 2, RNO. Perform following:

a. IF pressure is less than 1125 psig, THEN manually close affected atmospheric relief valve.
b. Notify Chemistry that a release has occurred and for Chemistry to determine if a release permit is required per STA-603.
c. GO TO Step 11.

Step 11. Refer to Technical Specifications per Attachment 6.

Attachment 6 indicates TS are NA.

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

1 Event No:

2 Page 6

of 16 Event

Description:

PZR Spray valve fails open.

Time RO BOP SRO Applicant's Actions or Behavior 3.1 Symptoms

a. Annunciator Alarms PRZR 1 OF 4 PRESS LO (5B-3.4)

PRZR 1 OF 4 SI PRESS LO (5B-4.4)

PRZR LO PRESS PORV 456 BLK (5B-1.6)

PRZR LO PRESS PORV 455A BLK (5B-2.6

b. Plant Indication Spray valve indicated open when not called for by master controller.

3.2 Automatic Actions

a. Control response for failed open spray valve(s)
1) Control and backup heaters come on.

1/u-PCPR, PRZR CTRL HTR GROUP C 1/u-PCPR1, PRZR BACKUP HTR GROUP A 1/u-PCPR2, PRZR BACKUP HTR GROUP B 1/u-PCPR3, PRZR BACKUP HTR GROUP D

2) Reactor trip at 1880 psig.
3) Safety Injection at 1820 psig.

Enter section ABN-705, section 3, Pressurizer Spray Valve Failure Step 1. CLOSE Pressurizer Spray Valve(s) u-PK-455B, RC LOOP 1 PRZR SPR VLV CTRL u-PK-455C, RC LOOP 4 PRZR SPR VLV CTRL Step 2. Check RCS pressure stable or increasing.

Sep 3. Verify RCS pressure returning to 2235 psig.

Step 4. Refer to the following Technical Specifications:

3.3.1, Reactor Trip System (RTS) Instrumentation 3.3.2, Engineered Safety Features Actuation System (ESFAS)

Instrumentation 3.3.3, Post Accident Monitoring (PAM) Instrumentation 3.3.4, Remote Shutdown Instrumentation 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB)

Limits 3.4.14, RCS Pressure Isolation Valves (PIV) Leakage 13.4.14, Reactor Coolant System Pressure Isolation Valves

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

1 Event No:

3 Page 7

of 16 Event

Description:

86-2 LOR on Bus 1EA2 (Bus will be powered by the EDG)

Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms

a. Annunciator Alarms:

6.9 KV BUS uEA1 LOR TRIP (10B-1.5) 6.9 KV ANY BUS LOR LOSS OF CONTINUITY (10B-1.7) 6.9 KV ANY 1E XFMR BKR OPEN (10B-1.11) 6.9 KV BUS uEA2 LOR TRIP (10B-2.5) 6.9 KV BUS uEA1/uEA2 VOLTLOSS (10B-2.6) 6.9 KV BUS uEA1/uEA2 NOT PWRD FROM PREF OFFSITE PWR (10B-3.6) 6.9 KV/480V ANY 1E SECOND LVL UNDRVOLT (10B-4.5)

b. Plant Indications 345 KV supply outside of 340-361 KV 138 KV supply outside of 135-144 KV 6.9 KV or 480 V buses outside normal voltage limits 6.9 KV Voltage Limits = 6480 V to 7150 V 480 V Voltage Limits = 455 V to 508 V Slow transfer of a 6.9 KV safeguard bus Diesel generator supplying power to the bus Loss of transformer XST1, XST2, or XST1/2 6.9 KV bus uEA1 or uEA2 de-energized Lockout relay (LOR) trip of any 6.9 KV safeguard bus A 6.9 KV bus de-energized with no apparent causes.

2.2 Automatic Actions Second level undervoltage at 6192 V (6.9 KV bus) or 442.4 V (480 V bus) will trip 6.9 KV safeguard bus preferred and alternate feeds. lists specific undervoltage response.

Diesel generators auto-start and energize affected safeguard bus, loading via blackout sequencer. Attachment 2 lists specific sequence.

Transformer XST2 or XST1/2 faults isolate 1EA1 and 1EA2 preferred source, causing slow transfer.

Transformer 1ST fault momentarily de-energizes XST2, causing a slow transfer.

Transformer XST1 fault isolates 2EA1 and 2EA2 preferred source, causing slow transfer.

Both affected 6.9 KV safeguard bus offsite feeder breakers open.

Associated diesel generator starts Equipment powered from affected bus de-energizes.

  • BOLD INDICATES CRITICAL STEP

Revision 2 Appendix D Op-Test No:

1 Scenario No:

1 Event No:

3 Page 8

of 16 Event

Description:

LOR on 1EA2 (Bus will be de-energized resulting in loss of all AFW)

Time RO BOP SRO Applicant's Actions or Behavior CAUTION:

Only ONE attempt to close a tripped breaker should be allowed; provided NO obvious equipment damage or fault is indicated. Further attempts should NOT be made until checked by Electrical Maintenance.

When a 6.9 KV safeguard bus fault prevents running a SSWP, DG run time should be limited to approximately 15 minutes unloaded, 1 minute loaded to prevent damage due to loss of cooling.

Following overcurrent or instantaneous overcurrent relay operations, the CTs should be checked by Meter & Relay for proper operation.

(ONE 97-806)

After approximately 120 seconds BOS Operator Lockout (OL) signal automatically resets, as indicated by associated BOS OL light OFF and RMUW pump restart when BOS has timed out. Should an OL not automatically reset, resetting the sequencer may correct the condition.

NOTE: It is probable that the crew will decrease Turbine Load approx. 50 MW in response the AFW pump start.

Step 1 Check Unit MODE - 1, 2, 3 OR 4 Step 2 Check 6.9 KV safeguard bus - AT LEAST ONE ENERGIZED CAUTION:

If power is greater than 10%. MDAFW should be allowed to run until the sequencer times out. The pumps will be stopped in Section 8.0, if not required. DO NOT throttle AFW above 10% power.

The AFWP flow control and isolation valves are required to be fully open when above 10% power per TS 3.7.5.

NOTE:

An emergency start will allow DG breaker to automatically close on a phase to ground bus DG breaker will not automatically or manually close when a phase to phase bus fault (LOR An Operator Lockout signal from Blackout Sequencer (BOS) opens TDAFWP steam supply valves. The BOS also starts associated train MDAFWP. It may be necessary to limit AFW flow to prevent excessive RCS cooldown, or other adverse condition. Placing the TDAFW Pump in PULL-OUT with one safeguards bus de-energized will result in two inoperable AFW Pumps per TS 3.7.5. Throttling any train of AFW above 10% power renders the train

  • contains steps to deenergize the sequencer if the bus will not be needed. This would restore common equipment available to the other unit (e.g CRACs, UPS).
  • BOLD INDICATES CRITICAL STEP

Revision 2 Appendix D Op-Test No:

1 Scenario No:

1 Event No:

3 Page 9

of 16 Event

Description:

LOR on 1EA2 (Bus will be de-energized resulting in loss of all AFW)

Time RO BOP SRO Applicant's Actions or Behavior Step 3 Check 6.9 KV safeguard buses - BOTH ENERGIZED

a. Bus voltage, 6500-7100 volts
b. Bus frequency, 59.5-60.5 Hz
c. GO TO Step 5.

Step 5 Monitor blackout sequencer status:

a. Affected bus - ENERGIZED
b. Verify Blackout Sequencer -OPERATED OUTPUT-STEP TIME lights -ALL LIT OR Automatic lockouts AL light -LIT
c. Verify all required equipment actuated per Attachment 2.
d. Recover from blackout sequencer operation per Section 8 while continuing.

NOTE: After crew completes Att 2, and the SM is notified that the TD AFW Pump is INOPERABLE, the Booth Operator calls US as Shift Manager and inform the crew that the CPC RO will take over the ABN.

The crew should focus on the plant Shutdown.

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

1 4

Page 10 of 16 Event

Description:

TDAWP Overspeeds on Auto Start Time RO BOP SRO Applicant's Actions or Behavior 4.1 Symptoms

a. Annunciator Alarms TD AFWP OVRSPD TRIP (8B-4.6)
b. Plant Indications Rapidly fluctuating AFWPT speed u-SI-2452A, AFWPT SPD 4.2 Automatic Action None Enter ABN-305 Aux Feedwater Malfunction Step1 Verify Turbine Driven Auxiliary Feedwater Pump malfunctioning by one or more of the following indications:

AFWPT TRIP light on u-HS-2452F - LIT Step 2 Verify Turbine Driven Auxiliary Feedwater Pump - NOT TRIPPED Step 2 RNO. Perform the following:

a. Ensure at least one steam supply valve open:

u-HS-2452-1, AFWPT STM SPLYVLV-MSL 4 u-HS-2452-2, AFWPT STM SPLYVLV-MSL 1

b. Lower u-SK-2452A, AFWPT SPD CTRL to 0% output.
c. Direct Plant Equipment Operator to perform the following per Attachment 1
1) Reset overspeed trip linkage.
2) Slowly open u-HV-2452, AFWPT u-01 TRIP AND THROT VLV
d. Verify u-HS-2452 G/H, AFWPT TRIP & THROTTLE VALVE open AND valve red lights are lit.
e. Adjust u-SK-2452A, AFWPT SPD CTRL to desired output.
f. Return to procedure and step in effect.
  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

1 Event No:

5 Page 11 of 16 Event

Description:

Power Reduction (Directed by the Shift Manager)

Time RO BOP SRO Applicant's Actions or Behavior Review IPO-003A, Power Operations Notifies Generation Controller prior to reducing load.

Notifies Chemistry and Radiation Protection if power will be reduction will be

> 15% in one hour Notifies Reactor Engineering of power reduction > 25%.

Calculates the amount of boration required Calculates the rate of boration Reviews AFD guidance Initiates boration Sets in the desired unloading rate and amount using the Digital Control System Maintains AFD in the target band Maintains rods above the Rod Insertion Limit Maintains Tave with 1 degree of Tref

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

1 Event No: 6&7 Page 12 of 16 Event

Description:

Feedline Break Outside Containment/LOR on 1EA2 Time RO BOP SRO Applicant's Actions or Behavior Annunciators ALB-08A, SG3 FW NZL FLO HI ALB-08A, SG3 STM & FW FLO MISMATCH ALB-08A, SG3 LLVL DEV ALB-08A, SG3 LVL LO Plant Indications Tave decreasing Bank D rods moving out Nuclear Power increasing MFP speed increasing Diagnose plant conditions and determines that a Feedwater Leak is occurring outside the Reactor Containment Building.

Orders a reactor trip and enters EOP-0.0A.

Step 1. Verify Reactor Trip

a. Verfiy the following:

Reactor Trip and bypass breakers-OPEN, AND Neutron Flux-DECREASING

b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
a. AC safeguards busses - AT LEAST ONE ENERGIXED AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
b. AC safeguards busses - BOTH ENERGIZED Step b. RNO Restore power to de-energized AC Safeguards bus per ABN-601 or 602, when time permits.

NOTE: It is probable that the crew will place the B EDG in Pull Out.

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

1 Event No: 6&7 Page 13 of 16 Event

Description:

Feedline Break Outside Containment/LOR on 1EA2 Time RO BOP SRO Applicant's Actions or Behavior Step 4. Check SI Status:

a. Check If SI is Actuated:

SI actuation as indicated on the First Out Ann 1-ALB-6C SI Actuated blue status light - ON

b. Verify Both Trains DI Actuated:

SI Actuated blue status light - ON NOT FLASHING Step 4, RNO. IF SI is NOT required, THEN go to EOS-0.1 A, REACTOR TRIP RESPONSE The CPC RO will refer to ABN-602 for 1EA2 Bus LOR

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

1 Event No: 6&7 Page 14 of 16 Event

Description:

Feedline Break Outside Containment/LOR on 1EA2 Time RO BOP SRO Applicant's Actions or Behavior Transitions to EOS-0.1A, Reactor Trip Response Step 1. Check RcCS Average Temperature - STABLE AT OR TRENDING TO 557° F.

Step 2. Check FW Status:

a. Verify reactor trip and bypass breaker - OPEN
b. Check RCS average temperatures - LESS THAN 564° F.
c. Verify Feedwater Isolation - ISOLATION COMPLETE
d. Verify total AFW to SGs - GREATER THAN 460 GPM.

Step 3. Check PRZR Level Control:

a. Level - GREATER THAN 17%
b. Verify charging - IN SERVICE
c. Verify letdown - IN SERVICE step c RNO. Perform the following to place letdown in service NOTE: There was previously a leak in the letdown line. The crew should NOT establish letdown flow at this point.
d. Level - TRENDING TO 25%

Step 4. Check PRZR Pressure Control:

a. Pressure - GREATER THAN 1820 PSIG
b. Pressure - STABLE AT OR TRENDING TO 2235 Step 5. Check SG Levels:
a. Narrow Range Level - GREATER THAN 5%
b. Control Feed flow to maintain narrow range level between 5% and 50%.

NOTE: The crew may get to this point or even further before the Heat Sink Red Path come in.

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Operator Actions Op-Test No:

1 Scenario No:

1 Event No:

8 Page 15 of 16 Event

Description:

Loss of Heat Sink ( with SI Pump Failure)

Time RO BOP SRO Applicant's Actions or Behavior Steam Generator Levels will continue to decrease. There is no AFW flow and the plant condition continues to degrade. As it becomes clear to the crew that the location of the feed break precludes the establishment of normal feed to the Steam Generators the crew will enter FRH-0.1A, Response to a Loss of Secondary Heat Sink.

At approximately 8 minutes after the Feed break, AFW flow to the SGs will still be 0 and the narrow range level will be <5%.

Enter FRH-0.1A Loss of Heat Sink Step 1 Check If Secondary Heat Sink is Required:

a. RCS pressure - GREATER THAN ANY NON_FAULTED SG PRESSURE
b. RCS temperature - GREATER THAN 320°F Yes, continue to step 2.

Step 2. Check CCP Status - BOTH AVAILABLE Step 2, RNO. Immediately perform the following:

a. STOP ALL RCPs
b. Got to Step 11. OBSERVE CAUTION PRIOR TO STEP 11.

CAUTION: Steps 11 through 20 must be performed quicly in order to establish RCS removal by RCS bleed and feed.

Step 11. Actuate SI.

Step 12. Verify RCS Feed Path:

a. Check Pump Status:

CCPs BOTH RUNNING OR AT LEAST ON CCP AND AT LEAST ONE SI PUMP-RUNNING B. Check valve alignment for operating pumps - PROPER EMERGENCY ALIGNMENT PER ATTACHMENT 3.

Step 12, RNO. Manually start pumps and align valves as necessary to establish feed path.

Step 13. IF the Diesels are Running, THEN place Both DG EMERG STOP/START Handswitches in START.

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Operator Actions Op-Test No:

1 Scenario No:

1 Event No:

8 Page 16 of 16 Event

Description:

Loss of Heat Sink ( with SI Pump Failure)

Time RO BOP SRO Applicant's Actions or Behavior Step 14. Reset SI Step 15. Reset SI Sequencers Step 16. Reset Containment Isolation Phase A and B.

Step 17. Reset Containment Spray Signal Step 18. Establish Instrument Air And Nitrogen to Containment.

a. Establish instrument air:
1) Verify air compressor running and establish instrument air to containment.
b. Establish nitrogen
1) Verify ACCUM 1-4 VENT CTRL, 1-HC-943 - CLOSED
2) Open SI/PORV ACCUM N2 ISOL VLV, 1/1-8880.

Step 19. Establish RCS Bleed Path:

a. Verify power to PRZR PORV block valves - AVAILABLE
b. Verify PRZR PORV block valves - BOTH OPEN
c. Open both - PRZR PORVs.

Step 20. Verify Adequate RCS Bleed Path:

PRZR PORVs - BOTH OPEN PRZR PORV block valves - BOTH OPEN The Scenario may be terminated at the Lead Examiners discretion.

  • BOLD INDICATES CRITICAL STEP

SHIFT TURNOVER INFORMATION 1.0 INITIAL CONDTIONS:

Time in Core Life: BOL Tavg: 589oF Reactor Power: 100%

RCS Pressure: 2235 psig Turbine Load:1200 Mwe Xenon: Equil Boron Concentration:1263 ppm Rod Control: AUTO Rod Height: CB D @ 215steps 2.0 LCOAR/TECHNICAL SPECIFICATION ACTIONS IN EFFECT:

TS#

Description Reason 3.7.5 AFW AFW Pump 1-01 OOS for Oil Sample 3.0 CLEARANCES IN EFFECT:

AFW Pump 1-01 OOS for Oil Sample 4.0 SAFETY SYSTEM SETTING BYPASS/MALFUNCTIONS None 5.0 DEGRADED EQUIPMENT 6.0 PLANNED EVOLUTIONS:

Return AFW Pump 1-01 to service when the oil sample is complete.

7.0 TURNOVER INFORMATION:

Unit 1 and Unit 2 are at 100% power. U1 has been at 100% for the last 15 days following refueling. The A MDAFWP is OOS due to contamination in the oil. Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. There are no surveillances planned for this shift and the orders are to maintain current load and unit availability.

Revision 0 Appendix D Scenario Outline Form ES-D-1 Facility:

CPSES Scenario No.:

2 Op-Test No.:

1 Examiners:

Operators:

Note:

(NEW) Do SRO Admin A.4.2, Emerg. Class. With this Scenario (SAE).

Initial Conditions:

40% power, Xenon building in, plant start-up in progress. Unit 2 is at 100%. (IC-13. Preload malfunctions RP07A, and RP07B Train A/B Auto SI failure.)

Turnover:

Unit 1 is at 40% power and increasing per IPO-003A, step 5.4.19. Shift orders are to increase reactor power during the shift. The A MDAFWP is OOS due to contamination in the oil. Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. The expectation is that the ALERT will last until midnight. There are no surveillances planned for this shift.

Event No.

Malf. No.

Event Type*

Event Description 1

T=0 N (SRO)

R (RO)

N (BOP)

Increase Reactor Power 2

T=13 RX04B

@ 100%

I (SRO)

I (BOP)

SG level transmitter LT-552 fails high.

3 T=23 CV01B C (RO)

C (SRO)

Trip of Running CCP 4

T=33 CV13A

@12gpm C (SRO)

C (RO)

Letdown Leak inside containment 5

T=40 RC15A C (ALL)

RCP Seized Shaft 6

T=45 RC09A2 M (ALL)

LBLOCA 7

T=45 RH01B C(ALL)

RHRP1-2 Trip NOTE: Make new IC that has second MFP running and equil xenon.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Revision 0 Appendix D Narrative Description Op-Test No:

1 Scenario No:

2 Event No:

Page 2

of 24 The objective of this scenario is to evaluate the operators ability to change Reactor power in a controlled manner, respond to various instrument and component failures, and to carry out the requisite emergency procedures to mitigate the consequences of a Loss of Coolant Accident.

Event One.

The operators are directed to continue the plant startup. In order to preclude unnecessary delay, the shift turnover will direct the crew to start the power increase immediately upon taking the watch. The customary reactivity brief will be allowed, but due to the ALERT for grid conditions, an extensive pre job brief will not be held. Operator feedback for the need to increase power will be the ALERT condition or plant management direction. It is expected that the crew will:

Refer to the appropriate plant procedure Complete a reactivity brief.

Commence dilution and increase power using the Turbine Digital Control System Event Two.

When power has been increased enough to meet the requirements of NUREG 1021 and at the lead examiners discretion, the controlling level channel on SG 1-02 will fail high. This will cause the feed regulating valve to go closed more than normal due to the high indicated SG level. Operator feedback for this event is SG level alarms, steam flow/feed flow mismatch alarms and increasing Reactor Coolant Average temperature due to lower than normal SG level. It is expected that the crew will:

Evaluate plant conditions and determine that SG 1-02 level is NOT normal Recognize that the feed flow does not match steam flow Determine that the level indicator LI-552 is reading higher than the other channels Take manual control of the FRV and match steam and feed flow Refer to the correct ABN procedure Make the necessary notifications and refer to Technical Specifications. It is expected that the SRO will stop the power increase during this event.

Event Three.

The running CCP (CCP 1-01) trips. All charging and seal injection flow is lost. Without charging flow to cool the regenerative heat exchanger, letdown will flash and cause the letdown relief to lift. Operator feedback for this event is provided by annunciation for the CCP trip and various annunciations due to loss of letdown. It is expected that the operator will:

Verify that CCW is at least 35 gpm to the RCP Thermal Barrier Heat Exchangers (Initial Operator Action)

Isolate letdown (Initial Operator Action)

Refer to the correct ABN procedure.

Start the CCP 1-02 Establish charging flow to support letdown flow Establish letdown Make the necessary notifications and refer to Technical Specifications

Revision 0 Appendix D Narrative Description Op-Test No:

1 Scenario No:

2 Event No:

Page 3

of 24 Event Four.

Due to the previous valve, temperature and pressure cycles on the letdown system, a small leak occurs on the Letdown Isolation Valve LCV-460. The leak size is 12 gpm and is evidenced by, increasing charging flow, decreasing VCT level, increased make up to the VCT, and increasing radioactive gas levels inside the Containment. Due to the plant startup in progress, which results in large dilutions and RCS tave leading turbine load, a decrease in PZR level may not be the first indication of the loss of inventory. It is expected that the crew will:

Respond to alarms and determine that pressurizer level is decreasing.

Verify that charging flow has increased to maintain pressurizer level Refer to the correct ABN procedure Increase charging and/or decrease letdown to maintain pressurizer level.

Evaluate plant conditions and determine that the leak is greater than allowed by Technical Specifications and comply with the Limiting Condition for Operation.

Event Five Failure of the seal package caused by the cycling of seal injection lead to the RCP 1-01 experiencing a seized shaft. If reactor power is <48%, then the operator feedback will be MCB alarms for low flow and RCP trip. The operators should trip the Reactor to meet the requirements of the ABN procedures. If reactor power is > 48%, then a Reactor Trip will occur. Automatic Reactor Trips were blocked in the scenario setup.

NOTE: The evaluator should also note the crews response to the SG level in the 1-01 SG. RCS flow will be reversed and SG level will be abnormally high. It is not uncommon for a crew to believe that a SGTR has occurred due to this thermo hydraulic behavior.

It is expected that the operator will:

Respond to alarms and determine that the RCP has tripped.

Trip the reactor (Initial Operator Action)

Refer to the correct ABN procedure Enter the correct EOP and continue with the ABN procedure.

Perform the Immediate Operator Actions from memory.

Evaluate plant conditions and determine what Technical Specification Limiting Condition for Operations apply.

Evaluate the level change in the 1-01 SG and determine that the level increase is due to reverse RCS flow through the SG.

Revision 0 Appendix D Narrative Description Op-Test No:

1 Scenario No:

2 Event No:

Page 4

of 24 Event Six and Seven.

On the loop with the tripped RCP, a Large Break LOCA occurs. Safety Injection first out alarms will come in. The pressurizer will rapidly empty and containment pressure will rapidly increase to the HI-3 setpoint and containment spray will actuate. It is expected that the crew will:

Recognize that a Safety Injection is required and initiate a Manual SI.

Enter the correct EOP.

Perform the Immediate Operator Actions from memory.

Verify automatic actions, and determine that the RHR pump 1-02 has tripped.

Trip RCPs when plant conditions meet those listed on the Fold Out page.

Transition to the correct EOP Transition to the correct EOS Procedure when conditions are met Establishes at least one train of cold leg recirculation NOTE: In the CPSES Probabilistic Risk Analysis, important operator actions are evaluated in Table 9 of the PRA Summary Document. For this scenario, it is important that the Operators establish cold leg recirculation when required. Failure to establish long term cooling for the LBLOCA are major contributors to both the CDF and LERF considerations The scenario may be terminated when one train of cold leg recirculation has been established or at the discretion of the Lead Evlauator.

Recommended Critical Tasks Fails to manually control SG level, resulting in a Reactor Trip on SG Level.

Fails to manually initiate Safety Injection when required by plant conditions.

Fails to trip RCPs when required by plant conditions.

Revision 0 Appendix D Operator Actions Op-Test No:

1 Scenario No:

2 Event No:

1 Page 5

of 24 Event

Description:

Increase Reactor Power Time RO BOP SRO Applicant's Actions or Behavior Review IPO-003A, Power Operations Notifies Generation Controller prior to increasing load.

Calculates the amount of dilution required Calculates the rate of dilution Reviews AFD guidance Initiates boration Sets in the desired loading rate and amount using the Digital Control System Maintains AFD in the target band Maintains rods above the Rod Insertion Limit Maintains Tave with 1 degree of Tref

  • BOLD INDICATES CRITICAL STEP Revision 0

Appendix D Op-Test No:

1 Scenario No:

2 Event No:

2 Page 6

of 24 Event

Description:

SG Level Transmitter LT-552 Fails High Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms

a. Annunciator Alarms SG 2 LVL LO (8A-2.6)

SG 2 LVL DEV (8A-2.12)

SG 2 STEM & FW FLO MISMATCH

b. Plant Indications
1) One steam generator level instrument indicating higher or lower than the other steamgenerators level instruments.

u-LI-552, SG 2 LVL (NR) CHAN II 2.2 Automatic Actions NOTE: Control responses will occur only if the failed channel is selected for control.

Steam Generator Level Channel failing HIGH will cause the feedwater control valve to CLOSE, thereby decreasing steam generator level.

(Unit 1 LO LEVEL REACTOR TRIP at 25%)

(Unit 2 LO LEVEL REACTOR TRIP at 35.4%)

Diagnose Failed SG Level Controller and Enter ABN-710.

Step 1 Verify controlling level channel -FAILED.

Step 2 Manually control the following, as necessary to maintain SG - 2 AT PROGRAMMED LEVEL.

u-FK-520, SG 2 FW FLO CTRL u-SK-509A, FWPT MASTERSPD CTRL Step 3 Verify instruments on common instrument line - NORMAL (See )

CAUTION:

Turbine Trip AND Feedwater Isolation will occur if 2 or more of the 3 HI-HI level bistables for the SAME steam generator are TRIPPED.

IF preferred level control channel has failed (551, 552, 553, or 554)

AND automatic steam generator water level control is restored using alternate levelcontrol channel, THEN Step 9 must be completed within SIX hours for requiredchannel protection coincidence.

Step 4 Verify ALL other HI-HI level bistable windows on TSLB-3 for affected SG-DARK SG 2(Channels 527, 528, and 529)windows 1.3, 3.3, and 4.3

  • BOLD INDICATES CRITICAL STEP Revision 0

Appendix D Op-Test No:

1 Scenario No:

2 Event No:

2 Page 7

of 24 Event

Description:

SG Level Transmitter LT-552 Fails High (cont)

Time RO BOP SRO Applicant's Actions or Behavior Step 5 Verify automatic SG level control - DESIRED

a. Alternate level control channel responding normally.
b. Automatic level control desired,as determined by UnitSupervisor.

Step 6 Select alternate channel:

u-LS-529C, SG 2 LVL CHAN SELECT Step 7 Verify affected SG conditions for auto level control.

Feedwater and steam flows matched.

SG level stable at program.

Step 8 Place Feedwater Flow OR Feedwater Bypass Control Valve in automatic AND ensure proper control.

Step 9 Within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, have an I&C Technician place bistable test switches for failed level channel in CLOSE utilizing Attachments 2 and 3.

Step 10 Verify appropriate Alarms AND Trip Status Lights LIT per AND note this verification in the Unit Log.

Step 11 Refer to Technical Specifications, per Attachment 4.

RX trip Inst. Table 3.3.1-1 item #14 ESF Inst Table 3.3.2-1 item 6C Accidnet Monitoring Table 3.3.3-1 item # 13

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 Event No:

3 Page 8

of 24 Event

Description:

Trip of Running CCP Time RO BOP SRO Applicant's Actions or Behavior 3.1 Symptoms

a. Annunciator Alarms ANY RCP SEAL WTR INJ FLO LO (5A-1.6)

PRZR LVL DEV LO (5C-1.2)

ANY CHRG PMP OVRLOAD/TRIP (6A-1.7)

REGEN HX LTDN OUT TEMP HI (6A-1.4)

CHRG FLO HI/LO (6A-3.4)

b. Plant Indications
1. Amber MISMATCH or trip light(s) ON at the charging pump control switch.

1/u-APPD, PDP 1/u-APCH1, CCP 1 1/u-APCH2, CCP 2

2. Pressurizer level indicating lower than program level during steady state conditions.

u-LR-459, PRZR LVL/PRZR LVL SET PT u-LI-459A, PRZR LVL CHAN I u-LI-460A, PRZR LVL CHAN II u-LI-461, PRZR LVL CHAN III

3. Charging Flow will indicate 0 gpm u-FI-121A, CHRG FLO 3.2 Automatic Actions
a. Letdown line isolation occurs at 17% pressurizer level AND pressurizer heaters will deenergize.

Diagnose CCP Trip and Enter ABN-105 NOTE: Step 1 and 2 may be performed concurrently.

Step 1. (Initial Operator Action ) Verify Component Cooling Water flow to RCP Thermal Barrier HX(s)-GREATER THAN 35 GPM:

u-FI-4678, RCP 1 THBR CLR CCW RET FLO u-FI-4682, RCP 2 THBR CLR CCW RET FLO u-FI-4686, RCP 3 THBR CLR CCW RET FLO u-FI-4690, RCP 4 THBR CLR CCW RET FLO

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 3

Page 9

of 24 Event

Description:

Trip of Running CCP Time RO BOP SRO Applicant's Actions or Behavior Step 2. (Initial Operator Action ) Verify Letdown Flow - ISOLATED 1/u-8149A, LTDN ORIFICE ISOL VLV (45 GPM) - CLOSED 1/u-8149B, LTDN ORIFICE ISOL VLV (75 GPM) - CLOSED 1/u-8149C, LTDN ORIFICE ISOLVLV (75 GPM) -CLOSED 1/u-LCV-459, LTDN ISOL VLV -CLOSED 1/u-LCV-460, LTDN ISOL VLV -CLOSED Step 3. Verify at least one Charging Pump - RUNNING Step 3. (RNO)

Start a Charging Pump.

Step 4 Verify Seal Injection Flow to each RCP - BETWEEN 6 GPM AND 13 GPM Step 5 Verify RCP Parameters in - NORMAL OPERATING RANGE:

6 Verify PRZR level-GREATER THAN 17% AND INCREASING Step 7 Establish normal Letdown:

a. OPEN Letdown Isolation Valves:

1/u-LCV-460, LTDN ISOL VLV 1/u-LCV-459, LTDN ISOL VLV 1/u-8152, LTDN CNTMT ISOL VLV ORC 1/u-8160, LTDN CNTMT ISOL VLV IRC

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 3

Page 10 of 24 Event

Description:

Trip of Running CCP Time RO BOP SRO Applicant's Actions or Behavior

b. Manually OPEN u-PK-131, LTDN HX OUT PRESS CTRL to 30%

DEMAND (50% if restoring two orifice valves).

c. Manually OPEN u-TK-130, LTDN HX OUT TEMP CTRL to 50%

DEMAND.

d. Adjust charging to desired flow WHILE maintaining seal injection flow between 6 and 13 gpm.

e OPEN selected Letdown Orifice Isolation Valve(s).

f Adjust u-PK-131, LTDN HX OUT PRESS CTRL to maintain approximately 310 psig AND place in AUTO.

g Adjust u-TK-130, LTDN HX OUT TEMP CTRL to maintain approximately 95°F AND place in AUTO.

Step 8 Verify RCS leakage - NORMAL

a. PRZR level stable at OR trending to program.
b. Charging flow less than 15 GPM above letdown flow.

Step 9 Refer to Technical Specifications listed in Section 9.1, this procedure.

9.1 Technical Specifications/Requirements 3.4.13, RCS Operational Leakage 3.4.14, RCS Pressure Isolation Valve (PIV) Leakage 3.4.15, RCS Leakage Detection Instrumentation 3.5.2, ECCS - Operating 3.5.3, ECCS - Shutdown 13.1.31, Boration Injection System - Operating 13.1.32, Boration Injection System - Shutdown

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 4

Page 11 of 24 Event

Description:

Letdown Leak Inside Containment Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms

a. Annunciator Alarms CNTMT SMP 1 FILL RATE INCREASE (2A-1.6)

CNTMT SMP 1 LVL HI-HI (2A-1.7)

CNTMT SMP 2 LVL HI-HI (2A-1.8)

CNTMT SMP 2 FILL RATE INCREASE (2A-2.6)

RX CAV SMP LVL HI-HI (2A-2.7)

CNTNT FAN CLR 3 & 4 CNDS FILL RATE HI (2B-3.12)

CNTNT FAN CLR 1 & 2 CNDS FILL RATE HI (2B-4.12)

PRZR LVL DEV LO (5C-1.2)

CHRG FLO HI/LO (6A-3.4) 2.1 b. Plant Indications Containment humidity high or increasing Containment radiation levels high or increasing Incore instrument leakage alarm Containment temperature high or increasing Containment pressure high or increasing Containment dew point increasing Increased reactor coolant make-up frequency VCT level decreasing Charging flow increasing Pressurizer relief and safety valve temperature high Pressurizer level decreasing Condenser off gas radiation level increasing 2.2 Automatic Actions

a. IF pressurizer level decreases to the low level alarm (5B-3.6), THEN letdown will isolate and pressurizer heaters will be blocked.
b. IF VCT level decreases to the lo-lo level alarm (6A-4.5), THEN charging pump suction will transfer to the RWST.

Enters ABN-103 RCS Leak Step 1 Verify charging pump - AT LEAST ONE RUNNING 1/u-APPD, PDP 1/u-APCH1, CCP 1 1/u-APCH2, CCP 2

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 Event No:

4 Page 12 of 24 Event

Description:

Letdown Leak Inside Containment Time RO BOP SRO Applicant's Actions or Behavior Step 2 Ensure Pressurizer level - AT OR TRENDING TO PROGRAM LEVEL SETPOINT

a. Verify running charging pump controller automatically maintaining Pressurizer level at program setpoint u-FK-121, CCP CHRG FLOCTRL u-SK-459A, PDP SPD CTRL Step 2 (RNO). Place the running charging pump controller in MANUAL AND adjust charging flow to maintain pressurizer level at program level setpoint Step 3 Check PRZR Status
a. PRZR PORVs - CLOSED 1/u-PCV-455A, PRZR PORV 1/u-PCV-456, PRZR PORV
b. PRZR Safety Valves - CLOSED u-ZL-8010A, PRZR SFTY VLV A u-ZL-8010B, PRZR SFTY VLV B u-ZL-8010C, PRZR SFTY VLV C
c. PRZR Spray Valves - RESPONDING NORMALLY TO CONTROL PRESSURE u-ZL-455B, RC LOOP 1 PRZRSPR VLV u-ZL-455C, RC LOOP 4 PRZR SPR VLV
d. Pressurizer Relief Tank level AND temperature - NO SIGNIFICANT INCREASE u-TI-468, PRT TEMP u-LI-470, PRT LVL u-PI-469, PRT PRESS
d. Check PRZR PORV AND Safety Valves for indication of leakage:

u-TI-463, PRZR PORV OUT TEMP u-TI-464, PRZR SFTY VLV C OUT TEMP u-TI-465, PRZR SFTY VLV B OUT TEMP Step 4 Verify AUTO makeup in service 1/u-MU, RCS MU MAN ACT -START 43/u-MU, RCS MU MODE SELECT-AUTO Step 5 Verify 1/u-LCV-112A, VCT LVL CTRL VLV - ALIGNED TO VCT.

Step 6 Check Steam Generator status:

a. All Steam Generator levels - NORMAL
b. Verify SG feedwater/steam flow - NO SIGNIFICANT MISMATCH
c. Monitor PC-11 trends on affected Steam Generators for increased radioactivity.
  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 Event No:

4 Page 13 of 24 Event

Description:

Letdown Leak Inside Containment Time RO BOP SRO Applicant's Actions or Behavior Step 7 Verify primary sampling valves closed - u-MLB-1A2-LIGHTS DARK 1.1 u-HV-4165, PRZR STM SMPL ISOL VLV OPEN 2.1 u-HV-4166, PRZR LIQ SMPL ISOL OPEN 3.1 u-HV-4168, HL 1 SMPL ISOL OPEN 4.1 u-HV-4169, HL 4 SMPL ISOL OPEN Step 8 Announce over plant page:

"ATTENTION ALL PERSONNEL. WE HAVE INDICATION OF A LEAK FROM THE UNIT RCS. BE AWARE OF POSSIBLE INCREASED RADIATION LEVELS OUTSIDE CONTAINMENT BUILDING. REPORT ANY WATER SPILLAGE, OBSERVED LEAKS, OR UNEXPECTED TANK OR SUMP LEVEL INCREASES TO UNIT u CONTROL ROOM".

Step 9 Dispatch personnel to search for leak while continuing with this procedure:

a. Check the following:
1) Residual Heat Removal Line pressure - NORMAL FOR CONDITIONS Piping temperature - AMBIENT NO piping leaks
2) Safety Injection NO piping leaks Piping temperature - AMBIENT
3) RCS Letdown and Makeup NO piping leaks Filter Drains - CLOSED NO pump leakage NO BTRS drain valve or diaphragm valve leakage.
4) Auxiliary Building AND SFGD building sump levels - NO UNEXPECTED INCREASE
  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 Event No:

4 Page 14 of 24 Event

Description:

Letdown Leak Inside Containment Time RO BOP SRO Applicant's Actions or Behavior Step 10. Check areas AND systems for signs of leakage:

a. Verify PC-11 Trends - NORMAL Main Steam Line Monitors SFGDs Building ARMs Auxiliary Building ARMs Containment Building ARMs AND PIG Component Cooling Water Process Monitors
b. Verify Accumulator Tank levels - NORMAL c.Verify Containment Building Sumps - NOT INCREASING:

u-LI-5160, CNTMT SMP 1 LVL u-LI-5161, CNTMT SMP 2 LVL u-LI-5164, RX CAV SMP LVL

d. Verify Reactor Coolant Drain Tank level AND discharge flow - NORMAL Step 11 Check letdown and normal charging for leakage.
a. Area Radiation Monitor in vicinity of letdown and charging - NORMAL PPAu21, HRAM PIPE PENET N(S). 810 (u-RE-6259B)
b. Check FFLu60, FAILED FUEL (u-RE-0406) for loss of flow.
c. Verify VCT level - NORMAL
d. Verify RCS Makeup Flow and makeup intervals - NORMAL
e. Verify NO reports of leakage observed.
f. Letdown flow - LESS THAN 140 gpm
2) Isolate Letdown and normal charging as follows:

A) Close Orifice Isolation Valves:

1/u-8149A, LTDN ORIFICE ISOL VLV (45 GPM) 1/u-8149B, LTDN ORIFICE ISOL VLV (75 GPM) 1/u-8149C, LTDN ORIFICE ISOL VLV (75 GPM)

B) Close Letdown Isolation Valves:

1/u-LCV-460, LTDN ISOL VLV 1/u-LCV-459, LTDN ISOL VLV Note: The crew may not get to this point. The next event will happen at the discretion of the lead evaluator.

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 Event No:

5 Page 15 of 24 Event

Description:

RCP Seized Shaft Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms

a. Annunciators Alarm ANY RCP TRIP (5B-1.1) 1 OF 4 RCP UNDRVOLT (5B-1.2)

RC LOOP 1 1 OF 3 FLO LO (5A-1.3) 1 OF 4 RCP UNDRFREQ (5B-2.2)

RC LOOP 2 1 OF 3 FLO LO (5A-2.3)

RC LOOP 3 1 OF 3 FLO LO (5A-3.3)

RC LOOP 4 1 OF 3 FLO LO (5A-4.3)

b. Plant Indications Low flow indication on any reactor coolant loop.

Breaker TRIP or MISMATCH light illuminated on any RCP handswitch.

Motor amps on any RCP motor reading zero.

2.2 Automatic Actions Reactor trip occurs in the event of one reactor coolant pump trip with reactor power greater than 48% (P-8 permissive annunciator NOT LIT).

Reactor trip occurs in the event of two reactor coolant pumps trip with reactor power orturbine power greater than 10% (P-7 permissive annunciator NOT LIT).

If the crew enters ABN-101 the first step is:

Step 1. (Initial Operator Action) Check Plant status

a. Verify Reactor - Tripped
b. GO TO EOP-0.0A/B while other qualified operators continue with this procedure.
  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 Event No:

5 Page 16 of 24 Event

Description:

RCP Seized Shaft Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms

a. Annunciators Alarm RX> 48% PWR 1 OF 4 RC LOOP FLO LO (6C-4.2)

RX> 10% PWR PRZR PRSS LO (6C-1.3)

SG2 LVL LO (6C-2.6)

Plant Indications Various First Out Annunciator alarms and changing plant conditions Automatic Actions Reactor Trip breakers open and the turbine trips Orders a reactor trip and enters EOP-0.0A.

Step 1. Verify Reactor Trip

a. Verfiy the following:

Reactor Trip and bypass breakers-OPEN, AND Neutron Flux-DECREASING

b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
a. AC safeguards busses - AT LEAST ONE ENERGIXED AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
b. AC safeguards busses - BOTH ENERGIZED Step 4. Check SI Status:
a. Check If SI is Actuated:

SI actuation as indicated on the First Out Ann 1-ALB-6C SI Actuated blue status light - ON

b. Verify Both Trains DI Actuated:

SI Actuated blue status light - ON NOT FLASHING Step 4, RNO. IF SI is NOT required, THEN go to EOS-0.1 A, REACTOR TRIP RESPONSE

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 Event No:

5 Page 17 of 24 Event

Description:

Reactor Trip Response Time RO BOP SRO Applicant's Actions or Behavior Transitions to EOS-0.1A, Reactor Trip Response Step 1. Check RCS Average Temperature - STABLE AT OR TRENDING TO 557° F.

Step 2. Check FW Status:

a. Verify reactor trip and bypass breaker - OPEN
b. Check RCS average temperatures - LESS THAN 564° F.
c. Verify Feedwater Isolation - ISOLATION COMPLETE
d. Verify total AFW to SGs - GREATER THAN 460 GPM.

Step 3. Check PRZR Level Control:

a. Level - GREATER THAN 17%
b. Verify charging - IN SERVICE
c. Verify letdown - IN SERVICE
d. Level - TRENDING TO 25%

Step 4. Check PRZR Pressure Control:

a. Pressure - GREATER THAN 1820 PSIG
b. Pressure - STABLE AT OR TRENDING TO 2235 Step 5. Check SG Levels:
a. Narrow Range Level - GREATER THAN 5%
b. Control Feed flow to maintain narrow range level between 5% and 50%.

NOTE: Because of the RCP Trip, the level in the #1 SG will be higher than in the other SGs. The crew should NOT believe that this is indication of a SGTR. If they do, however, it will not effect the outcome of the scenario

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 Event No: 6 & 7 Page 18 of 24 Event

Description:

LB LOCA (Auto SI Fails)

Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms

a. Annunciators Alarm PRZR PRESS LO SI ACT (6C-2.7)

CNTMT PRESS HI SI ACT (6C-4.7)

Plant Indications RCS pressure and temperature rapidly dropping, Pressurizer level and pressure dropping and Containment Temperature and Pressure increasing rapidly.

Automatic Actions Automatic SI will not function and RHR Pump 1-02 fails to start.

NOTE: It is expected that the operator will initiate Manual SI prior to procedure entry.

Transitions to EOP-0.0A.

Step 1. Verify Reactor Trip

a. Verfiy the following:

Reactor Trip and bypass breakers-OPEN, AND Neutron Flux-DECREASING

b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
a. AC safeguards busses - AT LEAST ONE ENERGIXED AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
b. AC safeguards busses - BOTH ENERGIZED Step 4. Check SI Status:
a. Check If SI is Actuated:

SI actuation as indicated on the First Out Ann 1-ALB-6C SI Actuated blue status light - ON

b. Verify Both Trains DI Actuated:

SI Actuated blue status light - ON NOT FLASHING Step 4 RNO. Check if SI required (YES)

Manually Initiate SI.

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 Event No: 6 & 7 Page 19 of 24 Event

Description:

LB LOCA (Auto SI Fails)

Time RO BOP SRO Applicant's Actions or Behavior Step 5. Ensure Proper Safeguards Equipment Operation Per Attachment 2.

NOTE: It is expected that the RHR pump trip will be noticed and documented during the performance of Attachment 2.

Step 6. Verify AFW Alignment

a. MDAFWP - RUNNING
b. Turbine Driven AFW Pump - RUNNING IF NECESSARY
c. AFW total flow - GREATER THAN 460 GPM
d. AFW Valves alignment - PROPER ALIGNMENT Step 7. Verify Containment Spray Not Required :
a. Containment Pressure - HAS REMAINED LESS THAN 18 PSIG (NO)

Step a RNO. Perform the following:

1) Verify Containment Spray inititated.
2) Verify appropriated MLB indication for CNTMT SPRAY (BLUE WINDOWS) AND PHASE B (ORANGE WINDOWS)
3) Verify containment spray flow
4) Esnure CHEM ADD TK DISCH VLVs - OPEN
5) Stop all RCPs. (NOTE: The crew will stop RCPs at this point instead of waiting until step 11. They may also have stopped the RCPs per the fold out page for this procedure.)
6) Go to step 8.

Step 8. Check if Main Steamlines should be Isolated:

a. Verify the following:

Containment Pressure - GREATER THAN 6 PSIG (YES)

b. Verify main steam isolation complete.

Step 9. Check RCS Average Temperature - STABLE AT OR TRENDING TO 557°F.

Step 9 RNO. Throttle AFW and stop dumping steam.

Step 10. Check PRZR Valve Status:

a. PRZR Safeties - CLOSED
b. Normal PRZR Spray valves - CLOSED
c. PORVs - CLOSED
d. Power to at least one block valve - AVAILABLE
e. Block valves - AT LEAST ONE OPEN
  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 Event No: 6 & 7 Page 20 of 24 Event

Description:

LB LOCA (Auto SI Fails)

Time RO BOP SRO Applicant's Actions or Behavior Step 11. Check if RCPs should be stopped:

a. ECCS pumps - AT LEAST ONE RUNNING CCP

-OR-SI pump

b. RCS subcooling - LESS THAN 25° F (55° F FOR ADVERSE CONTAINMENT)
c. Stop all RCPs.

Step 12. Check if any SG is Faulted:

a. Check pressures in all SGs:

ANY SG DECREASING IN AN UNCONTROLLED MANNER

-OR-ANY SG COMPLETELY DEPRESSURIZED Step a RNO, Go to Step 13.

b. Go to EOP-2.0A, FAULTED STEAM GENERATOR ISOLATION, Step 1.

Step 13.Check if SG Tubes Are Not Ruptured:

Condenser off gas radiation - NORMAL (COG-182, 1RE-2959)

Main steamline radiation - NORMAL (MSL-178-181, 1RE-2325 -

2328)

SG blowdown and sample radiation monitor - NORMAL (SGS-164, 1RE-4200)

No Steam Generator level increasing in an uncontrolled manner NOTE: See previous note about SG level response to a tripped RCP Step 14. Check If RCS Is Intact:

Containment pressure - LESS THAN 1.3 PSIG Containment recirculation sump levels - NORMAL Containment radiation - NORMAL (GRID 4)

Step 14 RNO, Got to EOP-1.0A, LOSS OF REACTOR OR SECONDARY COOLANT

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 Event No: 6 & 7 Page 21 of 24 Event

Description:

LB LOCA (Auto SI Fails) EOP 1.0A Loss of Reactor or Secondary Coolant Time RO BOP SRO Applicant's Actions or Behavior NOTE: It is expected that the RWST level will be at 45% within 17 minutes of the LBLOCA. The progress through EOP-1.0A will vary with each crew dependent upon how fast they proceed. Actual progress is not important, but the transition to EOS-1.3 A, Transfer to Cold Leg Recirculation, when plant conditions require, is.

Transitions to EOP-1.0A, Loss of Reactor or Secondary Coolant Step 1. Check if RCPs should be stopped:

a. ECCS pumps - AT LEAST ONE RUNNING CCP

-OR-SI pump

b. RCS subcooling - LESS THAN 25° F (55° F FOR ADVERSE CONTAINMENT)
c. Stop all RCPs.

NOTE: ALL RCPs SHOULD BE STOPPED AT THIS POINT.

Step 2. Check if any SG is Faulted:

a. Check pressures in all SGs:

ANY SG DECREASING IN AN UNCONTROLLED MANNER

-OR-ANY SG COMPLETELY DEPRESSURIZED Step a RNO, Go to Step 3.

b. Go to EOP-2.0A, FAULTED STEAM GENERATOR ISOLATION, Step 1.

Step 3. Check SG Levels:

a. Narrow Range Level - GREATER THAN 5%
b. Control Feed flow to maintain narrow range level between 5% and 50%.

Step 4.Check Secondary Radiation - NORMAL Condenser off gas radiation - NORMAL (COG-182, 1RE-2959)

Main steamline radiation - NORMAL (MSL-178-181, 1RE-2325 -

2328)

SG blowdown and sample radiation monitor - NORMAL (SGS-164, 1RE-4200)

When RWST LVL LO-LO Alarm comes in, transition to EOS-1.3A, Transfer to Cold Leg Recirculation. (Reference EOP-1.0A fold out page and ALM 1-ALB-4B, 3.7)

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 Event No: 6 & 7 Page 22 of 24 Event

Description:

LB LOCA (Auto SI Fails) EO2 1.3A Transfer to Cold Leg Recirculation Time RO BOP SRO Applicant's Actions or Behavior Caution: Steps 1 through 3 should be performed without delay. FRGs should not be implemented prior to completion of these steps.

Step 1. Reset SI Step 2. Verify CCW Flow From RHR And Containment Spray Heat Exchangers.

Caution: Any ECCS pump taking suction from RWST should be stopped upon RWST EMPTY alarm at 12% level. Any Containment Spray pump taking suction from RWST should be stopped when RWST level reaches 6%.

Caution: Any ECCS or Containment Spray pump that loses suction or shows indication of cavitation should be stopped.

Caution: SI pumps should be stopped if RCS pressure is greater than their shutoff head pressure.

Step 3. Align ECCS For Cold Leg Recirculation

a. Check open CNTMT SMP TO RHRP 1 AND 2 SUCT ISOL VLVS:

1/1-8811A 1/1-8811B

b. Close RWST TO RHRP 1 AND RHRP 2 SUCT VLVS 1/1-8812A 1/1-8812B
c. Close SIP 1 AND SIP 2 MINIFLO VLVS:

1/1-8814A 1/1-8814B 1/1-8813

d. Close RHRP 1 AND RHRP 2 XTIE VLVS:

1/1-8716A 1/1-8716B

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 Event No: 6 & 7 Page 23 of 24 Event

Description:

LB LOCA (Auto SI Fails) EO2 1.3A Transfer to Cold Leg Recirculation Time RO BOP SRO Applicant's Actions or Behavior

e. Close the CCP ALT MINIFLO ISOL VLVS:

1/1-8511A 1/1-8512B 1/1-8511B 1/1-8512A

f. Open SI < -- > CHRG SUCT HDR XTIE VLVS:

1/1-8807A 1/1-8807B

g. Open RHRPs TO CCP/SIP SUCT VLVS:

1/1-8804A 1/1-8804B NOTE: Due to the RHR pump trip, only one train will be lined up for Cold Leg Recirculation.

Step 4. Align Containment Spray System for Recirculation:

a. Check RWST level - LESS THAN 24%.

Step a RNO. If Containment Spray ACTUATED, then continue with step 5.

b. Realign Containment Spray System as follows:
1) Open CNTMT SMP TO CSP 1 & 3 AND 2 & 4 SUCT ISOL VLVS:

1-HS-4782 1-HS-4783

2) Close RWST TO CSP 1 & 3 AND 2 & 4 SUCT VLVS 1-HS-4758 1-HS-4759
3) IF the containment spray pumps have been stopped due to RWST level, THEN perform the following:
  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

2 Event No: 6 & 7 Page 24 of 24 Event

Description:

LB LOCA (Auto SI Fails) EO2 1.3A Transfer to Cold Leg Recirculation Time RO BOP SRO Applicant's Actions or Behavior A) Ensure CS HX 1 AND 2 OUT VLVs closed, and handswitches in PULL-OUT:

1-HS-4776 1-HS-4777 B) Perform steps C) and D) simultaneously.

C) Open CS HS 1 AND 2 OUT VLVS:

1-HS-4776 1-HS-4777 D) WHEN CS HX OUT VLVs begin to open, THEN start CS PUMPS:

1-HS-4764 AND 1-HS-4765 1-HS-4766 AND 1-HS-4767

4) Verify containment spray flow.

The scenario may be terminated at the discretion of the Lead Examiner.

  • BOLD INDICATES CRITICAL STEP

SHIFT TURNOVER INFORMATION 1.0 INITIAL CONDTIONS:

Time in Core Life: BOL Tavg: 572.6oF Reactor Power: 40%

RCS Pressure: 2251 psig Turbine Load: 425 Mwe Xenon: Equil Boron Concentration: 2251 ppm Rod Control: MAN Rod Height: CB D @ 189 steps 2.0 LCOAR/TECHNICAL SPECIFICATION ACTIONS IN EFFECT:

3.0 CLEARANCES IN EFFECT:

TS#

Description Reason 3.7.5 AFW AFW Pump 1-01 OOS for Oil Sample 3.0 CLEARANCES IN EFFECT:

4.0 SAFETY SYSTEM SETTING BYPASS/MALFUNCTIONS None 5.0 DEGRADED EQUIPMENT 6.0 PLANNED EVOLUTIONS:

Return AFW Pump 1-01 to service when the oil sample is complete.

7.0 TURNOVER INFORMATION:

Unit 1 is at 40% power and increasing per IPO-003A, step 5.4.19. Shift orders are to increase reactor power during the shift. The A MDAFWP is OOS due to contamination in the oil. Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. The expectation is that the ALERT will last until midnight. There are no surveillances planned for this shift.

Revision 0 Appendix D Scenario Outline Form ES-D-1 Facility:

CPSES Scenario No.:

3 Op-Test No.:

1 Examiners:

Operators:

Note:

(NEW)

Initial Conditions:

BOL, 100% power Eq Xenon. The A MDAFWP is OOS for oil contamination. ( 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> into LCO)

IC-15, REMF FWR20 in Rackout with H/S in P.O and Red Tagged.

Turnover:

Unit 1 and Unit 2 are at 100% power. U1 has been at 100% for the last 15 days following refueling. The A MDAFWP is OOS due to contamination in the oil.

Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. There are no surveillances planned for this shift and the orders are to maintain current load and unit availability.

Event No.

Malf. No.

Event Type*

Event Description 1

T=0 SG01C

@ 8 gpm C (SRO)

C (RO)

SGTL on #3 Steam Generator 2

T= 7 RP06D@

150%

I (SRO)

I (RO)

Loop 4 N-16 Instrument fails high.

3 T=7 RD08 C (SRO)

C (RO)

Rods move in the opposite direction (Auto only) 4 T=20 N (SRO)

R (RO)

N (BOP)

Plant Shutdown Required by Steam Generator Tube Leak >

150 gpd. (May be directed by Duty Manager) 5 T=34 RD13B8

@ 6 RD03F8 C (SRO)

C (RO)

Two rods misaligned by more than 12 steps (Manual Rx trip required). CBC Rod B8 slips to 6 steps and CBA rod F-8 drops to the bottom.

6 T=38 SG01C 675gpm M (ALL)

SGTL increases to SGTR at 675 gpm 7

T=38 RP09A &

B C (SRO)

C (BOP)

Phase A fails to actuate on SIS 8

T=46*

MS13C

@ 100%

I (SRO)

I (BOP)

The ARV on the ruptured SG fails open due to Main Steam line pressure xmtr failure. May be manually closed.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Revision 0 Appendix D Narrative Description Op-Test No:

1 Scenario No:

3 Event No:

Page 2

of 19 The objective of this scenario is to evaluate the operators ability to change Reactor power in a controlled manner, respond to various instrument and component failures, and to carry out the requisite emergency procedures to mitigate the consequences of a Steam Generator Tube Rupture Accident.

Event One.

The 1-03 Steam Generator develops a tube leak at 8 gpm. This small leak will not be able to be diagnosed by comparing steam flow and feed flow for a mismatch. Operator feedback for the SGTL will be the Radiation Monitoring system and further investigation by the crew will reveal a small mismatch between charging flow and letdown flows that is larger than usual. The first indication will be a Radiation Monitor alarm from the Main Steam line N-16 monitors. Subsequent to the N-16 alarms, the Condenser Off Gas monitor will alarm followed by the less sensitive MSL radiation monitors. It is expected that the operators will:

Respond to the Radiation Monitor alarms Determine the SG 1-03 has a tube leak Refer to the correct ABN procedure Evaluate plant conditions and determine that conditions require a plant shutdown to less than 50% in one hour and Mode 3 in two hours Make the necessary notifications and refer to Technical Specifications.

NOTE: The SRO will find that two ABN procedures apply. ABN-106, High Secondary Activity and ABN-103, Excessive RCS Leakage are both applicable to this event. ABN-106 is constructed to evaluate SGTL size and then directs the crew to take actions based on leak size. ABN-103 is a diagnostic tool used to locate and isolate the leak. ABN-106 will not DIRECT the operator to ABN-103 because the leak is < 15gpm. It is expected that the crew will recognize the leak is in a steam generator and cannot be isolated, determine the need to shutdown the plant and proceed to IPO-003A for guidance to shutdown the plant.

Event Two and Three.

Prior to the crew commencing a plant shutdown, the Loop 4 N-16 Reactor Protection channel fails high.

This failure will cause the Control Banks for the Rod Control System to demand an inward sequence.

This failure is further compounded by a problem in the Rod Control system that causes the rods to move out when inward direction is required. Operator feedback for these events will be various alarms generated by the N-16 failure, turbine load and reactor stable, and rods moving in the outward direction with power matched and no significant RCS temperature indication. It is expected that the operators will:

Evaluate plant conditions and determine that Rod Motion is not warranted.

Determine that Rod Control has malfunctioned and that rods are moving in the WRONG direction Place Rod Control in MANUAL Refer to the correct ABN procedure Select out the failed channel Make the necessary notifications and refer to Technical Specifications.

Determine that Rod Control should remain in MANUAL.

NOTE: Rod Control will remain in Manual for the rest of the scenario. It is not expected that the Operators will initiate a Reactor Trip for these events. For the case of an unexpected RX trip, the scenario has been evaluated against the requirement and still exceeds minimum requirements if the next event is NOT completed,(misaligned rods) but may need to be evaluated to ensure Normal and Reactivity requirements for the candidates are met with respect to the plant shutdown.

Revision 0 Appendix D Narrative Description Op-Test No:

1 Scenario No:

3 Event No:

Page 3

of 19 Event Four.

The SGTL requires a forced down power maneuver to meet management expectations and license requirements. In order to preclude unnecessary delay while the SRO communicates with plant management about plant conditions and make recommendations, the lead evaluator may direct the staff to act as SM and instruct the SRO to commence an immediate plant shutdown. Operator feedback for the need to shutdown the plant will be ABN procedure requirements, Technical Specification LCOs, or plant management direction. It is expected that the crew will:

Refer to the appropriate plant procedure Complete a reactivity brief.

Commence boration and reduce power using the Turbine Digital Control System Event Five When power has been reduced enough to meet the requirements of NUREG 1021 and at the lead examiners discretion, a continuation of the previous problem with Rod Control will be encountered. One Control Rod, CBA, Rod F-8, drops to the bottom and Control Rod CBC, Rod B8 slips to 6 steps.

Feedback to the operators for this event will be alarms that indicate rods are misaligned by more than 12 steps and one control rod is at the bottom of the core. It is expected that the operators will:

Evaluate plant conditions and determine that more than one control rod is misaligned by more than 12 steps Recognize that ABN procedures require a Manual Reactor Trip or enter the correct ABN and comply with direction to trip the reactor.

Manually trip the reactor Enter the appropriate Emergency Procedure Complete the required Immediate Actions from memory.

Determine that Safety Injection is NOT required.

Transition to the appropriate Optimal Recovery procedure.

Event Six and Seven.

Shortly after the reactor trip, due to stresses caused by the trip, the tube that started to leak finally severs completely. The failure results in a Steam Generator Tube Rupture event at 675 gpm. Concurrent with the SGTR, both trains of Containment Isolation Phase A system fail to respond in auto. Manual operation is available and it is expected that the operator manually initiate the Phase A using the manual handswitches. Operator feedback for this event is rapidly decreasing pressurizer pressure and level, and increasing level in SG 1-03. The Phase A failure will be evidenced by numerous components indicated on the Monitor Light Boxes not being in the positions called for in Attachment 2 of EOP-0.0A. It is expected that the operators will:

Evaluate pressurizer and SG parameters and determine the need for Safety Injection or respond to the automatic SI Refer to correct Emergency procedure Complete Immediate Operator actions from memory Verify automatic actions have occurred.

Take actions to compensate for lack of automatic actions if required.

Diagnose Plant conditions and transition to the correct Optimal Recovery Procedure Identify the ruptured Steam Generator Isolate the ruptured Steam Generator Cool down and depressurize the RCS to minimize RCS leakage.

Revision 0 Appendix D Narrative Description Op-Test No:

1 Scenario No:

3 Event No:

Page 4

of 19 Event Eight.

After the SGTR has been diagnosed, and at the Lead Examiners discretion, the Main Steam Line pressure transmitter for the Ruptured Steam Generator fails high. This will cause the ARV to go fully open. The valve will go open regardless of whether or not the operator has adjusted the setpoint to 1160 psig as required by EOP-3.0A. Operator feedback will be decreasing pressure in the ruptured steam generator, valve position indicating lights on the MCB, and RCS temperature decrease. It is expected that the operators will:

Evaluate plant conditions and determine that an uncontrolled RCS cooldown is in progress.

Recognize that SG 1-03 pressure is not high enough for the ARV to be fully open.

Recognize that the ruptured SG is no longer ISOLATED.

Take manual control of the ARV and close it.

Make the necessary notifications NOTE: The Lead Evaluator should carefully consider when to insert the ARV malfunction. If it is entered after the operator controlled cool down has been started, an important aspect of the feedback consideration will be lost.

NOTE: The CPSES PRA Assessment Summary document contains the following paragraph:

A SGTR event represents a unique challenge to the RCS safety systems. The SGTR combines a very small LOCA and an interfacing system LOCA. A rupture of the SG tubes results in leakage fro the RCS to the secondary-side which allows RCS inventory to bypass the containment. Thus, SGTR are important to both the CDF and LERF considerations. The operator must reduce RCS pressure and isolate the affected steam generator in order to re-establish adequate RCS integrity. One difference between the SGTR and the very small LOCA is that any water lost through the break to the SG will be lost from the containment and will become unavailable for recirculation. Therefore, it is important that the leakage from the RCS be minimized as soon as possible to preclude long term inventory problems. The loss of a steam generator reduces the number of steam generators available for decay heat removal and can lead to a loss of the auxiliary feedwater steam driven pump if the faulted steam generator is not isolated from the steam supply line.

The scenario may be terminated when the RCS has been cooled down and depressurized to less than ruptured SG pressure or at the discretion of the Lead Evaluator.

Recommended Critical Tasks Fails to identify and isolate the ruptured Steam Generator when required by plant conditions.

Fails to manually initiate Phase A when required by plant conditions.

Fails to manually close the failed open ARV on the ruptured Steam Generator.

Revision 0 Appendix D Operator Actions Op-Test No:

1 Scenario No:

3 Event No:

1 Page 5

of 19 Event

Description:

Steam Generator Tube Leak on #3 SG Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms

a. Annunciator Alarms None
b. Plant Indications An abnormal increase in steam generator specific activity as reported by Chemistry.

An abnormal increase in steam generator sampling radiation as indicated by u-RE-4200 (SGS-u64).

An abnormal increase in condenser off-gas radiation as indicated by u-RE-2959(COG-u82).

An abnormal increase in main steamline leak rate as indicated on u-RE-2325A (N16-u74), u-RE-2326A (N16-u75), u-RE-2327A (N16-u76), and u-RE-2328A (N16-u77). Computer points R7749A(R7753A) thru R7752A(R7756A).

2.2 Automatic Actions Steam Generator Blowdown will isolate on high radiation as indicated on u-RE-4200 (SGS-u64).

u-HS-2397, SG 1 BLDN ISOL VLV u-HS-2398, SG 2 BLDN ISOL VLV u-HS-2399, SG 3 BLDN ISOL VLV u-HS-2400, SG 4 BLDN ISOL VLV 2.3 Operator Actions Step 1. Verify main steamline radiation alarms - CLEAR u-RE-2325 (MSL-u78) u-RE-2326 (MSL-u79) u-RE-2327 (MSL-u80) u-RE-2328 (MSL-u81)

NOTE: u-RE-2327 (MSL-u80) will be in alarm on the PC-11 Step 1 RNO. Go to Section 3 of this procedure.

Section 3 Step 1. Verify main steamline radiation alarms - CLEAR u-RE-2325 (MSL-u78) u-RE-2326 (MSL-u79) u-RE-2327 (MSL-u80) u-RE-2328 (MSL-u81)

Step 1 RNO.

a. Reduce power to 50% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Be in MODE 3 in the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
b. GO TO Step 5.
  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

3 Event No:

1 Page 6

of 19 Event

Description:

Steam Generator Tube Leak on #3 SG Time RO BOP SRO Applicant's Actions or Behavior Step 5 Check plant conditions:

a. Turbine-Generator load - STEADY AT DESIRED POWER
b. Verify charging flow within 15 gpm of letdown flow AND both flows STABLE u-FI-121A, CHRG FLO u-FI-132, LTDN FLO
c. Verify PRZR level - STABLE OR TRENDING TO NORMAL LEVEL u-LI-459A, PRZR LVL CHAN I u-LI-461, PRZR LVL CHAN III u-LI-460A, PRZR LVL CHAN II Step 6. Adjust affected Steam Generator Atmospheric Relief Controller setpoint to 1160 PSIG per TDM-501A/B.

Step 7. Verify affected Steam Generator - NOT SG #1 or SG #4 Step 8. Isolate Auxiliary Steam supplied from the affected unit by closing the applicable valves:

NOTE: The US will call the PEO to isolate the appropriate valves.

Step 9 Verify NO significant increase exists, as indicated on PC-11, from system(s) drains that discharge to the LVW:

u-RE-4200, (SGS-u64) BLOWDOWN SMPL u-RE-2959, (COG-u82) CONDENSER OFF GAS u-RE-2325, (MSL-u78) MAIN STEAM LINE #1 u-RE-2326, (MSL-u79) MAIN STEAM LINE #2 u-RE-2327, (MSL-u80) MAIN STEAM LINE #3 u-RE-2328, (MSL-u81) MAIN STEAM LINE #4 u-RE-2325A, (N16-u74) MAIN STEAM LINE #1 LEAK RATE u-RE-2326A, (N16-u75) MAIN STEAM LINE #2 LEAK RATE u-RE-2327A, (N16-u76) MAIN STEAM LINE #3 LEAK RATE u-RE-2328A, (N16-u77) MAIN STEAM LINE #4 LEAK RATE Step 10 Monitor position of Steam Generator Atmospheric Relief AND Safety Valves during performance of this procedure:

a. Verify relief AND safety valves remain - CLOSED
  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

3 Event No: 2 & 3 Page 7

of 19 Event

Description:

Loop 4 N-16 Instrument Fails High and Rods move the wrong way Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms

a. Annunciator Alarms ANY N16 DEV HI/LO (5C-1.5) 1 of 4 OT N16 HI (5C-2.5)

ANY Tave DEV HI/LO (5C-3.5) 1 of 4 OP N16 HI (5C-2.6)

AVE Tave-Tref DEV (6D-1.10)

AVE Tave HI (6D-2.10) 1 of 4 Tave LO-LO (6D-3.10)

Tref-AUCT LO TAVE MISMATCH (6D-3.13)

AUCT TAVE LO (6D-4.13) 1 of 4 OT N16 ROD STOP & TURB RUNBACK (6D-3.14) 1 of 4 OP N16 ROD STOP & TURB RUNBACK (6D-2.13)

b. Plant Indications:
3) One N-16 channel higher or lower than the other three.

u-JI-411A/B, RC LOOP 1 N16 PWR CHAN I u-JI-421A/B, RC LOOP 2 N16 PWR CHAN II u-JI-431A/B, RC LOOP 3 N16 PWR CHAN III u-JI-441A/B, RC LOOP 4 N16 PWR CHAN IV 2.2 Automatic Actions

a. Any failure that results in an increased Loop Tave will cause Average Tave to be higher with the following actions:

Rapid control rod insertion due to Tave-Tref mismatch if in AUTO.

Steam dumps will open if armed with a C-7 (loss of load).

Pressurizer reference level increase (to a maximum of 60%) with charging flow increase when in auto.

NOTE: This should alert the crew that rods moving OUT is a malfunction and action should be taken.

NOTE:

Rod Control should remain in MANUAL until all channels are operable. This does not preclude placing rods in AUTO during rapidly changing transient conditions such as runbacks, etc. as long as rod control is returned to MANUAL when the plant is stabilized.

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

3 Event No: 2 & 3 Page 8

of 19 Event

Description:

Loop 4 N-16 Instrument Fails High and Rods move the wrong way Time RO BOP SRO Applicant's Actions or Behavior Step 1 Place Control Rods in - MANUAL NOTE: The RO should recognize that rods moved the wrong way, report this to the US, and recommend driving rods IN to match Tave to Tref.

Step 2 Select the failed channel on:

u-TS-412T, Tave CHAN DEFEAT Step 3 Verify Steam Dump System:

NOT actuated NOT armed.

Step 4 Restore Tave to within 1°F of Tref.

Step 5 Select the failed channel on:

1/u-JS-411E, N16 PWR CHAN DEFEAT Step 6 Ensure a valid N16 channel is supplying the recorder:

1/u-TS-411E, u-TR-411 CHAN SELECT Step 7 Verify Steam Dumps not armed by observing the following light DARK:

TURB LOAD REJ STM DMP ARMED C-7 (PCIP - 3.4)

Step 8 IF Steam Dumps were blocked in Step 2, THEN restore to service by returning following switches to ON:

43/u-SDA, STM DMP INTLK SELECT 43/u-SDB, STM DMP INTLK SELECT Step 9 Within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, have I&C place bistable test switches for failed channel in CLOSED position per Attachments 1 and 2.

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

3 Event No: 2 & 3 Page 9

of 19 Event

Description:

Loop 4 N-16 Instrument Fails High and Rods move the wrong way Time RO BOP SRO Applicant's Actions or Behavior Step 10 Verify appropriate alarms and trip status lights ON per Attachment 3 AND note verification in Unit Log.

Step 11 Refer to Technical Specifications listed in Section 3.1 of this procedure to determine applicable LCOAR conditions.

3.1 Technical Specifications/Requirements 3.3.1, Reactor Trip System (RTS) Instrumentation 13.1.38, Control Bank Insertion Limits

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

3 Event No:

4 Page 10 of 19 Event

Description:

Power Reduction Time RO BOP SRO Applicant's Actions or Behavior Review IPO-003A, Power Operations Notifies Generation Controller prior to reducing load.

Notifies Chemistry and Radiation Protection if power reduction will be > 15%

in one hour Notifies Reactor Engineering of power reduction > 25%.

Calculates the amount of boration required Calculates the rate of boration Reviews AFD guidance Initiates boration Sets in the desired unloading rate and amount using the Digital Control System Maintains AFD in the target band Maintains rods above the Rod Insertion Limit Maintains Tave with 1 degree of Tref

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

3 Event No:

5 Page 11 of 19 Event

Description:

Two dropped rods (Manual Reactor Trip Required)

Time RO BOP SRO Applicant's Actions or Behavior 3.1 Symptoms

a. Annunciator Alarms PR CHAN DEV (6D-3.4)

DRPI ROD DEV (6D-3.5)

ANY ROD AT BOT (6D-3.7)

> 2 ROD AT BOT (6D-4.7)

QUADRANT PWR TILT (6D-4.10)

b. Plant Indications Plant parameters changing abnormally during rod position changes NIS Power Range instruments power or AFD indications disagree DRPI Rod Bottom Light(s) lit for rods which should be withdrawn DRPIs in a bank disagree by greater than 12 steps DRPI disagrees with its group step counter by greater than 12 steps 3.2 Automatic Actions Possible Reactor trip Automatic control rod motion Ensure 1/u-RBSS, CONTROL ROD BANK SELECT - NOT IN AUTO.

2 Check Reactor - CRITICAL.

Verify Number of Rods Misaligned from Step Counter by >12 steps - < ONE Step 3 RNO:

a) IF two or more rods dropped, THEN trip Reactor AND GO TO EOP-0.0A/B.

b) Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> verify SDM OR initiate boration to restore SDM.

c) Within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> place unit in HOT STANDBY per IPO-003A/B (TS 3.1.4).

NOTE: Crew should trip the Reactor and go to EOP-0.0A

  • BOLD INDICATES CRITICAL STEP Revision 0

Appendix D Op-Test No:

1 Scenario No:

3 Event No:

5 Page 12 of 19 Event

Description:

Two dropped rods (Manual Reactor Trip Required) EOP-0.0A Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms

a. Annunciators Alarm MAN RX TRIP (6C-1.1)

Plant Indications Various First Out Annunciator alarms and changing plant conditions Automatic Actions Reactor Trip breakers open and the turbine trips Orders a reactor trip and enters EOP-0.0A.

Step 1. Verify Reactor Trip

a. Verify the following:

Reactor Trip and bypass breakers-OPEN, AND Neutron Flux-DECREASING

b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
a. AC safeguards busses - AT LEAST ONE ENERGIXED AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
b. AC safeguards busses - BOTH ENERGIZED Step 4. Check SI Status:
a. Check If SI is Actuated:

SI actuation as indicated on the First Out Ann 1-ALB-6C SI Actuated blue status light - ON

b. Verify Both Trains DI Actuated:

SI Actuated blue status light - ON NOT FLASHING Step 4, RNO. IF SI is NOT required, THEN go to EOS-0.1 A, REACTOR TRIP RESPONSE

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Op-Test No:

1 Scenario No:

3 Event No:

5 Page 13 of 19 Event

Description:

EOS-0.1 A, REACTOR TRIP RESPONSE Time RO BOP SRO Applicant's Actions or Behavior Transitions to EOS-0.1A, Reactor Trip Response Step 1. Check RCS Average Temperature - STABLE AT OR TRENDING TO 557° F.

Step 2. Check FW Status:

a. Verify reactor trip and bypass breaker - OPEN
b. Check RCS average temperatures - LESS THAN 564° F.
c. Verify Feedwater Isolation - ISOLATION COMPLETE
d. Verify total AFW to SGs - GREATER THAN 460 GPM.

Step 3. Check PRZR Level Control:

a. Level - GREATER THAN 17%
b. Verify charging - IN SERVICE
c. Verify letdown - IN SERVICE
d. Level - TRENDING TO 25%

Step 4. Check PRZR Pressure Control:

a. Pressure - GREATER THAN 1820 PSIG
b. Pressure - STABLE AT OR TRENDING TO 2235 Step 5. Check SG Levels:
a. Narrow Range Level - GREATER THAN 5%
b. Control Feed flow to maintain narrow range level between 5% and 50%.

NOTE: 4 minutes after the manual RX Trip, the SGTR becomes active at 675 GPM. If not done automatically, the crew should Initiate a Safety Injection and transition to EOP-0.0A, step 1.

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Operator Actions Op-Test No:

1 Scenario No:

3 Event No: 6 & 7 Page 14 of 19 Event

Description:

SGTR with failure of Phase A to auto actuate Time RO BOP SRO Applicant's Actions or Behavior 2.1 Symptoms

a. Annunciators Alarm PRZR PRESS LO SI ACT (6C-2.7)

Plant Indications Various First Out Annunciator alarms and changing plant conditions Automatic Actions Safety Injection and ECCS actuations Step 1. Verify Reactor Trip

a. Verify the following:

Reactor Trip and bypass breakers-OPEN, AND Neutron Flux-DECREASING

b. All control position rod bottom lights-ON Step 2. Verify Turbine Trip:
a. All turbine stop valves - CLOSED Step 3. Verify Power to AC Safeguards Busses:
a. AC safeguards busses - AT LEAST ONE ENERGIXED AC safeguards bus voltage _ 6900 Volts (6500-7100 volts)
b. AC safeguards busses - BOTH ENERGIZED Step 4. Check SI Status:
a. Check If SI is Actuated:

SI actuation as indicated on the First Out Ann 1-ALB-6C SI Actuated blue status light - ON

b. Verify Both Trains SI Actuated:

SI Actuated blue status light - ON NOT FLASHING

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Operator Actions Op-Test No:

1 Scenario No:

3 Event No: 6 & 7 Page 15 of 19 Event

Description:

SGTR with failure of Phase A to auto actuate Time RO BOP SRO Applicant's Actions or Behavior Step 5. Ensure Proper Safeguards Equipment Operation Per.

NOTE: It is expected that the failure of Phase A to actuate will be noted and a manual Phase A initiated while Attachment 2 is being performed.

Step 6. Verify AFW Alignment

a. MDAFWP - RUNNING
b. Turbine Driven AFW Pump - RUNNING IF NECESSARY
c. AFW total flow - GREATER THAN 460 GPM
d. AFW Valves alignment - PROPER ALIGNMENT Step 7. Verify Containment Spray Not Required :
1) a. Containment Pressure - HAS REMAINED LESS THAN 18 PSIG Step 8. Check if Main Steamlines should be Isolated:
a. verify the following:

Containment Pressure - GREATER THAN 6 PSIG (YES)

b. Verify main steam isolation complete.

Step 9. Check RCS Average Temperatue - STABLE AT OR TRENDING TO 557°F.

Step 9 RNO. Throttle AFW and stop dumping steam.

Step 10. Check PRZR Valve Status:

a. PRZR Safeties - CLOSED
b. Normal PRZR Spray valves - CLOSED
c. PORVs - CLOSED
d. Power to at least one block valve - AVAILABLE
e. Block valves - AT LEAST ONE OPEN
  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Operator Actions Op-Test No:

1 Scenario No:

3 Event No: 6 & 7 Page 16 of 19 Event

Description:

SGTR with failure of Phase A to auto actuate Time RO BOP SRO Applicant's Actions or Behavior Step 11. Check if RCPs should be stopped:

a. ECCS pumps - AT LEAST ONE RUNNING CCP

-OR-SI pump

b. RCS subcooling - LESS THAN 25° F (55° F FOR ADVERSE CONTAINMENT)
c. Stop all RCPs.

Step 12. Check if any SG is Faulted:

a. Check pressures in all SGs:

ANY SG DECREASING IN AN UNCONTROLLED MANNER

-OR-ANY SG COMPLETELY DEPRESSURIZED Step a RNO, Go to Step 13.

b. Go to EOP-2.0A, FAULTED STEAM GENERATOR ISOLATION, Step 1.

Step 13.Check if SG Tubes Are Not Ruptured:

Condenser off gas radiation - NORMAL (COG-182, 1RE-2959)

Main steamline radiation - NORMAL (MSL-178-181, 1RE-2325 -

2328)

SG blowdown and sample radiation monitor - NORMAL (SGS-164, 1RE-4200)

No Steam Generator level increasing in an uncontrolled manner Note: Steam Generator #3 is ruptured at 675 GPM. The crew should transistion to EOP-3.0A, Steam Generator Tube Rupture

  • BOLD INDICATES CRITICAL STEP Revision 0

Appendix D Operator Actions Op-Test No:

1 Scenario No:

3 Event No: 6 & 7 Page 17 of 19 Event

Description:

SGTR EOP-3.0A Steam Generator Tube Rupture Time RO BOP SRO Applicant's Actions or Behavior Step 1. Check if RCPs should be stopped:

a. ECCS pumps - AT LEAST ONE RUNNING CCP

-OR-SI pump

b. RCS subcooling - LESS THAN 25° F (55° F FOR ADVERSE CONTAINMENT)
c. Stop all RCPs.

Step 2. Identify Ruptured SG (s):

Unexpected increase in any SG narrow range level

-OR-High Radiation form any SG blowdown sample line (SGS-164, 1 RE-4200)

-OR-High Radiaiton from any Main steamline. (MSL-178-181, 1 RE-2325-2328)

Step 3 Isolate Flow From Ruptured SG(s):

a. Adjust ruptured SG(s) atmospheric controller setpoint to 1160 PSIG.
b. Check ruptured SG(s) atmospheric - CLOSED
c. Close ruptured SG(s) main steamline isolation and ensure bypass valve closed.
d. Pull-Out steam supply valve handswitch from ruptured SG(s) to Turbine Driven AFW pump.
e. Close ruptured SG drippot isolation valve.
f. Verfy blowdown isolation valves from ruptured SG(s) - CLOSED Step 4 Check Ruptured SG(s) Level:
a. Narrow range level - GREATER THAN 5% (26% FOR ADVERSE CONTAINMENT)
b. Stop AFW flow to ruptured SG(s).

Notes that the #3 ARV is open. Verify the SG pressure is less than 1160, places the controller in manual, and closes the ARV.

  • BOLD INDICATES CRITICAL STEP

Revision 0 Appendix D Operator Actions Op-Test No:

1 Scenario No:

3 Event No: 6 & 7 Page 18 of 19 Event

Description:

Time RO BOP SRO Applicant's Actions or Behavior Step 5 Check Ruptured SG(s) Pressure - GREATER THAN 420 PSIG.

Step 6 Initiate RCS Cooldown:

a. When PRZR pressure decreases to less than 1960 psig, block the low steamline pressure SI signal.
b. Determine required core exit temperature from Table 1.

NOTE: It is probable that the temperature selected from the Table will be 485°F.

c. Dump steam to condenser from intact SG(s) at maximum rate and avoid main steam isolation.
1) Transfer Steam Dump to steam pressure mode.
2) Place the steam pressure controller in manual increase demand.
3) When P-12 (553°F TAVG is reached, select bypass interlock on Steam Dumps and continue cooldown.
d. Core exit TCs - LESS THAN REQUIRED TEMPERATURE Step 6d RNO Continue with step 7. WHEN core exit TCs less than required temperature, THEN do step 6e and 6f.

Step 7. Check Intact SG Levels:

a. Narrow Range Level - GREATER THAN 5%(26% FOR ADVERSE CONTAINMENT)
b. Control Feed flow to maintain narrow range level between 5% and 50%.

Step 8. Check PRZR PORVs and Block Valves:

a. Power to block valves - AVAILABLE
b. PORVs - CLOSED
c. Block valves - AT LEAST ONE OPEN Step 9. IF the Diesels Are Running, THEN Place Bothe DG EMER STOP/START Handswitches in START.

Step 10. Reset SI.

Step 11. Reset SI sequencers.

Step 12. Reset Containment Isolation Phase A and B.

Step 13. Reset Containment Spray Signal.

  • BOLD INDICATES CRITICAL STEP Revision 0 Appendix D Operator Actions Op-Test No:

1 Scenario No:

3 Event No: 6 & 7 Page 19 of 19 Event

Description:

Time RO BOP SRO Applicant's Actions or Behavior Step 14. Establish Instrument Air And Nitrogen to Containment.

a. Establish instrument air:
1) Verify air compressor running and establish instrument air to containment.
b. Establish nitrogen
1) Verify ACCUM 1-4 VENT CTRL, 1-HC-943 - CLOSED
2) Open SI/PORV ACCUM N2 ISOL VLV, 1/1-8880.

Step 15. Check if RHR Pumps Should be Stopped:

a. RCS pressure - GREATER THAN 325 PSIG (425 PSIG FOR ADVERSE CONTAINMENT)
b. Stop RHR Pumps and place in standby
c. Reset RHR auto switchover.

Step 16. Check If RCS Cooldwon Should Be Stopped:

a. Core exit TCs - LESS THAN REQUIRED TEMPERATURE
b. Verify Steps 6 e and 6 f are complete.

Step 17. Check Ruptured SG(s) Pressure - STABLE OR INCREASING Step 18. Check RCS subcooling - GREATER THAN 45°F (75°F FOR ADVERSE CONTAINMENT)

Step 19. Depressurize the RCS to Minimize Break Flow and Refill PRZR:

a. Normal Spray - AVAILABLE
b. Place all PRZR heater switches in OFF position.
c. Spary PRZR with maximum available spray until ANY of the the following conditions satisfied:
1) RCS pressure - LESS THAN RUPTURED SG(s)

PRESSURE

2) PRZR level - GREATER THAN 6% (34% FOR ADVERSE CONTAINMENT

-OR-PRZR level GREATER THAN 74% (65% FOR ADVERSE CONTAINMENT)

-OR-RCS subcooling - At 25°F (55°F FOR ADVERSE CONTAINMENT)

The scenario may be terminated at the discretion of the lead examiner.

  • BOLD INDICATES CRITICAL STEP SHIFT TURNOVER INFORMATION 1.0 INITIAL CONDTIONS:

Time in Core Life: BOL Tavg: 589oF Reactor Power: 100%

RCS Pressure: 2235 psig Turbine Load:1200 Mwe Xenon: Equil Boron Concentration:1263 ppm Rod Control: AUTO Rod Height: CB D @ 215steps 2.0 LCOAR/TECHNICAL SPECIFICATION ACTIONS IN EFFECT:

TS#

Description Reason 3.7.5 AFW AFW Pump 1-01 OOS for Oil Sample 3.0 CLEARANCES IN EFFECT:

AFW Pump 1-01 OOS for Oil Sample 4.0 SAFETY SYSTEM SETTING BYPASS/MALFUNCTIONS None 5.0 DEGRADED EQUIPMENT 6.0 PLANNED EVOLUTIONS:

Return AFW Pump 1-01 to service when the oil sample is complete.

7.0 TURNOVER INFORMATION:

Unit 1 and Unit 2 are at 100% power. U1 has been at 100% for the last 15 days following refueling. The A MDAFWP is OOS due to contamination in the oil.

Maintenance is in the process of changing the oil and the pump should be ready for test in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The Generation Controller has declared an ALERT due to the loss of several peaking plants and all of the Big Brown units due to a common mode failure. There are no surveillances planned for this shift and the orders are to maintain current load and unit availability.