IR 05000261/2015007: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML15362A551 | | number = ML15362A551 | ||
| issue date = 12/28/2015 | | issue date = 12/28/2015 | ||
| title = | | title = IR 05000261/2015007, October 26, 2015 Through November 19, 2015, H.B. Robinson Steam Electric Plant - NRC Evaluation Of Changes, Tests, And Experiments And Permanent Plant Modifications | ||
| author name = Bartley J H | | author name = Bartley J H | ||
| author affiliation = NRC/RGN-II/DRS/EB1 | | author affiliation = NRC/RGN-II/DRS/EB1 | ||
Revision as of 08:37, 13 February 2018
| ML15362A551 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 12/28/2015 |
| From: | Bartley J H NRC/RGN-II/DRS/EB1 |
| To: | Glover R M Duke Energy Corp |
| References | |
| IR 2015007 | |
| Download: ML15362A551 (11) | |
Text
December 28, 2015
Mr. Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, South Carolina 29550
SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NRC EVALUATION OF CHANGES, TESTS, AND EXPERIMENTS AND PERMANENT PLANT MODIFICATIONS INSPECTION REPORT 05000261/2015007
Dear Mr. Glover:
On November 19, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your H. B. Robinson Steam Electric Plant, Unit 2. On November 19, 2015, the NRC inspectors discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.
The NRC inspectors did not identify any findings or violations of more than minor significance.
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice", a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/ Jonathan H. Bartley, Chief Engineering Branch 1 Division of Reactor Safety Docket No.: 50-261 License No.: DPR-23
Enclosure:
Inspection Report 05000261/2015007
w/Attachment:
Supplemental Information
cc Distribution via Listserv December 28, 2015 Mr. Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, South Carolina 29550
SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NRC EVALUATION OF CHANGES, TESTS, AND EXPERIMENTS AND PERMANENT PLANT MODIFICATIONS INSPECTION REPORT 05000261/2015007 Dear M
SUMMARY
IR 05000261/2015007, October 26, 2015, through November 19, 2015; Duke Energy Progress,
Inc., H.B. Robinson Steam Electric Plant, Unit 2; NRC Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications.
This report covers a two-week, on-site inspection by two regional inspectors and one resident inspector. No findings or violations were identified. The Nuclear Regulatory Commission's (NRC's) program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 5, dated February 2014.
REPORT DETAILS
REACTOR SAFETY
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity
1R17 Evaluations of Changes, Tests Experiments, and Permanent Plant Modifications
a. Inspection Scope
Evaluations of Changes, Tests Experiments: The team reviewed eight safety evaluations performed pursuant to Title 10, Code of Federal Regulations (CFR) 50.59, "Changes, tests, and experiments," to determine if the evaluations were adequate and that prior NRC approval was obtained as appropriate. The team also reviewed 15 screenings where licensee personnel had determined that a 10 CFR 50.59 evaluation was not necessary. The team reviewed these documents to determine if:
- the changes, tests, or experiments performed were evaluated in accordance with 10 CFR 50.59 and that sufficient documentation existed to confirm that a license amendment was not required;
- the safety issues requiring the changes, tests or experiments were resolved;
- the licensee conclusions for evaluations of changes, tests, or experiments were correct and consistent with 10 CFR 50.59; and
- the design and licensing basis documentation used to support the change was updated to reflect the change. The team used, in part, Nuclear Energy Institute (NEI) 96-07, "Guidelines for 10 CFR 50.59 Implementation," Revision 1, to determine acceptability of the completed evaluations and screenings. The NEI document was endorsed by the NRC in Regulatory Guide 1.187, "Guidance for Implementation of 10 CFR 50.59, Changes, Tests, and Experiments," dated November 2000.
Permanent Plant Modifications: The team reviewed 10 permanent plant modifications that had been installed in the plant during the last three years. The modifications reviewed are listed below:
- DCHG 0000275044, EDG A Voltage Regulator Replacement child EC#1
- DCHG 0000277390, Replace TE-410, TE-420 & TE-430 Cold leg RTDs Revision 2: Revise Torque Values for the subject RTD PATEL Conduit Seal Assembly Interface Fitting
- DCHG 0000280186, Replace Existing A1 and B1 Battery Chargers child EC#1 to master EC 77389 Replace Battery Charger A1
- DCHG 0000280351, Relocate RPS System BFD/NBFD Relays, RF0-29 Modification child EC for Rack 61 Implementation (Master EC 68034)
- DCHG 0000284282, Replace RHR-744A AND RHR-744B Motors
- DCHG 0000291633, Diesel Fire Pump Engine Replacement
- DCHG 0000292104, NUS Replacement for Hagan Function Generators LTAM RNP-10-359 LRPF 428011
- DCHG 0000272331, Replace EDG FO Day Tank Solenoid Valves
- DCHG 0000279462, Replace CST Level Transmitter
- DCHG 0000300624, Replace Thermal Overloads for SI-864A The modifications were selected based upon risk significance, safety significance, and complexity. The team reviewed the modifications selected to determine if:
- the supporting design and licensing basis documentation was updated;
- the changes were in accordance with the specified design requirements;
- the procedures and training plans affected by the modification had been adequately updated;
- the test documentation as required by the applicable test programs had been updated; and
- post-modification testing adequately verified system operability and/or functionality. The team also used applicable industry standards to evaluate acceptability of the modifications and performed walkdowns of accessible portions of the modifications.
Documents reviewed are listed in the Attachment.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit On November 19, 2015, the team presented the inspection results to Mr. Glover and other members of the licensee's staff.
The team verified that no proprietary information was retained by the inspectors or documented in this report.
ATTACHMENT:
SUPPLEMENTARY INFORMATION
KEY POINTS OF CONTACT
Licensee personnel
- J. Brady, Regulatory Affairs
- G. Eakins, Major Projects Design Engineer
- S. Connelly, Licensing
- M. Glover, Site Vice President
- D. Hoffman, Nuclear Oversight Manager
- A. Helms, Principal Engineer
- D. Hunt, Engineer III
- R. Ludwick, Lead Engineer
- A. Mallner, Lead Engineer
- E. Saunders, Engineer II
- M. Watkins, Senior Engineer
- V. Balakhnin, Lead Engineer
- K. Brown, Contract Engineer
- D. Coon, Senior Engineer
- T. Halker, Senior Engineer
- L. Hall, Senior Nuclear Emergency Preparedness Specialist
- H. King, Engineer III
- T. Nance, Senior Engineer
NRC personnel
- K. Ellis, Senior Resident Inspector
- C. Scott, Resident Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
None
Closed
- None
Discussed
None
LIST OF DOCUMENTS REVIEWED
10
- CFR 50.59 Evaluations:
- REG-NGGC-0010, Attachment 11 - 10
- CFR 50.59 Evaluation,
- REG-NGGC-0010, Attachment 11 - 10
- CFR 50.59 Evaluation, DCHG
- 0000275690, Delete
- Steam Flow Feed Flow Mismatch into Rx Trip on low SG Level
- REG-NGGC-0010, Attachment 11 - 10
- CFR 50.59 Evaluation, DCHG
- 0000279037, Safe
- Shutdown Analysis Update for Appendix R Administrative Revision
- REG-NGGC-0010, Attachment 11 - 10
- CFR 50.59 Evaluation, DCHG
- 0000280767, Correct
- LOCA Containment Analysis Errors
- REG-NGGC-0010, Attachment 11 - 10
- CFR 50.59 Evaluation,
- Seals
- REG-NGGC-0010, Attachment 11 - 10
- CFR 50.59 Evaluation,
- EC 86806, Permanent Canal
- Seal Plate
- REG-NGGC-0010, Attachment 11 - 10
- CFR 50.59 Evaluation, DCHG
- 0000729915, Robinson
- Nuclear Plant Cycle 30 Reload
- REG-NGGC-0010, Attachment 11 - 10
- CFR 50.59 Evaluation, DCHG
- 0000280836, EQ
- Pressure Profile Update
- CFR 50.59 Screening:
- REG-NGGC-0010, Attachment 1 - Screen, DCHG
- 0000266508, Replace
- SST-2F AND
- SST-2G
- REG-NGGC-0010, Attachment 1 - Screen, DCHG
- 0000268034, Relocate RPS System
- BFD/NBFD Relays
- REG-NGGC-0010, Attachment 1 - Screen, DCHG
- 0000272478, Alternate Replacement of CC-
- REG-NGGC-0010, Attachment 1 - Screen, DCHG
- 0000272901, NUS Replacement for Hagan
- Controllers/M-A Stations Alternate Replacement EC
- REG-NGGC-0010, Attachment 1 - Screen, DCHG
- 0000276171, Provide Alt Level Control
- Transmitter for SG Level Control System
- REG-NGGC-0010, Attachment 1 - Screen, DCHG
- 0000277383, Containment Equipment Hatch
- Upgrade Project, LTAM
- RNP-11-0145
- REG-NGGC-0010, Attachment 1 - Screen, DCHG
- 0000278571, RCP Seal Injection Flow Indication in the Control Room, LTAM
- RNP-10-0319
- REG-NGGC-0010, Attachment 1 - Screen,
- REG-NGGC-0010, Attachment 1 - Screen, DCHG
- 0000284078, Replace ESF Timing Relays
- REG-NGGC-0010, Attachment 1 - Screen, DCHG
- 0000292547, Battery B Specification
- REG-NGGC-0010, Attachment 1 - Screen, DCHG
- 0000293383, Permanently Replace the
- DSDG Output Cable
- REG-NGGC-0010, Attachment 1 - Screen, DCHG
- REG-NGGC-0010, Attachment 1 - Screen, DCHG
- 0000285368, LTOP temperature alarm change
- REG-NGGC-0010, Attachment 1 - Screen, DCHG
- 0000274159, Cut and Cap SW Cooling Lines to FW penetrations
- REG-NGGC-0010, Attachment 1 - Screen, DCHG
- 0000284188, Switchyard and Electrical Bus Protection Upgrade Licensing Bases Documents Technical Specifications and Bases, Current Updated Final Safety Analysis, Current
Procedures
- AD-EG-ALL-1117, Design Analyses and Calculations, Revision 2
- AD-EG-ALL-1176, Preparation of Engineering Documents, Revision 0
- APP-036, Auxiliary Annunciator, Revision 89
- AOP-031, Robinson Plant Operating Manual Volume 3, Part 5, Abnormal Operating Procedure, Revision 15
- OST-603-1, Engine Driven Fire Pump Test, Revision 7
- FP-012, Fire Protection Systems Minimum Equipment and Compensatory Actions, Revision 19
Drawings
- B-190628 Sheet 120A, Control Wiring Diagram, Pressurizer Relief Valve
- PCV-455C, Revision 21
- B-190628 Sheet 120B, Control Wiring Diagram, Pressurizer Relief Valve
- PCV-455C,
- Revision 16 B-190628 Sheet 885, Control Wiring Diagram, Revision 4
- HBR2-8608, Hagan Wiring Diagram, RCS High Pressure Low Temp. Protection, Revision 19
- 5379-3482, CP&L Hagan Wiring Diagram, Revision 30
- 5379-3492, CP&L Hagan Wiring Diagram, Revision 13
- 5379-3506, CP&L Hagan Wiring Diagram, Revision 21 5379-3535, CP&L Hagan Wiring Diagram, Revision 20 342500M06BC01, Sheet 13 Page 1 of 2, Magnetic Technologies Corp. Dry Type Transformer,
- R1
- 2500M06BC01, Sheet 13 Page 2 of 2, Magnetic Technologies Corp. Dry Type Transformer,
- R0
- 06010786-LD-1, Nuclear Logistic Inc., Layout Drawing for Relay Mounting Plate (BF and BFD)
- Relays
Calculations
- RNP-E-8.016, Revision 9, Emergency Diesel Generator Static and Dynamic Analysis for
- H.B. Robinson Unit No.2
- RNP-E-7.002, Revision 12, Emergency Equipment Load Factor Study
- RNP-E-8.002, Revision 8A, AC Auxiliary Electrical Distribution System Voltage I Load Flow I
- Fault Current Study
- Revision 6
- RNP-E-8.042, Attachment E, Field Testing of Thermal Overload Relays, Revision 2
- Design Basis Documents DBD/R87038/SD05, Revision 9, Emergency Diesel Generator System
- DBD/R87038/SD16, Revision 3, Electrical Power Distribution System
- DBD/R87038/SD06, Revision 12, Reactor Safeguards and Protection System
- CRs (Condition Reports)
- NCR-749789, Valve
- SI-864A (RWST Discharge) failed to stroke
- NCR-704926, Administrative Error in Section 7.2.1.1.2 of UFSAR
- NCR 751728, Procedure Revision Issued Before EC Implementation
- NCR 751913,
- MM-432B Found Out of Tolerance
Miscellaneous Documents
- Field Testing of Thermal Relays, Westinghouse Electrical Corporation, Dated 4/23/80
- Type A Thermal Overload Relays Size 1 and 2, 2 Pole Non-Compensated or Ambient
- Compensated Westinghouse Corporation, Effective April 1969
- NEI 01-01, Guideline on Licensing Digital Upgrades, Charter 4, Licensing Process and 10 CFR
- 50.59, Revision 1
- Engineering Change
- 100624, Replace Thermal Overloads for
- SI-864A, R1
- Engineering Change 66508, Replace
- SST-2F and
- SST-2G, R12 Engineering Change 84282, Replace
- RHR-744A/B, R3
- NUS-A033SA, Equivalence Review of NUSI
- PID 801 Module, Revision 1
- QR-06010786-1, NLI, Qualification Report for BF & BFD Mounting Plate, Revision 4
- Corrective Action Program Documents generated as a result of the inspection
- CR 1967115 Reg
- AR 632591632591Did Not Include Justification for a Question
- CR 1970236
- EC 72901 Incorrectly Identifies Isolation of P-444 and P-501
- CR 1970394 50.59 Screen Lacks Detail (EC 284188)
- CR 1976126 EREG Assignment
- 623351-03 Completed Incorrectly
- CR 1976196 Calculation
- RNP-E-8.002 Error
- CR 1976210 CST
- LT-1454A label/insulation missed
- CR 1976328 Calibration Data Omitted from
- OST-646
- CR 1976410 Inconsistency Found in
- CR 1976549 50.59 Justification Left Blank (EC 288263)
- CR 1977140 Swap of Station Battery Chargers per
- CR 1977192 E-Bus Voltage Spikes above 506 VAC