ML20040H547: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML20040H547 | | number = ML20040H547 | ||
| issue date = 02/10/1982 | | issue date = 02/10/1982 | ||
| title = Responds to NRC | | title = Responds to NRC Re New Applications Survey.Util Currently Considering Purchase of Share of Vogtle Plant Under Const by Ga Power Co;However,Status of Acquisition Too Uncertain to Furnish Any Dates of Possible Involvement | ||
| author name = Lyles R | | author name = Lyles R | ||
| author affiliation = JACKSONVILLE ELECTRIC AUTHORITY | | author affiliation = JACKSONVILLE ELECTRIC AUTHORITY | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8202180373 | | document report number = NUDOCS 8202180373 | ||
| title reference date = 01-12-1982 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 1 | | page count = 1 | ||
| project = | |||
| stage = Other | |||
}} | }} | ||
| Line 18: | Line 21: | ||
{{#Wiki_filter:-- -- | {{#Wiki_filter:-- -- | ||
f. | f. | ||
Jacksonville Electric Authority 233 WEST DUVAL STREET e P. O. BOX 53015 e JACKSONVILLE, FLORtCA 32201 | Jacksonville Electric Authority | ||
[n 233 WEST DUVAL STREET e P. O. BOX 53015 e JACKSONVILLE, FLORtCA 32201 j | |||
Mr. Robert Tedesco | R:yce Lyles Managing Director February 10, 1982 ca s-0) 9 Mr. Robert Tedesco RECEIVED Assistant Director for Licensing Division of Licensing s; | ||
Division of Licensing | FE81 71982 Cll U.S. Nuclear Regulatory Commission NamWW'mcza:ar h Washington, D.C. | ||
f\) | 20555 f$}#8" p | ||
Re: | |||
New Applications Survey Cu | |||
/ | |||
f\\) | |||
==Dear Mr. Tedesco:== | ==Dear Mr. Tedesco:== | ||
This is a late response to your request dated January 12, 1982. | |||
This is a late response to your request dated January 12, 1982. | The receipt of your letter in my office on February 9, 1982 is the cause of the untimeliness of this response. | ||
The Jacksonville Electric Authority does not have a nuclear plant in the planning, construction or operating phase. | The Jacksonville Electric Authority does not have a nuclear plant in the planning, construction or operating phase. | ||
The Jacksonville Electric Authority does have under consideration the purchase of a share of Plant Vogtle currently under construction by Georgia Power Company. Should a deter-mination be raade to purchase a part of this plant, it is my understanding that at that time JEA would be required to make a separate application to the Nuclear Regulatory Commission. | This response is considered to be a negative response to your new application survey. | ||
The Jacksonville Electric Authority does have under consideration the purchase of a share of Plant Vogtle currently under construction by Georgia Power Company. | |||
Should a deter-mination be raade to purchase a part of this plant, it is my understanding that at that time JEA would be required to make a separate application to the Nuclear Regulatory Commission. | |||
The status of this acquisition is too uncertain for us to furnish an-j dates as to any involvement with the Commission. | The status of this acquisition is too uncertain for us to furnish an-j dates as to any involvement with the Commission. | ||
Sincerely fI | Sincerely fI a | ||
w | / | ||
e w | |||
R6fce | R6fce yles RL/ctb f $ | ||
s e/o F202180373 820210 PDR ADOCK 05000424 A | |||
PDR | |||
_}} | |||
Latest revision as of 20:37, 19 December 2024
| ML20040H547 | |
| Person / Time | |
|---|---|
| Site: | Vogtle, 05000426, 05000427 |
| Issue date: | 02/10/1982 |
| From: | Lyles R JACKSONVILLE ELECTRIC AUTHORITY |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8202180373 | |
| Download: ML20040H547 (1) | |
Text
-- --
f.
Jacksonville Electric Authority
[n 233 WEST DUVAL STREET e P. O. BOX 53015 e JACKSONVILLE, FLORtCA 32201 j
R:yce Lyles Managing Director February 10, 1982 ca s-0) 9 Mr. Robert Tedesco RECEIVED Assistant Director for Licensing Division of Licensing s;
FE81 71982 Cll U.S. Nuclear Regulatory Commission NamWW'mcza:ar h Washington, D.C.
20555 f$}#8" p
Re:
New Applications Survey Cu
/
f\\)
Dear Mr. Tedesco:
This is a late response to your request dated January 12, 1982.
The receipt of your letter in my office on February 9, 1982 is the cause of the untimeliness of this response.
The Jacksonville Electric Authority does not have a nuclear plant in the planning, construction or operating phase.
This response is considered to be a negative response to your new application survey.
The Jacksonville Electric Authority does have under consideration the purchase of a share of Plant Vogtle currently under construction by Georgia Power Company.
Should a deter-mination be raade to purchase a part of this plant, it is my understanding that at that time JEA would be required to make a separate application to the Nuclear Regulatory Commission.
The status of this acquisition is too uncertain for us to furnish an-j dates as to any involvement with the Commission.
Sincerely fI a
/
e w
R6fce yles RL/ctb f $
s e/o F202180373 820210 PDR ADOCK 05000424 A
_