==Dear Mr. Crane:== | ==Dear Mr. Crane:== | ||
On March 22, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070740325) regarding dissimilar metal welds in the pressurizer at Byron Station (Byron), Unit No. 2. This letter acknowledges receipt of your {{letter dated|date=June 4, 2007|text=letter dated June 4, 2007}} (ADAMS Accession No. ML071560272) informing the NRC of actions taken in response to this CAL. | |||
On March 22, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070740325) regarding dissimilar metal welds in the pressurizer at Byron Station (Byron), Unit No. 2. This letter acknowledges receipt of your letter dated June 4, 2007 (ADAMS Accession No. ML071560272) informing the NRC of actions taken in response to this CAL. | In your letter, you stated the actions and commitments confirmed in CAL No. NRR-07-012 have been completed for Byron, Unit No. 2. Full structural weld overlays, with primary water stress corrosion cracking resistant material, were installed on Byron, Unit No. 2 pressurizer surge, spray, safety, and relief nozzle butt welds and safe end butt welds containing Alloy 82/182 material. The overlays were completed in spring 2007 refueling outage (B2R13). All six Byron, Unit No. 2 pressurizer connections weld overlays were volumetrically examined in accordance with the requirements of Relief Request 13R-08. Results of the examinations were transmitted to the NRC by {{letter dated|date=May 4, 2007|text=letter dated May 4, 2007}} (ADAMS Accession No. ML071240370). | ||
In your letter, you stated the actions and commitments confirmed in CAL No. NRR-07-012 have been completed for Byron, Unit No. 2. Full structural weld overlays, with primary water stress corrosion cracking resistant material, were installed on Byron, Unit No. 2 pressurizer surge, spray, safety, and relief nozzle butt welds and safe end butt welds containing Alloy 82/182 material. The overlays were completed in spring 2007 refueling outage (B2R13). All six Byron, Unit No. 2 pressurizer connections weld overlays were volumetrically examined in accordance with the requirements of Relief Request 13R-08. Results of the examinations were transmitted to the NRC by letter dated May 4, 2007 (ADAMS Accession No. ML071240370). | |||
Based on your letter, the NRC staff has found that all the commitments listed in the CAL and supporting commitment letter (ADAMS Accession No. ML070520499) have been met. No further response is required regarding the CAL. We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. | Based on your letter, the NRC staff has found that all the commitments listed in the CAL and supporting commitment letter (ADAMS Accession No. ML070520499) have been met. No further response is required regarding the CAL. We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. | ||
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility. | Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility. | ||
| Line 32: | Line 31: | ||
regulatory/enforcement or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays). | regulatory/enforcement or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays). | ||
C. Crane | C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. STN 50-455 cc: See next page | Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. STN 50-455 cc: See next page | ||
ML071800086 | ML071800086 NRR-106 OFFICE DCI/CPNB LPL3-2/PM LPL3-2/LA LPL3-2/BC DORL/D NAME TLupold RKuntz EWhitt RGibbs CHaney DATE 7/9/07 7/2/07 7/2/07 7/6/07 7/17/07 OFFICE DCI/D DRP/D, RGN3 NAME MEvans CPederson (S.West for) | ||
DATE | DATE 7/9/07 7/17/07 | ||
Byron Station, Unit Nos. 1 and 2 cc: | |||
Regional Administrator, Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Illinois Emergency Management Agency Division of Disaster Assistance & | |||
Preparedness 1035 Outer Park Dr Springfield, IL 62704 Document Control Desk - Licensing via e-mail Mr. Dwain W. Alexander, Project Manager via e-mail Howard A. Learner Environmental Law and Policy Center of the Midwest 35 East Wacker Drive Suite 1300 Chicago, IL 60601-2110 U.S. Nuclear Regulatory Commission Byron Resident Inspectors Office 4448 North German Church Road Byron, IL 61010-9750 Ms. Lorraine Creek RR 1, Box 182 Manteno, IL 60950 Chairman, Ogle County Board P.O. Box 357 Oregon, IL 61061 Mrs. Phillip B. Johnson 1907 Stratford Lane Rockford, IL 61107 Attorney General 500 S. Second Street Springfield, IL 62701 Plant Manager - Byron Station via e-mail Site Vice President - Byron Station via e-mail Senior Vice President - Operations Support via e-mail Chairman Will County Board of Supervisors Will County Board Courthouse Joliet, IL 60434 Director - Licensing and Regulatory Affairs via e-mail Manager Regulatory Assurance - Byron via e-mail Associate General Counsel via e-mail Vice President - Regulatory Affairs via e-mail Manager Licensing - Braidwood/Byron via e-mail Senior Vice President - Midwest Operations via e-mail Vice President - Regulatory Affairs via e-mail Manager Licensing - Braidwood, Byron and LaSalle via e-mail Senior Vice President - Midwest Operations via e-mail Mr. Barry Quigley 3512 Louisiana Rockford, IL 61108}} | |||
Latest revision as of 23:05, 14 January 2025
| ML071800086 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 07/17/2007 |
| From: | Catherine Haney Plant Licensing Branch III-2 |
| To: | Crane C Exelon Generation Co |
| kuntz, Robert , NRR/DORL, 415-3733 | |
| References | |
| TAC MD4137, NRR-07-012 | |
| Download: ML071800086 (5) | |
Text
July 17, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BYRON STATION, UNIT NO. 2 - CLOSURE OF CONFIRMATORY ACTION LETTER NO. NRR-07-012 (TAC NO. MD4137)
Dear Mr. Crane:
On March 22, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070740325) regarding dissimilar metal welds in the pressurizer at Byron Station (Byron), Unit No. 2. This letter acknowledges receipt of your letter dated June 4, 2007 (ADAMS Accession No. ML071560272) informing the NRC of actions taken in response to this CAL.
In your letter, you stated the actions and commitments confirmed in CAL No. NRR-07-012 have been completed for Byron, Unit No. 2. Full structural weld overlays, with primary water stress corrosion cracking resistant material, were installed on Byron, Unit No. 2 pressurizer surge, spray, safety, and relief nozzle butt welds and safe end butt welds containing Alloy 82/182 material. The overlays were completed in spring 2007 refueling outage (B2R13). All six Byron, Unit No. 2 pressurizer connections weld overlays were volumetrically examined in accordance with the requirements of Relief Request 13R-08. Results of the examinations were transmitted to the NRC by letter dated May 4, 2007 (ADAMS Accession No. ML071240370).
Based on your letter, the NRC staff has found that all the commitments listed in the CAL and supporting commitment letter (ADAMS Accession No. ML070520499) have been met. No further response is required regarding the CAL. We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system.
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Current NRC regulations and the NRC Enforcement Policy are available at the NRC web site at http://www.nrc.gov/materials/miau/mat-toolkits.html and http://www.nrc.gov/what-wedo/
regulatory/enforcement or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. STN 50-455 cc: See next page
ML071800086 NRR-106 OFFICE DCI/CPNB LPL3-2/PM LPL3-2/LA LPL3-2/BC DORL/D NAME TLupold RKuntz EWhitt RGibbs CHaney DATE 7/9/07 7/2/07 7/2/07 7/6/07 7/17/07 OFFICE DCI/D DRP/D, RGN3 NAME MEvans CPederson (S.West for)
DATE 7/9/07 7/17/07
Byron Station, Unit Nos. 1 and 2 cc:
Regional Administrator, Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Illinois Emergency Management Agency Division of Disaster Assistance &
Preparedness 1035 Outer Park Dr Springfield, IL 62704 Document Control Desk - Licensing via e-mail Mr. Dwain W. Alexander, Project Manager via e-mail Howard A. Learner Environmental Law and Policy Center of the Midwest 35 East Wacker Drive Suite 1300 Chicago, IL 60601-2110 U.S. Nuclear Regulatory Commission Byron Resident Inspectors Office 4448 North German Church Road Byron, IL 61010-9750 Ms. Lorraine Creek RR 1, Box 182 Manteno, IL 60950 Chairman, Ogle County Board P.O. Box 357 Oregon, IL 61061 Mrs. Phillip B. Johnson 1907 Stratford Lane Rockford, IL 61107 Attorney General 500 S. Second Street Springfield, IL 62701 Plant Manager - Byron Station via e-mail Site Vice President - Byron Station via e-mail Senior Vice President - Operations Support via e-mail Chairman Will County Board of Supervisors Will County Board Courthouse Joliet, IL 60434 Director - Licensing and Regulatory Affairs via e-mail Manager Regulatory Assurance - Byron via e-mail Associate General Counsel via e-mail Vice President - Regulatory Affairs via e-mail Manager Licensing - Braidwood/Byron via e-mail Senior Vice President - Midwest Operations via e-mail Vice President - Regulatory Affairs via e-mail Manager Licensing - Braidwood, Byron and LaSalle via e-mail Senior Vice President - Midwest Operations via e-mail Mr. Barry Quigley 3512 Louisiana Rockford, IL 61108