{{#Wiki_filter:November 28, 2007 TO: | {{#Wiki_filter:November 28, 2007 TO: | ||
Those on the Enclosed List | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 24: | Line 25: | ||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
On October 24, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued License Amendment No. 177 for the Grand Gulf Nuclear Station, Unit 1. The NRC staffs related safety evaluation (SE) was enclosed with the amendment. A copy was distributed to you by mail. | On October 24, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued License Amendment No. 177 for the Grand Gulf Nuclear Station, Unit 1. The NRC staffs related safety evaluation (SE) was enclosed with the amendment. A copy was distributed to you by mail. | ||
The NRC staff has determined that a portion of the information contained in the SE should not have been included in the SE. The NRC staff has subsequently removed the information and revised the SE. The revised SE is available in its entirety under Agencywide Documents Access and Management System (ADAMS) Accession No. ML073190250. | The NRC staff has determined that a portion of the information contained in the SE should not have been included in the SE. The NRC staff has subsequently removed the information and revised the SE. The revised SE is available in its entirety under Agencywide Documents Access and Management System (ADAMS) Accession No. ML073190250. | ||
| Line 30: | Line 30: | ||
Thank you for your assistance in resolving this matter. If you have any questions regarding this letter, please contact me at (301) 415-3308 or via e-mail at bkv@nrc.gov. | Thank you for your assistance in resolving this matter. If you have any questions regarding this letter, please contact me at (301) 415-3308 or via e-mail at bkv@nrc.gov. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 | Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 | ||
==Enclosures:== | ==Enclosures:== | ||
: 1. List of Recipients of October 24, 2007, letter | : 1. List of Recipients of {{letter dated|date=October 24, 2007|text=October 24, 2007, letter}} | ||
: 2. Revised SE pages 3 and 4 | : 2. Revised SE pages 3 and 4 | ||
ML073190201 OFFICE | ML073190201 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME BVaidya JBurkhardt THiltz DATE 11/28/07 11/28/07 11/28/07 | ||
EVALUATION RELATED TO LICENSE AMENDMENT NO. 177 (TAC NO. MD3469) | |||
Mr. William R. Brian Site Vice President Grand Gulf Nuclear Station Entergy Operations, Inc. | |||
P.O. Box 756 Port Gibson, MS 39150 Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President and COO Entergy Operations, Inc. | |||
P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Operations Support Entergy Services, Inc. | |||
P.O. Box 31995 Jackson, MS 39286-1995 General Manager, Plant Operations Entergy Operations, Inc. | |||
P.O. Box 756 Port Gibson, MS 39150 Director, Nuclear Safety & Licensing Entergy Services, Inc. | |||
440 Hamilton Avenue White Plains, NY 10601 Director, Nuclear Safety Assurance Entergy Operations, Inc. | |||
P.O. Box 756 Port Gibson, MS 39150 Senior Manager, Nuclear Safety & Licensing Entergy Services, Inc. | |||
P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc. | |||
P.O. Box 756 Port Gibson, MS 39150 State Health Officer State Health Board P.O. Box 1700 Jackson, MS 39215 Attorney General Asst. Attorney General State of Mississippi P.O. Box 22947 Jackson, MS 39225-2947 Office of the Governor State of Mississippi Jackson, MS 39201 Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005 President Claiborne County Board of Supervisors P.O. Box 339 Port Gibson, MS 39150 Mr. Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497 Chief, Energy and Transportation Branch Environmental Compliance and Enforcement Division Mississippi Department of Environmental Quality P.O. Box 10385 Jackson, MS 39289-0385 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 399 Port Gibson, MS 39150 ENCLOSURE 1 | |||
ENCLOSURE 2 GRAND GULF NUCLEAR STATION, UNIT 1 REVISED PAGES 3 AND 4 TO SAFETY EVALUATION DATED OCTOBER 24, 2007, RELATED TO AMENDMENT NO. 177 1The information in [ ] contained the proprietary information and as such has been redacted in this nonproprietary version of SE. | |||
November 1, 2006 (Reference 1), the licensee presented its analysis of the proposed TS change, which is summarized below: | November 1, 2006 (Reference 1), the licensee presented its analysis of the proposed TS change, which is summarized below: | ||
The current SR was originally based on using the P-1 core monitoring system and older design LPRM detector, which experienced drift between calibrations. | |||
GGNS currently uses an improved AREVA NP POWERPLEX-III core monitoring system and newer LPRM chambers (NA250 series) which exhibit more consistent sensitivity than older LPRM detectors. | GGNS currently uses an improved AREVA NP POWERPLEX-III core monitoring system and newer LPRM chambers (NA250 series) which exhibit more consistent sensitivity than older LPRM detectors. | ||
The uncertainty in the power distribution will remain within the value used in the GGNS minimum critical power ratio (MCPR) safety limit analysis for Cycle 12 operation, dated April 2001 (Reference 2). | |||
The basis for the extension of the calibration period is that the increase in the uncertainty in the nodal power distribution resulting from LPRM response uncertainty due to the extension of calibration period should not exceed the uncertainty currently assumed in the MCPR safety limit calculation. | |||
Additionally, in response to the U.S. Nuclear Regulatory Commission (NRC) staffs requests for additional information (RAIs), the licensee provided its technical justification regarding extension of the calibration interval from 1000 MWD/T to 2000 MWD/T, and included justification for the 25 percent increase in the interval allowed by TS 3.0.2, which is summarized below: | Additionally, in response to the U.S. Nuclear Regulatory Commission (NRC) staffs requests for additional information (RAIs), the licensee provided its technical justification regarding extension of the calibration interval from 1000 MWD/T to 2000 MWD/T, and included justification for the 25 percent increase in the interval allowed by TS 3.0.2, which is summarized below: | ||
The licensee conducted detailed statistical evaluations of the uncertainty in LPRM calibration cases from Cycle 3 to 14 with exposure intervals up to 3000 MWD/T (Reference 1). In the analysis, over 900 points of actual calibration data were used to establish a database of various calibration intervals. Starting from an actual data point as the initial condition, a prediction of calibration current with a specified exposure interval could be made through an exponential decay equation (Reference 4). Comparing the predicted current to the actual calibrated current for the exposure interval, the percentage of deviation was obtained for the exposure interval. Since this method could skip the actual calibration point, more prediction points than actual calibration points were established in the deviation analysis. For data points with a calibration interval from 500 MWD/T to 1500 MWD/T, the relative standard deviation for 1000 MWD/T was obtained as [ ]1 percent. A similar approach was conducted for calibration interval from 1500 MWD/T to 2500 MWD/T and the relative standard deviation was determined to be [ ] percent for 2000 MWD/T (Reference 6). The decay constant used in the decay equation had variations among the 168 LPRMs. The applicant determined detector-specific decay factors for each detector and applied them in the analysis. The increase of the relative standard deviation was [ ] percent. A separate conservative approach used a fixed nominal value for all LPRMs and re-performed a similar analysis. | |||
An increase of the relative standard deviation was found to be [ ] percent in this approach. | An increase of the relative standard deviation was found to be [ ] percent in this approach. | ||
These evaluations showed that the equivalent LPRM response uncertainty for the increased calibration interval of 2000 MWD/T would increase the LPRM response uncertainty from 3.4 percent to [ ] percent (3.4 percent + | |||
response uncertainty from 3.4 percent to [ ] percent (3.4 percent + | |||
[ ] percent), which is less than the 4.3 percent uncertainty limit currently used in calculating radial bundle power distribution for MCPR safety limit analysis. | [ ] percent), which is less than the 4.3 percent uncertainty limit currently used in calculating radial bundle power distribution for MCPR safety limit analysis. | ||
Thus, the radial bundle power uncertainty is maintained and MCPR safety limit results remain unchanged. | Thus, the radial bundle power uncertainty is maintained and MCPR safety limit results remain unchanged. | ||
In the application dated November 1, 2006, GGNS also stated that the TS provision of SR 3.0.2 would continue to allow the LPRM calibration interval to be considered met if the calibration was performed within 1.25 times the interval specified, as measured from the previous calibration. Staff requested additional analysis from the licensee for exposure of 2500 MWD/T (2000 MWD/T x 1.25) to ensure the power uncertainty limit of the MCPR calculation was met. With a detector-specific decay factor, the analysis showed a relative standard deviation of [ ] percent with an increase of [ ] percent from an exposure interval of 1000 MWD/T ([ ] percent). With a fixed nominal decay factor, the relative standard deviation was [ ] percent and the increase of relative standard deviation was [ ] percent from an exposure interval of 1000 MWD/T | |||
[ ] percent). The increase of relative standard deviation was within 0.9 percent (4.3 percent - 3.4 percent) in the detector-specific decay factor analysis; however, the increase of relative standard deviation exceeded the 0.9 percent limit in the fixed decay factor analysis. The licensee stated in its RAI response (Reference 6), "The LPRM uncertainty results using the detector specific sensitivity values are more appropriate for the evaluation because detector specific sensitivities are used in the GGNS calibration process. Since the greater uncertainties associated with a fixed detector sensitivity are not representative of actual practice, it would be inappropriate and overly conservative to evaluate the effect of an extended calibration interval based upon a fixed detector." The licensee also performed additional analysis with plant calibration data points only (with no extrapolation of skipping actual calibration data) and showed the increase of relative standard deviation of | [ ] percent). The increase of relative standard deviation was within 0.9 percent (4.3 percent - 3.4 percent) in the detector-specific decay factor analysis; however, the increase of relative standard deviation exceeded the 0.9 percent limit in the fixed decay factor analysis. The licensee stated in its RAI response (Reference 6), "The LPRM uncertainty results using the detector specific sensitivity values are more appropriate for the evaluation because detector specific sensitivities are used in the GGNS calibration process. Since the greater uncertainties associated with a fixed detector sensitivity are not representative of actual practice, it would be inappropriate and overly conservative to evaluate the effect of an extended calibration interval based upon a fixed detector." The licensee also performed additional analysis with plant calibration data points only (with no extrapolation of skipping actual calibration data) and showed the increase of relative standard deviation of | ||
[ ] percent for the detector-specific decay factor analysis and [ ] percent for the fixed decay factor analysis (Reference 6). The small increase ([ ] percent) in the detector-specific decay factor study was due to fewer actual calibration data points available in the exposure interval (2000 MWD/T to 3000 MWD/T), | [ ] percent for the detector-specific decay factor analysis and [ ] percent for the fixed decay factor analysis (Reference 6). The small increase ([ ] percent) in the detector-specific decay factor study was due to fewer actual calibration data points available in the exposure interval (2000 MWD/T to 3000 MWD/T), | ||
which resulted in a lower relative standard deviation. A linear extrapolation resulted in [ ] percent of relative standard deviation increase. Based on the detector-specific decay factor analysis and conservative fixed decay factor analysis on multiple sampling points (with and without exposure interval extrapolation), the staff has reasonable assurance that the allowance of the 2500 MWD/T calibration interval would not cause violation of the LPRM response uncertainty limit that is currently used in the SLMCPR calculation. | which resulted in a lower relative standard deviation. A linear extrapolation resulted in [ ] percent of relative standard deviation increase. Based on the detector-specific decay factor analysis and conservative fixed decay factor analysis on multiple sampling points (with and without exposure interval extrapolation), the staff has reasonable assurance that the allowance of the 2500 MWD/T calibration interval would not cause violation of the LPRM response uncertainty limit that is currently used in the SLMCPR calculation. | ||
These analyses have shown that the equivalent LPRM response uncertainty for the increased calibration interval of 2500 MWD/T would increase the LPRM response uncertainty from 3.4 percent to [ ] percent (3.4 percent + | |||
[ ] percent), which is less than the 4.3 percent uncertainty limit currently used in calculating radial bundle power distribution for MCPR safety limit analysis. | [ ] percent), which is less than the 4.3 percent uncertainty limit currently used in calculating radial bundle power distribution for MCPR safety limit analysis. | ||
Thus the radial bundle power uncertainty is maintained and MCPR safety limit results remain unchanged.}} | Thus the radial bundle power uncertainty is maintained and MCPR safety limit results remain unchanged.}} | ||
Latest revision as of 19:59, 14 January 2025
| ML073190201 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 11/28/2007 |
| From: | Bhalchandra Vaidya NRC/NRR/ADRO/DORL/LPLIV |
| To: | City of Port Gibson, MS, Claiborne County, MS, Entergy Nuclear Operations, Entergy Operations, Entergy Services, Northwestern State Univ, NRC Region 4, State of LA, Dept of Justice, State of LA, Office of Environmental Services, State of MS, Dept of Environmental Quality, State of MS, Office of the Attorney General, State of MS, Office of the Governor |
| Vaidya B, NRR/DORL/LPL4, 415-3308 | |
| References | |
| TAC MD3469 | |
| Download: ML073190201 (6) | |
Text
November 28, 2007 TO:
Those on the Enclosed List
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1: REVISION OF SAFETY EVALUATION RELATED TO LICENSE AMENDMENT NO. 177 (TAC NO. MD3469)
Dear Sir or Madam:
On October 24, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued License Amendment No. 177 for the Grand Gulf Nuclear Station, Unit 1. The NRC staffs related safety evaluation (SE) was enclosed with the amendment. A copy was distributed to you by mail.
The NRC staff has determined that a portion of the information contained in the SE should not have been included in the SE. The NRC staff has subsequently removed the information and revised the SE. The revised SE is available in its entirety under Agencywide Documents Access and Management System (ADAMS) Accession No. ML073190250.
In an effort to control further dissemination of the information that was inadvertently placed in the SE that was mailed to you, please destroy your copy of pages 3 and 4 of the SE, along with any additional copies that were made. Replacement pages 3 and 4 of the SE are enclosed.
Thank you for your assistance in resolving this matter. If you have any questions regarding this letter, please contact me at (301) 415-3308 or via e-mail at bkv@nrc.gov.
Sincerely,
/RA/
Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosures:
- 1. List of Recipients of October 24, 2007, letter
- 2. Revised SE pages 3 and 4
ML073190201 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME BVaidya JBurkhardt THiltz DATE 11/28/07 11/28/07 11/28/07
EVALUATION RELATED TO LICENSE AMENDMENT NO. 177 (TAC NO. MD3469)
Mr. William R. Brian Site Vice President Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President and COO Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Operations Support Entergy Services, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 General Manager, Plant Operations Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Director, Nuclear Safety & Licensing Entergy Services, Inc.
440 Hamilton Avenue White Plains, NY 10601 Director, Nuclear Safety Assurance Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Senior Manager, Nuclear Safety & Licensing Entergy Services, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 State Health Officer State Health Board P.O. Box 1700 Jackson, MS 39215 Attorney General Asst. Attorney General State of Mississippi P.O. Box 22947 Jackson, MS 39225-2947 Office of the Governor State of Mississippi Jackson, MS 39201 Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005 President Claiborne County Board of Supervisors P.O. Box 339 Port Gibson, MS 39150 Mr. Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497 Chief, Energy and Transportation Branch Environmental Compliance and Enforcement Division Mississippi Department of Environmental Quality P.O. Box 10385 Jackson, MS 39289-0385 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 399 Port Gibson, MS 39150 ENCLOSURE 1
ENCLOSURE 2 GRAND GULF NUCLEAR STATION, UNIT 1 REVISED PAGES 3 AND 4 TO SAFETY EVALUATION DATED OCTOBER 24, 2007, RELATED TO AMENDMENT NO. 177 1The information in [ ] contained the proprietary information and as such has been redacted in this nonproprietary version of SE.
November 1, 2006 (Reference 1), the licensee presented its analysis of the proposed TS change, which is summarized below:
The current SR was originally based on using the P-1 core monitoring system and older design LPRM detector, which experienced drift between calibrations.
GGNS currently uses an improved AREVA NP POWERPLEX-III core monitoring system and newer LPRM chambers (NA250 series) which exhibit more consistent sensitivity than older LPRM detectors.
The uncertainty in the power distribution will remain within the value used in the GGNS minimum critical power ratio (MCPR) safety limit analysis for Cycle 12 operation, dated April 2001 (Reference 2).
The basis for the extension of the calibration period is that the increase in the uncertainty in the nodal power distribution resulting from LPRM response uncertainty due to the extension of calibration period should not exceed the uncertainty currently assumed in the MCPR safety limit calculation.
Additionally, in response to the U.S. Nuclear Regulatory Commission (NRC) staffs requests for additional information (RAIs), the licensee provided its technical justification regarding extension of the calibration interval from 1000 MWD/T to 2000 MWD/T, and included justification for the 25 percent increase in the interval allowed by TS 3.0.2, which is summarized below:
The licensee conducted detailed statistical evaluations of the uncertainty in LPRM calibration cases from Cycle 3 to 14 with exposure intervals up to 3000 MWD/T (Reference 1). In the analysis, over 900 points of actual calibration data were used to establish a database of various calibration intervals. Starting from an actual data point as the initial condition, a prediction of calibration current with a specified exposure interval could be made through an exponential decay equation (Reference 4). Comparing the predicted current to the actual calibrated current for the exposure interval, the percentage of deviation was obtained for the exposure interval. Since this method could skip the actual calibration point, more prediction points than actual calibration points were established in the deviation analysis. For data points with a calibration interval from 500 MWD/T to 1500 MWD/T, the relative standard deviation for 1000 MWD/T was obtained as [ ]1 percent. A similar approach was conducted for calibration interval from 1500 MWD/T to 2500 MWD/T and the relative standard deviation was determined to be [ ] percent for 2000 MWD/T (Reference 6). The decay constant used in the decay equation had variations among the 168 LPRMs. The applicant determined detector-specific decay factors for each detector and applied them in the analysis. The increase of the relative standard deviation was [ ] percent. A separate conservative approach used a fixed nominal value for all LPRMs and re-performed a similar analysis.
An increase of the relative standard deviation was found to be [ ] percent in this approach.
These evaluations showed that the equivalent LPRM response uncertainty for the increased calibration interval of 2000 MWD/T would increase the LPRM response uncertainty from 3.4 percent to [ ] percent (3.4 percent +
[ ] percent), which is less than the 4.3 percent uncertainty limit currently used in calculating radial bundle power distribution for MCPR safety limit analysis.
Thus, the radial bundle power uncertainty is maintained and MCPR safety limit results remain unchanged.
In the application dated November 1, 2006, GGNS also stated that the TS provision of SR 3.0.2 would continue to allow the LPRM calibration interval to be considered met if the calibration was performed within 1.25 times the interval specified, as measured from the previous calibration. Staff requested additional analysis from the licensee for exposure of 2500 MWD/T (2000 MWD/T x 1.25) to ensure the power uncertainty limit of the MCPR calculation was met. With a detector-specific decay factor, the analysis showed a relative standard deviation of [ ] percent with an increase of [ ] percent from an exposure interval of 1000 MWD/T ([ ] percent). With a fixed nominal decay factor, the relative standard deviation was [ ] percent and the increase of relative standard deviation was [ ] percent from an exposure interval of 1000 MWD/T
[ ] percent). The increase of relative standard deviation was within 0.9 percent (4.3 percent - 3.4 percent) in the detector-specific decay factor analysis; however, the increase of relative standard deviation exceeded the 0.9 percent limit in the fixed decay factor analysis. The licensee stated in its RAI response (Reference 6), "The LPRM uncertainty results using the detector specific sensitivity values are more appropriate for the evaluation because detector specific sensitivities are used in the GGNS calibration process. Since the greater uncertainties associated with a fixed detector sensitivity are not representative of actual practice, it would be inappropriate and overly conservative to evaluate the effect of an extended calibration interval based upon a fixed detector." The licensee also performed additional analysis with plant calibration data points only (with no extrapolation of skipping actual calibration data) and showed the increase of relative standard deviation of
[ ] percent for the detector-specific decay factor analysis and [ ] percent for the fixed decay factor analysis (Reference 6). The small increase ([ ] percent) in the detector-specific decay factor study was due to fewer actual calibration data points available in the exposure interval (2000 MWD/T to 3000 MWD/T),
which resulted in a lower relative standard deviation. A linear extrapolation resulted in [ ] percent of relative standard deviation increase. Based on the detector-specific decay factor analysis and conservative fixed decay factor analysis on multiple sampling points (with and without exposure interval extrapolation), the staff has reasonable assurance that the allowance of the 2500 MWD/T calibration interval would not cause violation of the LPRM response uncertainty limit that is currently used in the SLMCPR calculation.
These analyses have shown that the equivalent LPRM response uncertainty for the increased calibration interval of 2500 MWD/T would increase the LPRM response uncertainty from 3.4 percent to [ ] percent (3.4 percent +
[ ] percent), which is less than the 4.3 percent uncertainty limit currently used in calculating radial bundle power distribution for MCPR safety limit analysis.
Thus the radial bundle power uncertainty is maintained and MCPR safety limit results remain unchanged.