{{#Wiki_filter:UNDERWATER ENGINEERING SERVICES, Inc.
{{#Wiki_filter:IjdcEwot E
1326 S.W. Biltmore Street
~
          ~      t;-fx~~
t;-fx~~ ESrvn%
E IjdcEwot    ESrvn%
1(
1(                Port Saint Lucie, FL 34983
UNDERWATER ENGINEERING SERVICES, Inc.
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983


==Subject:==
==Subject:==
Completion of evaluation: 10CFR Part 21 Notification of Potential Safety Related Noncompliance Deviation To:                    United States Nuclear Regulatory Commission Document Control Desk Evaluation Renort Cover Letter:
Completion of evaluation: 1 OCFR Part 21 Notification of Potential Safety Related Noncompliance Deviation United States Nuclear Regulatory Commission Document Control Desk To:
On Wednesday, April 9 t, 2008 UESI repoited an initial notification of potential Part 21 applicability to the USNRC. This notification was faxed to, and confirmation received from, the NRC Operations Center.
Evaluation Renort Cover Letter:
On Wednesday, April 9t, 2008 UESI repoited an initial notification of potential Part 21 applicability to the USNRC. This notification was faxed to, and confirmation received from, the NRC Operations Center.
Please find attached the completed evaluation report of the UESI Part 21-review of its Picco
Please find attached the completed evaluation report of the UESI Part 21-review of its Picco
-UT- 15 Service Level I repair coating material, and its impact, if any, on end users of the product. There have been no changes between the initial notification sent to your office, and the final evaluation enclosed with this document. The evaluation report has been final reviewed and approved by the CEO/Presideht of UESI.
-UT-15 Service Level I repair coating material, and its impact, if any, on end users of the product. There have been no changes between the initial notification sent to your office, and the final evaluation enclosed with this document. The evaluation report has been final reviewed and approved by the CEO/Presideht of UESI.
UESI has provided a copy of the evaluatio'nifor your information. Attachment 2 of the evaluation is a copy of the official notification that was faxed to your Operations Center.
UESI has provided a copy of the evaluatio'nifor your information. Attachment 2 of the evaluation is a copy of the official notification that was faxed to your Operations Center.
UESI has notified all applicable facilities ti at may have been impacted by this Part 21, and provided a copy of this report to them.
UESI has notified all applicable facilities ti at may have been impacted by this Part 21, and provided a copy of this report to them.
* If you have any questions or need additional information concerning this notification, please feel free to contact me, Regards, Chris C. Graham UESI QA Manager Phone: (772) 337-3116 (x114)
If you have any questions or need additional information concerning this notification, please feel free to contact me,
: Regards, Chris C. Graham UESI QA Manager Phone: (772) 337-3116 (x114)
Fax: (772) 337-0294 Email: cgraham@uesi.com FJ
Fax: (772) 337-0294 Email: cgraham@uesi.com FJ


UNDERWATER ENGINEERING SERVICES, Inc.
U (?MB UNDERWATER ENGINEERING SERVICES, Inc.
U(?MB                                  1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 1 of 16 Potential 10 CFR 21 Applicability Review UESI Service Level 1 Coating Repair Material Picco UT-15 Evaluation Team:
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 1 of 16 Potential 10 CFR 21 Applicability Review UESI Service Level 1 Coating Repair Material Picco UT-15 Evaluation Team:
A Review Team was formed as directed by UESI/GPI President Steve Greenman to resolve UESI Nonconformance Report #2008-01 (Reference 1) and the associated findings of NUPIC Audit 08.03.SPAFL.08.1 (Joint Audit # 20119) (Reference 2). The Review Team members responsible for the results entailed in this report are:
A Review Team was formed as directed by UESI/GPI President Steve Greenman to resolve UESI Nonconformance Report #2008-01 (Reference 1) and the associated findings of NUPIC Audit 08.03.SPAFL.08.1 (Joint Audit # 20119) (Reference 2). The Review Team members responsible for the results entailed in this report are:
    " Mr. Jon R. Cavallo, PE, Vice President of GPI affiliate Corrosion Control Consultants & Labs, Inc, UESI Certified Level III Coatings Inspector, registered Professional Engineer, ASTM D-33 Nuclear Coatings Committee Chairman, a SSPC certified Protective Coatings Specialist and industry leader in coatings evaluation and consulting.
" Mr. Jon R. Cavallo, PE, Vice President of GPI affiliate Corrosion Control Consultants & Labs, Inc, UESI Certified Level III Coatings Inspector, registered Professional Engineer, ASTM D-33 Nuclear Coatings Committee Chairman, a SSPC certified Protective Coatings Specialist and industry leader in coatings evaluation and consulting.
    " Mr. Robert Walcheski, UESI Technical Manager, UESI Assistant Vice President, Certified UESI ANSI Level III Coatings Inspector, ASNT SNT-TC-1A & CP189 VT-1/V-3 (IWE, IWL, IWF) Level II, ASTM D33 committee member, certified NACE CIP Level II, former SGPAI-UES QA Manager, and;
" Mr. Robert Walcheski, UESI Technical Manager, UESI Assistant Vice President, Certified UESI ANSI Level III Coatings Inspector, ASNT SNT-TC-1A & CP189 VT-1/V-3 (IWE, IWL, IWF) Level II, ASTM D33 committee member, certified NACE CIP Level II, former SGPAI-UES QA Manager, and;
* Mr. Chris Graham, UESI Quality Assurance Manager, NQA-l Lead Auditor, NACE CIPI, Certified UESI ANSI Level II Coatings, Certified UESI ANSI Level III Visual Welding, Current API 510 Certified Inspector, CQCM and UESI Part 21 Review Team POC.
* Mr. Chris Graham, UESI Quality Assurance Manager, NQA-l Lead Auditor, NACE CIPI, Certified UESI ANSI Level II Coatings, Certified UESI ANSI Level III Visual Welding, Current API 510 Certified Inspector, CQCM and UESI Part 21 Review Team POC.
Report submitted for review and approval to UESI/GPI President by:
Report submitted for review and approval to UESI/GPI President by:
Chris C, Grahan/Py.4 EST Quality Assurance Manager                   Date I have reviewed the results of this evaluation and concur with its evaluations and conclusion. I have reviewed and approved this report, and authorize applicable determinationsmade within this internal evaluation to be included in the official Part 2L21 submittal to the Nuclear Regulatory Commission, in accordance with 10CFR t               uality AssuranceManual,3"d Edition, Rev. 0.
Chris C, Grahan/Py.4 EST Quality Assurance Manager Date I have reviewed the results of this evaluation and concur with its evaluations and conclusion. I have reviewed and approved this report, and authorize applicable determinations made within this internal evaluation to be included in the official Part 2L21 submittal to the Nuclear Regulatory Commission, in accordance with 10CFR t
Ste--en Greenman-                                     -entCEO         Date K-j
uality Assurance Manual, 3"d Edition, Rev. 0.
Ste--en Greenman-  
-entCEO Date K-j


UNDERWATER ENGINEERING SERVICES, Inc.
UNDERWATER ENGINEERING SERVICES, Inc.
(1326 S.W. Biltmore Street fPort                           Saint Lucie, FL 34983 Und.a,,-,- ýnonew.n- S,,*..,* 1ýPage                                                   2 of 16
(1326 S.W. Biltmore Street fPort Saint Lucie, FL 34983 Und.a,,-,- ýnonew.n-S,,*..,*
1ýPage 2 of 16


==SUBJECT:==
==SUBJECT:==
Potential 10 CFR 21 Applicability Review as described in UESI QA Manual, QAP-15, R/5, Section 5.0 DISCUSSION A Review Team was formed as directed by UESI / GPI President and CEO Steve Greenman to resolve UESI Nonconformance Report #2008-01 (Reference 1) and the associated findings of NUPIC Audit 08.03.SPAFL.08.1 (Joint Audit # 20119 - Reference 2). The Review Team members assigned were:
Potential 10 CFR 21 Applicability Review as described in UESI QA Manual, QAP-15, R/5, Section 5.0 DISCUSSION A Review Team was formed as directed by UESI / GPI President and CEO Steve Greenman to resolve UESI Nonconformance Report #2008-01 (Reference 1) and the associated findings of NUPIC Audit 08.03.SPAFL.08.1 (Joint Audit # 20119 - Reference 2). The Review Team members assigned were:
* Mr. Jon R. Cavallo, PE, Vice President of GPI affiliate Con-osion Control Consultants & Labs, Inc, UES1 Certified Level III Coatings Inspector, registered Professional Engineer, ASTM D-3 3 Nuclear Coatings Committee Chairman, a SSPC certified Protective Coatings Specialist and industry leader in coatings evaluation and consulting.
* Mr. Jon R. Cavallo, PE, Vice President of GPI affiliate Con-osion Control Consultants & Labs, Inc, UES1 Certified Level III Coatings Inspector, registered Professional Engineer, ASTM D-3 3 Nuclear Coatings Committee Chairman, a SSPC certified Protective Coatings Specialist and industry leader in coatings evaluation and consulting.
      " Mr. Robert Walcheski, UESI Technical Manager, UESI Assistant Vice President, UESI Certified ANSI Level III Coatings Inspector, ASNT SNT-TC-IA & CP189 VT-1,/V-3 (IWE, IWL, IWF), ASTM D33 committee member, certified NACE CIP Level II, former SGPAI-UES QA Manager, and;
" Mr. Robert Walcheski, UESI Technical Manager, UESI Assistant Vice President, UESI Certified ANSI Level III Coatings Inspector, ASNT SNT-TC-IA & CP189 VT-1,/V-3 (IWE, IWL, IWF), ASTM D33 committee member, certified NACE CIP Level II, former SGPAI-UES QA Manager, and;
      " Mr. Chris Graham, UESI Quality Assurance Manager, NQA- I Lead Auditor, NACE CIPl, Certified UESI ANSI Level II Coatings, Certified UESI ANSI Level III Visual Welding, Current API 510 Certified Inspector and UESI Part 21 Review Team POC.
" Mr. Chris Graham, UESI Quality Assurance Manager, NQA-I Lead Auditor, NACE CIPl, Certified UESI ANSI Level II Coatings, Certified UESI ANSI Level III Visual Welding, Current API 510 Certified Inspector and UESI Part 21 Review Team POC.
PHASE ONE Evaluation:
PHASE ONE Evaluation:
The Review Team conducted an initial meeting on March 18, 2008. Dean Reynolds, UESI Vice President and Branch Manager also attended the 3/1 8/08 meeting. The purpose of the meeting was to create a schedule to identify locations of use and determine the acceptability of UT-15 coatings applied in commercial nuclear facilities.
The Review Team conducted an initial meeting on March 18, 2008. Dean Reynolds, UESI Vice President and Branch Manager also attended the 3/1 8/08 meeting. The purpose of the meeting was to create a schedule to identify locations of use and determine the acceptability of UT-15 coatings applied in commercial nuclear facilities.
An evaluation of all available Picco UT- 15 DBA/Irradiation tests was conducted under Phase One to confirm that Picco UT-15 meets the DBA/lrradiation requirements of ASTM D-391 1-95 (Reference 3) on all substrates tested. The Phase One Evaluation confirmed that Picco UT- 15 satisfies the DBA/irradiation qualification requirements for Service Level I coating to the acceptance requirements of ASTM D-3911-95 on all substrates tested.
An evaluation of all available Picco UT-15 DBA/Irradiation tests was conducted under Phase One to confirm that Picco UT-15 meets the DBA/lrradiation requirements of ASTM D-391 1-95 (Reference 3) on all substrates tested. The Phase One Evaluation confirmed that Picco UT-15 satisfies the DBA/irradiation qualification requirements for Service Level I coating to the acceptance requirements of ASTM D-3911-95 on all substrates tested.
Next, the Phase One evaluation effort focused on the assessment of DBA qualifications tests to determine the acceptability of Picco UT-1 5 as it relates to the ANSI N101.2-1972 (Reference 4) and ANSI N5.12-1974 (Reference 5) (DBA/irradiation and lining test) requirements, establish the level to which the product meets those qualification requirements and identify any limitations that should have been imposed on the product after completion of irradiation and DBA testing in 1996. The 1996 irradiation and DBA testing is reported in Reference 6.
Next, the Phase One evaluation effort focused on the assessment of DBA qualifications tests to determine the acceptability of Picco UT-1 5 as it relates to the ANSI N101.2-1972 (Reference 4) and ANSI N5.12-1974 (Reference 5) (DBA/irradiation and lining test) requirements, establish the level to which the product meets those qualification requirements and identify any limitations that should have been imposed on the product after completion of irradiation and DBA testing in 1996. The 1996 irradiation and DBA testing is reported in Reference 6.


UNDERWATER ENGINEERING SERVICES, Inc.
UNDERWATER ENGINEERING SERVICES, Inc.
1326 S.W. Biltmore Street
1326 S.W. Biltmore Street
                *Port                         Saint Lucie, FL 34983 Underwater Eu-i'"neln' Servic". t Page 3 of 16 The 1996 irradiation and DBA test report for UT-15 (Reference 6) states, on page 3 of 7:
*Port Saint Lucie, FL 34983 Underwater Eu-i'"neln' Servic".
          "Testing was performed in accordance with ANSI N101.2 and ASTM D 3911 for DBA test requirements... Specific parameters were obtained from anticipated DBA and irradiation conditions of various facilities as described in the applicable FSAR's,"
t Page 3 of 16 The 1996 irradiation and DBA test report for UT-15 (Reference 6) states, on page 3 of 7:
"Testing was performed in accordance with ANSI N101.2 and ASTM D 3911 for DBA test requirements... Specific parameters were obtained from anticipated DBA and irradiation conditions of various facilities as described in the applicable FSAR's,"
On page 5 of 7 of Reference 6, the following statement appears concerning DBA testing:
On page 5 of 7 of Reference 6, the following statement appears concerning DBA testing:
          "Examination and evaluation was performed in accordance with ASTM D 3911..."
"Examination and evaluation was performed in accordance with ASTM D 3911..."
Again on page 5 of 7 of Reference 6, the following statement appears under Acceptance Criteria:
Again on page 5 of 7 of Reference 6, the following statement appears under Acceptance Criteria:
          "Peeling shall not be permitted. Delamination shall not be permitted. Cracking is not considered a failure unless accompanied by delamination or loss of adhesion.
"Peeling shall not be permitted. Delamination shall not be permitted. Cracking is not considered a failure unless accompanied by delamination or loss of adhesion.
Blisters shall be limited to intact blisters which are completely surrounded by sound coating bonded to the surface."
Blisters shall be limited to intact blisters which are completely surrounded by sound coating bonded to the surface."
These acceptance criteria conform to the 1995 version of ASTM D391 1. These acceptance criteria do not conform to ANSI N1 01.2; specifically, ANSI N1 01.2 limits blistering to a few No. 4 blisters as defined in ASTM D 714 (Reference 7).
These acceptance criteria conform to the 1995 version of ASTM D391 1. These acceptance criteria do not conform to ANSI N1 01.2; specifically, ANSI N1 01.2 limits blistering to a few No. 4 blisters as defined in ASTM D 714 (Reference 7).
The review team next identified the following information contained in the 1996 irradiation and DBA test report (Reference 6).
The review team next identified the following information contained in the 1996 irradiation and DBA test report (Reference 6).
: 1. Review of the 1996 test report revealed that testing of the Picco UT-I5 coating material, Batch I and Batch 2 met or exceeded-the acceptance criteria delineated in ANSI N 101.2-1972 and ASTM when applied on the following substrates; CZ-11SGQ Dimetcote 6N, Ameron 90, Keeler and Long 6548/7107, Valspar/Mobil V78 Series and Plasite 7155.
: 1. Review of the 1996 test report revealed that testing of the Picco UT-I5 coating material, Batch I and Batch 2 met or exceeded-the acceptance criteria delineated in ANSI N 101.2-1972 and ASTM when applied on the following substrates; CZ-11SGQ Dimetcote 6N, Ameron 90, Keeler and Long 6548/7107, Valspar/Mobil V78 Series and Plasite 7155.
: 2. Picco UT-15, Batch 3 met or exceeded the acceptance criteria delineated in ANSI N 101.2-1972 for all substrates referenced above with the exception of CZ- 1ISG.
: 2. Picco UT-15, Batch 3 met or exceeded the acceptance criteria delineated in ANSI N 101.2-1972 for all substrates referenced above with the exception of CZ-1ISG.
: 3. Simulated pitting defects of 1/16 in (0.0625 in.) were introduced into selected test panels.
: 3. Simulated pitting defects of 1/16 in (0.0625 in.) were introduced into selected test panels.
4, The 1996 test did not include Chemical Resistance Testing as defined in Section 5 of ANSI N5.12.
4, The 1996 test did not include Chemical Resistance Testing as defined in Section 5 of ANSI N5.12.
The review team reviewed a 1990 GPU-Oyster Creek DBA/Irradiation Test (Reference 8), which provides the results of testing of Brutem- 15 (the predecessor of UT- 15).
The review team reviewed a 1990 GPU-Oyster Creek DBA/Irradiation Test (Reference 8), which provides the results of testing of Brutem-15 (the predecessor of UT-15).
Testing was performed by application of Brutem 15 over CZ-1 ISG. No post-irradiation and post-DBA defects were noted.
Testing was performed by application of Brutem 15 over CZ-1 ISG. No post-irradiation and post-DBA defects were noted.


UNDERWATER ENGINEERING SERVICES, Inc.
UNDERWATER ENGINEERING SERVICES, Inc.
(Mom                         1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 U         Engn,,,g ,.,,, ... ,n..                                                 Page 4 of 16 The review team reviewed a 2005 Duane Arnold Energy Center DBAilrradiation Test (Reference 9). Testing was performed by application of UT-15 over CZl 1SG. This testing was performed at the Owner's request as a result of a possible increase of the design peak temperature in the torus. Chemical Resistance Testing was not requested by Duane Arnold Site Engineering due to time and financial constraints, even though it was apparently invoked in the contract document.
(Mom 1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 U
Engn,,,g,.,,,...,n..
Page 4 of 16 The review team reviewed a 2005 Duane Arnold Energy Center DBAilrradiation Test (Reference 9). Testing was performed by application of UT-15 over CZl 1SG. This testing was performed at the Owner's request as a result of a possible increase of the design peak temperature in the torus. Chemical Resistance Testing was not requested by Duane Arnold Site Engineering due to time and financial constraints, even though it was apparently invoked in the contract document.
Phase One Summary:
Phase One Summary:
The review team, after conducting the Phase One reviews described above, holds the following opinions:
The review team, after conducting the Phase One reviews described above, holds the following opinions:
Line 79: Line 88:
: 2. UT-15 coating is qualified per ASTM D391 1-95 for application as a repair coating over CZ I ISG.
: 2. UT-15 coating is qualified per ASTM D391 1-95 for application as a repair coating over CZ I ISG.
: 3. UT-I5 coating is not qualified per ANSI N101.2 for application as a repair coating over CZI t SG.
: 3. UT-I5 coating is not qualified per ANSI N101.2 for application as a repair coating over CZI t SG.
: 4. UT- I5 is qualified fIr repair of defects up to 1/16 in (0.0625 in.) in depth, subject to the limitations of I, 2and 3 above.
: 4. UT-I5 is qualified fIr repair of defects up to 1/16 in (0.0625 in.) in depth, subject to the limitations of I, 2and 3 above.
Since the completion and evaluation of this 2005 DBA/lrradiation Test the review team concluded that UESt has not provided and installed any Pieco UT-I 5 coating to the DAEC facility. It was also noted that UEST had takens, corrective action measures related to, the Test Report. Technical errors noted in this 2005 DAEC DBAilrradiation Test were identified and documented on a UESI Nonconformance Report (NCR # 2008-02). UESI Quality Assurance initiated QA records corrections and submitted to Mr. Eric Sorenson of the DAEC facility as an amendment to the existing DBA/Irradiation Test, and the NCR was closed.
Since the completion and evaluation of this 2005 DBA/lrradiation Test the review team concluded that UESt has not provided and installed any Pieco UT-I 5 coating to the DAEC facility. It was also noted that UEST had takens, corrective action measures related to, the Test Report. Technical errors noted in this 2005 DAEC DBAilrradiation Test were identified and documented on a UESI Nonconformance Report (NCR # 2008-02). UESI Quality Assurance initiated QA records corrections and submitted to Mr. Eric Sorenson of the DAEC facility as an amendment to the existing DBA/Irradiation Test, and the NCR was closed.
This concludes Phase One of the review.
This concludes Phase One of the review.


Underwatr Eng]-ordrlg ir l
aqm I*
PHASE TWO Evaluation:
UNDERWATER ENGINEERING SERVICES, Inc.
UNDERWATER ENGINEERING SERVICES, Inc.
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Underwatr Eng]-ordrlg      ir  l I*aqm
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983
                                                                                                    'Page 5 of 16 PHASE TWO Evaluation:
'Page 5 of 16 Phase Two of the evaluation began with a review of Final Engineering Reports, contract documents, job start and Order Entry Review forms of Nuclear Project work to determine the extent of use of Picco UT-I5 on Nuclear Safety related projects.
Phase Two of the evaluation began with a review of Final Engineering Reports, contract documents, job start and Order Entry Review forms of Nuclear Project work to determine the extent of use of Picco UT-I5 on Nuclear Safety related projects.
UESI identified all nuclear coating project work involving Picco UT-15 performed since the 1996 DBA Test (Reference 6). This information is summarized in Table 1.
UESI identified all nuclear coating project work involving Picco UT-15 performed since the 1996 DBA Test (Reference 6). This information is summarized in Table 1.
TABLE 1 UT-15 Coating                 Phase 3 UESI Project #                                                                   Repairs Client/ Facility     Scope of Services         Perlormed               Evaluation (Prefix)NUC-
TABLE 1 UT-15 Coating Phase 3 UESI Project #
___   ___Required             (YIN)
Repairs (Prefix) NUC-Client/ Facility Scope of Services Perlormed Evaluation
Tor us desludging 2008101 _____and SNC - Hatch         Touspectin.
___ ___Required (YIN)
inspection.             N                      N Torus desludging, 2007106                     DTE -Fermi             inspection &               YES                     YES repairs          Plasite
Tor us desludging 2008101 SNC - Hatch Touspectin.
_________    7155 2007105                   GPC - Branch           Plant discharge               N                       N 2007105__                 GP - Branchrepairs                                   NN ENW -           Wetwell / drywell               N 2007104                       Columbia                 coatings                 N                       N Station               inspection 2007103                         ENW -               Inspect Circ.               N                       N Columbia               Water Pump         .....
N N
Torus desludge, 2007102                                 Wntry Pilgrim Station -        inspection repairs &        CZ-ll YES D3911                 YES 2007101                     SNC     -: Hatch   Torus desludge &               N                       N inspection                 NN 2006105                         INEEL               Isolation pool               N                       N 2006104                        TXU -                     Staff                             NN Comanche Peak             augmentation                 N
_____and inspection.
                                                    .Vendor support 2006103                   NPPD -Cooper             Vno                           N                       N
Torus desludging, 2007106 DTE -Fermi inspection &
______________                                  CST                                 _  _  _  _  _  _ _
YES YES Plasite 7155 repairs 2007105 GPC - Branch Plant discharge N
2006102                     SNC - Hatch         CST Plug removal               N                       N Torus desludge &               YES 2006101                     SNC     - Hatch                                 Ameron                   YES inspection             Dimetcote 2005103                        TXU -                     Staff                           NN Comanche Peak             augmentation 200510O2                        TXU -                     Staff                           NN Comanche Peak             augmentation 2005101                     SNC - Hatch         Torus desludge &               N                       N inspection
N 2007105__
GP  
- Branchrepairs NN ENW -
Wetwell / drywell N
2007104 Columbia coatings N
N Station inspection 2007103 ENW -
Inspect Circ.
N N
Columbia Water Pump Torus desludge, 2007102 Wntry inspection &
YES YES Pilgrim Station repairs CZ-ll D3911 2007101 SNC -: Hatch Torus desludge &
N N
inspection NN 2006105 INEEL Isolation pool N
N TXU -
Staff 2006104 NN Comanche Peak augmentation N
.Vendor support 2006103 NPPD -Cooper Vno N
N CST 2006102 SNC - Hatch CST Plug removal N
N Torus desludge &
YES 2006101 SNC - Hatch Ameron YES inspection Dimetcote TXU -
Staff 2005103 NN Comanche Peak augmentation TXU -
Staff 200510O2 NN Comanche Peak augmentation 2005101 SNC - Hatch Torus desludge &
N N
inspection


wtr uS                                 UNDERWATER ENGINEERING SERVICES, Inc.
wtr uS Unde-~tur 1Engin-Ing Serriter. In..
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Unde-~tur 1Engin-Ing Serriter. In..
UNDERWATER ENGINEERING SERVICES, Inc.
Page 6 of 16 TABLE 1 UT-15 Coating       Phase 3 UESI Project #         Client/Facility Scope of Services                   Repairs (Prefix)NUC-                                                             Performed       Evaluation Required   (Y/N)~
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 6 of 16 TABLE 1 UT-15 Coating Phase 3 UESI Project #
(Y/79 2004109             NMC - DAEC               DBA /Irradiation             N                 N of UT-15 2004108             NPPD - Cooper                     Stafft               N                 N
Client/Facility Scope of Services Repairs (Prefix) NUC-Performed Evaluation Required (Y/N)~
_____________        augmentation                     _______
(Y/79 2004109 NMC - DAEC DBA /Irradiation N
2004107                     ENW -               Dive inspections,           N                 N Columbia             clean & removal       BioDur 561 2004106             NMC - Duane               Coating repair and         YES             YES Arnold                 inspections 200,4.105             DTE - Fermi               Torus desludge           YES             YES and inspection       Plasite 7155 2004104                     TXU -                     Staff                                 N Comanche Peak                 augmentation 20043 - Browns TVA                        Subcontract to 2004103                       Ferry             UCC - Desludge             YES             YES
N of UT-15 2004108 NPPD - Cooper Stafft N
______e_____y__&       coating repairs                 ____pr_78 2004102                     [NEEL                 Underwater               N               N cleaning 2004101               SNC - Hatch               Desludge and               N               N inspection TXU -                     Staff 2003106                                                                     N               N Comanche Peak               augmentation Qualification of 2003105                     NMC -
N augmentation 2004107 ENW -
Monticello               U/W coating               N               N repair systems 2003104               SNC - Hatch                 Steam dryer               N               N diving services 200 3ENW   -      Torus desludge,             N 2003103                   Columbia               inspection and           BioDur repair as needed Torus desludge, 2003101                 SNC - Hatch             inspection and             N               N RHR / CS dive 2002106               SNC - Vogtle             Fire Water Storage                             N Tank Insp.               N 2002105                     TXU -                     Staff                                 N Comanche Peak               Augmentation 2002104               GPU - Oyster               Sub to UCC             YES             YES Creek             Coating repairs       Valspar 78
Dive inspections, N
N Columbia clean & removal BioDur 561 2004106 NMC - Duane Coating repair and YES YES Arnold inspections 200,4.105 DTE - Fermi Torus desludge YES YES and inspection Plasite 7155 2004104 TXU -
Staff N
Comanche Peak augmentation 20043 TVA - Browns Subcontract to 2004103 Ferry UCC - Desludge YES YES
______e_____y__&
coating repairs
____pr_78 2004102
[NEEL Underwater N
N cleaning 2004101 SNC - Hatch Desludge and N
N inspection TXU -
Staff 2003106 N
N Comanche Peak augmentation NMC -
Qualification of 2003105 Monticello U/W coating N
N repair systems 2003104 SNC - Hatch Steam dryer N
N diving services 200 3ENW Torus desludge, N
2003103 Columbia inspection and BioDur repair as needed Torus desludge, 2003101 SNC - Hatch inspection and N
N RHR / CS dive 2002106 SNC - Vogtle Fire Water Storage Tank Insp.
N N
2002105 TXU -
Staff N
Comanche Peak Augmentation 2002104 GPU - Oyster Sub to UCC YES YES Creek Coating repairs Valspar 78


Underwater Enrgin-erng Serri, Ic.
UNDERWATER ENGINEERING SERVICES, Inc.
UNDERWATER ENGINEERING SERVICES, Inc.
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Underwater Enrgin-erng Serri,  Ic.
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 7 of 16
Page 7 of 16
_ _TABLE I UT-15 Coating Phase 3 UESI Project #
_ _TABLE     I UT-15 Coating       Phase 3 UESIProject #           Client/ Facility       Scope ofServices         Repairs         Evaluation (Prefix)NUC-                                                             Performed     Required (Y/N) 2002103                     TXQ -                     Staff               N               N Comanche Peak             Au2mentation Torus desludge, 2002102                 SNC - Hatch             inspection and             N               N repair as needed ENW -             Torus desludge, 2002101                     Columbia             inspection and             N               N repair as needed Coatings               N               N 2001107               NPPD - Cooper                 inspection       Carboline 890 Torus desludge,           YES 2001106                 DTE - Fermi             inspection and     Part B - 00D063       YES
Client/ Facility Scope ofServices Repairs Evaluation (Prefix) NUC-Performed Required (Y/N) 2002103 TXQ -
_ _repair as needed     Plasite 7155 Torus desludge, 2001105                   SNC - Hatch           inspection and             N               N repair as needed, EN W -             Torus desludge,             N 2001104                     Columbia             inspection and     Amercoat 90             N repair as needed     Ae.t.
Staff N
Torus desludge,           YES 2001103               Alliant - DAEC             inspection and     Part B - 00D063       YES repair as needed     cz-11 N101.2 TVA - Browns           Torus U2 inspect, 2001102                       Ferry           desludge, repair         YES               YES Torus desludge, Entergy -           Tr       d               YES 2001101                                           inspection and                           YES Pilgrim           repair as needed     CZ-1 I D-3911 2000106                      NYPA -             SFP Interference             N               N Fitzpatrick               removal     _                _        _
N Comanche Peak Au2mentation Torus desludge, 2002102 SNC - Hatch inspection and N
2000105                     NYPA -             Torus desludge,             N               N Fitzpatrick       inspection, strainer Torus desludge, 2000104                   SNC - Hatch             inspection and             N               N repair as needed 2000103               NPPD       - Cooper     Drywell coating             N               N 2000103_________       N           Cinspection                       Carboline 890 Torus desludge, 2000102                   SNC - Hatch             inspection and             N               N repair as needed
N repair as needed ENW -
Torus desludge, 2002101 Columbia inspection and N
N repair as needed Coatings N
N 2001107 NPPD - Cooper inspection Carboline 890 Torus desludge, YES 2001106 DTE - Fermi inspection and Part B - 00D063 YES
_repair as needed Plasite 7155 Torus desludge, 2001105 SNC - Hatch inspection and N
N repair as needed, EN W -
Torus desludge, N
2001104 Columbia inspection and Amercoat 90 N
repair as needed Ae.t.
Torus desludge, YES 2001103 Alliant - DAEC inspection and Part B - 00D063 YES repair as needed cz-11 N101.2 TVA - Browns Torus U2 inspect, 2001102 Ferry desludge, repair YES YES Torus desludge, Entergy -
Tr d
YES 2001101 inspection and YES Pilgrim repair as needed CZ-1 I D-3911 NYPA -
SFP Interference 2000106 N
N Fitzpatrick removal 2000105 NYPA -
Torus desludge, N
N Fitzpatrick inspection, strainer Torus desludge, 2000104 SNC - Hatch inspection and N
N repair as needed 2000103 NPPD - Cooper Drywell coating N
N 2000103_________
N Cinspection Carboline 890 Torus desludge, 2000102 SNC - Hatch inspection and N
N repair as needed


Underwater Enginer ng Service n
UN)E RWATER ENGINEERING SERVICES, Inc.
UN)E RWATER ENGINEERING SERVICES, Inc.
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Underwater Enginer ng Service  n Page 8 of 16 TABLE 1I           Ti       otn       hs UT-15 Coating       Phase 3 UESI Project #           Client / Facility     Scope of Services         Repairs       Evaluation (Prefix) NUC-                                                           Performed
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 8 of 16 TABLE 1I Ti otn hs UT-15 Coating Phase 3 UESI Project #
_(Y/N)     Required (YN)
Client / Facility Scope of Services Repairs Evaluation (Prefix) NUC-Performed
Torus deshudge,             YES 2000101                 DTE - Fermi             inspection and       Plasite 7155       YES repair as needed 0990110                     SGPAI           QPS Development               N               N 0990109               CornEd - Quad           Torus desludge,               N               N Citie             tinspection and Cities         rear as needed             UT 790 0990108MPC - D.C.                               AEP Concrete               N               N
_(Y/N)
____ _Cook                                           Coatings 0990107                     TXU -                   Coatings               N             N Comanche Peak                 InspectionN 0990106               ENW - WNP 2             Wetwell diving               N             N (Columbia)                   services         BioDur 9 'CornEd-        Torus desludge               N 0990105                     Dred Dresden        and ECCS strainer           UTN790          - N inspection Carboline DBA 0990104             Carboline Korea             coordination               N             N Boston Ed -         Torus desiudge,             YES 0990103                                         inspection and     Part B - 98E084       YES
Required (YN)
____                        Pgepair                     as needed   CZ-11 D3911 Tomus desludge, 019900 102               SNC - Hatch             inspection and             N               N repair as needed SCornEd                             -            U2 Strainer
Torus deshudge, YES 2000101 DTE - Fermi inspection and Plasite 7155 YES repair as needed 0990110 SGPAI QPS Development N
  *0990101           !        LaSalle             replacement               N               N 0   12                 CornEd -             Desludge and               N               N Dresden         coating inspection           UT 790 098                       CornEd   -             U1 Strainer               N               N LaSalle             replacement               NN 0980110               TVA - Browns           Desludge, coating             N               N Ferry Unit 3       inspection, strainer Torus desludge, 0980109                 SNC - Hatch             inspection and             N               N repair as needed Torus desludge, 0980108                 DTE - Fermi             inspection and                           YES as needed   Plasite 7155
N 0990109 CornEd - Quad Torus desludge, N
_  _._repair 0980107               GPU - Oyster                   Strainer         , YES             YES Creek               replacements       Part B - 98E084
N Citie tinspection and Cities rear as needed UT 790 0990108MPC - D.C.
AEP Concrete N
N
____ _Cook Coatings 0990107 TXU -
Coatings N
N Comanche Peak InspectionN 0990106 ENW - WNP 2 Wetwell diving N
N (Columbia) services BioDur 9 'CornEd Torus desludge N
0990105 Dred and ECCS strainer N
N Dresden UT 790 inspection Carboline DBA 0990104 Carboline Korea coordination N
N Boston Ed -
Torus desiudge, YES 0990103 inspection and Part B - 98E084 YES Pgepair as needed CZ-11 D3911 Tomus desludge, 019900 102 SNC - Hatch inspection and N
N repair as needed SCornEd U2 Strainer
* 0990101 LaSalle replacement N
N 0 12 CornEd -
Desludge and N
N Dresden coating inspection UT 790 098 CornEd -
U1 Strainer N
N LaSalle replacement NN 0980110 TVA - Browns Desludge, coating N
N Ferry Unit 3 inspection, strainer Torus desludge, 0980109 SNC - Hatch inspection and N
N repair as needed Torus desludge, 0980108 DTE - Fermi inspection and YES
_._repair as needed Plasite 7155 0980107 GPU - Oyster Strainer  
, YES YES Creek replacements Part B - 98E084


Underwatr Englneartng Ser.lc",
inc.
UNDERWATER ENGINEERING SERVICES, Inc.
UNDERWATER ENGINEERING SERVICES, Inc.
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Underwatr Englneartng Ser.lc",    inc.
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 9 of 16 TABLE I UT-15 Coating Further UESI Project #
Page 9 of 16 TABLE I UT-15 Coating       Further UESI Project #             Client! Facility       Scope of Services         Repairs         Evaluation (Prefi~x) NUC-                                                             Performed (Y/N)       Required (/N) 0980106                         WPPSS -                 Strainer                             N (Columbia)             installation 0980105                     SNC - Hatch         Mock-up strainer             N               N 0980104                   IEU - DAEC                 Desludge,           YES             YES inspection, strainer   Part B - 96H023 Torus desludge, 0980103                     SNC - Hatch           inspection and             N               N repair as needed 0980102                         CornEd -               Desludge,             N               N LaSalle       insoection. strainer       UT 790 0980101                         GE Morris         Fuel basin liner           N               N COM 097                         CornEd -       Desludge, coating,           N (7328)                         Dresden                 strainer       Plastite 790 COM 097                         CornEd -           ECCS Strainer             N               N (7321)                         LaSalle             installation COM 097                         WPPSS -       Destudge, inspect,             N               N (7320)                       (Columbia)         renair coatings COM 097                     SNC - Hatch         Desludge, inspect,           N               N (7315)                                           ECCS strainer COM 097                 TVA - Browns             Diver services,           N               N (7314) .                         Ferry           ECCS strainer             N_       __
Client! Facility Scope of Services Repairs Evaluation (Prefi~x) NUC-Performed (Y/N)
COM 097                   PECO - Peach               U/W Torus             YES (7311)                         Bottom               inspection     Part B - 9511023 COM07                   NPPD-Cooper             Desludge, inspect,         YES (7301)                                         repair as needed     Part B - 96H023 COM 097                     SNC       - Hatch   Desludge, inspect,           N               N (7299)                                         repair as needed COM 097                         CornEd -         Inspection and             N (7298)                         LaS alle         debris removal           C790 COM 097                   ComEd - Quad           Torus desludge,             N               N (7292)                     Cities Unit t         inspect, repair         C790 COM 096                   CornEd - Quad           Torus desludge,             N (7291)                     Cities Unit 2         inspect, repair         C790 COM 096                       Boston Ed -     Desludge, inspect,         YES Part B - 96F077 B-3916 YES (7290)                         Pilgrim         repair as needed     CZ-Pr COM 096                                         Desludge, inspect,         YES (7287)                     IES - DAEC          repair as needed     Part-B - NO.
Required (/N) 0980106 WPPSS -
96F077      YES CZ-11 N101.2 COM 096                       Boston Ed -           Strainer walk           N               N (7286)                         Pilgrim                 down
Strainer N
(Columbia) installation 0980105 SNC - Hatch Mock-up strainer N
N 0980104 IEU - DAEC
: Desludge, YES YES inspection, strainer Part B - 96H023 Torus desludge, 0980103 SNC - Hatch inspection and N
N repair as needed 0980102 CornEd -
: Desludge, N
N LaSalle insoection. strainer UT 790 0980101 GE Morris Fuel basin liner N
N COM 097 CornEd -
Desludge, coating, N
(7328)
Dresden strainer Plastite 790 COM 097 CornEd -
ECCS Strainer N
N (7321)
LaSalle installation COM 097 WPPSS -
Destudge, inspect, N
N (7320)
(Columbia) renair coatings COM 097 SNC - Hatch Desludge, inspect, N
N (7315)
ECCS strainer COM 097 TVA - Browns Diver services, N
N (7314).
Ferry ECCS strainer N_
COM 097 PECO - Peach U/W Torus YES (7311)
Bottom inspection Part B - 9511023 COM07 NPPD-Cooper Desludge, inspect, YES (7301) repair as needed Part B - 96H023 COM 097 SNC - Hatch Desludge, inspect, N
N (7299) repair as needed COM 097 CornEd -
Inspection and N
(7298)
LaS alle debris removal C790 COM 097 ComEd - Quad Torus desludge, N
N (7292)
Cities Unit t inspect, repair C790 COM 096 CornEd - Quad Torus desludge, N
(7291)
Cities Unit 2 inspect, repair C790 COM 096 Boston Ed -
Desludge, inspect, YES Part B - 96F077 YES (7290)
Pilgrim repair as needed CZ-Pr B-3916 COM 096 Desludge, inspect, YES IES - DAEC Part B - 96F077 YES (7287) repair as needed NO.
CZ-11 N101.2 COM 096 Boston Ed -
Strainer walk N
N (7286)
Pilgrim down


Undelater Engineei.ng S.rvce, Inc.
UNDERWATER ENGINEERING SERVICES, Inc.
UNDERWATER ENGINEERING SERVICES, Inc.
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Undelater Engineei.ng S.rvce,  Inc.
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 10 of16 TABLE 1 UT-15 Coating Further UESI Project #
Page 10 of16 TABLE     1 UT-15 Coating           Further UESI Project#           Client / Facility       Scope of Services         Repairs (Prefix)NUC-                                                             Performed         Required (Yon)
Client / Facility Scope of Services Repairs (Prefix) NUC-Performed Required (Yon)
(_ie(Y(N)   _
(_ie(Y(N)
COM 096                                         ECCS Strainer inspection                  NN (7285)
COM 096 ECCS Strainer (7285) inspection NN COM 096 PECO -
COM 096                     PECO -           Suppression pool               N                 N (7278)                 Limerick           desludge, inspect COM 096               TVA - Browns                                                     Material sent to site (7277) 0e                             3job. Diving services Browns                          UT-15 Issued         but no recurd of use.
Suppression pool N
COM 096               GPU - Oyster           Torus destudge,             YES                 YES (7275)                     Creek             inspect, repair     Part B - 96F077 COM 096                     NYPA -           Coating inspection               N                 N (7273)                 Fitzpatrick 096 (7270)                 CornEd -           Desludgc, inspect LaSalle         suppression poo1               N   __
N (7278)
096(7269)                   WPPSS             Desludge, inspect               N                   N (Columbia)               supp. pool TVA - Browns           Torus desludge,                                   N 096 (7256)                     Ferry           inspect, repair 096(7255)               SNC     - Hatch     Desludge, inspect,             N                   N
Limerick desludge, inspect COM 096 TVA - Browns Material sent to site (7277) 0e Browns Diving services UT-15 Issued 3job.
__96__(72__5_           SN____           _h   repair as needed       Plastite C790 096(7253)                   WPPSS -               WTNP-2 FME                   N                   N 096_______3)             (Columbia)           Suppression pool               NN 096(7252)               ComEd - Quad             Unit I Torus                 N                   N Cities             desludge           Plastite C790 Phase Two Summary:
but no recurd of use.
COM 096 GPU - Oyster Torus destudge, YES YES (7275)
Creek inspect, repair Part B - 96F077 COM 096 NYPA -
Coating inspection N
N (7273)
Fitzpatrick 096 (7270)
CornEd -
Desludgc, inspect LaSalle suppression poo1 N
096(7269)
WPPSS Desludge, inspect N
N (Columbia) supp. pool TVA - Browns Torus desludge, N
096 (7256)
Ferry inspect, repair 096(7255)
SNC - Hatch Desludge, inspect, N
N
__96__(72__5_
SN____
_h repair as needed Plastite C790 096(7253)
WPPSS -
WTNP-2 FME N
N 096_______3)
(Columbia)
Suppression pool NN 096(7252)
ComEd - Quad Unit I Torus N
N Cities desludge Plastite C790 Phase Two Summary:
As depicted by Table 1, UESI reviewed all available documentation related to the issue, storage and installation of its Picco UT-15 in SErvice Level I coating applications to commercial nuclear facility clients / purchasers. The review identified eight commercial nuclear facilities (Fermi, Pilgrim, Hatch, Duane Arnold, Oyster Creek, Browns Ferry, Peach Bottom and Cooper Stations) where Picco UT-i 5 repair coating had been applied to suppression pools/tori after the 1996 DBA / Irradiation Test results. The Phase 3 review (scheduled to commence on April 3d thru 5'h timeframe based on availability of team members) was planned by the Review Committee to evaluate substrates applied, acceptability to defined site specific criteria and whether a Part 21 notificationis required.
As depicted by Table 1, UESI reviewed all available documentation related to the issue, storage and installation of its Picco UT-15 in SErvice Level I coating applications to commercial nuclear facility clients / purchasers. The review identified eight commercial nuclear facilities (Fermi, Pilgrim, Hatch, Duane Arnold, Oyster Creek, Browns Ferry, Peach Bottom and Cooper Stations) where Picco UT-i 5 repair coating had been applied to suppression pools/tori after the 1996 DBA / Irradiation Test results. The Phase 3 review (scheduled to commence on April 3d thru 5'h timeframe based on availability of team members) was planned by the Review Committee to evaluate substrates applied, acceptability to defined site specific criteria and whether a Part 21 notificationis required.
This concludes Phase Two of the review.
This concludes Phase Two of the review.


ut
,l Underwter E=g~gel.ng Harmicos, Inm.
UNDERWATER ENGINEERING SERVICES, Inc.
UNDERWATER ENGINEERING SERVICES, Inc.
ut Underwter E=g~gel.ng
                            ,l Harmicos, Inm.
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 11 ofl6 PHASE THREE Evaluation:
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 11 ofl6 PHASE THREE Evaluation:
Review Team members convened as previously scheduled. After review of the previous charts; related Final Engineering Reports, Purchase Orders, Contract requirements, Order Entries and other associated documentation with the Phase 2 evaluation, UESI identified eight commercial nuclear facilities (Fermi, Pilgrim, Hatch, Duane Arnold, Oyster Creek, Browns Ferry, Peach Bottom and Cooper Stations) where Picco UT- 15 repair coating had been applied to the suppression pools/tori after 1996. Table 2 below lists these facilities and indicates the review team recommendation for filing a 10CFR Part 21 report:
Review Team members convened as previously scheduled. After review of the previous charts; related Final Engineering Reports, Purchase Orders, Contract requirements, Order Entries and other associated documentation with the Phase 2 evaluation, UESI identified eight commercial nuclear facilities (Fermi, Pilgrim, Hatch, Duane Arnold, Oyster Creek, Browns Ferry, Peach Bottom and Cooper Stations) where Picco UT-15 repair coating had been applied to the suppression pools/tori after 1996. Table 2 below lists these facilities and indicates the review team recommendation for filing a 1 OCFR Part 21 report:
TABLE 2 UESI Project                                 Substrate     UT-15 Material Code           Part21 Recommended?
TABLE 2 UESI Project Substrate UT-15 Material Code Part 21 Recommended?
Job Start!FER           ClientFacility        Applied           Referenced                         Yes/No Numbers                                       Over         (Contractual)             (See Phase 3 Summary) 2004106           2013Coatings                                       to meet           YES - Product N!N0.
Job Start !FER Client Facility Applied Referenced Yes/No Numbers Over (Contractual)
iavretya                supplied 2001103             Duane Arnold             CZ-11     ASTM D 3911, ANSI         inadvertently as ANSINI01.2 0980104                                                 N101.2 & ANSI N5.12     qualified, but only met ASTM D-096 (7287)                                                                                           3911.
(See Phase 3 Summary) 2004106 YES - Product supplied 2013Coatings to meet iavretya N!N0.
Indeterminate- Pit depth repairs Contract 96-75           exceeded DBA qualification Unavailable - FER       limits for UT-1 5 at direction of 097(7301)                   Cooper           CZ-11           noted repairs           facility nersonnel. Repair Station                     performed as directed                 I P by facility. No final C       material was reviewcd and of C issued.               evaluated "unqualified" according to client program.
2001103 Duane Arnold CZ-11 ASTM D 3911, ANSI inadvertently as ANSINI01.2 0980104 N101.2 & ANSI N5.12 qualified, but only met ASTM D-096 (7287) 3911.
Indeterminate-Pit depth repairs Contract 96-75 exceeded DBA qualification Unavailable - FER limits for UT-1 5 at direction of 097(7301)
Cooper CZ-11 noted repairs facility nersonnel. Repair Station performed as directed I P by facility. No final C material was reviewcd and of C issued.
evaluated "unqualified" according to client program.
Indeterminate - See Summary -
Indeterminate - See Summary -
097(7311)             Peach Bottom                                               Product was deemed unqualified Unit 3           CZ-11       P.O. 00270469 R!A           due to no final examination performed per PECO directive.
097(7311)
2007102 2003102                   Pi!:in                         Contract specifies     NO - Product'conmplies with D-2001101                                     CZ-11         Coatings to meet         3911 when applied to CZ-lI 0990103                   Station                       ASTM D-3911-95                         substrate 096 (7290)
Peach Bottom Product was deemed unqualified Unit 3 CZ-11 P.O. 00270469 R!A due to no final examination performed per PECO directive.
Browns 2Unit 2&ASTMFerry    Valspar       Coatings   to meet D 3911   and     NO -and 3911      Product  complies N 101.2       to D-on substrate 200 110 24nt2                         37                     ANSI N101.2         _    _  _  _  _  _  _  _  _
2007102 2003102 Pi!:in Contract specifies NO - Product'conmplies with D-2001101 CZ-11 Coatings to meet 3911 when applied to CZ-l I 0990103 Station ASTM D-3911-95 substrate 096 (7290)
2002104                                                   Coatings to meet         NO - Product complies to D-0980107             Oyster Creek           Valspar       ASTM D 3911 and         3911 and N 101.2 on substrate 096 (7275)                                       78           ANSI N101.2 2006101                                     Amero         Coatings to meet         NO - Product complies to D-080103                                       mHatchneo  ASTM D 3911 and 0980103                                   Dimetcote         ANSIN       .2       3911 and N 101.2 on substrate 2007106                                     Plasite       Coatings to meet         NO -Product complies to D-2004105                     Fermi             7155       ASTM D 3911 and           3911 and N 101.2 on substrate 2001106             ______                _____              ANSI N101.2
Browns Ferry Valspar Coatings to meet NO - Product complies to D-2 Unit 2&ASTM D 3911 and 3911 and N 101.2 on substrate 200 110 24nt2 37 ANSI N101.2 2002104 Coatings to meet NO - Product complies to D-0980107 Oyster Creek Valspar ASTM D 3911 and 3911 and N 101.2 on substrate 096 (7275) 78 ANSI N101.2 2006101 Amero Coatings to meet NO - Product complies to D-080103 mHatch neo ASTM D 3911 and 0980103 Dimetcote ANSIN  
.2 3911 and N 101.2 on substrate 2007106 Plasite Coatings to meet NO -Product complies to D-2004105 Fermi 7155 ASTM D 3911 and 3911 and N 101.2 on substrate 2001106 ANSI N101.2


UNDERWATER ENGINEERING SERVICES, Inc.
UNDERWATER ENGINEERING SERVICES, Inc.
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 U   ,    E ,,ngn..,ig-.,n ,
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 U
S..vjG.. Inc-                                           Page 12 of 16 Phase Three Summary:
E  
As determined by review team evaluation during the Phase One evaluation, the 1996 DBA/Irradiation Test revealed that Picco UT- 15 met the qualification and acceptance requirements of ANSI N 101.2 / ANSI N5.12 (both DBA/Irradiation and DBA criteria),
,,ngn..,ig-.,n,
S..vjG.. Inc-Page 12 of 16 Phase Three Summary:
As determined by review team evaluation during the Phase One evaluation, the 1996 DBA/Irradiation Test revealed that Picco UT-15 met the qualification and acceptance requirements of ANSI N 101.2 / ANSI N5.12 (both DBA/Irradiation and DBA criteria),
when applied and tested on substrates Dimetcote 6N, Ameron 90, K&L 6548/7107, Valspar/Mobil V78 Series and Plasite 7155. On this basis, UESI is confident that there is no potential impact to safety with regard to Service Level I protective coating Picco UT-15 provided and installed at nuclear facilities Fermi, Hatch, Oyster Creek and Browns Ferry meets the acceptance requirements (ANSI N 10 1.2 1 ASTM D-3911) defined by contractual documents.
when applied and tested on substrates Dimetcote 6N, Ameron 90, K&L 6548/7107, Valspar/Mobil V78 Series and Plasite 7155. On this basis, UESI is confident that there is no potential impact to safety with regard to Service Level I protective coating Picco UT-15 provided and installed at nuclear facilities Fermi, Hatch, Oyster Creek and Browns Ferry meets the acceptance requirements (ANSI N 10 1.2 1 ASTM D-3911) defined by contractual documents.
Affected plants with CZ-1 I Substrate are addressed as follows:
Affected plants with CZ-1 I Substrate are addressed as follows:
FPL- Duane Arnold Enerpy Center The Duane Arnold Energy Center facility has been determined to contain CZ- 11 substrate and Picco UT-15 material was installed under the auspices of ANSI N101.2 / N5. 12, and therefore it is determined that the potential Part 21 applies to this facility.
FPL-Duane Arnold Enerpy Center The Duane Arnold Energy Center facility has been determined to contain CZ-11 substrate and Picco UT-15 material was installed under the auspices of ANSI N101.2 / N5. 12, and therefore it is determined that the potential Part 21 applies to this facility.
FPL-DAEC's Garth Dolderer is aware of finding, as he was the NUPIC member that made UESI aware that the potential for a Part 21 existed. At conclusion of Phase Three evaluation a potential Part 21 notification was placed to FPL-DAEC's Eric Sorenson.
FPL-DAEC's Garth Dolderer is aware of finding, as he was the NUPIC member that made UESI aware that the potential for a Part 21 existed. At conclusion of Phase Three evaluation a potential Part 21 notification was placed to FPL-DAEC's Eric Sorenson.
Follow up email notification to be sent.
Follow up email notification to be sent.
NPPD- Cooper Station The Cooper Station facility has been determined to contain CZ-1 I substrate, however a review of the Final Engineering Report (097) 7301 supplied to Cooper at the completion of UT- 15 Coating Repairs does not specify the code requirements the product was required to satisfy (ANSI NI01.2 and/or ASTM D-391 1). The review team attempted to review the Nebraska Public Power Contract (# 96-75) referenced in the report, but was unable to locate the business record's copy (over 10 years sent to alternate storage and not considered permanent QA records).
NPPD-Cooper Station The Cooper Station facility has been determined to contain CZ-1 I substrate, however a review of the Final Engineering Report (097) 7301 supplied to Cooper at the completion of UT-15 Coating Repairs does not specify the code requirements the product was required to satisfy (ANSI NI01.2 and/or ASTM D-391 1). The review team attempted to review the Nebraska Public Power Contract (# 96-75) referenced in the report, but was unable to locate the business record's copy (over 10 years sent to alternate storage and not considered permanent QA records).
A review of the FER indicates that UESJ personnel were directed by Cooper Station personnel to perform repairs to pit depths in the torus vapor and UA/ regions in excess of 60 mils (0.060"). It should be noted that the depth of coating qualification per the DBA Test (induced defects) for Picco UT- 15 is 0.0625" and may explain why a post installation Certificate of Conformance was not issued with this Final Engineering Report. Records indicate that UESI (S.G. Pinney at the time) performed a total of 1,454 repairs (approximately 40 sq. ft) within all 16 bays of the Cooper Station Torus. As a courtesy, UESI has notified NPPD-Cooper personnel (Russ Wenzl and Joshua Swele via phone and email confirmation) of a potential Part 21 that they will need to evaluate to see if it is applicable to their facility.
A review of the FER indicates that UESJ personnel were directed by Cooper Station personnel to perform repairs to pit depths in the torus vapor and UA/ regions in excess of 60 mils (0.060"). It should be noted that the depth of coating qualification per the DBA Test (induced defects) for Picco UT-15 is 0.0625" and may explain why a post installation Certificate of Conformance was not issued with this Final Engineering Report. Records indicate that UESI (S.G. Pinney at the time) performed a total of 1,454 repairs (approximately 40 sq. ft) within all 16 bays of the Cooper Station Torus. As a courtesy, UESI has notified NPPD-Cooper personnel (Russ Wenzl and Joshua Swele via phone and email confirmation) of a potential Part 21 that they will need to evaluate to see if it is applicable to their facility.


UNDERWATER ENGINEERING SERVICES, Inc.
UNDERWATER ENGINEERING SERVICES, Inc.
(000                         1326 S.W. Biltmore Street f1Port                   Saint Lucie, FL 34983 Und-ate*r Eng,.io.atn   .Is.
(000 1326 S.W. Biltmore Street f1Port Saint Lucie, FL 34983 Und-ate*r Eng,.io.atn Is.
                          ... Inc-                                           Page 13 of 16 Exelon- Peach Bottom Unit 3 A review of the Coatings Material Certificate of Conformance issued to Peach Bottom Unit 3 revealed that the coatings were not designated a "Qualified Repair" due to the fact that PECO Management made a determination to eliminate the UESI (SG Pinney at the time) Final Visual Examination (DFT and defects inspection of final coat) due to time constraints.
Inc-Page 13 of 16 Exelon-Peach Bottom Unit 3 A review of the Coatings Material Certificate of Conformance issued to Peach Bottom Unit 3 revealed that the coatings were not designated a "Qualified Repair" due to the fact that PECO Management made a determination to eliminate the UESI (SG Pinney at the time) Final Visual Examination (DFT and defects inspection of final coat) due to time constraints.
UESI contacted Dan Testa and Paul Macuiba of Exelon and informed them of finding and evaluation results via phone conversation and email confirmation. On the basis that the coating repairs perfonned were not considered qualified repairs by UESI, Exc[on should evaluate to validate whether coatings were properly documented according to their quality program.
UESI contacted Dan Testa and Paul Macuiba of Exelon and informed them of finding and evaluation results via phone conversation and email confirmation. On the basis that the coating repairs perfonned were not considered qualified repairs by UESI, Exc[on should evaluate to validate whether coatings were properly documented according to their quality program.
Phase Three summary: The review team determined that the only plant definitively affected by a potential Part 21 is the Duane Arnold Energy Center facilities. 3 other facilities where Picco UT-t 5 was installed over a Carboline Carbo-Zine CZ-1 I substrate either met the contractual scope (ASTM D-39 11) or should have been included in plant inventory of unqualified coatings, and should be evaluated by those affected facilities to validate.
Phase Three summary: The review team determined that the only plant definitively affected by a potential Part 21 is the Duane Arnold Energy Center facilities. 3 other facilities where Picco UT-t 5 was installed over a Carboline Carbo-Zine CZ-1 I substrate either met the contractual scope (ASTM D-39 11) or should have been included in plant inventory of unqualified coatings, and should be evaluated by those affected facilities to validate.
Line 180: Line 343:


UNDERWATER ENGINEERING SERVICES, Inc.
UNDERWATER ENGINEERING SERVICES, Inc.
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Undoto Engin.,o ng S,, e, .Inc.                                               Page 14 of 16 REVIEW TEAM CONCLUS1IONS AND RECOMAMENDA TIONS Review of Design Basis Accident Reports revealed that the post DBA/lrradiation test acceptance criteria for blistering was exceed on 4 of 16 test panels tested on CZ- II substrate, when evaluated to the requirements of AN SI N101 .2-1972. Blisters and adjacent repair coating were noted as "sound and fully intact", which complies with ASTM D-3911-95, but the size of blisters was documented as size #2 and larger. ANSI N101.2-1972 requires that blister size be limited to few, size #4 and smaller. Picco UT-15 satisfactorily passed all other acceptance criteria established in ANSI N101.2-1972 (flaking, cracking, delamination, peeling and chalking).
1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Undoto Engin.,o ng S,,
Safet* Hazard: On the basis of the UESI evaluation, while the Picco UT-15 coating was inadvertently presented as ANSI N101.2/N5.12 qualified over Carboline Cabo-Zine 1 substrate, the results of the irradiation aid DBA testing confirm that UT- 15 remained sound and fully intact with no other coating failures noted. UESI is confident in assessing that UT-1 5 poses no substantial safety hazard, as it is highly unlikely to contribute to the ECCS debris source tenn inventory of coatings debris.
e,.Inc.
Recommendations: As the seller and installer of the UT-15 coating material, UESI cannot adequately evaluate the product for purchaser/affected licensee with regard to facility specific Safety Analysis requirements. As referenced in Part 21.21 (3)(ii)(b) UESI is informing licensees (within 5 days of this determination) where Picco UT-I 5 was sold and installed on CZ-l I substrate under the auspices of ANSI N 101.2 so that they may properly evaluate in accordance with their IOCFR50 App. B quality program. Again it is emphasized that the ke, elements of a Service Level I repair coating, adhesion and intact, were acceptable tributes of all DBA tests conducted on Picco UT-15.
Page 14 of 16 REVIEW TEAM CONCLUS1IONS AND RECOMAMENDA TIONS Review of Design Basis Accident Reports revealed that the post DBA/lrradiation test acceptance criteria for blistering was exceed on 4 of 16 test panels tested on CZ-II substrate, when evaluated to the requirements of AN SI N101.2-1972. Blisters and adjacent repair coating were noted as "sound and fully intact", which complies with ASTM D-3911-95, but the size of blisters was documented as size #2 and larger. ANSI N101.2-1972 requires that blister size be limited to few, size #4 and smaller. Picco UT-15 satisfactorily passed all other acceptance criteria established in ANSI N101.2-1972 (flaking, cracking, delamination, peeling and chalking).
Safet* Hazard:
On the basis of the UESI evaluation, while the Picco UT-15 coating was inadvertently presented as ANSI N101.2/N5.12 qualified over Carboline Cabo-Zine 1 substrate, the results of the irradiation aid DBA testing confirm that UT-15 remained sound and fully intact with no other coating failures noted. UESI is confident in assessing that UT-1 5 poses no substantial safety hazard, as it is highly unlikely to contribute to the ECCS debris source tenn inventory of coatings debris.
Recommendations:
As the seller and installer of the UT-15 coating material, UESI cannot adequately evaluate the product for purchaser/affected licensee with regard to facility specific Safety Analysis requirements. As referenced in Part 21.21 (3)(ii)(b) UESI is informing licensees (within 5 days of this determination) where Picco UT-I 5 was sold and installed on CZ-l I substrate under the auspices of ANSI N 101.2 so that they may properly evaluate in accordance with their IOCFR50 App. B quality program. Again it is emphasized that the ke, elements of a Service Level I repair coating, adhesion and intact, were acceptable tributes of all DBA tests conducted on Picco UT-15.
UESI work procedures shall be revised to reflect maximum pit depth allowable to be considered "qualified" coating. Amended records to the DBA/Irradiation Test results should include maximum pit depth data also.
UESI work procedures shall be revised to reflect maximum pit depth allowable to be considered "qualified" coating. Amended records to the DBA/Irradiation Test results should include maximum pit depth data also.
The final draft of the evaluation was completed on Tuesday, April 8, 2008 and forwarded to the UESI / GPI president, as defined in the UESI QA Manual and 10 CFR 21.
The final draft of the evaluation was completed on Tuesday, April 8, 2008 and forwarded to the UESI / GPI president, as defined in the UESI QA Manual and 10 CFR 21.
Line 189: Line 356:
This concludes the Conclusion and Recommendations Section of the review.
This concludes the Conclusion and Recommendations Section of the review.


UNDERWATER ENGINEERING SERVICES, Inc, 1326 S.W. Biltmore Street
UNDERWATER ENGINEERING SERVICES, Inc, 1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 U.d.morHngl...nso.g 5 o..I Page 15 of 16 REVIEW TEAM  
              -
* Port Saint Lucie, FL 34983 U.d.morHngl...nso.g 5 o..I
                      ...                                              Page 15 of 16 REVIEW TEAM  


==REFERENCES:==
==REFERENCES:==
: 1. UESI Nonconformance Report (VCR) # 2008-0I
: 1.
: 2. NUPIC Audit 08.03.SPAFL.O8.1I (JointAudit # 20119)
UESI Nonconformance Report (VCR) # 2008-0I
: 3. ASTM D-391 1-95, "Standard Test Methodfor Evaluating Coatings Used in Light-Waler Nuclear Power Plants at Simulated Design Basis Accident (DBA)
: 2.
NUPIC Audit 08.03.SPAFL.O8.1I (Joint Audit # 20119)
: 3.
ASTM D-391 1-95, "Standard Test Method for Evaluating Coatings Used in Light-Waler Nuclear Power Plants at Simulated Design Basis Accident (DBA)
Conditions"
Conditions"
: 4. ANSI N t 01.2-1972, "Protective Coatings (Paints)Jr Light Water Nuclear Reactor ContainmentFacilities"
: 4.
: 5. ANSI N5.12-1974, "Protectivecoalings (paints)jotrthe nuclear indus!n."'
ANSI N t 01.2-1972, "Protective Coatings (Paints) Jr Light Water Nuclear Reactor Containment Facilities"
: 6. Final Engineering Report "FinalReport for Design Basis Accident (DBA) and IrradiationTesting ofCoating RepairMaterialsJbr Use in Boiling Water Reactor Suppression Chamber Immersion Areas" dated 16 December 1996
: 5.
: 7. ASTM D714-87(1994) el "Standard Test Method for EvaluatingDegree of Blistering of Paints"
ANSI N5.12-1974, "Protective coalings (paints)jotr the nuclear indus!n."'
: 8. Final Engineering Report "CoatingSystems Tested on Steel Panelsfor irradiation andDesign Basis Accident (DBA) CriteriaRequirements / Duane Arnold Ene-yv Center /Joowa Electric Light and Power Company / Cedar Rqapid.s'l Iowa / Report No. 2" dated 1/16/1990
: 6.
: 9. Final Engineering Report No. NUC2004109, "Irradiationand Desig- Basis Accident (DBA,) Qualification Testing of Repair Coatings fro Duane lrnold Energy Center" daied December 20, 2005.
Final Engineering Report "Final Report for Design Basis Accident (DBA) and Irradiation Testing ofCoating Repair Materials Jbr Use in Boiling Water Reactor Suppression Chamber Immersion Areas" dated 16 December 1996
: 7.
ASTM D714-87(1994) el "Standard Test Method for Evaluating Degree of Blistering of Paints"
: 8.
Final Engineering Report "Coating Systems Tested on Steel Panels for irradiation and Design Basis Accident (DBA) Criteria Requirements / Duane Arnold Ene-yv Center /Joowa Electric Light and Power Company / Cedar Rqapid.s'l Iowa / Report No. 2" dated 1/16/1990
: 9.
Final Engineering Report No. NUC2004109, "Irradiation and Desig-Basis Accident (DBA,) Qualification Testing of Repair Coatings fro Duane lrnold Energy Center" daied December 20, 2005.


UNDERWATER ENGINEERING SERVICES, Inc.
UNDERWATER ENGINEERING SERVICES, Inc.
U(                                           1326 S.W. Biltmore Street
U (
                -M                                 Port Saint Lucie, FL 34983 Underwater Engineering Servic., Inc.                                                             Page 16 of 16 ATTACHMENT 1 "Notificationrequirementsof 10 CFR Part21 related to a directorof corporateofficer" (3) Notification required by paragraph (d)(1) of this section must be made as follows     --
1326 S.W. Biltmore Street
-M Port Saint Lucie, FL 34983 Underwater Engineering Servic.,
Inc.
Page 16 of 16 ATTACHMENT 1 "Notification requirements of 10 CFR Part 21 related to a director of corporate officer" (3) Notification required by paragraph (d)(1) of this section must be made as follows --
(i) Initial notification by facsimile, which is the preferred method of notification, to the NRC Operations Center at (301) 816 - 5151 -or by telephone at (301) 816 - 5 100 within two days following receipt of information by the director or responsible corporate officer under paragraph (a)(1) of this section, on the identification of a defect or a failure to comply. Verification that the facsimile has been received should be made by calling the NRCf Operations Center. This paragraph does not apply to interim reports described in
(i) Initial notification by facsimile, which is the preferred method of notification, to the NRC Operations Center at (301) 816 - 5151 -or by telephone at (301) 816 - 5 100 within two days following receipt of information by the director or responsible corporate officer under paragraph (a)(1) of this section, on the identification of a defect or a failure to comply. Verification that the facsimile has been received should be made by calling the NRCf Operations Center. This paragraph does not apply to interim reports described in
§ 21.2 1(a)(2).
§ 21.2 1(a)(2).
Line 225: Line 401:
(e) Individuals subject to this part may be required by the Commission to supply additional information related to a defect or failure to comply. Conmmission action to obtain additional information may be based on reports of defects from other reporting entities.
(e) Individuals subject to this part may be required by the Commission to supply additional information related to a defect or failure to comply. Conmmission action to obtain additional information may be based on reports of defects from other reporting entities.


TRANSTIISSION VERTFICATION REPORT TIME     04/09/2008 10:55 i-AME FAX TEL SER. 0  BROM5J390260 GREENMAN-PEDERSEN, LNC.
TRANSTIISSION VERTFICATION REPORT TIME i-AME FAX TEL SER. 0 04/09/2008 10:55 BROM5J390260 GREENMAN-PEDERSEN, LNC.
UNDERWATER ENGINZERNG SERVICES INC.
UNDERWATER ENGINZERNG SERVICES INC.
INSTRUMENT SALES INC. a GPI. Company Malila Addres 1326 SW Biltmore St Port St. Lutie, FL 34983-2958 Ph. 772-337-3080       tax: 772-13730294 FACSIMILE COVER SHEEET COMPANY:                 4( f e4.e? 0~~Lrg FAX:3i                   4-ij FROM:             6ehP/S'. e,,9A0,4lPZ~A f DATE:         _"____/       _________
INSTRUMENT SALES INC. a GPI. Company Malila Addres 1326 SW Biltmore St Port St. Lutie, FL 34983-2958 Ph. 772-337-3080 tax: 772-13730294 FACSIMILE COVER SHEEET COMPANY:
PAGES INCLUD*NG COVAPR   PAGE'               A MESSAGE;
4( f e4.e? 0~~Lrg FAX:3i 4-ij FROM:
                                                        /O4"Apo'f46 #t 4/orLf/c
6ehP/S'. e,,9A0,4lPZ~A f DATE:
_73L                -
_"____/
PAGES INCLUD*NG COVAPR PAGE' A
MESSAGE;
_73L 4/orLf/c
/O4 "Apo'f4 6
#t


UNDERWATER ENGLNEERING SERVICES, Inc.                       -  -
UNDERWATER ENGLNEERING SERVICES, Inc.
C1326                     S.W. Biltmore Street
C1326 S.W. Biltmore Street
              -Port                                 Saint Lucie, FL 34983
-Port Saint Lucie, FL 34983 Engi.....  
              ,od Engi..... ,
,od Se....,nc.
Se.... ,nc.                                                     Page   I of 3
Page I of 3


==Subject:==
==Subject:==
I0CFR Part 21, Initial Notification of Potential Safety Related Noncompliance Deviation Notification By:           Underwater Engineering Services, Inc. (Formerly S.G. Pinney and Associates - UES)
I0CFR Part 21, Initial Notification of Potential Safety Related Noncompliance Deviation Notification By:
Phone:                     (772) 337-3116 (xi 14 Chris Graham), Fax: (772) 337-0294 Based on NUPIC Audit No. 08.03SPAFL.08. 1, Finding No. I a review of Historical Design Basis Accident (DBA) / Irradiation Test Results dated 12/16/1996, and subsequent internal investigation and evaluation, it has been determined that UESI Proprietary Underwater Coating Picco UT-l 5, when applied over the substrate Carboline CZ- II only, does not meet all acceptance criteria of ANSI N101.2-1972 and ANSI N5.12-1974 for DBA qualified Coating Service Level I repair material.
Underwater Engineering Services, Inc. (Formerly S.G. Pinney and Associates - UES)
Phone:
(772) 337-3116 (xi 14 Chris Graham), Fax: (772) 337-0294 Based on NUPIC Audit No. 08.03SPAFL.08. 1, Finding No. I a review of Historical Design Basis Accident (DBA) / Irradiation Test Results dated 12/16/1996, and subsequent internal investigation and evaluation, it has been determined that UESI Proprietary Underwater Coating Picco UT-l 5, when applied over the substrate Carboline CZ-II only, does not meet all acceptance criteria of ANSI N101.2-1972 and ANSI N5.12-1974 for DBA qualified Coating Service Level I repair material.
The evaluation concluded that while Picco UT-15 is fully qualified to ASTM D-3911-95 for all Service Level I and Torus/Immersion Area coating repairs on all substrates tested, use of the product should have been limited to ANSI N 101.2-1972 qualified on all substrates tested with the exception of CZ-1 1.
The evaluation concluded that while Picco UT-15 is fully qualified to ASTM D-3911-95 for all Service Level I and Torus/Immersion Area coating repairs on all substrates tested, use of the product should have been limited to ANSI N 101.2-1972 qualified on all substrates tested with the exception of CZ-1 1.
Beginning innediately, UESI will cease to market and install its product as ANSI Ni01.2-1972 / N5.12-1974 irradiation and DBA qualified when applied as a repair material over" Carboline CZ-l I substrate.
Beginning innediately, UESI will cease to market and install its product as ANSI Ni01.2-1972 / N5.12-1974 irradiation and DBA qualified when applied as a repair material over" Carboline CZ-l I substrate.
Line 252: Line 435:
Facilities with CZ-I 1 substrate and repairs performed with Picco UT-15, but may be exempt from Part 21 impacts are as Noted:
Facilities with CZ-I 1 substrate and repairs performed with Picco UT-15, but may be exempt from Part 21 impacts are as Noted:


UNDERWATER ENGINEERING SERVICES, Inc.                       19 A1 e. r
UNDERWATER ENGINEERING SERVICES, Inc.
19A1 e.
r
* 1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Undowa.tr E.nnoof...g Scoso, Inc.
* 1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Undowa.tr E.nnoof...g Scoso, Inc.
Page 2 of 3 (ii) Identification (continued)
Page 2 of 3 (ii) Identification (continued)
Note 1: Cooper Nuclear Station- Picco UT-15 stating coating repairs performed in CZ- 1I Torus per SGPAI (Final Engineering Report) FER 097 (7301) - Contract # 96-75. Code compliance not referenced in Final Engineering Report nor C of C issued stating ANSI NI 01.2 conformance. Per NPPD Cooper station personnel, coatings were classified "unqualified" based on revised Drywell and Wetwell curves. NPPD (Joshua Swele. Russ Wenzl) has been advised of finding as a courtesy.
Note 1: Cooper Nuclear Station-Picco UT-15 stating coating repairs performed in CZ-1I Torus per SGPAI (Final Engineering Report) FER 097 (7301) - Contract # 96-75. Code compliance not referenced in Final Engineering Report nor C of C issued stating ANSI NI 01.2 conformance. Per NPPD Cooper station personnel, coatings were classified "unqualified" based on revised Drywell and Wetwell curves. NPPD (Joshua Swele. Russ Wenzl) has been advised of finding as a courtesy.
Note 2: LUESI (under the name of S.G. Pinney and Associates - UES) has provided UT-15 coating repairs for the Pilgrim Nuclear Station under the contract conditions of ASTM D-3911-95, which product is shown to satisfy the requirements of on CZ-1 1 substrate, therefore they are exempt from this Part 21 notification, but PNS has been advised of the finding as a courtesy.
Note 2: LUESI (under the name of S.G. Pinney and Associates - UES) has provided UT-15 coating repairs for the Pilgrim Nuclear Station under the contract conditions of ASTM D-3911-95, which product is shown to satisfy the requirements of on CZ-1 1 substrate, therefore they are exempt from this Part 21 notification, but PNS has been advised of the finding as a courtesy.
Note 3: UESI (under the name of S.G. Pinney and Associates - UES) has provided UT-15 coating repairs for the Peach Bottom Nuclear facility, but the coatings material was determined to be considered not a "Qualified Repair" due to the SGPAI-UES Inspectors not being provided opportunity to perform a final visiual examination of the applied coatings due to time constraints. On this basis, PECO must evaluate impact of this Part 21 notification, and have been advised (Dan Testa, Paul Macuiba) of the finding as a courtesy.
Note 3: UESI (under the name of S.G. Pinney and Associates - UES) has provided UT-15 coating repairs for the Peach Bottom Nuclear facility, but the coatings material was determined to be considered not a "Qualified Repair" due to the SGPAI-UES Inspectors not being provided opportunity to perform a final visiual examination of the applied coatings due to time constraints. On this basis, PECO must evaluate impact of this Part 21 notification, and have been advised (Dan Testa, Paul Macuiba) of the finding as a courtesy.
(iii) Identification of the firm constructing the flacility or supplying the basic component which fails to comply with or contains the defect.
(iii) Identification of the firm constructing the flacility or supplying the basic component which fails to comply with or contains the defect.
Underwater Engineering Services, hIc 1326 SW Biltmore St.
Underwater Engineering Services, hIc 1326 SW Biltmore St.
Port Saint Lucie, FL 34983 Ph. 772-337-311,6 (iv) Nature of the defect or failure0to comply and the safety hazard which is created by such a defect or failure to comply.
Port Saint Lucie, FL 34983 Ph. 772-337-311,6 (iv) Nature of the defect or failure 0to comply and the safety hazard which is created by such a defect or failure to comply.
Review of Design Basis Accident Reports revealed that the post DBA/Irradiation test acceptance criteria for blistering was exceed on 4 of 16 test panels tested on CZ-1 1 substrate, when evaluated to the requirements of ANSI N101.2-1972. Blisters and adjacent repair coating were noted as "sound and fully intact", which complies with ASTM D-3911-95, but the size of blisters was doctunented as size #2 and larger. ANSI N101 .2-1972 requires that blister size be limited to few, size #4 and smaller. Picco UT- 15 satisfactorily passed all other acceptance criteria established in ANSI NI 01.2-1972 (flaking, cracking, delamination, peeling and chalking).
Review of Design Basis Accident Reports revealed that the post DBA/Irradiation test acceptance criteria for blistering was exceed on 4 of 16 test panels tested on CZ-1 1 substrate, when evaluated to the requirements of ANSI N101.2-1972. Blisters and adjacent repair coating were noted as "sound and fully intact", which complies with ASTM D-3911-95, but the size of blisters was doctunented as size #2 and larger. ANSI N101.2-1972 requires that blister size be limited to few, size #4 and smaller. Picco UT-15 satisfactorily passed all other acceptance criteria established in ANSI NI 01.2-1972 (flaking, cracking, delamination, peeling and chalking).
Safety Hazard: On the basis of the UJESI evaluation, while the Picco UT-i5 coating was incorrectly presented as ANSI N101 .2/N5.12 qualified over Carboline Carbo-Zinc 11 substrate, the results of the irradiation and DBA testing confirm that UT-15 remained sound and fully intact with no other coating failures noted. UESI is confident in assessing that UT-15 poses no substantial safety hazard, as it willnot contribute to the ECCS debris source term inventory of coatings debris. As the seller and installer of the UT-I 5 coating material, UESI camnot adequately evaluate the product for purchaser/affected licensee with regard to facility specific Safety Analysis requirements. As referenced in Part 21,21 (3)(ii)(b) UESI is
Safety Hazard: On the basis of the UJESI evaluation, while the Picco UT-i5 coating was incorrectly presented as ANSI N101.2/N5.12 qualified over Carboline Carbo-Zinc 11 substrate, the results of the irradiation and DBA testing confirm that UT-15 remained sound and fully intact with no other coating failures noted. UESI is confident in assessing that UT-15 poses no substantial safety hazard, as it willnot contribute to the ECCS debris source term inventory of coatings debris. As the seller and installer of the UT-I 5 coating material, UESI camnot adequately evaluate the product for purchaser/affected licensee with regard to facility specific Safety Analysis requirements. As referenced in Part 21,21 (3)(ii)(b) UESI is


UNDERWATER ENGINEERING SERVICES, Inc.                           .'4 1326 S.W. Biltmore Street Port Saint Lucie, FL 34983
UNDERWATER ENGINEERING SERVICES, Inc.  
              ,o*-,e E,*,,*     ,
.'4 1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 E,*,,*  
S.... ,o.
,o*-,e S....  
IPage                                                         3 of 3 informing licensees (within 5 days of this detennination) where Picco UT-15 was sold and installed on CZ-l 1 substrate under the auspices of ANSI N101.2 so that they may properly evaluate in accordance with their IOCFR50 App. B quality program.
,o.
IPage 3 of 3 informing licensees (within 5 days of this detennination) where Picco UT-15 was sold and installed on CZ-l 1 substrate under the auspices of ANSI N101.2 so that they may properly evaluate in accordance with their IOCFR50 App. B quality program.
(v) The date on which the information of such defect or failure to comply Was obtained.
(v) The date on which the information of such defect or failure to comply Was obtained.
NUPIC identified that a potential problem of unqualified coatings exists with results of the 1996 DBA/JInadiation Test on Februai-y 29, 2008. UESI initiated Nonconformance Report NCR # 2008-0 1, insured that no coating applications was scheduled in Nuclear facilities requiring adherence to ANSI N101.2-1972, notified parent company President of potential Part 21 and under his directive began investigation.
NUPIC identified that a potential problem of unqualified coatings exists with results of the 1996 DBA/JInadiation Test on Februai-y 29, 2008. UESI initiated Nonconformance Report NCR # 2008-0 1, insured that no coating applications was scheduled in Nuclear facilities requiring adherence to ANSI N101.2-1972, notified parent company President of potential Part 21 and under his directive began investigation.
Line 273: Line 459:
Duane Arnold Energy Center: undetermined sq. ft.
Duane Arnold Energy Center: undetermined sq. ft.
(vii) The corrective action which has been, is being, or will be taken: the name of the individual or ormanization responsible for the action: and the length of time that has been or will be taken to complete the action.
(vii) The corrective action which has been, is being, or will be taken: the name of the individual or ormanization responsible for the action: and the length of time that has been or will be taken to complete the action.
UESI Quality Assurance shall issue a Records Correction Notice to amend the DBA/Irradiation Test dated 12/16/1996. This record will limit the use Picco UT- 15 on substrate material Carboline Carbo-Zinc 1 under the auspices of ASTM D-3911-95 only.
UESI Quality Assurance shall issue a Records Correction Notice to amend the DBA/Irradiation Test dated 12/16/1996. This record will limit the use Picco UT-15 on substrate material Carboline Carbo-Zinc 1 under the auspices of ASTM D-3911-95 only.
The records correction shall also amend the report to indicate acceptance of product test to ANSI NI 01.2 for other DBAilrradiation Tested substrates. This action item is planned to be completed within 60 days of this report.
The records correction shall also amend the report to indicate acceptance of product test to ANSI NI 01.2 for other DBAilrradiation Tested substrates. This action item is planned to be completed within 60 days of this report.
(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
Picco UT-15 is DBA qualified for Service Level I coatings applications in accordance with ASTM D-391 1-95 and subsequent revisions to date.
Picco UT-15 is DBA qualified for Service Level I coatings applications in accordance with ASTM D-391 1-95 and subsequent revisions to date.
Picco UT-i5 is DBA qualified for Service Level I coatings applications in accordance with ANSI N101.2-1972, excluding application on Carboline CZ-1 I substrate.
Picco UT-i5 is DBA qualified for Service Level I coatings applications in accordance with ANSI N101.2-1972, excluding application on Carboline CZ-1 I substrate.
Picco UT-15 maintains excellent adhesion and resistance to peeling, cracking, flaking and delarmination, and, based on irradiation and DBA test results, will not contribute to the coatings component of the ECCS debris source terni If you have any questions or need additional information concerning this notification, please contact Chris Graham, UESI QA Manager or Robert Walcheski, UESI Assistant VP and Technical Manager, at (772) 337-3116.             .              2}}
Picco UT-15 maintains excellent adhesion and resistance to peeling, cracking, flaking and delarmination, and, based on irradiation and DBA test results, will not contribute to the coatings component of the ECCS debris source terni If you have any questions or need additional information concerning this notification, please contact Chris Graham, UESI QA Manager or Robert Walcheski, UESI Assistant VP and Technical Manager, at (772) 337-3116.
2}}

Latest revision as of 17:00, 14 January 2025

Notification of Potential Part 21 on Safety Related Noncompliance Deviation
ML081200882
Person / Time
Site: Hatch, Monticello, Dresden, Peach Bottom, Browns Ferry, Fermi, Oyster Creek, Cooper, Pilgrim, Columbia, Limerick, Vogtle, Duane Arnold, Comanche Peak, Quad Cities, FitzPatrick, LaSalle
Issue date: 04/14/2008
From: Graham C
Underwater Engineering Services
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML081200882 (21)


Text

IjdcEwot E

~

t;-fx~~ ESrvn%

1(

UNDERWATER ENGINEERING SERVICES, Inc.

1326 S.W. Biltmore Street Port Saint Lucie, FL 34983

Subject:

Completion of evaluation: 1 OCFR Part 21 Notification of Potential Safety Related Noncompliance Deviation United States Nuclear Regulatory Commission Document Control Desk To:

Evaluation Renort Cover Letter:

On Wednesday, April 9t, 2008 UESI repoited an initial notification of potential Part 21 applicability to the USNRC. This notification was faxed to, and confirmation received from, the NRC Operations Center.

Please find attached the completed evaluation report of the UESI Part 21-review of its Picco

-UT-15 Service Level I repair coating material, and its impact, if any, on end users of the product. There have been no changes between the initial notification sent to your office, and the final evaluation enclosed with this document. The evaluation report has been final reviewed and approved by the CEO/Presideht of UESI.

UESI has provided a copy of the evaluatio'nifor your information. Attachment 2 of the evaluation is a copy of the official notification that was faxed to your Operations Center.

UESI has notified all applicable facilities ti at may have been impacted by this Part 21, and provided a copy of this report to them.

If you have any questions or need additional information concerning this notification, please feel free to contact me,

Regards, Chris C. Graham UESI QA Manager Phone: (772) 337-3116 (x114)

Fax: (772) 337-0294 Email: cgraham@uesi.com FJ

U (?MB UNDERWATER ENGINEERING SERVICES, Inc.

1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 1 of 16 Potential 10 CFR 21 Applicability Review UESI Service Level 1 Coating Repair Material Picco UT-15 Evaluation Team:

A Review Team was formed as directed by UESI/GPI President Steve Greenman to resolve UESI Nonconformance Report #2008-01 (Reference 1) and the associated findings of NUPIC Audit 08.03.SPAFL.08.1 (Joint Audit # 20119) (Reference 2). The Review Team members responsible for the results entailed in this report are:

" Mr. Jon R. Cavallo, PE, Vice President of GPI affiliate Corrosion Control Consultants & Labs, Inc, UESI Certified Level III Coatings Inspector, registered Professional Engineer, ASTM D-33 Nuclear Coatings Committee Chairman, a SSPC certified Protective Coatings Specialist and industry leader in coatings evaluation and consulting.

" Mr. Robert Walcheski, UESI Technical Manager, UESI Assistant Vice President, Certified UESI ANSI Level III Coatings Inspector, ASNT SNT-TC-1A & CP189 VT-1/V-3 (IWE, IWL, IWF) Level II, ASTM D33 committee member, certified NACE CIP Level II, former SGPAI-UES QA Manager, and;

  • Mr. Chris Graham, UESI Quality Assurance Manager, NQA-l Lead Auditor, NACE CIPI, Certified UESI ANSI Level II Coatings, Certified UESI ANSI Level III Visual Welding, Current API 510 Certified Inspector, CQCM and UESI Part 21 Review Team POC.

Report submitted for review and approval to UESI/GPI President by:

Chris C, Grahan/Py.4 EST Quality Assurance Manager Date I have reviewed the results of this evaluation and concur with its evaluations and conclusion. I have reviewed and approved this report, and authorize applicable determinations made within this internal evaluation to be included in the official Part 2L21 submittal to the Nuclear Regulatory Commission, in accordance with 10CFR t

uality Assurance Manual, 3"d Edition, Rev. 0.

Ste--en Greenman-

-entCEO Date K-j

UNDERWATER ENGINEERING SERVICES, Inc.

(1326 S.W. Biltmore Street fPort Saint Lucie, FL 34983 Und.a,,-,- ýnonew.n-S,,*..,*

1ýPage 2 of 16

SUBJECT:

Potential 10 CFR 21 Applicability Review as described in UESI QA Manual, QAP-15, R/5, Section 5.0 DISCUSSION A Review Team was formed as directed by UESI / GPI President and CEO Steve Greenman to resolve UESI Nonconformance Report #2008-01 (Reference 1) and the associated findings of NUPIC Audit 08.03.SPAFL.08.1 (Joint Audit # 20119 - Reference 2). The Review Team members assigned were:

  • Mr. Jon R. Cavallo, PE, Vice President of GPI affiliate Con-osion Control Consultants & Labs, Inc, UES1 Certified Level III Coatings Inspector, registered Professional Engineer, ASTM D-3 3 Nuclear Coatings Committee Chairman, a SSPC certified Protective Coatings Specialist and industry leader in coatings evaluation and consulting.

" Mr. Robert Walcheski, UESI Technical Manager, UESI Assistant Vice President, UESI Certified ANSI Level III Coatings Inspector, ASNT SNT-TC-IA & CP189 VT-1,/V-3 (IWE, IWL, IWF), ASTM D33 committee member, certified NACE CIP Level II, former SGPAI-UES QA Manager, and;

" Mr. Chris Graham, UESI Quality Assurance Manager, NQA-I Lead Auditor, NACE CIPl, Certified UESI ANSI Level II Coatings, Certified UESI ANSI Level III Visual Welding, Current API 510 Certified Inspector and UESI Part 21 Review Team POC.

PHASE ONE Evaluation:

The Review Team conducted an initial meeting on March 18, 2008. Dean Reynolds, UESI Vice President and Branch Manager also attended the 3/1 8/08 meeting. The purpose of the meeting was to create a schedule to identify locations of use and determine the acceptability of UT-15 coatings applied in commercial nuclear facilities.

An evaluation of all available Picco UT-15 DBA/Irradiation tests was conducted under Phase One to confirm that Picco UT-15 meets the DBA/lrradiation requirements of ASTM D-391 1-95 (Reference 3) on all substrates tested. The Phase One Evaluation confirmed that Picco UT-15 satisfies the DBA/irradiation qualification requirements for Service Level I coating to the acceptance requirements of ASTM D-3911-95 on all substrates tested.

Next, the Phase One evaluation effort focused on the assessment of DBA qualifications tests to determine the acceptability of Picco UT-1 5 as it relates to the ANSI N101.2-1972 (Reference 4) and ANSI N5.12-1974 (Reference 5) (DBA/irradiation and lining test) requirements, establish the level to which the product meets those qualification requirements and identify any limitations that should have been imposed on the product after completion of irradiation and DBA testing in 1996. The 1996 irradiation and DBA testing is reported in Reference 6.

UNDERWATER ENGINEERING SERVICES, Inc.

1326 S.W. Biltmore Street

  • Port Saint Lucie, FL 34983 Underwater Eu-i'"neln' Servic".

t Page 3 of 16 The 1996 irradiation and DBA test report for UT-15 (Reference 6) states, on page 3 of 7:

"Testing was performed in accordance with ANSI N101.2 and ASTM D 3911 for DBA test requirements... Specific parameters were obtained from anticipated DBA and irradiation conditions of various facilities as described in the applicable FSAR's,"

On page 5 of 7 of Reference 6, the following statement appears concerning DBA testing:

"Examination and evaluation was performed in accordance with ASTM D 3911..."

Again on page 5 of 7 of Reference 6, the following statement appears under Acceptance Criteria:

"Peeling shall not be permitted. Delamination shall not be permitted. Cracking is not considered a failure unless accompanied by delamination or loss of adhesion.

Blisters shall be limited to intact blisters which are completely surrounded by sound coating bonded to the surface."

These acceptance criteria conform to the 1995 version of ASTM D391 1. These acceptance criteria do not conform to ANSI N1 01.2; specifically, ANSI N1 01.2 limits blistering to a few No. 4 blisters as defined in ASTM D 714 (Reference 7).

The review team next identified the following information contained in the 1996 irradiation and DBA test report (Reference 6).

1. Review of the 1996 test report revealed that testing of the Picco UT-I5 coating material, Batch I and Batch 2 met or exceeded-the acceptance criteria delineated in ANSI N 101.2-1972 and ASTM when applied on the following substrates; CZ-11SGQ Dimetcote 6N, Ameron 90, Keeler and Long 6548/7107, Valspar/Mobil V78 Series and Plasite 7155.
2. Picco UT-15, Batch 3 met or exceeded the acceptance criteria delineated in ANSI N 101.2-1972 for all substrates referenced above with the exception of CZ-1ISG.
3. Simulated pitting defects of 1/16 in (0.0625 in.) were introduced into selected test panels.

4, The 1996 test did not include Chemical Resistance Testing as defined in Section 5 of ANSI N5.12.

The review team reviewed a 1990 GPU-Oyster Creek DBA/Irradiation Test (Reference 8), which provides the results of testing of Brutem-15 (the predecessor of UT-15).

Testing was performed by application of Brutem 15 over CZ-1 ISG. No post-irradiation and post-DBA defects were noted.

UNDERWATER ENGINEERING SERVICES, Inc.

(Mom 1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 U

Engn,,,g,.,,,...,n..

Page 4 of 16 The review team reviewed a 2005 Duane Arnold Energy Center DBAilrradiation Test (Reference 9). Testing was performed by application of UT-15 over CZl 1SG. This testing was performed at the Owner's request as a result of a possible increase of the design peak temperature in the torus. Chemical Resistance Testing was not requested by Duane Arnold Site Engineering due to time and financial constraints, even though it was apparently invoked in the contract document.

Phase One Summary:

The review team, after conducting the Phase One reviews described above, holds the following opinions:

1. UT-I5 coating is qualified per ASTM D39 11-95 and ANSI N101.2-1974 for application as a repair coating over Dimetcote 6N, Ameron 90, Keeler and Long 6548/7 107, Valspar/Mobil V78 Series and Plasite 7155.
2. UT-15 coating is qualified per ASTM D391 1-95 for application as a repair coating over CZ I ISG.
3. UT-I5 coating is not qualified per ANSI N101.2 for application as a repair coating over CZI t SG.
4. UT-I5 is qualified fIr repair of defects up to 1/16 in (0.0625 in.) in depth, subject to the limitations of I, 2and 3 above.

Since the completion and evaluation of this 2005 DBA/lrradiation Test the review team concluded that UESt has not provided and installed any Pieco UT-I 5 coating to the DAEC facility. It was also noted that UEST had takens, corrective action measures related to, the Test Report. Technical errors noted in this 2005 DAEC DBAilrradiation Test were identified and documented on a UESI Nonconformance Report (NCR # 2008-02). UESI Quality Assurance initiated QA records corrections and submitted to Mr. Eric Sorenson of the DAEC facility as an amendment to the existing DBA/Irradiation Test, and the NCR was closed.

This concludes Phase One of the review.

Underwatr Eng]-ordrlg ir l

aqm I*

PHASE TWO Evaluation:

UNDERWATER ENGINEERING SERVICES, Inc.

1326 S.W. Biltmore Street Port Saint Lucie, FL 34983

'Page 5 of 16 Phase Two of the evaluation began with a review of Final Engineering Reports, contract documents, job start and Order Entry Review forms of Nuclear Project work to determine the extent of use of Picco UT-I5 on Nuclear Safety related projects.

UESI identified all nuclear coating project work involving Picco UT-15 performed since the 1996 DBA Test (Reference 6). This information is summarized in Table 1.

TABLE 1 UT-15 Coating Phase 3 UESI Project #

Repairs (Prefix) NUC-Client/ Facility Scope of Services Perlormed Evaluation

___ ___Required (YIN)

Tor us desludging 2008101 SNC - Hatch Touspectin.

N N

_____and inspection.

Torus desludging, 2007106 DTE -Fermi inspection &

YES YES Plasite 7155 repairs 2007105 GPC - Branch Plant discharge N

N 2007105__

GP

- Branchrepairs NN ENW -

Wetwell / drywell N

2007104 Columbia coatings N

N Station inspection 2007103 ENW -

Inspect Circ.

N N

Columbia Water Pump Torus desludge, 2007102 Wntry inspection &

YES YES Pilgrim Station repairs CZ-ll D3911 2007101 SNC -: Hatch Torus desludge &

N N

inspection NN 2006105 INEEL Isolation pool N

N TXU -

Staff 2006104 NN Comanche Peak augmentation N

.Vendor support 2006103 NPPD -Cooper Vno N

N CST 2006102 SNC - Hatch CST Plug removal N

N Torus desludge &

YES 2006101 SNC - Hatch Ameron YES inspection Dimetcote TXU -

Staff 2005103 NN Comanche Peak augmentation TXU -

Staff 200510O2 NN Comanche Peak augmentation 2005101 SNC - Hatch Torus desludge &

N N

inspection

wtr uS Unde-~tur 1Engin-Ing Serriter. In..

UNDERWATER ENGINEERING SERVICES, Inc.

1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 6 of 16 TABLE 1 UT-15 Coating Phase 3 UESI Project #

Client/Facility Scope of Services Repairs (Prefix) NUC-Performed Evaluation Required (Y/N)~

(Y/79 2004109 NMC - DAEC DBA /Irradiation N

N of UT-15 2004108 NPPD - Cooper Stafft N

N augmentation 2004107 ENW -

Dive inspections, N

N Columbia clean & removal BioDur 561 2004106 NMC - Duane Coating repair and YES YES Arnold inspections 200,4.105 DTE - Fermi Torus desludge YES YES and inspection Plasite 7155 2004104 TXU -

Staff N

Comanche Peak augmentation 20043 TVA - Browns Subcontract to 2004103 Ferry UCC - Desludge YES YES

______e_____y__&

coating repairs

____pr_78 2004102

[NEEL Underwater N

N cleaning 2004101 SNC - Hatch Desludge and N

N inspection TXU -

Staff 2003106 N

N Comanche Peak augmentation NMC -

Qualification of 2003105 Monticello U/W coating N

N repair systems 2003104 SNC - Hatch Steam dryer N

N diving services 200 3ENW Torus desludge, N

2003103 Columbia inspection and BioDur repair as needed Torus desludge, 2003101 SNC - Hatch inspection and N

N RHR / CS dive 2002106 SNC - Vogtle Fire Water Storage Tank Insp.

N N

2002105 TXU -

Staff N

Comanche Peak Augmentation 2002104 GPU - Oyster Sub to UCC YES YES Creek Coating repairs Valspar 78

Underwater Enrgin-erng Serri, Ic.

UNDERWATER ENGINEERING SERVICES, Inc.

1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 7 of 16

_ _TABLE I UT-15 Coating Phase 3 UESI Project #

Client/ Facility Scope ofServices Repairs Evaluation (Prefix) NUC-Performed Required (Y/N) 2002103 TXQ -

Staff N

N Comanche Peak Au2mentation Torus desludge, 2002102 SNC - Hatch inspection and N

N repair as needed ENW -

Torus desludge, 2002101 Columbia inspection and N

N repair as needed Coatings N

N 2001107 NPPD - Cooper inspection Carboline 890 Torus desludge, YES 2001106 DTE - Fermi inspection and Part B - 00D063 YES

_repair as needed Plasite 7155 Torus desludge, 2001105 SNC - Hatch inspection and N

N repair as needed, EN W -

Torus desludge, N

2001104 Columbia inspection and Amercoat 90 N

repair as needed Ae.t.

Torus desludge, YES 2001103 Alliant - DAEC inspection and Part B - 00D063 YES repair as needed cz-11 N101.2 TVA - Browns Torus U2 inspect, 2001102 Ferry desludge, repair YES YES Torus desludge, Entergy -

Tr d

YES 2001101 inspection and YES Pilgrim repair as needed CZ-1 I D-3911 NYPA -

SFP Interference 2000106 N

N Fitzpatrick removal 2000105 NYPA -

Torus desludge, N

N Fitzpatrick inspection, strainer Torus desludge, 2000104 SNC - Hatch inspection and N

N repair as needed 2000103 NPPD - Cooper Drywell coating N

N 2000103_________

N Cinspection Carboline 890 Torus desludge, 2000102 SNC - Hatch inspection and N

N repair as needed

Underwater Enginer ng Service n

UN)E RWATER ENGINEERING SERVICES, Inc.

1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 8 of 16 TABLE 1I Ti otn hs UT-15 Coating Phase 3 UESI Project #

Client / Facility Scope of Services Repairs Evaluation (Prefix) NUC-Performed

_(Y/N)

Required (YN)

Torus deshudge, YES 2000101 DTE - Fermi inspection and Plasite 7155 YES repair as needed 0990110 SGPAI QPS Development N

N 0990109 CornEd - Quad Torus desludge, N

N Citie tinspection and Cities rear as needed UT 790 0990108MPC - D.C.

AEP Concrete N

N

____ _Cook Coatings 0990107 TXU -

Coatings N

N Comanche Peak InspectionN 0990106 ENW - WNP 2 Wetwell diving N

N (Columbia) services BioDur 9 'CornEd Torus desludge N

0990105 Dred and ECCS strainer N

N Dresden UT 790 inspection Carboline DBA 0990104 Carboline Korea coordination N

N Boston Ed -

Torus desiudge, YES 0990103 inspection and Part B - 98E084 YES Pgepair as needed CZ-11 D3911 Tomus desludge, 019900 102 SNC - Hatch inspection and N

N repair as needed SCornEd U2 Strainer

  • 0990101 LaSalle replacement N

N 0 12 CornEd -

Desludge and N

N Dresden coating inspection UT 790 098 CornEd -

U1 Strainer N

N LaSalle replacement NN 0980110 TVA - Browns Desludge, coating N

N Ferry Unit 3 inspection, strainer Torus desludge, 0980109 SNC - Hatch inspection and N

N repair as needed Torus desludge, 0980108 DTE - Fermi inspection and YES

_._repair as needed Plasite 7155 0980107 GPU - Oyster Strainer

, YES YES Creek replacements Part B - 98E084

Underwatr Englneartng Ser.lc",

inc.

UNDERWATER ENGINEERING SERVICES, Inc.

1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 9 of 16 TABLE I UT-15 Coating Further UESI Project #

Client! Facility Scope of Services Repairs Evaluation (Prefi~x) NUC-Performed (Y/N)

Required (/N) 0980106 WPPSS -

Strainer N

(Columbia) installation 0980105 SNC - Hatch Mock-up strainer N

N 0980104 IEU - DAEC

Desludge, YES YES inspection, strainer Part B - 96H023 Torus desludge, 0980103 SNC - Hatch inspection and N

N repair as needed 0980102 CornEd -

Desludge, N

N LaSalle insoection. strainer UT 790 0980101 GE Morris Fuel basin liner N

N COM 097 CornEd -

Desludge, coating, N

(7328)

Dresden strainer Plastite 790 COM 097 CornEd -

ECCS Strainer N

N (7321)

LaSalle installation COM 097 WPPSS -

Destudge, inspect, N

N (7320)

(Columbia) renair coatings COM 097 SNC - Hatch Desludge, inspect, N

N (7315)

ECCS strainer COM 097 TVA - Browns Diver services, N

N (7314).

Ferry ECCS strainer N_

COM 097 PECO - Peach U/W Torus YES (7311)

Bottom inspection Part B - 9511023 COM07 NPPD-Cooper Desludge, inspect, YES (7301) repair as needed Part B - 96H023 COM 097 SNC - Hatch Desludge, inspect, N

N (7299) repair as needed COM 097 CornEd -

Inspection and N

(7298)

LaS alle debris removal C790 COM 097 ComEd - Quad Torus desludge, N

N (7292)

Cities Unit t inspect, repair C790 COM 096 CornEd - Quad Torus desludge, N

(7291)

Cities Unit 2 inspect, repair C790 COM 096 Boston Ed -

Desludge, inspect, YES Part B - 96F077 YES (7290)

Pilgrim repair as needed CZ-Pr B-3916 COM 096 Desludge, inspect, YES IES - DAEC Part B - 96F077 YES (7287) repair as needed NO.

CZ-11 N101.2 COM 096 Boston Ed -

Strainer walk N

N (7286)

Pilgrim down

Undelater Engineei.ng S.rvce, Inc.

UNDERWATER ENGINEERING SERVICES, Inc.

1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 10 of16 TABLE 1 UT-15 Coating Further UESI Project #

Client / Facility Scope of Services Repairs (Prefix) NUC-Performed Required (Yon)

(_ie(Y(N)

COM 096 ECCS Strainer (7285) inspection NN COM 096 PECO -

Suppression pool N

N (7278)

Limerick desludge, inspect COM 096 TVA - Browns Material sent to site (7277) 0e Browns Diving services UT-15 Issued 3job.

but no recurd of use.

COM 096 GPU - Oyster Torus destudge, YES YES (7275)

Creek inspect, repair Part B - 96F077 COM 096 NYPA -

Coating inspection N

N (7273)

Fitzpatrick 096 (7270)

CornEd -

Desludgc, inspect LaSalle suppression poo1 N

096(7269)

WPPSS Desludge, inspect N

N (Columbia) supp. pool TVA - Browns Torus desludge, N

096 (7256)

Ferry inspect, repair 096(7255)

SNC - Hatch Desludge, inspect, N

N

__96__(72__5_

SN____

_h repair as needed Plastite C790 096(7253)

WPPSS -

WTNP-2 FME N

N 096_______3)

(Columbia)

Suppression pool NN 096(7252)

ComEd - Quad Unit I Torus N

N Cities desludge Plastite C790 Phase Two Summary:

As depicted by Table 1, UESI reviewed all available documentation related to the issue, storage and installation of its Picco UT-15 in SErvice Level I coating applications to commercial nuclear facility clients / purchasers. The review identified eight commercial nuclear facilities (Fermi, Pilgrim, Hatch, Duane Arnold, Oyster Creek, Browns Ferry, Peach Bottom and Cooper Stations) where Picco UT-i 5 repair coating had been applied to suppression pools/tori after the 1996 DBA / Irradiation Test results. The Phase 3 review (scheduled to commence on April 3d thru 5'h timeframe based on availability of team members) was planned by the Review Committee to evaluate substrates applied, acceptability to defined site specific criteria and whether a Part 21 notificationis required.

This concludes Phase Two of the review.

ut

,l Underwter E=g~gel.ng Harmicos, Inm.

UNDERWATER ENGINEERING SERVICES, Inc.

1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Page 11 ofl6 PHASE THREE Evaluation:

Review Team members convened as previously scheduled. After review of the previous charts; related Final Engineering Reports, Purchase Orders, Contract requirements, Order Entries and other associated documentation with the Phase 2 evaluation, UESI identified eight commercial nuclear facilities (Fermi, Pilgrim, Hatch, Duane Arnold, Oyster Creek, Browns Ferry, Peach Bottom and Cooper Stations) where Picco UT-15 repair coating had been applied to the suppression pools/tori after 1996. Table 2 below lists these facilities and indicates the review team recommendation for filing a 1 OCFR Part 21 report:

TABLE 2 UESI Project Substrate UT-15 Material Code Part 21 Recommended?

Job Start !FER Client Facility Applied Referenced Yes/No Numbers Over (Contractual)

(See Phase 3 Summary) 2004106 YES - Product supplied 2013Coatings to meet iavretya N!N0.

2001103 Duane Arnold CZ-11 ASTM D 3911, ANSI inadvertently as ANSINI01.2 0980104 N101.2 & ANSI N5.12 qualified, but only met ASTM D-096 (7287) 3911.

Indeterminate-Pit depth repairs Contract 96-75 exceeded DBA qualification Unavailable - FER limits for UT-1 5 at direction of 097(7301)

Cooper CZ-11 noted repairs facility nersonnel. Repair Station performed as directed I P by facility. No final C material was reviewcd and of C issued.

evaluated "unqualified" according to client program.

Indeterminate - See Summary -

097(7311)

Peach Bottom Product was deemed unqualified Unit 3 CZ-11 P.O. 00270469 R!A due to no final examination performed per PECO directive.

2007102 2003102 Pi!:in Contract specifies NO - Product'conmplies with D-2001101 CZ-11 Coatings to meet 3911 when applied to CZ-l I 0990103 Station ASTM D-3911-95 substrate 096 (7290)

Browns Ferry Valspar Coatings to meet NO - Product complies to D-2 Unit 2&ASTM D 3911 and 3911 and N 101.2 on substrate 200 110 24nt2 37 ANSI N101.2 2002104 Coatings to meet NO - Product complies to D-0980107 Oyster Creek Valspar ASTM D 3911 and 3911 and N 101.2 on substrate 096 (7275) 78 ANSI N101.2 2006101 Amero Coatings to meet NO - Product complies to D-080103 mHatch neo ASTM D 3911 and 0980103 Dimetcote ANSIN

.2 3911 and N 101.2 on substrate 2007106 Plasite Coatings to meet NO -Product complies to D-2004105 Fermi 7155 ASTM D 3911 and 3911 and N 101.2 on substrate 2001106 ANSI N101.2

UNDERWATER ENGINEERING SERVICES, Inc.

1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 U

E

,,ngn..,ig-.,n,

S..vjG.. Inc-Page 12 of 16 Phase Three Summary:

As determined by review team evaluation during the Phase One evaluation, the 1996 DBA/Irradiation Test revealed that Picco UT-15 met the qualification and acceptance requirements of ANSI N 101.2 / ANSI N5.12 (both DBA/Irradiation and DBA criteria),

when applied and tested on substrates Dimetcote 6N, Ameron 90, K&L 6548/7107, Valspar/Mobil V78 Series and Plasite 7155. On this basis, UESI is confident that there is no potential impact to safety with regard to Service Level I protective coating Picco UT-15 provided and installed at nuclear facilities Fermi, Hatch, Oyster Creek and Browns Ferry meets the acceptance requirements (ANSI N 10 1.2 1 ASTM D-3911) defined by contractual documents.

Affected plants with CZ-1 I Substrate are addressed as follows:

FPL-Duane Arnold Enerpy Center The Duane Arnold Energy Center facility has been determined to contain CZ-11 substrate and Picco UT-15 material was installed under the auspices of ANSI N101.2 / N5. 12, and therefore it is determined that the potential Part 21 applies to this facility.

FPL-DAEC's Garth Dolderer is aware of finding, as he was the NUPIC member that made UESI aware that the potential for a Part 21 existed. At conclusion of Phase Three evaluation a potential Part 21 notification was placed to FPL-DAEC's Eric Sorenson.

Follow up email notification to be sent.

NPPD-Cooper Station The Cooper Station facility has been determined to contain CZ-1 I substrate, however a review of the Final Engineering Report (097) 7301 supplied to Cooper at the completion of UT-15 Coating Repairs does not specify the code requirements the product was required to satisfy (ANSI NI01.2 and/or ASTM D-391 1). The review team attempted to review the Nebraska Public Power Contract (# 96-75) referenced in the report, but was unable to locate the business record's copy (over 10 years sent to alternate storage and not considered permanent QA records).

A review of the FER indicates that UESJ personnel were directed by Cooper Station personnel to perform repairs to pit depths in the torus vapor and UA/ regions in excess of 60 mils (0.060"). It should be noted that the depth of coating qualification per the DBA Test (induced defects) for Picco UT-15 is 0.0625" and may explain why a post installation Certificate of Conformance was not issued with this Final Engineering Report. Records indicate that UESI (S.G. Pinney at the time) performed a total of 1,454 repairs (approximately 40 sq. ft) within all 16 bays of the Cooper Station Torus. As a courtesy, UESI has notified NPPD-Cooper personnel (Russ Wenzl and Joshua Swele via phone and email confirmation) of a potential Part 21 that they will need to evaluate to see if it is applicable to their facility.

UNDERWATER ENGINEERING SERVICES, Inc.

(000 1326 S.W. Biltmore Street f1Port Saint Lucie, FL 34983 Und-ate*r Eng,.io.atn Is.

Inc-Page 13 of 16 Exelon-Peach Bottom Unit 3 A review of the Coatings Material Certificate of Conformance issued to Peach Bottom Unit 3 revealed that the coatings were not designated a "Qualified Repair" due to the fact that PECO Management made a determination to eliminate the UESI (SG Pinney at the time) Final Visual Examination (DFT and defects inspection of final coat) due to time constraints.

UESI contacted Dan Testa and Paul Macuiba of Exelon and informed them of finding and evaluation results via phone conversation and email confirmation. On the basis that the coating repairs perfonned were not considered qualified repairs by UESI, Exc[on should evaluate to validate whether coatings were properly documented according to their quality program.

Phase Three summary: The review team determined that the only plant definitively affected by a potential Part 21 is the Duane Arnold Energy Center facilities. 3 other facilities where Picco UT-t 5 was installed over a Carboline Carbo-Zine CZ-1 I substrate either met the contractual scope (ASTM D-39 11) or should have been included in plant inventory of unqualified coatings, and should be evaluated by those affected facilities to validate.

Further information that may be helpful to these affected facilities will be found in the next section of this evaluation report titled "Review Teamn Conclusions and Recommendation" This concludes Phase Three of the review.

Added Note:

On the basis of the Phase One, Two and Three evaluations, an official notification of-a Part 21 was issued to the Nuclear Regulatory Commission via facsimile op. Wednesday.

April 9. 2008 and validated as received by telephone concurrence to the NRC Operations Center. A copy of this correspondence has been attached (see Attachment 2) to this report.

UNDERWATER ENGINEERING SERVICES, Inc.

1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Undoto Engin.,o ng S,,

e,.Inc.

Page 14 of 16 REVIEW TEAM CONCLUS1IONS AND RECOMAMENDA TIONS Review of Design Basis Accident Reports revealed that the post DBA/lrradiation test acceptance criteria for blistering was exceed on 4 of 16 test panels tested on CZ-II substrate, when evaluated to the requirements of AN SI N101.2-1972. Blisters and adjacent repair coating were noted as "sound and fully intact", which complies with ASTM D-3911-95, but the size of blisters was documented as size #2 and larger. ANSI N101.2-1972 requires that blister size be limited to few, size #4 and smaller. Picco UT-15 satisfactorily passed all other acceptance criteria established in ANSI N101.2-1972 (flaking, cracking, delamination, peeling and chalking).

Safet* Hazard:

On the basis of the UESI evaluation, while the Picco UT-15 coating was inadvertently presented as ANSI N101.2/N5.12 qualified over Carboline Cabo-Zine 1 substrate, the results of the irradiation aid DBA testing confirm that UT-15 remained sound and fully intact with no other coating failures noted. UESI is confident in assessing that UT-1 5 poses no substantial safety hazard, as it is highly unlikely to contribute to the ECCS debris source tenn inventory of coatings debris.

Recommendations:

As the seller and installer of the UT-15 coating material, UESI cannot adequately evaluate the product for purchaser/affected licensee with regard to facility specific Safety Analysis requirements. As referenced in Part 21.21 (3)(ii)(b) UESI is informing licensees (within 5 days of this determination) where Picco UT-I 5 was sold and installed on CZ-l I substrate under the auspices of ANSI N 101.2 so that they may properly evaluate in accordance with their IOCFR50 App. B quality program. Again it is emphasized that the ke, elements of a Service Level I repair coating, adhesion and intact, were acceptable tributes of all DBA tests conducted on Picco UT-15.

UESI work procedures shall be revised to reflect maximum pit depth allowable to be considered "qualified" coating. Amended records to the DBA/Irradiation Test results should include maximum pit depth data also.

The final draft of the evaluation was completed on Tuesday, April 8, 2008 and forwarded to the UESI / GPI president, as defined in the UESI QA Manual and 10 CFR 21.

Based on the evaluation performed by the review team as described herein, a report in accordance with 10 CFR PART 21 --REPORTING OF DEFECTS AND NONCOMPLIANCE should be transmitted to the US Nuclear Regulatory Commission by Mr. Steve Greenman, President, Greenman-Pedersen, Inc. or his designee concerning the findings related to UESI Nonconformance Report #2008-01 and NUPIC Audit Finding 08.03.SPAFL.08.1 Finding No. 1.

The notification requirements of 10 CFR Part 21 related to a director of corporate officer are reproduced on Attachment 1.

This concludes the Conclusion and Recommendations Section of the review.

UNDERWATER ENGINEERING SERVICES, Inc, 1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 U.d.morHngl...nso.g 5 o..I Page 15 of 16 REVIEW TEAM

REFERENCES:

1.

UESI Nonconformance Report (VCR) # 2008-0I

2.

NUPIC Audit 08.03.SPAFL.O8.1I (Joint Audit # 20119)

3.

ASTM D-391 1-95, "Standard Test Method for Evaluating Coatings Used in Light-Waler Nuclear Power Plants at Simulated Design Basis Accident (DBA)

Conditions"

4.

ANSI N t 01.2-1972, "Protective Coatings (Paints) Jr Light Water Nuclear Reactor Containment Facilities"

5.

ANSI N5.12-1974, "Protective coalings (paints)jotr the nuclear indus!n."'

6.

Final Engineering Report "Final Report for Design Basis Accident (DBA) and Irradiation Testing ofCoating Repair Materials Jbr Use in Boiling Water Reactor Suppression Chamber Immersion Areas" dated 16 December 1996

7.

ASTM D714-87(1994) el "Standard Test Method for Evaluating Degree of Blistering of Paints"

8.

Final Engineering Report "Coating Systems Tested on Steel Panels for irradiation and Design Basis Accident (DBA) Criteria Requirements / Duane Arnold Ene-yv Center /Joowa Electric Light and Power Company / Cedar Rqapid.s'l Iowa / Report No. 2" dated 1/16/1990

9.

Final Engineering Report No. NUC2004109, "Irradiation and Desig-Basis Accident (DBA,) Qualification Testing of Repair Coatings fro Duane lrnold Energy Center" daied December 20, 2005.

UNDERWATER ENGINEERING SERVICES, Inc.

U (

1326 S.W. Biltmore Street

-M Port Saint Lucie, FL 34983 Underwater Engineering Servic.,

Inc.

Page 16 of 16 ATTACHMENT 1 "Notification requirements of 10 CFR Part 21 related to a director of corporate officer" (3) Notification required by paragraph (d)(1) of this section must be made as follows --

(i) Initial notification by facsimile, which is the preferred method of notification, to the NRC Operations Center at (301) 816 - 5151 -or by telephone at (301) 816 - 5 100 within two days following receipt of information by the director or responsible corporate officer under paragraph (a)(1) of this section, on the identification of a defect or a failure to comply. Verification that the facsimile has been received should be made by calling the NRCf Operations Center. This paragraph does not apply to interim reports described in

§ 21.2 1(a)(2).

(ii) Written notification to the NRC at the address specified in '. 21.5 within 30 days following receipt of infornation by the director or responsible corporate officer under paragraph (a)(3) of this section, on the identification of a defect or a failure to comply.

(4) The written report required by this paragraph shall includc, but need not be limited to, the following infonmation, to the extent known:

(i) Name and address of the individual or individuals irfortning the Commission.

(ii) Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the Unlited States which fails to comply or contains a defect.

(iii) Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a detect.

(iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.

(v) The date on which the information of such defect or failure to comply was obtained.

(vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.

(vii) Tthe corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length oftime that has been or will be taken to complete the action.

(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.

(.ix) In the case of an early site permit, the entities toa whom an early site permit was transferred.

(5) '[he director or responsible officer may authorize an individual to provide the notification required by this paragraph, provided that, this shall not relieve the director or responsible officer of his or her responsibility tunder this paragraph.

(e) Individuals subject to this part may be required by the Commission to supply additional information related to a defect or failure to comply. Conmmission action to obtain additional information may be based on reports of defects from other reporting entities.

TRANSTIISSION VERTFICATION REPORT TIME i-AME FAX TEL SER. 0 04/09/2008 10:55 BROM5J390260 GREENMAN-PEDERSEN, LNC.

UNDERWATER ENGINZERNG SERVICES INC.

INSTRUMENT SALES INC. a GPI. Company Malila Addres 1326 SW Biltmore St Port St. Lutie, FL 34983-2958 Ph. 772-337-3080 tax: 772-13730294 FACSIMILE COVER SHEEET COMPANY:

4( f e4.e? 0~~Lrg FAX:3i 4-ij FROM:

6ehP/S'. e,,9A0,4lPZ~A f DATE:

_"____/

PAGES INCLUD*NG COVAPR PAGE' A

MESSAGE;

_73L 4/orLf/c

/O4 "Apo'f4 6

  1. t

UNDERWATER ENGLNEERING SERVICES, Inc.

C1326 S.W. Biltmore Street

-Port Saint Lucie, FL 34983 Engi.....

,od Se....,nc.

Page I of 3

Subject:

I0CFR Part 21, Initial Notification of Potential Safety Related Noncompliance Deviation Notification By:

Underwater Engineering Services, Inc. (Formerly S.G. Pinney and Associates - UES)

Phone:

(772) 337-3116 (xi 14 Chris Graham), Fax: (772) 337-0294 Based on NUPIC Audit No. 08.03SPAFL.08. 1, Finding No. I a review of Historical Design Basis Accident (DBA) / Irradiation Test Results dated 12/16/1996, and subsequent internal investigation and evaluation, it has been determined that UESI Proprietary Underwater Coating Picco UT-l 5, when applied over the substrate Carboline CZ-II only, does not meet all acceptance criteria of ANSI N101.2-1972 and ANSI N5.12-1974 for DBA qualified Coating Service Level I repair material.

The evaluation concluded that while Picco UT-15 is fully qualified to ASTM D-3911-95 for all Service Level I and Torus/Immersion Area coating repairs on all substrates tested, use of the product should have been limited to ANSI N 101.2-1972 qualified on all substrates tested with the exception of CZ-1 1.

Beginning innediately, UESI will cease to market and install its product as ANSI Ni01.2-1972 / N5.12-1974 irradiation and DBA qualified when applied as a repair material over" Carboline CZ-l I substrate.

The followins information is provided as required by 10 CFR 2 1.21(d) (4):

(i) Name and address of individual informing the commission.

Chris Graham, UES I Quality Assurance Manager Robert J. Walcheski, UESI Assistant Vic President and Technical Manager Jon R. Cavallo. P.E. PCS, Vice President of GPI affiliate Corrosion Control Consultants &

Labs, Inc, UESI Certified Level Ill Coatings Inspector, registered Professional Engineer, ASTM D-33 Nuclear Coatings Committee Chairmran, SSPC certified Protective Coatings Specialist.

Underwater Engineering Services, Inc. (formerly SG Pinney & Associates-UES) 1326 SW Biltmore St.

Port Saint Lucie, FL 34983 Ph. 772-337-3116 (ii) Idertification of the facility, the activity, or the basic compionent supplied for such facility or such activity within the United States which fails to comply or contains the defect.

Duane Arnold Energy Center - Picco UT-I 5 stating ANSI N101.2 coating repairs performed in CZ-1 I Torus per Final Engineering Report's (FER) SGPAI 096 (7287), 0980104, 2001103 and 2004106. DAEC has been contacted and issued CAP 0560444 (Eric Sorenson).

Facilities with CZ-I 1 substrate and repairs performed with Picco UT-15, but may be exempt from Part 21 impacts are as Noted:

UNDERWATER ENGINEERING SERVICES, Inc.

19A1 e.

r

  • 1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 Undowa.tr E.nnoof...g Scoso, Inc.

Page 2 of 3 (ii) Identification (continued)

Note 1: Cooper Nuclear Station-Picco UT-15 stating coating repairs performed in CZ-1I Torus per SGPAI (Final Engineering Report) FER 097 (7301) - Contract # 96-75. Code compliance not referenced in Final Engineering Report nor C of C issued stating ANSI NI 01.2 conformance. Per NPPD Cooper station personnel, coatings were classified "unqualified" based on revised Drywell and Wetwell curves. NPPD (Joshua Swele. Russ Wenzl) has been advised of finding as a courtesy.

Note 2: LUESI (under the name of S.G. Pinney and Associates - UES) has provided UT-15 coating repairs for the Pilgrim Nuclear Station under the contract conditions of ASTM D-3911-95, which product is shown to satisfy the requirements of on CZ-1 1 substrate, therefore they are exempt from this Part 21 notification, but PNS has been advised of the finding as a courtesy.

Note 3: UESI (under the name of S.G. Pinney and Associates - UES) has provided UT-15 coating repairs for the Peach Bottom Nuclear facility, but the coatings material was determined to be considered not a "Qualified Repair" due to the SGPAI-UES Inspectors not being provided opportunity to perform a final visiual examination of the applied coatings due to time constraints. On this basis, PECO must evaluate impact of this Part 21 notification, and have been advised (Dan Testa, Paul Macuiba) of the finding as a courtesy.

(iii) Identification of the firm constructing the flacility or supplying the basic component which fails to comply with or contains the defect.

Underwater Engineering Services, hIc 1326 SW Biltmore St.

Port Saint Lucie, FL 34983 Ph. 772-337-311,6 (iv) Nature of the defect or failure 0to comply and the safety hazard which is created by such a defect or failure to comply.

Review of Design Basis Accident Reports revealed that the post DBA/Irradiation test acceptance criteria for blistering was exceed on 4 of 16 test panels tested on CZ-1 1 substrate, when evaluated to the requirements of ANSI N101.2-1972. Blisters and adjacent repair coating were noted as "sound and fully intact", which complies with ASTM D-3911-95, but the size of blisters was doctunented as size #2 and larger. ANSI N101.2-1972 requires that blister size be limited to few, size #4 and smaller. Picco UT-15 satisfactorily passed all other acceptance criteria established in ANSI NI 01.2-1972 (flaking, cracking, delamination, peeling and chalking).

Safety Hazard: On the basis of the UJESI evaluation, while the Picco UT-i5 coating was incorrectly presented as ANSI N101.2/N5.12 qualified over Carboline Carbo-Zinc 11 substrate, the results of the irradiation and DBA testing confirm that UT-15 remained sound and fully intact with no other coating failures noted. UESI is confident in assessing that UT-15 poses no substantial safety hazard, as it willnot contribute to the ECCS debris source term inventory of coatings debris. As the seller and installer of the UT-I 5 coating material, UESI camnot adequately evaluate the product for purchaser/affected licensee with regard to facility specific Safety Analysis requirements. As referenced in Part 21,21 (3)(ii)(b) UESI is

UNDERWATER ENGINEERING SERVICES, Inc.

.'4 1326 S.W. Biltmore Street Port Saint Lucie, FL 34983 E,*,,*

,o*-,e S....

,o.

IPage 3 of 3 informing licensees (within 5 days of this detennination) where Picco UT-15 was sold and installed on CZ-l 1 substrate under the auspices of ANSI N101.2 so that they may properly evaluate in accordance with their IOCFR50 App. B quality program.

(v) The date on which the information of such defect or failure to comply Was obtained.

NUPIC identified that a potential problem of unqualified coatings exists with results of the 1996 DBA/JInadiation Test on Februai-y 29, 2008. UESI initiated Nonconformance Report NCR # 2008-0 1, insured that no coating applications was scheduled in Nuclear facilities requiring adherence to ANSI N101.2-1972, notified parent company President of potential Part 21 and under his directive began investigation.

(vi) In the case of a basic coinponent which contains a defect or fails to comply, the number and location of all such components in use at. supplied for. or being supplied for one or more facilities or activities subject to the regulations in this part.

Duane Arnold Energy Center: undetermined sq. ft.

(vii) The corrective action which has been, is being, or will be taken: the name of the individual or ormanization responsible for the action: and the length of time that has been or will be taken to complete the action.

UESI Quality Assurance shall issue a Records Correction Notice to amend the DBA/Irradiation Test dated 12/16/1996. This record will limit the use Picco UT-15 on substrate material Carboline Carbo-Zinc 1 under the auspices of ASTM D-3911-95 only.

The records correction shall also amend the report to indicate acceptance of product test to ANSI NI 01.2 for other DBAilrradiation Tested substrates. This action item is planned to be completed within 60 days of this report.

(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.

Picco UT-15 is DBA qualified for Service Level I coatings applications in accordance with ASTM D-391 1-95 and subsequent revisions to date.

Picco UT-i5 is DBA qualified for Service Level I coatings applications in accordance with ANSI N101.2-1972, excluding application on Carboline CZ-1 I substrate.

Picco UT-15 maintains excellent adhesion and resistance to peeling, cracking, flaking and delarmination, and, based on irradiation and DBA test results, will not contribute to the coatings component of the ECCS debris source terni If you have any questions or need additional information concerning this notification, please contact Chris Graham, UESI QA Manager or Robert Walcheski, UESI Assistant VP and Technical Manager, at (772) 337-3116.

2