{{#Wiki_filter:September 4, 2008 Mr. Dennis R. Madison Vice President Southern Nuclear Operating Company, Inc.
{{#Wiki_filter:September 4, 2008 Mr. Dennis R. Madison Vice President Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513  


==SUBJECT:==
==SUBJECT:==
EDWIN I. HATCH NUCLEAR PLANT, NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
EDWIN I. HATCH NUCLEAR PLANT, NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION  


==Dear Mr. Madison:==
==Dear Mr. Madison:==
On November 17 - 21, 2008, the NRC will perform the baseline Public Radiation Safety Inspection at the Edwin I. Hatch Nuclear Plant, (NRC Inspection Procedures 71121.01, 71121.03, 71122.01, 71122.03, and Radiation Safety Sections of 711551 and 60855.1).
On November 17 - 21, 2008, the NRC will perform the baseline Public Radiation Safety Inspection at the Edwin I. Hatch Nuclear Plant, (NRC Inspection Procedures 71121.01, 71121.03, 71122.01, 71122.03, and Radiation Safety Sections of 711551 and 60855.1).
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Steve Tipps of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Wade T. Loo, at (404) 562-4727.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Steve Tipps of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Wade T. Loo, at (404) 562-4727.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Sincerely,  
                                              /RA/
/RA/
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5  


==Enclosure:==
==Enclosure:==
(See page 2)
(See page 2)  
 
XG SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS SIGNATURE
/RA/
/RA/
NAME Wade Loo Brian Bonser DATE 09/03/2008 09/04/2008 9/ /2008 9/ /2008 9/ /2008 9/ /2008 9/ /2008 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO


_________________________                XG SUNSI REVIEW COMPLETE OFFICE            RII:DRS        RII:DRS SIGNATURE          /RA/            /RA/
SNC 2
NAME              Wade Loo        Brian Bonser DATE                  09/03/2008      09/04/2008    9/  /2008    9/  /2008    9/  /2008    9/  /2008    9/  /2008 E-MAIL COPY?        YES        NO  YES        NO YES      NO  YES        NO YES        NO YES      NO YES      NO SNC                                     2 cc w/encl:
cc w/encl:
Jeffrey T. Gasser                         Senior Resident Inspector Executive Vice President                   Southern Nuclear Operating Company, Inc.
Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant Electronic Mail Distribution               U.S. NRC 11030 Hatch Parkway N Raymond D. Baker                           Baxley, GA 30334 Licensing Manager Licensing-Hatch                           Arthur H. Domby, Esq.
Electronic Mail Distribution Raymond D. Baker Licensing Manager Licensing-Hatch Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Troutman Sanders Electronic Mail Distribution              Electronic Mail Distribution L. Mike Stinson                           Dr. Carol Couch Vice President                             Director Fleet Operations Support                   Environmental Protection Southern Nuclear Operating Company, Inc. Department of Natural Resources Electronic Mail Distribution              Electronic Mail Distribution David H. Jones                             Cynthia Sanders Vice President                             Program Manager Engineering                               Radioactive Materials Program Southern Nuclear Operating Company, Inc. Department of Natural Resources Electronic Mail Distribution              Electronic Mail Distribution Moanica Caston                             Jim Sommerville Vice President and General Counsel         (Acting) Chief Southern Nuclear Operating Company, Inc. Environmental Protection Division Electronic Mail Distribution              Department of Natural Resources Electronic Mail Distribution Steven B. Tipps Hatch Principal Engineer - Licensing       Mr. Steven M. Jackson Edwin I. Hatch Nuclear Plant               Senior Engineer - Power Supply Electronic Mail Distribution              Municipal Electric Authority of Georgia Electronic Mail Distribution Mr. K. Rosanski Resident Manager                          Mr. Reece McAlister Oglethorpe Power Corporation              Executive Secretary Electronic Mail Distribution              Georgia Public Service Commission Electronic Mail Distribution Laurence Bergen Oglethorpe Power Corporation              Chairman Electronic Mail Distribution              Appling County Commissioners County Courthouse Bob Masse                                  69 Tippins Street, Suite 201 Resident Manager                          Baxley, GA 31513 Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution
Electronic Mail Distribution L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution David H. Jones Vice President Engineering Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Steven B. Tipps Hatch Principal Engineer - Licensing Edwin I. Hatch Nuclear Plant Electronic Mail Distribution Mr. K. Rosanski Resident Manager Oglethorpe Power Corporation Electronic Mail Distribution Laurence Bergen Oglethorpe Power Corporation Electronic Mail Distribution Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution Senior Resident Inspector Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N Baxley, GA 30334 Arthur H. Domby, Esq.
Troutman Sanders Electronic Mail Distribution Dr. Carol Couch Director Environmental Protection Department of Natural Resources Electronic Mail Distribution Cynthia Sanders Program Manager Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution Jim Sommerville (Acting) Chief Environmental Protection Division Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA 31513  


SNC                                       3 Letter to Dennis R. Madison from Brian Bonser dated September 4, 2008
SNC 3
Letter to Dennis R. Madison from Brian Bonser dated September 4, 2008  


==SUBJECT:==
==SUBJECT:==
EDWIN I. HATCH NUCLEAR PLANT, NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION Distribution w/encl:
EDWIN I. HATCH NUCLEAR PLANT, NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION Distribution w/encl:
RIDSNRRDIRS PUBLIC R. Martin, NRR (PM: HAT, SUM)
RIDSNRRDIRS PUBLIC R. Martin, NRR (PM: HAT, SUM)
C. Gratton, NRR
C. Gratton, NRR  


Pre-Inspection Document Request Public Radiation Safety Cornerstone Licensee:                 Edwin I. Hatch Nuclear Plant Docket Numbers:           50-321, 050-366 Inspection Dates:         November 17 - 21, 2008 Inspection Procedures Scheduled:
Pre-Inspection Document Request Public Radiation Safety Cornerstone Licensee:
60855.1           Operation of an ISFSI at Operating Plants 71121.01         Access Control to Radiologically Significant Areas 71121.03         Radiation Monitoring Instrumentation and Protective Equipment 71122.01         Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 71122.03         Radiological Environmental Monitoring Program (REMP) and Radioactive Material Control Program 71151             Performance Indicator Verification The most recent inspection completed for inspection procedures 71121.03, 71122.01, and 71122.03 ended on July 21, 2006, and 60855.1, 71121.01, and 71151 ended on March 1, 2007.
Edwin I. Hatch Nuclear Plant Docket Numbers:
50-321, 050-366 Inspection Dates:
November 17 - 21, 2008 Inspection Procedures Scheduled:
60855.1 Operation of an ISFSI at Operating Plants 71121.01 Access Control to Radiologically Significant Areas 71121.03 Radiation Monitoring Instrumentation and Protective Equipment 71122.01 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 71122.03 Radiological Environmental Monitoring Program (REMP) and Radioactive Material Control Program 71151 Performance Indicator Verification The most recent inspection completed for inspection procedures 71121.03, 71122.01, and 71122.03 ended on July 21, 2006, and 60855.1, 71121.01, and 71151 ended on March 1, 2007.
We request documentation from the date of the previous inspection to the present.
We request documentation from the date of the previous inspection to the present.
We would prefer as much of the information as possible in electronic form. An index to the CD contents is also helpful. For those items requesting a list of documents/areas, the inspectors will select documents/areas from the list for on-site review.
We would prefer as much of the information as possible in electronic form. An index to the CD contents is also helpful. For those items requesting a list of documents/areas, the inspectors will select documents/areas from the list for on-site review.
If you have any questions, please call Wade Loo by phone at (404) 562-4727 or E-Mail at wade.loo@nrc.gov. Thank you in advance for all your effort in putting together this material.
If you have any questions, please call Wade Loo by phone at (404) 562-4727 or E-Mail at wade.loo@nrc.gov. Thank you in advance for all your effort in putting together this material.
Assistance Requested During On-Site Inspection
Assistance Requested During On-Site Inspection Identification of work activities during the inspection for inspector observations, including notification of pre-job briefings.
* Identification of work activities during the inspection for inspector observations, including notification of pre-job briefings.
Advance notification of any liquid or gaseous effluent releases, including the associated pre-release sampling, analysis, and permit generation.
* Advance notification of any liquid or gaseous effluent releases, including the associated pre-release sampling, analysis, and permit generation.
Health physics assistance in plant walk-downs assessing access controls, e.g. verifying the posting and locking of entrances to HDR-HRA and VHRA, and spent fuel pool controls.
* Health physics assistance in plant walk-downs assessing access controls, e.g. verifying the posting and locking of entrances to HDR-HRA and VHRA, and spent fuel pool controls.
Assistance in plant walk-downs of the liquid and gaseous effluent systems and associated radiation monitors.
* Assistance in plant walk-downs of the liquid and gaseous effluent systems and associated radiation monitors.
Assistance in plant walk-downs of radiation monitors, including ARMs, CAMs, whole body counters, and personnel contamination monitors, etc.
* Assistance in plant walk-downs of radiation monitors, including ARMs, CAMs, whole body counters, and personnel contamination monitors, etc.
Assistance with walk-down of meteorological equipment.
* Assistance with walk-down of meteorological equipment.
Assistance with observations of REMP sample collection and processing.  
* Assistance with observations of REMP sample collection and processing.


2 General Information Request
2 General Information Request Current Radiation Protection, Chemistry and Environmental/Meteorological organizational charts with contact numbers Electronic copy of applicable chapters of UFSAR (e.g. radiation protection program, effluents and environmental monitoring programs, radiation monitoring system, etc.)
* Current Radiation Protection, Chemistry and Environmental/Meteorological organizational charts with contact numbers
Latest revision of the Offsite Dose Calculation Manual (ODCM)
* Electronic copy of applicable chapters of UFSAR (e.g. radiation protection program, effluents and environmental monitoring programs, radiation monitoring system, etc.)
List of radiation protection and chemistry (i.e. effluents) procedures Most recent DAW 10 CFR Part 61 analytical results.
* Latest revision of the Offsite Dose Calculation Manual (ODCM)
Corrective Action Program procedures Procedure(s) for identifying, notification, tracking, and correcting PI occurrences List of all Performance Indicators (PIs) and copies of associated corrective action reports for Occupational Exposure Control Effectiveness and RETS/ODCM Radiological Effluent Occurrences Audits and self-assessments performed since the last inspection that encompass the areas of (1) radiation protection, (2) access controls, (3) effluent treatment and monitoring program (including chemistry and count room), (4) radiological environmental monitoring program, (5) meteorological monitoring program, (5) radioactive material control, (6) radiation measurement instrumentation program (fixed and portable), and (7) respiratory protection program.
* List of radiation protection and chemistry (i.e. effluents) procedures
60855: Operation of an ISFSI Procedures associated with the ISFSI facility. Procedures should include:
* Most recent DAW 10 CFR Part 61 analytical results.
* Corrective Action Program procedures
* Procedure(s) for identifying, notification, tracking, and correcting PI occurrences
* List of all Performance Indicators (PIs) and copies of associated corrective action reports for Occupational Exposure Control Effectiveness and RETS/ODCM Radiological Effluent Occurrences
* Audits and self-assessments performed since the last inspection that encompass the areas of (1) radiation protection, (2) access controls, (3) effluent treatment and monitoring program (including chemistry and count room), (4) radiological environmental monitoring program, (5) meteorological monitoring program, (5) radioactive material control, (6) radiation measurement instrumentation program (fixed and portable), and (7) respiratory protection program.
60855: Operation of an ISFSI
* Procedures associated with the ISFSI facility. Procedures should include:
Radiological surveys, postings, and radiation control barricades Environmental monitoring (including TLDs)
Radiological surveys, postings, and radiation control barricades Environmental monitoring (including TLDs)
Loading of casks Routine activities
Loading of casks Routine activities Radiation surveys of the ISFSI since the last inspection.
* Radiation surveys of the ISFSI since the last inspection.
ALARA reviews and planning and associated RWPs for cask loading activities Environmental monitoring results (e.g. TLDs)
* ALARA reviews and planning and associated RWPs for cask loading activities
Radiological records for the loading of casks since the last inspection Records of contamination incidents since the last inspection.
* Environmental monitoring results (e.g. TLDs)
List of corrective action reports related to the ISFSI with respect to radiation protection (i.e. access controls, ALARA, contamination, radiation levels, etc.) since the last inspection.
* Radiological records for the loading of casks since the last inspection
71121.01: Access Controls to Radiologically Significant Areas Site and corporate procedures associated with the access control program. Procedures should include:
* Records of contamination incidents since the last inspection.
* List of corrective action reports related to the ISFSI with respect to radiation protection (i.e. access controls, ALARA, contamination, radiation levels, etc.) since the last inspection.
71121.01: Access Controls to Radiologically Significant Areas
* Site and corporate procedures associated with the access control program. Procedures should include:
Radiological surveys, postings, and radiation control barricades Security and control of high radiation sources/objects stored in pools Radiation Work Permits Radiological Job-Coverage
Radiological surveys, postings, and radiation control barricades Security and control of high radiation sources/objects stored in pools Radiation Work Permits Radiological Job-Coverage


SNC                                             3 Controlling access to High Radiation Areas (HRAs), High Dose Rate High Radiation Areas (HDR-HRAs), and Very High Radiation Areas (VHRAs)
SNC 3
Controlling access to High Radiation Areas (HRAs), High Dose Rate High Radiation Areas (HDR-HRAs), and Very High Radiation Areas (VHRAs)
Key controls for all high radiation areas Radioactive material control, including contamination and hot particles Dosimetry monitoring (electronic dosimeters, multi-badging, etc.)
Key controls for all high radiation areas Radioactive material control, including contamination and hot particles Dosimetry monitoring (electronic dosimeters, multi-badging, etc.)
Calculations of internal exposures
Calculations of internal exposures List of the 10 most exposure significant work areas within radiation areas, high radiation areas (<1R/hr), or airborne radioactivity areas in the plant. This may include areas with low dose rates but high collective dose. Identify any high radiation areas with significant dose rate gradients (factor of 5 or more), including underwater diving activities.
* List of the 10 most exposure significant work areas within radiation areas, high radiation areas (<1R/hr), or airborne radioactivity areas in the plant. This may include areas with low dose rates but high collective dose. Identify any high radiation areas with significant dose rate gradients (factor of 5 or more), including underwater diving activities.
List or map of HRAs, LHRAs, HDR-HRAs (>25 rem in one hour @ 30 cm), and VHRAs.
* List or map of HRAs, LHRAs, HDR-HRAs (>25 rem in one hour @ 30 cm), and VHRAs.
Include areas with the potential to become a HRA during routine operations or outages.
Include areas with the potential to become a HRA during routine operations or outages.
* Internal dose assessments, including calculations, for any internal exposures greater that 50 mrem CEDE since the last inspection.
Internal dose assessments, including calculations, for any internal exposures greater that 50 mrem CEDE since the last inspection.
* List of corrective action reports generated since the last inspection related to access controls, including the following:
List of corrective action reports generated since the last inspection related to access controls, including the following:
Access controls, including high radiation area radiological incidents Radiological events caused by radiation worker errors Radiological events caused by radiation protection technician errors
Access controls, including high radiation area radiological incidents Radiological events caused by radiation worker errors Radiological events caused by radiation protection technician errors Available for onsite review during the inspection:
* Available for onsite review during the inspection:
RWPs for the top five dose rate areas or tasks; RWPs for airborne activity areas.
RWPs for the top five dose rate areas or tasks; RWPs for airborne activity areas.
Elevation maps with most recent operating and outage radiation survey levels.
Elevation maps with most recent operating and outage radiation survey levels.
71121.03: Radiation Monitoring Instrumentation and Protective Equipment
71121.03: Radiation Monitoring Instrumentation and Protective Equipment Site and corporate procedures/manuals associated with radiation monitoring instrumentation and respiratory protection. Procedures/manuals should include:
* Site and corporate procedures/manuals associated with radiation monitoring instrumentation and respiratory protection. Procedures/manuals should include:
Operation, calibration, and maintenance of ARM, CAM, portal monitor (PM),
Operation, calibration, and maintenance of ARM, CAM, portal monitor (PM),
personnel contamination monitor (PCM), and tool monitors, including set-point determination Operation and calibration of Whole Body Counter (WBC) equipment Issuance/operation of portable survey instruments Calibration and maintenance of portable instruments (e.g. ion chambers, friskers, teletectors, rem-ball)
personnel contamination monitor (PCM), and tool monitors, including set-point determination Operation and calibration of Whole Body Counter (WBC) equipment Issuance/operation of portable survey instruments Calibration and maintenance of portable instruments (e.g. ion chambers, friskers, teletectors, rem-ball)
Actions to be taken when portable instrument found to be significantly out of tolerance/calibration Issuance and use of respiratory protective equipment (emphasis on SCBA and air-supplied equipment)
Actions to be taken when portable instrument found to be significantly out of tolerance/calibration Issuance and use of respiratory protective equipment (emphasis on SCBA and air-supplied equipment)
Training, including fit-testing, for use of SCBA and supplied-air systems SCBA maintenance activities, including vital components (i.e. regulators)
Training, including fit-testing, for use of SCBA and supplied-air systems SCBA maintenance activities, including vital components (i.e. regulators)
Determination/verification of Grade D air for SCBA
Determination/verification of Grade D air for SCBA  


SNC                                             4
SNC 4
* If PASS capabilities have been modified through license amendment, provide a copy of the amendment and applicable SER
If PASS capabilities have been modified through license amendment, provide a copy of the amendment and applicable SER Two most recent surveillances of PASS equipment (or equivalent equipment as approved by license amendment)
* Two most recent surveillances of PASS equipment (or equivalent equipment as approved by license amendment)
Two most recent calibrations for the following ARM/CAM equipment for:
* Two most recent calibrations for the following ARM/CAM equipment for:
Control Room Area Radiation Monitors Refuel Floor Area Radiation Monitors Stack Monitors Radwaste Area Monitors Containment High Range Area Monitors for both Units Two most recent calibrations each of the PCMs, PMs and SAMs located at the RCA exit.
Control Room Area Radiation Monitors Refuel Floor Area Radiation Monitors Stack Monitors Radwaste Area Monitors Containment High Range Area Monitors for both Units
Most recent calibration of WBC and copy of the analysis library.
* Two most recent calibrations each of the PCMs, PMs and SAMs located at the RCA exit.
Records of certification of air quality for equipment used to provide breathing air for air-supplied respirators and SCBA bottles since the last inspection.
* Most recent calibration of WBC and copy of the analysis library.
List of corrective action reports generated since the last inspection involving radiation monitoring and protective equipment deficiencies, including the following:
* Records of certification of air quality for equipment used to provide breathing air for air-supplied respirators and SCBA bottles since the last inspection.
* List of corrective action reports generated since the last inspection involving radiation monitoring and protective equipment deficiencies, including the following:
Area radiation monitors and continuous air monitors Portable instrumentation, PCM, PM, and WBC monitoring equipment Respiratory protection equipment and program implementation.
Area radiation monitors and continuous air monitors Portable instrumentation, PCM, PM, and WBC monitoring equipment Respiratory protection equipment and program implementation.
* Available for onsite review by inspector during inspection:
Available for onsite review by inspector during inspection:
Inventory, inspection, and maintenance records for SCBA equipment Training records, including fit-testing, for SCBA-qualified individuals Training records/certification for individuals qualified to perform maintenance on vital components (e.g. regulators) on SCBA 71122.01: Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems
Inventory, inspection, and maintenance records for SCBA equipment Training records, including fit-testing, for SCBA-qualified individuals Training records/certification for individuals qualified to perform maintenance on vital components (e.g. regulators) on SCBA 71122.01: Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Site and corporate procedures/manuals associated with the radioactive effluents treatment and monitoring program. Procedures/manuals should include:
* Site and corporate procedures/manuals associated with the radioactive effluents treatment and monitoring program. Procedures/manuals should include:
Calibration and routine surveillance procedures for the effluent monitors listed below, including set-point determination.
Calibration and routine surveillance procedures for the effluent monitors listed below, including set-point determination.
HP/Chemistry/Operations procedures for liquid and gaseous effluent sampling, analysis, and release, including release permit generation Calibration and use of the effluent sample counting laboratory instruments (gamma spectroscopy, liquid scintillation, gas proportional)
HP/Chemistry/Operations procedures for liquid and gaseous effluent sampling, analysis, and release, including release permit generation Calibration and use of the effluent sample counting laboratory instruments (gamma spectroscopy, liquid scintillation, gas proportional)
Counting laboratory QC activities, including daily/weekly calibration checks, control charts, and interlaboratory comparison performance Surveillance activities on air treatment systems, including charcoal and HEPA filter testing Calculation of projected doses to members of the public from effluent releases
Counting laboratory QC activities, including daily/weekly calibration checks, control charts, and interlaboratory comparison performance Surveillance activities on air treatment systems, including charcoal and HEPA filter testing Calculation of projected doses to members of the public from effluent releases  


SNC                                           5
SNC 5
* Two most recent Annual Radioactive Effluents Release Reports.
Two most recent Annual Radioactive Effluents Release Reports.
* Records of instrument calibrations performed since the last inspection for each point of discharge effluent radiation monitor and flow measurement device
Records of instrument calibrations performed since the last inspection for each point of discharge effluent radiation monitor and flow measurement device List of time periods during which the discharge effluent radiation monitors were out of service since the last inspection.
* List of time periods during which the discharge effluent radiation monitors were out of service since the last inspection.
Most recent liquid and gaseous continuous release permits and most recent liquid and gaseous batch release permits (4 total).
* Most recent liquid and gaseous continuous release permits and most recent liquid and gaseous batch release permits (4 total).
Interlaboratory comparison program results for effluent sample counting laboratory since the last inspection.
* Interlaboratory comparison program results for effluent sample counting laboratory since the last inspection.
List of corrective action reports generated since the last inspection related to effluent monitoring equipment, effluent treatment systems, and air cleanup systems.
* List of corrective action reports generated since the last inspection related to effluent monitoring equipment, effluent treatment systems, and air cleanup systems.
Available for onsite review by inspector during inspection:
* Available for onsite review by inspector during inspection:
Plant drawings sufficient to permit the inspector to walk-down the liquid and gaseous effluent processing systems and effluent/process radiation monitors to verify current system configuration/operation agrees with the descriptions contained in the UFSAR and ODCM.
Plant drawings sufficient to permit the inspector to walk-down the liquid and gaseous effluent processing systems and effluent/process radiation monitors to verify current system configuration/operation agrees with the descriptions contained in the UFSAR and ODCM.
List/description of modifications and design changes, including procedural or operational changes, made to effluent treatment, monitoring, or sampling systems or to plant ventilation systems since the last inspection.
List/description of modifications and design changes, including procedural or operational changes, made to effluent treatment, monitoring, or sampling systems or to plant ventilation systems since the last inspection.
71122.03: Radiological Environmental Monitoring Program (REMP) and Radioactive Material Control Program
71122.03: Radiological Environmental Monitoring Program (REMP) and Radioactive Material Control Program Site and corporate procedures associated with the REMP program, meteorological monitoring, and radioactive material control program. These procedures should include:
* Site and corporate procedures associated with the REMP program, meteorological monitoring, and radioactive material control program. These procedures should include:
Environmental sampling methodology for each matrix (e.g. TLD, ground and surface water, milk, vegetation, sediment, etc.) including sample collection, preparation, and analysis Calibration and maintenance of sampling equipment Calibration and QC activities for sample counting instruments Calibration, maintenance, and routine surveillance of meteorological instruments Control, survey and release of individuals and materials from the RCA Response to alarms at RCA and/or protected area exits Calibration, maintenance, and use of small article monitors, tool monitors, etc.
Environmental sampling methodology for each matrix (e.g. TLD, ground and surface water, milk, vegetation, sediment, etc.) including sample collection, preparation, and analysis Calibration and maintenance of sampling equipment Calibration and QC activities for sample counting instruments Calibration, maintenance, and routine surveillance of meteorological instruments Control, survey and release of individuals and materials from the RCA Response to alarms at RCA and/or protected area exits Calibration, maintenance, and use of small article monitors, tool monitors, etc.
* Two most recent Annual Environmental Monitoring Reports [2006 and 2007]
Two most recent Annual Environmental Monitoring Reports [2006 and 2007]
* Calibration and maintenance records for air samplers and composite water samplers.
Calibration and maintenance records for air samplers and composite water samplers.
* Calibration records for environmental sample counting instruments, including control charts and LLD determination OR audits of quality control program of vendor laboratory used to analyze REMP samples, as appropriate.
Calibration records for environmental sample counting instruments, including control charts and LLD determination OR audits of quality control program of vendor laboratory used to analyze REMP samples, as appropriate.
* Interlaboratory comparison program results for the past two years (in-house laboratory or vendor laboratory). For in-house counting lab, quality control evaluation of results.
Interlaboratory comparison program results for the past two years (in-house laboratory or vendor laboratory). For in-house counting lab, quality control evaluation of results.
* Calibration/surveillance/maintenance records for the meteorological instruments since the last inspection.
Calibration/surveillance/maintenance records for the meteorological instruments since the last inspection.


SNC                                       6
SNC 6
* List of small article monitors, tool monitors, etc. and their locations (calibration records for select instruments will be requested by the inspectors after reviewing the list).
List of small article monitors, tool monitors, etc. and their locations (calibration records for select instruments will be requested by the inspectors after reviewing the list).
* List of corrective action reports generated since the last inspection related to the REMP and Radioactive Material Control program, including the following:
List of corrective action reports generated since the last inspection related to the REMP and Radioactive Material Control program, including the following:
REMP program, including sampling and sample analysis Meteorological monitoring program, including sensor problems, tower unavailability and data transmission/display discrepancies Radioactive material control}}
REMP program, including sampling and sample analysis Meteorological monitoring program, including sensor problems, tower unavailability and data transmission/display discrepancies Radioactive material control}}

Latest revision as of 15:18, 14 January 2025

Notification of Inspection and Request for Information
ML082490098
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/04/2008
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Madison D
Southern Nuclear Operating Co
References
Download: ML082490098 (10)


Text

September 4, 2008 Mr. Dennis R. Madison Vice President Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT, NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Madison:

On November 17 - 21, 2008, the NRC will perform the baseline Public Radiation Safety Inspection at the Edwin I. Hatch Nuclear Plant, (NRC Inspection Procedures 71121.01, 71121.03, 71122.01, 71122.03, and Radiation Safety Sections of 711551 and 60855.1).

Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Steve Tipps of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Wade T. Loo, at (404) 562-4727.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5

Enclosure:

(See page 2)

XG SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS SIGNATURE

/RA/

/RA/

NAME Wade Loo Brian Bonser DATE 09/03/2008 09/04/2008 9/ /2008 9/ /2008 9/ /2008 9/ /2008 9/ /2008 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

SNC 2

cc w/encl:

Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Raymond D. Baker Licensing Manager Licensing-Hatch Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution David H. Jones Vice President Engineering Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Steven B. Tipps Hatch Principal Engineer - Licensing Edwin I. Hatch Nuclear Plant Electronic Mail Distribution Mr. K. Rosanski Resident Manager Oglethorpe Power Corporation Electronic Mail Distribution Laurence Bergen Oglethorpe Power Corporation Electronic Mail Distribution Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution Senior Resident Inspector Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N Baxley, GA 30334 Arthur H. Domby, Esq.

Troutman Sanders Electronic Mail Distribution Dr. Carol Couch Director Environmental Protection Department of Natural Resources Electronic Mail Distribution Cynthia Sanders Program Manager Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution Jim Sommerville (Acting) Chief Environmental Protection Division Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA 31513

SNC 3

Letter to Dennis R. Madison from Brian Bonser dated September 4, 2008

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT, NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION Distribution w/encl:

RIDSNRRDIRS PUBLIC R. Martin, NRR (PM: HAT, SUM)

C. Gratton, NRR

Pre-Inspection Document Request Public Radiation Safety Cornerstone Licensee:

Edwin I. Hatch Nuclear Plant Docket Numbers:

50-321, 050-366 Inspection Dates:

November 17 - 21, 2008 Inspection Procedures Scheduled:

60855.1 Operation of an ISFSI at Operating Plants 71121.01 Access Control to Radiologically Significant Areas 71121.03 Radiation Monitoring Instrumentation and Protective Equipment 71122.01 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 71122.03 Radiological Environmental Monitoring Program (REMP) and Radioactive Material Control Program 71151 Performance Indicator Verification The most recent inspection completed for inspection procedures 71121.03, 71122.01, and 71122.03 ended on July 21, 2006, and 60855.1, 71121.01, and 71151 ended on March 1, 2007.

We request documentation from the date of the previous inspection to the present.

We would prefer as much of the information as possible in electronic form. An index to the CD contents is also helpful. For those items requesting a list of documents/areas, the inspectors will select documents/areas from the list for on-site review.

If you have any questions, please call Wade Loo by phone at (404) 562-4727 or E-Mail at wade.loo@nrc.gov. Thank you in advance for all your effort in putting together this material.

Assistance Requested During On-Site Inspection Identification of work activities during the inspection for inspector observations, including notification of pre-job briefings.

Advance notification of any liquid or gaseous effluent releases, including the associated pre-release sampling, analysis, and permit generation.

Health physics assistance in plant walk-downs assessing access controls, e.g. verifying the posting and locking of entrances to HDR-HRA and VHRA, and spent fuel pool controls.

Assistance in plant walk-downs of the liquid and gaseous effluent systems and associated radiation monitors.

Assistance in plant walk-downs of radiation monitors, including ARMs, CAMs, whole body counters, and personnel contamination monitors, etc.

Assistance with walk-down of meteorological equipment.

Assistance with observations of REMP sample collection and processing.

2 General Information Request Current Radiation Protection, Chemistry and Environmental/Meteorological organizational charts with contact numbers Electronic copy of applicable chapters of UFSAR (e.g. radiation protection program, effluents and environmental monitoring programs, radiation monitoring system, etc.)

Latest revision of the Offsite Dose Calculation Manual (ODCM)

List of radiation protection and chemistry (i.e. effluents) procedures Most recent DAW 10 CFR Part 61 analytical results.

Corrective Action Program procedures Procedure(s) for identifying, notification, tracking, and correcting PI occurrences List of all Performance Indicators (PIs) and copies of associated corrective action reports for Occupational Exposure Control Effectiveness and RETS/ODCM Radiological Effluent Occurrences Audits and self-assessments performed since the last inspection that encompass the areas of (1) radiation protection, (2) access controls, (3) effluent treatment and monitoring program (including chemistry and count room), (4) radiological environmental monitoring program, (5) meteorological monitoring program, (5) radioactive material control, (6) radiation measurement instrumentation program (fixed and portable), and (7) respiratory protection program.

60855: Operation of an ISFSI Procedures associated with the ISFSI facility. Procedures should include:

Radiological surveys, postings, and radiation control barricades Environmental monitoring (including TLDs)

Loading of casks Routine activities Radiation surveys of the ISFSI since the last inspection.

ALARA reviews and planning and associated RWPs for cask loading activities Environmental monitoring results (e.g. TLDs)

Radiological records for the loading of casks since the last inspection Records of contamination incidents since the last inspection.

List of corrective action reports related to the ISFSI with respect to radiation protection (i.e. access controls, ALARA, contamination, radiation levels, etc.) since the last inspection.

71121.01: Access Controls to Radiologically Significant Areas Site and corporate procedures associated with the access control program. Procedures should include:

Radiological surveys, postings, and radiation control barricades Security and control of high radiation sources/objects stored in pools Radiation Work Permits Radiological Job-Coverage

SNC 3

Controlling access to High Radiation Areas (HRAs), High Dose Rate High Radiation Areas (HDR-HRAs), and Very High Radiation Areas (VHRAs)

Key controls for all high radiation areas Radioactive material control, including contamination and hot particles Dosimetry monitoring (electronic dosimeters, multi-badging, etc.)

Calculations of internal exposures List of the 10 most exposure significant work areas within radiation areas, high radiation areas (<1R/hr), or airborne radioactivity areas in the plant. This may include areas with low dose rates but high collective dose. Identify any high radiation areas with significant dose rate gradients (factor of 5 or more), including underwater diving activities.

List or map of HRAs, LHRAs, HDR-HRAs (>25 rem in one hour @ 30 cm), and VHRAs.

Include areas with the potential to become a HRA during routine operations or outages.

Internal dose assessments, including calculations, for any internal exposures greater that 50 mrem CEDE since the last inspection.

List of corrective action reports generated since the last inspection related to access controls, including the following:

Access controls, including high radiation area radiological incidents Radiological events caused by radiation worker errors Radiological events caused by radiation protection technician errors Available for onsite review during the inspection:

RWPs for the top five dose rate areas or tasks; RWPs for airborne activity areas.

Elevation maps with most recent operating and outage radiation survey levels.

71121.03: Radiation Monitoring Instrumentation and Protective Equipment Site and corporate procedures/manuals associated with radiation monitoring instrumentation and respiratory protection. Procedures/manuals should include:

Operation, calibration, and maintenance of ARM, CAM, portal monitor (PM),

personnel contamination monitor (PCM), and tool monitors, including set-point determination Operation and calibration of Whole Body Counter (WBC) equipment Issuance/operation of portable survey instruments Calibration and maintenance of portable instruments (e.g. ion chambers, friskers, teletectors, rem-ball)

Actions to be taken when portable instrument found to be significantly out of tolerance/calibration Issuance and use of respiratory protective equipment (emphasis on SCBA and air-supplied equipment)

Training, including fit-testing, for use of SCBA and supplied-air systems SCBA maintenance activities, including vital components (i.e. regulators)

Determination/verification of Grade D air for SCBA

SNC 4

If PASS capabilities have been modified through license amendment, provide a copy of the amendment and applicable SER Two most recent surveillances of PASS equipment (or equivalent equipment as approved by license amendment)

Two most recent calibrations for the following ARM/CAM equipment for:

Control Room Area Radiation Monitors Refuel Floor Area Radiation Monitors Stack Monitors Radwaste Area Monitors Containment High Range Area Monitors for both Units Two most recent calibrations each of the PCMs, PMs and SAMs located at the RCA exit.

Most recent calibration of WBC and copy of the analysis library.

Records of certification of air quality for equipment used to provide breathing air for air-supplied respirators and SCBA bottles since the last inspection.

List of corrective action reports generated since the last inspection involving radiation monitoring and protective equipment deficiencies, including the following:

Area radiation monitors and continuous air monitors Portable instrumentation, PCM, PM, and WBC monitoring equipment Respiratory protection equipment and program implementation.

Available for onsite review by inspector during inspection:

Inventory, inspection, and maintenance records for SCBA equipment Training records, including fit-testing, for SCBA-qualified individuals Training records/certification for individuals qualified to perform maintenance on vital components (e.g. regulators) on SCBA 71122.01: Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Site and corporate procedures/manuals associated with the radioactive effluents treatment and monitoring program. Procedures/manuals should include:

Calibration and routine surveillance procedures for the effluent monitors listed below, including set-point determination.

HP/Chemistry/Operations procedures for liquid and gaseous effluent sampling, analysis, and release, including release permit generation Calibration and use of the effluent sample counting laboratory instruments (gamma spectroscopy, liquid scintillation, gas proportional)

Counting laboratory QC activities, including daily/weekly calibration checks, control charts, and interlaboratory comparison performance Surveillance activities on air treatment systems, including charcoal and HEPA filter testing Calculation of projected doses to members of the public from effluent releases

SNC 5

Two most recent Annual Radioactive Effluents Release Reports.

Records of instrument calibrations performed since the last inspection for each point of discharge effluent radiation monitor and flow measurement device List of time periods during which the discharge effluent radiation monitors were out of service since the last inspection.

Most recent liquid and gaseous continuous release permits and most recent liquid and gaseous batch release permits (4 total).

Interlaboratory comparison program results for effluent sample counting laboratory since the last inspection.

List of corrective action reports generated since the last inspection related to effluent monitoring equipment, effluent treatment systems, and air cleanup systems.

Available for onsite review by inspector during inspection:

Plant drawings sufficient to permit the inspector to walk-down the liquid and gaseous effluent processing systems and effluent/process radiation monitors to verify current system configuration/operation agrees with the descriptions contained in the UFSAR and ODCM.

List/description of modifications and design changes, including procedural or operational changes, made to effluent treatment, monitoring, or sampling systems or to plant ventilation systems since the last inspection.

71122.03: Radiological Environmental Monitoring Program (REMP) and Radioactive Material Control Program Site and corporate procedures associated with the REMP program, meteorological monitoring, and radioactive material control program. These procedures should include:

Environmental sampling methodology for each matrix (e.g. TLD, ground and surface water, milk, vegetation, sediment, etc.) including sample collection, preparation, and analysis Calibration and maintenance of sampling equipment Calibration and QC activities for sample counting instruments Calibration, maintenance, and routine surveillance of meteorological instruments Control, survey and release of individuals and materials from the RCA Response to alarms at RCA and/or protected area exits Calibration, maintenance, and use of small article monitors, tool monitors, etc.

Two most recent Annual Environmental Monitoring Reports [2006 and 2007]

Calibration and maintenance records for air samplers and composite water samplers.

Calibration records for environmental sample counting instruments, including control charts and LLD determination OR audits of quality control program of vendor laboratory used to analyze REMP samples, as appropriate.

Interlaboratory comparison program results for the past two years (in-house laboratory or vendor laboratory). For in-house counting lab, quality control evaluation of results.

Calibration/surveillance/maintenance records for the meteorological instruments since the last inspection.

SNC 6

List of small article monitors, tool monitors, etc. and their locations (calibration records for select instruments will be requested by the inspectors after reviewing the list).

List of corrective action reports generated since the last inspection related to the REMP and Radioactive Material Control program, including the following:

REMP program, including sampling and sample analysis Meteorological monitoring program, including sensor problems, tower unavailability and data transmission/display discrepancies Radioactive material control