ML20045B902: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20045B902
| number = ML20045B902
| issue date = 05/31/1993
| issue date = 05/31/1993
| title = Monthly Operating Repts for May 1993 for Vogtle Electric Generating Plant,Units 1 & 2.W/930614 Ltr
| title = Monthly Operating Repts for May 1993 for Vogtle Electric Generating Plant,Units 1 & 2
| author name = Hooper G, Mccoy C
| author name = Hooper G, Mccoy C
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:cog a row cmr oany
{{#Wiki_filter:cog a row cmr oany
        .  . 49 iruecen cemer Fam, a
. 49 iruecen cemer Fam, rw ow cu ms a
rw ow cu ms Ri m qigt .mr:. A' $barna 35201 Te phone .?OS 877 71:'2
Ri m qigt.mr:. A' $barna 35201 Te phone.?OS 877 71:'2 Georgia Power
: c. x. w. coy
: c. x. w. coy
              ,u. v;wv:~ nnw Georgia Power sjugg: p r o,w *                                                         !?n' SmBtwarr1 c <x trc S(, tem June 14,1993 LCV-0038 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPOEI Gentlemen:
,u. v;wv:~ nnw sjugg: p r o,w *
!?n' SmBtwarr1 c <x trc S(, tem June 14,1993 LCV-0038 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPOEI Gentlemen:
Enclosed are the May 1993 monthly operating reports for Vogtle Units I and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.
Enclosed are the May 1993 monthly operating reports for Vogtle Units I and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.
Sincerely,
Sincerely,
                                                                            /
/
C. K. McCoy CKM/JLUgmb Enclosure xc: Georgia Power Company Mr. J. B. Beasley Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle 9iOOOa                             . , .
C. K. McCoy CKM/JLUgmb Enclosure xc: Georgia Power Company Mr. J. B. Beasley Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle 9iOOOa 9306210240 930531 h
9306210240 930531                   4 h                                                                     1 DR     ADOCK 0500                                                                             [
1 DR ADOCK 0500 4
[


ENCLOSURE 1 c
ENCLOSURE 1 c
VOGTLE ELECTRIC GENERATING PLANT - UNIT I MONTHLY OPERATING REPORT FOR MAY 1993 TABLE OF CONTENTS NARRATIVE REPORT                             Page V1-1 OPERATING DATA REPORT                         Page VI-2 AVERAGE DAILY POWER LEVEL                     Page VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS           Page VI-4 t
VOGTLE ELECTRIC GENERATING PLANT - UNIT I MONTHLY OPERATING REPORT FOR MAY 1993 TABLE OF CONTENTS NARRATIVE REPORT Page V1-1 OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 t
b F
b F


NARRATIVE REPORT             DOCKET NO. 50-424                                 11 UNIT 1                 DATE:         JUNE 1,1993 COMPLETED BY: G, L. HOOPER                           ,
NARRATIVE REPORT DOCKET NO. 50-424 11 UNIT 1 DATE:
TELEPHONE:             (706) 826-4104-r MAY 01. 00:00 UNIT 1 AT 87% POWER, POWER ASCENSION IN PROGRESS.
JUNE 1,1993 COMPLETED BY: G, L. HOOPER TELEPHONE:
(706) 826-4104-r MAY 01. 00:00 UNIT 1 AT 87% POWER, POWER ASCENSION IN PROGRESS.
MAY 03 04:06 UNIT 1 TURBINE TRIP! REACTOR TRIP CAUSED BY LOW EHC PRESSURE.
MAY 03 04:06 UNIT 1 TURBINE TRIP! REACTOR TRIP CAUSED BY LOW EHC PRESSURE.
UNIT ENTERED MODE 3.
UNIT ENTERED MODE 3.
Line 43: Line 46:
V1-1
V1-1


OPERATING DATA REPORT                     DOCKET NO. 50-424                                       .;
OPERATING DATA REPORT DOCKET NO. 50-424 DATE:
DATE:         ' JUNE 1,1993                               ,
' JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:
COMPLETED BY: G. L. HOOPER TELEPHONE:           (706) 826-4104-O'PERATING STATUS
(706) 826-4104-O'PERATING STATUS
: 1. UNIT NAME:                                                               VEGP UNIT 1-                                               ,
: 1. UNIT NAME:
        ' 2. REPORT PERIOD:                                                           MAY 1993
VEGP UNIT 1-
: 3. LICENSED THERMAL POWER (MWt):                                             3565
' 2. REPORT PERIOD:
: 4. NAMEPLATE RATING (GROSS MWe):                                             1215
MAY 1993
: 5. DESIGN ELECTRICAL RATING (NET MWe):                                       1151                                                     >
: 3. LICENSED THERMAL POWER (MWt):
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):                                 1212
3565
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):                                   1158
: 4. NAMEPLATE RATING (GROSS MWe):
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS                                     N/A (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
1215
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):                       NO RESTRICTIONS
: 5. DESIGN ELECTRICAL RATING (NET MWe):
: 10. REASONS FOR RESTRICTION,IF ANY:                                           N/A THIS MONTH                   YR. TO DATE             CUMULATIVE .
1151
: 11. HOURS IN REPORTING PERIOD:                                         744                   3623                 52608           j
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL:                           720.1               ' 2552.5               44754.4               !
1212
: 13. REACTOR RESERVE SHUTDOWN HOURS:                                     0.0                   0.0 -                     0.0
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
      ' 14. HOURS GENERATOR ON-LINE:
1158
682.9                 2462.9               43757.9
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS N/A (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
: 15. UNIT RESERVE SHUTDOWN HOURS:                                         0.0                   0.0                       0.0
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
      - 16. GROSS THERMAL ENERGY GENERATED (MWH):                       2401502                 8227877               145597280
NO RESTRICTIONS
: 17. GROSS ELEC. ENERGY GENERATED (MWH):                           816045               2811055               48792040
: 10. REASONS FOR RESTRICTION,IF ANY:
: 18. NET ELEC. ENERGY GENERATED (MWH):                             779425-               2673245               46314210
N/A THIS MONTH YR. TO DATE CUMULATIVE.
: 19. REACTOR SERVICE FACTOR                                         96.8 %                   70.5 %               - 85.1%
: 11. HOURS IN REPORTING PERIOD:
: 20. REACTOR AVAILABILITY FACTOR                                     96.8 %                   70.5 %                 85.1 %             <
744 3623 52608 j
: 21. UNIT SERVICE FACTOR:                                           91.8 %                 68.0 %                 83.2 %
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
: 22. UNIT AVAILABluTY FACTOR:                                       91.8 %                   68.0 %                 83.2 %
720.1
: 23. UNIT CAPACITY FACTOR (USING MDC NET):                           90.5 %                   65 4 %                 80.7%
' 2552.5 44754.4
: 24. UNIT CAPACITY FACTOR (USING DER NET):                           91.0 %                 65.8%                 79.9%               ,
: 13. REACTOR RESERVE SHUTDOWN HOURS:
: 25. UNIT FORCED OUTAGE RATE:                                         8.2%                   2.9% -                 6.1%.         .j
0.0 0.0 -
      .26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH).
0.0
NONE                                                                                   ;
' 14. HOURS GENERATOR ON-LINE:
: 27. IF SHUTDOWN AT ENC OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                                   N/A                             1
682.9 2462.9 43757.9
                                                                                                                                              .I J
: 15. UNIT RESERVE SHUTDOWN HOURS:
                                                                                                                                              -I V1-2                                                                                   ;
0.0 0.0 0.0
                                                                                                                                              .l I
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
2401502 8227877 145597280
: 17. GROSS ELEC. ENERGY GENERATED (MWH):
816045 2811055 48792040
: 18. NET ELEC. ENERGY GENERATED (MWH):
779425-2673245 46314210
: 19. REACTOR SERVICE FACTOR 96.8 %
70.5 %
- 85.1%
: 20. REACTOR AVAILABILITY FACTOR 96.8 %
70.5 %
85.1 %
: 21. UNIT SERVICE FACTOR:
91.8 %
68.0 %
83.2 %
: 22. UNIT AVAILABluTY FACTOR:
91.8 %
68.0 %
83.2 %
: 23. UNIT CAPACITY FACTOR (USING MDC NET):
90.5 %
65 4 %
80.7%
: 24. UNIT CAPACITY FACTOR (USING DER NET):
91.0 %
65.8%
79.9%
: 25. UNIT FORCED OUTAGE RATE:
8.2%
2.9% -
6.1%.
.j
.26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH).
NONE
: 27. IF SHUTDOWN AT ENC OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A 1.I J
-I V1-2
.l I


UNIT 1 - AVERAGE DAILY                                 DOCKET NO. 50-424 POWER LEVEL                                   DATE:       JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:     (706) 826-4104 DAY                                         Not MW 1 .-.. .                 ... .              1065 2..                   .. ..                1110                  ,
UNIT 1 -
3=                         . .                109 4 . ..           . . .            .            0 5...                                           57
AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:
: 6.         .        ..                      982 7 ...       . . . . ..                      1128 8 . .. .                                   1164 *
JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:
: 9.             .                  .        1169*
(706) 826-4104 DAY Not MW 1.-...
10 .. .. .                 ...              1169
1065 1110 2..
* 11               .                          1169
3=
* 12 . .. . ..                                 1169
109 4...
* 13 .           .                .            1172
0 5...
* 14 . .. ..                                   1175*
57 6.
15 ..                                         1171
982 7...
* 16 ..     .          .        .              1169
1128 8....
* 17 .           ..                  .        1166
1164
* 18 .       ..                                1165 *               .
* 1169*
19 . .         ...            .              1171
9.
* 20 . .               ..                      1175
10.....
* 21 ..                       . . .            1179 *               ,
1169
22 .       ..        . . . . . . .          1180
* 11 1169
* 23 . . . ..                                   1175
* 12......
* 24 . .. .. ..           . . . .              1170
1169
* 25 . .. . .                     ..          1167
* 13.
* 26 .                   .                    1166
1172
* 27 .         . . .                ..        1168
* 14.....
* 28 .       .        ... .                  1167
1175*
* 29 . .                   .                  1166
15..
* 30 .     .          ..                      1166
1171
* 31 . . .                                     1164 *
* 16..
1169
* 17.
1166
* 18.
1165
* 19..
1171
* 20..
1175
* 21..
1179
* 1180
* 22.
23.....
1175
* 24.......
1170
* 25.....
1167
* 26.
1166
* 27.
1168
* 28.
1167
* 29..
1166
* 30.
1166
* 31...
1164 *
* MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS V1-3 L.
* MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS V1-3 L.


1 UNIT SHUTDOWNS AND POWER REDUCTIONS             DOCKET NO. 50-424 DATE:       JUNE 1,1993 UNIT NAME:       VEGP UNIT 1                   COMPLETED BY: G. L. HOOPER TELEPHONE:     (706) 826-4104 REPORT MONTH       MAY 1993 R M             S E   E             Y T               A T   LICENSEE SC Y               S H     EVENT TO       COMPONENT         CAUSE & CORRECTIVE P     DURATION O   O   REPORT ED           CODE               ACTION TO -
1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 DATE:
NO. DATE   E     (HOURS)   N D   NUMBER ME       (SUBCODE)       PREVENT RECURRENCE 93-4   5/3   F       61.1   A   3   1-93-009   TG         P               SEE BELOW
JUNE 1,1993 UNIT NAME:
                                                                                                            ~
VEGP UNIT 1 COMPLETED BY: G. L. HOOPER TELEPHONE:
F: FORCED       REASON:                             METHOD:               EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN)         1 - MANUAL           A GREATER THAN 20%
(706) 826-4104 REPORT MONTH MAY 1993 R
B-MAINTENANCE OR TEST               2 - MANUAL SCRAM     REDUCTION IN AVERAGE C-REFUELING                         3 - AUTO. SCRAM       DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION           4 - CONTINUATIONS     THE PRECEDING 24 HOURS.
M S
E-OPERATOR TRAINING & LICENSE       5 - LOAD REDUCTION                                 -
E E
F-ADMINISTRATIVE                   9 - OTHER (EXPLAIN)
Y T
A T
LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION O
O REPORT ED CODE ACTION TO -
NO.
DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE 93-4 5/3 F
61.1 A
3 1-93-009 TG P
SEE BELOW
~
F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
H-OTHER (EXPLAIN)
Line 119: Line 212:
TIIE DIRECT CAUSE OF Tills EVENT WAS A FAILURE OF Tile *A" EllC PUMP, ALONO WITil TIE FAILUIE OF TIE STANDBY ElIC PUMP TO AUTO START AT Tile CORRECT PRESSURE. TIIE COMBINATION OF TIIE TWO FAILURES PREVENTED TIIE EllC PUMPS FROM PROPERLY M.AINTAINING EllC PRESSURE.
TIIE DIRECT CAUSE OF Tills EVENT WAS A FAILURE OF Tile *A" EllC PUMP, ALONO WITil TIE FAILUIE OF TIE STANDBY ElIC PUMP TO AUTO START AT Tile CORRECT PRESSURE. TIIE COMBINATION OF TIIE TWO FAILURES PREVENTED TIIE EllC PUMPS FROM PROPERLY M.AINTAINING EllC PRESSURE.
1 CORRECTIVE ACTION: TIE DEFECTIVE EllC PUMP WAS REPLACED, AND TlIE ElIC SYSTEM WAS DRAINED AND REFILLED PRIOR TO BEING RESTORED TO SERVICE. Tile LOW EllC PRESSURE ALARM AND STANDBY PUMP AUTOSTART PRESSURE SWITCIIES WERE CALIBRATED AND ADJUSTED TO TIIE CORRECT SETPOINTS.
1 CORRECTIVE ACTION: TIE DEFECTIVE EllC PUMP WAS REPLACED, AND TlIE ElIC SYSTEM WAS DRAINED AND REFILLED PRIOR TO BEING RESTORED TO SERVICE. Tile LOW EllC PRESSURE ALARM AND STANDBY PUMP AUTOSTART PRESSURE SWITCIIES WERE CALIBRATED AND ADJUSTED TO TIIE CORRECT SETPOINTS.
V1-4 l
V1-4


ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR MAY 1993 TABLE OF CONTENTS NARRATIVE REPORT                               Page V2-1 OPERATING DATA REPORT                         Page V2-2 AVERAGE DAILY POWER LEVEL                     Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS           Page V2-4
ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR MAY 1993 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4


i 1
i 1
  . .                                                                                l NARRATIVE REPORT           DOCKET NO. 50-425           l UNIT 2                 DATE:   JUNE 1,1993         j COMPLETED BY: G. L. HOOPER TELEPHONE:   (706) 826-4104 1
NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:
                                                                                      =
JUNE 1,1993 j
COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 1
MAY 01 00.00 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
MAY 01 00.00 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
=
MAY 11 15:00 UNIT 2 BEGAN POWER UPRATE PROCESS.
MAY 11 15:00 UNIT 2 BEGAN POWER UPRATE PROCESS.
MAY 17 05:03 UNIT 2 POWER UPRATE COMPLETED. CONTROLVALVES REACHED THE FULL OPEN POSITION AT 99% POWEF'.
MAY 17 05:03 UNIT 2 POWER UPRATE COMPLETED. CONTROLVALVES REACHED THE FULL OPEN POSITION AT 99% POWEF'.
Line 133: Line 229:


1 1
1 1
OPERATING DATA REPORT               DOCKET NO. 50-425 DATE:       JUNE 1,1993                     .
OPERATING DATA REPORT DOCKET NO. 50-425 DATE:
COMPLETED BY: G. L. HOOPER                   l TELEPHONE:         (706) 826-4104           i l
JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:
l OPERATING STATUS
(706) 826-4104 i
      - 1. UNIT NAME:                                                       VEGP UNIT 2'                                 j
OPERATING STATUS
: 2. REPORT PERIOD:                                                   MAY 1993
- 1. UNIT NAME:
: 3. LICENSED THERMAL POWER (MWt):                                     3565 *
VEGP UNIT 2' j
: 4. NAMEPLATE RATING (GROSS MWe):                                     1215
: 2. REPORT PERIOD:
: 5. DESIGN ELECTRICAL RATING (NET MWe):                               1151 *
MAY 1993
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):                           1211 *
: 3. LICENSED THERMAL POWER (MWt):
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):                             1157 *
3565 *
: 4. NAMEPLATE RATING (GROSS MWe):
1215
: 5. DESIGN ELECTRICAL RATING (NET MWe):
1151 *
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1211 *
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1157 *
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
* CHANGES RESULT FROM THE UNIT UPRATE                       l APPROVED BY AMMENDMENT 39 TO FACILITY OPERATING LICENSE NPF-81. THE DESIGN ELECTRICAL RATING IS AN ESTIMATE WHICH Wil.L BE REVISED AFTER UNIT PERFORMANCE TESTING.
* CHANGES RESULT FROM THE UNIT UPRATE APPROVED BY AMMENDMENT 39 TO FACILITY OPERATING LICENSE NPF-81. THE DESIGN ELECTRICAL RATING IS AN ESTIMATE WHICH Wil.L BE REVISED AFTER UNIT PERFORMANCE TESTING.
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):               NO RESTRICTIONS
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
      - 10. REASONS FOR RESTRICTION,IF ANY:                                 N/A THIS MONTH         YR. TO DATE         CUMULATIVE
NO RESTRICTIONS
: 11. HOURS IN REPORTING PERIOD:                                   744                 3623               35352
- 10. REASONS FOR RESTRICTION,IF ANY:
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL:                     744.0               3623.0             31868.9
N/A THIS MONTH YR. TO DATE CUMULATIVE
: 13. REACTOR RESERVE SHUTDOWN HOURS:                               0.0                 0.0                 0.0
: 11. HOURS IN REPORTING PERIOD:
: 14. HOURS GENERATOR ON-LINE:                                   744.0               3623.0             31410.6
744 3623 35352
: 15. UNIT RESERVE SHUTDOWN HOURS:                                 0.0                 0.0                 0.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
: 16. GROSS THERMAL ENERGY GENERATED (MWH):                   2577663             12392003           102880351
744.0 3623.0 31868.9
: 17. GROSS ELEC. ENERGY GENERATED (MWH):                     883973             4278566           34863842
: 13. REACTOR RESERVE SHUTDOWN HOURS:
: 18. NET ELEC. ENERGY GENERATED (MWH):                       844963             4087766           33154342
0.0 0.0 0.0
: 19. REACTOR SERVICE FACTOR                                   100.0 %             100.0 %             90.1 %
: 14. HOURS GENERATOR ON-LINE:
: 20. REACTOR AVAILABILITY FACTOR                             100.0 %             100.0 %             90.1 %
744.0 3623.0 31410.6
: 21. UNIT SERVICE FACTOR:                                     100.0%               100.0%               88.9 %     I
: 15. UNIT RESERVE SHUTDOWN HOURS:
: 22. UNIT AVAILABILITY FACTOR:                               100.0 %             100.0%               88.9 %     l
0.0 0.0 0.0
: 23. UNIT CAPACITY FACTOR (USING MDC NET):                   100.4 % "         101.5 %               85.1 %
: 16. GROSS THERMAL ENERGY GENERATED (MWH):
: 24. UNIT CAPACITY FACTOR (USING DER NET):                     98.7 %             101.5 %             85.1 %
2577663 12392003 102880351
: 25. UNIT FORCED OUTAGE RATE:                                   0.0%                 0.0%                 1.7%     l
: 17. GROSS ELEC. ENERGY GENERATED (MWH):
883973 4278566 34863842
: 18. NET ELEC. ENERGY GENERATED (MWH):
844963 4087766 33154342
: 19. REACTOR SERVICE FACTOR 100.0 %
100.0 %
90.1 %
: 20. REACTOR AVAILABILITY FACTOR 100.0 %
100.0 %
90.1 %
: 21. UNIT SERVICE FACTOR:
100.0%
100.0%
88.9 %
I
: 22. UNIT AVAILABILITY FACTOR:
100.0 %
100.0%
88.9 %
: 23. UNIT CAPACITY FACTOR (USING MDC NET):
100.4 % "
101.5 %
85.1 %
: 24. UNIT CAPACITY FACTOR (USING DER NET):
98.7 %
101.5 %
85.1 %
: 25. UNIT FORCED OUTAGE RATE:
0.0%
0.0%
1.7%
: 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
: 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
i REFUELING, SEPTEMBER 11,1993,37 DAYS
i REFUELING, SEPTEMBER 11,1993,37 DAYS
: 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                       NA                     ,
: 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
      " THE CAPACITY FACTOR (USING MDC NET) FOR THE MONTH OF MAY WAS CALCULATED USING A                                 !
NA
MONTHLY AVERAGE MDC VALUE OF 1134.4. THIS IS BA0ED ON UPRATING MAY 17,1993.
" THE CAPACITY FACTOR (USING MDC NET) FOR THE MONTH OF MAY WAS CALCULATED USING A MONTHLY AVERAGE MDC VALUE OF 1134.4. THIS IS BA0ED ON UPRATING MAY 17,1993.
l I
I V2-2 i
V2-2                                                           i l
i
i


UNIT 2 AVERAGE DAILY                                         DOCKET NO. 50425 POWER LEVEL                                         DATE:     JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:   (706) 826-4104 DAY                                               Net MW 1..         ..                                    1118 *
UNIT 2 AVERAGE DAILY DOCKET NO. 50425 POWER LEVEL DATE:
: 2.                                   .            1115
JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:
* 3 ..     .              .. .                      1114 *
(706) 826-4104 DAY Net MW 1..
: 4.                 .                              1110
1118
* 5 ..               ..                              1113
* 2.
* 6 .. . . . .                             .        1113*
1115
7......                           .              1113*
* 3..
: 8.         .                                      1114 *
1114
: 9.         . .                                    1116 *
* 4.
: 10. ..                   .                        1117
1110
* 11               . . .                            1116
* 5..
* 12 . .           ...                              1113
1113
* 13 . . .                                           1119
* 6......
* 14 .     ..                              .        1119 *                     >
1113*
15 ..       . . . . . .                            1117
7......
* 16 .         . . .                                  1113
1113*
* 17 .   .              .              ..            1149 18 .     ..                            .          1150 19 . . . .               .            ..          1156
8.
: 20.                                   .            1160
1114
* 21     . . .                    .                  1167
* 9.
* 22 .       . .                  .                1171
1116 *
* 23.....             ,      . . . . , .            1168
: 10...
* 24 . ..           .              . . .            1162
1117
* 25...                                     .        1159 *                     ;
* 11 1116
26 .         . .                                    1157 *                   'l 27.....                     . . .                  1156                       I 28...         .                . ..                1156                        l 29 .         ..            ,                      1154                       l 30 . .         .                                  1154 l
* 12..
31 . .               . . . ..                      1153 l
1113
l
* 13...
* MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS                                           l l
1119
* 14.
1119
* 15..
1117
* 1113
* 16.
17.
1149 18.
1150 19....
1156 20.
1160
* 21 1167
* 22.
1171
* 23.....
1168
* 24...
1162
* 25...
1159
* 26.
1157 *
'l 27.....
1156 I
1156 28...
29.
1154 30..
1154 31..
1153 l
* MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS l
V2-3 l
V2-3 l
l


s UNIT SHUTDOWNS AND POWER REDUCTIONS             DOCKET NO. 50-425                 )
s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425
DATE:       JUNE 1,1993 UNIT NAME:       VEGP UNIT 2                   COMPLETED BY: G. L. HOOPER TELEPHONE:       (706) 826-4104 REPORT MONTH   MAY 1993 R M             S E E             Y T             A T   LICENSEE SC Y               S H     EVENT TO       COMPONENT           CAUSE & CORRECTIVE P DURATION   O O   REPORT ED           CODE                 ACTION TO NO. DATE   E   (HOURS)   N D   NUMBER ME       XSUBCODE)         PREVENT RECURRENCE NA   NA   NA     NA     NA NA     NA       NA       NA                     NA F: FORCED     REASON:                           METHOD:                 EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN)       1 - MANUAL             ' A GREATER THAN 20%
)
B-MAINTENANCE OR TEST             2 - MANUAL SCRAM         REDUCTION IN AVERAGE C-REFUELING                       3 - AUTO. SCRAM         DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION         4 - CONTINUATIONS       THE PRECEDING 24 HOURS.
DATE:
E-OPERATOR TRAINING & LICENSE     5 - LOAD REDUCTION F-ADMINISTRATIVE                 9 - OTHER (EXPLAIN)
JUNE 1,1993 UNIT NAME:
VEGP UNIT 2 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 REPORT MONTH MAY 1993 R
M S
E E
Y T
A T
LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION O
O REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER ME XSUBCODE)
PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA NA F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL
' A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN) s 4
H-OTHER (EXPLAIN) s 4
Line 213: Line 396:
a f
a f


                                                                            -i e ***
- i e ***
e 1
e 1
(ENCLOSURE 3)                         ;
(ENCLOSURE 3)
DOCKET NOS. 504 24,50-425-VEGP UNITS 1 & 2                 DATE:     JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:   (706) 826-4104 EVENT DATE   TAG NO.     TYPE                 DEFCRIPTION NO EVENTS FOR MAY
DOCKET NOS. 504 24,50-425-VEGP UNITS 1 & 2 DATE:
                                                                        -r}}
JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 EVENT DATE TAG NO.
TYPE DEFCRIPTION NO EVENTS FOR MAY
-r}}

Latest revision as of 12:07, 19 December 2024

Monthly Operating Repts for May 1993 for Vogtle Electric Generating Plant,Units 1 & 2
ML20045B902
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/31/1993
From: Hooper G, Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9306210240
Download: ML20045B902 (13)


Text

cog a row cmr oany

. 49 iruecen cemer Fam, rw ow cu ms a

Ri m qigt.mr:. A' $barna 35201 Te phone.?OS 877 71:'2 Georgia Power

c. x. w. coy

,u. v;wv:~ nnw sjugg: p r o,w *

!?n' SmBtwarr1 c <x trc S(, tem June 14,1993 LCV-0038 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPOEI Gentlemen:

Enclosed are the May 1993 monthly operating reports for Vogtle Units I and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.

Sincerely,

/

C. K. McCoy CKM/JLUgmb Enclosure xc: Georgia Power Company Mr. J. B. Beasley Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle 9iOOOa 9306210240 930531 h

1 DR ADOCK 0500 4

[

ENCLOSURE 1 c

VOGTLE ELECTRIC GENERATING PLANT - UNIT I MONTHLY OPERATING REPORT FOR MAY 1993 TABLE OF CONTENTS NARRATIVE REPORT Page V1-1 OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 t

b F

NARRATIVE REPORT DOCKET NO. 50-424 11 UNIT 1 DATE:

JUNE 1,1993 COMPLETED BY: G, L. HOOPER TELEPHONE:

(706) 826-4104-r MAY 01. 00:00 UNIT 1 AT 87% POWER, POWER ASCENSION IN PROGRESS.

MAY 03 04:06 UNIT 1 TURBINE TRIP! REACTOR TRIP CAUSED BY LOW EHC PRESSURE.

UNIT ENTERED MODE 3.

MAY 04 02:42 UNIT 1 COMMENCED REACTOR STARTUP, ENTERED MODE 2.

MAY 04 04:02 UNIT 1 REACTOR CRITICAL MAY 04 12:51 UNIT 1 ENTERED MODE 1.

MAY 05 17:13 GENERATOR TIED TO GRID.

MAY 07 15:46 UNIT 1 POWER UPRATE COMPLETE.

MAY 31 23:59 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

t 9

V1-1

OPERATING DATA REPORT DOCKET NO. 50-424 DATE:

' JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104-O'PERATING STATUS

1. UNIT NAME:

VEGP UNIT 1-

' 2. REPORT PERIOD:

MAY 1993

3. LICENSED THERMAL POWER (MWt):

3565

4. NAMEPLATE RATING (GROSS MWe):

1215

5. DESIGN ELECTRICAL RATING (NET MWe):

1151

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1212

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1158

8. IF CHANGES OCCUR IN CAPACITY RATINGS N/A (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION,IF ANY:

N/A THIS MONTH YR. TO DATE CUMULATIVE.

11. HOURS IN REPORTING PERIOD:

744 3623 52608 j

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

720.1

' 2552.5 44754.4

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 -

0.0

' 14. HOURS GENERATOR ON-LINE:

682.9 2462.9 43757.9

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

- 16. GROSS THERMAL ENERGY GENERATED (MWH):

2401502 8227877 145597280

17. GROSS ELEC. ENERGY GENERATED (MWH):

816045 2811055 48792040

18. NET ELEC. ENERGY GENERATED (MWH):

779425-2673245 46314210

19. REACTOR SERVICE FACTOR 96.8 %

70.5 %

- 85.1%

20. REACTOR AVAILABILITY FACTOR 96.8 %

70.5 %

85.1 %

21. UNIT SERVICE FACTOR:

91.8 %

68.0 %

83.2 %

22. UNIT AVAILABluTY FACTOR:

91.8 %

68.0 %

83.2 %

23. UNIT CAPACITY FACTOR (USING MDC NET):

90.5 %

65 4 %

80.7%

24. UNIT CAPACITY FACTOR (USING DER NET):

91.0 %

65.8%

79.9%

25. UNIT FORCED OUTAGE RATE:

8.2%

2.9% -

6.1%.

.j

.26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH).

NONE

27. IF SHUTDOWN AT ENC OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A 1.I J

-I V1-2

.l I

UNIT 1 -

AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:

JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 DAY Not MW 1.-...

1065 1110 2..

3=

109 4...

0 5...

57 6.

982 7...

1128 8....

1164

  • 1169*

9.

10.....

1169

  • 11 1169
  • 12......

1169

  • 13.

1172

  • 14.....

1175*

15..

1171

  • 16..

1169

  • 17.

1166

  • 18.

1165

  • 19..

1171

  • 20..

1175

  • 21..

1179

  • 1180
  • 22.

23.....

1175

  • 24.......

1170

  • 25.....

1167

  • 26.

1166

  • 27.

1168

  • 28.

1167

  • 29..

1166

  • 30.

1166

  • 31...

1164 *

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS V1-3 L.

1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 DATE:

JUNE 1,1993 UNIT NAME:

VEGP UNIT 1 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 REPORT MONTH MAY 1993 R

M S

E E

Y T

A T

LICENSEE SC Y

S H

EVENT TO COMPONENT CAUSE & CORRECTIVE P

DURATION O

O REPORT ED CODE ACTION TO -

NO.

DATE E

(HOURS)

N D

NUMBER ME (SUBCODE)

PREVENT RECURRENCE 93-4 5/3 F

61.1 A

3 1-93-009 TG P

SEE BELOW

~

F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

EVENT 03-4 CAUSE: TURBINE TRIP / REACTOR TRIP DUE TO LOW ELECTROIlYDRAULIC CONTROL (EllC) SYSTEM PRESSURE.

TIIE DIRECT CAUSE OF Tills EVENT WAS A FAILURE OF Tile *A" EllC PUMP, ALONO WITil TIE FAILUIE OF TIE STANDBY ElIC PUMP TO AUTO START AT Tile CORRECT PRESSURE. TIIE COMBINATION OF TIIE TWO FAILURES PREVENTED TIIE EllC PUMPS FROM PROPERLY M.AINTAINING EllC PRESSURE.

1 CORRECTIVE ACTION: TIE DEFECTIVE EllC PUMP WAS REPLACED, AND TlIE ElIC SYSTEM WAS DRAINED AND REFILLED PRIOR TO BEING RESTORED TO SERVICE. Tile LOW EllC PRESSURE ALARM AND STANDBY PUMP AUTOSTART PRESSURE SWITCIIES WERE CALIBRATED AND ADJUSTED TO TIIE CORRECT SETPOINTS.

V1-4

ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR MAY 1993 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4

i 1

NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:

JUNE 1,1993 j

COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 1

MAY 01 00.00 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

=

MAY 11 15:00 UNIT 2 BEGAN POWER UPRATE PROCESS.

MAY 17 05:03 UNIT 2 POWER UPRATE COMPLETED. CONTROLVALVES REACHED THE FULL OPEN POSITION AT 99% POWEF'.

MAY 31 23:59 UNIT 2 AT 99% POWER.

t V2-1

1 1

OPERATING DATA REPORT DOCKET NO. 50-425 DATE:

JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 i

OPERATING STATUS

- 1. UNIT NAME:

VEGP UNIT 2' j

2. REPORT PERIOD:

MAY 1993

3. LICENSED THERMAL POWER (MWt):

3565 *

4. NAMEPLATE RATING (GROSS MWe):

1215

5. DESIGN ELECTRICAL RATING (NET MWe):

1151 *

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1211 *

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1157 *

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
  • CHANGES RESULT FROM THE UNIT UPRATE APPROVED BY AMMENDMENT 39 TO FACILITY OPERATING LICENSE NPF-81. THE DESIGN ELECTRICAL RATING IS AN ESTIMATE WHICH Wil.L BE REVISED AFTER UNIT PERFORMANCE TESTING.
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS

- 10. REASONS FOR RESTRICTION,IF ANY:

N/A THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

744 3623 35352

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

744.0 3623.0 31868.9

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

744.0 3623.0 31410.6

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

2577663 12392003 102880351

17. GROSS ELEC. ENERGY GENERATED (MWH):

883973 4278566 34863842

18. NET ELEC. ENERGY GENERATED (MWH):

844963 4087766 33154342

19. REACTOR SERVICE FACTOR 100.0 %

100.0 %

90.1 %

20. REACTOR AVAILABILITY FACTOR 100.0 %

100.0 %

90.1 %

21. UNIT SERVICE FACTOR:

100.0%

100.0%

88.9 %

I

22. UNIT AVAILABILITY FACTOR:

100.0 %

100.0%

88.9 %

23. UNIT CAPACITY FACTOR (USING MDC NET):

100.4 % "

101.5 %

85.1 %

24. UNIT CAPACITY FACTOR (USING DER NET):

98.7 %

101.5 %

85.1 %

25. UNIT FORCED OUTAGE RATE:

0.0%

0.0%

1.7%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

i REFUELING, SEPTEMBER 11,1993,37 DAYS

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA

" THE CAPACITY FACTOR (USING MDC NET) FOR THE MONTH OF MAY WAS CALCULATED USING A MONTHLY AVERAGE MDC VALUE OF 1134.4. THIS IS BA0ED ON UPRATING MAY 17,1993.

I V2-2 i

i

UNIT 2 AVERAGE DAILY DOCKET NO. 50425 POWER LEVEL DATE:

JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 DAY Net MW 1..

1118

  • 2.

1115

  • 3..

1114

  • 4.

1110

  • 5..

1113

  • 6......

1113*

7......

1113*

8.

1114

  • 9.

1116 *

10...

1117

  • 11 1116
  • 12..

1113

  • 13...

1119

  • 14.

1119

  • 15..

1117

  • 1113
  • 16.

17.

1149 18.

1150 19....

1156 20.

1160

  • 21 1167
  • 22.

1171

  • 23.....

1168

  • 24...

1162

  • 25...

1159

  • 26.

1157 *

'l 27.....

1156 I

1156 28...

29.

1154 30..

1154 31..

1153 l

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS l

V2-3 l

s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425

)

DATE:

JUNE 1,1993 UNIT NAME:

VEGP UNIT 2 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 REPORT MONTH MAY 1993 R

M S

E E

Y T

A T

LICENSEE SC Y

S H

EVENT TO COMPONENT CAUSE & CORRECTIVE P

DURATION O

O REPORT ED CODE ACTION TO NO.

DATE E

(HOURS)

N D

NUMBER ME XSUBCODE)

PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA NA F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL

' A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) s 4

i n

4 4

4 ENCLOSURE 3 VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 MONTHLY OPERATING REPORT FOR MAY 1993 CHALLENGES TO PORV OR SAFETY VALVES I

a f

- i e ***

e 1

(ENCLOSURE 3)

DOCKET NOS. 504 24,50-425-VEGP UNITS 1 & 2 DATE:

JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 EVENT DATE TAG NO.

TYPE DEFCRIPTION NO EVENTS FOR MAY

-r