OPERATING DATA REPORT DOCKET NO.
OPERATING DATA REPORT 50-336 DOCKET NO.
50-336 DATE               4-R-82 COMPLETED BY                 J.J. Parillo TELEPHONE (203) 447-1791 X W9 OPERATING STATUS
DATE 4-R-82 COMPLETED BY J.J. Parillo TELEPHONE (203) 447-1791 X W9 OPERATING STATUS Millstone 2 Notes Items 21 and 22 are
: l. Unit Name:                      Millstone 2                                                                           Notes   Items 21 and 22 are
: l. Unit Name:
: 2. Reporting Period:                   March 1982                                                                         computed using a weighted 2700                                                                              average. Unit operated at l     3. Licensed Thermal Power (MWt):                                                                                         2560 MW prior to uprating to
March 1982 computed using a weighted
: 4. Nameplate Rating (Gross MWe):         909 its current 2700 MW power
: 2. Reporting Period:
: 5. Design Electrical Rating (Net MWe): 870                                                                                level.
l
: 6. Maximum Dependable Capacity (Gross MWe):           895
: 3. Licensed Thermal Power (MWt):
: 7. Masimum Dependable Capacity (Net MWe):             864
2700 average. Unit operated at 909 2560 MW prior to uprating to
: 4. Nameplate Rating (Gross MWe):
its current 2700 MW power 870
: 5. Design Electrical Rating (Net MWe):
level.
895
: 6. Maximum Dependable Capacity (Gross MWe):
864
: 7. Masimum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
NA NA
NA NA
: 9. Power Lesel To which Restricted. If Any (Net MWe):                             NA
: 9. Power Lesel To which Restricted. If Any (Net MWe):
: 10. Reasons For Restrictions.lf Any:                                                                                   NA This Month                                                           Yr..to-Date       Cumulatise
NA
: 11. Hours In Reporting Period                                                         774                                         2160                         54.912
: 10. Reasons For Restrictions.lf Any:
: 12. Number Of Hours Reactor Was Critical                                             484                                           484           39.071.3
NA This Month Yr..to-Date Cumulatise
: 13. Reactor Resene Shutdown Hours                                                                         0                           0                       2076.9
: 11. Hours In Reporting Period 774 2160 54.912
: 14. Hours Generator On-Line                                                           373                                           373           37.374.5
: 12. Number Of Hours Reactor Was Critical 484 484 39.071.3
: 15. Unit Reserve Shutdown Hours                                                                           0                           0                         468.2
: 13. Reactor Resene Shutdown Hours 0
: 16. Gross Thermal Energy Generated (MWH)               808,939.7                                                           808,939.7           93,224,887
0 2076.9
: 17. Gross Electrical Energy Generated (MWH)               265,650                                                             265.650           30,267,147
: 14. Hours Generator On-Line 373 373 37.374.5
: 18. Net Electrical Energy Generated (MWH)                 248,388 _ , _ ,                                                     245,259           28,992,491
: 15. Unit Reserve Shutdown Hours 0
: 19. Unit Senice Factor                                                     50.1                                                   17.3                             68.1
0 468.2
: 20. Unit Asailability Factor                                               50.1                                                   17.3                             68.9
: 16. Gross Thermal Energy Generated (MWH) 808,939.7 808,939.7 93,224,887
: 21. Unit Capacity Factor (Using MDC Net)                                   38.6                                                   13.1                             63.5
: 17. Gross Electrical Energy Generated (MWH) 265,650 265.650 30,267,147
: 22. Unit Capacity Factor (Using DER Net)                                   38.3                                                   13.1                             62.5
: 18. Net Electrical Energy Generated (MWH) 248,388 _, _,
: 23. Unit Forced Outage Rate                                                         6.0                                             6.0                           20.3
245,259 28,992,491
: 19. Unit Senice Factor 50.1 17.3 68.1
: 20. Unit Asailability Factor 50.1 17.3 68.9
: 21. Unit Capacity Factor (Using MDC Net) 38.6 13.1 63.5
: 22. Unit Capacity Factor (Using DER Net) 38.3 13.1 62.5
: 23. Unit Forced Outage Rate 6.0 6.0 20.3
: 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Each):
: 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Each):
NA
NA
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:                                                           NA
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                                                                       Forecast           Achiesed INITI A L CRITICALITY                                                                                       NA                           NA INITI AL ELECTRICITY                                                                                       NA                           NA CO\l%lERCI AL OPER ATION                                                                                   NA                           NA 8205140229 820415 DR ADOCK 05000336                                                                                                                                           to/771 PDR
NA
: 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITI A L CRITICALITY NA NA INITI AL ELECTRICITY NA NA CO\\l%lERCI AL OPER ATION NA NA 8205140229 820415 DR ADOCK 05000336 to/771 PDR


S;                   q AVf R AGE D ALLY L* NIT PObER LEVEL                                                           '
S; q
                                                                                                                                                                                            ~       .
AVf R AGE D ALLY L* NIT PObER LEVEL
                                                                                                                                                                                                      +
+
DOCKET No. _ 50' -3'36                         _
~
                                                        .. . - -                    -- . .: = L . . .. . .                         -            :-                  WIT M&qQ,,
DOCKET No. _ 50' -3'36 WIT M&qQ,,
DATE         4-8_-82 J. P3ril10                   '*
--..: = L......
COMPI.ETED BY TELEPHONE ..HD03) 447-1791 -
DATE 4-8_-82 J. P3ril10 COMPI.ETED BY TELEPHONE..HD03) 447-1791 -
x 44W s
x 44W s
yosig _                   MARCH 1982                                                                   ,
yosig _
DAY         AVER AGE DAILY POWER LEVEL                                       DAY         AVER AGE DAILY l'OWER LEVEL (MWe Nct)                                                                   - (Mwe. Net)         +
MARCH 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY l'OWER LEVEL (MWe Nct)
1                                         1                                 0 (-3)                                   37                                   413 2                                   0 (-4)                                   ig                                   466
- (Mwe. Net)
                                  *                                                                                                        ~
+
3       -
1 1
0 (-si   '
0 (-3) 37 413 2
19                                  E;76 4                                  0 (-5)               __
0 (-4) 466 ig 3
2o                                - 818 5
0 (-si 19
0 (-2)                                 -,,          ,.
~
823
E;76 0 (-5) 4 2o
                                        .6                                 0 (-3)           -                        22                                   820 7                                 0 (-5)                                   23                                   324 s                                  0 (-12)             .
- 818 0 (-2) 823 5
74       ,
.6 0 (-3) 22 820 7
161 9                                 0 (-19)                                   2g                                   687 3o,                                0 (-24)                         .
0 (-5) 324 23 0 (-12) 74 161 s
7f                                   858 l                                       -11                                 0 (-26)                                   27                                   858 12                                  0 (-25)                                 , 7s                                   841 13                                 03-2_5)                                   39                                   857 f                                        14                                  0 (-28)                       -
9 0 (-19) 2g 687 0 (-24) 7f 858 3o, l
30                                   860-i                                                                                                                                                                       t is                                 AS                                       31                                 861 i                                                                        ,
-11 0 (-26) 27 858 0 (-25) 841 12 7s 13 03-2_5) 857 39 0 (-28) 30 860-f 14 i
l             16
t 861 i
                                                                          '265 t
is AS 31 l
r       -<
'265 16 t
INSITIUCTIONS                                                                                                             _        7 i                                                                                                                                                                               -
r INSITIUCTIONS 7
l                                        On this foran.!!st the nerare daib unit powyr L selin MWe Net fm #c2:h defisthe te,ynin,e n.,9th7ComPric to
i l
                                                                                                                                                                                                            -      -N
On this foran.!!st the nerare daib unit powyr L selin MWe Net fm c2:h defisthe te,ynin,e n.,9th7ComPric to
:he r.niest Q, ele mapwatt.                                                                                             s
- N
                                                                                                                                                                                          ,p AN           8 l
:he r.niest Q, ele mapwatt.
g      (98#)I       A   g
s
                                                                                                                                        ~
,p AN 8
l (98#)I A
g g
l
l
                                                                                                                                                                                                              *4   . ,
~
y
*4 y
                                                          \                                                                                         $p
\\
                                                                    ,                                                                      w
$p w
                                                                                                      .a                                                     ,
.a
    - - - , . ., - - - . - - -                      ,v   e-,   , a&.#-                 --e   --        -e     -                            - Yr
,v e-,
a&.#-
e+
--e
-e w
- Yr
=
~~


DOCKET NO.
50-336 UNIT SilUTDCWNS AND POWER REDUCTIONS DOCKET NO.
50-336 UNIT SilUTDCWNS AND POWER REDUCTIONS UNIT N A3.iE       Milistone Unit 2'
UNIT N A3.iE Milistone Unit 2'
                                                                                                                  'DATE       d R-R7 COUi's.r.::D ny         .1 pari'in REPORT MON'DI    MARCH 1982 TEtullONE (203)       447 791 x 4413       ,
'DATE d R-R7 REPORT MON'DI MARCH 1982 COUi's.r.::D ny
                                            =_    en 3 .:                    _        5
.1 pari'in TEtullONE (203) 447 791 x 4413 y
                      .o.      ate y      h$     5 *J f           C#USCC M.         d,
h$
5
*J f C#USCC 5
=_
en 3.:
M.
d, (JUSC & Catite*g ttyg
.o.
ate I
2E 4
2 L a:
Event u?
: a. '>
: a. '>
(JUSC & Catite*g ttyg I      2E    4 2 L a:        Event    u?                              A,i n ,n ,,,
A,i n,n,,,
                                            $3     E j di -     Report n   80
}d
                                                                                      }d                13, event Recurrence 6
$3 E
11     811205   5   347'   C   1           NA       NA       NA     Completion of Refuel and Maintenance Outage 1   820323   F     24     H   3           NA IA     INSTRUM. Reactor Protecticn System Trip (TM/LP) from noise induced signals.
j di -
Report n 80 13, event Recurrence 6
11 811205 5
347' C
1 NA NA NA Completion of Refuel and Maintenance Outage 1
820323 F
24 H
3 NA IA INSTRUM.
Reactor Protecticn System Trip (TM/LP) from noise induced signals.
Noise problem was corrected and power operation resumed via normal. operatin g procedures.
Noise problem was corrected and power operation resumed via normal. operatin g procedures.
i                                       -
i 2
                !      2    820328 iS      10     B NA           NA       NA       NA     Reduced Power to 95% to clean l
820328 i S 10 B
NA NA NA NA Reduced Power to 95% to clean l
condenser water boxes.
condenser water boxes.
(9/77 )
(9/77 )
  . w mm-m e - ..w
. w mm-m e -
..w


Docket No.     50-336
Docket No.
                                                                                                                                                    ~
50-336 Date 4-8-82
Date           4-8-82
~
                                                                                  .                            Unit Name     Millstone Unit 2 Completed By     J. J. Parillo Telephone   (?no 447 17o1         .
Unit Name Millstone Unit 2 Completed By J. J. Parillo Telephone
                    -                                                                                                              Ext. 4419 CORRECTIVE MAINTENANCE  
(?no 447 17o1 Ext. 4419 CORRECTIVE MAINTENANCE  


==SUMMARY==
==SUMMARY==
FOR SAFETY RELATED EQUIPMENT Report Month   FEBRUARY 1982 DATE               SYSTEM'                                         COMPONENT                             MAINTENANCE ACTION 2/1/82   Control Rod Drive                 CEA Extension Shafts                           Replaced 1 single and 1 Dual Shaft ESAS                       "B" LPSI Pump                                   Replace Relay 2/2/82   Main Steam                         Ir.let Blowdown Header on the Steam             Replace Generator Blowdown Ouench Tank 2/3/82'   Reactor Coolant System "D" Reactor Coolant Pump                                   Change Mechanical Shaft Seal Cartridge Reactor Coolant Syster, PORV Block Valve 2-RC-403                                 Repair Body to Bonnet Leak RBCCW                             "A" RBCCW Pump                                 Replace Pump Bearing Reactor Protection                     Temperature Transmitters TT-ll2HA,         Repair System                               TT-122HC and TT-122HA 2/5/82   Reactor Protection                     TM/LP Channel "A" Bistable Trip             Replace System                               Unit 2/6/82   Reactor Protection                     Channel "A" G-2 Mcdule in Core             Replace System                                 Protection Calculator #1 2/8/82   CVCS                                 Reroute CVCS Relief Valve (CH-345)           Reroute Discharge Drain Line 2/9/82     Incore Detectors                       Detector Location L-18                     Install Hydroplug e
FOR SAFETY RELATED EQUIPMENT Report Month FEBRUARY 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 2/1/82 Control Rod Drive CEA Extension Shafts Replaced 1 single and 1 Dual Shaft ESAS "B" LPSI Pump Replace Relay 2/2/82 Main Steam Ir.let Blowdown Header on the Steam Replace Generator Blowdown Ouench Tank 2/3/82' Reactor Coolant System "D" Reactor Coolant Pump Change Mechanical Shaft Seal Cartridge Reactor Coolant Syster, PORV Block Valve 2-RC-403 Repair Body to Bonnet Leak RBCCW "A" RBCCW Pump Replace Pump Bearing Reactor Protection Temperature Transmitters TT-ll2HA, Repair System TT-122HC and TT-122HA 2/5/82 Reactor Protection TM/LP Channel "A" Bistable Trip Replace System Unit 2/6/82 Reactor Protection Channel "A" G-2 Mcdule in Core Replace System Protection Calculator #1 2/8/82 CVCS Reroute CVCS Relief Valve (CH-345)
Reroute Discharge Drain Line 2/9/82 Incore Detectors Detector Location L-18 Install Hydroplug e
e 4
e 4
9
9


Dock;t No.     50-336 Date           4-8-82
Dock;t No.
                                                              .                              Unit Name       Millstone Unit 2 Completeo By       J. J. Parillo Telephone   (203) 447-1791       -
50-336 Date 4-8-82 Unit Name Millstone Unit 2 Completeo By J. J. Parillo Telephone (203) 447-1791 x 4419 CORRECTIVE MAINTENANCE  
x 4419 CORRECTIVE MAINTENANCE  


==SUMMARY==
==SUMMARY==
FOR SAFETY RELATED EQUIPMENT Report Month       FEBRUARY 1982 DATE             SYSTEM'                         COMPONENT                               MAINTENANCE ACTION 2/15/82   Containment Spray       Containment Spray Pump P43A             Repair Mechanical Seal Leak Aux. Feedwater           Flow indicator FI-5277                   Replace A-1 & B-1 2/18/82   CVCS                     Charging Pump Suction Pressure           Replace Switches PC 224X & PC 224Y 2/25/82   Service Water           Strainer "C"                             Backwash Piping
FOR SAFETY RELATED EQUIPMENT Report Month FEBRUARY 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 2/15/82 Containment Spray Containment Spray Pump P43A Repair Mechanical Seal Leak Aux. Feedwater Flow indicator FI-5277 Replace A-1 & B-1 2/18/82 CVCS Charging Pump Suction Pressure Replace Switches PC 224X & PC 224Y 2/25/82 Service Water Strainer "C" Backwash Piping
  ~2/1 thru 2/20 Steam Generators         S.G. Tubes                               Plugged 425 tubes in #1 Generator Plugged 284 tubes in #2 Generator e
~2/1 thru 2/20 Steam Generators S.G. Tubes Plugged 425 tubes in #1 Generator Plugged 284 tubes in #2 Generator e
6 e
6 e
e 0
e 0
e
e


Dock;t No.       50-336 Date             4-8-82
Dock;t No.
                                                                    .                              Unit Name         Millstone Unit 2 .
50-336 Date 4-8-82 Unit Name Millstone Unit 2.
Completed By         J. Parillo Telephone       (203) 447-1791     .
Completed By J. Parillo Telephone (203) 447-1791 i
i                                                                                                                          x 4419 CORRECTIVE MAINTENANCE  
x 4419 CORRECTIVE MAINTENANCE  


==SUMMARY==
==SUMMARY==
FOR SAFETY RELATED EQUIPMENT I
FOR SAFETY RELATED EQUIPMENT I
Report Month         f1 ARCH 1982 DATE               SYSTEM'                         COMPONENT                                     MAINTENANCE ACTION 3/2/82     Containment               Personnel Access Hatch                   Replace inner door gasket Service Water             "A" Service Water Pump                   Rebuild l     3/8/82     S.F.P. Cooling           "A" SFP Cooling Pump                     Change tiotor Bearing 3/9/82       Various                 Snubbers 413011 & 413041                 Removed & Reinstalled satisfactory stroke test S/10/82     Aux. Feedwater           Terry Turbine                             Overspeed Test 3/13/82     Reactor Protection       Channel   "D" Trip Inhibit Module         Replace System                   Bridge Rectifier MDA 970-2
Report Month f1 ARCH 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 3/2/82 Containment Personnel Access Hatch Replace inner door gasket Service Water "A" Service Water Pump Rebuild l
    '3/25/82     Reactor Protection       Scaling Amplifier F4,5 in Core           Replace System                   Protection Calculator 2 - Channel "A"
3/8/82 S.F.P. Cooling "A" SFP Cooling Pump Change tiotor Bearing 3/9/82 Various Snubbers 413011 & 413041 Removed & Reinstalled satisfactory stroke test S/10/82 Aux. Feedwater Terry Turbine Overspeed Test 3/13/82 Reactor Protection Channel "D" Trip Inhibit Module Replace System Bridge Rectifier MDA 970-2
    '3/30/82     CVCS                     "C" Charging Pump                         Repack 3/31/82     Reactor Protection       RCS RTD's                                 Perform response time testing System O
'3/25/82 Reactor Protection Scaling Amplifier F4,5 in Core Replace System Protection Calculator 2 - Channel "A"
'3/30/82 CVCS "C" Charging Pump Repack 3/31/82 Reactor Protection RCS RTD's Perform response time testing System O
e e
e e
9
9


Dockit No.                                   50-336 bate:                                         4-8-82 Completed by J. J. Parillo Telephone (203) 447-1791
Dockit No.
                                                                    .                                                                                    x 4419 REFUELING INFORMATION REQUEST                                                           --      -
50-336 bate:
: 1.       Name of facility:             Millstone 2
4-8-82 Completed by J. J. Parillo Telephone (203) 447-1791 x 4419 REFUELING INFORMATION REQUEST 1.
: 2.       Scheduled date for next refueling shutdown:
Name of facility:
Millstone 2 2.
Scheduled date for next refueling shutdown:
Consnence refuel outage March 26, 1983.
Consnence refuel outage March 26, 1983.
: 3.     Schedule date for restart following refueling: May 14, 1983
3.
: 4.       Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Schedule date for restart following refueling: May 14, 1983 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
It is not anticipated that Cycle 6 operations will require Technical Specification changes or other License amendments.
It is not anticipated that Cycle 6 operations will require Technical Specification changes or other License amendments.
: 5.       Scheduled date(s) for submitting lic'ensing action and supporting information:
5.
N/A
Scheduled date(s) for submitting lic'ensing action and supporting information:
: 6.       Important licensing considerations associated with refueling, e.g., new or different fuel design er, supplier, unreviewed design or perfonnance analysis methods, significant changes in fuel design, new operating procedures:
N/A 6.
N/A
Important licensing considerations associated with refueling, e.g., new or different fuel design er, supplier, unreviewed design or perfonnance analysis methods, significant changes in fuel design, new operating procedures:
: 7.     The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
N/A 7.
(a) In Core:                   217                         (b)                                     288 l
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
: 8.       The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
(a) In Core:
667
217 (b) 288 l
: 9.       The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
667 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1985, Spent Fuel Pool, full core off load capability is reached.
1985, Spent Fuel Pool, full core off load capability is reached.
1987. Ccre Full, Spent Fuel Pool contains 648 bundles.
1987. Ccre Full, Spent Fuel Pool contains 648 bundles.
                                                                          ^
es
  - -    es    ,r-..-     , , - - .    ..  - , . .    ..,o --              .    - - . - - - , . - - - . - - - - - - - , - . - - - , ,
,r-..-
                                                                                                      -                                      -}}
..,o
^
-}}

Latest revision as of 06:36, 18 December 2024

Monthly Operating Rept for Mar 1982
ML20052G007
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/08/1982
From: John Parillo
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20052G004 List:
References
NUDOCS 8205140229
Download: ML20052G007 (7)


Text

-

OPERATING DATA REPORT 50-336 DOCKET NO.

DATE 4-R-82 COMPLETED BY J.J. Parillo TELEPHONE (203) 447-1791 X W9 OPERATING STATUS Millstone 2 Notes Items 21 and 22 are

l. Unit Name:

March 1982 computed using a weighted

2. Reporting Period:

l

3. Licensed Thermal Power (MWt):

2700 average. Unit operated at 909 2560 MW prior to uprating to

4. Nameplate Rating (Gross MWe):

its current 2700 MW power 870

5. Design Electrical Rating (Net MWe):

level.

895

6. Maximum Dependable Capacity (Gross MWe):

864

7. Masimum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

NA NA

9. Power Lesel To which Restricted. If Any (Net MWe):

NA

10. Reasons For Restrictions.lf Any:

NA This Month Yr..to-Date Cumulatise

11. Hours In Reporting Period 774 2160 54.912
12. Number Of Hours Reactor Was Critical 484 484 39.071.3
13. Reactor Resene Shutdown Hours 0

0 2076.9

14. Hours Generator On-Line 373 373 37.374.5
15. Unit Reserve Shutdown Hours 0

0 468.2

16. Gross Thermal Energy Generated (MWH) 808,939.7 808,939.7 93,224,887
17. Gross Electrical Energy Generated (MWH) 265,650 265.650 30,267,147
18. Net Electrical Energy Generated (MWH) 248,388 _, _,

245,259 28,992,491

19. Unit Senice Factor 50.1 17.3 68.1
20. Unit Asailability Factor 50.1 17.3 68.9
21. Unit Capacity Factor (Using MDC Net) 38.6 13.1 63.5
22. Unit Capacity Factor (Using DER Net) 38.3 13.1 62.5
23. Unit Forced Outage Rate 6.0 6.0 20.3
24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Each):

NA

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

NA

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed INITI A L CRITICALITY NA NA INITI AL ELECTRICITY NA NA CO\\l%lERCI AL OPER ATION NA NA 8205140229 820415 DR ADOCK 05000336 to/771 PDR

S; q

AVf R AGE D ALLY L* NIT PObER LEVEL

+

~

DOCKET No. _ 50' -3'36 WIT M&qQ,,

--..: = L......

DATE 4-8_-82 J. P3ril10 COMPI.ETED BY TELEPHONE..HD03) 447-1791 -

x 44W s

yosig _

MARCH 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY l'OWER LEVEL (MWe Nct)

- (Mwe. Net)

+

1 1

0 (-3) 37 413 2

0 (-4) 466 ig 3

0 (-si 19

~

E;76 0 (-5) 4 2o

- 818 0 (-2) 823 5

.6 0 (-3) 22 820 7

0 (-5) 324 23 0 (-12) 74 161 s

9 0 (-19) 2g 687 0 (-24) 7f 858 3o, l

-11 0 (-26) 27 858 0 (-25) 841 12 7s 13 03-2_5) 857 39 0 (-28) 30 860-f 14 i

t 861 i

is AS 31 l

'265 16 t

r INSITIUCTIONS 7

i l

On this foran.!!st the nerare daib unit powyr L selin MWe Net fm c2:h defisthe te,ynin,e n.,9th7ComPric to

- N

he r.niest Q, ele mapwatt.

s

,p AN 8

l (98#)I A

g g

l

~

  • 4 y

\\

$p w

.a

,v e-,

a&.#-

e+

--e

-e w

- Yr

=

~~

50-336 UNIT SilUTDCWNS AND POWER REDUCTIONS DOCKET NO.

UNIT N A3.iE Milistone Unit 2'

'DATE d R-R7 REPORT MON'DI MARCH 1982 COUi's.r.::D ny

.1 pari'in TEtullONE (203) 447 791 x 4413 y

h$

5

  • J f C#USCC 5

=_

en 3.:

M.

d, (JUSC & Catite*g ttyg

.o.

ate I

2E 4

2 L a:

Event u?

a. '>

A,i n,n,,,

}d

$3 E

j di -

Report n 80 13, event Recurrence 6

11 811205 5

347' C

1 NA NA NA Completion of Refuel and Maintenance Outage 1

820323 F

24 H

3 NA IA INSTRUM.

Reactor Protecticn System Trip (TM/LP) from noise induced signals.

Noise problem was corrected and power operation resumed via normal. operatin g procedures.

i 2

820328 i S 10 B

NA NA NA NA Reduced Power to 95% to clean l

condenser water boxes.

(9/77 )

. w mm-m e -

..w

Docket No.

50-336 Date 4-8-82

~

Unit Name Millstone Unit 2 Completed By J. J. Parillo Telephone

(?no 447 17o1 Ext. 4419 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Report Month FEBRUARY 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 2/1/82 Control Rod Drive CEA Extension Shafts Replaced 1 single and 1 Dual Shaft ESAS "B" LPSI Pump Replace Relay 2/2/82 Main Steam Ir.let Blowdown Header on the Steam Replace Generator Blowdown Ouench Tank 2/3/82' Reactor Coolant System "D" Reactor Coolant Pump Change Mechanical Shaft Seal Cartridge Reactor Coolant Syster, PORV Block Valve 2-RC-403 Repair Body to Bonnet Leak RBCCW "A" RBCCW Pump Replace Pump Bearing Reactor Protection Temperature Transmitters TT-ll2HA, Repair System TT-122HC and TT-122HA 2/5/82 Reactor Protection TM/LP Channel "A" Bistable Trip Replace System Unit 2/6/82 Reactor Protection Channel "A" G-2 Mcdule in Core Replace System Protection Calculator #1 2/8/82 CVCS Reroute CVCS Relief Valve (CH-345)

Reroute Discharge Drain Line 2/9/82 Incore Detectors Detector Location L-18 Install Hydroplug e

e 4

9

Dock;t No.

50-336 Date 4-8-82 Unit Name Millstone Unit 2 Completeo By J. J. Parillo Telephone (203) 447-1791 x 4419 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Report Month FEBRUARY 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 2/15/82 Containment Spray Containment Spray Pump P43A Repair Mechanical Seal Leak Aux. Feedwater Flow indicator FI-5277 Replace A-1 & B-1 2/18/82 CVCS Charging Pump Suction Pressure Replace Switches PC 224X & PC 224Y 2/25/82 Service Water Strainer "C" Backwash Piping

~2/1 thru 2/20 Steam Generators S.G. Tubes Plugged 425 tubes in #1 Generator Plugged 284 tubes in #2 Generator e

6 e

e 0

e

Dock;t No.

50-336 Date 4-8-82 Unit Name Millstone Unit 2.

Completed By J. Parillo Telephone (203) 447-1791 i

x 4419 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT I

Report Month f1 ARCH 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 3/2/82 Containment Personnel Access Hatch Replace inner door gasket Service Water "A" Service Water Pump Rebuild l

3/8/82 S.F.P. Cooling "A" SFP Cooling Pump Change tiotor Bearing 3/9/82 Various Snubbers 413011 & 413041 Removed & Reinstalled satisfactory stroke test S/10/82 Aux. Feedwater Terry Turbine Overspeed Test 3/13/82 Reactor Protection Channel "D" Trip Inhibit Module Replace System Bridge Rectifier MDA 970-2

'3/25/82 Reactor Protection Scaling Amplifier F4,5 in Core Replace System Protection Calculator 2 - Channel "A"

'3/30/82 CVCS "C" Charging Pump Repack 3/31/82 Reactor Protection RCS RTD's Perform response time testing System O

e e

9

Dockit No.

50-336 bate:

4-8-82 Completed by J. J. Parillo Telephone (203) 447-1791 x 4419 REFUELING INFORMATION REQUEST 1.

Name of facility:

Millstone 2 2.

Scheduled date for next refueling shutdown:

Consnence refuel outage March 26, 1983.

3.

Schedule date for restart following refueling: May 14, 1983 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

It is not anticipated that Cycle 6 operations will require Technical Specification changes or other License amendments.

5.

Scheduled date(s) for submitting lic'ensing action and supporting information:

N/A 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design er, supplier, unreviewed design or perfonnance analysis methods, significant changes in fuel design, new operating procedures:

N/A 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) In Core:

217 (b) 288 l

8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

667 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1985, Spent Fuel Pool, full core off load capability is reached.

1987. Ccre Full, Spent Fuel Pool contains 648 bundles.