ML20052G007: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:- | ||
OPERATING DATA REPORT DOCKET NO. | OPERATING DATA REPORT 50-336 DOCKET NO. | ||
DATE 4-R-82 COMPLETED BY J.J. Parillo TELEPHONE (203) 447-1791 X W9 OPERATING STATUS Millstone 2 Notes Items 21 and 22 are | |||
: l. Unit Name: | |||
: | March 1982 computed using a weighted | ||
: 4. Nameplate Rating (Gross MWe): | : 2. Reporting Period: | ||
: 5. Design Electrical Rating (Net MWe): | l | ||
: 6. Maximum Dependable Capacity (Gross MWe): | : 3. Licensed Thermal Power (MWt): | ||
: 7. Masimum Dependable Capacity (Net MWe): | 2700 average. Unit operated at 909 2560 MW prior to uprating to | ||
: 4. Nameplate Rating (Gross MWe): | |||
its current 2700 MW power 870 | |||
: 5. Design Electrical Rating (Net MWe): | |||
level. | |||
895 | |||
: 6. Maximum Dependable Capacity (Gross MWe): | |||
864 | |||
: 7. Masimum Dependable Capacity (Net MWe): | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons: | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons: | ||
NA NA | NA NA | ||
: 9. Power Lesel To which Restricted. If Any (Net MWe): | : 9. Power Lesel To which Restricted. If Any (Net MWe): | ||
: 10. Reasons For Restrictions.lf Any: | NA | ||
: 11. Hours In Reporting Period | : 10. Reasons For Restrictions.lf Any: | ||
: 12. Number Of Hours Reactor Was Critical | NA This Month Yr..to-Date Cumulatise | ||
: 13. Reactor Resene Shutdown Hours | : 11. Hours In Reporting Period 774 2160 54.912 | ||
: 14. Hours Generator On-Line | : 12. Number Of Hours Reactor Was Critical 484 484 39.071.3 | ||
: 15. Unit Reserve Shutdown Hours | : 13. Reactor Resene Shutdown Hours 0 | ||
: 16. Gross Thermal Energy Generated (MWH) | 0 2076.9 | ||
: 17. Gross Electrical Energy Generated (MWH) | : 14. Hours Generator On-Line 373 373 37.374.5 | ||
: 18. Net Electrical Energy Generated (MWH) | : 15. Unit Reserve Shutdown Hours 0 | ||
: 19. Unit Senice Factor | 0 468.2 | ||
: 20. Unit Asailability Factor | : 16. Gross Thermal Energy Generated (MWH) 808,939.7 808,939.7 93,224,887 | ||
: 21. Unit Capacity Factor (Using MDC Net) | : 17. Gross Electrical Energy Generated (MWH) 265,650 265.650 30,267,147 | ||
: 22. Unit Capacity Factor (Using DER Net) | : 18. Net Electrical Energy Generated (MWH) 248,388 _, _, | ||
: 23. Unit Forced Outage Rate | 245,259 28,992,491 | ||
: 19. Unit Senice Factor 50.1 17.3 68.1 | |||
: 20. Unit Asailability Factor 50.1 17.3 68.9 | |||
: 21. Unit Capacity Factor (Using MDC Net) 38.6 13.1 63.5 | |||
: 22. Unit Capacity Factor (Using DER Net) 38.3 13.1 62.5 | |||
: 23. Unit Forced Outage Rate 6.0 6.0 20.3 | |||
: 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Each): | : 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Each): | ||
NA | NA | ||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | ||
: 26. Units In Test Status (Prior to Commercial Operation): | NA | ||
: 26. Units In Test Status (Prior to Commercial Operation): | |||
Forecast Achiesed INITI A L CRITICALITY NA NA INITI AL ELECTRICITY NA NA CO\\l%lERCI AL OPER ATION NA NA 8205140229 820415 DR ADOCK 05000336 to/771 PDR | |||
S; | S; q | ||
AVf R AGE D ALLY L* NIT PObER LEVEL | |||
+ | |||
DOCKET No. _ 50' -3'36 | ~ | ||
DOCKET No. _ 50' -3'36 WIT M&qQ,, | |||
DATE | --..: = L...... | ||
COMPI.ETED BY TELEPHONE ..HD03) 447-1791 - | DATE 4-8_-82 J. P3ril10 COMPI.ETED BY TELEPHONE..HD03) 447-1791 - | ||
x 44W s | x 44W s | ||
yosig _ | yosig _ | ||
DAY | MARCH 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY l'OWER LEVEL (MWe Nct) | ||
1 | - (Mwe. Net) | ||
+ | |||
3 | 1 1 | ||
0 (-si | 0 (-3) 37 413 2 | ||
0 (-4) 466 ig 3 | |||
0 (-si 19 | |||
0 (-2) | ~ | ||
823 | E;76 0 (-5) 4 2o | ||
- 818 0 (-2) 823 5 | |||
74 | .6 0 (-3) 22 820 7 | ||
0 (-5) 324 23 0 (-12) 74 161 s | |||
7f | 9 0 (-19) 2g 687 0 (-24) 7f 858 3o, l | ||
30 | -11 0 (-26) 27 858 0 (-25) 841 12 7s 13 03-2_5) 857 39 0 (-28) 30 860-f 14 i | ||
l | t 861 i | ||
is AS 31 l | |||
r | '265 16 t | ||
INSITIUCTIONS | r INSITIUCTIONS 7 | ||
i l | |||
On this foran.!!st the nerare daib unit powyr L selin MWe Net fm c2:h defisthe te,ynin,e n.,9th7ComPric to | |||
:he r.niest Q, ele mapwatt. | - N | ||
:he r.niest Q, ele mapwatt. | |||
s | |||
,p AN 8 | |||
l (98#)I A | |||
g g | |||
l | l | ||
~ | |||
y | *4 y | ||
\\ | |||
$p w | |||
.a | |||
,v e-, | |||
a&.#- | |||
e+ | |||
--e | |||
-e w | |||
- Yr | |||
= | |||
~~ | |||
50-336 UNIT SilUTDCWNS AND POWER REDUCTIONS DOCKET NO. | |||
50-336 UNIT SilUTDCWNS AND POWER REDUCTIONS UNIT N A3.iE | UNIT N A3.iE Milistone Unit 2' | ||
'DATE d R-R7 REPORT MON'DI MARCH 1982 COUi's.r.::D ny | |||
.1 pari'in TEtullONE (203) 447 791 x 4413 y | |||
h$ | |||
5 | |||
*J f C#USCC 5 | |||
=_ | |||
en 3.: | |||
M. | |||
d, (JUSC & Catite*g ttyg | |||
.o. | |||
ate I | |||
2E 4 | |||
2 L a: | |||
Event u? | |||
: a. '> | : a. '> | ||
A,i n,n,,, | |||
}d | |||
$3 E | |||
11 | j di - | ||
Report n 80 13, event Recurrence 6 | |||
11 811205 5 | |||
347' C | |||
1 NA NA NA Completion of Refuel and Maintenance Outage 1 | |||
820323 F | |||
24 H | |||
3 NA IA INSTRUM. | |||
Reactor Protecticn System Trip (TM/LP) from noise induced signals. | |||
Noise problem was corrected and power operation resumed via normal. operatin g procedures. | Noise problem was corrected and power operation resumed via normal. operatin g procedures. | ||
i | i 2 | ||
820328 i S 10 B | |||
NA NA NA NA Reduced Power to 95% to clean l | |||
condenser water boxes. | condenser water boxes. | ||
(9/77 ) | (9/77 ) | ||
. w mm-m e - | |||
..w | |||
Docket No. | Docket No. | ||
50-336 Date 4-8-82 | |||
Date | ~ | ||
Unit Name Millstone Unit 2 Completed By J. J. Parillo Telephone | |||
(?no 447 17o1 Ext. 4419 CORRECTIVE MAINTENANCE | |||
==SUMMARY== | ==SUMMARY== | ||
FOR SAFETY RELATED EQUIPMENT Report Month | FOR SAFETY RELATED EQUIPMENT Report Month FEBRUARY 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 2/1/82 Control Rod Drive CEA Extension Shafts Replaced 1 single and 1 Dual Shaft ESAS "B" LPSI Pump Replace Relay 2/2/82 Main Steam Ir.let Blowdown Header on the Steam Replace Generator Blowdown Ouench Tank 2/3/82' Reactor Coolant System "D" Reactor Coolant Pump Change Mechanical Shaft Seal Cartridge Reactor Coolant Syster, PORV Block Valve 2-RC-403 Repair Body to Bonnet Leak RBCCW "A" RBCCW Pump Replace Pump Bearing Reactor Protection Temperature Transmitters TT-ll2HA, Repair System TT-122HC and TT-122HA 2/5/82 Reactor Protection TM/LP Channel "A" Bistable Trip Replace System Unit 2/6/82 Reactor Protection Channel "A" G-2 Mcdule in Core Replace System Protection Calculator #1 2/8/82 CVCS Reroute CVCS Relief Valve (CH-345) | ||
Reroute Discharge Drain Line 2/9/82 Incore Detectors Detector Location L-18 Install Hydroplug e | |||
e 4 | e 4 | ||
9 | 9 | ||
Dock;t No. | Dock;t No. | ||
50-336 Date 4-8-82 Unit Name Millstone Unit 2 Completeo By J. J. Parillo Telephone (203) 447-1791 x 4419 CORRECTIVE MAINTENANCE | |||
x 4419 CORRECTIVE MAINTENANCE | |||
==SUMMARY== | ==SUMMARY== | ||
FOR SAFETY RELATED EQUIPMENT Report Month | FOR SAFETY RELATED EQUIPMENT Report Month FEBRUARY 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 2/15/82 Containment Spray Containment Spray Pump P43A Repair Mechanical Seal Leak Aux. Feedwater Flow indicator FI-5277 Replace A-1 & B-1 2/18/82 CVCS Charging Pump Suction Pressure Replace Switches PC 224X & PC 224Y 2/25/82 Service Water Strainer "C" Backwash Piping | ||
~2/1 thru 2/20 Steam Generators S.G. Tubes Plugged 425 tubes in #1 Generator Plugged 284 tubes in #2 Generator e | |||
6 e | 6 e | ||
e 0 | e 0 | ||
e | e | ||
Dock;t No. | Dock;t No. | ||
50-336 Date 4-8-82 Unit Name Millstone Unit 2. | |||
Completed By | Completed By J. Parillo Telephone (203) 447-1791 i | ||
x 4419 CORRECTIVE MAINTENANCE | |||
==SUMMARY== | ==SUMMARY== | ||
FOR SAFETY RELATED EQUIPMENT I | FOR SAFETY RELATED EQUIPMENT I | ||
Report Month | Report Month f1 ARCH 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 3/2/82 Containment Personnel Access Hatch Replace inner door gasket Service Water "A" Service Water Pump Rebuild l | ||
3/8/82 S.F.P. Cooling "A" SFP Cooling Pump Change tiotor Bearing 3/9/82 Various Snubbers 413011 & 413041 Removed & Reinstalled satisfactory stroke test S/10/82 Aux. Feedwater Terry Turbine Overspeed Test 3/13/82 Reactor Protection Channel "D" Trip Inhibit Module Replace System Bridge Rectifier MDA 970-2 | |||
'3/25/82 Reactor Protection Scaling Amplifier F4,5 in Core Replace System Protection Calculator 2 - Channel "A" | |||
'3/30/82 CVCS "C" Charging Pump Repack 3/31/82 Reactor Protection RCS RTD's Perform response time testing System O | |||
e e | e e | ||
9 | 9 | ||
Dockit No. | Dockit No. | ||
50-336 bate: | |||
4-8-82 Completed by J. J. Parillo Telephone (203) 447-1791 x 4419 REFUELING INFORMATION REQUEST 1. | |||
Name of facility: | |||
Millstone 2 2. | |||
Scheduled date for next refueling shutdown: | |||
Consnence refuel outage March 26, 1983. | Consnence refuel outage March 26, 1983. | ||
3. | |||
Schedule date for restart following refueling: May 14, 1983 4. | |||
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? | |||
It is not anticipated that Cycle 6 operations will require Technical Specification changes or other License amendments. | It is not anticipated that Cycle 6 operations will require Technical Specification changes or other License amendments. | ||
5. | |||
N/A | Scheduled date(s) for submitting lic'ensing action and supporting information: | ||
N/A 6. | |||
N/A | Important licensing considerations associated with refueling, e.g., new or different fuel design er, supplier, unreviewed design or perfonnance analysis methods, significant changes in fuel design, new operating procedures: | ||
N/A 7. | |||
(a) In Core: | The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: | ||
(a) In Core: | |||
667 | 217 (b) 288 l | ||
8. | |||
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: | |||
667 9. | |||
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: | |||
1985, Spent Fuel Pool, full core off load capability is reached. | 1985, Spent Fuel Pool, full core off load capability is reached. | ||
1987. Ccre Full, Spent Fuel Pool contains 648 bundles. | 1987. Ccre Full, Spent Fuel Pool contains 648 bundles. | ||
es | |||
,r-..- | |||
..,o | |||
^ | |||
-}} | |||
Latest revision as of 06:36, 18 December 2024
| ML20052G007 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/08/1982 |
| From: | John Parillo NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20052G004 | List: |
| References | |
| NUDOCS 8205140229 | |
| Download: ML20052G007 (7) | |
Text
-
OPERATING DATA REPORT 50-336 DOCKET NO.
DATE 4-R-82 COMPLETED BY J.J. Parillo TELEPHONE (203) 447-1791 X W9 OPERATING STATUS Millstone 2 Notes Items 21 and 22 are
- l. Unit Name:
March 1982 computed using a weighted
- 2. Reporting Period:
l
- 3. Licensed Thermal Power (MWt):
2700 average. Unit operated at 909 2560 MW prior to uprating to
- 4. Nameplate Rating (Gross MWe):
its current 2700 MW power 870
- 5. Design Electrical Rating (Net MWe):
level.
895
- 6. Maximum Dependable Capacity (Gross MWe):
864
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
NA NA
- 9. Power Lesel To which Restricted. If Any (Net MWe):
NA
- 10. Reasons For Restrictions.lf Any:
NA This Month Yr..to-Date Cumulatise
- 11. Hours In Reporting Period 774 2160 54.912
- 12. Number Of Hours Reactor Was Critical 484 484 39.071.3
- 13. Reactor Resene Shutdown Hours 0
0 2076.9
- 14. Hours Generator On-Line 373 373 37.374.5
- 15. Unit Reserve Shutdown Hours 0
0 468.2
- 16. Gross Thermal Energy Generated (MWH) 808,939.7 808,939.7 93,224,887
- 17. Gross Electrical Energy Generated (MWH) 265,650 265.650 30,267,147
- 18. Net Electrical Energy Generated (MWH) 248,388 _, _,
245,259 28,992,491
- 19. Unit Senice Factor 50.1 17.3 68.1
- 20. Unit Asailability Factor 50.1 17.3 68.9
- 21. Unit Capacity Factor (Using MDC Net) 38.6 13.1 63.5
- 22. Unit Capacity Factor (Using DER Net) 38.3 13.1 62.5
- 23. Unit Forced Outage Rate 6.0 6.0 20.3
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Each):
NA
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
NA
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITI A L CRITICALITY NA NA INITI AL ELECTRICITY NA NA CO\\l%lERCI AL OPER ATION NA NA 8205140229 820415 DR ADOCK 05000336 to/771 PDR
S; q
AVf R AGE D ALLY L* NIT PObER LEVEL
+
~
DOCKET No. _ 50' -3'36 WIT M&qQ,,
--..: = L......
DATE 4-8_-82 J. P3ril10 COMPI.ETED BY TELEPHONE..HD03) 447-1791 -
x 44W s
yosig _
MARCH 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY l'OWER LEVEL (MWe Nct)
- (Mwe. Net)
+
1 1
0 (-3) 37 413 2
0 (-4) 466 ig 3
0 (-si 19
~
E;76 0 (-5) 4 2o
- 818 0 (-2) 823 5
.6 0 (-3) 22 820 7
0 (-5) 324 23 0 (-12) 74 161 s
9 0 (-19) 2g 687 0 (-24) 7f 858 3o, l
-11 0 (-26) 27 858 0 (-25) 841 12 7s 13 03-2_5) 857 39 0 (-28) 30 860-f 14 i
t 861 i
is AS 31 l
'265 16 t
r INSITIUCTIONS 7
i l
On this foran.!!st the nerare daib unit powyr L selin MWe Net fm c2:h defisthe te,ynin,e n.,9th7ComPric to
- N
- he r.niest Q, ele mapwatt.
s
,p AN 8
l (98#)I A
g g
l
~
- 4 y
\\
$p w
.a
,v e-,
a&.#-
e+
--e
-e w
- Yr
=
~~
50-336 UNIT SilUTDCWNS AND POWER REDUCTIONS DOCKET NO.
UNIT N A3.iE Milistone Unit 2'
'DATE d R-R7 REPORT MON'DI MARCH 1982 COUi's.r.::D ny
.1 pari'in TEtullONE (203) 447 791 x 4413 y
h$
5
- J f C#USCC 5
=_
en 3.:
M.
d, (JUSC & Catite*g ttyg
.o.
ate I
2E 4
2 L a:
Event u?
- a. '>
A,i n,n,,,
}d
$3 E
j di -
Report n 80 13, event Recurrence 6
11 811205 5
347' C
1 NA NA NA Completion of Refuel and Maintenance Outage 1
820323 F
24 H
3 NA IA INSTRUM.
Reactor Protecticn System Trip (TM/LP) from noise induced signals.
Noise problem was corrected and power operation resumed via normal. operatin g procedures.
i 2
820328 i S 10 B
NA NA NA NA Reduced Power to 95% to clean l
condenser water boxes.
(9/77 )
. w mm-m e -
..w
Docket No.
50-336 Date 4-8-82
~
Unit Name Millstone Unit 2 Completed By J. J. Parillo Telephone
(?no 447 17o1 Ext. 4419 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month FEBRUARY 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 2/1/82 Control Rod Drive CEA Extension Shafts Replaced 1 single and 1 Dual Shaft ESAS "B" LPSI Pump Replace Relay 2/2/82 Main Steam Ir.let Blowdown Header on the Steam Replace Generator Blowdown Ouench Tank 2/3/82' Reactor Coolant System "D" Reactor Coolant Pump Change Mechanical Shaft Seal Cartridge Reactor Coolant Syster, PORV Block Valve 2-RC-403 Repair Body to Bonnet Leak RBCCW "A" RBCCW Pump Replace Pump Bearing Reactor Protection Temperature Transmitters TT-ll2HA, Repair System TT-122HC and TT-122HA 2/5/82 Reactor Protection TM/LP Channel "A" Bistable Trip Replace System Unit 2/6/82 Reactor Protection Channel "A" G-2 Mcdule in Core Replace System Protection Calculator #1 2/8/82 CVCS Reroute CVCS Relief Valve (CH-345)
Reroute Discharge Drain Line 2/9/82 Incore Detectors Detector Location L-18 Install Hydroplug e
e 4
9
Dock;t No.
50-336 Date 4-8-82 Unit Name Millstone Unit 2 Completeo By J. J. Parillo Telephone (203) 447-1791 x 4419 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month FEBRUARY 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 2/15/82 Containment Spray Containment Spray Pump P43A Repair Mechanical Seal Leak Aux. Feedwater Flow indicator FI-5277 Replace A-1 & B-1 2/18/82 CVCS Charging Pump Suction Pressure Replace Switches PC 224X & PC 224Y 2/25/82 Service Water Strainer "C" Backwash Piping
~2/1 thru 2/20 Steam Generators S.G. Tubes Plugged 425 tubes in #1 Generator Plugged 284 tubes in #2 Generator e
6 e
e 0
e
Dock;t No.
50-336 Date 4-8-82 Unit Name Millstone Unit 2.
Completed By J. Parillo Telephone (203) 447-1791 i
x 4419 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT I
Report Month f1 ARCH 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 3/2/82 Containment Personnel Access Hatch Replace inner door gasket Service Water "A" Service Water Pump Rebuild l
3/8/82 S.F.P. Cooling "A" SFP Cooling Pump Change tiotor Bearing 3/9/82 Various Snubbers 413011 & 413041 Removed & Reinstalled satisfactory stroke test S/10/82 Aux. Feedwater Terry Turbine Overspeed Test 3/13/82 Reactor Protection Channel "D" Trip Inhibit Module Replace System Bridge Rectifier MDA 970-2
'3/25/82 Reactor Protection Scaling Amplifier F4,5 in Core Replace System Protection Calculator 2 - Channel "A"
'3/30/82 CVCS "C" Charging Pump Repack 3/31/82 Reactor Protection RCS RTD's Perform response time testing System O
e e
9
Dockit No.
50-336 bate:
4-8-82 Completed by J. J. Parillo Telephone (203) 447-1791 x 4419 REFUELING INFORMATION REQUEST 1.
Name of facility:
Millstone 2 2.
Scheduled date for next refueling shutdown:
Consnence refuel outage March 26, 1983.
3.
Schedule date for restart following refueling: May 14, 1983 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
It is not anticipated that Cycle 6 operations will require Technical Specification changes or other License amendments.
5.
Scheduled date(s) for submitting lic'ensing action and supporting information:
N/A 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design er, supplier, unreviewed design or perfonnance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core:
217 (b) 288 l
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
667 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1985, Spent Fuel Pool, full core off load capability is reached.
1987. Ccre Full, Spent Fuel Pool contains 648 bundles.