ML20050D564: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
I SEMOM STATION U mmc e: .avice                                     Engineedng Office:
SEMOM STATION U mmc e:.avice Engineedng Office:
Companyof NewMr W                             1671 Worcester Road Framingham, Massachusetts 01701 (617) - 872- 8100 (n j e         Wo, .
Companyof NewMr W 1671 Worcester Road Framingham, Massachusetts 01701 (617) - 872-8100 (n j e
April 8, 1982                             N',
Wo,.
                                                                                    @        ' g,,
April 8, 1982 N',
SBN-252               ~      / ,0             h-T. F. B 7.1.2         -    4 1 3r.                L--
' g,,
gd 4 '" h* Ad.O Dc United States Nuclear Regulatory Commission                                 g             q,,      .
h-SBN-252
        '4a s hi ng t on , D. C. 20555                                                                 ,
/
                                                                                        &            0 Attention:           Mr. Frank J. Mi raglia, Chief Licensing Branch No. 3 Division of Licensing Referencen.           (a) Const ruc t ion Pe rmits CPPR-135 and CPPR-136, Docke t No s . 50-443 and 50-444 Su bj ec t :         Meeting Notes; Structural Engineering Branch Design Audit Dea r Si r :
4
,0 1 3
~
r.
L--
T. F. B 7.1.2 gd 4 '" h* A Dc q,,
d.O United States Nuclear Regulatory Commission g
'4a s hi ng t on, D.
C.
20555
,0 Attention:
Mr. Frank J. Mi raglia, Chief Licensing Branch No. 3 Division of Licensing Referencen.
(a) Const ruc t ion Pe rmits CPPR-135 and CPPR-136, Docke t No s. 50-443 and 50-444 Su bj ec t :
Meeting Notes; Structural Engineering Branch Design Audit Dea r Si r :
We have attached notes from the March 29, 1982 through April 2, 1982 St ructural Engineering Branch Design Audit conducted at the office of United Engineers (Philadelphia, PA).
We have attached notes from the March 29, 1982 through April 2, 1982 St ructural Engineering Branch Design Audit conducted at the office of United Engineers (Philadelphia, PA).
These notes are provided to assist you in the prepa ration of the Safety Eva luat ion Report , as they highlight open issues, resolved issues, and commitment s which have been tendered.
These notes are provided to assist you in the prepa ration of the Safety Eva luat ion Report, as they highlight open issues, resolved issues, and commitment s which have been tendered.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY r{     pw John DeVincentis                                   j Project Manager                             ()O
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY r{
(                                                   , ,
pw John DeVincentis j
At t a c hme n t                                                                                   ,/
Project Manager
f?
()O
8204120323 820408 PDR ADOCK 05000443 A                       PDR                                                                                   .
(
l
At t a c hme n t
,/
f ?
8204120323 820408 PDR ADOCK 05000443 A
PDR l


(Sheet 1 of 5)
(Sheet 1 of 5)
PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE SEABROOK STATION. UNITS 1 & 2 NRC STRUCTURAL ENGINEERING BRANCH DESIGN AUDIT AI UNITED ENGINEERS & CONSTRUCTORS INC.
PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE SEABROOK STATION. UNITS 1 & 2 NRC STRUCTURAL ENGINEERING BRANCH DESIGN AUDIT AI UNITED ENGINEERS & CONSTRUCTORS INC.
PHILADELPHIA, PENNSYLVANIA PURPOSE:
PHILADELPHIA, PENNSYLVANIA NRC Structural Engineering Branch Design Audit PURPOSE:
NRC Structural Engineering Branch Design Audit per SRP 3.8.4 on RAIs 220.6 thru 220.37 and Audit Questionnaire Subject Matter DATE:     Monday, March 29, 1982 (1:00 p.m.)
per SRP 3.8.4 on RAIs 220.6 thru 220.37 and Audit Questionnaire Subject Matter DATE:
ATTENDEES: See Sheet No. 1 of Attachment A.
Monday, March 29, 1982 (1:00 p.m.)
AGENDA:     1. Discussion of the objectives and the conduct of Audit.
ATTENDEES:
: 2. Review of Seabrook site and key structures at various stages of construction in progress through slide presentation.
See Sheet No. 1 of Attachment A.
: 3. Presentation of an overview of seismic and static analyses and design methods, as applied to contain-ment structure (including internal structures) and other key structures, such as primary auxiliary building, control and diesel gener-ator building, condensate storage tank, fuel storage building and polar crane support structures.
AGENDA:
: 4. An overview of Tuesday's Agenda.
1.
Discussion of the objectives and the conduct of Audit.
2.
Review of Seabrook site and key structures at various stages of construction in progress through slide presentation.
Presentation of an overview of seismic and static 3.
analyses and design methods, as applied to contain-ment structure (including internal structures) and other key structures, such as primary auxiliary building, control and diesel gener-ator building, condensate storage tank, fuel storage building and polar crane support structures.
4.
An overview of Tuesday's Agenda.


(Sheet 2 of 5)
(Sheet 2 of 5)
SEABROOK STATION UNITS 1 & 2 NRC-SEB DESIGN AUDIT al UNITED ENGINEERS & CONSTRUCTORS INC.
SEABROOK STATION UNITS 1 & 2 NRC-SEB DESIGN AUDIT al UNITED ENGINEERS & CONSTRUCTORS INC.
DATE:     Tuesday, March 30, 1982 ATTENDEES: See Sheet No. 2 of Attachment A.
DATE:
AGENDA:   1. An overview of seismic and static analyses and design methods, as applied to various key structures (continued f rom Monday's meeting)
Tuesday, March 30, 1982 ATTENDEES:
: 2. Audit of analysis and design calculations for the steel lined concrete containment structures.
See Sheet No. 2 of Attachment A.
: 3. Seismic analysis of polar crane.
AGENDA:
: 4. Design of metal portions of equipment hatch and personnel airlock, not backed by concrete, per ASME Code Section III, Division 1.
1.
: 5. Overall structural stability of key structures and incorporation of " accidental torsion" based on 5 % eccentricity.
An overview of seismic and static analyses and design methods, as applied to various key structures (continued f rom Monday's meeting) 2.
: 6. Design status of annular steel framing of the containment internal structures.
Audit of analysis and design calculations for the steel lined concrete containment structures.
3.
Seismic analysis of polar crane.
4.
Design of metal portions of equipment hatch and personnel airlock, not backed by concrete, per ASME Code Section III, Division 1.
5.
Overall structural stability of key structures and incorporation of " accidental torsion" based on 5 % eccentricity.
6.
Design status of annular steel framing of the containment internal structures.
The action items identified at this meeting and subsequent resolution achieved are su=marized on Sheet Nos. 1 and 2 of Attachment B.
The action items identified at this meeting and subsequent resolution achieved are su=marized on Sheet Nos. 1 and 2 of Attachment B.


      --      .                          .        =_   .      .          .                    - .              --      .
=_
(Sheet 3 of 5)
(Sheet 3 of 5)
  ;.                                                        SEABROOK STATION UNITS 1 & 2 NRC-SEB DESIGN AUDIT
SEABROOK STATION UNITS 1 & 2 NRC-SEB DESIGN AUDIT
    ~
~
A.I UNITED ENGINEERS & CONSTRUCTORS INC.
A.I UNITED ENGINEERS & CONSTRUCTORS INC.
DATE:                             Wednesday, March 31, 1982 ATTENDEES:                         See Sheet No. 3o'f Attachment A.
DATE:
AGENDA:                           1. Containment liner integrity with respect to turbine missile.
Wednesday, March 31, 1982 ATTENDEES:
: 2. Containment ultimate capacity study.
See Sheet No. 3 'f Attachment A.
,                                                  3. Audit of analysis and design calculations
o AGENDA:
;                                                      for the containment internal structures
1.
  ;                                                    and primary auxiliary building.
Containment liner integrity with respect to turbine missile.
4
2.
: 4. An overview of tornado missile protection.
Containment ultimate capacity study.
: 5. State of rebar stresses and strains for the containment structure.
3.
: 6. Analysis and design methods of cable tray.
Audit of analysis and design calculations for the containment internal structures and primary auxiliary building.
: 7. Interaction of non-Category I structures with Category I structures.
4 4.
The action items identified at this meeting and f                                                 subsequent resolution achieved are summarized j                                                   on Sheet Nos. 3, 4 and 5 of Attachment B.
An overview of tornado missile protection.
5.
State of rebar stresses and strains for the containment structure.
6.
Analysis and design methods of cable tray.
7.
Interaction of non-Category I structures with Category I structures.
The action items identified at this meeting and f
subsequent resolution achieved are summarized j
on Sheet Nos. 3, 4 and 5 of Attachment B.
i t
i t
F 4
F 4
i I
i I
i l--         .  . - . - . - . - _ _ - . - - - , _ _                  ,      _.  .        _ _ _ _ _ _    .__    _ , _    __ _
i l - -


(Sheet 4 of 5)
(Sheet 4 of 5)
SEABROOK STATION UNITS 1 & 2 NRC-SEB DESIGN AUDIT
SEABROOK STATION UNITS 1 & 2 NRC-SEB DESIGN AUDIT AI UNITED ENGINEERS & CONSTRUCTORS INC.
-                                  AI UNITED ENGINEERS & CONSTRUCTORS INC.
DATE:
DATE:     Thursday, April 1, 1982 ATTENDEES: See Sheet No. 4 of Attachment A.
Thursday, April 1, 1982 ATTENDEES:
AGENpa:   1. Audit of analysis and design calculations for control and diesel generator building, con-densate storage tank, fuel storage buildings and polar crane support structures.
See Sheet No. 4 of Attachment A.
: 2. Dynamic lateral pressures and shear wave velocity.
AGENpa:
: 3. Underground piping and underground structures.
1.
: 4. Seismic instrumentation.
Audit of analysis and design calculations for control and diesel generator building, con-densate storage tank, fuel storage buildings and polar crane support structures.
: 5. Spent fuel pool racks.
2.
: 6. An overview of RAIs 220.6 thru 220.37.
Dynamic lateral pressures and shear wave velocity.
: 7. Other technical issues as necessary.
3.
Underground piping and underground structures.
4.
Seismic instrumentation.
5.
Spent fuel pool racks.
6.
An overview of RAIs 220.6 thru 220.37.
7.
Other technical issues as necessary.
The action items identified at this meeting and subsequent resolution achieved are summarized on Sheet Nos. 6 thru 9 of Attachment B.
The action items identified at this meeting and subsequent resolution achieved are summarized on Sheet Nos. 6 thru 9 of Attachment B.


        ..          -          _                      __.                          , ..            .      . - _ _ - .          -      ._ _.                        ~.              .. -          .
~.
i i
i i
l                                                                                                                                                                       (Sheet 5 of 5) i                                                                                                       SEABROOK STATION UNITS 1 & 2 NRC-SEB DESIGN AUDIT f                                                                                                                                                                                                             f i                                                                                                  UNITED ENGINEERS & CONSTRUCTORS INC.
l (Sheet 5 of 5) i SEABROOK STATION UNITS 1 & 2 NRC-SEB DESIGN AUDIT f
4 1
f UNITED ENGINEERS & CONSTRUCTORS INC.
I DATE:                                                           Friday, April 2, 1982 i                           ATTENDEES:                                                     See Sheet No. 5 of Attachment A.                                                                                 .;
i 4
AGENDA;                                                         1. An overview of ultimate capacity of concrete containment.
1 I
J                                                                                             2. Further discussion on analysis, design and j                                                                                                 erection methods of cable trays.
DATE:
i                                                                                            ' 3. Review of action items and establish i
Friday, April 2, 1982 i
committal dates and.actionees.
ATTENDEES:
  ,                                                                                            4. Audit terminated at 12 noon.
See Sheet No. 5 of Attachment A.
AGENDA; 1.
An overview of ultimate capacity of concrete containment.
J 2.
Further discussion on analysis, design and j
erection methods of cable trays.
' 3.
Review of action items and establish i
i committal dates and.actionees.
4.
Audit terminated at 12 noon.
The action items identified at this meeting and 4
The action items identified at this meeting and 4
4                                                                                            subsequent resolution are summarized on Sheet.
subsequent resolution are summarized on Sheet.
No. 10 of Attachment B.
4 No. 10 of Attachment B.
t 1
t 1
l l
l l
l I
l I
f 1
f 1
      . . , . -    -  . , _      . - - - . , , , _ . .    .._..,_..--._~,-___-__-,,_____y,                               ,  ,,,._,_..~v_       ,_- . ---.. ., - . - .      - _ _ - - . , - - , , , _ - . .
.._..,_..--._~,-___-__-,,_____y,
,,,._,_..~v_


4 ATTACHMENT A 4                                                                                                                              (Sheet 1 of 5) t l                                                                               SEABROOK STATION. UNITS 1 & 2 ATTENDANCE ROSTER-SEB MEETING AT,
4 ATTACHMENT A (Sheet 1 of 5) 4 t
    ,                                                                        UNITED ENGINEERS & CONSTRUCTORS e
l SEABROOK STATION. UNITS 1 & 2 ATTENDANCE ROSTER-SEB MEETING AT, UNITED ENGINEERS & CONSTRUCTORS e
4 March 29, 1982 NAME                                               ORGANIZATION                           TITLE Howard Wong                                                 NRC/IE                       Rx Construction Engineer
4 March 29, 1982 NAME ORGANIZATION TITLE Howard Wong NRC/IE Rx Construction Engineer Nilesh Chokshi NRC/SEB Structural Engineer Khalid Shaukat NRC/SEB Structural Engineer David C. Jeng NRC/SEB Section A Leader, SEB/DE/NRC i
;                      Nilesh Chokshi                                               NRC/SEB                       Structural Engineer Khalid Shaukat                                               NRC/SEB                       Structural Engineer David C. Jeng                                               NRC/SEB                       Section A Leader, SEB/DE/NRC i
John Ma NRC/SEB Senior Structural Engineer Richard Toland UE&C/ SAG Mgr. Structural Analysis Dipak Majumder UE&C/ SAG Structural Analysis Group Noshir Karanjia UE&C/ SAG Structural Analysis Group V.N.Vazirani UE&C/ SAG Structural Analysis Group f
John Ma                                                     NRC/SEB                       Senior Structural Engineer
Joe Ucciferro
  !                    Richard Toland                                             UE&C/ SAG                     Mgr. Structural Analysis Dipak Majumder                                             UE&C/ SAG                     Structural Analysis Group Noshir Karanjia                                             UE&C/ SAG                     Structural Analysis Group
* UE&C Asst. Chief Struct. Engineer j
,                      V.N.Vazirani                                               UE&C/ SAG                     Structural Analysis Group f                     Joe Ucciferro
* UE&C                           Asst. Chief Struct. Engineer j
L.S.Nascimento
L.S.Nascimento
* UE&C                           Chief Structural Engineer
* UE&C Chief Structural Engineer Dilip K. Ghosh UE&C Structural Engineer K.M.Kalavadia UE&C Structural Engineer A.J.Hulshizer UE&C Supervising Structural Engineer Paul A. Nason PSNH Project Engineer 4
!                      Dilip K. Ghosh                                             UE&C                           Structural Engineer                                               ,
i llenry E. Wingate YAEC Sr. Project Engineer David H. Rhoads
K.M.Kalavadia                                               UE&C                           Structural Engineer A.J.Hulshizer                                               UE&C                           Supervising Structural Engineer 4
* UE&C Project Engineering Manager Howard H. Katz UE&C Super. Licensing Engineer i
Paul A. Nason                                               PSNH                           Project Engineer i
Alan M. Ebner
llenry E. Wingate                                           YAEC                           Sr. Project Engineer David H. Rhoads
* UE&C Project Manager l
* UE&C                           Project Engineering Manager Howard H. Katz                                             UE&C                           Super. Licensing Engineer i
!                      Alan M. Ebner
* UE&C                           Project Manager l
l
l
* Part Time i
* Part Time i
    --  , - , - -          .n, - - . . , ... - - , . . - . . - ._> -- . . - - ----. - .                - - - ,    - -.          . - , - - - , - - . -      --          , - - .
.n,


ATTACICIENT A (Sheet 2 of 5) i                                                                 SEABROOK STATION. UNITS 1 & 2                                   ,
ATTACICIENT A (Sheet 2 of 5) i SEABROOK STATION. UNITS 1 & 2 ATTENDANCE ROSTER-SEB MEETING A,,T, UNITED ENGINEERS & CONSTRUCTORS t
ATTENDANCE ROSTER-SEB MEETING A,,T, UNITED ENGINEERS & CONSTRUCTORS t .
March 30, 1982 NAME ORGANIZATION TITLE Howard Wong NRC/IE Rx Construction Engineer t
March 30, 1982 NAME                               ORGANIZATION                             TITLE Howard Wong                             NRC/IE                         Rx Construction Engineer t
I Nilesh Chokshi NRC/SEB Structural Engineer Khalid Shaukat NRC/SEB Structural Engineer David C. Jeng NRC/SEB Section A Leader John S. Ma NRC/SEB Senior Structural Engineer Dipak K. Majumder UE&C Structural Engineer V.N.Vazirani UE&C Structural Engineer N.C.Karanjia UE&C Consulting Engineer K.M.Kalavadia UE&C Structural Engineer Dilip K. Ghosh UE&C Structural Engineer 1
I                       Nilesh Chokshi                           NRC/SEB                         Structural Engineer Structural Engineer Khalid Shaukat                           NRC/SEB David C. Jeng                           NRC/SEB                         Section A Leader NRC/SEB                         Senior Structural Engineer John S. Ma Dipak K. Majumder                       UE&C                           Structural Engineer V.N.Vazirani                             UE&C                           Structural Engineer N.C.Karanjia                             UE&C                           Consulting Engineer K.M.Kalavadia                           UE&C                           Structural Engineer
i Howard H. Katz
>                        Dilip K. Ghosh                           UE&C                           Structural Engineer 1
* UE&C Sup. Licensing Engineer-Seabrook John A. Mott
i                       Howard H. Katz
* UE&C Structural Engineer
* UE&C                           Sup. Licensing Engineer-Seabrook
+
+                        John A. Mott
Allen J. Hulshizer UE&C Supv. Structural Engineer Richard Toland UE&C Manager, Structural Anal. Gr.
* UE&C                           Structural Engineer Allen J. Hulshizer                       UE&C                           Supv. Structural Engineer Richard Toland                           UE&C                           Manager, Structural Anal. Gr.
Henry E. Wingate
Henry E. Wingate
* YAEC                           Senior Project Engineer Michael Ossing
* YAEC Senior Project Engineer Michael Ossing
* YAEC                           Project Engineer
* YAEC Project Engineer
* Part Time b
* Part Time b
i
i


            . _ . . _ _ = _ .               .                                    _                    _                  _ - . _
. _.. _ _ = _.
i                                                                                                                                                                                                               ATTACEDIENT A .
i ATTACEDIENT A (Sheet 3 of 5)
(Sheet 3 of 5) I a
I a
SEABROOK STATION, UNITS 1 & 2                                                                                                                 !
SEABROOK STATION, UNITS 1 & 2 4
4                                                                              ATTENDANCE ROSTER-SEB MEETING                                                                                                                   l AT I       -                                                                  UNITED ENGINEERS & CONSTUCTORS March 31, 1982 NAME                             ORGANIZATION                                                                               TITLE Howard tJong                                       NRC/IE                                                         Rx Construction Engineer i                               David C. Jeng                                       NRC, NRR                                                         Section A Leader, SEB/NRC Khalid Shaukat                                     NRC/SEB                                                         Structural Engineer Nilesh Chokshi                                     NRC/SEB                                                         Structural Engineer John S. Ma                                         NRC/SEB                                                         Sernior Structural Engineer i
ATTENDANCE ROSTER-SEB MEETING l
AT I
UNITED ENGINEERS & CONSTUCTORS March 31, 1982 NAME ORGANIZATION TITLE Howard tJong NRC/IE Rx Construction Engineer i
David C. Jeng NRC, NRR Section A Leader, SEB/NRC Khalid Shaukat NRC/SEB Structural Engineer Nilesh Chokshi NRC/SEB Structural Engineer John S. Ma NRC/SEB Sernior Structural Engineer i
V.D.Patel
V.D.Patel
* UE&C                                                             Structural Engineer John A. Mott
* UE&C Structural Engineer John A. Mott
* UE&C                                                             Structural Engineer V.N.Vazirani                                       UE&C                                                             Structural Engineer Richard Toland                                     UE&C                                                             Manager, Struc. Anal. Gr.
* UE&C Structural Engineer V.N.Vazirani UE&C Structural Engineer Richard Toland UE&C Manager, Struc. Anal. Gr.
Dipak Majumder                                     UE&C                                                             Structural Engineer Noshir Karanjia                                     UE6C                                                             Consulting Engineer
Dipak Majumder UE&C Structural Engineer Noshir Karanjia UE6C Consulting Engineer K.M.Kalavadia
;                                K.M.Kalavadia
* UE&C Structural Engineer 2
* UE&C                                                             Structural Engineer 2
Dilip. K. Chosh UE&C Structural Engineer i
Dilip. K. Chosh                                     UE&C                                                             Structural Engineer i                               Allen J. Hulshizer                                 UE6C                                                             Supverising Engineer (Structural)
Allen J. Hulshizer UE6C Supverising Engineer (Structural)
R. Boritz
R. Boritz
* UE&C                                                             Consulting Engineet Howard Katz
* UE&C Consulting Engineet Howard Katz
* UE&C                                                             Superv. Licensing Engineer.-Seabrook Michael Ossing                                     YAEC                                                             Project Engineer R.KsTucker                                         YAEC                                                             SB Lead Mechanical Engineer Joe Ucciferro
* UE&C Superv. Licensing Engineer.-Seabrook Michael Ossing YAEC Project Engineer R.KsTucker YAEC SB Lead Mechanical Engineer Joe Ucciferro
* UE6C                                                             Asst. Chief Struct. Engineer E. Skolnick                                         UE&C                                                             Mechanical Analysis l                               R.J.Hammerschlag
* UE6C Asst. Chief Struct. Engineer E. Skolnick UE&C Mechanical Analysis l
* UE6C                                                             Mech. Analysis
R.J.Hammerschlag
!                                R.F. Perry
* UE6C Mech. Analysis R.F. Perry
* UE&C                                                             Mech. Analysis f
* UE&C Mech. Analysis f
* Part Time
* Part Time m
    - - . . . . _ , . . - _ .          --.- -__ _  m . _. . _ _ _ _ _ __ . . _ _ _ . . _ . . _ _ _ - _ _ . _ , _ , .


ATTACIDfENT A (Sheet 4 of 5)
ATTACIDfENT A (Sheet 4 of 5)
SEABROOK STATION, UNITS 1 & 2 ATTENDANCE ROSTER-SEB MEETING AT UNITED ENGINEERS & CONSTRUCTORS April 1, 1982 UA*!E               ORGANIZATION                         TITLE lloward Wong                   NRC/IE                     Pa Construction Engineer David C. Jeng                   NRC/NRR                     Section A Leader, SEB/NRR Nilesh Chokshi                 NRC/NRR/SEB                 Structural Engineer Khalid Shaukat                 NRC/SEB                     Structural Engineer
SEABROOK STATION, UNITS 1 & 2 ATTENDANCE ROSTER-SEB MEETING AT UNITED ENGINEERS & CONSTRUCTORS April 1, 1982 UA*!E ORGANIZATION TITLE lloward Wong NRC/IE Pa Construction Engineer David C. Jeng NRC/NRR Section A Leader, SEB/NRR Nilesh Chokshi NRC/NRR/SEB Structural Engineer Khalid Shaukat NRC/SEB Structural Engineer
]             John S. Ma                     NRC/SEB                     Senior Structural Engineer R.K. Tucker                     YAEC                       SB Lead Mech. Engineer V.N.Vazirani                   UE&C                       Engineer Dipak K. Majumder               UE&C                       Structural Engineer, SAG Noshir Karanjia                 UE&C                       Consulting Engineer, SAG D. Patel
]
* UE&C                       Geotechnical Engineer Allen J. Iluishizer             UE&C                       Supervising Struct. Engineer V.D.Patel
John S. Ma NRC/SEB Senior Structural Engineer R.K. Tucker YAEC SB Lead Mech. Engineer V.N.Vazirani UE&C Engineer Dipak K. Majumder UE&C Structural Engineer, SAG Noshir Karanjia UE&C Consulting Engineer, SAG D. Patel
* UE&C                       Structural Engineer K.M.Kalawadia                   UE&C                       Structural Engineer Dilip K. Ghosh                 UE&C                       Structural Engineer Joe Ucciferro
* UE&C Geotechnical Engineer Allen J. Iluishizer UE&C Supervising Struct. Engineer V.D.Patel
* UE&C                       Asst. Chief Struct. Engr.
* UE&C Structural Engineer K.M.Kalawadia UE&C Structural Engineer Dilip K. Ghosh UE&C Structural Engineer Joe Ucciferro
* UE&C Asst. Chief Struct. Engr.
W.H. Reading
W.H. Reading
* UE&C                       Struct. Design Supervisor R.F. Perry
* UE&C Struct. Design Supervisor R.F. Perry
* UE&C                       Mechanical Analysis E.Skolnick
* UE&C Mechanical Analysis E.Skolnick
* UE&C                       Mechanical Analysis L.S.Nascimento
* UE&C Mechanical Analysis L.S.Nascimento
* UE&C                       Chief Struct. Engr.
* UE&C Chief Struct. Engr.
II. ll. Ka t z
II. ll. Ka t z
* UE&C                       Superv. Licensing Engineer
* UE&C Superv. Licensing Engineer G. Gupta
;            G. Gupta
* UE&C I&C Engineer l
* UE&C                       I&C Engineer l
T.C.Yu
i T.C.Yu
* UE&C Mechanical Analysis i
* UE&C                       Mechanical Analysis 1
1
:
* Part Time
* Part Time


_. ._          _ . - . .        .-- m _.      _ __ _ _      _ - _ -_.          - . _ _ _ .          - _-. _ _ . _ __..
m _.
1 ATTAClefENT A SEABROOK STATION, UNITS 1 & 2 ATTENDANCE ROSTER-SEB MEETING AT UNITED ENCi!IEERS & CONSTRUCTORS 1   .
1 ATTAClefENT A SEABROOK STATION, UNITS 1 & 2 ATTENDANCE ROSTER-SEB MEETING AT UNITED ENCi!IEERS & CONSTRUCTORS 1
April 2, 1982 1
April 2, 1982 1
J NAME                               ORGANIZATION                                   TITLE K.M.Kalawadia                                   UE&C                       Structural Engineer Dilip K. Ghosh                                   UE&C                       Structural Engineer N.C.Karanjia                                     UE&C                       Consulting Engineer D.K.Majumder                                     UE&C                       Structural Engineer R.Toland                                         UE&C                       Mgr. Structual Analysis V.N.Vazirani                                     UE&C                       Structural Engineer                         ,
J NAME ORGANIZATION TITLE K.M.Kalawadia UE&C Structural Engineer Dilip K. Ghosh UE&C Structural Engineer N.C.Karanjia UE&C Consulting Engineer D.K.Majumder UE&C Structural Engineer R.Toland UE&C Mgr. Structual Analysis V.N.Vazirani UE&C Structural Engineer i
i                                                                                                                                              L J.S.Ma                                           NRC/SEB                   Senior Structual Engineer Nilesh Chokshi                                   NRC/SEB                   Structural Engineer Khalid Shaukat                                   NRC/SEB                   Structural Engineer David C. Jeng                                   NRC/SEB                   Section A Leader, SEB/NRC 4
L J.S.Ma NRC/SEB Senior Structual Engineer Nilesh Chokshi NRC/SEB Structural Engineer Khalid Shaukat NRC/SEB Structural Engineer David C. Jeng NRC/SEB Section A Leader, SEB/NRC 4
D.H.Rhoads                                       UE&C                       P.E.M.
D.H.Rhoads UE&C P.E.M.
l                       H.Wingate                                       YAEC                       Proj. Eng.
l H.Wingate YAEC Proj. Eng.
I R.F. Perry
I R.F. Perry
* UE&C                       MAG E.Skolnick
* UE&C MAG E.Skolnick
* UE&C                       MAG Allen J. Hulshizer                               UE&C                       Superv. Struct. Eng.
* UE&C MAG Allen J. Hulshizer UE&C Superv. Struct. Eng.
B.B. Scott
B.B. Scott
* UE&C                       Asst. Mgr. R&QA-E.P.Rothong
* UE&C Asst. Mgr. R&QA-E.P.Rothong
* UE&C                       Chief Elec. Engr.
* UE&C Chief Elec. Engr.
A.M. Ebner
A.M. Ebner
* UE&C                       Project Manager L.S.Nascimento
* UE&C Project Manager f-L.S.Nascimento
* UE&C                       Chief Struct. Eng.
* UE&C Chief Struct. Eng.
f-UE&C                       Asst. Chief Struct. Eng.
J.J.Ucciferro UE&C Asst. Chief Struct. Eng.
J.J.Ucciferro L
L I
I l
* Part Time l
* Part Time l
l l
l l
l e     -y-- --
l l
y- -          - - ,w         a-e                         --y,   ,              y---v ,-
e
-y--
y-
,w a-e g-,,.rm,,.*mm-viyo-
--y, e veraw y---v um-w em mum--,..ry,---m<is r-y-mm


l
l SEABROOK STATION, UNITS 1 & 2 ATTACHMENT B SHEET 10F 30 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 to 4/2/82 ACTION ITEMS *AND RESOLUTION l
:                                                  SEABROOK STATION, UNITS 1 & 2                               ATTACHMENT B SHEET 10F 30 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 to 4/2/82
DATE:
  ,                                                    ACTION ITEMS *AND RESOLUTION l
3/30/82 ITEM ISSUE REQUIRED ACTION RESOLUTION 1
DATE: 3/30/82 ITEM           ISSUE                             REQUIRED ACTION                   RESOLUTION 1   Response to RAI 220.13. In describing the applicability of damping       Resolved based on discussion.
Response to RAI 220.13.
Damping values used in     values of R.G. 1.61 to the Seabrook design,       Revised response to be submitted by seismic analysis.           UE&C will provide a discussion of the de-         April 19, 1982.
In describing the applicability of damping Resolved based on discussion.
Damping values used in values of R.G. 1.61 to the Seabrook design, Revised response to be submitted by seismic analysis.
UE&C will provide a discussion of the de-April 19, 1982.
sign philosophy wherein a design without excessive conservatism results in stress levels compatable with the given damping values.
sign philosophy wherein a design without excessive conservatism results in stress levels compatable with the given damping values.
Action by R.H. Toland and N.C'. Karanjia.
Action by R.H. Toland and N.C'.
2   Response to RAI 220.21. UE&C will show for the containment struc-         Open. UE6C will provide an assessment of The current technical       ture and a typical building that structural       the impact for ' accidental torsion' based position of the NRC staff   stresses are still acceptable for this con-       on 5% cecentricity in the design of the requires the consideration dition.                                           containment structure and a typical of ' accidental torsion' in Action by Structural discipline, K.M.             Category I structure.
Karanjia.
1 the design of structures. Kalawadia and D.K. Ghosh, with input from         Due to NRC by May 3, 1982.
2 Response to RAI 220.21.
!                                      Structural Analysis Group.
UE&C will show for the containment struc-Open.
l Response to RAI 220.20.
UE6C will provide an assessment of The current technical ture and a typical building that structural the impact for ' accidental torsion' based position of the NRC staff stresses are still acceptable for this con-on 5% cecentricity in the design of the requires the consideration dition.
3                                The response should note that soil varia-         Resolved based on discussion.
containment structure and a typical of ' accidental torsion' in Action by Structural discipline, K.M.
Justification of Il0% peak bility is not a parameter here since Sea-         Revised response to be submitted by spreading.                 brook is a rock site. Since soil is the           April 19, 1982.
Category I structure.
j                                     principal source of variability in seismic
the design of structures.
:                                      response, the 110% peak spreading is justified.
Kalawadia and D.K. Ghosh, with input from Due to NRC by May 3, 1982.
1 Structural Analysis Group.
l 3
Response to RAI 220.20.
The response should note that soil varia-Resolved based on discussion.
Justification of Il0% peak bility is not a parameter here since Sea-Revised response to be submitted by spreading.
brook is a rock site.
Since soil is the April 19, 1982.
j principal source of variability in seismic response, the 110% peak spreading is justified.
Action by N.C. Karanjia.
Action by N.C. Karanjia.
l l
l l
l l
l l


  -.      - . _ _ - .        -    - - - . ~ - . , . -           . -                . . _  - _ . - . -      --          .. .-  -  _--      . .      - _ . .    .        . - . .  .
. ~ -.,. -
I                                                                                                                                                                                     .
I i
i i
i SEABROOK STATION, UNITS 1 & 2 ATTACHMENT B i
SEABROOK STATION, UNITS 1 & 2                                 ATTACHMENT B                                       i 4                                                                                                                                    SHEET 2 OF 10                                     i
SHEET 2 OF 10 i
!                                                            NRC STRUCTURAL DESIGN AUDIT, 3/29/82 - 4/2/82 l                                                                       ACTION ITEMS AND RESOLUTION DATE: 3/30/82 (Con't.)
4 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 - 4/2/82
.        ITEM                   ISSUE                                 REQUIRED ACTION                             RESOLUTION                                                           .
{
t 4           Response to Rdl 220.18.           The UE&C response should note the compatibil- Resolved. Revised response will show the Meeting the intent of R.G.       ity of its method to the intent of the Reg,               comparison of results obtained using fre-1.122 frequency incre-           Guide.                                                   quencies from two different documented ments in calculating             Action by N.C. Karanjia.                                   tables. Due to NRC by April 19, 1982.
l ACTION ITEMS AND RESOLUTION DATE: 3/30/82 (Con't.)
i                     floor response spectra.
ITEM ISSUE REQUIRED ACTION RESOLUTION t
4 Response to Rdl 220.18.
The UE&C response should note the compatibil-Resolved. Revised response will show the Meeting the intent of R.G.
ity of its method to the intent of the Reg, comparison of results obtained using fre-1.122 frequency incre-Guide.
quencies from two different documented l
ments in calculating Action by N.C. Karanjia.
tables. Due to NRC by April 19, 1982.
i floor response spectra.
i 1
i 1
5           Response to RAI 220.29.           Clarification of load combination which                   Resolved. Revised response to be submitted J                     Load combinations for             controls the design.                                       by April 19, 1982.
5 Response to RAI 220.29.
l                     equipment hatch and               Action by Mechanical Analysis Group.
Clarification of load combination which Resolved. Revised response to be submitted J
Load combinations for controls the design.
by April 19, 1982.
[
l equipment hatch and Action by Mechanical Analysis Group.
l personnel locks.
l personnel locks.
!                                                                                                                                                                                        i l
i l
f           6         Response to RAl 220.30.           Clarification of load combination which                     Resolved. Revised response to be~ submitted j                     Stress limits for equip-         controls the design.                                       by April 19, 1982.
f 6
I                     ment hatch and                   Action by Hechanical Analysis Group.
Response to RAl 220.30.
}                     personnel locks.
Clarification of load combination which Resolved. Revised response to be~ submitted j
Stress limits for equip-controls the design.
by April 19, 1982.
I ment hatch and Action by Hechanical Analysis Group.
}
personnel locks.
i 4
i 4
7         Response to RAI 220.26.           UE&C will clarify its response especially                   Resolved. Revised response to be submitted                         ,
7 Response to RAI 220.26.
j                     Effect of temperature             with regards to the ASME provisions for                   by April 19, 1982.
UE&C will clarify its response especially Resolved. Revised response to be submitted
                                                                                                                                                                                        +
+
j                       gradient across the wall         rebar strain.
j Effect of temperature with regards to the ASME provisions for by April 19, 1982.
!                      on containment struc-             Action by R.H. Toland.
j gradient across the wall rebar strain.
I                       tural design.
on containment struc-Action by R.H. Toland.
I tural design.
I 1
I 1
!                                                                                                                                                                                        t i
t i


_          ,    .-    .      ,              .    - _ -  -  ~ . . = _ . . _ . - ._ ._ _        -    -    --  _
~.. = _.. _. -._._ _
                                                                                                                                  . - ~ .    .. .
. - ~.
i                                                                                                                                         .
i SEABROOK STATION, UNITS I & 2 ATTACHMENT B SHEET 3 OF 10 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 - 4/2/82 ACTION ITEMS AND RESOLUTION 4
SEABROOK STATION, UNITS I & 2                                 ATTACHMENT B
i DATE: 3/31/82 ITEM ISSUE REQUIRED ACTION RESOLUTION t
  ,                                                                                                                SHEET 3 OF 10 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 - 4/2/82 ACTION ITEMS AND RESOLUTION 4
l 1
i DATE: 3/31/82 ITEM           ISSUE                             REQUIRED ACTION                             RESOLUTION                                     !
Response of RAI 220.11.
l   1   Response of RAI 220.11.       UE&C will clarify the issue and terminology               Open. Revised response consistent with Clarification of termino 1-   as required.                                               the present industry design practice to ogy; Disagreement on           Action by Bob Boritz, Al Hulshizer and                     be submitted by Ray 3, 1982.
UE&C will clarify the issue and terminology Open.
basic physical phenomenon. R.H. Toland 2   Response to RAI 220.37.       UE&C will give an overview of ultimate                     Open. UE&C to submit the ultimate con-Ultimate Containment         capacity of concrete containment on 4/2/82                 tainment capacity study for the membrane Capacity Study.               and a date when study could be completed.                 region by July 1, 1982.
Revised response consistent with Clarification of termino 1-as required.
the present industry design practice to ogy; Disagreement on Action by Bob Boritz, Al Hulshizer and be submitted by Ray 3, 1982.
basic physical phenomenon.
R.H. Toland 2
Response to RAI 220.37.
UE&C will give an overview of ultimate Open.
UE&C to submit the ultimate con-Ultimate Containment capacity of concrete containment on 4/2/82 tainment capacity study for the membrane Capacity Study.
and a date when study could be completed.
region by July 1, 1982.
Action by R.H. Toland and D.K. Chosh.
Action by R.H. Toland and D.K. Chosh.
3   a) Overturning analysis of UE&C will provide this information.                           Resolved. Supporting documents to be           i the. primary auxiliary                                                               submitted by April 19, 1982.
3 a) Overturning analysis of UE&C will provide this information.
b1dg. giving the sum-mary of the final
Resolved. Supporting documents to be i
!            calculation b) A generic statement       Action taken by Structural discipline that the approach taken with input from Structural Analysis by UE&C in Seabrook is   Croup.
the. primary auxiliary submitted by April 19, 1982.
b1dg. giving the sum-mary of the final calculation b) A generic statement Action taken by Structural discipline that the approach taken with input from Structural Analysis by UE&C in Seabrook is Croup.
conservative.
conservative.
;        c) A supporting study for
c) A supporting study for this approach.
,            this approach.
l 4
l   4   Tornado missile protection. UE6C will provide a copy of calculation                       Calculation to be submitted by April 19, l                                       pages showing 12"4 steel pipe, 13 "f utility -             1982, pole & automobile missiles including the forcing function.
Tornado missile protection. UE6C will provide a copy of calculation Calculation to be submitted by April 19, l
pages showing 12"4 steel pipe, 13 "f utility -
: 1982, pole & automobile missiles including the forcing function.
Action by R.H. Toland.
Action by R.H. Toland.
i l
i l
i
i


SEABROOK STATION, UNITS 1 & 2                         ATTACUMENT B SUEET 4 0F 10 NRC STRUCTURAL DESICN AUDIT, 3/29/82 - 4/2/82 ACTION ITDtS AND RESOLUTION DATE: 3/31/82 (Cont't.)
SEABROOK STATION, UNITS 1 & 2 ATTACUMENT B SUEET 4 0F 10 NRC STRUCTURAL DESICN AUDIT, 3/29/82 - 4/2/82 ACTION ITDtS AND RESOLUTION DATE: 3/31/82 (Cont't.)
ISSUE                           REQUIRED ACTION                     RESOLUTION ITDI 5   NRC requires responses to     UE&C will provide responses by Friday,           Open. UE&C's response to question Nos. a),
ITDI ISSUE REQUIRED ACTION RESOLUTION 5
the following questions     4/2/82.                                         b) and c) was provided for NRC's review with respect to cable         Action by R.F. Perry and E. Skolnick.           on 4/2/82. Total response to all questions tray analysis:                                                                a) through d) due to NRC by May 19, 1982, a) Why is static load /
NRC requires responses to UE&C will provide responses by Friday, Open. UE&C's response to question Nos. a),
the following questions 4/2/82.
b) and c) was provided for NRC's review with respect to cable Action by R.F. Perry and E. Skolnick.
on 4/2/82. Total response to all questions a) through d) due to NRC by May 19, 1982, tray analysis:
a) Why is static load /
deflection test suita-ble for the dynamic case?
deflection test suita-ble for the dynamic case?
b) Show that cable integ-rity is maintained when tray is deformed to proportional load limit +1/3 (ultimate load limit - propor-tional load limit).
b) Show that cable integ-rity is maintained when tray is deformed to proportional load limit +1/3 (ultimate load limit - propor-tional load limit).
Line 284: Line 386:
d) How is differential displacement between consecutive supports accounted for?
d) How is differential displacement between consecutive supports accounted for?


_ _ _ _ . _ - _ . . . . _._                . _ _ _ . . _ _ - - _ _ . _ _ _ _                  ._- -      _                      . - . _ . - _ _ . - _ _ . ._ . - ._                . _ _. __-    m. . . _ - _ _ - . _ _ . .. .
m.
l                                                                                                     SEABROOK STATION, UNITS 1 & 2                                                           ATTACliMENT B SHEET 5 OF 10
l SEABROOK STATION, UNITS 1 & 2 ATTACliMENT B i
  !                                                                                        NRC STRUCTURAL DESIGN AUDIT, 3/29/82 - 4/2/82 l                                                                                                   ACTION ITEMS AND RESOLUTION a
SHEET 5 OF 10 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 - 4/2/82 l
ACTION ITEMS AND RESOLUTION a
DATE: 3/31/82 (Con't.)
DATE: 3/31/82 (Con't.)
ITEM                     ISSUE                                                         REQUIRED ACTION                                                   RESOLUTION 6               Calculation of Anchor                             UE&C will provide this Anchor Plate                                                   Item closed based on presented j                               Plates.                                           calculation.                                                                           calculation.
ITEM ISSUE REQUIRED ACTION RESOLUTION 6
j                                                                                 Action by Structural Discipline.
Calculation of Anchor UE&C will provide this Anchor Plate Item closed based on presented j
Plates.
calculation.
calculation.
j Action by Structural Discipline.
A. Hulshizer i
A. Hulshizer i
i 1               7               Rebar details, forces and                         UE&C will provide such information.                                                   Typical design data for mechanical moments due to pressure.                         Action by D.K."Chosh.                                                                 loads and the resulting stresses /
i 1
temperature and earthquake                                                     .                                                        strains in rebars and concrete for two sections of the                                                                                                                 (as discussed on 4/2/82) to be l                               containment-one'in membrane                                                                                                             submitted by April 19, 1982.
7 Rebar details, forces and UE&C will provide such information.
area, and one at wall base junction.                                                                                                                                                                                         +
Typical design data for mechanical moments due to pressure.
t 8               Effect of Switch Cear                             UE6C will provide the calculation.                                                     Item closed based on presented documents.
Action by D.K."Chosh.
Building (Non-Category 1)                         Action by Structural Discipline.                                                                                                                     i on the Control Building                                                                                                                                                                               ;
loads and the resulting stresses /
(Catetory I) . Show how seismic / wind loads were calculated including con-sideration of the dynamic nature of the load.
temperature and earthquake strains in rebars and concrete for two sections of the (as discussed on 4/2/82) to be l
l i
containment-one'in membrane submitted by April 19, 1982.
l
area, and one at wall base junction.
+
t 8
Effect of Switch Cear UE6C will provide the calculation.
Item closed based on presented documents.
Building (Non-Category 1)
Action by Structural Discipline.
i on the Control Building (Catetory I). Show how seismic / wind loads were calculated including con-sideration of the dynamic nature of the load.
F l
i l
[
[
f i
f i


_ .. _ _ .--    . - - - -          ._  __.-.  .__      -=..      -      -.      ... - -  - . _ - .    ..    , .      -.
-=..
                                                                                                                                      .                      r I
r I
i                                                                                                                                                   .
i I
I SEABROOK STATION, UNITS 1 & 2                       ATTACHMENT B               ,
SEABROOK STATION, UNITS 1 & 2 ATTACHMENT B i
i
SHEET 6 0F 10
~                                                                                                                        SHEET 6 0F 10 NRC STRUCTURAL DESIGN AUDIT. 3/29/82 to 4/2/82 ACTION ITEMS AND RESOLUTION _
~
k a
NRC STRUCTURAL DESIGN AUDIT. 3/29/82 to 4/2/82 ACTION ITEMS AND RESOLUTION _
DATE: 4/1/82 RESOLUTION REQUIRED ACTION I ITEM                       ISSUE Open. Response (being consistent with 1   Clarify the criteria for           UE&C will provide such criteria.               actual work perforced and identifying l
k DATE: 4/1/82 a
rigid and non-rigid walls           Action by Structural Discipline.               all the non-rigid walls) to be submitted
RESOLUTION REQUIRED ACTION I ITEM ISSUE Open. Response (being consistent with l
) '                subjected to static and                                                             by May 3, 1982.
1 Clarify the criteria for UE&C will provide such criteria.
i dynamic lateral earth pressures.
actual work perforced and identifying
i Open. Response to be submitted by 2   Justify why wave other             UE&C will provide this information.             May 3, 1982.
)
than shear wave is not             Action by N.C. Karanjia.
rigid and non-rigid walls Action by Structural Discipline.
1 considered in calcu-lating soil strain.
all the non-rigid walls) to be submitted i
i                                                                                                       Item closed based on discussion and 3   Discuss the seismic               UE&C to discuss.                                 presented documents.
subjected to static and by May 3, 1982.
instrumentation and basis         Action by G. Cupta of I & C Discipline.             >
dynamic lateral earth pressures.
f i
Open. Response to be submitted by 2
Justify why wave other UE&C will provide this information.
May 3, 1982.
than shear wave is not Action by N.C. Karanjia.
considered in calcu-1' lating soil strain.
i Item closed based on discussion and 3
Discuss the seismic UE&C to discuss.
presented documents.
instrumentation and basis Action by G. Cupta of I & C Discipline.
for its location; also identify operator's notification.
for its location; also identify operator's notification.
Item resolved based on presented 4   Confirm the value of               UE&C to provide such information.               documents. For the purpose of dynamic soil pressure used Action by D. Patel,                                       confirmation, calculation to be submitted in conformance with the                                                           by April 19, 1982.
Item resolved based on presented 4
parameters given in RAI 220.16. Acceptance of this I                     parameter will be done by Geotechnical Branch of NRC.
Confirm the value of UE&C to provide such information.
documents. For the purpose of dynamic soil pressure used Action by D. Patel, confirmation, calculation to be submitted in conformance with the by April 19, 1982.
parameters given in RAI 220.16. Acceptance of this I
parameter will be done by Geotechnical Branch of NRC.
l i
l i
l 1
l 1


      -        _.      .- -      . . _ . - ~ .- . _ . _ . -                .--_-_-- - - --          . _ _ _-_-        -- . _ - . . --.              ---..    .-    - .~.-
.. _. - ~
SEABROOK STATION, UNITS 1 & 2                                   ATTACHMENT R                         i SilEET 7 0F 10                       ,
-.~.-
j NRC STRUCTURAL DESIGN AUDIT 3/29/82 to 4/2/82 i
SEABROOK STATION, UNITS 1 & 2 ATTACHMENT R i
,                                                                        ACTION ITEMS AND RESOLUTION 1
SilEET 7 0F 10 j
NRC STRUCTURAL DESIGN AUDIT 3/29/82 to 4/2/82 i
ACTION ITEMS AND RESOLUTION 1
l DATE: 4/1/82 (Con't.)
l DATE: 4/1/82 (Con't.)
i ITEM                 ISSUE                                     REQUIRED ACTION                       RESOLUTION l
i ITEM ISSUE REQUIRED ACTION RESOLUTION l
5     Response to RAI 220.36                   UE&C to submit.                                     Item resolved based on discussion.                           '
5 Response to RAI 220.36 UE&C to submit.
;                  will be submitted as dis-                 Action by N.C. Karanjia.                           Response to be submitted by April 19, cussed (add effects of                                                                       1982, i
Item resolved based on discussion.
will be submitted as dis-Action by N.C. Karanjia.
Response to be submitted by April 19, cussed (add effects of
: 1982, i
filtering of time-history motion through structures).
filtering of time-history motion through structures).
)             6     Revise response to RAI                   UE&C to revise.                                   Resolved. Refer to Item _#4, dated
)
-                  220.18 as discussed.                     Action by N.C.'Karanjia.                           3/30/82.
6 Revise response to RAI UE&C to revise.
!                  Show comparison of results                                                                                                                                 ,
Resolved. Refer to Item _#4, dated 220.18 as discussed.
obtained using frequencies i
Action by N.C.'Karanjia.
from two different                                                                                                                                         i documented tables.                                                                                                                                         [
3/30/82.
l1 I
Show comparison of results obtained using frequencies i
              +
from two different i
7 7     Revise response to RAI                   Structural Discipline to revise.                   Resolved. Revised response to be lc i
documented tables.
220.9 as discussed.                       Action by D.K. Chosh.                             submitted by April 19, 1982.
[
0 i-j'!           8     Res'ponse to RAI 220.14                   UE&C to submit.                                   Open. Response as discussed to be
l 1 I
,'                  and 220.15 to be sub-                                                                       submitted by April 19, 1982.
+
, ,,s               mitted.
7 7
                                  \
Revise response to RAI Structural Discipline to revise.
1
Resolved. Revised response to be lc 220.9 as discussed.
        \ k              n d
Action by D.K. Chosh.
4                                                                                                                                                                               i 9     Re ise response to RAI                   UE&C to revise.                                   Resolved. Revised response to be submitted 22C.17 as discussed, (give Action by N.C. Karanjia.                                         by May 3, 1982 reference to Whitman's paper).
submitted by April 19, 1982.
Y n,                                                                             ,,        n. ---
i 0
i-j'!
8 Res'ponse to RAI 220.14 UE&C to submit.
Open.
Response as discussed to be and 220.15 to be sub-submitted by April 19, 1982.
mitted.
,,,s
\\ k
\\
d 1
n i
4 9
Re ise response to RAI UE&C to revise.
Resolved. Revised response to be submitted 22C.17 as discussed, (give Action by N.C. Karanjia.
by May 3, 1982 reference to Whitman's paper).
Y n,
n.


                                                                                                      - - - . - - - . . . - . -            _ . -- - -.~...-_
_. -- - -.~...-_
i                                                                                                                                                     *
i
~
~
1 SEABROOK STATION, UNITS 1 & 2                                     ATTACHMENT B SilEET 8 0F 10 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 to 4/2/82 ACTION ITEMS AND RESOLUTION                                                                           ,
1 SEABROOK STATION, UNITS 1 & 2 ATTACHMENT B SilEET 8 0F 10 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 to 4/2/82 ACTION ITEMS AND RESOLUTION f
f DATE: 4/1/82 (Con't.)                                                                                                                                           t I                                                                                                                                                                       ,
DATE: 4/1/82 (Con't.)
ITEH               ISSUE                                 REQUIRED ACTION                     RESOLUTION                                                         [
t I
t I       10       Response to RAI 220.24         UE&C to re-submit.                                 Item resolved. Response will include an                           [
ITEH ISSUE REQUIRED ACTION RESOLUTION
]                 not adequate. Re-submit.       Action by Mechanical Analysis Group,               additional sentence, " Conservatism in j                                                                                                     combining modal responses is equal to or                           l greater than that recommended in Regulatory Guide 1.92." Due to NCR by April 19, 1982.                         ;
[
.        11       Needs the discussion >f       UE6C to revise.                                     Resolved. Discussion will be provided amplification of input         Action by N.C. Karanjia.                           in the revised response. Due to NRC by motion with respect to                                                             thy 3, 1982.                                                      .
t I
10 Response to RAI 220.24 UE&C to re-submit.
Item resolved. Response will include an
[
]
not adequate. Re-submit.
Action by Mechanical Analysis Group, additional sentence, " Conservatism in I
j combining modal responses is equal to or l
greater than that recommended in Regulatory Guide 1.92."
Due to NCR by April 19, 1982.
11 Needs the discussion >f UE6C to revise.
Resolved. Discussion will be provided amplification of input Action by N.C. Karanjia.
in the revised response. Due to NRC by motion with respect to thy 3, 1982.
RAI 220.25.
RAI 220.25.
1                                                                                                                                                                       o 12       NRC will send revised         Action by NRC.                                     Open. NRC to provide YAEC with the revised                         '
I 1
position on RAI 220.35.                                                           position. Due to YAEC by April 19, 1982.
o 12 NRC will send revised Action by NRC.
13       Discussed the status of response to the following i                 RAI's:
Open. NRC to provide YAEC with the revised position on RAI 220.35.
220.6                         N/A                                                 Resolved based on submitted response.
position. Due to YAEC by April 19, 1982.
220.7                         N/A                                                 Resolved based on submitted response.
13 Discussed the status of response to the following i
l 220.8                         Correct typographical error from " radio"           Resolved. Corrected response to be                                 ;
RAI's:
to " radial"                                       submitted by April 19, 1982.
220.6 N/A Resolved based on submitted response.
220.10                         N/A                                                 Resolved based on submitted response.                             ,
220.7 N/A Resolved based on submitted response.
I 220.12                         N/A                                                 Resolved based on submitted response.
l 220.8 Correct typographical error from " radio" Resolved. Corrected response to be to " radial" submitted by April 19, 1982.
l                                                                                                                                                                       !
220.10 N/A Resolved based on submitted response.
I 220.12 N/A Resolved based on submitted response.
l


                                            $EABR007 STATIONi_ UNITS 1 & 2
$EABR007 STATIONi_ UNITS 1 & 2 A1 TAC 11 MENT B
                                                              ~
~
A1 TAC 11 MENT B           -
S11EET 9 OF 10 NRC STRUCTURAL DEh!CN ' AUDIT, 3/29/82 to 4/2/82 ACTION ITE'S AND RESOLUTION M
                                                                  ,                                S11EET 9 OF 10 NRC STRUCTURAL DEh!CN ' AUDIT, 3/29/82 to 4/2/82 ACTION ITE'S M AND RESOLUTION DATE: _4/1/8E (Coc*t.)
DATE: _4/1/8E (Coc*t.)
                                                                            /
/
\             .                                    ,                      .i ITEM           f_SSUE                   REpUIRED ACiIdN           ",        'NESOLUTION
\\
                                                          /     '
.i ITEM f_SSUE REpUIRED ACiIdN
                                      ~            '                '#
'NESOLUTION
13   (Continued) 220.22             Refer to Item #3, dated 3/31/82.
/
220.23             N/A                                                 Resolved based on submitted response.
13 (Continued)
  ,        220.28             N/A                                                 Resolved based on submitted response.
~
220.31             N/A                                                 Resolved based on submitted response.
220.22 Refer to Item #3, dated 3/31/82.
220.32             UE6C to submit the results of a detailed             Open. Due to NRC by July 30, 1982.
220.23 N/A Resolved based on submitted response.
220.28 N/A Resolved based on submitted response.
220.31 N/A Resolved based on submitted response.
220.32 UE6C to submit the results of a detailed Open.
Due to NRC by July 30, 1982.
review of ACI-318 versus ACI-349.
review of ACI-318 versus ACI-349.
220.33             N/A                                                 Resolved based on submitted response.
220.33 N/A Resolved based on submitted response.
14   Clarify response to UE&C to explain.                                     Open. Clarified the ASME Code position RAI 220.27.         Action by B.B. Scott.                               regarding the use of prepackaged grout and epoxies. Revised response to be submitted by April 19, 1982. NRC will be advised of the progress of the issue.
14 Clarify response to UE&C to explain.
Open.
Clarified the ASME Code position RAI 220.27.
Action by B.B. Scott.
regarding the use of prepackaged grout and epoxies. Revised response to be submitted by April 19, 1982. NRC will be advised of the progress of the issue.


SEABROOK STATION, UNITS 1 & 2                     ATTAC!! MENT B SilEET 10 0F 10 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 to 4/2/82 j
SEABROOK STATION, UNITS 1 & 2 ATTAC!! MENT B SilEET 10 0F 10 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 to 4/2/82 j
j                                                                                 ACTION ITEMS AND RESOLUTION i
j ACTION ITEMS AND RESOLUTION i
DATE: 4/2/82 (Con' t.)
DATE: 4/2/82 (Con' t.)
i j
i ITEM ISSUE REQUIRED ACTION RESOLUTION j
ITEM                       ISSUE                                     REQUIRED ACTION                 RESOLUTION 1               Provide the NRC with the             UE&C to submit required information.           Item 1(b) closed based on presented following information re-             Action by E.P. Rothong, R.F. Perry             response. Response to all other garding the design of                 and E. Skolnick.                               questions to be submitted by April 19, 1982       >
1 Provide the NRC with the UE&C to submit required information.
,                            cable tray:
Item 1(b) closed based on presented following information re-Action by E.P. Rothong, R.F. Perry response. Response to all other garding the design of and E. Skolnick.
questions to be submitted by April 19, 1982 cable tray:
See also Item #5, dated 3/31/82.
See also Item #5, dated 3/31/82.
,                            a) Technical basis for treating the trays as                                                             Open.
a) Technical basis for treating the trays as Open.
non-safety related structural elements.
non-safety related structural elements.
b) Confirm that these                                                                 Closed.
b) Confirm that these Closed.
2 trays were erected to the QA requirements of 1
2 trays were erected to the QA requirements of 1
Appendix B to Part 50.
Appendix B to Part 50.
j                           c) Provide any available                                                             Open.                                             '
j c) Provide any available Open.
test data which would I
test data which would I
further assure the
further assure the structural integrity and functionality of the 1
!                                structural integrity and functionality of the 1
trays when subjected to SSE and other applicable loads.
trays when subjected to SSE and other applicable loads.
d) Check IEEE 344 applica-                                                             Open, ble provision which may require additional bases for establishing non-safety related structural elements.
d) Check IEEE 344 applica-
_            . _ _ _                      _ _.      ..._}}
: Open, ble provision which may require additional bases for establishing non-safety related structural elements.
..._}}

Latest revision as of 09:22, 18 December 2024

Forwards Notes from Structural Engineering Branch Design Audit Conducted 820329-0402
ML20050D564
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 04/08/1982
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE, YANKEE ATOMIC ELECTRIC CO.
To: Miraglia F
Office of Nuclear Reactor Regulation
References
SBN-252, NUDOCS 8204120323
Download: ML20050D564 (21)


Text

.

SEMOM STATION U mmc e:.avice Engineedng Office:

Companyof NewMr W 1671 Worcester Road Framingham, Massachusetts 01701 (617) - 872-8100 (n j e

Wo,.

April 8, 1982 N',

' g,,

h-SBN-252

/

4

,0 1 3

~

r.

L--

T. F. B 7.1.2 gd 4 '" h* A Dc q,,

d.O United States Nuclear Regulatory Commission g

'4a s hi ng t on, D.

C.

20555

,0 Attention:

Mr. Frank J. Mi raglia, Chief Licensing Branch No. 3 Division of Licensing Referencen.

(a) Const ruc t ion Pe rmits CPPR-135 and CPPR-136, Docke t No s. 50-443 and 50-444 Su bj ec t :

Meeting Notes; Structural Engineering Branch Design Audit Dea r Si r :

We have attached notes from the March 29, 1982 through April 2, 1982 St ructural Engineering Branch Design Audit conducted at the office of United Engineers (Philadelphia, PA).

These notes are provided to assist you in the prepa ration of the Safety Eva luat ion Report, as they highlight open issues, resolved issues, and commitment s which have been tendered.

Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY r{

pw John DeVincentis j

Project Manager

()O

(

At t a c hme n t

,/

f ?

8204120323 820408 PDR ADOCK 05000443 A

PDR l

(Sheet 1 of 5)

PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE SEABROOK STATION. UNITS 1 & 2 NRC STRUCTURAL ENGINEERING BRANCH DESIGN AUDIT AI UNITED ENGINEERS & CONSTRUCTORS INC.

PHILADELPHIA, PENNSYLVANIA NRC Structural Engineering Branch Design Audit PURPOSE:

per SRP 3.8.4 on RAIs 220.6 thru 220.37 and Audit Questionnaire Subject Matter DATE:

Monday, March 29, 1982 (1:00 p.m.)

ATTENDEES:

See Sheet No. 1 of Attachment A.

AGENDA:

1.

Discussion of the objectives and the conduct of Audit.

2.

Review of Seabrook site and key structures at various stages of construction in progress through slide presentation.

Presentation of an overview of seismic and static 3.

analyses and design methods, as applied to contain-ment structure (including internal structures) and other key structures, such as primary auxiliary building, control and diesel gener-ator building, condensate storage tank, fuel storage building and polar crane support structures.

4.

An overview of Tuesday's Agenda.

(Sheet 2 of 5)

SEABROOK STATION UNITS 1 & 2 NRC-SEB DESIGN AUDIT al UNITED ENGINEERS & CONSTRUCTORS INC.

DATE:

Tuesday, March 30, 1982 ATTENDEES:

See Sheet No. 2 of Attachment A.

AGENDA:

1.

An overview of seismic and static analyses and design methods, as applied to various key structures (continued f rom Monday's meeting) 2.

Audit of analysis and design calculations for the steel lined concrete containment structures.

3.

Seismic analysis of polar crane.

4.

Design of metal portions of equipment hatch and personnel airlock, not backed by concrete, per ASME Code Section III, Division 1.

5.

Overall structural stability of key structures and incorporation of " accidental torsion" based on 5 % eccentricity.

6.

Design status of annular steel framing of the containment internal structures.

The action items identified at this meeting and subsequent resolution achieved are su=marized on Sheet Nos. 1 and 2 of Attachment B.

=_

(Sheet 3 of 5)

SEABROOK STATION UNITS 1 & 2 NRC-SEB DESIGN AUDIT

~

A.I UNITED ENGINEERS & CONSTRUCTORS INC.

DATE:

Wednesday, March 31, 1982 ATTENDEES:

See Sheet No. 3 'f Attachment A.

o AGENDA:

1.

Containment liner integrity with respect to turbine missile.

2.

Containment ultimate capacity study.

3.

Audit of analysis and design calculations for the containment internal structures and primary auxiliary building.

4 4.

An overview of tornado missile protection.

5.

State of rebar stresses and strains for the containment structure.

6.

Analysis and design methods of cable tray.

7.

Interaction of non-Category I structures with Category I structures.

The action items identified at this meeting and f

subsequent resolution achieved are summarized j

on Sheet Nos. 3, 4 and 5 of Attachment B.

i t

F 4

i I

i l - -

(Sheet 4 of 5)

SEABROOK STATION UNITS 1 & 2 NRC-SEB DESIGN AUDIT AI UNITED ENGINEERS & CONSTRUCTORS INC.

DATE:

Thursday, April 1, 1982 ATTENDEES:

See Sheet No. 4 of Attachment A.

AGENpa:

1.

Audit of analysis and design calculations for control and diesel generator building, con-densate storage tank, fuel storage buildings and polar crane support structures.

2.

Dynamic lateral pressures and shear wave velocity.

3.

Underground piping and underground structures.

4.

Seismic instrumentation.

5.

Spent fuel pool racks.

6.

An overview of RAIs 220.6 thru 220.37.

7.

Other technical issues as necessary.

The action items identified at this meeting and subsequent resolution achieved are summarized on Sheet Nos. 6 thru 9 of Attachment B.

~.

i i

l (Sheet 5 of 5) i SEABROOK STATION UNITS 1 & 2 NRC-SEB DESIGN AUDIT f

f UNITED ENGINEERS & CONSTRUCTORS INC.

i 4

1 I

DATE:

Friday, April 2, 1982 i

ATTENDEES:

See Sheet No. 5 of Attachment A.

AGENDA; 1.

An overview of ultimate capacity of concrete containment.

J 2.

Further discussion on analysis, design and j

erection methods of cable trays.

' 3.

Review of action items and establish i

i committal dates and.actionees.

4.

Audit terminated at 12 noon.

The action items identified at this meeting and 4

subsequent resolution are summarized on Sheet.

4 No. 10 of Attachment B.

t 1

l l

l I

f 1

.._..,_..--._~,-___-__-,,_____y,

,,,._,_..~v_

4 ATTACHMENT A (Sheet 1 of 5) 4 t

l SEABROOK STATION. UNITS 1 & 2 ATTENDANCE ROSTER-SEB MEETING AT, UNITED ENGINEERS & CONSTRUCTORS e

4 March 29, 1982 NAME ORGANIZATION TITLE Howard Wong NRC/IE Rx Construction Engineer Nilesh Chokshi NRC/SEB Structural Engineer Khalid Shaukat NRC/SEB Structural Engineer David C. Jeng NRC/SEB Section A Leader, SEB/DE/NRC i

John Ma NRC/SEB Senior Structural Engineer Richard Toland UE&C/ SAG Mgr. Structural Analysis Dipak Majumder UE&C/ SAG Structural Analysis Group Noshir Karanjia UE&C/ SAG Structural Analysis Group V.N.Vazirani UE&C/ SAG Structural Analysis Group f

Joe Ucciferro

  • UE&C Asst. Chief Struct. Engineer j

L.S.Nascimento

  • UE&C Chief Structural Engineer Dilip K. Ghosh UE&C Structural Engineer K.M.Kalavadia UE&C Structural Engineer A.J.Hulshizer UE&C Supervising Structural Engineer Paul A. Nason PSNH Project Engineer 4

i llenry E. Wingate YAEC Sr. Project Engineer David H. Rhoads

  • UE&C Project Engineering Manager Howard H. Katz UE&C Super. Licensing Engineer i

Alan M. Ebner

  • UE&C Project Manager l

l

  • Part Time i

.n,

ATTACICIENT A (Sheet 2 of 5) i SEABROOK STATION. UNITS 1 & 2 ATTENDANCE ROSTER-SEB MEETING A,,T, UNITED ENGINEERS & CONSTRUCTORS t

March 30, 1982 NAME ORGANIZATION TITLE Howard Wong NRC/IE Rx Construction Engineer t

I Nilesh Chokshi NRC/SEB Structural Engineer Khalid Shaukat NRC/SEB Structural Engineer David C. Jeng NRC/SEB Section A Leader John S. Ma NRC/SEB Senior Structural Engineer Dipak K. Majumder UE&C Structural Engineer V.N.Vazirani UE&C Structural Engineer N.C.Karanjia UE&C Consulting Engineer K.M.Kalavadia UE&C Structural Engineer Dilip K. Ghosh UE&C Structural Engineer 1

i Howard H. Katz

  • UE&C Sup. Licensing Engineer-Seabrook John A. Mott
  • UE&C Structural Engineer

+

Allen J. Hulshizer UE&C Supv. Structural Engineer Richard Toland UE&C Manager, Structural Anal. Gr.

Henry E. Wingate

  • YAEC Senior Project Engineer Michael Ossing
  • YAEC Project Engineer
  • Part Time b

i

. _.. _ _ = _.

i ATTACEDIENT A (Sheet 3 of 5)

I a

SEABROOK STATION, UNITS 1 & 2 4

ATTENDANCE ROSTER-SEB MEETING l

AT I

UNITED ENGINEERS & CONSTUCTORS March 31, 1982 NAME ORGANIZATION TITLE Howard tJong NRC/IE Rx Construction Engineer i

David C. Jeng NRC, NRR Section A Leader, SEB/NRC Khalid Shaukat NRC/SEB Structural Engineer Nilesh Chokshi NRC/SEB Structural Engineer John S. Ma NRC/SEB Sernior Structural Engineer i

V.D.Patel

  • UE&C Structural Engineer John A. Mott
  • UE&C Structural Engineer V.N.Vazirani UE&C Structural Engineer Richard Toland UE&C Manager, Struc. Anal. Gr.

Dipak Majumder UE&C Structural Engineer Noshir Karanjia UE6C Consulting Engineer K.M.Kalavadia

  • UE&C Structural Engineer 2

Dilip. K. Chosh UE&C Structural Engineer i

Allen J. Hulshizer UE6C Supverising Engineer (Structural)

R. Boritz

  • UE&C Consulting Engineet Howard Katz
  • UE&C Superv. Licensing Engineer.-Seabrook Michael Ossing YAEC Project Engineer R.KsTucker YAEC SB Lead Mechanical Engineer Joe Ucciferro
  • UE6C Asst. Chief Struct. Engineer E. Skolnick UE&C Mechanical Analysis l

R.J.Hammerschlag

  • UE6C Mech. Analysis R.F. Perry
  • UE&C Mech. Analysis f
  • Part Time m

ATTACIDfENT A (Sheet 4 of 5)

SEABROOK STATION, UNITS 1 & 2 ATTENDANCE ROSTER-SEB MEETING AT UNITED ENGINEERS & CONSTRUCTORS April 1, 1982 UA*!E ORGANIZATION TITLE lloward Wong NRC/IE Pa Construction Engineer David C. Jeng NRC/NRR Section A Leader, SEB/NRR Nilesh Chokshi NRC/NRR/SEB Structural Engineer Khalid Shaukat NRC/SEB Structural Engineer

]

John S. Ma NRC/SEB Senior Structural Engineer R.K. Tucker YAEC SB Lead Mech. Engineer V.N.Vazirani UE&C Engineer Dipak K. Majumder UE&C Structural Engineer, SAG Noshir Karanjia UE&C Consulting Engineer, SAG D. Patel

  • UE&C Geotechnical Engineer Allen J. Iluishizer UE&C Supervising Struct. Engineer V.D.Patel
  • UE&C Structural Engineer K.M.Kalawadia UE&C Structural Engineer Dilip K. Ghosh UE&C Structural Engineer Joe Ucciferro
  • UE&C Asst. Chief Struct. Engr.

W.H. Reading

  • UE&C Struct. Design Supervisor R.F. Perry
  • UE&C Mechanical Analysis E.Skolnick
  • UE&C Mechanical Analysis L.S.Nascimento
  • UE&C Chief Struct. Engr.

II. ll. Ka t z

  • UE&C Superv. Licensing Engineer G. Gupta
  • UE&C I&C Engineer l

T.C.Yu

  • UE&C Mechanical Analysis i

1

  • Part Time

m _.

1 ATTAClefENT A SEABROOK STATION, UNITS 1 & 2 ATTENDANCE ROSTER-SEB MEETING AT UNITED ENCi!IEERS & CONSTRUCTORS 1

April 2, 1982 1

J NAME ORGANIZATION TITLE K.M.Kalawadia UE&C Structural Engineer Dilip K. Ghosh UE&C Structural Engineer N.C.Karanjia UE&C Consulting Engineer D.K.Majumder UE&C Structural Engineer R.Toland UE&C Mgr. Structual Analysis V.N.Vazirani UE&C Structural Engineer i

L J.S.Ma NRC/SEB Senior Structual Engineer Nilesh Chokshi NRC/SEB Structural Engineer Khalid Shaukat NRC/SEB Structural Engineer David C. Jeng NRC/SEB Section A Leader, SEB/NRC 4

D.H.Rhoads UE&C P.E.M.

l H.Wingate YAEC Proj. Eng.

I R.F. Perry

  • UE&C MAG E.Skolnick
  • UE&C MAG Allen J. Hulshizer UE&C Superv. Struct. Eng.

B.B. Scott

  • UE&C Asst. Mgr. R&QA-E.P.Rothong
  • UE&C Chief Elec. Engr.

A.M. Ebner

  • UE&C Project Manager f-L.S.Nascimento
  • UE&C Chief Struct. Eng.

J.J.Ucciferro UE&C Asst. Chief Struct. Eng.

L I

  • Part Time l

l l

l l

e

-y--

y-

,w a-e g-,,.rm,,.*mm-viyo-

--y, e veraw y---v um-w em mum--,..ry,---m<is r-y-mm

l SEABROOK STATION, UNITS 1 & 2 ATTACHMENT B SHEET 10F 30 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 to 4/2/82 ACTION ITEMS *AND RESOLUTION l

DATE:

3/30/82 ITEM ISSUE REQUIRED ACTION RESOLUTION 1

Response to RAI 220.13.

In describing the applicability of damping Resolved based on discussion.

Damping values used in values of R.G. 1.61 to the Seabrook design, Revised response to be submitted by seismic analysis.

UE&C will provide a discussion of the de-April 19, 1982.

sign philosophy wherein a design without excessive conservatism results in stress levels compatable with the given damping values.

Action by R.H. Toland and N.C'.

Karanjia.

2 Response to RAI 220.21.

UE&C will show for the containment struc-Open.

UE6C will provide an assessment of The current technical ture and a typical building that structural the impact for ' accidental torsion' based position of the NRC staff stresses are still acceptable for this con-on 5% cecentricity in the design of the requires the consideration dition.

containment structure and a typical of ' accidental torsion' in Action by Structural discipline, K.M.

Category I structure.

the design of structures.

Kalawadia and D.K. Ghosh, with input from Due to NRC by May 3, 1982.

1 Structural Analysis Group.

l 3

Response to RAI 220.20.

The response should note that soil varia-Resolved based on discussion.

Justification of Il0% peak bility is not a parameter here since Sea-Revised response to be submitted by spreading.

brook is a rock site.

Since soil is the April 19, 1982.

j principal source of variability in seismic response, the 110% peak spreading is justified.

Action by N.C. Karanjia.

l l

l l

. ~ -.,. -

I i

i SEABROOK STATION, UNITS 1 & 2 ATTACHMENT B i

SHEET 2 OF 10 i

4 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 - 4/2/82

{

l ACTION ITEMS AND RESOLUTION DATE: 3/30/82 (Con't.)

ITEM ISSUE REQUIRED ACTION RESOLUTION t

4 Response to Rdl 220.18.

The UE&C response should note the compatibil-Resolved. Revised response will show the Meeting the intent of R.G.

ity of its method to the intent of the Reg, comparison of results obtained using fre-1.122 frequency incre-Guide.

quencies from two different documented l

ments in calculating Action by N.C. Karanjia.

tables. Due to NRC by April 19, 1982.

i floor response spectra.

i 1

5 Response to RAI 220.29.

Clarification of load combination which Resolved. Revised response to be submitted J

Load combinations for controls the design.

by April 19, 1982.

[

l equipment hatch and Action by Mechanical Analysis Group.

l personnel locks.

i l

f 6

Response to RAl 220.30.

Clarification of load combination which Resolved. Revised response to be~ submitted j

Stress limits for equip-controls the design.

by April 19, 1982.

I ment hatch and Action by Hechanical Analysis Group.

}

personnel locks.

i 4

7 Response to RAI 220.26.

UE&C will clarify its response especially Resolved. Revised response to be submitted

+

j Effect of temperature with regards to the ASME provisions for by April 19, 1982.

j gradient across the wall rebar strain.

on containment struc-Action by R.H. Toland.

I tural design.

I 1

t i

~.. = _.. _. -._._ _

. - ~.

i SEABROOK STATION, UNITS I & 2 ATTACHMENT B SHEET 3 OF 10 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 - 4/2/82 ACTION ITEMS AND RESOLUTION 4

i DATE: 3/31/82 ITEM ISSUE REQUIRED ACTION RESOLUTION t

l 1

Response of RAI 220.11.

UE&C will clarify the issue and terminology Open.

Revised response consistent with Clarification of termino 1-as required.

the present industry design practice to ogy; Disagreement on Action by Bob Boritz, Al Hulshizer and be submitted by Ray 3, 1982.

basic physical phenomenon.

R.H. Toland 2

Response to RAI 220.37.

UE&C will give an overview of ultimate Open.

UE&C to submit the ultimate con-Ultimate Containment capacity of concrete containment on 4/2/82 tainment capacity study for the membrane Capacity Study.

and a date when study could be completed.

region by July 1, 1982.

Action by R.H. Toland and D.K. Chosh.

3 a) Overturning analysis of UE&C will provide this information.

Resolved. Supporting documents to be i

the. primary auxiliary submitted by April 19, 1982.

b1dg. giving the sum-mary of the final calculation b) A generic statement Action taken by Structural discipline that the approach taken with input from Structural Analysis by UE&C in Seabrook is Croup.

conservative.

c) A supporting study for this approach.

l 4

Tornado missile protection. UE6C will provide a copy of calculation Calculation to be submitted by April 19, l

pages showing 12"4 steel pipe, 13 "f utility -

1982, pole & automobile missiles including the forcing function.

Action by R.H. Toland.

i l

i

SEABROOK STATION, UNITS 1 & 2 ATTACUMENT B SUEET 4 0F 10 NRC STRUCTURAL DESICN AUDIT, 3/29/82 - 4/2/82 ACTION ITDtS AND RESOLUTION DATE: 3/31/82 (Cont't.)

ITDI ISSUE REQUIRED ACTION RESOLUTION 5

NRC requires responses to UE&C will provide responses by Friday, Open. UE&C's response to question Nos. a),

the following questions 4/2/82.

b) and c) was provided for NRC's review with respect to cable Action by R.F. Perry and E. Skolnick.

on 4/2/82. Total response to all questions a) through d) due to NRC by May 19, 1982, tray analysis:

a) Why is static load /

deflection test suita-ble for the dynamic case?

b) Show that cable integ-rity is maintained when tray is deformed to proportional load limit +1/3 (ultimate load limit - propor-tional load limit).

c) What is load criteria for for connection of hor-izontal strut to verti-cal strut, with cable tray placed on horizontal strut.

d) How is differential displacement between consecutive supports accounted for?

m.

l SEABROOK STATION, UNITS 1 & 2 ATTACliMENT B i

SHEET 5 OF 10 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 - 4/2/82 l

ACTION ITEMS AND RESOLUTION a

DATE: 3/31/82 (Con't.)

ITEM ISSUE REQUIRED ACTION RESOLUTION 6

Calculation of Anchor UE&C will provide this Anchor Plate Item closed based on presented j

Plates.

calculation.

calculation.

j Action by Structural Discipline.

A. Hulshizer i

i 1

7 Rebar details, forces and UE&C will provide such information.

Typical design data for mechanical moments due to pressure.

Action by D.K."Chosh.

loads and the resulting stresses /

temperature and earthquake strains in rebars and concrete for two sections of the (as discussed on 4/2/82) to be l

containment-one'in membrane submitted by April 19, 1982.

area, and one at wall base junction.

+

t 8

Effect of Switch Cear UE6C will provide the calculation.

Item closed based on presented documents.

Building (Non-Category 1)

Action by Structural Discipline.

i on the Control Building (Catetory I). Show how seismic / wind loads were calculated including con-sideration of the dynamic nature of the load.

F l

i l

[

f i

-=..

r I

i I

SEABROOK STATION, UNITS 1 & 2 ATTACHMENT B i

SHEET 6 0F 10

~

NRC STRUCTURAL DESIGN AUDIT. 3/29/82 to 4/2/82 ACTION ITEMS AND RESOLUTION _

k DATE: 4/1/82 a

RESOLUTION REQUIRED ACTION I ITEM ISSUE Open. Response (being consistent with l

1 Clarify the criteria for UE&C will provide such criteria.

actual work perforced and identifying

)

rigid and non-rigid walls Action by Structural Discipline.

all the non-rigid walls) to be submitted i

subjected to static and by May 3, 1982.

dynamic lateral earth pressures.

f i

Open. Response to be submitted by 2

Justify why wave other UE&C will provide this information.

May 3, 1982.

than shear wave is not Action by N.C. Karanjia.

considered in calcu-1' lating soil strain.

i Item closed based on discussion and 3

Discuss the seismic UE&C to discuss.

presented documents.

instrumentation and basis Action by G. Cupta of I & C Discipline.

for its location; also identify operator's notification.

Item resolved based on presented 4

Confirm the value of UE&C to provide such information.

documents. For the purpose of dynamic soil pressure used Action by D. Patel, confirmation, calculation to be submitted in conformance with the by April 19, 1982.

parameters given in RAI 220.16. Acceptance of this I

parameter will be done by Geotechnical Branch of NRC.

l i

l 1

.. _. - ~

-.~.-

SEABROOK STATION, UNITS 1 & 2 ATTACHMENT R i

SilEET 7 0F 10 j

NRC STRUCTURAL DESIGN AUDIT 3/29/82 to 4/2/82 i

ACTION ITEMS AND RESOLUTION 1

l DATE: 4/1/82 (Con't.)

i ITEM ISSUE REQUIRED ACTION RESOLUTION l

5 Response to RAI 220.36 UE&C to submit.

Item resolved based on discussion.

will be submitted as dis-Action by N.C. Karanjia.

Response to be submitted by April 19, cussed (add effects of

1982, i

filtering of time-history motion through structures).

)

6 Revise response to RAI UE&C to revise.

Resolved. Refer to Item _#4, dated 220.18 as discussed.

Action by N.C.'Karanjia.

3/30/82.

Show comparison of results obtained using frequencies i

from two different i

documented tables.

[

l 1 I

+

7 7

Revise response to RAI Structural Discipline to revise.

Resolved. Revised response to be lc 220.9 as discussed.

Action by D.K. Chosh.

submitted by April 19, 1982.

i 0

i-j'!

8 Res'ponse to RAI 220.14 UE&C to submit.

Open.

Response as discussed to be and 220.15 to be sub-submitted by April 19, 1982.

mitted.

,,,s

\\ k

\\

d 1

n i

4 9

Re ise response to RAI UE&C to revise.

Resolved. Revised response to be submitted 22C.17 as discussed, (give Action by N.C. Karanjia.

by May 3, 1982 reference to Whitman's paper).

Y n,

n.

_. -- - -.~...-_

i

~

1 SEABROOK STATION, UNITS 1 & 2 ATTACHMENT B SilEET 8 0F 10 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 to 4/2/82 ACTION ITEMS AND RESOLUTION f

DATE: 4/1/82 (Con't.)

t I

ITEH ISSUE REQUIRED ACTION RESOLUTION

[

t I

10 Response to RAI 220.24 UE&C to re-submit.

Item resolved. Response will include an

[

]

not adequate. Re-submit.

Action by Mechanical Analysis Group, additional sentence, " Conservatism in I

j combining modal responses is equal to or l

greater than that recommended in Regulatory Guide 1.92."

Due to NCR by April 19, 1982.

11 Needs the discussion >f UE6C to revise.

Resolved. Discussion will be provided amplification of input Action by N.C. Karanjia.

in the revised response. Due to NRC by motion with respect to thy 3, 1982.

RAI 220.25.

I 1

o 12 NRC will send revised Action by NRC.

Open. NRC to provide YAEC with the revised position on RAI 220.35.

position. Due to YAEC by April 19, 1982.

13 Discussed the status of response to the following i

RAI's:

220.6 N/A Resolved based on submitted response.

220.7 N/A Resolved based on submitted response.

l 220.8 Correct typographical error from " radio" Resolved. Corrected response to be to " radial" submitted by April 19, 1982.

220.10 N/A Resolved based on submitted response.

I 220.12 N/A Resolved based on submitted response.

l

$EABR007 STATIONi_ UNITS 1 & 2 A1 TAC 11 MENT B

~

S11EET 9 OF 10 NRC STRUCTURAL DEh!CN ' AUDIT, 3/29/82 to 4/2/82 ACTION ITE'S AND RESOLUTION M

DATE: _4/1/8E (Coc*t.)

/

\\

.i ITEM f_SSUE REpUIRED ACiIdN

'NESOLUTION

/

13 (Continued)

~

220.22 Refer to Item #3, dated 3/31/82.

220.23 N/A Resolved based on submitted response.

220.28 N/A Resolved based on submitted response.

220.31 N/A Resolved based on submitted response.

220.32 UE6C to submit the results of a detailed Open.

Due to NRC by July 30, 1982.

review of ACI-318 versus ACI-349.

220.33 N/A Resolved based on submitted response.

14 Clarify response to UE&C to explain.

Open.

Clarified the ASME Code position RAI 220.27.

Action by B.B. Scott.

regarding the use of prepackaged grout and epoxies. Revised response to be submitted by April 19, 1982. NRC will be advised of the progress of the issue.

SEABROOK STATION, UNITS 1 & 2 ATTAC!! MENT B SilEET 10 0F 10 NRC STRUCTURAL DESIGN AUDIT, 3/29/82 to 4/2/82 j

j ACTION ITEMS AND RESOLUTION i

DATE: 4/2/82 (Con' t.)

i ITEM ISSUE REQUIRED ACTION RESOLUTION j

1 Provide the NRC with the UE&C to submit required information.

Item 1(b) closed based on presented following information re-Action by E.P. Rothong, R.F. Perry response. Response to all other garding the design of and E. Skolnick.

questions to be submitted by April 19, 1982 cable tray:

See also Item #5, dated 3/31/82.

a) Technical basis for treating the trays as Open.

non-safety related structural elements.

b) Confirm that these Closed.

2 trays were erected to the QA requirements of 1

Appendix B to Part 50.

j c) Provide any available Open.

test data which would I

further assure the structural integrity and functionality of the 1

trays when subjected to SSE and other applicable loads.

d) Check IEEE 344 applica-

Open, ble provision which may require additional bases for establishing non-safety related structural elements.

..._