ML19209B629: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML19209B629
| number = ML19209B629
| issue date = 08/15/1979
| issue date = 08/15/1979
| title = Auxiliary Sys Operating Procedure 1106-6,Revision 13, Emergency Feed.
| title = Auxiliary Sys Operating Procedure 1106-6,Revision 13, Emergency Feed
| author name =  
| author name =  
| author affiliation = METROPOLITAN EDISON CO.
| author affiliation = METROPOLITAN EDISON CO.
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:i 0-0
{{#Wiki_filter:i 0-0 Revision 13 08/15/79 THREE MILE ISLAND NUCLEAR STATION AUXILIARY SYSTEMS OPERATING PROCEDURES PORC C AR V AN essaceNCY ese0 Table of Effective Pages U.N ~~ 1 Pace Date Revision Pace Date Revision Page Date R evision 1.0 03/07/77 9
            -                                                                                                  Revision 13 08/15/79 THREE MILE ISLAND NUCLEAR STATION AUXILIARY SYSTEMS OPERATING PROCEDURES essaceNCY ese0 PORC C AR V AN Table of Effective Pages                         U.N ~~ 1 Pace         Date         Revision           Pace     Date         Revision             Page       Date       R evision 1.0       03/07/77           9             26.0                                       51.0 2.0       07/12/79         12               27.0                                       52.0 3.0       07/12/79         12               28.0                                       53.0 4.0       07/23/75           7             29.0                                       54.0 5.0       07/12/79         12               30.0                                       55.0 6.0       08/15/79         13               31.0                                       56.0 7.0       08/15/79         13               32.0                                       57.0 8.0       08/15/79         13               33.0                                       58.0 9.0       07/12/79         12               34.0                                       59.0 10.0         07/12/79         12               35.0                                       60.0 11.0         07/12/79         12               36.0                                       61.0 12.0         03/07/77           9             37.0                                       62.0 13.0         07/12/79         12               38.0                                       63.0 14.0         03/07/77           9             39.0                                       64.0 15.0         07/12/79         12               40.0                                       65.0 16.0         03/07/77           9             41.0                                       66.0 17.0         08/15/79         13               42.0                                       67.0 18.0                                             43.0                                       68.0 19.0                                             44.0                                       69.0 20.0           -                                45.0                                       70.0 21.0                                             46.0                                       71.0 22.0                                             47.0                                       72.0 23.0                                             48.0                                       73.0 24.0                                             49.0                                       74.0 25.0                                             50.0                                       75.0 Unit 1 Staff Recomme d Approval                                   Unit 2 Staff Recomm nd Approval Approval                                   Date Approval                     T           Date Cognfzant dept. Head                                         Cognizarit Dedt. Head Unit 1 PORC Recommends Approval                                   Unit 2 PORC Recqmmandy Approval
26.0 51.0 2.0 07/12/79 12 27.0 52.0 3.0 07/12/79 12 28.0 53.0 4.0 07/23/75 7
              /       /       M3-               Date b/                                           /             Date
29.0 54.0 5.0 07/12/79 12 30.0 55.0 6.0 08/15/79 13 31.0 56.0 7.0 08/15/79 13 32.0 57.0 8.0 08/15/79 13 33.0 58.0 9.0 07/12/79 12 34.0 59.0 10.0 07/12/79 12 35.0 60.0 11.0 07/12/79 12 36.0 61.0 12.0 03/07/77 9
              ~y' Chairman of PORC                                               Chairman of PORC Unit 1 Superihtendent Approval                                     Unit 2 Su;;erintendent Approval
37.0 62.0 13.0 07/12/79 12 38.0 63.0 14.0 03/07/77 9
  /
39.0 64.0 15.0 07/12/79 12 40.0 65.0 16.0 03/07/77 9
Date     /I YM                              %/
41.0 66.0 17.0 08/15/79 13 42.0 67.0 18.0 43.0 68.0 19.0 44.0 69.0 20.0 45.0 70.0 21.0 46.0 71.0 22.0 47.0 72.0 23.0 48.0 73.0 24.0 49.0 74.0 25.0 50.0 75.0 Unit 1 Staff Recomme d Approval Unit 2 Staff Recomm nd Approval Approval Date Approval T
                                                                                                          ~
Date Cognfzant dept. Head Cognizarit Dedt. Head Unit 1 PORC Recommends Approval Unit 2 PORC Recqmmandy Approval
Date Manager Gereration Quality Assurance Approval                                             b             Date 79, o , ou a 5~/                                   >>
/
/
M3-Date b/
/
Date
~ ' Chairman of PORC Chairman of PORC y
Unit 1 Superihtendent Approval Unit 2 Su;;erintendent Approval YM
%/
~
Date Date
/I
/
Manager Gereration Quality Assurance Approval b
Date 79, o, ou a 5~/
p - s>
p - s>
lit         U66
lit U66


1106-6 Revision 9 03/07/77 THREE fille ISLAND NUCLEAR STATION AUXILIARY SYSTEMS OPERATING PROCEDURES Emergency Feed Table of Contents 6.1   Rt 2rences 6.1.1 System Descriptions 6.1.2 Drawings 6.1.3 Manufacturers Instru: tion Manuals 6.1.4 Applicable Operating Procedures                                   -
1106-6 Revision 9 03/07/77 THREE fille ISLAND NUCLEAR STATION AUXILIARY SYSTEMS OPERATING PROCEDURES Emergency Feed Table of Contents 6.1 Rt 2rences 6.1.1 System Descriptions 6.1.2 Drawings 6.1.3 Manufacturers Instru: tion Manuals 6.1.4 Applicable Operating Procedures 6.2 Limitations and Precautions 6.2.1 Equipment 6.2.2 Administrative 6.3 Operating Procedures 6.3.1 Emergency Standby 5.4 Fill 1A OTSG with Emergency Feed Pumps 6.6 Fill IB OTSG with Emergency Feed Pumps 6.6 Enclosures 6.6.1 Emergency Standby Valve Checklist, Enclosure I 6.6.2 1 A OTSG Fill with EFP's Valve Checklist 6.6.3 1B OTSG Fill with EFP's Valve Checklist i
6.2   Limitations and Precautions 6.2.1 Equipment 6.2.2 Administrative 6.3   Operating Procedures 6.3.1 Emergency Standby 5.4   Fill 1A OTSG with Emergency Feed Pumps                         '
i 1.0 112:
6.6   Fill IB OTSG with Emergency Feed Pumps 6.6   Enclosures 6.6.1 Emergency Standby Valve Checklist, Enclosure I 6.6.2 1 A OTSG Fill with EFP's Valve Checklist 6.6.3 1B OTSG Fill with EFP's Valve Checklist i
087
i 1.0 112: 087


1106-6 Revision 12 07/12/79
1106-6 Revision 12 07/12/79


==6.1     REFERENCES==
==6.1 REFERENCES==
 
6.1.1 System Descriotions 6.1.1.1 Emergency Feed Pumps & Drives Volume I, Section C, Chapter 8 6.1.1.2 Feedwater System Volume I, Section C, Chapter 6 6.1.2 Drawinas 6.1.2.1 Main Steam GAI-302-011 6.1.2.2 Feedwater GAI-302-081 6.1.2.3 Nuclear Service Closed Cycle Cooling Water GAI-302-610 6.1.3
6.1.1   System Descriotions 6.1.1.1 Emergency Feed Pumps & Drives Volume I, Section C, Chapter 8 6.1.1.2 Feedwater System Volume I, Section C, Chapter 6 6.1.2   Drawinas 6.1.2.1 Main Steam GAI-302-011 6.1.2.2 Feedwater GAI-302-081 6.1.2.3 Nuclear Service Closed Cycle Cooling Water GAI-302-610 6.1.3   _ Manufacturers Instruction Manual 6.1.3.1 Bailey Instruction Manual on I.C.S.
_ Manufacturers Instruction Manual 6.1.3.1 Bailey Instruction Manual on I.C.S.
6.1.3.2 Worthington Manual on Pumps and Steam Turbine 6.1.3.3 Westinghouse Motors 6.1.4   Acolicable ODeratino Procedures 6.1.4.1 0.P. 1202-26 Loss of Steam Generator Feed 6.1.4.2 0.P. 1203-5 Feed System Abnonnal Operation 6.2     LIMITATIONS AND PRECAUTTONS 6.2.1   Ecuioment 6.2.1.1 To prevent damage to pumps, insure that each pump recirculation path is lined up when system is in emergency standby.
6.1.3.2 Worthington Manual on Pumps and Steam Turbine 6.1.3.3 Westinghouse Motors 6.1.4 Acolicable ODeratino Procedures 6.1.4.1 0.P. 1202-26 Loss of Steam Generator Feed 6.1.4.2 0.P. 1203-5 Feed System Abnonnal Operation 6.2 LIMITATIONS AND PRECAUTTONS 6.2.1 Ecuioment 6.2.1.1 To prevent damage to pumps, insure that each pump recirculation path is lined up when system is in emergency standby.
6.2.1.2 EF-V4 and EF-V5 (River Water to EFP Suction isolation valve) will be opened only when all other sources of water have been exhausted.
6.2.1.2 EF-V4 and EF-V5 (River Water to EFP Suction isolation valve) will be opened only when all other sources of water have been exhausted.
NOTE:   Prior to opening EF-V4 and EF-V5 (from CC), one (1) of the R.B.
NOTE:
Emergency Cooling Pumps must be running to satisfy interlock in valve opening CKT. Also EF-V4 and 5 are locked closed at valve, and breakers are locked open at 480 V. Control Center ICESV.
Prior to opening EF-V4 and EF-V5 (from CC), one (1) of the R.B.
Emergency Cooling Pumps must be running to satisfy interlock in valve opening CKT. Also EF-V4 and 5 are locked closed at valve, and breakers are locked open at 480 V.
Control Center ICESV.
2.
2.
1123 088
1123 088


1106-6 Revision 12 07/12/79 6.2.1.3 When returning system to standby after maintenance or extended shutdown, thoroughly vent each pump.
1106-6 Revision 12 07/12/79 6.2.1.3 When returning system to standby after maintenance or extended shutdown, thoroughly vent each pump.
6.2.1.4 Oil should always be visible in the glass bottle on the constant level oilers on the pumps.
6.2.1.4 Oil should always be visible in the glass bottle on the constant level oilers on the pumps.
6.2.2   Administrative 6.2.2.1 The emergency feed pu'.'s will not be used to replace a main feed pump for normal operation.
6.2.2 Administrative 6.2.2.1 The emergency feed pu'.'s will not be used to replace a main feed pump for normal operation.
6.2.2.2 During plant start-up, place the emergency feed pump turbine auto-start switch in NORMAL per OP 1102-2, Plant Heatup with the RCS at hot shutdown conditions.
6.2.2.2 During plant start-up, place the emergency feed pump turbine auto-start switch in NORMAL per OP 1102-2, Plant Heatup with the RCS at hot shutdown conditions.
6.2.2.3 During plant shutdown, place the emergency feed pump turbine auto-start switch in DEFEAT prior to removing the second main feed pump from service per OP 1102-10, Plant Shutdown.
6.2.2.3 During plant shutdown, place the emergency feed pump turbine auto-start switch in DEFEAT prior to removing the second main feed pump from service per OP 1102-10, Plant Shutdown.
6.2.2.4   Insure emergency trip for EF-U-1 is reset for standby operation.
6.2.2.4 Insure emergency trip for EF-U-1 is reset for standby operation.
6.2.2.5 During startup, before the primary coolant temperature exceeds 250 F as indicated on RCSA/B-TI-1, the turbine driven emergency feedwater pump (EF-P1) and both motor driven emergency feedwater pump's (EF-P2A & 23) shall be operable per Tech. Specs.
6.2.2.5 During startup, before the primary coolant temperature exceeds 250 F as indicated on RCSA/B-TI-1, the turbine driven emergency feedwater pump (EF-P1) and both motor driven emergency feedwater pump's (EF-P2A & 23) shall be operable per Tech. Specs.
6.2.2.6 Any component in 6.2.2.5 above may be removed from service for a.
6.2.2.6 Any component in 6.2.2.5 above may be removed from service for a.
period not to exceed 48 hours.                 If this period exceeded, the unit will be placed in the cold shutdown condition, per OP 1102-10, Plant Shutdown, and OP 1102-11, Plant Cooldown, within 12 hours per Tech. Specs.
period not to exceed 48 hours.
6.3     OPERATING PROCEDURE 6.3.1   Emercency Standby 3.0 O
If this period exceeded, the unit will be placed in the cold shutdown condition, per OP 1102-10, Plant Shutdown, and OP 1102-11, Plant Cooldown, within 12 hours per Tech. Specs.
6.3 OPERATING PROCEDURE 6.3.1 Emercency Standby 3.0 O


o-
o-Revision 7 07/23/76 The following procedure outlines the steps necessary for placing the emergency feed system in an emergency standby condition.
-  -                                                                        Revision 7 07/23/76 The following procedure outlines the steps necessary for placing the emergency feed system in an emergency standby condition.
6.3.1.1 Prerequisites (Indicate satisfactory completion of steps below by initiaiing at each step and sign name at end of procedure section).
6.3.1.1 Prerequisites (Indicate satisfactory completion of steps below by initiaiing at each step and sign name at end of procedure section).
: 1. Verify instrument air system lined up for normal operation per OP 1104-25 and air available to system valves and controls.
1.
: 2. The flormal and Emergency Electrical Systems lined up for normal operation per OP 1107-1 and 1107-2 respectively.
Verify instrument air system lined up for normal operation per OP 1104-25 and air available to system valves and controls.
: 3. On console 'CL' and 'CC' in the control room, place the C/S for EF-P2 A & B in PULL-TO-LOCK.
2.
fl0TE:   Each pump has two (2) control switches.
The flormal and Emergency Electrical Systems lined up for normal operation per OP 1107-1 and 1107-2 respectively.
: 4. Control power (125VDC) is available at the switch gear for breaker cor. trol. Pt'L 1E SW #9 and Pt1L 1F SW #9 for 4160V Buses 10 and 1E respectively.
3.
: 5. On the 4160 volt engineered safeguard bus 1D, place the breakers for EF-P2A and B in the racked-in position.
On console 'CL' and 'CC' in the control room, place the C/S for EF-P2 A & B in PULL-TO-LOCK.
: 6. On the 4160 volt engineered safeguard bus IE, place the breaker for EF-P2A and B in the racked-in position.
fl0TE:
: 7. On the following 480 V control centers, insure that the designated equipment manual breakers are closed.
Each pump has two (2) control switches.
: a. lA E.S.;   EF-V1A at Bkr. 2B EF-V2A at Bkr. 2D
4.
: b. 1B E.S.; EF-V1B at Bkr. 150 EF-V2B at Bkr. 15E 4.0 1123 190
Control power (125VDC) is available at the switch gear for breaker cor. trol.
Pt'L 1E SW #9 and Pt1L 1F SW #9 for 4160V Buses 10 and 1E respectively.
5.
On the 4160 volt engineered safeguard bus 1D, place the breakers for EF-P2A and B in the racked-in position.
6.
On the 4160 volt engineered safeguard bus IE, place the breaker for EF-P2A and B in the racked-in position.
7.
On the following 480 V control centers, insure that the designated equipment manual breakers are closed.
a.
lA E.S.;
EF-V1A at Bkr. 2B EF-V2A at Bkr. 2D b.
1B E.S.;
EF-V1B at Bkr. 150 EF-V2B at Bkr. 15E 4.0 1123 190


1106-6 Rev'sion 12 07/12/79
1106-6 Rev'sion 12 07/12/79 c.
: c. 1C E.S.V.;MS-V2A at Bkr. SD MS-V2B at Bkr. 10C
1C E.S.V.;MS-V2A at Bkr. SD MS-V2B at Bkr. 10C 8.
: 8. On the 250/125VDC distribution system, close the following switches.
On the 250/125VDC distribution system, close the following switches.
Dist.     pnl.     SW#                 Equip.
Dist.
250VDC     1C       1                   MS-V10A 250VDC     1D       1                   MS-V108 125VDC     1E       3 (to XCC cab.)     PS-V13A (fuse) 125VDC     1F       3 (to XCL cat- )     MS-V13B (fuse)
pnl.
: 9. At 480 V control center IC-ESV, place the CKT breakers for EF-V4 and S in the "lockeJ 09en" position.
SW#
: 10. Align system valves per 6.4, Enclosure I.
Equip.
: 11. Verify that the condensate system is lined up, per OP 1106-2, to provide water to emergency feed pump suction header.
250VDC 1C 1
: 12. Steam Driven Emergency Feed Pump (EF U 1) Trip Reset.
MS-V10A 250VDC 1D 1
MS-V108 125VDC 1E 3 (to XCC cab.)
PS-V13A (fuse) 125VDC 1F 3 (to XCL cat- )
MS-V13B (fuse) 9.
At 480 V control center IC-ESV, place the CKT breakers for EF-V4 and S in the "lockeJ 09en" position.
10.
Align system valves per 6.4, Enclosure I.
11.
Verify that the condensate system is lined up, per OP 1106-2, to provide water to emergency feed pump suction header.
12.
Steam Driven Emergency Feed Pump (EF U 1) Trip Reset.
6.3.1.2 Procedure (Indicate satisfactory completion of steps below by initialing at each step and sign name at end of procedure section).
6.3.1.2 Procedure (Indicate satisfactory completion of steps below by initialing at each step and sign name at end of procedure section).
: 1. During Plant Startup per OP 1102-2 with the RCS at hot shutdown place the emergency feed pump turbine AUTO-START DEFEAT switch on console 'CC' to the NORMAL position and accomplish steps 2 and 3 below.
1.
: 2. On console CL, place C/S for EF-P2A-D in the Normal - After Stop and EF-P2B-D in Pull-to-lock.
During Plant Startup per OP 1102-2 with the RCS at hot shutdown place the emergency feed pump turbine AUTO-START DEFEAT switch on console 'CC' to the NORMAL position and accomplish steps 2 and 3 below.
: 3. On console 'CC' place C/S for EF-P2A-E in Pull-to-Lock and EF-P23-E in Normal - After - Stop.
2.
On console CL, place C/S for EF-P2A-D in the Normal - After Stop and EF-P2B-D in Pull-to-lock.
3.
On console 'CC' place C/S for EF-P2A-E in Pull-to-Lock and EF-P23-E in Normal - After - Stop.
The system is now lined up for Emergency Standby.
The system is now lined up for Emergency Standby.
1123 091 5.0
1123 091 5.0


1106-6 Revisfon 13 08/15/79 6.4 Fill 1 A OTSG with Emergency Feed Pumps NOTE:       Only for use when normal feedwater supply is no. availabla during Cold Shutdown Conditions.
1106-6 Revisfon 13 08/15/79 6.4 Fill 1 A OTSG with Emergency Feed Pumps NOTE:
Only for use when normal feedwater supply is no. availabla during Cold Shutdown Conditions.


====6.4.1 Prerequisites====
====6.4.1 Prerequisites====
: 1. Nitrogen truck lined up to secondary plant.
1.
: 2. lA or 1B OTSG's are not on sample recire.
Nitrogen truck lined up to secondary plant.
6.4.2       Procedure for A OTSG
2.
: 1. Complete valve line up per Enclosure II.
lA or 1B OTSG's are not on sample recire.
: 2. Open EF-V-2A and EF-V-28.
6.4.2 Procedure for A OTSG 1.
: 3. Start EF-P-2A or EF-P-2B open MS-V-71A and 71B.
Complete valve line up per Enclosure II.
: 4. Control fill rate with EF-V-30A.
2.
NOTE:     See Section 6.6.4
Open EF-V-2A and EF-V-28.
: 5. Secure EF-P-2A or EF-P-23 when lA OTSG level is 416" (or lower level if required) and close EF-V 'iOA. To fill above 416" refer to OP 1106-16,
3.
: 6. Close MS-V-71A and 71B and open MS-V-75A and 758.
Start EF-P-2A or EF-P-2B open MS-V-71A and 71B.
: 7. Establish nitrogen pressure on lA OTSG by 1106-16.
4.
: 8. Place 1A OTSG on sample recirc per OP 1106-16.
Control fill rate with EF-V-30A.
: 9. Close EF-V-2A and EF-V-23.
NOTE:
                                                                        /
See Section 6.6.4 5.
Secure EF-P-2A or EF-P-23 when lA OTSG level is 416" (or lower level if required) and close EF-V 'iOA.
To fill above 416" refer to OP 1106-16, 6.
Close MS-V-71A and 71B and open MS-V-75A and 758.
7.
Establish nitrogen pressure on lA OTSG by 1106-16.
8.
Place 1A OTSG on sample recirc per OP 1106-16.
9.
Close EF-V-2A and EF-V-23.
/
6.5 Fill IB OTSG's with Emergency Feed Pumps.
6.5 Fill IB OTSG's with Emergency Feed Pumps.
NOTE:       Only for use when normal feedwater supply is not available during Cold Shutdown Conditions.
NOTE:
6.5.1       P- requisites:
Only for use when normal feedwater supply is not available during Cold Shutdown Conditions.
: 1. Nitrogen truck lined up to sec. plant.
6.5.1 P-requisites:
: 2. lA or IB OTSG's are not on sample recirc.
1.
6.5.2       Procedure for B OTSG
Nitrogen truck lined up to sec. plant.
: 1. Complete valve line up as per Enclosure III.
2.
lA or IB OTSG's are not on sample recirc.
6.5.2 Procedure for B OTSG 1.
Complete valve line up as per Enclosure III.
5o 112: 192
5o 112: 192


1106-6 Revision 13 08/15/79
1106-6 Revision 13 08/15/79 2.
: 2. Open EF-V-2B and EF-V-2A.
Open EF-V-2B and EF-V-2A.
: 3. Start EF-P-2B or EF-P-2A. Open MS-V-71C and 710.
3.
: 4. Control fill rate with EF-V-303.
Start EF-P-2B or EF-P-2A.
f NOTE:     See Section 6.6.4.
Open MS-V-71C and 710.
4.
Control fill rate with EF-V-303.
f NOTE:
See Section 6.6.4.
5.
5.
Secure EF-F-2B or EF-P-2A when IB OTSG level is 416" (or lower level if required) and close EF-V-30B. To fill above 416" refer to OP 1106-16.
Secure EF-F-2B or EF-P-2A when IB OTSG level is 416" (or lower level if required) and close EF-V-30B.
: 6. Close MS-V-71C and 710 and open MS-V75C and 750.
To fill above 416" refer to OP 1106-16.
: 7. Establish nitrogen pressure on 1B OTSG by OP 1106-16.
6.
: 8. Place IB OTSG on sample recirc per OP 1106-16.
Close MS-V-71C and 710 and open MS-V75C and 750.
: 9. Close EF-V-2A and EF-V-28.
7.
7.0 112     093
Establish nitrogen pressure on 1B OTSG by OP 1106-16.
8.
Place IB OTSG on sample recirc per OP 1106-16.
9.
Close EF-V-2A and EF-V-28.
7.0 112 093


0$[flg13 ENCLOSURE I 6.6.1       Startuo Valve Checklist A - Control Room Valve No.             Descriotion                                     Position     Initial MS-V-2A               Steam dump Hdr. A Isolation                   Open MS-V-2B               Steam dump Hdr. B Isolation                   Open MS-V-6                 EFP1 Steam Regulator                   Locked Open MS-V-10A               Steam supply to EF-U1                         Closed MS-V-13A               MS-V-10A Startup Bypass                         Closed MS-V-10B               Steam supply to EF-U1                           Closed MS-V-6                 EF-P-1 Steam Regulator       Handwheel Locked Open MS-V-13B               MS-V-10B Startup bypass                         Closed EF-V-1A               Suction Hdr'. Sectional Isolation             Open EF-V-18               Suction Hdr. Sectional Isolation               Open EF-V-2A                 Discharge Hdr. Sectional Isolation             Open E F-V- 2B               Discharge Hdr. Sectional Isolation             Open EF-V-4                 Emergency River Water Supply to Suction       Locked Closed EF-V-5                 Emergency River Water Supply to Suction       Locked Closed       ___
0$[flg13 ENCLOSURE I 6.6.1 Startuo Valve Checklist A - Control Room Valve No.
EF-V-30A               Emergency feed C.V. to S.G.A.                 Auto Verify Emergency feed pumps are off and have CR0 stroke valve from the Control Room to assure it properly and smoothly strokes.
Descriotion Position Initial MS-V-2A Steam dump Hdr. A Isolation Open MS-V-2B Steam dump Hdr. B Isolation Open MS-V-6 EFP1 Steam Regulator Locked Open MS-V-10A Steam supply to EF-U1 Closed MS-V-13A MS-V-10A Startup Bypass Closed MS-V-10B Steam supply to EF-U1 Closed MS-V-6 EF-P-1 Steam Regulator Handwheel Locked Open MS-V-13B MS-V-10B Startup bypass Closed EF-V-1A Suction Hdr'. Sectional Isolation Open EF-V-18 Suction Hdr. Sectional Isolation Open EF-V-2A Discharge Hdr. Sectional Isolation Open E F-V-2B Discharge Hdr. Sectional Isolation Open EF-V-4 Emergency River Water Supply to Suction Locked Closed EF-V-5 Emergency River Water Supply to Suction Locked Closed EF-V-30A Emergency feed C.V. to S.G.A.
EF-V- 30B               Emergency feed C.V. to S.G.B.                 Auto Verify Emergency feed pumps are off and have CR0 stroke valve from the Control Room to assure it properly and smoothly strokes.
Auto Verify Emergency feed pumps are off and have CR0 stroke valve from the Control Room to assure it properly and smoothly strokes.
CO-V-10A               Condensate Tk. A Isolation                     Open         ,
EF-V-30B Emergency feed C.V. to S.G.B.
CO-V- 10B               Condensate Tk. B Isolation                     Open E F- V-45 A             Sensing Line Root for EF-V-15A                 Open EF-V-453               Sensing Line Root for EF-V-15B                 Open 8.0                       q. ,
Auto Verify Emergency feed pumps are off and have CR0 stroke valve from the Control Room to assure it properly and smoothly strokes.
(,,. a qq4
CO-V-10A Condensate Tk. A Isolation Open CO-V-10B Condensate Tk. B Isolation Open E F-V-45 A Sensing Line Root for EF-V-15A Open EF-V-453 Sensing Line Root for EF-V-15B Open 8.0
                                                                                    'J J
: q.,
qq4
(,,. a
'J J


  "                                                                        1106-6 Revision 12 1 - Intermediate Bldg.
1106-6 Revision 12 1 - Intermediate Bldg.
Vi e No.             Descriction                               Position   Initial EF-V8B           EF-P-1 Min. Flow Recirc.                       Auto V28A         Vent on Suction of EF-P-1                       Closed V288         Vent on Discharge of EF-P-1                     Closed V22           EF-P-1 Recire. Isolation               Locked Open V-31         EF-P-1 Brg. Cooling Water Outlet               Open VISA         EF-P-1 Brg. Cooling Supply Reg.                 Auto V15B         EF-P-1 Brg. Cooling Supply Reg.               Auto V1015         PT 65 Root                                     Open V1016         PT 65 Isolation                               Open V1017       PT 65 Drain                                     Closed V6           E.F.-P1 Suction Isolation               Locked Open V1005       F.E. 78 High side root                         Open
Vi e No.
      ,V1006         F.E. 78 Low side root                           Open V1007       F~   78 Valve Manifold H.P. Isolation         Open L.P. Isolation         Open Equalizer               Closed Drain                   Closed V1008         FS-78 High side drain                           Closed V1009         FS-78 Low side drain                           Closed V1020         P1 69 Root                                     Open V23           EF-P-2A Suction Hdr. drain                     Closed V24           EF-P-1 Suction Hdr. Drain                       Closed EF-V-14         Emergency River line Flushing                   Closed V1000         FE-77 High side root                           Open V-1001       FE-77 Low side root                             Open 9.0 1123 095
Descriction Position Initial EF-V8B EF-P-1 Min. Flow Recirc.
Auto V28A Vent on Suction of EF-P-1 Closed V288 Vent on Discharge of EF-P-1 Closed V22 EF-P-1 Recire. Isolation Locked Open V-31 EF-P-1 Brg. Cooling Water Outlet Open VISA EF-P-1 Brg. Cooling Supply Reg.
Auto V15B EF-P-1 Brg. Cooling Supply Reg.
Auto V1015 PT 65 Root Open V1016 PT 65 Isolation Open V1017 PT 65 Drain Closed V6 E.F.-P1 Suction Isolation Locked Open V1005 F.E. 78 High side root Open
,V1006 F.E. 78 Low side root Open V1007 F~
78 Valve Manifold H.P. Isolation Open L.P. Isolation Open Equalizer Closed Drain Closed V1008 FS-78 High side drain Closed V1009 FS-78 Low side drain Closed V1020 P1 69 Root Open V23 EF-P-2A Suction Hdr. drain Closed V24 EF-P-1 Suction Hdr. Drain Closed EF-V-14 Emergency River line Flushing Closed V1000 FE-77 High side root Open V-1001 FE-77 Low side root Open 9.0 1123 095


1106-6 Revision 12 B - Intennediate Bldg. (Cont.)
1106-6 Revision 12 B - Intennediate Bldg. (Cont.)
Valve No.     Descriotion                                     Position Initial V1002       FS-77 Valve Manifold High side Isolation       Open Low side Isolation       Open Equalizer                 Closed Drain                     Closed V1003       FS-77 High side drain                           Closed V1004       FS-77 Low side drain                           Closed       __
Valve No.
V40         EF-P1 Bearing cooling vent                     Closed V41         EF-P2A/2B Bearing cooling Vent                 Closed V42A       EF-P2A Suction Vent                             Closed V16A       EF-P2A Suction                           Locked Open '
Descriotion Position Initial V1002 FS-77 Valve Manifold High side Isolation Open Low side Isolation Open Equalizer Closed Drain Closed V1003 FS-77 High side drain Closed V1004 FS-77 Low side drain Closed V40 EF-P1 Bearing cooling vent Closed V41 EF-P2A/2B Bearing cooling Vent Closed V42A EF-P2A Suction Vent Closed V16A EF-P2A Suction Locked Open '
V1021       P1 70 Root valve                               Open V1022       PT 71 Root                                     Open
V1021 P1 70 Root valve Open V1022 PT 71 Root Open
        ,V1023       PT 71 Isolation                                 Open V1024       PT 71 Drain                                     Closed V36A       EF-P-2A Brg. Cool Isol.                         Open V38A       Bearing cooler inlet                           Open V8A         Min. flow recirt.                               Auto V10A       EF-P-2A disch. valve                     Locked Open V25A       EF-P-2A vent                                   Closed V20A       EF-P-2A Recire. Isol.                   Locked Open EF-V25         EF-P-2B Suction Hdr. drain                     Closed V27A       Drain disch. Mdr.                               Closed V44         OTSG "B" Feed line vent                         Closed V1028       P1 476 root                                     Open 112: 096
,V1023 PT 71 Isolation Open V1024 PT 71 Drain Closed V36A EF-P-2A Brg. Cool Isol.
Open V38A Bearing cooler inlet Open V8A Min. flow recirt.
Auto V10A EF-P-2A disch. valve Locked Open V25A EF-P-2A vent Closed V20A EF-P-2A Recire. Isol.
Locked Open EF-V25 EF-P-2B Suction Hdr. drain Closed V27A Drain disch. Mdr.
Closed V44 OTSG "B" Feed line vent Closed V1028 P1 476 root Open 112:
096


  -    -                                                                          1106-6 Revision 12 07/12/79 B-Intermediate Eldg. (Cont.)
1106-6 Revision 12 07/12/79 B-Intermediate Eldg. (Cont.)
Valve No.     Description                                         Position   Initial V1029       P1 477 Root                                         Open V29         Drain Disch. Hdr.                                   Closed V27B       Drain Disch. Hdr.                                   Closed V1018       Px 67 test valve                                   Closed V26B       EF-P-2B Disch. Hdr. Vent                           Closed V10B       EF-P-2B Disch. Isolation                   Locked Open                 l V38B       EF-P-2B bearing cooling water inlet                 Open V36B       EF-P-2B bearing cooling water outlet               Open V-8C       EF-P-25 Minimum flow recire.                       Auto V1025       PT 72 root valve                                   Open V1026       PT 72 Isolation                     -
Valve No.
Open V1027       PT 72 drain                                   -
Description Position Initial V1029 P1 477 Root Open V29 Drain Disch. Hdr.
Closed V208       EF-P-2B recirc. line isolation                 Lock Open V16B       EF-P-2B Suction isolation                   Locked Open               '
Closed V27B Drain Disch. Hdr.
I V42B       EF-P-2B Suction Hdr. Vent                           Closed V17         E.F.P.'s Recire. line drain                         Closed V18         E.F.P. 's Recirc. line vent                         Closed V43A       A #eed Hdr. to S.G.A. vent (In Reactor Bldg.)       Closed V43B       A feed Hdr. to S.G.B. vent (In Reactor Bldg.)       Closed C0-V176       Feed pumps recirc. to CO-T-1B Isol.         Locked Open EF-V47         Supply to EF-Pl seal cool. wtr. vv. EF-V46A/B       Open V46A       EF-P1 inboard seal cooling water                   Open V46B       EF-P1 outboard "      "      "
Closed V1018 Px 67 test valve Closed V26B EF-P-2B Disch. Hdr. Vent Closed V10B EF-P-2B Disch. Isolation Locked Open l
Open             _
V38B EF-P-2B bearing cooling water inlet Open V36B EF-P-2B bearing cooling water outlet Open V-8C EF-P-25 Minimum flow recire.
V49         Supply to EF-P2A seal cool . wtr. a. EF-V48A/B     Ooen V48A       EF-P2A inboard seal cooling water                   Open V488       EF-P2A outboard "        "      "
Auto V1025 PT 72 root valve Open V1026 PT 72 Isolation Open V1027 PT 72 drain Closed V208 EF-P-2B recirc. line isolation Lock Open V16B EF-P-2B Suction isolation Locked Open I
Open 11.0                 }}2[     ')97
V42B EF-P-2B Suction Hdr. Vent Closed V17 E.F.P.'s Recire. line drain Closed V18 E.F.P. 's Recirc. line vent Closed V43A A #eed Hdr. to S.G.A. vent (In Reactor Bldg.)
Closed V43B A feed Hdr. to S.G.B. vent (In Reactor Bldg.)
Closed C0-V176 Feed pumps recirc. to CO-T-1B Isol.
Locked Open EF-V47 Supply to EF-Pl seal cool. wtr. vv. EF-V46A/B Open V46A EF-P1 inboard seal cooling water Open V46B EF-P1 outboard "
Open V49 Supply to EF-P2A seal cool. wtr. a. EF-V48A/B Ooen V48A EF-P2A inboard seal cooling water Open V488 EF-P2A outboard "
Open 11.0
}}2[
')97


1106-6 Revision 9 03/07/77 B-Intermediate Bldg. (Cont.)
1106-6 Revision 9 03/07/77 B-Intermediate Bldg. (Cont.)
Valve No.       Descriotion                                     Position Initial V51         Supply to EF-P2B seal cool . wtr. vv. EF-V50A/B Open V50A         EF-P2B inboard seal cooling water               Open V50B         EF-P2B Outboard "              "
Valve No.
Open EF-V1010     FE-79 High Side Root Valve                       Open EF-V10ll     FE-79 Lo Side Root Valve                         Open EF-V1012     FS-79 Manifold - Drain                           Closed H.P. Isolation                               Open L.P. Isolation                               Open Equalizer                                   Close EF-V1013     FS-79 Hi Side Drain                             Close EF-V1014     FS-79 Lo Side Drain                             Close EF-V1019     PX-68 Test Valve             ,
Descriotion Position Initial V51 Supply to EF-P2B seal cool. wtr. vv. EF-V50A/B Open V50A EF-P2B inboard seal cooling water Open V50B EF-P2B Outboard "
Close VALVE CHECKLIST COMPLETE Performed By Signature                             Date Reviewed By SR0 or R0 License Signature                         Date 12.0 llE 098
Open EF-V1010 FE-79 High Side Root Valve Open EF-V10ll FE-79 Lo Side Root Valve Open EF-V1012 FS-79 Manifold - Drain Closed H.P. Isolation Open L.P. Isolation Open Equalizer Close EF-V1013 FS-79 Hi Side Drain Close EF-V1014 FS-79 Lo Side Drain Close EF-V1019 PX-68 Test Valve Close VALVE CHECKLIST COMPLETE Performed By Signature Date Reviewed By SR0 or R0 License Signature Date 12.0 llE 098


1106-6 Revision 12 07/12/79 ENCLOSURE II 6.6.2     1A OTSG Fill with CFP's Valve Checklist Valve No.               Description                 Position       Initial SD-V-14A                                           Close SD-V-87A                                           Close FW-V-78A                                           Close FW-V-79A                                           Close         __
1106-6 Revision 12 07/12/79 ENCLOSURE II 6.6.2 1A OTSG Fill with CFP's Valve Checklist Valve No.
FW-V - 3 Close FW-V-81A                                           Close FW-V-82A                                           Cicse FW-V-83A                                           Close EF-V-16A                                   Locked Open EF-V-16B                                   Locked Open EF-V-10A                                   Locked Open                       i EF-V-10B                                   Locked Open EF-V-20A                                           Open EF-V-20B                                           Open C0-V-176                                           Open CO-V-10A                                           Open C0-V-10B                                           Open MS-V-25A                                           Close MS-V-25B                                           Close MS-V-70A                                           Open
Description Position Initial SD-V-14A Close SD-V-87A Close FW-V-78A Close FW-V-79A Close FW-V -
    .MS-V-708                                           Open MS-V-75A Close MS-V-75B Close 13.0               1123 099
Close 3
:                                                                        Revision 3 03/07/77 EllCLOSURE II (con't) 6.6.2     1A OTSG Fill with EFP's Valve Checklist Valve flo.               Descriotion                     Position         Initial     ,
FW-V-81A Close FW-V-82A Cicse FW-V-83A Close EF-V-16A Locked Open EF-V-16B Locked Open EF-V-10A Locked Open i
MS-V-71A                                                 Close                         !
EF-V-10B Locked Open EF-V-20A Open EF-V-20B Open C0-V-176 Open CO-V-10A Open C0-V-10B Open MS-V-25A Close MS-V-25B Close MS-V-70A Open
I MS-V-71B                                                 Close                       {
.MS-V-708 Open MS-V-75A Close MS-V-75B Close 13.0 1123 099
i Valve Checklist Complete                                 i 1
 
Performed By                                       Date                             !
Revision 3 03/07/77 EllCLOSURE II (con't) 6.6.2 1A OTSG Fill with EFP's Valve Checklist Valve flo.
Signautra                                                       l Reviewed By SR0 or R0 License                                       Date Signature t
Descriotion Position Initial MS-V-71A Close I
MS-V-71B Close
{
i Valve Checklist Complete i
1 Performed By Date Signautra l
Reviewed By SR0 or R0 License Date Signature t
h I
h I
I 14.0 ll23     !00
I 14.0 ll23
..:. ,. .~ -. . .w         e.,.m.,nn :g...mmen. ;my..,
!00
..:.,..~ -...w e.,.m.,nn :g...mmen. ;my..,


1106-6 Revision 12 ENCLOSURE III 6.E.3     ,lB OTSG Fill with EFP's Valve Checklist Valve No.                 Description                   Position Initial SD-V-148                                                   Close SD-V-87B                                                   Close FW-V-788                                                   Close FW-V-799                                                   Close FW-V-803                                                   Close FW-V-81B                                                 Close FW-V-82B                                                 Close FW-V-83B                                                 Close EF-V-16A                                           Locked Open EF-V-168                                           Locked Open EF-V-10A                                           Locked Open EF-V-10B                                           Locked Open EF-V-20A                                                   Open EF-V-208                                                   Open C0-V-176                                                   Open C0-V-10A                                                   Open C0-V-10B                                                   Open MS-V-25A                                                   Close MS-V-258                                                   Close MS-V-70C                                                   Open MS-V-700                                                   Open MS-V-75C Close MS-V-75D Close 15.0
1106-6 Revision 12 ENCLOSURE III 6.E.3
,lB OTSG Fill with EFP's Valve Checklist Valve No.
Description Position Initial SD-V-148 Close SD-V-87B Close FW-V-788 Close FW-V-799 Close FW-V-803 Close FW-V-81B Close FW-V-82B Close FW-V-83B Close EF-V-16A Locked Open EF-V-168 Locked Open EF-V-10A Locked Open EF-V-10B Locked Open EF-V-20A Open EF-V-208 Open C0-V-176 Open C0-V-10A Open C0-V-10B Open MS-V-25A Close MS-V-258 Close MS-V-70C Open MS-V-700 Open MS-V-75C Close MS-V-75D Close 15.0


0-0 Revision 9 03/07/77 ENCLOSURE III (cont't) 6.6.3       IB OTSG Fill with EFP's Valve Checklist Valve No.                   Description                       Position     Initial MS-V-71C                             -
0-0 Revision 9 03/07/77 ENCLOSURE III (cont't) 6.6.3 IB OTSG Fill with EFP's Valve Checklist Valve No.
Close MS-V-710                                                                     '
Description Position Initial MS-V-71C Close MS-V-710 Close l
Close                       !
t Valve Checklist Complete
l, t
~~~ ~~ Performed By Date i
Valve Checklist Complete                                     '
Signature Reviewed By SR0 l
  ~~~ ~~ Performed By                                           Date                               i Signature Reviewed By SR0                                                                         l or R0 License                                         Date Signature
or R0 License Date Signature 16.0 1123
* 16.0 1123 !02
!02
                                                        . . . ~ .
... ~.


  -                                                                1106-6
1106-6 Revision 13 08/15/79 6.6.4 Placing EF-V-30A/B from Auto to Manual and Manual to Auto.
-                                                                  Revision 13 08/15/79 6.6.4 Placing EF-V-30A/B from Auto to Manual and Manual to Auto.
Auto To Manual 1.
Auto To Manual
Turn handwheel to align holes.
: 1. Turn handwheel to align holes.
2.
: 2. Insert pin.
Insert pin.
: 3. Position Auto-Manual switch to manual located on controller box.
3.
4   Open equalizing valve located on outside of diaphram.
Position Auto-Manual switch to manual located on controller box.
: 5. Position valve as needed with handwheel.
4 Open equalizing valve located on outside of diaphram.
Manual To Auto Shut equalizi.y
5.
: 1.                    ,_..;.
Position valve as needed with handwheel.
: 2. Position Auto-Manual Switc5 to Auto.
Manual To Auto 1.
: 3. Remove Pin from hole.
Shut equalizi.y 2.
: 4. Position pointer on valve stem to align with neutral position marked on valve body by use of handwheel.
Position Auto-Manual Switc5 to Auto.
17.0 112J     '03}}
3.
Remove Pin from hole.
4.
Position pointer on valve stem to align with neutral position marked on valve body by use of handwheel.
17.0 112J
'03}}

Latest revision as of 22:49, 4 January 2025

Auxiliary Sys Operating Procedure 1106-6,Revision 13, Emergency Feed
ML19209B629
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/15/1979
From:
METROPOLITAN EDISON CO.
To:
References
1106-6, NUDOCS 7910100251
Download: ML19209B629 (18)


Text

i 0-0 Revision 13 08/15/79 THREE MILE ISLAND NUCLEAR STATION AUXILIARY SYSTEMS OPERATING PROCEDURES PORC C AR V AN essaceNCY ese0 Table of Effective Pages U.N ~~ 1 Pace Date Revision Pace Date Revision Page Date R evision 1.0 03/07/77 9

26.0 51.0 2.0 07/12/79 12 27.0 52.0 3.0 07/12/79 12 28.0 53.0 4.0 07/23/75 7

29.0 54.0 5.0 07/12/79 12 30.0 55.0 6.0 08/15/79 13 31.0 56.0 7.0 08/15/79 13 32.0 57.0 8.0 08/15/79 13 33.0 58.0 9.0 07/12/79 12 34.0 59.0 10.0 07/12/79 12 35.0 60.0 11.0 07/12/79 12 36.0 61.0 12.0 03/07/77 9

37.0 62.0 13.0 07/12/79 12 38.0 63.0 14.0 03/07/77 9

39.0 64.0 15.0 07/12/79 12 40.0 65.0 16.0 03/07/77 9

41.0 66.0 17.0 08/15/79 13 42.0 67.0 18.0 43.0 68.0 19.0 44.0 69.0 20.0 45.0 70.0 21.0 46.0 71.0 22.0 47.0 72.0 23.0 48.0 73.0 24.0 49.0 74.0 25.0 50.0 75.0 Unit 1 Staff Recomme d Approval Unit 2 Staff Recomm nd Approval Approval Date Approval T

Date Cognfzant dept. Head Cognizarit Dedt. Head Unit 1 PORC Recommends Approval Unit 2 PORC Recqmmandy Approval

/

/

M3-Date b/

/

Date

~ ' Chairman of PORC Chairman of PORC y

Unit 1 Superihtendent Approval Unit 2 Su;;erintendent Approval YM

%/

~

Date Date

/I

/

Manager Gereration Quality Assurance Approval b

Date 79, o, ou a 5~/

p - s>

lit U66

1106-6 Revision 9 03/07/77 THREE fille ISLAND NUCLEAR STATION AUXILIARY SYSTEMS OPERATING PROCEDURES Emergency Feed Table of Contents 6.1 Rt 2rences 6.1.1 System Descriptions 6.1.2 Drawings 6.1.3 Manufacturers Instru: tion Manuals 6.1.4 Applicable Operating Procedures 6.2 Limitations and Precautions 6.2.1 Equipment 6.2.2 Administrative 6.3 Operating Procedures 6.3.1 Emergency Standby 5.4 Fill 1A OTSG with Emergency Feed Pumps 6.6 Fill IB OTSG with Emergency Feed Pumps 6.6 Enclosures 6.6.1 Emergency Standby Valve Checklist, Enclosure I 6.6.2 1 A OTSG Fill with EFP's Valve Checklist 6.6.3 1B OTSG Fill with EFP's Valve Checklist i

i 1.0 112:

087

1106-6 Revision 12 07/12/79

6.1 REFERENCES

6.1.1 System Descriotions 6.1.1.1 Emergency Feed Pumps & Drives Volume I, Section C, Chapter 8 6.1.1.2 Feedwater System Volume I, Section C, Chapter 6 6.1.2 Drawinas 6.1.2.1 Main Steam GAI-302-011 6.1.2.2 Feedwater GAI-302-081 6.1.2.3 Nuclear Service Closed Cycle Cooling Water GAI-302-610 6.1.3

_ Manufacturers Instruction Manual 6.1.3.1 Bailey Instruction Manual on I.C.S.

6.1.3.2 Worthington Manual on Pumps and Steam Turbine 6.1.3.3 Westinghouse Motors 6.1.4 Acolicable ODeratino Procedures 6.1.4.1 0.P. 1202-26 Loss of Steam Generator Feed 6.1.4.2 0.P. 1203-5 Feed System Abnonnal Operation 6.2 LIMITATIONS AND PRECAUTTONS 6.2.1 Ecuioment 6.2.1.1 To prevent damage to pumps, insure that each pump recirculation path is lined up when system is in emergency standby.

6.2.1.2 EF-V4 and EF-V5 (River Water to EFP Suction isolation valve) will be opened only when all other sources of water have been exhausted.

NOTE:

Prior to opening EF-V4 and EF-V5 (from CC), one (1) of the R.B.

Emergency Cooling Pumps must be running to satisfy interlock in valve opening CKT. Also EF-V4 and 5 are locked closed at valve, and breakers are locked open at 480 V.

Control Center ICESV.

2.

1123 088

1106-6 Revision 12 07/12/79 6.2.1.3 When returning system to standby after maintenance or extended shutdown, thoroughly vent each pump.

6.2.1.4 Oil should always be visible in the glass bottle on the constant level oilers on the pumps.

6.2.2 Administrative 6.2.2.1 The emergency feed pu'.'s will not be used to replace a main feed pump for normal operation.

6.2.2.2 During plant start-up, place the emergency feed pump turbine auto-start switch in NORMAL per OP 1102-2, Plant Heatup with the RCS at hot shutdown conditions.

6.2.2.3 During plant shutdown, place the emergency feed pump turbine auto-start switch in DEFEAT prior to removing the second main feed pump from service per OP 1102-10, Plant Shutdown.

6.2.2.4 Insure emergency trip for EF-U-1 is reset for standby operation.

6.2.2.5 During startup, before the primary coolant temperature exceeds 250 F as indicated on RCSA/B-TI-1, the turbine driven emergency feedwater pump (EF-P1) and both motor driven emergency feedwater pump's (EF-P2A & 23) shall be operable per Tech. Specs.

6.2.2.6 Any component in 6.2.2.5 above may be removed from service for a.

period not to exceed 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

If this period exceeded, the unit will be placed in the cold shutdown condition, per OP 1102-10, Plant Shutdown, and OP 1102-11, Plant Cooldown, within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> per Tech. Specs.

6.3 OPERATING PROCEDURE 6.3.1 Emercency Standby 3.0 O

o-Revision 7 07/23/76 The following procedure outlines the steps necessary for placing the emergency feed system in an emergency standby condition.

6.3.1.1 Prerequisites (Indicate satisfactory completion of steps below by initiaiing at each step and sign name at end of procedure section).

1.

Verify instrument air system lined up for normal operation per OP 1104-25 and air available to system valves and controls.

2.

The flormal and Emergency Electrical Systems lined up for normal operation per OP 1107-1 and 1107-2 respectively.

3.

On console 'CL' and 'CC' in the control room, place the C/S for EF-P2 A & B in PULL-TO-LOCK.

fl0TE:

Each pump has two (2) control switches.

4.

Control power (125VDC) is available at the switch gear for breaker cor. trol.

Pt'L 1E SW #9 and Pt1L 1F SW #9 for 4160V Buses 10 and 1E respectively.

5.

On the 4160 volt engineered safeguard bus 1D, place the breakers for EF-P2A and B in the racked-in position.

6.

On the 4160 volt engineered safeguard bus IE, place the breaker for EF-P2A and B in the racked-in position.

7.

On the following 480 V control centers, insure that the designated equipment manual breakers are closed.

a.

lA E.S.;

EF-V1A at Bkr. 2B EF-V2A at Bkr. 2D b.

1B E.S.;

EF-V1B at Bkr. 150 EF-V2B at Bkr. 15E 4.0 1123 190

1106-6 Rev'sion 12 07/12/79 c.

1C E.S.V.;MS-V2A at Bkr. SD MS-V2B at Bkr. 10C 8.

On the 250/125VDC distribution system, close the following switches.

Dist.

pnl.

SW#

Equip.

250VDC 1C 1

MS-V10A 250VDC 1D 1

MS-V108 125VDC 1E 3 (to XCC cab.)

PS-V13A (fuse) 125VDC 1F 3 (to XCL cat- )

MS-V13B (fuse) 9.

At 480 V control center IC-ESV, place the CKT breakers for EF-V4 and S in the "lockeJ 09en" position.

10.

Align system valves per 6.4, Enclosure I.

11.

Verify that the condensate system is lined up, per OP 1106-2, to provide water to emergency feed pump suction header.

12.

Steam Driven Emergency Feed Pump (EF U 1) Trip Reset.

6.3.1.2 Procedure (Indicate satisfactory completion of steps below by initialing at each step and sign name at end of procedure section).

1.

During Plant Startup per OP 1102-2 with the RCS at hot shutdown place the emergency feed pump turbine AUTO-START DEFEAT switch on console 'CC' to the NORMAL position and accomplish steps 2 and 3 below.

2.

On console CL, place C/S for EF-P2A-D in the Normal - After Stop and EF-P2B-D in Pull-to-lock.

3.

On console 'CC' place C/S for EF-P2A-E in Pull-to-Lock and EF-P23-E in Normal - After - Stop.

The system is now lined up for Emergency Standby.

1123 091 5.0

1106-6 Revisfon 13 08/15/79 6.4 Fill 1 A OTSG with Emergency Feed Pumps NOTE:

Only for use when normal feedwater supply is no. availabla during Cold Shutdown Conditions.

6.4.1 Prerequisites

1.

Nitrogen truck lined up to secondary plant.

2.

lA or 1B OTSG's are not on sample recire.

6.4.2 Procedure for A OTSG 1.

Complete valve line up per Enclosure II.

2.

Open EF-V-2A and EF-V-28.

3.

Start EF-P-2A or EF-P-2B open MS-V-71A and 71B.

4.

Control fill rate with EF-V-30A.

NOTE:

See Section 6.6.4 5.

Secure EF-P-2A or EF-P-23 when lA OTSG level is 416" (or lower level if required) and close EF-V 'iOA.

To fill above 416" refer to OP 1106-16, 6.

Close MS-V-71A and 71B and open MS-V-75A and 758.

7.

Establish nitrogen pressure on lA OTSG by 1106-16.

8.

Place 1A OTSG on sample recirc per OP 1106-16.

9.

Close EF-V-2A and EF-V-23.

/

6.5 Fill IB OTSG's with Emergency Feed Pumps.

NOTE:

Only for use when normal feedwater supply is not available during Cold Shutdown Conditions.

6.5.1 P-requisites:

1.

Nitrogen truck lined up to sec. plant.

2.

lA or IB OTSG's are not on sample recirc.

6.5.2 Procedure for B OTSG 1.

Complete valve line up as per Enclosure III.

5o 112: 192

1106-6 Revision 13 08/15/79 2.

Open EF-V-2B and EF-V-2A.

3.

Start EF-P-2B or EF-P-2A.

Open MS-V-71C and 710.

4.

Control fill rate with EF-V-303.

f NOTE:

See Section 6.6.4.

5.

Secure EF-F-2B or EF-P-2A when IB OTSG level is 416" (or lower level if required) and close EF-V-30B.

To fill above 416" refer to OP 1106-16.

6.

Close MS-V-71C and 710 and open MS-V75C and 750.

7.

Establish nitrogen pressure on 1B OTSG by OP 1106-16.

8.

Place IB OTSG on sample recirc per OP 1106-16.

9.

Close EF-V-2A and EF-V-28.

7.0 112 093

0$[flg13 ENCLOSURE I 6.6.1 Startuo Valve Checklist A - Control Room Valve No.

Descriotion Position Initial MS-V-2A Steam dump Hdr. A Isolation Open MS-V-2B Steam dump Hdr. B Isolation Open MS-V-6 EFP1 Steam Regulator Locked Open MS-V-10A Steam supply to EF-U1 Closed MS-V-13A MS-V-10A Startup Bypass Closed MS-V-10B Steam supply to EF-U1 Closed MS-V-6 EF-P-1 Steam Regulator Handwheel Locked Open MS-V-13B MS-V-10B Startup bypass Closed EF-V-1A Suction Hdr'. Sectional Isolation Open EF-V-18 Suction Hdr. Sectional Isolation Open EF-V-2A Discharge Hdr. Sectional Isolation Open E F-V-2B Discharge Hdr. Sectional Isolation Open EF-V-4 Emergency River Water Supply to Suction Locked Closed EF-V-5 Emergency River Water Supply to Suction Locked Closed EF-V-30A Emergency feed C.V. to S.G.A.

Auto Verify Emergency feed pumps are off and have CR0 stroke valve from the Control Room to assure it properly and smoothly strokes.

EF-V-30B Emergency feed C.V. to S.G.B.

Auto Verify Emergency feed pumps are off and have CR0 stroke valve from the Control Room to assure it properly and smoothly strokes.

CO-V-10A Condensate Tk. A Isolation Open CO-V-10B Condensate Tk. B Isolation Open E F-V-45 A Sensing Line Root for EF-V-15A Open EF-V-453 Sensing Line Root for EF-V-15B Open 8.0

q.,

qq4

(,,. a

'J J

1106-6 Revision 12 1 - Intermediate Bldg.

Vi e No.

Descriction Position Initial EF-V8B EF-P-1 Min. Flow Recirc.

Auto V28A Vent on Suction of EF-P-1 Closed V288 Vent on Discharge of EF-P-1 Closed V22 EF-P-1 Recire. Isolation Locked Open V-31 EF-P-1 Brg. Cooling Water Outlet Open VISA EF-P-1 Brg. Cooling Supply Reg.

Auto V15B EF-P-1 Brg. Cooling Supply Reg.

Auto V1015 PT 65 Root Open V1016 PT 65 Isolation Open V1017 PT 65 Drain Closed V6 E.F.-P1 Suction Isolation Locked Open V1005 F.E. 78 High side root Open

,V1006 F.E. 78 Low side root Open V1007 F~

78 Valve Manifold H.P. Isolation Open L.P. Isolation Open Equalizer Closed Drain Closed V1008 FS-78 High side drain Closed V1009 FS-78 Low side drain Closed V1020 P1 69 Root Open V23 EF-P-2A Suction Hdr. drain Closed V24 EF-P-1 Suction Hdr. Drain Closed EF-V-14 Emergency River line Flushing Closed V1000 FE-77 High side root Open V-1001 FE-77 Low side root Open 9.0 1123 095

1106-6 Revision 12 B - Intennediate Bldg. (Cont.)

Valve No.

Descriotion Position Initial V1002 FS-77 Valve Manifold High side Isolation Open Low side Isolation Open Equalizer Closed Drain Closed V1003 FS-77 High side drain Closed V1004 FS-77 Low side drain Closed V40 EF-P1 Bearing cooling vent Closed V41 EF-P2A/2B Bearing cooling Vent Closed V42A EF-P2A Suction Vent Closed V16A EF-P2A Suction Locked Open '

V1021 P1 70 Root valve Open V1022 PT 71 Root Open

,V1023 PT 71 Isolation Open V1024 PT 71 Drain Closed V36A EF-P-2A Brg. Cool Isol.

Open V38A Bearing cooler inlet Open V8A Min. flow recirt.

Auto V10A EF-P-2A disch. valve Locked Open V25A EF-P-2A vent Closed V20A EF-P-2A Recire. Isol.

Locked Open EF-V25 EF-P-2B Suction Hdr. drain Closed V27A Drain disch. Mdr.

Closed V44 OTSG "B" Feed line vent Closed V1028 P1 476 root Open 112:

096

1106-6 Revision 12 07/12/79 B-Intermediate Eldg. (Cont.)

Valve No.

Description Position Initial V1029 P1 477 Root Open V29 Drain Disch. Hdr.

Closed V27B Drain Disch. Hdr.

Closed V1018 Px 67 test valve Closed V26B EF-P-2B Disch. Hdr. Vent Closed V10B EF-P-2B Disch. Isolation Locked Open l

V38B EF-P-2B bearing cooling water inlet Open V36B EF-P-2B bearing cooling water outlet Open V-8C EF-P-25 Minimum flow recire.

Auto V1025 PT 72 root valve Open V1026 PT 72 Isolation Open V1027 PT 72 drain Closed V208 EF-P-2B recirc. line isolation Lock Open V16B EF-P-2B Suction isolation Locked Open I

V42B EF-P-2B Suction Hdr. Vent Closed V17 E.F.P.'s Recire. line drain Closed V18 E.F.P. 's Recirc. line vent Closed V43A A #eed Hdr. to S.G.A. vent (In Reactor Bldg.)

Closed V43B A feed Hdr. to S.G.B. vent (In Reactor Bldg.)

Closed C0-V176 Feed pumps recirc. to CO-T-1B Isol.

Locked Open EF-V47 Supply to EF-Pl seal cool. wtr. vv. EF-V46A/B Open V46A EF-P1 inboard seal cooling water Open V46B EF-P1 outboard "

Open V49 Supply to EF-P2A seal cool. wtr. a. EF-V48A/B Ooen V48A EF-P2A inboard seal cooling water Open V488 EF-P2A outboard "

Open 11.02[ ')97

1106-6 Revision 9 03/07/77 B-Intermediate Bldg. (Cont.) Valve No. Descriotion Position Initial V51 Supply to EF-P2B seal cool. wtr. vv. EF-V50A/B Open V50A EF-P2B inboard seal cooling water Open V50B EF-P2B Outboard " Open EF-V1010 FE-79 High Side Root Valve Open EF-V10ll FE-79 Lo Side Root Valve Open EF-V1012 FS-79 Manifold - Drain Closed H.P. Isolation Open L.P. Isolation Open Equalizer Close EF-V1013 FS-79 Hi Side Drain Close EF-V1014 FS-79 Lo Side Drain Close EF-V1019 PX-68 Test Valve Close VALVE CHECKLIST COMPLETE Performed By Signature Date Reviewed By SR0 or R0 License Signature Date 12.0 llE 098

1106-6 Revision 12 07/12/79 ENCLOSURE II 6.6.2 1A OTSG Fill with CFP's Valve Checklist Valve No. Description Position Initial SD-V-14A Close SD-V-87A Close FW-V-78A Close FW-V-79A Close FW-V - Close 3 FW-V-81A Close FW-V-82A Cicse FW-V-83A Close EF-V-16A Locked Open EF-V-16B Locked Open EF-V-10A Locked Open i EF-V-10B Locked Open EF-V-20A Open EF-V-20B Open C0-V-176 Open CO-V-10A Open C0-V-10B Open MS-V-25A Close MS-V-25B Close MS-V-70A Open .MS-V-708 Open MS-V-75A Close MS-V-75B Close 13.0 1123 099

Revision 3 03/07/77 EllCLOSURE II (con't) 6.6.2 1A OTSG Fill with EFP's Valve Checklist Valve flo. Descriotion Position Initial MS-V-71A Close I MS-V-71B Close { i Valve Checklist Complete i 1 Performed By Date Signautra l Reviewed By SR0 or R0 License Date Signature t h I I 14.0 ll23 !00 ..:.,..~ -...w e.,.m.,nn :g...mmen. ;my..,

1106-6 Revision 12 ENCLOSURE III 6.E.3 ,lB OTSG Fill with EFP's Valve Checklist Valve No. Description Position Initial SD-V-148 Close SD-V-87B Close FW-V-788 Close FW-V-799 Close FW-V-803 Close FW-V-81B Close FW-V-82B Close FW-V-83B Close EF-V-16A Locked Open EF-V-168 Locked Open EF-V-10A Locked Open EF-V-10B Locked Open EF-V-20A Open EF-V-208 Open C0-V-176 Open C0-V-10A Open C0-V-10B Open MS-V-25A Close MS-V-258 Close MS-V-70C Open MS-V-700 Open MS-V-75C Close MS-V-75D Close 15.0

0-0 Revision 9 03/07/77 ENCLOSURE III (cont't) 6.6.3 IB OTSG Fill with EFP's Valve Checklist Valve No. Description Position Initial MS-V-71C Close MS-V-710 Close l t Valve Checklist Complete ~~~ ~~ Performed By Date i Signature Reviewed By SR0 l or R0 License Date Signature 16.0 1123 !02 ... ~.

1106-6 Revision 13 08/15/79 6.6.4 Placing EF-V-30A/B from Auto to Manual and Manual to Auto. Auto To Manual 1. Turn handwheel to align holes. 2. Insert pin. 3. Position Auto-Manual switch to manual located on controller box. 4 Open equalizing valve located on outside of diaphram. 5. Position valve as needed with handwheel. Manual To Auto 1. Shut equalizi.y 2. Position Auto-Manual Switc5 to Auto. 3. Remove Pin from hole. 4. Position pointer on valve stem to align with neutral position marked on valve body by use of handwheel. 17.0 112J '03}}