ML20005G835: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[U-601586, Monthly Operating Rept for Dec 1989 for Clinton Power Station]]
| number = ML20005G835
| issue date = 12/31/1989
| title = Monthly Operating Rept for Dec 1989 for Clinton Power Station.W/900112 Ltr
| author name = Holtzscher D
| author affiliation = ILLINOIS POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000461
| license number =
| contact person =
| document report number = U-601586, NUDOCS 9001230171
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 5
}}
 
=Text=
{{#Wiki_filter:5-g.,      .-                                                            ,                ,
q-t3 '' ^1      . , , '4_    ;  *
                                                                  >              U                  '
[;e. , (. g ( n
                          ,                    t        4    '
A'                      ^
                                                                                                                .'y,601586'-                                  j
    +                  .
L30 90(01-12)-LP :                    1)
                                            ,                                        ,                          8E.100c' s                  ~lLLIN018 POWER 00MPANC        .
                                                                                                                                                        .i I
                                                                                ~
CLINTON POWER STATION, P.O. BOX 678. CLINTON, ILLINOIS 61727 1
i January- 12 1990                                                                      i
                                                                                                                                                            )
il
                                                                    -10CFR50.36 DocketLNo.-50 4'61 U(S.' Nuclear Regulatory Commission Document.. Control Desk-                                                                                                   . ".
Washington, D.C.        20555
 
==Subject:==
Clinton Power Station, Unit 1' December 1989 Monthly Operatine Report NPF-62                                                              '
 
==Dear Sir:==
                                        ~-Please find.in Attachment 1 the: Monthly Operating Report for Clinton Power. Station, Unit'1, for the; period ending December. 31,;1989.
I Sincerely yours,                                                                      '
b/                                                                                  .
..                                                                    D. L. Holtzscher                                                                    '
l-Acting Manager'-'                                                                    ,
Licensing and Safety 1
DAS/krm 1
Attachment ~
1 cc:      NRC Region III Regional Administrator-NRC Resident Office                                                                                                  l i
l l
e 9001230171 891231 PDR R
ADOCK 05000461 PDC                                                                  [    s g.
i
          >      - s. .
(
 
of'} T
      ^@ .-;j: ., . , . . .
  +-
s
: Pegs 1 of 4 '                              ;
                          ' * ~
                                                                                                                                    -Attachment 1'-                          .j
                                                                                                                                      .to U- 601586 -                            ,
t.
i h-
                                                                                                                                                                              ~$
  ?
                                              - CHALLENGES TO, MAIN STEAM SAFETY / RELIEF VALVES-
                                                                                                                                                                              ,i r
Month ~                      December 1989'                                                                  "s s
6 1
None:
l :.
L l-                                                                                                                                                                              >
L L
r,
                                                                                                                                                                                !i l
                                                                                                .                                                                          ~
 
. i                                                                                                        ,
t
[* .[-[ ;, ;; =. 3                                                                                            ;
    . . . <                                                                                                        c Paga 2 of .4        ';  .
                      *                                                            . Attachment 1              -l o                                                                                  to U401586 -                ,
AVERAGE DAILY UNIT' POWER LEVEL                                    '.
c.
s DbCKET NO. 50-461                        _
  ..J-                                                                UNIT Clinton 1 s
DATE 12/31/89'                                L COMPLETED BY  D. L. Holtzscher
~,
TELEPHONE (217) 935-8881'X3400                  ,
MONTH    December 1989 DAY AVERAGE DAILY POWER LEVEL-    ' DAY' AVERAGE DAILY. POWER LEVEL (MWe-Net)'                              (MWe Net)                                -
                        '1-      ' 5?;i_.                  17-              348                            -;
i, 2      574                    18              624 3      573                    19-              862                                  ,
4        573'                    20              925 5'      573                    21              928-                                  .
6-      57?                    22-              929' 7-      570                    23              031                          =;
8~      571~                    24              918 9-      565                    25~              929 10          571                    26.              932 11          421'                    27              929                                  s 12              0                    28              932                                >
13            0                      29              934 14            0                      30'              921                                ,
15            0                      31              933                                  m 1
16            0                                                                                1
                                                                                                              -I a-                  'wT-
 
                  ~ '
88 .  .'-' ,
d' Pags 3 of 4
                    -.-                                                                                        Attachment 1            i to U-601586-3m                                                    OPERATING DATA REPORT:
                                                                            -DOCKET-NO.'            50-461 i
L          <                                                                              UNIT Clinton l'                            ;
DATE 12/31/89'                              t COMPLETED BY "D. L. Holtzscher TELEPHONE ~ (217) 935-8881 X3400-                  .(
OPERATING STATUS L                      .
l                    . 1. REPORTING PERIOD:      December 1989 -GROSS: HOURS'_IN REPORTING PERIOD: 744
: 2. CURRENTLY AUTHORIZED POWER LEVEL'(MWt): 2894 -MAX.- DEPEND. CAPACITY (MDC)                            .l (MWe-Net):    930-    DESIGN ELECTRICAL RATINGi(MWe-Net): 222
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)J(MWe-Net): E2D.R 4.c    REASONS FOR RESTRICTION (IF ANY): ~N/A                                                                  ;
THIS MONTH YR TO'DATE CUMULATIVE 5.-    NUMBER OF HOURS REACTOR WAS CRITICAL...                          646.3      '4244.3  12.542.0
                    - 6.    .REACTGR RESERVE SHUTDOWN HOURS....,.,..                            0-            0          0
: 7. HOURS GENERATOR ON:LINE................                          625.6        3950.1  12.094.6
: 8. UNIT' RESERVE SHUTDOWN' HOURS............                          0              0          0
: 9. GROSS THERMAL ENERGY GENERATED (MWH).. 1.454.750                          _9.263.082 30.057.165
: 10. . GROSS ELECTRICAL ENERGY GENERATED.(MWH)- 481.-368                            3.051.305 9.928.364
: 11. NET ELECTRICAL ENERGY GENERITED (MWH)..                        457.171      2.861.904 9.406.749
: 12. REACTOR S ERVICE . FACTOR . . . . . . . . . . . . . . .. . , '    86.9%          48.5%        68.0%
: 13. REACTOR AVAILABILITY FACTOR............                              86.9%-        48.5%        68.0%
: 14. UNIT SERVICE FACTOR....................                          84.1%-        45.1%        65.6%
: 15. UNIT AVAILABILITY FACTOR...............                          84.1%          45.1%        65.6%
: 16. UNIT CAPACITY FACTOR (Using MDC).......                          66.1%          35.1%        54.8%
: 17. UNIT CAPACITY. FACTOR (Using Design MWe)                          65.9%          35.0%-      54.7%
: 18. UNIT FORCED OUTAGE RATE................                              0%        31.6%        16.2%
: 19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):                                ,
: 1. An outage is scheduled to begin on February 25, 1990 and last approximately 30 days. The purpose of this outage is to perform work activities which will support.or enhance operation through the summer peak and reduce the complexity, alleviate some of the risk, and reduce the duration of the second refueling outage at CPS.
: 20. IF SHUT ^DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST                              ACHIEVED INITIAL CRITICALITY                                                                    2/27/87 INITIAL ELECTRICITY (Synchronization).                                                  4/24/87 COMPLETION OF WARRANTY RUN                                                            10/09/87
 
:s          n
                                                                                                                                    * :. a ,;-
Pcg2 4 .of .4 ' '          ,
[    ]
Attaclunent 1 ,          .,
to U-601586        3                4 UNIT SHUTDOWNS AND-POWER REDUCTIONS-DOCKET NO. 50-461 UNIT Clinton'l~
DATE 12/31/89 COMPLETED BY  D. L. Holtzscher TELEPHONE (217) 935-8881 X3400 REPORT MONTH      December 1989 METHOD OF TYPE                                                      SHUTTING DOWN F: FORCED      DURATION                                  THE REACTOR OR -    CORRECTIVE ACTIONS:
NO. DATE    S: SCHEDULED (HOURS)    REASON (1)                      REDUCING POWER (2) /COriru:si5 10  891201  F                0      A:(Continued from November      4:(Continued from' November 1989) 1989). Reactor Recirculation    RR loop 'B' was isolated, reactor (RR) loop 'B' flow' control      power limited to capacity of a valve failure. Reactor          single.RR loop in operation.
power limited to capacity of a single RR loop in operation.
11  891211  S              118.4    B: Maintenance outage to:        1:RR flow was reduced and control repair.RR  'B'  flow control    rods were inserted.
valve (1) Reason A-Equipment Failure.(explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator Training & License' Examination, F-Administrative, G-Operational Error (explain),
H-Other (2) Method 1-Manual, 2-Manual Scram, 3-Auto Scram, 4-Continued
___E_-}}

Latest revision as of 07:43, 23 December 2024