ML20006C132: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:e                    .
{{#Wiki_filter:}}
m    .
r      4. -
L        New Hampshire-Senio      Pr ibniand
                                                                                                    . Chief operating Officer -
  ~
NYN-90028--
February 2, 1990 United States Nuclear. Regulatory Comission Washington, DC 20555 Attention:      Document Control Desk
 
==References:==
(a) Facility Operating Li,:ense,NPF-67, Docket No. 50-443                                                      ,
(b) PSNH Letter NYN-89156 dated December'1. 1989, " Revision F to New Hampshire Radiological Emergency Response Plan (NHRERP)", T.'O. Feigenbaum-to USNRC (c) PSNH Letter NYN-8915$ dated December l1, 1989, " Revision 1 to Seabrook Plan for. Massachusetts Communities-(SPMC)",
T. C. Feigenbaum to USNRC
 
==Subject:==
Analysis of Revision 3 Changes to the New Hampshire Radiological _
Emergency Response Plan and Revision 1 Changes'to the Seabrook Plan for Massachusetts Communities Gentlemen:
This letter responds to the Staff's oral request.that NHY submit an analysis of the Revision 3 changes to the New Hampshire-Radiological Emergency Response Plan (NHRERP) and in the Revision.1 changes to the Seabrook Plan for Massachusetts Communities-(SPMC).
The changes which are denoted by vertical change bars located on the left hand margin of the revised pages, were generated by the.following:
                      . The annual plan review.
                      . Drill comments from participants, controllers and= evaluators.
                      . Commitments made during and as a result of the ASLB proceedings.
                      . FEMA comments provided as-a result of' technical assistance visits, plan reviews.
                        . Comments generated during the training of emergency responders.
This analysis is intended to amplify the information contained in the matrices of changes previously submitted in Referencas (b) and (c). Consistent with the matrices previously submitted, changes-that are editorial only have not been described.
9002060355 900202 PDR      ADOCK 05000443                                                                ' )
F                          PDC                                                          h! g \
New Hampshire Yankee Divisio.i of Public Service Company of New Hampshire                                          I P.O. Box 300
* Seabrook, NH 03874
* Telephone (603) 474 9521
 
_.i b-                                                                                              .
f New.Hompshise                                                                  ..
1+                  '
ir      e Pr k t o Chief Operating Officer L I
                                                                  .x            ,-c                  %--
NYN-9002tr-February 2.-1990 United States Nuclear Regulatory Commission                                                                                  ,
Washington,_DC 20555'                                                                                              .
Attention:    Document Control Desk                                                                                    ,
 
==References:==
(a)  Facility Operating License NPF-67, Docket No. 50-443
                                                                                                                                  -i (b)  PSNH Letter NYN-89156, dated December 1, 1989. "RevisionL3                                                i to New Hampshire Radiological Emergency Response Plan (NHRERP)". T. C. Feigenbaum to USNRC:
(c) PSNH Letter NYN-89155 dated December l', 1989, " Revision                                1 to Seabrook Plan for Hassachusetts' Communities (SPMC)".
T. C. Feigenbaum to USNRC 1
Subjects Analysis of Revision 3-Changes to the New Hampshire Radiological                                                  >j Emergency Response Plan and Revision =1 Changes to the Seabrook                                                'l Plan for Massachusetts Consnunities.                                                                              3 Gentlemen:-
1 This letter responds to the Staff's oral request that NHY submit an f    analysis of the Revision 3 changes to the New Hampshire Radiological.                                                        ;
L      Emergency Response Plan (NHRERP) and in the Revision;1. changes to the                                                      j l      Seabrook Plan for Massachusetts Communities (SPMC).                                                                          I The changes which are denoted by. vertical change bars located onLthe                                            ~;
left hand margin of the revised pages, were generated by the following:                                                      j The annual plan review.                                                                                        l j
Drill comments from participants, controllers.and evaluators.                                                l Conunitments made during and asia result of the ASLB proceedings.                                              1 FEMA comments provided as a result of technical assistance visits,                                              }
plan reviews.
i Comments generated during the training of emergency responders.                                                j q
This analysis is intended to amplify the information contained in the matrices of changes previously submitted in References (b) and (c). Consistent                                              j with the matrices previously submitted, changes that are editorial only have not been described.
q 9002060355 900202 PDR F      ADOCK 05000443                                                  - )          ~.
PDC      2'                                      '
                                                                                  'l
                                                                                          \h                                      i New Hampshire Yankee Division of Public Service Company of New Hampshire P.O. Box 300
* Seabrook, NH 03874
* Telephone (603) 474-9521
                                                                  - , _ ,              u--u.    . . . . _ , - . .
 
                                                                                    ~
United States Nuclear Regulatory Commission                      February 2, 1990.
Attention: Document Control Desk.                                Page 2 If you should have any questions.regarding the above, please contact Mr. Anthony M. Callendrello, Manager..EP Licensing at (603) 474-9521,.
extension 2751.
Very truly yours, Nf            O Ted C. Feigenbaum                            [
Enclosure cci-    Mr. William.T. Russell Regional Administrator                                                          i United States Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia PA 19406 Mr. Victor Nerses, Project Manager                                              !
Project Directorate I-3 United States' Nuclear Regulatory Commission Division of Reactor Projects Washington, DC 20555 Mr. Noel Dudley                                                                  ,
NRC Senior Resident Inspector P.O. Box 1149                                                                    .
Seabrook, NH 03874 l              Atomic Safety Licensing Board Service List l
l l                                                                                                  l l
 
{                                                                                                          ~1
                - United States Nuclear Regulatory Consnission                        February 2.-1990;        [
Attention: Document Control Desk                                      Page 3.
                                                                                                              -9 t
1 L
* STATE OF NEW HAMPSHIRE Rockingham, ss.                                                      February 2, 1990:
l-                                                                                                              ,
i Then personally appeared before me, the.above-named Ted-C. Feigenbaum,_ ,              {
being duly sworn, did state that he is Senior Vice President'&' Chief Operating Officer.of the-New Hampshire Yankee' Division-of Public Service Company'of
                .New Hampshire,.that he is= duly authorized to execute and file the foregoing.
information in the name and on the behalf of New Hampshire Yankee Division of.
the Public Service Company and that the-statements therein are true to the best of his knowledge and belief.
Dau. d b              Dtwuu Beverly E d illoway,.Notar3lPublic h
My Commission Expiress. March'6, 1990              $
1
                                                                                                              -i
 
CERTIFICATE OF SERVICE'
                                                                                                    .i Ivan W.-Smith, Chairman                          .R. Scott' Hill-Whilton, Esquire Atomic Safety and Licensing Board Panel            Lagoulis, Hill-Whilton & Rotondi' U.S. Nuclear Regulatory Commission                  79 State Street' Newburyport, MA 01950 Washington, DC 20555 Gary Wi Holmes, Esquire Robert R. Pierce ' Esquire' Atomic.. Safety and Licensing Board Panel          Holmes & Ells U.S. Nuclear Regulatory Commission.                47 Winnacunnet Road Washington, DC 20555 Hampton. NH 03842 Philip Ahrens, Esquire
* Senator Gordon J. Humphrey Assistant-Attorney General                        United States Senate Office'of.The Attorney General                    Washington,.DC 20510 Statehouse Station #6                            Attention: Tom Burack Augusta, ME 04333
* Senator.Gordon J. Humphrey-AshodLN. Amirlan, Esquire                        1 Eagle Square, Suite 507                    ] '
Assistant City Golicitor                          Concord, NH 03301            _
City.of Haverhill                                Attention: Mary Jane ColtonL Haverhill, MA 01830                                                      .
Barbara J. Toint Andre,' Esquire Robert A. Backus, Esquire-                        Kopelman and Paige, P.C.
  -Backus, Meyer & Solomon                            77 Franklin-Street                            .
116 Lowell Street                                  Boston, MA 02110-                            {
P.O. Box 516
  ' Manchester, Nil 03105
                                                      -Paul'McEachern, Esquire Matthew T. Brock, Esquire                    1 I
Diane Curran, Esquire                              Shaines & McEachern.
Andrea C. Ferster, Esquire                        25 Maplewood Avenue                          i Harmon, Curran & Tousley                          P.O. Box 360.                                ;
  ~2001 S Street N.W. Suite 430                        Portsmouth. NH'03801 Washington, DC'20009-1125 George Dana Bisbee, Esquire Mr. Richard R. Donovan                            Assistant Attorney General Federal Emergency Management Agency'              . Office of the Attorney General ~            ,
l    Federal Regional Center                            25 Capitol Street                            l 130 228th Street, S.W.                            Concord .NH 03301-6397                        l
: l. Bothell. Washington 98021-9795                                                                'j Judith H.'Mizner, Esquire H. Joseph Flynn, Esquire                          79 State Street l    Office of General Counsel                        Second Floor l-    Federal Emergency Management Agency              Newburyport, MA 01950
!    500 C Street, S.W.
Washington, DC 20472
* Adjudicatory. File Atomic Safety and Licensing Board            !
Panel ~ Docket                            l U.S. Nuclear Regulatory Commission            i L
Washington; DC 20555 i
 
b, i
CERTIFICATE OF SERVICE'      <
Administ'rative Judge Richard F. Cole
    - Atondc1 Safety and Licensing Board' U.S. Nuclear Regulatory Commission Washington, DC 20555 Administrative' Judge Kenneth A. McCollom 1107 West Knapp Street                                        ,
Stillwater, OK 74075                                            P
* Atomic _ Safety and Licensing Appeal Board                                                      ,
U.S. Nuclear Regulatory Commission t
Washington, LC-20555
                                                                  -l Mitzi A. Young, Esquire Edwin J. Reis, Esquire                                        <
Office of'the General Counsel                                ,
U.S. Nuclear Regulatory Commission                          -i Washington, DC 20555 John Traficonte, Esquire Assistant Attorney General Department of the Attorney General                            l J
One Ashburton Place, 19th F1.
Boston, MA 02108 L'
George Iverson, Director N.H. Office of Emergency Management State House Office Park South 107 Pleasant Street                                          !
Concord, NH 03301
!      Mr. Jack Dolan                                            LC Federal Emergency Management Agency -
Region I                                                  .
J.W. McCormack Post Office & Courthouse Building, Room 442 Boston, MA 02109 h
Suzanne P. Egan, City Solicitor l      Lagoulis, Hill-Whilton'and Rotondi 79 State Street Newburyport, MA 01950 1
l l
                                                                    )
 
      .svdr-4 .4M              4 f p ..&--e.e,J
                                                          $1
:d 6
!-                                                              d
                                                                  .l
                                                                        )
k:          -l
                          .                        1;r -
M            -1 1
                    ^                                              i i
                                                                  'I g                                          -
g    .
i
                  -!        B 3          =
g  ,e      l i  !      l                                :
1
                  ~  i 8
E                                    :
                  $  2 B  $. E                                      ,
I a                                                .
b i
a i
l l
l.
l
 
untREP REV. 3 VOLUME:              1          SECTION: Introduction / Purpose AFFECTED AFFECTED              VOLUMES PAGES      & PAGES REV. 3      REV. 2                                      CHANGE                                                                  REASON                                            EFFECT xiii                  Vol. 1            Moved description of plume exposure Annual Update                                                                                More cohesive introductory 1.0-1          and ingestion' pathways to                                                                                                        description of plume exposure and-Introduction / Purpose section.                                                                                                    ingestion pathway. elements.
xiv                    Vol. 1              Moved: description of. plume exposure Annual Update                                                                              More cohesive introductory.
1.0-1          and ingestion. pathways to                                                                                                        description of NH plume exposure and' Introduction / Purpose.section.                                                                                                    Ingestion pathway characteristics.
xviii                  Vol. 1              Added definition of Access Control                                              Annual Update                                    Provide standard definition of' 1.6-1            Point to glossary.                                                                                                                frequently used term.-                                            .
xx                      Vol. 1            Added. definitions of Energency                                                  Annual Update                                    Provide standard definitions of 1.6-3            Response Planning Areas and                                                                                                      frequently used terms.
Exercise to. glossary; revised                                                                                                                                                    -
definition of: GENERAL !!MERGENCY to conform to NUREG-0654.
xx1                      Vol. 1,            Revised definitions of Incident                                                  Annual Update                                    Provide standard definitions of 1.6-4          Field Office and Ingestion Exposure                                                                                                frequently used terms and update Pathway; added' definitions of Joint Telephone.Information Center and glossary to incorporate.-recent~
planning terms.
Local-Dispatch Center.
      ;xxiii-                            Vol. 1              Added definitions of Precautionary                                              Annual Update                                    Provide standard definitions of 1.6-6            Action-and Public Alert                                                                                                            frequently.used terms and update
,                                                            Notification System to glossary.                                                                                                  glossary to incorporate recent planning terms.
xxiv                        Vol. 1              Added definition of Traffic Control.. Annual Update                                                                              Provide standard definitions of.
1.6-6;          Point to glossary; conformed-                                                                                                      frequently'used' terms.
1.6-7          ' definitions of SITE AREA EMERGENCY and UNUSUAL EVENT to NUREG-0654.
4
  .~1                                __..  , _ __  ._.    -      ...m..  . - _ , . . - -        ~ ~ -                                      -  --    .-- ,        - - , . _ - -- . . - . - - , . . - _ = ~        .-m                ... . ,    . . _ _ . . _
 
A MRRRRP REY. 3 VOLUME:                                  1                              SECTION: Introduction / Purpose AFFECTED AFFECTED                                VOLUMES PAGES                                & PAGES REV. 3                              REV. 2                                            CHANGE                                            REASON                EFFECT                  -l xxv                                    Vol. 1                            Added acronyms for Emergency                        Annual Update            Explain acronyms for terminology    H 1.6-8                            Services Unit Federal National                                              recently incorporated'into plans...
Radio System. Federal National                                                        '
Teletype System, Federal National u
Voice System.                                                                                                      '
xxvi                                    Vol. 1,                            Added acronyms for Joint Telephone                  Annual Update            Exple.in acronyms for terminology.
1.6-8                            Information Center and'New                                                  recently' incorporated into plans.
Hampshire Army National Guard.
xxvii                                    Vol. 1,                          Added acronyms.for School                      .
Annual' Update          Update acronyms previously omitted 1.6-9                          Administrative Unit, State Police
                                                                                                                                                            .for terminology used.In plans.
Operational' Teletype System.
Transportation Staging' Area, Yankee
* at Rowe, MA, and Yankee Atomic Electric Company.
. - - .                                    -    ._: .__:.---                            _ . - 2 _ _. .a=-.              -_ _w: -            ----        :              _ . -
* M3 VOLUME:                                  1          SECTION:        1.1 AFFECTED AFFECTED ' VOLUMES PAGES                        & PAGES                                                                                                                                                      .
REV. 3                        REY. ' 2                      ' CHANGE REASON                        EFFECT 1.1-1                                  Vol. 1,        Changed reference to legislative                          Annual Update                        Incorporate reference to most recentI 1.1-1        authority to New Hampshire                                                                    statuatory amendments.
Emergency Management Act (RSA 107-C, as amended) and Nuclear Planning and Response Program (RSA 107-B, as. amended).
1.1-4                                    Vol. 1,        Added reference to LOA between NHY                        Annual Update                        Reference coordination between NHY 1.1-5        and SONH for. coordination of                                                                  ORO and SONH Precautionary and Protection Actions in offsite locations.                                                                                                                  l 1.1-5                                    Vol. 1,        Added federal references." Guide for Annual Update                                              Update listing of frequently' cited 1.1-6        the Evaluation'of Alert and                                                                    - federal references.
* Notification Systems for Nuclear Power' Plants",' FEMA REP-10 and
                                                                              " Guide to Preparing Bnergency Public Information Material". FEMA
                                                                            ' REP-11.
1.1-6                                      Vol. 1,-      Added Table 1.1-1. referencing                        ' Annual Update                        Specify authorities for participation to                        1.1          authorities of: SONH response -                                                                of State agencies and.other 1.1-9                                                      agencies and organizations.                                                                    organizations.
    . - ,                                                  -          m                                                ..- e .%s  q  , -- - - - - - -    v.e,.TT 'm'
* e
* 1  "    *- -__ o '-
* Cd'
 
ImnRnP REY. 3 VOLUME:                                  1        SECTION:        1.2 l
AFFECTED AFFECTED                                  VOLUMES PAGES                                    & PAGES REV. 3                                  REV. 2                              CHANGE                                                                      REASON                                                                  EFFECT
, 1.2-2                                    Vol. 1,    Added Federal Aviation Agency to                                          Annual Update                                                Make consistent with procedures which.
1.2-2      list of federal support agencies.                                                                                                      has FAA responsible for restricting air traffic.
1.2-4                                    Vol. 1      Added Bureau of Emergency Medical                                        Annual Update                                                  Make consistent with procedures which 1.2-4    Services responsibilities to role                                                                                                        assign. responsibilities to Dis.
description of DPHS.
1.2-5                                    Vol. 1,    Added environmental sampling to                                          Annual Update                                                  Expand role of NH Dept. of 1.2-4    role description of NH Dept. of                                                                                                          Agriculture-consistent with Agriculture.                                                                                                                            procedures.
1.2-6                                    Vol. 1      Added reference to State Police                                          Annual Update                                                  Specify role of State Police-Conununications Center as 1.2-6                                                                                                                                              Communications' Center consi' stent with notification link between utility                                                                                                        procedures.-
and SONH response organization.
1.2-10                                    Vol. 1,    'Added reference to Joint Telephone                                        Annual Update.                                                Describe role of Joint Telephone 1 1.2-10    Information Center.                                                                                                                      Information Center previously not described.
1.2-10                                    Vol. 2,    Reformated Vol. 2. Appendix G,                                            Annual Update                                                  Consolidate plan description of' to                                      App. G      Concept of Operations for State                                                                                                          concept of operations for^
1.2-15                                              -Assistance to Municipalities, into-                                                                                                      compensatory plan.                                                                            O Vol. 1, Sec. 1.2. Concept of Operations.
1.2-11                                  .Vol. 2,    Added description of                                                    . Annual Update                                                Adds new' position for dealing with                                                          .
App..G,'    responsibilities of NHOEM Special                                                                                                        ~special needs. populations.
pg. G-2    Needs Liaisons -(new position).
3-
                                                                                      ,-..-e.m                  ,- , , - _ - ~      ~-,                                q. ,,, .,            ,- ,                            .m.-.,s+.                            , . , ,, , . . , , . .
7                                                                                    _
4-                                                  .,4.m.- .n.,        --
6m                            ,
 
MMER2P REY. 3-VOLOME:          -1          SECTION:                          1.2 AFFECTED AFFECTED            VOLLHES PAGES        & PAGES REV. 3        REV. 2                                          - CHANGE                                                                        REASON                                        EFFECT Table              Vol.'2,        Added NHOEM Special Needs Liaisons                                                  Annual' Update.
1.2-1        App. G,
                                                                                                                                                                                          - Identify responsibilities.of new to Responsibility Matrix for Table 1        Providing Assistance to.
position for-dealing with special needs populations.
Municipalities within Seabrook Station EPZ.
D L
                                                                                                                                                                                      .f
                                                                                                                                                                      -        e
- - - . - - ,,w >. ..      ~.. ._  ..\_.,s,,es,_.,,,n,,,,sa,m
                                            ,.                es-s  .+_n-. m,.-~:ma, s , --~.ammcs-..m..mna..aw    ,a,  +.,w~-,_....~.-x.-a..,es.--    - -ag-- ~ ,      ,ame vws--
 
                                                                                                                                                                                                                                                  ~
NRRFJtP REV. 3
  .. VOLUME:  1                  SECTION:                        1.3                                                                                                                                                                                              -
AFFECTED AFFECTED  VOL'JMES PAGES  & PAGES
_RJ17. 3  REV. 2                                                CHANGE                                                                      REASON                                                                    EFFECT 1.3-2      Vol. 1                Changed number of responsibilities                                                        Annual Update                            - Added responsibilities.for providing-1.3-2              assigned to the Governor's Office overall conmand and control and:for-from three to five and revised                                                                                                        authorizing re-entry and recovery.
descriptions of Governor's Office                                                                                                    Revised responsibilities to' include responsibilities.
                                                                                                                                                                        -coordination with NHY.ORO..
1.3-3    Vol. 1,                Added description of new                                                                  Annual update                          . Describe Governor's responsibilities.
1.3-2                  responsibilities assigned to the                                                                                                      per the NH constitution'and revised to                Governor's Office and revised 1.3-3 statues for command and control and :
descriptions of other                                                                                                              ' for re-entry and recovery operations.
responsibilities.                                                                                                                    Add to responsibility. descriptions.
coordination.with NHY ORO and' reconunendations for ;,recautionary.
actions.
* 1.3-4      Vol. 1,              ' Revised description of                                                                    Annual Update                            Made consistent,with State:
1.3-4              responsibilities of NHOEM.                                                                                                            operations where NHOEM supports
'                                                                                                                                                                      - Governor's responsibilities for-command and control; recosamends precautionary actions.-
1.3-5      Vol. 1,                Revised description of                                                                      Annual Update i
                                                                                                                                                                        ~ Made consistent with procedures.
1.3-5                responsibilities of NHOEM.                                                                                                            NHOEM partially activates EOC at''
                                                                                                                                                                                                                                                          ~
i Unusual Event. : Fully activates EOC:
and IFO at ALERT. or higher.
e
    . . - -  ,          .me- g w f    ,s.s        - g            e y                              - -              g  w.-' -
                                                                                                                                        $ .p s.-    e  p  ,  .'y-i            -,.,ru                                      ,-__..,____.____,.__,---
__        u s    e  3.,.r.. w dn .1't
 
NRRRRP RET. 3
  . VOLUME:        1          SECTION:                                        1.3 AFFECTED AFFECTED        VOLUMES PAGES          & PAGES REV. 3        REV. 2                                                      CHANGE                                                          REASON                                            EFFECT
  - 1.3-6            Vol. 1            Revised description of                                                                        Annual Update 1.3-6            responsibilities of NHOEM.
Provide for coordination of'public^
alert and notification with NHY ORO.
Add responsibility for recomunending -
precautionary actions and coordinating:them with NHY ORO. Add responsibility.for comununicating with U. S. Coast Guard and Federal Aviation Administration and assuring protectiv.e' actions are followed for affected areas of land, ocean, and:
: air. space.
  . 1.3-8          Vol. 1,        Revised description of.                                                                          Annual Update 1.3-7        responsibilities of-NHOEM.
References responsibility for
                                                                                                                                                                                . ensuring availability of sdfficient' reserve of vehicles-to meet pre-identified transportation needs.
1.3-10          Vol. 1,      ~ Revised description of~                                                                            FEMA Technical Assistance /'                Made consistent with procedures by 1.3-9        responsibilities of~DPHS.                                                                          Plan Review                                  adding reference to plant conditions as basis for-protective action recomunendations.
Annual Update                                Describes actions for emergency.
workers who receive exposure'in.          .
                                                                                                                                                                              - excess of PAGs - removal from aren and placement'in Radiological Screening Program. Add reference to
                                                                                                                                                                              - additional radiologicalt control measures described in Section 2.7.
O 4
                                                                                                                                                                        #                                                                  I
* ymm    o    %      =                                                    ~-
                                                                                                                                      ,  y  e g    r  . . . - - - e    ,..,.3      g          ..e  ,,-iy    ., ,      +-  . , . . , .
 
v s
* 3~
VOLUME:    1      SECTION:          1.3 AFFECTED AFFECTED  VOLUMES PAGES    & PAGES REV. 3  REV. 2                          CHANGE                                                                                              REASON                                                        EFFECT 1.3-11    Vol. 1,        Revised description of                                                                        Annual Update                                            Reference use of emergency workerJ 1.3-10        responsibilities of DPHS.
decon facility at Manchester during an evacuation. Describe DPHS/DHS-coordination.at reception centers.
1.3-12    Vol. 1,        Revised description of                                                                        Annual Update                                            Change reference to EPA Relocation 1.3-11        responsibilities of DPHS.
PAGs from draft June 1986 to draft December 1988.
1.3-14    Vol. 1,        Revised description of                                                                        Annual Update 1.3-Lt Added that the lists of agricultural-responsibilities of Dept. of Agriculture.                                                                                                                                            facilities include the name.
location, and telephone number of
                                                                                                                                                                                    - each facility'by town.
,                          -Change " regulatory. mechanisms to                                                            Fl!MA Technical- Assistance /                        . Made consistent with implement protective measures" to-                                                            Plan Review                                              responsibilities.
                              " administrative means to implement protective measures".
1.3-15    Vol. 1,      ' Revised description of        .
Annual Update                                            Add responsibility for notification.
1.3-22'      responsibilities for NH Dept. of                                                                                                                      of school administrative units.
                            -Education.
. 1.3-17    Vol. 1,        Revised description of                                                                      . Annual' Update 1.3-14      . responsibilities.for NH Fish and
                                                                                                                                                                                  . Add responsibility for controlling.                                                            i Game Department.                                                                                                                                    '
access and environmental sampling for shellfish harvesting areas.
1.3-19    Vol. 1,        Revised' description of NH State ~                                                            Annual' Update                                          .Provides for arrangements:to be made.
              '1.3-19      . Police responsibilities.
                                                                                                                                                                                  . with other troop stations or through:
                                                                                                                                                                                  - the.New England State Police Compacti to obtain additional assistance.
4
                                                                                                                                                  #                                                                                                                          ~
w.
                                                                                                                                                                          .~.
4      .,        .,w,,    ...s.-  --..-g
_          ..g.                                    s %. 9  f. , y m,--- - -  p.--    y #g.--5.  ,=f..    - ,.~-',                        g ,,  .,-..,.._w ,,r.. ..y        %. .w.,  .,.'es-+wr+*    w w  'r-
 
MRERP REV. 3 VOLUME:  1                                      SECTION:          1.3                                                                                                                                                              .
AFFECTED AFFECTED VOLUMES PAGES  & PAGES REV. 3  REY. 2                                                    CHANGE                                                              REASON                                        EFFECT 1.3-22  Vol. 1                                    Revised Rockingham County Sheriff                                        Annual Update              Add responsibility for staffing Local 1.3-18                            responsibilities.                                                                                    Transportation Staging Areas in non-participating municipalities.
1.3-23  Vol. 1                                  Revised American Red Cross                                                Annual Update              Add reference to NH Division of Human                                        :
1.3-16                            responsibilities.                                                                                    Services responsibilities at reception centers.
1.3-25  Vol. 1                                  Revised U. S. Coast Guard                                                FDIA Technical Assistance / Add responsibility for establishing 1.3-21                            responsibility.                                                          Plan Review                Marine Safety Zone consistent with procedures.
NA                                  Added Federal Aviation                                                    FEMA Technical Assistancel  Reference responsibility for air Administration responsibility.                                            Plan Review                space restriction consistedt with procedures.
 
N BRMEREP REY. 3                                                                                        s VOLUME:    1        SECTION:                          1.4 AFFECTED AFFECTED    VOLUMES PAGES      & PAGES REV. 3    REV. 2                                            CHANGE                                                                        REASON                                          EFFECT                  _
1.4-1      Vol. 1      Revised support role of FDfA.                                                                          FDfA Technical Assistance /                    Deleted reference to review and 1.4-1                                                                                                              Plan Review                                    integration of all federal agency implementation plans.
1.4-9      Vol. 1      Revised anticipated needs for                                                                          Annusi Update                                  Added NH Wing Civil Air Patrol for 1.4-8        federal assistance.                                                                                                                                    providing air and ground                            '
transportation.
h 9
i yy g  rm  v. #          _      . ' - - -                  y-              w -                  -.
* wy %--      -e+c                    +W' %v 4 -- . se-->e  iv- m- m v - w- w *  :.,-,im =  , --e  _.-wm---e
 
                                                                                *3
  ' VOLUME:        1        SECTION-        2.1 AFFECTED AFFECTED        VOLUMES                                                                                                                                                      !
PAGES        T PAGES REY. 3      REV. 2                      CHANGE                              REASON                                              EFFECT 2.1-1          Vol. 1      State Police confirmation of          Annual Update                                        State Police will confira 2.1-2        notification.
notification only if received by other than the Nuclear Alert System.
- 2.1-2            Vol. 1,    DPHS verification.                      Annual Update 2.1-2 Added that DPHS will obtain name of-Control Room Comemnicator.
2.1-5          Vol. 1,      State Police confirmation of change Annual Update                                          State Police will confira 2.1-7      in ECL.                                                                                    notification of change in ECL only if received by other than the Nuclear Alert System.
2.1-5          Vol. 1,      Added purpose for public alerting      Annual Update                                      The siren generated audible alert to            2.1-17      and supplementation of siren 2.1-6 also serves as the primary'means for                  ,
alerting.                                                                                  notification of campgrounds, State parks and other public recreation areas. It may be supplemented by tone-alert radios or direct notification.
2.1-7            Vol. 1,      Added reference to capability of        Annual Update                                      NH can request NHY to activate sirene 2.1-12      Seabrook Station Control Room to                                                            if back-up activation is required.
activate all sirens.                                                                        Local activation also provides back-up.                                                  ;
.2.1-8            Vol. 1      Added reference to Seabrook Station Annual Update                                          Incorporated reference to new 2.1-13      Public Alert and Notification FDfA- -                                                      document.
REP-10 Design Report.
'%  r        .% .          y      w e-.  -
w -  w    e            v            w.        eva.v r w- 9  v - * * - + - .    +.  --  +s  w    - e w --wv v . - . - - ,*=v 4. -
 
VOLUME: _        1      SECTION:        2.1 AFFECTED AFFECTED        VOLUMES PAGES          & PAGES REY. 3        REV. 2                      CHANGE                        REASON                              EFFECT                                  -
2.1-9          Vol. 1,      Revised description of alerting ASLB Hearing Comunents/      Reflected signaling devices offered 2.1-9,      devices offered to hearing      Stipulations                  to hearing impaired persons based on 2.1-14      impaired.
special needs survey information provided by support groups and personal contacts.
2.1-10          Vol. 1,    Added description of tone-alert  Annual-Update                Radios maintained jointly by SONH and 2.1-15      radio maintenance.                                            NHY, batteries replaced twice a year, post card provided for requesting
,                                                                                            repairs or replacement.
2.1-16          Vol. 1      Revised Table 2.1-1, State Level Annual Update 2.1-16      Notification Sequence.
Revised Table 2.1-1 to reflect procedures as to ECLs at witich individual State response agencies are notified.
2.1-17          Vol. 1,    Revised Table 2.1-2, Local Level Annual Update 2.1-8      Notification Sequence.
Revised Table 2.1-2 to reflect procedures as to ECLs at which local EPZ and host comununities are notified.
2.1-18        Vol. 1,      Revised Table 2.1-3, Siren      Annual Update                Changed Table 2.1-3 to reflect new 2.1-10      Locations.                                                    numbers for each type of siren (129 dBC or 122 dBC) located in each EPZ commiunity.
2.1-19          NA        Added Figure 2.1-1.              Annual Update                Figure 2.1-1 shows notification sequence frosa utility to State and local organizations.
                                                                                      ~
                        .  .          .                          _          _            . _ . _    . . . . . . , , . . _ - _ ~ . . . . _ _ . _ . - -
 
                                                                                      ~3 VOLUME:            1                SECTION:      2.1 AFFECTED AFFECTED            VOLUMES PACES          & PAGES
      ..REV- 3          REV. 2                                CHANGE                    REASON              EFFECT 2.1-20            ' Vol. 1                Figure 2.1-2, Siren Coverages Annusi Update 2.1-11                replaced.
Replaced w.ith siren coverage map from Seabrook Station Public Alert and Notificatica FEMA-REP-10 Design Report.
L....__me._._ am_u- - -  - - * - - - - -
 
REY. 3                                                                                          !
ON:    1        SECTION:      2.2 AFFECTED AFFECTED    VOLUMES PAGES  & PAGES REVe 3  REV. 2                      CHANGE                                                        REASON                                EFFECT 2.2-1      Vol. 1,    Delete reference to control of                          Annual Update                                Reflected control of emergency 2.2-2      system from the State EOC.                                                                            management radio network.
2.2-3      Vol. 1,      Added reference to Comunercial                          Annual Update                                Standard comunercial pegers are used 2.2-3      Pagers.                                                                                                by many state agencies for                              t notification of personnel.
Vol. 1      Added reference to Telephone                              Annual Update                                High speed facsimile machines located 2.2-4        Facsimile (FAX) System.                                                                                In key facilities for hard copy receipt and transmission of emergency information.
2.2-6        Vol. 1,    Added comunercial pagers for                              Annual Update                                Reflected equipment in place.
2.2-9      notification of Governor's Office                                                                                                            -
to Link G.
2.2-7          Vol. 1      Added Police radio as back-up                            Annual. Update                                Reflected equipment in place.
2.2-10      notification link for local organizations to Link I.
Vol. 1,    Added comununication link for EBS                        Annual Update                                Reflected equipment in place.
2.2-11      station (Primary-Dedicated telephone /FAK; back-up commercial telephone).
g        --          g.,                              a ev.                        , -
                                                                                                                  -a4 .,    -
                                                                                                                              ,  - , . . . , ~ _      a  -
e-      ,. .~.,..,~.w.e _  .n_ -,_ ,. ~ .-~
 
INIERRP REY. 3 VOLUME:    1        SECTION:      2.2 AFFECTED AFFECTED    VOLUMES PACES      & PAGES REY. 3    REV. 2                  CHANGE                                    REASON                                                                        EFFECT 2.2-8      Vol. 1,    Revised Section 2.2.6,                Annual Update                                                    Primary link for communications with 2.2-13      Communications With other States.                                                                      other states changed from Nuclear Alert Systeer to cosumercial telephone.
Nuclear Alert System described as available.
2.2-9      Vol. 1,    Revised Sec. 2.2.7, Comununications    Annual Update                                                  Add National Warning System link 2.2-13    with Federal Government.                                                                                between State EOC and Federal Regional Center in Maynard, MA to reflect actual equipment.
y _.  ,,,,,.    ,                  *#"' e ' ' - - e  "'" " d"**                      ' ' ' ' ' ' ' ' ' * * ' "      ' ' ' " ' " #~
* 3 VOLUME:  1      SECTION:      2.3 AFFECTED AFFECTED VOLUMES PAGES  & PAGES REV. 3  REV. 2                  CHANGE                                            REASON                      EFFECT 2.3-1    Vol. 1    Revised description of Emergency                Annual Update                Deleted description of Seabrook 2.3-1      Public Information Calendar.                                                Station Calendar contents.
4 2.3-5    Vol. 1,    Added reference to signs.                      Annual Update                Made consistent with coautitment to 2.3-5 install signs, which display information on siren tones and EBS stations, at parks, beaches, and other outdoor recreation areas.
2.3-10  Vol. 1    Revised Table 2.3-1            Summary of      Annual Update                Table 2.3-1 revised to show public 2.3-7      Public Information.                                                          Information materials targeted to specific population segments.
                              ,,    ,            , . , . , , ,  e  -r e  ~    >    M  ' ' ' ~ ^ * * ' * * '
                                                                                                                    " "" ^            ~~
 
VOLUME:
MRERP REY. 3 1                  SECTION:                        2.4                                                                                                                    _
AFFECTED AFFECTED        VOLUMES PAGES    & PAGES
_REV. 3    REV. 2                                              CHANGE REASON                                  EFFECT
  ~2.4-2                Vol. 1                            Revised description of IFO                      Annual Update                      Description of IFO functions for 2.4-2                              functions for Seabrook Station.                                                      Seabrook Station revised to indicate response implementation functions and field renitoring dispatch and coordination functions.
i 2.4-4            Vol. 1,                          Revised description of DHS                        Annual Update                      Description of DHS functions revised 2.4-3                            functions at reception centers.                                                      to delineate specific services offered by DHS at reception centers.
Revised description of functions of Annual Update                                    Description of functions revised to Monitoring / Decontamination                                                        describe DPHS responsibilities and to facilities.
describe the Emergency Worker Monitoring / Decontamination 7acility in Manchester.
2.4-5              Vol.-1,                            Revised description of                            Annual Update 2.4-4 Description revised to replace OMNE transportation staging areas.
Mall with NH Port Authority as State Transportation Staging Area at Portsmouth and to reference local transportation staging area.
Revised EOF description.                            Annual Update                    Revised description to indicate for Seabrook Station the IFO is colocated with the EOF.
2.4-6              Vol. 1                          Revised Media Center description.                    Annual Update                    Revised to add that rumor control is 2.4-5                                                                                                                  provided mainly at the JTIC.
  . . - . -          ,    p                                        -4>.e    , , , . , ., . , ~ , - . = ,        -  r  . - * . y +            w ey . , .~ry-,
                                                                                                                                      #yy . ~ 3                    .g. , , ,,.. ,, . , . ,w< -_s,  - w-,,, .-<~
 
k VOLUME:            1 INIESMP RET. 3 SECTION:          2.4 AFFECTED AFFECTED            VOLUMES PAGES        & PAGES REY. 3      REY. 2                              CHANGE                                      REASON                          EFFECT 2.4-11              Vol. 1,              Revised Table 2.4-1, State                      Annual Update 2.4-7                Emergency Response Facilities.                                                  Table 2.4-1 revised to show new location of Emergency Worker Monitoring /Decon Facility and State Transportation Station Area at Portsmouth.
        - 2.4-14                      Vol. 1                Revised Table 2.4-3, Local                      Annual Update                  Added locations of host comununity 2.4-9                Emergency Response Facilities.                                                  EOCs.
2.4-15                Vol. 1              Revised Table 2.4-4, Staffing                    Annual Update                    Revised staffing assignments to 2.4-13              Assignments for Seabrook Station.
facilities for Boating Safety, CAP, Governor's Office Transportation.
and DHS.
2.4-18                  Vol. 1              Revised Figure 2.4-1.                            Annual Update 2.4-17                                                                                                Added Joint Telephone Information Center.
2.4-21                    Vol. 1,            Revised Figure 2.4-3                            Annual Update 2.4-17                                                                                                Indicated expanded IFO space.
l y    . - ,  e        -- < -
* y v                        p                -,sq
            ',-%                                                    ,.                                      y  -- -y +
t    i,v-  =, - ,  ,          ,c  ,w,- ,. c'--e--- .  +w ,e -m* .w.
* M
 
IEEERP REV. 3 VOLIME:    1      SECTION:      2.5 AFFECTED                                                                                                                                                                                '
AFFECTED  VOLIMES PAGES    & PAGES REV. 3  REV. 2                    CHANGE                                        REASON                                          EFFECT 2.5-1    Vol. 1,    Revised description of Section                FEMA Technical Assistance /                    Added section entitled " Protective 2.5-1      2.5.2, Accident Assessment Tasks.              Plan Review                                    Action Recomunendations (PARS) Based on Plant Status and Prognosis
* describing how initial precautionary and protective actions will be based                                        ,
on plant status and prognosis reported by control room personnel.
2.5-2      Vol. 1      Revised description of Section                FEMA Technical Assistance /
2.5-2      2.5.2, Accident Assessment Tasks.
Added section entitled
* Estimating Plan Review                                      Current and Projected Doses for the Plume Exposure Pathway
* describing dose assessment tasks for the plume exposure EPZ.
2.5-3    Vol. 1      Revised description of Section                FEMA Technical Assistance /                      Combined facility activities. Placed 2.5-3      2.5.3, Accident Assessment Action              Plan Review Plan.
Plant Status Review as first activity Indicating that it will be used as basis for initial protective actions.
                                                                                                                .Added a Plume Exposure Pathway section describing methods for projecting doses and revising method for projecting thyroid doses. -Added section on Ingestion Exposure Pathway incorporating use of derived response levels.
2.5-8    Vol. 1,    Revised description of Field                  FEMA Technical Assistance /                      Revised description of field 2.5-6      Monitoring within the plume                    Plan Review                                      monitoring activities includes exposure pathway EPZ.                                                                          composition of field teams, equipment, and methods for monitoring and reporting.
 
                                                                                                                                                                *3 VOLUME:                            1        SECTION:                  2.5 AFFECTED
        'AFFECTED                            VOLUMES PAGES                            & PAGES REV. 3                          REV. 2                                  CHANGE                                                                          REASON                                        EFFECT 2.5-10                            Vol. 1,      Revised description of food, water, FEMA Technical Assistance /                                                            Revised description of environmental 2.5-15        and environmental sampling.                                                                Plan Review                      sampling distinguishes sampling team composition from field monitoring teams, focuses purposes of sampling on confirmation of deposition dose projection, and anticipates that sample analysis would not be needed for preventive ingestion pathway actions as opposed to subsequent' protective actions.
2.5-11                              Vol. 1,      Revised description of use of plant FEMA Technical Assistance /
2.5-16 Revised description emphasizes use of process parameters.                                                                        Plan Review                      plant status information for initial protective actions.
* 2.5-12                            Vol. 1,        Revised section entitled                                                                    FEMA Technical AFsistance/      Revised to indicate during plume 2.5-16        " Laboratory Analysis".                                                                    Plan Review                      phase of an emergency,. priority will be given to analysis of air sample media.
2.5-14                                NA          Added Table 2.5-1.                                                                          FEMA Technical Assistance /      Table 2.5-1 provided derived Plan Review                      estimated Iodine Isotope MDC values achievable by Seabrook Station portable emergency response equipment.
s    2.5-15                                  NA          Added Table 2.5-2.                                                                          FEMA Technical Assistance /      Table 2.5-2 provided integrated Plan Review                      thyroid dose estimates from MDCs for airborne Iodine Isotopes achievable with Seabrook Station equipment.
                                                                                                                                                                                  ~
 
                                                            *3 VOLUME:    1      - SECTIO 8t:    2.5 AFFECTED AFFECTED  VOLbHES
  -PAGES    & PAGES REV. 3    REV. 2                    CHANGE                  REASON                EFFECT
  ~2.5-16      NA          Added Table 2.5-3. FEMA Technical Assistance / Table 2.5-3 provided Iodine-131 Plan Review                derived MDCs for milk pathway achievable by Seabrook Station equipment as percentage of emergency PAGs.
2.5-22    Vol. 1,    Revised Table 2.5-5. FEMA Technical Assistance / Revised Table 2.5-5 adds re-Table      2.5-21,                          Plan Review                entry / recovery assessment tasks and
  -2.5-5    Table                                                        related additional aesessment 2.5-4 activities to plume exposure projected dose task.
 
M3 VOLUME:      1                    SECTION:            2,6 AFFECTED AFFECTED    VOLUMES PAGES    & PAGES                                                                                                                                                                '
REV. 3  REV. 2                                                CHANGE                                      REASON                    EFFECT 2.6-2        Vol. 1                    Added new first paragraph to                              FEMA Technical Assistance /  Statements added that initial 2.6-2                      Section 2.6.3.                                            Plan Review                    protective actions are based on plant status and prognosis reported by the utility and projected doses used to confirm protective actions.
2.6-3        Vol. 1,                    Revised first paragraph of Section                        FEMA Technical Assistance /    Incorporated FDA/ FEMA derived 2.6-3                      2.6.4.                                                    Plan Review                    response levels (DRLs) for ingestion pathway radionuclides.
2.6-4        Vol. 1,                    Added new second paragraph of                            FEMA Technical Assistance /  Added paragraph references primary 2.6-4                      Section 2.6.5.                                            Plan Review                    responsibility of the Governor for approving protective actions and references line of succession for delegation of authority.
2.6-5        Vol. 1                    Revised description of                                    FEMA Technical Assistance /  Added more detailed description of 2.6-4 &                    precautionary actions.                                    Plan Review                    precautionary actions for schools, 2.6-5                                                                                                                beaches, and boaters.
2.6-7        Vol. 1,                    Added reference to access control                          FEMA Technical Assistance /  Access control required for 2.6-5                      for sheltering.                                            Plan Review                  municipalities where sheltering is reccaneended.
2.6-9        Vol. 1,                    Added reference to notification                            Annual Update                Primary means for notification of 2.6-6A                    means for outdoor locations.                                                            campgrounds and outdoor locations is the siren system.
Vol. 1,                    Revised description of when                                Annual Update                Facility-specific DRFs utilized if 2.6-7A                    facility-specific DRFs for special                                                      protective actions recomumended for facilities would be utilized.                                                          'the general population cannot be implemented.
u-_  ---            -
                        ... _ _ _ - - - - -          ,__m _. _ _ - - - -      - - - - - - - _ , _ _ -    - - - -
_  __m ..  .._m ,u_.-_ ,... y-  -
 
NBRERP REV. 3 VOLUME:    1        SECTION:      2.6 AFFECTED AFFECTED  VOLUMES PAGES    & PAGES REV. 3    REV. 2                    CHANGE                              REASON                      EFFECT 2.6-12    Vol. 1      Added reference to IFO Resource      Annual Update                Consistent with procedures, IFO 2.6-11b    Coordinator.
Resource Coordinator dispatches required vehicles to local staging areas.
2.6-14    Vol. 1      Added access control references.      FEMA Technical Assistance / Access control used to restrict entry 2.6-16                                            Plan Review                  into portions of the EPZ and used for sheltered areas as well as evacuated areas.
                      -Added reference to Traffic            Annual Update              Indicates source of pre-selected Management Manual.                                                access control points.
2.6-18    Vol. 1,      Added reference to sastpling          FEMA Technical Assistance / Requirement for emergency protective 2.6      results.                              Plan Review                actions in Ingestion Pathway based on        I sampling results.
Vol. 1      Added reference to sampling            FEMA Technical Assistance / Control of surface water supplies 2.6-23      results.                              Plan Review                based on sampling results.                  '
2.6-10    vol. 1. Revised description of food control FDfA Technical Assistance /    Based emergency protective actions on 2.6-23      actions for ingestion pathway.        Plan Review                sampling results, described examples at appropriate preventive actions, referenced EBS as source of information.
4
                                                                              -            ,          - - . - ~ . . - . . . - , - .,-
 
ERRNEP REY. 3 VOLUME:      1      SECTION:        2.6 AFFECTED AFFECTED    VOLUMES PAGES      & PAGES REV. 3    REV. 2                      CHANGE                                                    REASON                            EFFECT 2.6-20      Vol. 1,      Revised description of criteria for FDfA Technical Assistance /                            Based precautionary actions for 2.6-24      protective actions for plume                              Plan Review                      schools, beaches and boaters and exposure pathway.                                                                          initial protective actions on plant status and prognosis as reported by the utility. Referenced Marine Safety Zone established by U. S.
Coast Guard.
2.6-22        Vol. 1      Revised description of use of PAGs                        FDfA Technical Assistance /      Dose projection variables considered 2.6-29      for PARS.                                                Plan Review                      to derive PARS only if plant conditions have not resulted in automatic PARS.
Added note prior to discussion of                        FDfA Technical Assistance /      Consideration given to closing decision process using EPA PAGs.                          Plan Review                      beaches at ALERT ECL regardless of availability of projected dose data.
2.6-25        Vol. 1,      Clarified basis for selection of                          FDIA Technical Assistance /      Made consistent with procedures that, 2.6-33        PAR locations.                                            Plan Review
'                                                                                                                        for Seabrook Station EPZ protective actions are based on ERPAs and implemented municipality by municipality.
2.6-26        Vol. 1,      Revised decision process for                              FDfA Technical Assistance /      Referenced use of derived response 2.6-33      ingestion psthway.                                        Plan Review                      levels (DRLs); referenced precalculated DRLs for specific pathways contained in DPHS procedures.
2.6-27        Vol. 1,      Revised decision process for                              FDfA Technical Assistance /    Referenced use of summation of dose 2.6-34      ingestion pathway                                          Plan Review                    commitment from all pathways for determining if PAG exceeded.
  ,-y  e-    n ,                n-, -            3                                    -                    y ,  #    ,,v-- e  %--_e,.              , , .          . - , . - - ,  ._c - ,,.,r-
 
IWRERP REY. 3
    . VOLUME:  1      SECTION:        2.6 AFFECTED AFFECTED VOLUMES PAGES  & PAGES REY. 3 REV. 2                    CHANGE                            REASON                    EFFECT 2.6-28  Vol. 1,    Revised Table 2.6-1, Special          Annual Update              Deleted reference to KI distribution 2.6-9      Facility Sheltering Factors                                        based on shelter factors.
2.6-33  Vol. 1    Revised Figure 2.6-4, Decision        FEMA Technical Assistance / Revised food and water pathway 2.6-27    Criteria for Reconunended Ingestion    Plan Review                decision trees; removed shellfish Exposure Pathway Protective                                        testing and control from water Actions.                                                          pathway and add to food pathway.
m_.u
 
1 IWIaMaP REY. 3 VOLUME:        1        SECTION:          2.7 AFFECTED
    . AFFECTED          VOLUMES PAGES          & PAGES
  ,      REY. 3        REV. 2                        CHANGE                                                REASON                                                    EFFECT 2.7-1          Vol. 1,      Revised description of dosimetry                      Annual Update                            Added reference to scale of 2.7-1        for emergency workers.                                                                          dosimeters issued for life saving missions (0-200R).
: 2. "'- 2        Vol. 1,      Revised description of when                            Annual Update                            Dosimetry issued to emergency workers 2.7-3        dosimetry issued to emergency                                                                  at ALERT ECL.
workers.
2.7-4          Vol. 1        Revised description of radiological Annual Update                                              Local EOCs and Supervisors of State 2.7-6        exposure control decision criteria.                                                            workers will submit hourly reports to the IFO Controller of the number of emergency workers reaching pre-established exposure levels.
207-6          Vol. 1,      Revised description of decision                      Annual Update                            TheIFORadiologicalHealtlkTechnical 2.7-9        process for allowing emergency                                                                Advisor (RHTA) will provide workers to exceed exposure limit.                                                                recomumendations to the DPHS Director-on exposure control measures.
Revised description of measuring                      Annual Update                            Allows use of CDV-700 or eculvalent.
device for thyroid screening.
i-2.7-7                Vol. 1,      Revised description of                              -Annual Update                            Referenced use of Emergency Worker
                                  ' decontamination of emergency 2.7-10                                                                                                      Monitoring / Decontamination Center.
workers.
2.7-8            Vol. 1      Added reference to decontamination                    ASLB Hearing Cosaments/                  Unaccompanied minors will be 2.7-10A      of unaccompanied minors.                              Stipulations                            decontaminated under DPHS supervision.
    .    . . _ . , ,    ,                    _ .          .      , . . ~ . . . . , , _ , , ,    . . . _  _.    ..  . , _ . - . , . . . . . . . _ . . . . _ . . . . .    . . . _ . . . . _ _ .
* 3 VOLUME:  1        SECTION:      2.7 AFFECTED AFFECTED VOLUMES PAGES  & PAGES REY. 3  REV. 2                  CHANGE                          REASON
_ _ ,_ __.                                        EFFECT 2.7-9    Vol. 1,    More detailed description of    Annual Update                    Expanded discussion of potential 2.7-12    Radiological Screening Program.                                  enrollees-emergency workers with dosimetry reading 3R or greater, who show evidence of internal contamination, and who show fixed external contamination-(unable to
                                                                                    ' remove below 100 CPM). Also members of general public who show evidence of internal contamination, fixed external contamination (unable to remove below 100 CPM), or excessive exposure from prolonged presence in plume.
y      y            ~-    -c  .,..        *-...-,--%,        w,    ,.,..-w.-y,.,.-- .,.
 
VOLUME:      1        SECTION:      2.8 AFFECTED AFFECTED    VOLUMES
    -PAGES      & PAGES REV. 3    REV. 2                    C'dANGE                            REASON                            EFFECT 2.8-2        Vol. 1,    Referenced bus conversion kits.      Annual Update 2.8-2                                                                              Evacuation bed bus camversion kits will be used to supp1 ment ambulance resources.
2.8-3        Vol. 1      Revised description of MS-1          Annual Update 2.8-4      hospital treatment facilities.
Expanded conditions which may require treatment to: external contamination and injured, internal contamination, high exposure to radiation.
2.8-4        Vol. 1,    Revised description of availability Annual Update                      Added reference to availability 2.8-6      of consultants.                                                        through New England Radiological Health Compact.
_..  .    ,  _ _ , _ _            . . . _ . . , _    , _ ~ , . .
 
INIHFJtP REY. 3 VOLUME:  1            SECTION:            2.9 AFFECTED AFFECTED  VOLUMES PAGES    & PAGES                                                                                                    ,
REV. 3  REV. 2                            CHANGE                              REASON                    EFFECT 2.9-1    Vol. 1,        Revised re-entry description.            Annual Update              Added reference to determining 2.9-1 requirements for access control, re-entry, and recovery.
2.9-2    Vol. 1.        Revised list of items to be              Annual Update 2.9-1          considered.                                                          Added references to notification of mass care shelters, determining availability of psychological services, coordinating with adjacent states and NHY ORD, decontamination of equipment and vehicles not previously processed, ingestion pathway evaluations, and determining presence of hot spots.
2.9-3    Vol. 1,        Revised reference to criteria for          Annual Update              Reference changed to most current EPA 2.9-2          tempcrary re-entry decisions.              FDfA Technical Assistance / PAGs (1989 draft document).
                                                                    -Plan Review 2.9-4    Vol. 1          Revised list of ingestion zone            Annual Update 2.9-3          samples.                                                              Added shellfish samples and wipe samples.
Revised reference to additional          Annual Update                Added reference to lab facilities laboratory facilities.
available through New England Radiological Health Compact or FRMAC,
__ , _ _              _ _ .        w ------
 
M REP REY. 3 VOLUME: 1                          SECTION:      2.9 AFFECTED AFFECTED  VOLUMES PAGES  & PAGES REV. 3 REV. 2                                        CHANGE                                    REASON                                  EFFECT 2.9-5    Vol. 1,                      Revised description of total FEMA Technical Assistance /  Revised pathways considered to 2.9-4                        population exposure estimates.                Plan Review                  exposure front plume, exposure front ground deposition, internal exposure from ingestion. Referenced initial use of METPAC for plume exposure and later use of measurements.
Referenced use of measured sample results-for deposition and ingestion and purpose of total population estimates. Deleted calculational example.
                                                                                                                                                                                                              }
[                          _
                                                                                                                                    ?.--        . - _ - - - - - - - - - - - - - - - - - - - - - - - - - -
 
                                                                                                                                                                          )
IMammP REY. 3 VOLUME:      1            SECTION:                      3.1 AFFECTED AFFECTED    VOLUMES PAGES    & PAGES REV. 3    REY. 2                                        CHANGE                          REASON                EFFECT 3.1-2      Vol. 1            Revised description of radiological Annual Update                        Differentiate discriptions of 3.1-3            monitoring and health physics                                            radiological monitoring drills and drills.                                                                  health physics drills. Radiological monitoring drills conducted annually; health physics drills, semi-annualJy.
3,1-6      Vol. 1          Revised Table 3.1-1 Schedule of                  Annual Update            Added Link K: NHO M/ State Police-3.1-2            Communications Drills.                                                    Radio Station (WOKQ).
                                            - - - - - . , ~ , -  . - -      - ~ -
 
M ERP REY. 3 VOLUME:    1            SECTION:          3.2 AFFECTED AFFECTED- VOLUMES PAGES    &-PAGES REV. 3  REV. 2                            CHANGE                        REASON            EFFECT 3.2-3    Vol. 1          Revised description traffic          Annual Update 3.2-2 Added reference to Traffic Managessent management training.                                      Manual.
3.2-4    Vol. 1          Revised description of radiological Annual Update          Added reference to instrtament 3.2-3          monitoring equipment and exposure                          equivalent to CDV-700.
records training.
4 3.2-7    Vol. 1,        Revised description of medical      Annual Update        Referenced DPHS as responsible for 3.2-6          support and rescue training.                              coordinating training.
3.2-11    Vol. 1,        Revised description of training      Annual Update        Added reference to progr w and 3.2-8          administration.
seminars sponsored by the industry, vendors or the utility.
 
ImIRRRP REY. 3 VOLUME:  1      SECTION:                    3.3
                                                                                                                                                                              .a AFFECTED
: AFFECTED  VOLUMES PAGES    & PAGES REY. 3  REV. 2                                          CHANGE                  REASON                        EFFECT 3.3-4      NA            Added Table 3.3-2, Emergency
'                                                                          Annual Update                  Table 3.3-2 designated plan sections Response Procedure for Seabrook Station.
implemented by State agency procedures.
4 4
                                                                                          ,  _7,
                                                                                                    .- .,y      -        -***--e * * * " * - - - ' * - - " - "' ' " * * ' ' '
* 3
:    6      SECTION: DPHS Procedures                                                                                                                                                    .
AFFECTED AFFECTED    VOLUMES PAGES~    & PAGES REV. 3    REV. 2                    CHANGE                                            REASON                                          EFFECT Genrric      NA        Added list of supporting documents                Annual Update                              Delineated location of forms and Chnnge                  as preface to all check lists.                                                              other supporting documents applicable to each procedure.
1.0-9      Vol. 4A,    Added sub-step to Step 3, General                ASLB Hearing Conunitments/                DPHS Director will ensure that DPHS        Emergency Checklist.                              Stipulations                              resources are available for extended Dir.-6                                                                                                    (2 to 3 days) operation of monitoring / decontamination facilities.
for processing the general public.
3.0-8      Vol. 4A,    Added Step 11, General Emergency                  Annual Update                              EOC RETA will receive reports from EOC        Checklist.                                                                                  the Ehnergency Medical Services RHTA-5                                                                                                  Coordinator concerning transport of contaminated injured or exposed persons to MS-1 hospitals, will contact MS-1 hospitals, will determine eligibility for enrollment into Radiological Screening Program, and will enroll if eligible.                                            -
  -3.0-9      Vol. 4A,    Added Step 12, General Emergency                  ASLB Hearing Connaltments/                EOC RHTA will receive reports from EOC        Checklist.                                        Stipulations                              host Facility Supervisors via DPHS RHTA-5                                                                                                  Supervisors on host special facility patients who cannot be decontaminated or show internal contamination, and will enroll in Radiological Screening Program.
e y      .-      ,
                                    .o3 .
                                          ,  v. w          c    +r  ,y..    .y          w w    a w  <.w-.      -  ,.c    srr, ,    ,.% ._    ,,,m, _ _ _ ..    .,___.._mm2..s _._ .r.m__m_owa
 
n-15tBERP REY. 3 VOLUME:              6        SECTION: DPHS Procedures AFFECTED AFFECTED            VOLUMES PAGES'          E PAGES REV. 3            REV. 2                              CHANGE                              REASON                      EFFECT 5.0-3              Vol. 4A,        Added Step 5 to State Area            Drills / Exercise Conments        IFO RETA will provide information to IFO            Emergency Checklist and Step 18 to                                        the Media Representative in RHTA-2          General Emergency Checklist.                                              preparation for spokesperson's and                                                                                                                                        -
RETA-5                                                                                    remarks at joint media briefings.
6.0-4              Vol. 4A,        Revised Step 11. Site Area            ASLB Hearing Commitments /        DPHS Supervisor will coordinate DPHS            Emergency / General Emergency          Stipulations Sup-3          Checklist (Step 10 in Rev. 2).
monitoring of special facility evacuees with Host Facility Supervisors at the host healthcare facilities.
7.0-4              Vol. 4A,        Revised Step 3 Site Area Bnergency Annual Update IFO AA-3                                                                                  IFO Accident Assessment Team reports and General Baergency Checklists.                                        data to EOC RHTA.                -
Revised Steps 8 and 16, General Energency Checklist.
8.0-1              Vol. 4A,        Replaced position. . Revised          Drills / Exercise Comuments EOC            description of responsibilities.
Position of EOC Accident Assessment AA Support replaced by EOC METPAC Support                                                                                                                  Operator. Deleted recomunending -
precautionary and protective actions and determining requirements for-administration of KI from description
+
of responsibilities.
7 y- ,  , - + ,      .        ,y, c ' - - -r we e.s m*t-    ts'        '***t'=    *-            a  w--e  v    P- *m'  e+  --v%-r  -* +-
v1tm    #
 
M3 VOLUME.-    6            SECTION: _ DPBS Procedures AFFECTED AFFECTED    VOLUMES PAGES      & PAGES REV. 3    REV. 2                          CHANGE                                  REASON                                EFFECT 8.0-2      vol. 4,          Revised Step 3. Alert.                  Drills / Exercise Comments EOC AA Deleted direction to establish                                    ' ,
Support-1 comemnications with TSC for receipt of data and.information on plant conditions and prognosis and on recommendations proposed by the utility. Added direction to establish comununications with IFO .
Accident Assessment Team for receipt of data and information on plant conditions and prognosis, meteorological data and on recommendations proposed by the utility.
Revised Step 4 Alert, and Step 3          Drills / Exercise Comments            Deleted references to use of backup Site Area Bnergency/ General                                                    dose assessment programs if METPAC is Emergency..                                                                    unavailable.
Vol. 4A,        Deleted Steps 5 and 6, Alert.            Drills / Exercise Comments EOC AA Deleted directions to consider
                                                                                                                ' precautionary actions in fast Support-2                                                                                      breaking emergency based on plant conditions (Step 5) and to provide precautionary action reco.amendations to DPHS Director (Step 6) now in another procedure.
8.0-3      Vol. 4A,        Revised Step 2, Site Area                Drills / Exercise Comments'          Deleted references to receiving data EOC AA          Emergency / General Emergency.                                                front TSC and EOF Coordinator since Support-2                                                                                      data will come from IFO.
  ,        e  a  y. . , - , .      7,  ,, , .-w.  .v.e -
r        , -r v  e    <    +          +,es-,  ., w  , . , s,,n,- , , , , . , - . . , w . _ _ _ _ _ . - . . _ . - .w,.
 
IWntFRP REY. 3
    , VOLUME:          6        SECTION: DPBS Procedures                                                                                                                            -
AFFECTED AFFECTED        VOLUMES PAGES        & PAGES REY.~3        REV. 2'                    CHANGE                                      _ _                    REASON                                EFFECT                          '!
i 8.0-3            Vol. 4A,    Revised Step 4, Site Area                                        Drills / Exercise Comments              METPAC Operator will review data with' EOC AA        Dnergency/ General Emergency.-                                                                          ~ DOC RHTA rather than IFO Accident Support-2                                                                                                              Assessment Team.
Revised Step 5, Site Area                                        Drills / Exercise Comments              METPAC Operator will advise EOC RHTA Emergency / General-Emergency.                                                                            rather .than DPHS Director and NHOEM Director.
  ^ 9.0-2            Vol. 4A,    Revised Step 2, Alert.                                            Drills / Exercise Comments              Monitoring _ Team Coordinator will MTC-1                                                                                                                  proceed directly to Incident Field
                                                                                                                                            ' Office.
Revised Steps 4 and 6, Alert.                                    Annual Update                          Monitoring Team Coordinator directed to establish contact and cdordinate-with NHY ORO Field Team Dispatcher.
9.0-6            Vol. 4A,      Revised Step 8, Site Area                                        Drills / Exercise Counnents            Monitoring Team Coordinator will
                    . MTC-3        Emergency / General Emergency..                                                                          prioritize samples for return to the IFO rather thac receive priorities from IFO Accident Assessment. Team.
Revised Step 9. Site Area                                        Drills / Exercise Comments              Monitoring Team Coordinator ensures Bnergency/ General. Emergency.                                                                            provisions made for transport of samples to DPHS lab.
9.0-6            Vol. 4A,                                                                      Annual Update
                                                        ~
Added Step 10 Site Area.                                                                                  Monitoring Team Coordinator _will, MTC-4      . Emergency / General Emergency.                                                                            after consultation with IFO Accident Assessment Team, coordinate with-Maine, Massachusetts /NHY ORO, the-utility, New England and. federal-officials (if present) to establish coordinated-sample. team deployment.
6 e,$- u ,    .s + r      .,  ,                          .e-                              a n-p                  ,.  - N.,,...a y    . . , . ,,,; , . . ,s--. -~v., -. ,  l,.',
 
      - VOLUME:                              6                                                                            15mERP RET. 3 SECTION: DPHS Procedures                                                                                                                                                        -
AFFECTED AFFECTED                    VOLUMES PAGES              & PAGES REV. 3              REV. 2                                        CHANGE                                                  REASON                                    EFFECT 9.0-7                      Vol. 4A,      Added Step 16, Site Area                                                Annual Update                          Monitoring' Team Coordinator will MTC-4          Emergency / General Emergency.
instruct monitoring personnel, after
                                                                                                                                                                                                                  ~
completion of activities and preliminary monitoring / decontamination of the IF0,:to. report to the Emergency Worker Monitoring / Decontamination Center in Manchester if further decon:
is required.
Added Step 17, Site Area                                                Annual Update Emergency / General Emergency.
MonitoringLTeam Coordinator will turnJ
                                                                                                                                                                    - in all log sheets and information to IFO Accident Assessment Team.
10.0-3                        Vol. 4A,      Revised Step 4, Site Area                                              Annual Update MT-1          Emergency / General Emergency.                                                                                Monitoring Teams will proceed Inunediately to IFO when directed by' the Laboratory Supervisor.
Revised Step 5, Site Area                                              Annual Update Emergency / General Energency.
Monitoring ~ Teams will perfcrm radio check with DPBS Lab' Supervisor enroute.
W 5
L                                    y        J - *-    ~ . .- ~-.'-Ls--              -=e~                  ., ~ - . . w    -r    - - -      y(+ -+
  ,%#...%-                              , - .                                                        4                                                        2w-4    -
wr '*---7-- ve ' *ve6' e'w w*-- rs - a m w# -'r<1=-- *=J
 
IIHERRP REV. 3 VOLUME:                  6            SECTION: DPHS Procedures AFFECTED
: AFFECTED                  VOLUMES PAGES.            & PAGES REV. 3            REV. 2                        CHANGE                                            REASON-                                          EFFECT 10.0-4                Vol. 4A.-        Added Steps 12, 13, and 14, Site              Drills / Exercise Comments                      Monitoring Teams will report to MT-3            Area Emergency / General Emergency.                                                            Monitor Dispatch Area and pick up a field monitoring kit (including ~the duffel bag), another procedure-package, and a grid map notebook and will' inspect the seal on the kit. . If-the seal is intact MTs.will break the seal and proceed eith equipment-                                                          ,
operational checks.' If the seal is broken, MTs will inventory the kits' and perfnra equipment operational
                                                                                                                                                                                        ~
checks.
1000-5                  Vol. 4A,        Added Step 15 and Note, Site Area              Drills / Exercise Comments MT-3 Monitoring Teams will pick'up's Emergency / General Etnergency.                                                                utility radio at the Dispatch Area.
Note refers to alternative use of NHOD( radio or comunercial- telephone if radio commmunications fail.
Revised Step 17, Site Area                    Drills / Exercise. Conuments                  ' Step. revised-to direct monitoring ~
Emergency / General Emergency.                                                                  radiation levels enroute to monitoring point using E-140/HP210 rather than RO-2 except where count rate exceeds 5000cput.
  .,,.miwa+  , , ,- ~y ,v.,.:      . ~ , _-
t    3
                                                        -                s u        y-  g-w + - + . - - -,          3%<,q ..w.. g c w.-w,ww.,  f,_ _ . . c y  _ - __ _ _ _ ______u_n____
: u. _ _ _ _ _, . _ _ _t..,_.w_.., , M. . , ,
 
1
        ~                                                                                            MInterp REY. 3 VOLUME:                      6            SECTION: DPHS Procedures AFFECTED AFFECTED                VOLUMES PAGES                  & PAGES REV. 3                  _REV . 2                              CHANGE                                            REASON                                  EFFECT 10.0-6                  Vol. 4A,            Revised Steps 18 and'19, Site Area                Drills / Exercise Conunents MT-3                                                                                                            MTs report dose rates exceeding 100 Emergency / General Emergency.
mR/hr to DPHS MTC inanediately. If dose rates exceed 500 mR/hr, MTs go to a' lower background radiation area
                                                                                                                                                                                        ~
and await further instructions.-
Added Steps:23 and 24, Site Area                  Annual Update                              MTs directed to log general area' dose Emergency / General Emergency.
rate.and the background and sample count rates on Offsite Sample Log-and to report values to DPHS MTC.
                                                                                                                                                              ~
    - 10.0-8                    Vol. 4A,            -Added Steps 33 and 34, Site Area                . Drills / Exercise Comunents MTC-4
                                                                                                                                                  .MTs directed to. report to.
Eme'rgency/ General Emergency.                                                              Radiological Assistant.in the EOF with samples and 'saraple records, then^
report to DPHS MTC when directed by-the Radiological Assistant and await-      'l further instructions.-
    '11.0-1                        NA                Added Sampling. Team Procedure.                  Drills / Exercise Comunents              Sampling Team Procedures were added-        -,
to differentiate post-plume sampling :        .i team composition, equipment and.
activities-from those of DPHS Field.
                                                                                                                                                                  ~                            d Monitoring Teams.
                                                                                                                                                                                                .i
?
                                                  .                                                                                    .                                                      .j
_-______:__ - - _ _ . - - - _ _ _ _ _ _ . - - -            ~~-        ~ - . ~ -- --        --      -
r +-    , ~  e-~~,    ,m,    - ~~ -      --r - nn , -
                                                                                                                                                                                    -~.  ~~e,-
 
MmtFRP REY. 3
:VOLDME:      5        SECTION:                1.0 AFFECTED AFFECTED    VOLUMES
    ~ PAGES      & PAGES REV. 3    REV. 2                                  CHANGE                                    REASON                        EFFECT
          ~
Vol. 5      Vol. 4          Addition of supporting document                    Annual Update / Reformat          Provides direction to additional'
  .All          All.            lists and references. Changed                                                        - documents as reference for actions. .                      ,
Sections    Sections        NHCDA to NHOEM.
1.0-1        Vol. 4, Further clarified Governor's role                  Annual Update                    Change defines the Office's pg. 1          and responsibilities as defined in                                                    responsibilities.
Volume 1 of.the NHRERP.
1.0-4        Vol. 4        ' Added statement to consider the.                    Annual Update                    Change allows Governor or appointed pg. 3          Declaration of a State of                                                            - designee to review options and Emergency.                                                                            potentially free resources in the event.the emergency escalates.
  -1.0-6        Vol. 4,        Added step to procedure to ensure                  Annual Update                    ' Change further defines the' Governor's pg. 4          the issuance of the Declaration of.                                                  role and responsibilities as outlined State of Emergency.                                                                  in State Statutes.
                                                                                                                                                                              .i
~
                                                                                                                                                                              .1
                                                                                                                                                                                  .I
                                                                                                                    ,                                                        ..-l w  # 4  y    _    _  v              f-.y_-                  r.~, s- rw- :=m-            -
r-  t t''w --
                                                                                                                        -- * *        . . -
* e e*. . ' - ew < ' _ = - 'e-
 
MmtFJtP REY. 3
      - VOLUME:          5          SECTION:    2.0 AFFECTED.
:-AFFECTED            VOLUMES
        'PAGES            &'PAGES REV. - 3        REV. 2                        CHANGE                              REASON                                EFFECT
      - 2.0-1            Vol. 4,      Removed State Notification Fact        Annual Update                        All forms were moved to Volume 8, pg. 1-1        Sheet from procedure.- Incorporated                                          Forms Section, as part of the form ~into Volume 8 as Form 200A                                            reformat. Change improved state's State Notification Fact Sheet.                                              ability to implement, control and maintain forms.
    - 2.0-2              Vol . 4,      Clarified notification                Annual Update pg. 1-2        responsibilities. Added
                                                                                                                    . Change enhances initial notification
                                                                                                                      .to key NHOEM response staff and clarification to support staff                                              support staff.
notification.
i
.-..%m.    - . . s--- u- c yc-,,-~-u                    r.          g  - e      -
e* -  - y  cr .v4 -
                                                                                                              -ewr =    ,3 -
* c 4.e.,- ,    42,.-.,,-___,, mt
 
VOLUME:        5        SECTION:          3.0 AFFECTED AFFECTED    ' VOLUMES PAGES-        & PAGES REV. 3        REV. 2                          CIfANGE                                  REASON                                        EFFECT 3.0-2          vol. 4.-    Consolidated procedures to provide      Annual Update                                        Change clarifies notification' steps Sec. 2,    for actions at any ECL. Clarified                                                            to be taken at all ECLs.
pg. 2-2    notification of key and support staff.
b 7,.ir,m,,,3                y m,- y s,.,6.-
                                                  . - . + -,-y, em. a
* c o r.,  ,--
4 ~'"'**F" '
                                                                                                      ''a"T 3r"V rbN-*M.-e    --T- n- 'e  +r9'+ '-+v''M5hw'' e*  *=-w'' = r *
* NRRFRP REY. 3
    -VOLUME:        5        SECTION:      4.0 AFFECTED
    'AFFECTED      VOLUMES
      .PAGES        & PAGES REV. 3      REV. 2                                CHANGE                                        REASON                          EFFECT 4.0-4        Vol. 4,      Revised procedure to coordinate                        Annual Update                    Change enhances coordination between Sec. 3,        early or partial activation of the pg. 3-3        State Transportation Staging Area                                                      NHODi Director _ and EOC Coordinator with respect to State Transportation w.tth the EOC Resource Coordinator.                                                      Staging Area activation. In addition, the step provides for partial activation in the event the transit-dependent beach transients (Hampton'and Seabrook Beaches, May'15-Sept. 15)'and school children are evacuated prior.to the, Protective
                                                                                                                        - Action Reconunendation for the general public.
4.0-6        Vol. 4,        Added Host Connunities to list of                      Annual Update                    Change' ensures Director is' aware of Sec. 3,        facilities / communities to verify                                                      Host Comununity notification of pg. 3-4        notification of escalated status.                                                        upgraded status.-
,~4.0-8          Vol. 4,-        Added step to consider                                  Annual Update.                  Change provides additional resource Sec. 3,        regional / support assistance.                                                          options to the Director. Volume 50 pg. 3-4 provides LOA's for regional support group.(e.g.. Interstate Civil Defense Compact, New England Interstate Radiation Assistance Plan).
4.0-9      Vol. 4,        Added provision for use of pre-                        Annual Update                    Provides. Director option of using-Sec. 3,        recorded General Emergency EBS                                                          pre-recorded message at General pg. 3-6        message.                                                                                Emergency forLfast breaking
                                                                                                                        . incidents.-
                                                                                                                  ~~
_a            .-      . _,    s      .                            - :u _.      ;,    m    , ; -.    . #-    _ . _ .  . ~  2,  ..  ._,...a....---.  . a
 
b NHRERP REY. 3 VOLUME:  5        SECTION:    4.0 AFFECTED AFFECTED  VOLUMES PAGES- E PAGE0                                                                                                                              _;
REV. 3 RE7. 2                    CHANGE                                  REASON                      EFFECT 4.0-13    Vol. 4,    Added provision for considering the Annual Update                  Change ensures Director is aware of Sec. 3,    disposal for radiological waste                                    the considerations for waste pg. 3-9    during the recovery phase.                                          disposal.
  , _ , . , ..        x                        --            -.~;-. , - . . , ,  -. , -
                                                                                          - . . ,      . ~ .,    ,, , . _ _ _ _ . _ _ __ _ _ _ _ _
 
NsntRitP REY. 3 VOLUME:                                                  5        SECTION:        5.0 AFFECTED AFFECTED                                                VOLUMES PAGES                                            & PAGES REV. 3                                          REV. 2                                CHANGE                                REASON                        EFFECT 5.0-2                                                    Vol. 4,    Added word " Precautionary" to step                  Annual Update                  Change ensures Operations Officer Sec. 4,    to determine appropriate Protective                                                includes precautionary actions as an '
pg 4-2      or Precautionary Actions if                                                        option.
necessary.
5.0-3                                                    Vol. 4,    Added responsibility previously in                    Annual Update                  Operations Officer coordinates the 5.0-6                                                    Sec. 4    Director's-procedure for ensuring                                                    overall response effort. - This change-5.0-9                                                    pg. 4-2    receipt of utility notifications.
                                                                  - pg. 4-3  Clarified provisions for reflects his coordination role.
pg. 4-5    coordination of effort with Massachusetts, NHY ORO and Maine.
i,a'-a                                                    -w,,,w      *,e,mi-,,#    -e&+r. g g.                  r+      w    4  ,g9"..                              q;-my..,
7 4            ,    y        -9%
                                                                                                                                                                                                          ..9 , m  qgei q y
 
:  ! !  l!1 t
r l p  o'.t o p0 r oMVu5 c          p tE O e s'.p
                            .                                                              p r          eHcll u                                              -
e          gNnaos                                                a d          a      enV                .
r o
unro gi eisa'          l n      f gen l          aoeeco a        l srrni eg c              l i          l aesre g          e      reer                                              _
o        l eucf                                                .
l          l gd n e f                                            g T                aneaRo                                                  ,
C      n          rach                                                    _
E    i                                    .-
F F      s ahon.t pCre p
ss w
E      p          s nin t
e        d'.
d e s  0. ol i oi 4t rt s          a uor 'r.nf aoa z
s          edt ci                i e          gecedsn                                            m c          nceS r'              a                        N a          aor          oAg l          h ri .oOr P          C pD 5 c L o N
O                                                                        ,
S A                                                                  s E
R      e          e t          t 3                    a          a d            d
    .                  p          p Y                  U            U E                  l R                    a l
a u          u P                    n          n R                    n          n                                                  n P                  A            A R
m R                                                                                      -
N                  l a
r u                .
d                d                                            g e          l e c          at                                                y o
nc r
p          oe i r gi f            ed o            r s
n            na E    o          i G    i            ae N    t            t c A    a          b n H    z            oa C    i                t n
a os                                                  n, ti 0              g                s                                            u.
r            ps 6              o            ea e          t/
r            st                                                r
                              .        r                                            e
:              rs          d o m
N              op          ep O
I ne it d p T                          d u C
Ms          As                                                  .
E                                                                                .
  .S D
ESS            ,    ,2 TEE 2      45 -
CMG                    5 EUA    .    .
FLPV        l c .
FO E      oeg                                                            e 5  AV&R        VS p                                                            ~
e.
D                                                                        r
:    E  3 E    TS M    CE    . 3 U    EGV        -
  .L      FAE      0 O    FPR V    A        6
                                                                  '  T
 
NRRRRP REV. 3
                - VOLUME:            5-      SECTION: _ _ 7. 0 AFFECTED' AFFECTED      VOLUMES PAGES      & PAGES REV. 3    REV. 2                    CHANGE                                                        REASON                            EFFECT 7.0-2        Vol. 4      Added step to notify all agencies                            Annual Update                  Change ensures notification of Sec. 6,      previously contacted of termination                                                        termination.
pg. 6-2      of the event.
Combined Site Area and General                              Annual Update                  Change consistent with reformat; Emergency steps for procedures.                                                            aids implementation'and maintenance of procedure.
                -7.0-3              Vol. 4,      Moved step from ALERT to Site                              Annual Update                  Change consistent with State of New Sec. 6      Area / General Emergency procedure                                                        . Hampshire precautionary / protective pg. 6-2    which notifies the B & M Railroad                                                            action recosunendations.
,                                              .to halt train. traffic from entering the EPZ.
Added steps to ensure agency staff. Annual Update                                            Operational and administrative -
are briefed on' administrative                                                              control of EOC'operaticns.
operations. Added step to inform Director and Operations Officer of arrival of agency staff.
4
_ . _ _ _ _ _ _ _ _ _ _              + _ __  "      ''              " ' ' '  ''''r"'W
                                                                                  '      " * ~ * * ' ' ' ' " " " ' " "E '-
a"''- #''"    4' " ' ' " ' "'  '"''T''"'r--
* r em=- -
m w_w*  2: ee-_ s o-
 
WRRRRP REY. 3
: VOLUME:                                                        5          SECTION:    8.0                                                                                                                                                                . ,
AFFECTED AFFECTED                                                      VOLUMES PAGES                                                    & PAGES
:REV. 3                                                      REV. 2                          CHANGE                              REASON                                  EFFECT 8.0-1                                                        Vol. 4,_      Modified language governing State        Annual Update                            Standardizes titles. Allows early-
:8.0-2                                                              Sec. 7        Transportation Staging Areas                                                      deployment of vehicles to minimize activation and vehicle assignments;
:8.0-3                                                              pg. 7-1 8.0-5                                                          pg. 7-2        standardized use of TSA title; evacuation time for transit-dependents.
8.0-7                                                        pg. 7-3        added provision for considering the pg. 7-4        dispatch of vehicles to local TSA's prior to a PAR.
8.0-8                                                          Vol. 4,        Sheltering Portsmouth State TSA        Annual Update                            . The secondary State TSA has changed:
Sec. 7,        staff (Note OMNE Mall Staging Area                                                from the OMNE Mall'to the NH      -
pg. 7-4        has moved to NH Port Authority in Portsmouth Port Authority. Provides Portsmouth). ' Coast /UNH Karl Van is                                              for shelter of.TSA staff. Alternate no longer alternate shelter                                                        location no longer needed.
location.                                                                                                                                                '
i          8.0-8                                                          Vol. 4,        Added language to requ_est IFO          Annual Update                              Change to procedures enhances the Sec. 7,        Resource Ccordinator to. advise when                                              coordination with the' release of EBS pg. 7-5        bus routing / passenger picit up will-                                            messages.
begin'in the affected area.
                            .  -r-.*A'                    h-                                  m      m.        y y  +      f^    , '    -
                                                                                                                                                  % &fv'4'"  ' * "yn*' 'v'    y      ?  'W ' ' _ _ _ _ _ _ _ _ _ _ - _ - - _ . _ - - - - - . - -
                                                                                                                                                                                                                                                        --*-_---Mu'-    _4R-
 
IWIRRRP REY. 3 VOLUME:          5        SECTION:    9.0 AFFECTED AFFECTED        VOLUMES PAGES    & PAGES REV. 3    REV. 2                                  CHANGE                          REASON                EFFECT 9.0-1            Vol. 4,    Deleted duplicate information that                Annual Update.        All forms have been moved to Volume 8-Sec. 8,    is also~provided on Communications pg. 8-1    Systems Status Report (Form 300D                                        Forms Section for enhanced
                                                                                                                -implementation, control and Forms Section Volume).                                                  maintenance.
4
                                                                                                            .-                    -        "    - - - - ^ " "^ ' ~ ' - - -
 
NHEFRP REY. 3
    ' VOLUME:        5        SECTION:    10.0                                                                                                        -
AFFECTED AFFECTED        VOLUMES
        ~PAGES        & PAGES REV. 3      REV. 2                    CHANGE                                REASON'                        EFFECT 10.0-2          Vol. 4      Revised procedure to reflect            Annual Update                  Change allows personnel to mobilize Sec. 9      Liaison and IFO staff report to the pg. 9-1 and activate the Incident Field IFO without having to report to the-                                    Office-(IFO) in a more timely EOC first.                                                              fashion.
10.0-6          Vol. 4,    Added step to procedure which            Annual Update                  Change ensures that in a' fast Sec. 9,      ensures Liaison performs all steps                                      escalating event or if Liaison pg. 9-4      listed under ALERT.                                                    reports at a higher ECL all ALERT.
steps are accomplished.
10.0-7          Vol. 4      Added' Recovery /Re-entry section to'    Annual Update                  Change allows the State of New Sec. 9,    procedures.                                                              Hampshire to return to pre-pg. 9-5                                                                              emergency conditions.
                                                                                                      'J I
                                                                                                                                                              .l
                                                                                                  ~
      ._.          -                _  _,          ._            , , _ .                2,.  , . ,;    _    .. _    _ - , . - - ,__ _ _ _  . _ . _ ,  _m
 
NRRFJtP REY. 3
  ' VOLUME:                  5        SECTION:        11.0 AFFECTED AFFECTED                VOLUMES PAGES                  & PAGES REV. 3                  REV. 2                        CHANGE                                            REASON                      EFFECT 11.'0-2                  Vol. 4,      Added step to procedure for                              Annual Update                Change reflects integration'of Sec. 10,    consideration of precautionary                                                        precautionary action considerations.
pg. 10-1    actions.
Clarified use of Seabrook Station                      Annual Update                Change ensures current plant data-is Status Report Form and its provided.to key officials at_the..
coordination with the State EOC.                                                      State EOC.
11.0-5                  Vol. 4,      Included Recovery /Re-entry section --Annual Update                                  Change allows the State of New                                  i Sec. 10,    into procedures.
pg. 10-3 Hampshire to return to pre-
                                                                                                                                ' emergency conditions.
  ,    , 2_              _ _ _                                            _ . . _ .      .
 
u lenReP REV. 3 VOLUME:      5      SECTION:      12.0 AFFECTED-AFFECTED' ' VOLUMES PAGES        & PAGES REV. 3      REV. 2    ,
CHANGE                                        REASON                  EFFECT 12.0-2      Vol. 4,      Added provision to request town              Annual Update                Change allows the IFO Controller to Sec. 11,      notification status from the state                                        determine whether all towns have pg. 11-1      EOC.                                                                      received notification of an incident at Seabrook Station. Based on this information, the IFO Controller uill prioritize additional notifications..
12.0-2/      Vol. 4        Expanded procedure step to ensure            Drills / Exercise Comments    Step'was expanded to ensure'the IFO 12.0-3      Sec. 11,      the assignment of IFO staff.                                              is fully staffed.
pg. 11-1 12.0-2      Vol. 4        Added provision for Special Needs            Annual Update                A new position, the Special Needs Sec. 11,      Liaison.                                                                  Liaison, has been created.-
pg. 11-1 12.0-3      Vol. 4,      'Added provision for requesting                Annual Update                This step has been added to allow the-Sec. 11,-    communications status from the IFO                                        IFO controller to be aware of pg. 11-2      Communicator.-                                                            communications.
12.0-4      Vol. 4,
                              .Added provision for coordinating              Annual Update                Change to procedure to ensure the
                -Sec. 11,      briefings with EOF Liaison and DPHS                                        coordination between key staff.
pg. 11-2      IFO Coordinator.
12.0-5/. Vol. 4,      Added note to procedures to                    Annual Update                Change provides'the state an 12.0-8      Sec. 11,      consider activation of. sirens.from                                        additional siren activation option in _
pg. 11-4      the Seabrook Station Control Room                                          the event of siren activation failure if RCDC reports failure.                                                    at RCDC.
I I
e m  .              2 y
 
                                                                                                                                                  - 3 VOLUME:                                          5      SECTION:      12.0 AFFECTED AFFECTED                                        VOLUMES PAGES                                    & PAGES REV. 3                                  REV. 2                                CHANGE                                              REASON                        EFFECT 12.06                                            Vol. 4      Added provision for receipt of                                Annual Update                        Change to procedures provides Sec. 11    Stste road conditions and the                                                                      information on condition of and pg. 11-3    forwarding of that information to applicable organizations.                                                                          constraints to' potential evacuation routes.
      - 12.0-1                                              Vol. 4,    Removed all steps in procedure thru                                      Sec. 11, Drills /Ezercise Comments          Change reflects the expansion of the which provide direct control over 12.0-12                                            pg. 11-1    Local Liaisons. These steps now                                                                    role of IFO Resource Coordinator.
thru    'are included in the IFO Resource-pg. 11-7    Coordinator's procedure.
12.0-1                                              Vol. 4,    General clarification of IFO                                  Annual Update thru                                        Sec. 11,    operations.
Clarifications provide improved' 12.0-12                                            pg. 11-1 FEMA Technical Assistance /        ' coordination.of IFO activities (e.g.,
Plan Review                        message flow, conununication with the thru pg. 11-7                                                                                                      EOC and NHY ORO).
e.....,c.-,%g                                                .            -          -                              ;*r#--- y e e<        ,.y.,    -w      w- ..w,  n-      g- #      y-    e. ,, ,,ws _. , ..w v_ _ , [.e
 
M IMRFJtP REY. 3
  ~ VOLUME:                    5        SECTION:      14.O AFFECTED
  .AFFECTED                      VOLUMES PAGES                    & PAGES REV. 3                  REV.'2                      CHANGE                                REASON                        EFFECT 14.0-1                    Vol. 4      Changed NHOEM Local Liaison          Annual Update                  Change consistent with the expansion thru                    Sec. 13,    reporting and coordination FEMA Technical Assistance /    of the role of the IFO Resource-14.0-5                :pg. 13-1        responsibilities from IFO            Flan Review                    Coordinator. Change ensures'the thru        Controller to IFO Resource                                          coordination between~ state and pg. 13-4    Coordinator.                                                        local response orgenizations.
14.0-4                    Vol. 4      Added requirements for providing      Annual Update                  This change enables locals 'to prepare Sec. 13,    vehicle ETA's to Local EOC's.                                        for the arrival of evacuation pg. 13                                                                                                                    vehicles (e.g., activate. support staff, maps. etc.).                                                  -
                                                                                                                                                                                      .l
                                                                                                                                                                      .              .I g ---
c    . ,    -  -.
                                                                                                                              ,e-p  +e+- uq - - - .~ 4-r~ .-c ,m:,ty,e  ,.,,,e ,,.,
 
NRRRRP REY. 3 VOLUME:    5          SECTION:        14.1 AFFECTED
  'AFFECTED    VOLUMES PAGES    & PAGES REV. 3  REV. 2                              CHANGE                                          REASON                                        EFFECT 14.1      Vol. 4,        Revised to list separately the                        Annual Update                            This change allows for the Sec. 13A,      following: Private Schools / Day                                                              establishment of_ priorities for pg. 13A-2 Care Centers, Special Facilities,                                                                    notification, assignment of resources Nursing Homes, Hospitals..                                                                      and evacuation of facilities.
14.1-4    Vol. 4,        Re' vised procedure to have Special                  - Annual Update                            Change incorporates use of new Sec. 13A,    Needs Liaison assisting with the                      FEMA Technical Assistance /              position.
pg. 13A-3 contact of individuals on the                              Plan Review-Special Needs List.
14.1-5    Vol. 4,      Reassigned to Special Needs                            Annual Update                            Change centralizes all requests for.-
Sec. 13A, Liaisons the responsibility to FEMA Technical Assistance /              transportation assistance and ensures pg. 13A-3 receive calls from individuals who                        Plan Review                              proper assignment for' evacuation.
were directed by EBS to call for.                                                                                                                                      ' '
transportation assistance.
        .,m-g p .. _wi.. m  -.-u  is,ns    *    +.-e.mn., *g m <- .(      V  g        .7'" T
                                                                                                      ~
f '' *-
                                                                                                                  '--h t ''7  v  m '4 S' * ''- - - - -- * - - - - - - -- - --- A- r- - - ' ' --
                                                                                                                                                                                            - -        * =euuw" Y e
 
IMWRWP REY. 3
  -VOLUME:            5            SECTION:          15.0 AFFECTED AFFECTED          VOLUMES PAGES            & PAGES REV. 3          .REV. 2                                CHANGE                                    REASON                  EFFECT 15.0-1            NA                Added new procedure which provides        Annual Update                  New procedure enhances the State's for verification and facilitation          Drills / Exercise Coments      ' ability to compensate for towns of transportation requirements of                                          unable to respond.
persons having special needs in towns unable to respond.
                                                                                                                                                                                          .l a
L.        . . ~ . .      __s.-,, , - .    - . . ~ . . .-  ._
3        -. c  1_~.        --.~.JL,~.,
LA . , , _ . . , . ,  , -          .._m. - . _ _ . _ _ _ , . _ . , . _ . .
 
3 d  ,_
I NHRRRP REV. 3 VOLUME:      5      SECTION:      16.0                                                                                                                                                                          > ,
AFFECTED AFFECTED  . VOLUMES PAGES    & PAGES REV. 3    REV. 2                                          CHANGE                                                                      REASON                                          EFFECT 16.0-4    Vol. 4,    Added provision to provide siren                                                                  Annual Update                    This addition to the procedure Sec.-14,    and EBS activation times.                                                                        Drills / Exercise Conments      ensures EPZ conununities receive pg. 14-                                                                                                                                        timely notification of EBS 1.2                                                                                                                                            activation.
16.0-5    Vol. 4,    Added coordination steps with                                                                      Annual Update-                  Added steps address State's response Sec. 14,    Sheriff's Department personnel in                                                                Drills / Exercise Conments      to evacuate towns unable.to respond pg. 14-3    towns unable to respond to an                                                                                                      to an. emergency.
emergency.
16.0-5    Vol. 4,    Coordinate updates to                                                                              Annual Update                    Change ensures adequate vehicle-                              ,
Sec. 14,    transportation requirements with resources are available for residents                          ;
pg. 14-2    Sheriff Deputies in~ towns unable                                                                                                  in towns unable to respond ~1n an                              ;
to respond. 1Special_needs                                                                                                          emergency.                                  -
individuals who call the IFO-after-an EBS message is broadcasted, residents without transportation, etc.)
  . 16.0-5    -Vol. 4,    Added note to procedure which                                                                      Annual Update                    Note ensures information transmitted.
Sec. 14,    identifies the IFO as the' prime                                                                                                    to and from personnel in -towns unable .
l              pg. 14-2    radio contact point'for" Sheriff's                                                                                                  to respond to an emergency is Department personnel'in towns-                                                                                                      centralized and consistent.
unable to respond in an emergency.                                                                                                                                                                '
f
  .s            .,m ,.
                            ,%-- ,,m_-    ~3.-                        . -- - r_-                                        ,'7-            %y  -  +.--y .pm-    ,Eg                    y,. -    ,  ,,g ,,  ,, [ w. ' ,, U
 
N3 VOLUME:            5      SECTION:        17.0 AFFECTED
        ~AFFECTED        VOLUMES PAGES        & PAGES-REV. 3'      REV. 2                          CHANGE-                                              REASON                  EFFECT
        . .17.0-1          Vol. 4,        Combined Alert / Site Area Emergency / Annual Update                          Combined Alert / Site Area Emergency /
            .thru          Sec. 15,      General Emergency steps and                                                    General Emergency steps to facilitate 17.0-5        pg. 15      reorganized steps in logical                                                  implementation.-
thru 15-4    progression.
m 7
8
  ,_e.,-..,    .a .w.,                                    " ' ' ' " ' '
                          . , - , , ~    +'w.--''* '
                                                    ''                    ' * ' " ' " '                  ~~
Y
 
3 VOLUME:    5                SECTION:  18.0 AFFECTED AFFECTED VOLUMES PAGES  & PAGES REV. 3 REV. 2                              CHANGE                                  REASON                        EFFECT 18.0-1  Vol. 4                Combined Alert / Site Area Emergency / Annual Update thru                                                                                                -Combined Alert / Site Area Emergency /:
Sec. 15A, General Emergency steps and                                                          General Emergency steps to facilitate 18.0-3  pg. 15A-1 reorganized steps in logical                                                        implementation.
thru                  progression.
pg. 15A-3 18.0-1    Vol. 4,              Added that the position may be          Annual. Update                  State may decide to send individual Sec. 15A,              staffed by IFO technical support      ' FEMA Technical Assistance /~  from IFO who has been briefed on the pg. 15A-1 person dispatched from the IFO.                      Plan Review l                  New Hampshire response effort. -This will ensure technical correctness of media releases.
j e
  ~ ~ . .      ,  s    . - - , . . .
                              .        .. _        ._          .m... . - c _ c_-.      -
                                                                                                              ..r.. -.-. _~        . _ . - ~ . . . _ , ,.  .
 
                                                                        ~
: VOLUME:  5      SECTION:  20.0 AFFECTED                                                                                                            .
  '.AFFECTEE VOLUMES PAGES  & PAGES REV.-3 REV. 2                            CHANGE                      REASON                    EFFECT 120.0-1    Vol. 4      Combined Alert / Site Area Emergency / Annual Update            . Combined Alert / Site Area Emergencyl-20.0-2  Sec. 16A . General Emergency steps and                                        General Emergency steps to facilitate pg. 16A-1 reorganized steps in logical                                        implementation.                                    '
thru      progression.
pg. 16A-5
                                                                                                                                              .l
                                                                                                                                              -l
_.... _- ,_  ...z        ~      _ . . - . . .      _.        _  -      _ ,-__  ,_ h.  , _ .- _ c  _m.~.._ . .
__n,..  . _ _ _ . _  ._
 
M*3
        . VOLUME:            5                SECTION:      23.0
                                                                                                                                                                                                                                  -i AFFECTED AFFECTED          VOLUMES PAGES        & PAGES REV. 3      REV. 2                                  CHANGE                                                REASON                                      EFFECT                                                    'I 23.0-2            Vol. 4,                    Added step to coordinate activities Annual Update Step ensures consistent information..
Sec. 17B,                  with NHY ORO and SS ERO.
                        .pg. 17B-1 FEMA Technical Assistance /                    is provided to the public and the Plan Review                                    media.
                                                                                                                                                                                                                                'I a
aer-
  -,.w,
  +      -
* A  .- m,-w.  ,A.c?w .e    -p  , - .      +        b .,_m.+4.%~ - siWew.- g e = > + - , . y- -.+e 3 s =
1 .e-* 4  ''er-- -
* g:h-iv,- -,wp  .ae. m .- s- % -+.w+w 'yy'.-,y-.--- --etm4ge e  -y ww p
 
IgntFJtP REY. 3 VOLUME:                      5            SECTION:        26.0
      ..                        AFFECTED cAFFECTED                    VOLUMES
        -PAGES                  & PAGES 1REV. 3                    REV. 2                                  CHANGE                                            REASON                                            EFFECT 26.0-1                      Vol. 4                Added step to ensure appropriate                    Annual Update                                    This step will ensure appropriate Sec. 18,              personnel.are notified if necessary pg. 18-1            .at'U.E.                                                                                                personnel are on' standby in the event of' escalation.
  -26.0-1                      Vol. 4              . Moved steps from IFO Controller to                  Annual Update                                      This change enhances the.overall' thru                  Sec. 18                IFO Resource Coordinator.
26.0-10                    pg. 18-1                                                                    FEMA Technical Assistance /                      co3rdination of Local Liaison, EPZ Plan Review                                        and Host organizations, and thru
                              . pg. 18-4                                                                                                                    applicable state agencies to accomodate the expanded role of the-
                                                                                                                                                        .. IFO Resource Coordinator.
  ~~ 26. 0-3                    Vol. 4,              Added note to procedure to ensure                    Annual. Update                                -
Change ensures resources are assessed Esc. 18,              Special.Needs Liaisons assess pg. 18-1.              transportation needs.of all FEMA Technical Assistance /                        and added to the proper town resource 1 Plan Review                                        needs lists.                                        '
individuals and provide results to town assigned liaison.
26.0-5                      Vol. 4,            'Added statement to procedure to                      Annual Update.                                    Change ensures information flow from Sec.'18,              ensure staff briefingsjare                          FEMA Technical Assistancel                        the towns'and State are consistent.-
                              -pg.~18-1              periodically' held to update status. Plan Review
  ' 26.0-5                    Vol. 4            . Added clarification that' listed                      Annual Update _                                  This provision ensures resources willi Sec. 18,              transportation-' requirements are to                                                              - be provided even if unable to confirm pg. 18-la              be~ relied upon if. current
                                                                                                                                                        ' need.
transportation' requirements cannot be confirmed.
4 4
s M
  ,      .3e..m  M_ wise.*--          >i.N- y - w es. e    +    ami+    .*m y      y      ...ese      sa*N~ y .=e.-      J c.e-sel*%*h c.-w-,-    %-    4y*--  -- -- c- , , . - - _ - _ ,_ . _ _ _ _ _ _  __2..3._. ws-, 4  ,i
 
                                                                                                            ]UIRRRP REY. 3 VOLUME:                      5          SECTION:  26.0 AFFECTED AFFECTED                    VOLUMES PAGES                      & PAGES REV. 3                    REV. 2                              CHANGE                                                                        REASON                                                    EFFECT 26.0-6                    Vol. 4,        Added step to direct State TSA                                      Annual Update Sec. 18,        Supervisor to dispatch Sheriff's Change ensures' deputies are in place pg. 18-i        Dept. personnel to towns where
                                                                                                                                                                            - to handle local TSA dispatch as a compensatory action.                                                          >
state assistance is required.
26.0-6                    Vol. 4,        Added provision to ensure Sheriff's Annual Update                                                                                This change ensures IFO Communcatori Sec. 18,        Deputy radio. call signs are.                                      FEMA Technical Assistance /                                . is able'to establish and maintain pg. 18-3        provided to IFO Comraunicator.                                    Plan Review                                                  communication.with Deputies.
26.0-5                      Vol. 4          Added transportation coordination                                  Annual Update thru                      Sec. 18, These steps were added to ensure the steps before. during and after an 26.0-9                      pg. 18-4        evacuation.
generation of current resource needs.,
facilitate a timely evacuation and' ensure vehiclesireach designated Host' Communities.                                  ' ~
26.0-7                      Vol. 4          Added note to hold vehicles which                                  Annual Update                                                Change ensures vehicles will be.
Sec. 18,        arrive at a Local ~TSA in those                                                                                                . dispatched to areas where evacuation--
pg. 18-3        situations where vehicles.were                                                                                                  is recommended.
dispatched early in anticipation of                                                                      .
a protective action until instructed by the IFO to release                                                                                                                                                                            'q them.
26.0-8                      Vol. 4,        Added clarification that EOC                                        FEMA Technical Assistance /                                ' This will provide IFO and EOC with Sec. 18,        Resource Coordinator ~should-be                                    -Plan Review                                                  time when transportation vehicles pg. 18-3        given status on bus routing and                                                                                                  begin trip to Reception Center.
completion times when known.
                                                                                                                                                                                                                                                        .J
  <          %ms          ,
                                . ,    ,,                  9,+p,-  9e.a.'-  p. bar'*f++    6ri-g 9a.y,- e-      +.r*.m, i.y.  , , .4+-h "msi v  q    ,
                                                                                                                                                          'gikh 7~, -y- W*  1irN . '7.'J'' p' "r-. -
M-M'N  *MbM y p g.
* T    f- '4 Rd' - ' * **
 
IERERP REV. 3 VOLUME:    5      SECTION:  26.0                                                                                        .
AFFECTED AFFECTED. VOLUMES
      .PAGES    & PAGES REV. 3    REV. 2-                  CHANGE                              REASON                  EFFECT 26.C-9    Vol. 4,    Added provision for back-up door-    Annual Update            Change ensures hearing Isrpaired are Sec. 18,  to-door notification of hearing      ASLB Hearing Comunents/  contacted in those towns unable to pg. 18-4  impaired identified on the Special  Stipulations              respond to an emergency.
Needs List in towns unable to respond in an emergency.
Combined Site Area Emergency and    Annual Update            Consolidating procedure steps General Emergency Procedures.                                  enhances implementation.
 
WWW REY. 3 VOLUME:-        7      SECTION: State Procedures AFFECTED AFFECTED        VOLUMES
          'PAGES          & PAGES REvo 3        REY. 2                              CHANGE                                      REASON                                EFFECT vol. 7          Vol. 4B      Appendices &nd Phone Numbers were                  Annual Update                          All call lists and phone numbers were deleted from all procedures. A                                                            incorporated into the Telephone supporting documents list was                                                              Directory in order to provide a provided at the beginning of each                                                          centralized location for this procedure in Volume 7. Rev. 3.                                                            Information.
Whenever necessary a step was added in the procedure referencing the appropriate support document.
1.0-1          Vol. 4B,      Added list of supporting documents                Annual Update                            As part of the reformat, all Dept. of      to procedure.
reference documents were centralized Agricul-ture to facilitate implementation and plan maintenance.
* 2.0-3          Vol. 4B,      Added a note that the U. S. Coast                  Annual Update                            Improves coordination between Boatin6 Division      Guard will be requested to                          FEMA Technical Assistance /              Safety.and the USCG.
cif            implement a 5 mile water safety                    Plan Review Boating        zone at Site Area Emergency.
Safety
    - 3.0-4            Vol. 4B,      Step added to periodically confer                  Drills / Exercise Comments 3.0-6 Allows school information to be Dept. of      with School Superintendents to                                                              disseminated to the public in EBS Education determine status of protective                                                                  messages and News Advisories from the pg. 3, 4      action implementation and to relay                                                          Media Center.
this information to the EOC Media Liaison.
Sec. 5.1        Vol. 4B,      Reformat-reordered Appendix B                      Annual Update                            Provides agency overview at the front DHHS          " Description of Division of Human                                                          of the procedure rather than at the Proc.          Services RERP Duties" to the front                                                          end.
App. B        of .Voltane 7. Section S.
4
  ,~v*-.w      -
                  --%w..          ,.- *,  w- w < . , * - <
w--    ---.4.,,-~.-%'      '---+-+ve * * , - . -'- 9  vee,ie<e,--  -.-.. -=ma*_mm _ -.__u -._mm m+..mm_.mm.n.
 
VOLUME:                                                                      7 15tRERP REY. 3 SECTION: State Procedures AFFECTED AFFECTED                                                                    VOLUMES
                      -PAGES                                                                    & PAGES REY. 3                                                            REY. 2                    CHANGE                                        RFASON                                      EFFECT 5.3-1                                                                        Vol. 4B,    Description of the make up of                  Annual Update                        Clarifies the procedure by providing DHHS        Faergency Service Unit Staff.
Proc.                                                                                            descriptive text at the beginning.
Sec. 2-1 6.1-1                                                                        Vol. 4B. Relocated general description of              Annual Update National    National Guard duties from App. B                                                    Clarifies the procedure by providing Guard,      of Rev. 2 procedure to the front of                                                  descriptive text at the beginning.
App. B      Rev. 3, Vol. 7. Sec. 6.1.
10.1                                                                          Vol. 4B,    Relocated
* Description of State                Annual Update
                                                                                                ' State      Police Comununications Center RERP Clarifles the procedure by providing Police      Duties" from App. A,.Rev. 2 to the                                                    descriptive text at the beginning.
Commi.      front of Vol. 7 Sec. 10.1, Rev. 3.
* 10.3-2                                                                          Vol. 4B,    Added a note to insure                          Annual Update State      Authentication Code use and                                                            Adds assurance that EBS will not be Police      verification occurs.
inadvertently activated.
Comun. D.2 10.5-1                                                                          Vol. 4B,    Conibined this section in Rev. 2                Annual Update                          Consolidates all State Police Troop A    with State Police Comununication                                                      information into a single section of Proc.      procedures.
the procedures. This improves plan implementation and maintenance.
          '10 6-2                    .                                                          Vol. 4B,    Added clarification to note:
Troop A-FEMA Technical Assistance /            Limits incoming vehicles to the beach
* Ingress of vehicles into the beach Plan Review-                                      area.
IFO Rep. area is to be restricted upon 4                                                                                              pg. 4        staffing of the beach area Traffic / Access Control Points".
                                                                                                                                                                                                                                                            -l
    ,. . , _                                                              ,                                    .. ,  _        ,            n ~ < -      - . ,            ~ , _ , . .  . - - ,  . . - , - - . .    , , , . - . - _ - - _ _ _ -- -  .
 
INERERP REV. 3 VOLUME:      7      SECTION: _ State Procedures AFFECTED AFFECTED    VOLUMES PAGES  & PAGES REV. 3  REY. 2                        CHANGE                          REASON                    EFFECT 10.6-4    Vol. 4B,    Added note "If-the Maine State        Annual Update Troop A      Police are not represented at the                              Insures coordination with Maine State
          ,    IFO Rep. IFO, contact them at Troop A                                    Police if they have not yet provided a representative to the IFO. This Pg. 6        Headquarters, Scarborough, ME*.                                  will ensure necessary TCP/ACPs requiring MSP staffing are implemented.
10.6-8    Vol. 4B,    Added note ' Restriction of          ASLB Hearing Connaitments/ This note provides consistency pg. 6a,      ingressing traffic should be done    Stipulations Troop A between the procedure and the TIM in providing that traffic volume has IFO Rep.                                                                      response to hearing commitments.
declined to the extent that screening motorists will not result Insures returning EPZ residents will in the formation of long lines of                                not be delayed in an evacuation.
inbound vehicles (20 or more).                                                              -
11.4-2    Vol. 4B,    Added step.* provide status reports    Annual Update              Insures necessary data regarding pg. 8,      or State road conditions (i.e.,
DOT          construction areas, detours, impediments to evacuation are input Dist. 6 to decision making from DOT.
weather related impediments) in the Engineer    EPZ comanunities and along evacuation routes to the IFO Controller.
11.8-4      Vol. 4B,    Delete "upon request from State        Annual Update              All monitoring is performed by DPHS, pg. 18,      officials at the IFO, carry out DOT          monitoring of the outside area with appropriate monitoring equipment.
Rad.        around the State Staging Area using Officer      the CDV 700;. report findings.to the IFO.*
i
                                                                                                                                    'I
 
NRRRRP REY. 3 VOLUME:                    7    SECTION:    State Procedures _
AFFECTED AFFECTED                  VOLUMES PAGES                  f PAGES REY. 3                REV. 2                    CHANGE                                REASON              EFFECT Sec. 14                Vol. 4B,    Changes made throughout this            Annual Update        Makes the plan current with available Rocking-    section to delete OMNE Mall, and                .            facilities to be used as a State ham          incorporate the Portsmouth Port                                Transportation Star  g Area.
County      Authority.
14.1-4                    NA        Added minimum staffing list            Annual Update        Ensures that the    taging area has assigned minimu    taff to specific positions.
14.1-6,                Vol. 4B,      New figure drawn.                      Annual Update        New figure accurately reflects Figtro                  Fig. 1,                                                                    staging area organization at both 14.1-1                  State TSA                                                                  State Transportation Staging Areas.
Proc.
14.2-2                  Vol. 4B,    Added steps to discuss partial          Annual Update        Provides for conservative use of State        activation, and associated staff                              staffing levels, thereby minimizing TSA,        required,-of the State                                        the potential impact on staff Supv.        Transportation Staging Area at the                            resulting from a protracted pg. 7        ALERT level.                                                  emergency.
14.2-5                  Vol. 4B,    Clarification of consnunications        -Annual Update        Ensures proper-transportation to                State        between State TSA's, State EOC, and                            information flow between State 14.2-8                  TSA,        State IFO.                                                    facilities and State'TSA's.
Supv.
pg. 7 Steps added to ensure. equipment is      Annual Update        Ensures issuance of KI, dosimetry, issued to Deputies assigned to                                communications equipment, maps and local TSA's.                                                  procedures to Deputies.
                                                                                                        ~
 
IWIRREP REV. 3 VOLUME:          7        SECTION: State Procedures                                                                                                  1 AFFECTED AFFECTED        VOLUMES PAGES          & PAGES REV. 3        REV. 2                            CHANGE                                      REASON                      EFFECT 14.3-1          Vol. 4B,      Procedure revised to clarify areas        Annual Update                        Corrected minor errors and confusing to        Staging        of conununications, staffing.            Drills / Exercise Comments          instructions.
14.3-11        Area          equipment and recordkeeping.
Manager Proc.
14.4-1          Vol. 4B,      Replaces OMNE Mall TSA procedure          Annual Update                        Reflects current facility.
to          OMNE Mall with Portsmouth Port Authority TSA 14.4-0          State TSA procedure.
14.5-3          Vol. 4B,      Step added to request update from        Annual Update Local TSA IFO of the transportation Clarifies lines of cosumnication and Proc.
exchange of information necessary to requirements for the town. Then                                                implement activation / operation of pg. F-2        incorporate data on Form 131D.                                                local TSA.                        '
14.5-5          Vol. 4B,      Note " Vehicles may be sent to the        Annual Update                        This provision allows for a more Local TSA local TSA prior to the issuance of                                                  rapid provision of local Proc.        a protective action reconunendation.                                            transportation, should Protective If vehicles arrive prior to.                                                    Actions be recomunended.
protective actions requiring their use are issued, vehicles will be held at the local TSA on Standby.
While vehicles are on standby, _
brief drivers on pertinent
                                .information on emergency conditions received from IFO (i.e., decision to take KI)."
  --  ,-%w y ..9 ,        ,s y        -
                                        +,+=4  - +        * ,
* w    g-    -      -* ---ced,~    , y W  w ,  -*,-,,-~+w. <.-r- = w*3---- + + *w= m.m.
 
r_ . ..
liMHHP EEV. 3 VOLUME:                            7                        SECTION: State Procedures AFFECTED AFFECTED                        VOLUMES PAGES                      & PAGES REV. 3                      REV. 2                                                              CHANGE                    REASON              EFFECT 14.6-1                            NA                                      New procedure for Rockingham County Annual Update            Provides check list for Bus / Ambulance which delineates specific                                    Coordinators to ensure implementation responsibilities for Bus / Ambulance                        of their specific responsibilities.
Coordinators.
14.7-1                        Vol. 4B,                                  Procedure update to reflect more        Annual Update        Minimizes potential for eswrgency to                        RC                                        specific instructions for ensuring                            transportation resources from running 14.7-2                        Sheriff's all vehicles have adequate fuel                                                                out of gas.
Dept.                                      supply prior to being registered as App. H                                    an available vehicle.
                                                ''' ' - ' ' ' " " ~ ' ~ ' ' " " ' ' ' ' ' ' ' ' ' " ' "
L______-_.            ? ' - ' - '"'-' ' ' ' - '
 
(                                                                                                                                  _
VOLUME:        7      SECTION:    14
* AFFECTED AFFECTED VOLUMES PAGES      tr - PAGES REV. 3      _ REY. 2 CHANGE REASON 14.10-6      Vol. 4B,                                                                                EFFECT Step added to institute a
                  -State TSA radiological monitoring area at the FEMA Technical Assistance /
Rad                                                Plan Review              Ensures contamination detection and Officer, entrance to the conumand post to                              control at the State TSAs, as they -
App. G monitor all individuals seeking                              are both located within the EPZ.
entry.
14.11-1      Vol. 4B,      Moved general information text to    Annual Update RCDC          the front of the procedure.                                  Provides user with a quick overview Proc.                                                                      to the procedure.
App. A 14.12-4    Vol. 4B, RCDC Notification to Rockingham County  Annual Update Sheriff and the State                                        Improves capability to activate TSA Proc.          Transportation Staging Area                                  should the event escalate.
pg. 3          Supervisor added to Unusual Event.                                                      -
14.12-3,    Vol. 4B,      Changed local contact in Stratham 7, cnd 17 RCDC                                                -Annual Update from Newmarket Dispatch to Police                            Improves capability to promptly
                ' Proc.        -Officer on Duty. This parallels an                          notify the Town of Stratham.-
pg. 2, 5,    equipment change.
8, and 12 14.12-14    Vol. 4B,      Added step to receive dosimetry /KI  Annual Update 19          RCDC          from State TSA Staff.                                        Ensures Dispatcher receives adequate Proc.                                                                      dosimetry /KI.
pg. 10, 13
 
?
3                                                                      !
VOLUME:    7      SECTION: 14                                                                                                              t AFFECTED AFFECTED  VOLUMES PAGES    & PAGES REV- 3    REV. 2                  CHANGE                              REASON                                  EFFECT 14.13      Vol. 4B,    This procedures was
* draft" in Rev. Annual Update                            Removes Draft Procedure from the RCDC        2. This procedure was formatted Proc.
plan. Provides a finalized step by      '
and finalized in Rev. 3.                                                      step instructional procedure for
              ' App. C siren activation frous Rockingham County.
4 9
,                                                                                                    t i.
  .-                                          .    . ._.  ._  ., ,. .._ .      . _ - . . , _ . . -  . . -~ . . -,    . _ . ~ . . . _ _ _  . _
 
IWHtF2P REY. 3 VOLUME:  7        SECTION: 15 AFFECTED AFFECTED VOLUMES PAGES  & PAGES REY. 3  REV. 2                        CIIANGE                              REASON                              EFFECT 15.1-1  Vol. 4B,      Description of ARC RERP duties was    Annual Update                        Provides user with a quick overview Red Cross moved from an appendix in Rev. 2 to                                            of response requirements.
Proc.,        the front of the procedure in Rev.
App. B        3.
15.2-3  Vol. 4B,      Added a step 'If requested by the      Annual Update                        Provides ARC coordination between NH Red Cross NHY ORD, contact the Massachusetts                                              and MA response.
Proc.,        Chapter of the ARC to request pg . P.      activation of congregate care facilities".
4 o      ,      ,,<g r  --
                                -or~9, +        s ms - e    r    e-m < . . -
                                                                                      ~ **  ~.w- --w-e ~~w>--- - -
                                                                                                                      % -v-, ,.-m,- er-- ,  d,m,= .-m-me
 
NRRREP REY. 3 VOLUME:  8      SECTION:                                            1 AFFECTED
'AFFECTED VOLUMES PAGES  & PAGES REV. 3  REV. 2                                                        CHANGE                REASON                    EFFECT 1.1-1    Vol. 4A,                    Deleted directions from Concord to          Annual Update        Reformatted to consolidate directions to      App. D.                    IFO from Volume 4A; added to                                      to facilities in single reference for 1.1-2    D-1 to                    volume 8. Clarified directions.
D-2 use by all affected responders.
1.2-1    Vol. 4B,-                Deleted directions to fuel                    Annual Update to      RC State                  providers from Volume 4B; added to Reformatted to consolidate directions to facilities in single. reference for 1.3-2    TSA Proc. Volume 8.                                                                          use by all affected responders.
1.4-1    Vol. 4A,                  Deleted directions to host                    Annual Update to:    App. F,                  community discharge water Reformatted to consolidate directions to facilities in single reference for 1.4-3    F.10-1 to monitoring points from Volume 4A;                                                  use by all affected responders.
F.10-3                  added to Volume 8. Added location of host comununity EOC for                                                                      -
notification of local officials of monitoring activity.
                                                                                                      ~
 
NRRREP REY. 3 VOLUME:                            8      SECTION:    2 AFFECTED AFFECTED                            VOLUMES PACES                            & PAGES REV. 3                            REY. 2                  CHANGE                                                REASON                      EFFECT 2.1-1                              Vol. 4A,    Deleted monitoring and sampling                    Annual Update                    Reformatted to consolidate equipment to                                App. B,    team equipment operational checks                                                  check procedures into single 2.1-5                              B-1 to      from Vol. 4A; added to Vol. 8.
reference for use by all affected B-2        Refined and clarified equipment                                                      responders. Brought procedure into check procedures to check for physical condition and to ensure conformance with plan for equipment calibration.
calibration within one year.
2.2-1 ~                            Vol. 4A,  Deleted radio call signs from Vol.                  Annual Update
'to                                App. B,    4A; added to Vol. 8. Updated call Reformatted to consolidate into 2.2-3                              Att. 3    signs.
single reference. Updated signs to and                                                                                            conform to current conventions.
Art. 4 2.3-1                              Vol. 4A,  Deleted Radio Operating                            Annual Update                    Reformatted to consolidate into to                                App. B. Instructions from Vol. 4A; added                                                    single reference for use by all 2.3-3                              Att. 5    to Vol. 8. Revised and                                                              affected responders.
consolidated instructions for CD and hand held radios.
                                                                            .  , _ ~ - . , . - -            . . , - - -  - -    E    -~    .      -- - - - ------~~
 
p KRP REV. 3 VOLUME:            8      SECTION:            3 AFFECTED
  '-AFFECTED            VOLUMES PAGES            & PAGES REY. 3          REV. 2                              CHANGE                            REASON                EFFECT 3.0-1              Vol. 4A,            Deleted field monitoring and          Annual Update          Reformatted to consolidate in single to              App. C,              sampling standard operating                                  reference for use by all affected 3.0-22            C-1 to              procedures from Vol. 4A; added to                              responders.
C-23                Vol. 8.
  - 3.0-2              Vol. 4A,            Supporting documents, primarily      Annual Update            Reformatted to consolidate in single App. C,            forms used by monitoring and                                  reference for use by all affected C-1                sampling teams, and their location                            responders.
referenced in preface to procedure.
3.0-2              Vol. 4A,            Procedure steps revised to conform    Annual Update            Procedures clarified to make to              App. C,            to Monitoring Team and Sampling                                consistent with otber plan elements 3.0-22            C-1 to              Team Checklists (Vol. 6), equipment                            and procedures.
C-23                changes, or reformatting (change in                                                          -
procedure steps, reference to consolidated forms in Vol. 8).
l
                                                                                                                    / -.
y _ _ _ _ _ . _ _ _ _ _          _ _ _ . ,        - - - -  - - - - -
 
15HERRP REY. 3 VOLUME:  8          SECTION:    4 AFFECTED AFFECTED VOLUMES PAGES  & PAGES REV. 3  REV. 2                      CHANGE                                        REASON              EFFECT 4.1-1    Vol. 4A,      Supporting documents, primarily                Annual Update          Reformatted to consolidate in single App. K,        forms issued to emergency workers                                      reference for use by all affected K-1          with issuance of potassium iodide,                                    responders.
referenced in preface to procedure.
4.1-1    Vol. 4A,      Deleted Potassium Iodide                      Annual Update to-    App. K,      Administration Procedure from Vol.                                    Reformatted to consolidate in single reference for.use by all affected-
                                                                                                                          ~
4.4-1    K-1 to        4A; consolidated in Vol. 8.
responders.
K-11 Procedure steps' revised to conform            Annual Update          Procedures clarified to make reference to consolidated forms and                                    consistent with other plan elements other supporting documents in Vol.                                    'and procedures.
8, editorial changes, or.
* reformatting of procedural steps.
                                                                                                                                      .l
 
l InnrRRP REY. 3
    -VOLUME:                                                            8        SECTION:      5 AFFECTED AFFECTED                                                      VOLUMES PAGES                                                    Te PAGES
        ~REV. 3                                                        REV. 2                      CHANGE                                REASON                EFFECT 5.0-1                                                        Vols. 33      Deleted Monitoring / Decontamination    Annual Update        Reformatted to consolidate in single to                                                      35, 36,      Facility Procedures from Vols. 33,                            reference for use by all affected 5.8-2                                                          38. App.      35, 36, 38, and Vol. 4A;                                      responders.
B. B-1 to consolidated into Vol. 8.
B9-1 and Vol. 4A, App. F, F-1 to F10-3 5.0-1                                                          Vols. 33,      Deleted supply inventory as              Annual Update
                                                                                                                                                          ^
Supply inventory was integrated into 35, 36,        separate section'of procedure;                                applicable procedure to be more
: 38. App.      added as Attachment 1 of procedure                            readily available to affected B, B-1,        for opening a monitoring /                                    responders. Actual quantities of vol. 4A,        decontamination facility. Deleted                              supplies were indicated in Rev. 3 App. F,        call list as separate section of F-1                                                                            Vol. 9, App. D to be used by Vols. 33, 35, 36, 38, App. B;                                  personnel responsible for maintaining referenced NHRERP Emergency Phone                              the supply kits. Call list was List. Deleted Host Conantnity                                  integrated into NBRERP Emergency Envirotunental Monitoring as                                  Phone List to facilitate updating of separate section of Vol. 4A, App.                              telephone numbers. Host community F; . integrated procedure into Field                          environmental monitoring procedures Monitoring and Sampling Team          .
were integrated into procedures of Standard Operating Procedures (Vol.                            responders who would perform the 8, Sec. 3, p. 3.0-21).
                                                                                                                                                  . function.
 
o VOLUME:
leurRRP REV. 3 8      SECTION:        5 AFFECTED AFFECTED                                            VOLUMES PAGES                                  & PAGES i                            REV. 3                                  REV. 2                    CHANGE                                              REASON                                                      EFFECT 3.1-1                                              Vols. 33,  Facility diagrams of monitoring /      Annual Update                                                    Reformatted to make relevant                            '
to                                      35, 36,    decontamination facilities                                                                                information more readily retrievable 5.1-13                                            38,        maintained as part of individual App. B2;    host conununity plans, Rev. 3. Vols.                                                                      by affected responders.                                  t Vol. 4A,    38-41.
App. F1                                                                                                                                                                        '
5.4-2,                                            Vols. 33    Staffing assignments increased by 2 Annual Update                                                        Increased staffing reflects 1990 Table                                              35, 36,    to reflect increased vehicle            Drills / Exercise Comments                                      peak population figures. Staffing
          .5.4-1                                                      38,        monitoring requirements; other          ASLB Hearing Comunitments/                                        reallocation reflects revised App. B3,    staffing assignments reallocated (4 Stipulations                                                          procedure for host health care pg. B3-1,  from decentamination and 4 from                                                                          facility monitoring and reallocation Table 1;    health care facility monitoring                                                                          of personnel front decontamination Vol. 4A~,  reallocated to control point and                                                                          activities to monitoring activities.
App. F4,    registration' area monitoring) to                                                                        Supervisor provision allows optimal pg. F4-1,  reflect procedure changes.                                                                                utilization of resources.                                '
Table 1    Provision added for DPHS Supervisor to relocate staffing as necessary.
5.4-4                                                Vols. 33    Revised evacuee loads for host          ASLB Hearing Commaitments/
35, 36,    communities.
Evacuee loads revised to incorporate Stipulations                                                      1990 peak population figures for EPZ 38,.
conusunities.
App. B, pg. B3-3 Vol. 4A,                                                                                                                                                                        '
App. F, pg. F4-2A
                                                                                          ...      . f.          ,    u            ,    .c . ~.        ., r,.- ,            , , . . . ,      , , . - . . . , . ~ , , . . _,,  _ , ., . . ,
 
l HERERP REY. 3                                                                                                                  l
    .. VOLUME:              8        SECTION:            5 AFFECTED AFFECTED              VOLUMES PAGES            & PAGES REY. 3          REV. 2                                                CHANGE                        REASON                        EFFECT 5.4-19              Vols. 33,            Revised staffing assignmenc for                    Annual Update                Each host health care facility to              35, 36,            monitoring evacuees at host health                ASLB Hearing Commitments /    designates a monitoring supervisor to 5.4-20              38,                  care facilities.                                  Stipulations App. B,                                                                                              oversee monitoring of special pg. B3-8                                                                                              facility. evacuees by host facility to                                                                                                medical staff under direction of DPHS                                                        i Supervisor.
pg. B3-9 Vol. 4A, App. F, pg. F4-5 to pg. F4-6
  - 5.0-1                Vols. 33            Procedure steps revised to conform                Annual Update                  Procedures improved to make-to            35, 36,              references to consolidated forms                                                consistent with other plan elements 5.8-2.                38,                  and other supporting documents in                                                and procedures.
App. B,              Vol. 8, editorial changes, or                .
B-1 to              reformatted procedural steps.
B7-2
  . , , ,              y        v .y      ,,        +,                                --              y      e- s~-.w.e n    =..%--,  .,    -,..w- , - _ _ _ _. , . _ _ _ _ . - - _ . _ __._ --. . . . - - . . - . - .
 
BHRBERP REY. 3 VOLUME:    8        SECTION:        6 AFFECTED AFFECTED  VOLUMES PAGES    & PAGES REV. 3    REV. 2                        CHANGE                                  REASON                      EFFECT 6.0-1    .Vol. 4,        Deleted Protective Action Decision        Annual Update                  Reformatted to consolidate into App. F          Criteria procedure from NHOEM                                            single reference for use by all procedures Vol. 4, and DPHS                                              affected responders.
procedures, Vol. 4A; added procedure to consolidated state and local functional procedures Rev.
: 3. Vol. 8.
6.0-1        NA            Added index to sections of                Annual Update                  Facilitated referral to appropriate Protective Action Decision Criteria                                      section'of procedure.
procedure.                                                            .
6.1-1    .Vol. 4        Prefaced procedure with list of          Annual Update                  Reformatted to consolidate into App. F,        supporting documents and forms used                                      single reference for use by'all F-1            by responders to implement the                                          affected responders.
Vol. 4A,      procedure.
App. U, U-1 6.1-2      Vol. 4,        -Added statement of precautionary          FDIA Technical Assistance /'  Alerts decision makers to consider to        App. F          actions prescribed for schools and        Plan Review                    cancellation of extra-curricular 6.1-3      F-1 to          offshore boaters at Site Area                                            school activities, cancellation of F-2            Emergency.                                                              schools if out of session, and early Vol. 4A,                                                                                evacuation of schools. References App. U,                                                                                  five mile safety zone established by U-1 to                                                                                  U. S. Coast Guard procedures.
            .U-2 i
L
 
VOLUME:                    8 DHEREP RET. 3 SECTION:    6 AFFECTED
.AFFECTED                      VOLUMES PAGES              T PAGES REY. 3              REV. 2                        CHANGE                            REASON                      EFFECT 6.3-3                      Vol.      4,    Revised Plume Exposure Protective  Annual Update                Revised to conform flow chart to App.      F. Action Flow Chart For General        FEMA Technical Assistance / current protective action decision F-34            Emergency to show closing of MA    Plan Review                  procedures.
Vol.      4A,  beaches and evacuation of Hampton  ASLB Hearing Cosetitments/
App.      U,    and Seabrook beaches at declaration Stipulations U-34              of General Emergency.
6.5-1                      Vol.      4,    Updated peak summer weekend        Annual Update App.      F,    population figures for Seabrook Updated population figures are latest ASLB Hearing Commitments /  data projected to 1990 and derived F-15              Station EPZ ERPAs. Added            Stipulations                for beach areas from 1987 photos.
Vol.      4A,    population figures for peak summer App.      U,    midweek and permanent residents.
U                                                                                                                                                .
6.7-1                        Vol.      4      Updated ETE values.                Annual Update                Updated ETE values reflect to                    App.      F,                                        ASLB Hearing Commitments /  incorporation of ASLB PID 6.7-10                        F-17      to F-26 Stipulations                conditions.
Vol.      4A, App.      U, U-17      to U-26
 
INERNRP REY. 3 VOLUME:                  8      SECTION:      7 AFFECTED AFFECTED                  VOLUMES PACES                  & PAGES REV. 3                REV. 2                              CHANGE                      REASON            EFFECT 7.0-1                      NA        Inder provided to consolidated        Annual Update      Facilitated retrieval of applicable -
media relati s procedures.                                  information by affected responders.
7.1-1                    Vol. 1      Plan descri.tt e__s of Media Center    Annual Update      Provided context for procedures.
2.3-6 to    and designated Spokespersons 2.3-8      extracted from Volume 1 and reprinted in consolidated procedures as introduction.
7.2-1                    Vol. 4,    Media Relations Policy Guide            Annual Update      Reformatted to consolidate into a to                    16-8 to    deleted from NHOEM EOC Media                                single reference for use by all
  - 7.2-3                      16-9        Liaison Checklist and added to                              affected responders.
Vol. 8. Sec. 7.
7.3-1                    Vol. 4,    Rumor Control Policy Guide deleted      Annual Update      Reformatted to consolidate into a to                    16-10      from NHOEM EOC Media Liaison                                single reference for use by all 7.3-2                                Checklist; added to Volume 8,                              affected responders.
Sec. 7.
7.4-1                    Vol. 4,    Ingestion Exposure Pathway News        Annual Update      Reformatted to consolidate into a 16-11      Advisory Data deleted from NHOEM                            single reference for use by all EOC Media Liaison Checklist; added                          affected responders.
to Vol. 8, Sec. 7.
s u y.. p .3 9  .v. ,, ,-  a-            1 *"F  'T~''#''"''C*' '
 
IEREFJtP REY. 3 VOLUME:            8        SECTION:      8 AFFECTED AFFECTED          VOLUMES PAGES            & PAGES REY. 3          REV. 2                      CHANGE                                                REASON                              EFFECT 8.0-1          -Vol. 4A,        Deleted Emergency Exposure                            Annual Update                            Reformatted to consolidate into a App. L,        Authorization Procedure from                                                                  single reference forc use by all L-1            Vol. 4A; added to Vol. 8.                                                                      affected responders.
c.0-2          . Vol. 4A,        Procedure prefaced by reference to                    Annual Update                            Reformatted to consolidate into a App. L,        form used to implement the                                                                    single reference for use by all L-1            procedure. Emergency Exposure                                                                  affected responders.
Authorization form deleted from procedure; added to Vol. 8 Sec. 12.
, - - +  .y.  ,,g-g-.,    ,y.y  y.                , . , . . - - - - - .-w--.. , + w ,        <      e      ,m c.-,,,, w,,a..mw, -.+,..w.-  , , - , 4 ,,,., ,,n-n--., -w.,  .,n,,, v.
 
a E3 VOLUME:              8        SECTION:  9-AFFECTED AFFECTED            VOLUMES PAGES              & PAGES
_:REV. 3            REV. 2                      CHANGE                                    REASON                      EFFECT 9.0-1              Vol. 4A,    Deleted procedure from Vol. 4A;            Annual Update Ambulance added to Vol. 8. Sec. 9.                                                      Reformatted to consolidate into Proc.                                                                                    single reference for use by all-affected responders.
~ 9.0-2            Vol. 4A,      Expanded to include details of            Annual Update                    Directs ambulance personnel to to                Ambulance contamination control, patient                FDfA Technical Assistance /      properly handle patient and implement 0.0-9              Proc.        handling and hospital-specific            "lan Review diagrams.                                                                  effective contamination controls.
Drills / Exercise Comments
: w.                                    -                                                                a
                ., ,        ,                  y  .<                -- ~ . ~ ,    ..y> .
y      s        ,, , ,  ,.-.m.-
                                                                                                                                      +  ,,    , , - , , ,
 
IWensaP REY. 3 VOLLHE:      8        SECTION:            10                                                                                                                      -
AFFECTED AFFECTED      VOLUMES PAGES      .& PAGES REV. 3      REV. 2                          CHANGE                            REASON
_                                                    EFFECT 10.0-1      Vol. 4A,.      Deleted dosimetry Equipment              Annual Update                    Reformatted to consolidate into a
    ,to          LS-Al to      Operational Check and Personnel 10.0-3      LS-A3;        Monitoring procedures from single reference for use by all affected responders. Procedure App. F,      -individual procedures and                                                standardized for all resp 3nders.
F7-1 to        appendices; added to Vol. 8, F7-21;        .Sec. 10.
Vol. 4B, NHSP Proc.
Al-1 to Al-19; NHDOT                                                                                                                                                    '
Proc.
29-47;                                                                                                                                        -
RC State Staging-Area Proc.
G-1 to
_G-23; RC.
Nursing Home Proc.
  -      . ,.,      ~ . , _~,          . . . ,          . - ~ .  -    .                . _ ~, - -.          . . . _ _ _ _ - _ _ _ - _ _ __ - - _ _ - -  _ _ _ -
 
  .    . . . . . . . .        . . - . . ~ - . . . -    . - .. ..    - . . . . .  . . .  .    -    .,      _. . -              .  .      . - . . .., ..  . . .    .
IEntERP RET. 3
_ VOLIME:            8      SECTION:              10 AFFECTED AFFECTED            VOLIMES PAGES              & PAGES REV 3_            REV. 2                                CHANGE                                  REASON                        EFFECT 10.0-1              G-1 to to                G-19; 13.9-3              Vols. 16 (Cont.)            to 32; Radef Officer Proc.
Vols. 33, 35, 36,                                                                                                                                          i 38 App. B, B6-1 to B6-20                                                                                                                                            i 10,1-1                NA                Procedure prefaced by reference to' Annual Update                              Reformatted to consolidate into a supporting docur.ents, including                                                single reference for use by all forms and other procedure sections,                                            affected responders. Procedure used to implement the procedure.                                                standardized for all responders.
                                                                                                          = - -    . -%_y        ,      =                -
 
IRIEERP REY. 3 V2 LIME: 8      SECTION:  11                                                                                              .
AFFECTED-                                                                                                                    )
  - AFFECTED VOLUMES PAGES  & PAGES REV. 3 REV. 2                  CHANGE                                REASON                      EFFECT 11.0-1    NA        Added index to local siren              Annual Update                Facilitated access to appropriate activation procedure.                                                procedure section.
11.0-1  Vols. 16-  Deleted procedures-frost applicable      Annual Update                Reformatted to consolidate into-
      .to    32. Local local responder checklist; added                                      single reference for use by all 11.4-1    siren      to Vol. 8. Sec. 11.                                                  affected responders. Ensure acti-                                                                            procedure is standard in all-vation                                                                          procedures, proc.
L.___
 
_ _ _ . . _ . - - -      - ... ~. . _ -
m REP REY. 3
  'VOLIBtEs              8                SECTION:        12 AFFECTED -
AFFECTED            VOLIBtES .
PAGES            & PAGES REV. 3            REV. 2                              CHANGE                                      REASON                      EFFECT
  -12.1-1                NA                  Incorporated single reference list              Annual Update            Reformatted-to consolidate into to                                    of forms utilized.to implement                                            single reference for use by all 12.1-4                                    NHRERP, Rev. 3, followed by forms                                          responders.
referenced on list into Vol. 8, Sec. 12.
    "12.1-3              Vol. 4,              Deleted Protective Action                        Annual Update to'                App. F.
Reformatted.to consolidate into Recommendation Worksheet For                                              single reference for use by all 12.1-4,.            -F-11 to              General Population, and Special                                          'affected responders.
Frras                F-14 and -Facility Protective Action 210A,                F-31 to              Worksheet and Follow-up Information 210B, cnd F-32                            Form from procedure; added to
  .300 T.                Vol. 4A,            consolidated section of forms, App. U,              Vol. 8,.Sec. 12.                                                                                        *
                        'U-11 to U-14 and U-31 to U-32 e
 
  ,- _. - - _ - _ - _ _ _ _ - _ _ - _ _ - - - _ .                      . . .    .~  . . - . . -  .    .    .-        .            .  . .      .  ..  .  - . .    -    -
m.
IEEEERP REV. 3 VOLIME:                                      G      SECTION: Appendices A-F AFFECTED AFFECTED                                    VOLLMES PAGES                                    & PAGES REV. 3                                  itEV. 2                      CHANGE-l                                                                                                                      REASON                          EFFECT l
!'Vol. C.                                        Vol. 2      Volume 2. Appendices A, B, C E          F. Annual Update                    The appendices have been expanded to Generic                                      App. A. I, J, and L moved to Rev. 3,                                                  serve all of the NHRERP volumes, not
, Changro                                        B. E, F. Volume 9.      Volume 4A, Appendices G,                                    just. Volume 1.      Consolidation of
' (Se3                                            I, J. & L  R. S, and T moved to Rev. 3                                                Appendices into one volume facili-refermat                                    Vol. 4A,    Volume 9.                                                                    tates implementation as well as main-l gummary                                        App. G, tenance.
for                                        R. S. & T dattilo)
A1.1-2                                      Vol. 2      Enlarged diagram from 8 1/2 X11 to          Annual Update                  The Bnergency Classification A-3        11X17.                                                                      Flowchart was made consistent with the equivalent chart from the onsite plan. In addition, the increased size makes this chart more easily read.
, Bl.1-1                                        Vol. 4      "Any EBS activation must be                FEMA Technical Assistance /    Assures simultaneous activation of G-2        coordinated with any siren                  Plan Review                    EBS and sirens under all conditions.
activation".
                                                              "Further, any EBS activation                FEMA Technical Assistance /    Reminds NHOEM Director to coordinate requires multi-State coordination". Plan Review                            EBS activation with MCDA and NHY ORO.
Bl.1-2                                        Vol. 4    Made Step II.E in Rev. 2 a NOTE in          Annual Update G-3        Rev. 3.
                                                                                                                                        . Increases the effectiveness of the plan by visually drawing attention to the importance of this action.
 
  +
INERNRP REV. 3 VOLUME:                              9        SECTION: Appendices A-F AFFECTED
  ''AFFECTED                              VOLUMES PAGES                              & PAGES REV. 3                              REV. 2                        CHANGE                                    REASON                                          EFFECT Bl.1-8                              Vol. 4                                                        Annual Update Remove reference to WOKQ.                                                                  Station is incorporated in Call List G-6 which centralizes all contact numbers.
B2.0-1                              Vol. 4,      Addition of pre-recorded General                Annual Update G-8                                                                                                      List is now correct. . The message Emergency Message to the pre-                                                              existed in Rev. 2, however it did .
recorded message list.                                                                                                                              ,
not appear on the list on page G-8.
I B2.1-8                                Vol. 4,      Remove reference to temporary                  Annual Update                              This reference was incorrectly G-14          shelters for transit-dependent                                                            inserted in Rev. 2.                                    ;
transients.
-B2.1-10                                G-16          Provided ascription of source to              ASLB Hearing Conanitments/                ' The applicable messages now contain-B2.2-7                                G-24        applicable EBS messages.
B2.2-10                              G-26 Stipulations                                the proper ascription of source "The B2.2-14                              G-29 New Hampshire Office of Ehrgency Management".
B2.2-18                              G-44 B2.2-26 B2.2-32 B2.2-38 B2.2-15                                Vol. 4      Added information to message to.              - FEMA Technical' Assistance /              Iraproves effectiveness of EBS message.
B2.2-19                                G-29        indicate that arrival time for                  Plan Review                                by providing additional information G-32        buses will be announced over EBS.                                                          and minimizes persons having to wait outside.
i e
a s.g,            ,...,...,,3.-,      .g -,        , , . , - enew.- g-            % -- , w      w y-    r w,  .,- e-c--, ,ys  . . . -  c,c.,,,y-,.,,,e ,    e  s. m m ,__o_,mm  ..m. . .,m..
 
pMfFRP REY. 3
: VOLUME:    9'      SECTION:' Appendices A-F AFFECTED AFFECTED  VOLUMES
  'PAGES-    & PAGES REV. 3    REV. 2                    : CHANGE            _
REASON                  EFFECT B2.3-2    Vol. 4,      Added information concerning the      FEMA Technical Assistance / Diminishes potential for latch key G-50          holding of students for late          Plan Review                children problems, conforms plan to dismissal.                                                        FEMA GM-EV-2.' -
Added Pre-drafted News Advisorie.s    Annual Update
                                                                                                                                ~
B2.4-1      NA                                                                            EES messages and news advisories are to                    to Rev'. 3, previously maintained-                                now co-located in the plan.
B3.2-8                  under separate cover.                                              Improves access to information.
C1.1-3    Vol. 2,    .ERPA Map redrawn.                          ~
e            Improved graphic presentation of EPZ App. E,                                                                          ERPAs.
P8 4                                                                                                        .
NA          Vol. 2,      Deleted from Rev. 3.-                  FDfA Technical Assistance / This information was repetitive. It App. E.                                              Plan Review                is available in the ETE.
pg. 6-14                                                                                                                    ,
a        pg. 16-21 pg. 23 C1.1-7    Vol. 2,      Updated evacuation route              Annual Update                Route descriptions were revised to be thru    App. E,      descriptions.                          FEMA Technical Assistance /  consistent with those provided in the-C1.1-25    pg. 24-26                                          : Plan Review .              public information materials, and to conform to revisions to the ETE Study.
C1.1-28    Vol. 2        Traffic / Access Control Point map    Annual Update                Increased legibility of map.
App. E,      redrawn.
pg. 40
 
ImRNRP REY. 3 VOLUME:    9        SECTION: Apreendices A-F AFFECTED
  .AFFECTED    VOLUMES PAGES  -& PAGES REV. 3  REV. 2                      CHANGE                            -REASON                          EFFECT D1.1-1    Vol. 2, Relocated resource list for field    Annual Update                    Provides a single central location D1.1  C-10          monitoring equipment, reception                                          for inventory of resources. ~This D1.1-5    C-11          center and mass care locations,                                        improves' plan implementation and
  'D1.1-6      C-14          etc.                                                                  maintenance.
D1.1-7 x
Vol. 4A,      Inventories for field monitor-        Annual Update                  A standardized inventory was App. G        ing/ sampling' teams were' updated.                                    developed to facilitate State to State use'of teams and equipment.
  .D1.1-8    Vol. 1,      . Relocated laboratory equipment        Annual Update.            .Provides a central location for thru    Table        . inventory list. .                                                    resource inventories. .This' improves D1.1-15    2.5-2                                                                                implementation and' plan maintenance.
                          ' Updated radiologteal' equipment      Annual Update
                                                                                                              ~
D1.1-17    Vol. 2,                                                                              Provides quantity'and location.of,;
thru    C-15 thru inventory.              ,                                                dosimetry and KI in a single D1.1-21    C-17                                                                                location to facilitate plan' maintenance, equipment inventory and calibration.
D1.1-22    Vol. 4A,      Inventory of; decontamination          Annual Update              JCentral location of all'' resource thru    F9-4 thru facility kit.                                                            Inventories provides for improved-D1.1-24    F9-8                                                                                plan maintenance and implementation.
L
                                                            -_.    .        . _ _ -  - -]    - - - - - -
 
                            - -                -~                                        .. . .-              ...                    - -                    - ..        - -                  .
                                                                                                                                                                                                                                        ~
ImaumP REY. 3 VOLUME:                          9                            SECTION: Appendices A-F AFFECTED AFFECTED                        VOLUMES PAGES                        & PAGES REV. 3                      REV. 2                                                        CHANGE                                                                      REASON                          EFFECT D2.1-1                        .Vol. 33,                          Reception Center lists by town,                                              Annual Update                                  Centralized the location of all-thru                        II-18                            incorporated in Volume 9 from in-                                                                                            phone numbers.to facilitate D2.1-4                          Vol. 35,                          dividual host plans. In addition,                                                                                            response. Centralize the listing of 11-17                            this information is provided in                                                                                              resources to facilitate implemen--
Vol. 36,                          the Phone Directory.                                                                                                        tation and maintenance.-
11-18 Vol. 38 II-17 D2.1-5                        Vol. 4A,                          Bost. healthcare facilities list                                              Annual Update                                Centralize the location of all
                                - EMS                              moved to Volume 9.                                                                                                            resources to improve plan Coord, implementation and maintenance.
Proc.
App. C-1 D2.1-6                          Vol. 4A                            List of ambulance / rescue corps in                                          Annual Update                                  Centralize the location of all EPZ towns and adjacent communities'                                                                                          resources to improve plan moved from Vol. 4A. . This informa-                                                                                          implementation and maintenancc.
tion ~1s also provided in the phone book.
~D2.1-7                            Vol'. 4A,                        List of' hospital functions'(Acute                                          . Annual Update ~
EMC
                                                                                                                                                                                                ' Centralize the location of all care, licensed capacity, MS-1                                                                                                resources to improve plan Coord.                            capability) moved to. Volume 9.                                                                                              implementation and maintenance.-        '
Proc.
Attach. C et.      2- '1.--sure-_amn--sh---sev..-.mm-c.
_                      ins,-h.w#.__;=ms_A_w    m  wm Lmas.-Adn,.              r:-c,_a  M  .,y+2-n-e----am.-e      ks-y-,,    _t.sau  --a_-9----          p,--.-% e,-
 
      ' VOLUME:                                      9 NHRERP REY. 3 SECTION: Appendices A-F AFFECTED AFFECTED                                      VOLUMES PACES                                      & PAGES REV. 3                                      REV. 2                            CHANGE                                    REASON                    EFFECT D2.1-8                                        Vol. 2        Local medical facilities capable of Annual Update thru                                        App. H        treating radiation accident                                                Centralize location of all resources
  . D2.1-10 patients list moved from Vol. 2,                                            to improve plan implementation and-App. H.
maintenance.
E1.1-1                                        Vol. 4A,      Complete appendir redrafted.                    Annual. Update thru                                        App. T                                                                                    This section'sas rewrittenL to reflect
    .E3.2-8                                                                                                        FEMA Technical Assistance / changes to EPA Manual of Protective Plan Review                Action Guides and Protective Actions-for Nuclear Incidents (Draft 12/88).
This makes the plan currsnt with updated guidance.-
App. F                                          NA          New appendix which lists the                    Annual Update              This section provides a' central Federal, State, local and county                                            location, for reference, of'all
                                                                  ' support plans.                                                              support plans.
4 s                , _ _                          mye    u  v'. "                "'
 
~
ramw m v                                                          :
                                                                                        #                                    %.l NRRFRP REY. 3 If0LUME:  20      SECTION:    1.1 NOTE: REV. 3 VOLUME 20 CONTAINS COMMON MATERIAL PREVIOUSLY CONTAINED IN REV. 2 VOLUMES 16-38.
CHANGES HAVE BEEN COMPARED WITH REV. 2 VOLUME 16 AS A SAMPLE.
AFFECTED AFFECTED  VOLUMES PAGES  & PAGES REV. 3 REV.~'2                    CHANGE                                REASON                      EFFECT vol. 20  Vols.      Volume 20 developed to consolidate    Annual Update              Places all generic information which 16-38,      all comon information which                                      was repeated in each EPZ and Host Sec. I,    appeared in Rev. 2 Volume 16-38.                                Community Plan in a centralized II, & III                                                                    location. This provides a quick reference of common material to all:
emergency responders. In gddition, the reformat streamlines all EPZ and' Host Plans, thereby facilitating implementation, updates, and.overall maintenance of the NHRERP.
1.1-1    Vol.16      The purpose has been re-worded and  Annual Update              Provides a common purpose for all-thru  Sec. I,    expanded to include all EPZ and                                  potentially affected comunities.-
1.1-3    I-1, I-2    Host Communities.
                                                                                    ~
                                                                                          - - = - - - -            ----
 
,    ,c, .  . ..
NRRRRP REV. 3 VOLU}        20      SECTION:  1.2 AFFECTED AFFECTED    VOLUMES PAGES    & PAGES REV. 3  REV. 2                  CHANGE                              REASON          EFFECT 1.2-1      Vol. 16,  Alphabetized the definitions.      Annual Update      Deleted definitions no longer used in thru    Sec. I,    Deleted definition for Emergency                        the text. Inserted new terms used in 1.2-7      I-3 thru  Planning Coordinator. Added                            the text.
I-7a      definitions for Drill, Exercise, JTIC, ERPA, and Precautionary Actions.
1.2-8      Vol. 16    Updated list of abbreviations,      Annual Update      Ensure plan contains current list as Thru      Sec. I,    acronyms, and initialisms.                              used in the text.
1.2-9      I-8 l
 
IEMtFRP REY. 3 VOLUME:          20            SECTION:          1.3-AFFECTED AFFECTED        VOLUMES                                                                                                                                            .
PAGES        & PAGES REV. 3        REV. 2                                    CHANGE                                                          REASON                                  EFFECT 1.3-1            Vol.'16,            Revised authorities to reflect                              Annual Update                                  Ensures plan contains current thru          Sec. I,              current state statutes.                                                                                      authorities governing implementation.
1.3-2            I-9 e
e m--- - , -- - s -    ,-I-- ---e-- - - - - - ,      -------m-----  -
                            ,ee- ..-w,,  -.A,-    -.e1.
                                                              -ww  -- e- a-_--- - -
                --w. %.
t____..n--+.-- -
 
MRRRRP REY. 3 VOLUME:                                        20      SECTION:    1.4 AFFECTCD AFFECTED                                        VOLUMES
                    .PAGES                                      & PAGES REV. 3                                  REV. 2                        CHANGE                                                          REASON                                        ' EFFECT 1.4-1                                          Vol. 16    Added general statement for all Annual Update                                  Places all generic information which Sec. I. Local Governments (Town,                                                                                    . was repeated in each EPZ and Host I-10      Municipality or City Disaster                                                                                Consnunity Plan in a centralized ~
plans).
location.
Added FDfA Rep-10 and Rep-11                                  Annual Update                                Reflects current Fl!MA guidance.
references; deleted FEMA ECS-1.
i l
e 4
4
                        . .                                . , , . .      m.
                                                                              ... ,    .y.    .- ~--                  .- . ~ .  - -    ....~.,4    % --    .# --
3n...,    c-.  --w.,.,,. . . . ~,_ ,  ,,-,s .+ ,,,, . . ._,,      e    ,.,w.
 
d iH'  I  '    "
I  H NRRERP RET. 3 VOLUME:        ?.0      SECTION:  1.5 AFFECTED AFFECTED        VOLUMES PAGES          & FAGES REU. 3        REV. 2                  CHANGE                              REASON            EFFECT 1.5-1          Vol. 16,    Revised situation to include          Annual Update      Places all generic information which thru          Sec. I,    general descripticn of the                                was repeated in each EPZ and Host 1.5-3            I-11        seventeen EPZ communities and four                      Community Plan in a centralized host communities. Town-specific                          location.
Information has been moved to the local town plan procedures (Volumes 21-41).
Added a listing of the designated host communities and their assigned EPZ communities.
: 1. 5 -4      Vol. 16      Updated population figures for        Annual Update      Provides updated population figures E ac . I      seventeen NH and six MA EPZ towns.                        for responders.
                '.-13 l
l l
 
A MRRREP REV. 3 VOLUME:                            20              SECTION:      1. 6 ~
AFFECTED AFFECTED                          VOLUMES PAGES                        T PAGES REV. 3                      REV. 2                                  CHANGE                                              REASON                                  EFFECT 1.6-1                            Vol. 16,                ' Placed organizational information                  Annual Update                      . Places all generic information which-thru                        Sec. I,                  into this section.                                                                        was repeated in each EPZ and Host.
1.6-9                            I-16 thru Responsibilities unique in each                                                                          Conununity Plan in a centralized 1-26                      town are listed in Volumes 21-41.                                                                                                                              ..
location.-
Updated responsibilities of local,                  Innual Update                        Change updates plans to reflect county and State responders.
current local, county and State
                                                                                                                                                              . responsibilities.
1.6-5                                  NA                  Added Support / Service                            Annual Update thru                                                    organizations'.
This section was added to provide a-sununary of.the measures to be:
1.6-7
                                                                                                                                                              - provided by the various                                              '
support / service _ organizations-
                                                                                                                                                                                                                                        ~
assembled to support the NHRERP..
1.6-8                              App. A,                  Updated Emergency Broadcast System                  Annual Update                        . Updated to reflect new call pg. A-6                  Radio Stations.                                                                            letters / stations.
1-e
                                            . . - + - - . . . .  ,.3.                        , . _ + - + . . ~ -  *  ,-e        _ _ _ _
                                                                                                                                            , , . . _. y.-~. . ., - -+ * - -e-.. y .,.- k ,,.w... <..e, s z., m.m__ . ~ - #+,r,,~
 
J umtstRP - REY. 3 VOLUME:      20        SECTION:      1.7                                                                                                                    .
AFFECTED lAFFECTED      VOLUMES
    -PAGES      & PAGES REV. 3
    ~
REV. 2                          CHANGE                                            REASON                                  EFFECT 1.7-3        Vol. 16,      ' Revised table to include EPZ towns. Annual Update                                                  ~
Places all generic information which Sec..I.          and added precautionary actions to                                                        was repeated in_each EPZ and Host-I-28            the last column.                                                                          Conununity Plan in a centralized..
location.
Some precautionary actions may be.
recommended by the State. This                -
                                                                                                                          - addition ensures the responder is aware of all potential protective and precautionary recomunendations. -            ~!
e i.
b
]
3
                          ,  ,.p..            , -                            -- ,.    .e          p      e<e u -        wq.-        .-y-u.  -              ,, ,,m-+-.
 
IMRFRP REY. 3 VOLUME:          20      SECTION:            1.8 AFFECTED'
      'AFFECTED          VOLUMES PACES          & PAGES
          .REV. 3          REV. 2                          CHANGE                                REASON                                          EFFECT 1.8-1            'Vol. 16,      Updated descriptions of the Plume            Annual Update                                : Clarified the PEP EPZ and-IEP EPZ for Sec. I,        Exposure Pathway and Ingestion                                                              technical accuracy.
I-29          Exposure Pathway.
                                                                                                                        .h
                                                                                                                          . . - , .    ,,      -    .  - , . ~ . , . , m.-  ,. . . _ . . _ , ..
 
1iIill i      !
d n
a' n
s n ni oh Ct l        i aew ch            .
ot s e
l.f i eot r        i uel s ri nab .
ewin aso T  o        ni C  t eot E        rpc F  nasi F  o        ed E  isrs t e        i cil r et ou sirj rt donr ehoi dtCe d u        h Aa& t
                                                  '~
N O                        - '
S A
E R    e                        ~
t 3                    a                    ~    '
d                      ~
p                      '
T                  U E
R                  l a                          '
u n
P R                    n E                  A                          ~
                                                            ~
R                                              ~-'
E I
                                                          ^
o                        ~  "
t                          '
n o                            -
i t
c e
S                          '
                                                            +
l                              "
o                            ''
r t
E    n                                -
G    o                              '
N  C A
H  & .                                -
C        n d a nl                                -
ap s
2                m mi 2                oc Cc                                    -
o dl N                e O
d e I              dh T              At C                                                    _
E                                                      .
S D                                                  _
ESS                                                ._
TEE 2 CMG EUA FLPV        A 0  FO      E  N 2  AV&R D                                                    _
:      E    3                                              ,
E      TS                                                  _
M      CE . 12 U      EGV        - -
L O
FAE      2 2. .
V
                    . FPR                                                _
                    .A        22
 
~40LUME:
MMtMIP RET. 3 20      SECTION:    2.3 AFFECTED AFFECTED                                VOLUMES
      'PAGES                                  & PAGES REV. 3                                REV. 2                                        CHANGE                                                      REASON                        EFFECT 2.3-1                                    Vol. 16      Revised to provide a general                                            Annual Update                            Places all generic information which
      .thru                                  Sec. II,    description of the notification 2.3-3                                    II-2 thru process. . (Specific town was repeated-in each EPZ and Host-Community Plan in a centralized II-9        notification is located in Volume                                                                                location.
21-41.)
2.3-3                                    Vol. 16      Revised Figure 2.3-1 emergency                                          Annual Update Sec. II,                                                                                                                      Change reflects current procedures notification procedure.                                                                                        - for emergency notification at
                                              .II-3 Seabrook Station..
..~r.    .-r.a.            ,. ,,                        . .  . _                        .<.-.a    'm...
                                                                                                        ~s._-.m..-.
                                                                                                                . s o E x. u.-    a ,. .-....-m.-_,-      . - ----_m,-_
 
MHERIlp REY. 3 VOLUME:                    20      'SECTION:                        2.4 AFFECTED AFFECTED                  VOLUMES PACES                    & PAGES REV. 3                  REV.'2                                                        CHANGE                            REASON                  EFFECT 2.4-1                      Vol. 16,        Revised'and updated general                                        Annual Update          Places all generic information which thru                    Sec. II,        communication systems which are                                                            was repeated in each EPZ and Host 2.4-5                      11-10            utilized by the EPZ and Host                                                                Community Plan in a centralized thru II-        community response organizations.                                                          location.
16 4
4 O
e                                                                                                                                      .
        .,.    ...g.            ~  m. ,..  =-a.                                        . . + . . .ev, , >%
  .%                                                                                                            .    .            ,-  ,.  , - - , ,n .
mw-.--  w..,1,,
g  4 .-ec_.- . . _ __ - - _ , . ,
 
                                                                                      - 3
    ' VOLUME:        20      SECTION:        2.5 AFFECTED AFFECTED        VOLUMES
      .PAGES        & PAGES REV. 3      REV. 2                              CHANGE                        REASON                                              EFFECT
  ' 2.5-1            Vol. 16      Included general description of the Annual    Update                                        Places all generic information which'-
thru            Sec. II,      Public Alerting function common to                                                          was repeated in each EPZ and Host 2.5-3~          II-6 thru 'EPZ towns. (Specific locations are                                                            . Community Plan in a centralized II-9          included in Volumes 21-37.)                                                                location.
Updated Public Alerting Emergency Information (upgrades to sirens, tone-alert radios, etc.).
k L
e g__          y
                              .~s.  , , , - -    w--*---    , .,m.,w--+-,,- s y
                                                                                  -r-
                                                                                            --'t'4 - ^- " - + ' ;  '
                                                                                                                          *W-~  >^s-1  ,
w*'+--    -  **'v '
                                                                                                                                                                          +- - - ' + -
 
N
                                      ^
WRRRRP REY. 3
                - VOI11ME:                            20      SECTION:          2.6 AFFECTED
::AFFECTED                              VOLUMES PACES                & PAGES
                          'REV. 3                    REV. 2                                                CHANGE                                  REASON                                    EFFECT
: 2. 6                        Vol. 16,      Updated list of public information Annual Update                                    Updated plan to reflect list of Sec. II,.    . materials.                                                                                                materials provided to the general-II-17 public.
2.6-2                            Vol. 16      The Joint Telephone-Information                          Annual Update                                    The change enhances offsite and Sec. II,      Center (JTIC) was added to the                                                                              onsite-operations by ensuring II-18        plan. Rumor Control has moved from NHOEM to the JTIC and is consistent'information flow.
operated in conjunction with the utility and NHY ORO.
              ~
            - 2.6-3                                    NA          Added table to the local plan which Annual Update                                                          This table enables the user to reflects the distribution of public                                                                        determine the. type and targeted information.                                                                                                                                            .:
population of PI materials?-
l 1
$y _ [. '                                          _.    ._    _.                    .~.
                                                                                                                    -_        ,    . . _ .                . - , . . , . '._,,_    -. w. ,~ ; _ _  _..,    ,    ., . . . '
 
MetREP REY. 3
    ~ VOLUME:          20      SECTION:    2.7 AFFECTED A7FECTED          VOLUMES PAGES            & PAGES
* REV. 3            REV. 2                      CHANGE                                            REASON                        EFFECT
  '2.7-1              Vol. 16,. Revised section'to provide a                          Annual Update                  .. Places all generic-information which thru              Sec. II,    general discussion on emergency                                                        was repeated in each EPZ'and Host 2.7-7              II-19        facilities e.nd equipment. In                                                          Community Plan in a centralized thru        addition, reversed the order of the                                                    location.
II-26        description from Utility, State and Local to Local.. State and Utility.
2.7-1              Vol. 16,    Added language to the plan to open                    Annual Update                    This will ensure local responders Sec. II,      local EOCs at the Alert level to                                                      have early access'to the local EOCs II-21        provide access for key officials                                                        (e.g. test equipmenti contact special with emergency responsibilities.
facilities, etc.).
  '2.7-3              Vol. 16,    Added description of the EWF to                        ASLB Hearing Comments /-        The State of New Hampshire'has'a-Sec. II,    state operated facilities                              Stipulations                    dedicated monitoring / decontamination II-20a      (Brergency Worker Facility located                                                      facility for Bnergency Workers.
at the Hillside Jr.-High in Manchester).
2.7-3              Vol. 16,    Descriptions of the Media Center                    -Annual Update                    ~The' State of.New Hampshire uses the
    -thru              Sec. II,    and the Joint Telephone Information                                                    ~JTIC/ Media Center to ensure 2.7-4              II-19        Center (JTIC) have been added to                                                      ' consistent and accurate information.
l-                                  utility operated facilities.                                                          'is given to general public and the:
l media.
l
                                                                                                                                                                          ^
                                                - =                ---~=L-LL=--=~-------
                                ~..~x                                                                    - ~ " -        -
          . . . . . .        a              . .        - - - - - .
 
VOLUME:              20      SECTION: -2.7 AFFECTED AFFECTED- VOLUMES PAGES            & PAGES REV. 3          REV. 2-                              CHANGE                            REASON                                EFFECT 2.7-6                NA        Added table depicting the location        Annual Update                      This provides~the user information of local and host EOCs.                                                      regarding local ECCs in adjoining.
communities.
_ _ . . , ..y    ., m                    -+,-              e  w  9.w,  f ,-y,  9-  ,  .,
e + g  ,.,w,%, ,, w..,  f _ ,          t _ . _ _ _, _ _ _ . _ _, __,- _.., ._ _ _,
 
NHRRRP REY. 3
-4 VOLUME:            20    SECTION:    2.11 AFFECTED AFFECTED        VOLUMES PAGES        & PAGES REV. 3      REV. 2                        CHANGE                                        REASON                                    EFFECT 2.11-1          Vol. 16    Expanded general information                  Annual Update                                This change ~will' ensure all emergency Sec. II,    section to explain the Emergency                                                            workers understand the ERPA concept.
II-28      Response Planning Area (ERPA) concept.
2.11-2          Vol. 16,  Added the NH Traffic Management                Annual Update                                Traffic and access. control
* Sec. II,. Manual (TMM) as a reference to                  FEMA Technical Assistance /                  information has been consolidated in-II-29      accese control and traffic                    Plan Review                                  ' the TMi.
management discussions.
2.11-5          Vol. 16,  Deleted town-specific information.            - Annual Update                                Places all generic information which' thru          Sec. II,
                                                                                                                          . was repeated in each EPZ and Host                          '
2.11-12        II-28 Conununity Plan in a centralized thn2 location.
Il 12 2.11-6          Vc . 16    Added priority scheme to allocate              FEMA Technical Assistance /                    This concept.will ensure a priority Sec. II,  evacuation resources for special              Plan Review                                    is established for sending evacuation II-33      facilities (day care / school, transit-dependent beach transients,
                                                                                                                          ' vehicles to communities in close                          -i proximity to the plant first.
nursing home/ hospitals, general                                                                                                                        O public/special needs).
                                                                                                                                                                                      .l i
l
.                                                                                                                                                            e s~.-+..m,    ,  9  4 ,s-            *  ,,e- %-,.e~  e, e,  Ws    wra      *-      *'- -w    -y."-
                                                                                                        . l'.. ,4 v r      -* -+w,,g-
                                                                                                                                          * , - , . , . -,m,#  4-y g. .-, , , ,+,g .
 
IRIEMrP RET. 3
    -VOLUME:                      20          SECTION:          2.11 AFFECTED
  . AFFECTED                    VOLUMES PAGES                  Tr PAGES REV. 3                  REY. 2                                CHANGE                                    REASON                            EFFECT 2.11-10'                  Vol. 16          Added language to ensure critical                    FEMA Technical Assistance / . This ensures evacuated commmunities Sec. II,        emergency services are established                    Plan Review II-33            by local officials and NHOEM prior still have structured police-and fire.
services available.                                -
to releasing Bnergency Workers.
6 1
t
(
4 4
4
.      -    - . . . . .,                        . - . . .    -                , : = ~~ - - - + , .      -a      ,  ,-        l ~' ~      ' - -        * ~ ~ ~ '  ~ * ~ ~ ~ ~ ~ ' '
 
    . VOLUME:      20                                                              lemtF2P RET. 3
                            'SECTION:    3.2 AFFECTED AFFECTED      VOLUMES PAGES      -& PAGES REV. 3      REV. 2                                  CHANGE                                                  REASON                                            EFFECT 3.2 -4        Vol. 16,      Added a description of the Family                          Annual Update                                        Family Plan has been developed to Sec. II,      Plan training module to the text.
II-56                                                                                                                          assist emergency workers to plan for.
their. families prior to an emergency.
v'
  .._.2    c.....              ....~_      ..
                                                                    , .c-. . , --    , . ,    ~  - - . . _ . - _ ,    .- . . . _ . _ , , . . .        _ _
                                                                                                                                                                            . . a..    ....,_A. __
_ _.,w...
 
ilenterP REV. 3
        -VOLUME:          20            SECTION:        3.3 AFFECTED AFFECTED        VOLUMES PAGES      &.PAGES REV. 3      REV. 2                                          CHANGE                                                                                                REASON                                              EFFECT 3.3-3            Vol. 16 -          Updated Exercise / Drills section to                                                                      Annual Update Sec. II, This change ensures the plan is reflect changes in the State of New current with the SONH' drill / exercise II-53              Hampshire (SONH) program.                                                                                                                                                program.
ga,*m6..mem.m        wa _    m  .% ui_ee.-s..    .-=w. a .h, u.s.*:.->s' .wmmaeh__ s m,me+me%.eqw-z.            w e.eamA    _,w#A-sem%.,_m-w.eems-.m-muww%,,mmo,.,,%m_.g. _          _, ,., , , . ,j_        _,,,_a    , _ , , ,
 
                                                                                                                                  ]
IINIRRRP REY. 3 VOLUME:                20      SECTION:  3.4 AFFECTp AFFECTED              VOLUMES PAGES              & PAGES REV. 3              REV. 3__                CHANGE                              REASON          EFFECT 3.4-1                Vol. 16    The section has been revised to      Annual Update      Places all generic information which thru                Sec. III,  combine all common preparedness                          was repeated in each EPZ and Host 3.4-14                III-1      responsibilities including the                          Community Plan in a centralized thru        local and host maintenance program.                      location.
III-23      This section provides the responsibilities functionally for each EPZ and host response organization.
3
 
W E3 VOLIME:          20                SECTION:        3.5                                                                                                                                          .
AFFECTED AFFECTED    VOLUMES PACES    & PAGES REV. 3    REY. 2                                        CHANGE                                          REASON                                        EFFECT 3.5-1      Vol.'16,                  This section has been revised to                Annual Update                                          Places all generic information which thru    Sec. I,                  combine all common emergency                                                                            was repeated in'each EPZ and Host 3.5-4      I-19,                    responsibilities; In addition,                                                                          Conmuunity Plan in a centralized..
I-21,                    the revision functionally' describes                                                                    location.
I-22                      the emergency.. responsibilities for the EP2 and host communities.
w
                                                                                                                                                          ^
_ . - - . - - . - , - ~ -        , . - - .  ~:---~--  -- -- - ~ - - - - - ~    " - ~ " " - - '
                                                                                                                '1*
                                                                                                                        ' ' ^ ^ ^ ^ ~ ~ ~ ' ~ ^ ~ ' ' '    ^^ ~ ~ ~ " ~ ~ ~ ~ ^ ' ~ '^ ^ ^^ ~ ^' ~ ~
 
          .    .        ..        .        - . . . - ~ . . . - . ..      .    .    . _              - . .      - - . _ - - _ _ _ _ _ _ _ _ _ . - _ _ - _ - _ _ - _ _ _ _ - - -
NmrRnP REY. 3 VOLUME:    21-37      SECTION: Generic Local Plan                NOTE: The following changes were consistently applied to all 17,EPZ' communities. The page references and sample documents are provided-for Volume 21-Brentwood. Actual affected pages in Volumes 22-37' may vary slightly.
AFFECTED AFFECTED      VOLUMES PAGES      & PAGES REV. 3      REV. 2                                    CHANGE                                REASON                                                                        EFFECT VOL. 27 Page          vi            Deleted distribution list.                  Annual Update deleted                                                                                                                          Plan distribution list.is maintained ~
by NHOEM under separate cover.
tfols .      Vols.        Moved all phone numbers into a              Annual Update                                          Provides a single reference source 21-37        16-32        stand alone document - NHRERP                                                                        for all phone numbers.
Emergency Phone List.
1.1-1        1-1          General Information Section-                Annual Update                                          This reformat placed all generic Explanation that material that is                                                                    information which was repeated in common to all EPZ and Host                                                                        .each EPZ and Host Conununity Plan.in a:                                        :j Communities has been relocated to                                                                    centralized location (Vol. 20).
Volume 20. This includes such
                                                                                                                                                                                                                    ;j items as: Glossary of Terms, authorities,-abbreviations and acronyms, resident and peak population data and Federal, State and utility organizations and facilities.
[
1.3-1        1-11        Updated town population figures.              . Annual Update.                                        Provided 1990 information4 regarding population to the emergency responte organization.                                                                  'I 1.4-3        I-17        Revised and/or redrew Emergency                Annual Update                                          Provided accurate representation of Response Organization. Chart as                                                                        current emergency response necessary..                                                                                            organization.-
x_ _ , _. _            _  -      - . .  . _ _                  _ _
                                                                                  ,.    . ; _.u.. __.
                                                                                                                -                            .-.,w,,2_--_,                              _ _ _ ____ _____ _ , _ , __
 
NRRFRP -REY. 3 VOLUME:                  21-37                SECTION: Generic Local Plan                                NOTE: The following changes were. consistently applied to all 17 EPZ communities. The page references and sample documents are provided for Volume 21-Brentwood. Actual affected pages in Volumes 22-37~
may vary slightly.
AFFECTED AFFECTED                            VOLUMES PAGES                              &'PAGES REV. 3                            REV. 2                                  CHANGE                                                          REASON                          EFFECT 1
VOL. 27 1.5                                    NA        Added an Emergency Preparedness                                          Annual Update                  Clarified the level of pre-emrgency matrix which depicts activities and                                                                      preparedness.
responsibilities that should be carried out on a routine basis prior to-and in anticipation of an i
emergency.
1.6-3                              I-21            Formulated the existing text, which Annual Update                                                        Provided an easy reference for the thru          correlated procedures with plan                                                                            responder to determine the primary I-25            sections, into a Plan / Procedure                                                                        and support. agencies or individuals cross reference.
responsible for.a specific emergency.
action.
2.2-1                              II-2            Added statement " Support positions'                                      FEMA Technical Assistance /    Ensured support positions (TCP's, will-be staffed by available                                                Plan Review                    .TSA's) are staffed by available~
personnel based on the emergency                                                                          personnel based on the ECL. This classification level".                                                                                    formalized steps which were previously' performed on an ad-hoc basis.
2.2-3                            II-6b          Removed siren rating column from                                          Annual Update                    Made table' accurate.
siren location table as they were inaccurate.
                                                                                                                                                                                                        /
:. \
      - - . . . ~                          .-.  - , , . ~ . - - -    -a -. . -      L. . . . .      . . - ~ . _ . . - . - - ~ . -    .~.a--.      .-.  -
 
IUIRRRP REY. 3 VOLUME:        21-37              SECTION: Generic Local Plan                                                              NOTE: The following changes'were consistently applied to all 17 EPZ                                          .
communities. The page references and sample documents are'provided.:
                                                                                                                                                                                                                          ~
for Volume 21-Brentwood. Actual affected pages in Volumes 22-37 may vary slightly.                                                                                  <
AFFECTED AFFECTED              VOLUMES PAGES                & PAGES REV. 3              REV. 2                                          CHANGE                                                                            REASON                      EFFECT              _
VOL. 27 2.2-4                II-5                        Revised and/or redrafted 24-hour                                                      Annual Update                    Provided accurate representation of notification fan-out scheme                                                                                              current 24-hour notification fan-out diagram.                                                                                                                  scheme.
2.3-1                II-8                        Updated communications                                                                Annual Update                    Accurately reflected as-built thru                thru                        descriptions. ' Revised and/or                                                                                          communications' systems.
2.3-4                II-12A                        redrafted communications systems                                                                                                                                                            .
illustrations.
3.0                  IV                          Added language to Selectmen, EM                                                        Annual Update                    Ensured activation of EOC with key' Director, Fire Chief or Police officials at the Alert ECL.
Chief procedures to open the EOC'at the Alert level-to provide access for key staff with response functions.
3.2-7                  IV-6                      Added step to procedure to                                                              FEMA Technical Assistance /
'                                                                                                                                                                              Ensured consistent information'is coordinate local news briefing with Plan Review                                                                          provided to the public.
NHOEM prior to and after release.
i 3.2-8                  IV-7                    -Added statement to Selectmen'                                                            FEMA Technical Assistance /      Ensured that' critical municipal l                                                  procedure to coordinate.with NHOEM                                                      Plan Review                      services are maintained once all                                  ~
to maintain critical emergency                                                                                            emergency workers are evacuated.
services:(Fire suppression, municipal security) prior to-evacuating emergency workers.
                                                                                                                                                                                                                                                'l
:1
                                                                                                                                      ~,,.L.~
m-- _ a .x  _g_..    .                      -..+,.-,,.n,          - . , , _ ~                  ._-,--c.-. .
                                                                                                                              , ,,                s , . ,. c    m  ,.,
                                                                                                                                                                        -, . ,e..,.,.,..~  , _        _ _ _ _
 
NINIMP REY. 3 VOLUME: 21-37        SECTION: Generic Local Plan                                      NOTE: The following changes were consistently applied to all 17 EP2 conununities. The page references and sample documents are provided for Volume 21-Brentwood. Actusi affected pages in Volumes 22-37 may vary slightly.
AFFECTED AFFECTED  VOLUMES PAGES    & PAGES REY. 3  REY. 2                          CHANGE                                                                    REASON                            EFFECT YOL. 27 3.3-1      IV-8              Added statement to EM Director's                                Annual Update                                  Ensured command and control function procedure which provides command                                                                                is performed until such time as local and control authority in the event                                                                              elected officials can be contacted.
elected officials cannot be contacted.
3.3-5      IV-10            Added step to ' review staffing of                              FEMA Technical Assistance /                    Assured all response positions emergency response organization                                Plan Review                                    requiring staff are menned.
with key staff". Ensured                                                                                                                                          '
identified staffing levels are met.
3.4        IV-12            Added statement to Fire Chief or                                FDfA Technical Assistance /                    Assured local activation of sirens                                ,
Police Chief procedure to request                              Plan Review                                    will be attempted if required.
confirmation of siren activation from available field personnel.                                                                                                                                                  -!
Assigned individual to monitor                                  Annual Update                                  Clarified assignment of person to AM/FM radio or tone-alert radio for                                                                              monitor message content.
Emergency Broadcast System i
j                                announcements.
* 3.5-2      IV-20s            Included provision for contacting                              ASLB Hearing Connaitments/                      Ensured notification of individuals 3.5-3                        hearing impaired via TDD through-                                Stipulations                                    with special notification the IFO.                                                                                                        requirements.
  .,,c          . - - - . -
                            -r,,        e, y -            r - ,-                                e        ws    , sr -      w -      - --e-      - e              w . % <  w----  - - - - - --- - -+ ~-- - -=
 
NRRREP REV. 3 i
VOLUME: 21-37                    SECTION: Generic Local Plan              NOTE: The following changes were consistently applied to all 17 EPZ communities. The page references and sample documents are provided .
for volume 21-Brentwood. Actual affected pages in Volumes 22-37 may vary slightly.
AFFECTED AFFECTED          VOLUMES PAGES            & PAGES REV. 3          REV. 2                              CHANGE                                                    REASON EFFECT                                  !
VOL. 27 3.5-4              IV-21            Added note to procedures which                      FEMA Technical Assistence/
provides reference to order of                                                                      Established notification and Plan Review                                    transportation resource dispatch notification and dispatch of                                                                        priority.
vehicles (references transportation worksheets).
3.5-7              IV-23              Added " Inform NHOEM Local Liaison                  Arrm '. Jpdate 3.5-8            IV-24              when bus routing will begin' and                                                                    Provided information to NHOEtt to be incorporated in EBS messages. This
                                              " Inform NBOEM Local Liaison when                                                                  will keep the public informed as to bus routing / evacuation has been                                                                  when buses are running.
completed'.
      - 3.6-3              IV-28            Added note " Ensure that outside                      Annual Update resource providers, i.e. tow truck Ensured that all emergency workers drivers and road crews, are also are provided with dosimetry.
;                                            provided with dosimetry'.
3.0-5              IV-28            Added provision for assigning an                      Annual Update                                  Insures that an emergency worker,-
escort, if needed. to assist any                      Drills / Exercise Comments                      suffering adverse effects from-emergency worker, having a reaction                                                                  ingestion of KI, receives assistance.
to ingestion of KI, in leaving the area.
    -.,wg        + ~      ~ , , - ,        ,  - ~,          ,      ,-      +e~  ~ - . , , ,      r    w p    p->    +,--w , y- w--.-,  - ~. e, ew, e -w-    ,  v, , ,-,e-, -- sr-e,,v,-m w am - w
 
IWmREP REY. 3 VOLUME:  21-37      SECTION: Generic Local Plan                  NOTE: The following changes were consistently applied to all 17 EPZ comununities. The page references and sample documents are provided for Volume 21-Brentwood. Actual affected pages in Volumes 22-37 may vary slightly.
AFFECTED AFFECTED  VOLUMES PAGES    & PAGES REV. 3    REV. 2                    CHANGE                                          REASON                      EFFECT VOL. 27 3.7-3      IV-35      Deleted Traffic Control Post                      FEMA Technical Assistance /  Provided a central reference for diagrams from local plans,                        Plan Review                    traffic control strategies for all incorporated in Titi. Added necessary respond?rs to use.
reference to TMN in procedure.
Added the word " sheltering
* to the              FEMA Technical Assistance /  Ensures that municipal security will step, 'During and after                            Plan Review                  be sanintained during a sheltering sheltering / evacuation, maintain                                                protective action.
municipal security *                                                                                        '
3010-3    IV-45        Added provisions for local                        FDfA Technical Assistance /    Ensured EM Director is kept informed road / highway agent or Public Works              Plan Review Director to provide current status of the status of local evacuation routes.
of local evacuation routes to the Di Director.
                -.s                  - . - - - . , . . - _,-      _..                                                                        3
 
NHREILP RET. 3 VOLUME:  21      SECTION:    ALL AFFECTED AFFECTED  VOLUMES PAGES    & PAGES REU. 3  REV. 2                  CHANGE                              REASON          EFFECT 3.3-3    Vol. 27    Added step to EM Director procedure Annual Update        This change will ensure overall Sec. IV,    to report to the EOC if activated                      supervision of activities is IV-9      at Alert.                                                maintained.
Deleted reference to Emergency        Annual Update      The State no long uses the ERBS Radio Broadcast System (ERBS).                          concept. The deletion is consistent with State philosophy.
s F
 
NHRERP RET. 3
    - VOLUME:                    22                SECTION:                  ALL AFFECTED AFFECTED                    VOLUMES PAGES                    &-PAGES REV. 3                    REV. 2                                                CHANGE                                              REASON                                  EFFECT 1.6-2 and Vol. 30,.                                    The East Kingston procedure has                                Annual Update                          This ensures all emergency responders 1.6                      I-19                      hen revised to reflect current                                Drills / Exercise Comuments            procedures reflect current emergency response assignments as                                                                      assignments.
depicted in Section 1.6 Table 1.6-2. pg. 1.6-2 and 1.6-3.
3.10-1                      Vol. 30                  The title " Highway Agent" has been                            Annual Update                          Plan and procedure revised to thru                      IV-38                    changed to ' Road Agent'.                                                                              accurately reflect position title.
3.10-6                      thru IV-40 I
e m  ...,w,,.,          , , , _    .. - .. . , . . . _ , . . . , , . . _ ,
                                                                          .          -  ~r            , .. y . , %,  , , , . , . ,          ,..c< ...%. , ,. . m ..e.. s ,. .%.o  .,m  . . _ . , . . _m______m.  ,__,m_ . . _ __. s
 
REY. 3 VOLUME:    23        SECTION:    ALL AFFECTED AFFECTED    VOLUMES PAGES      & PAGES REV. 3    REV. 2                        CHANGE                              REASON                      EFFECT 1.6-2      Vol. 26,    Added EOC Controller Resident        Annual Update                    This change formalized support I-18        Pickup Staging Area Supervisor, and                                    position respense.
Local Transportation Staging Area Supervisor to responsibility matrix.
2.4-3,      Vol. 26      Updated EOC floor plan.              Annual Update                    Plan now reflects current location 2.4-4      II-19 II-20 and set up pattern. This change ensured any responder could activate II-21 the facility.
3.5-1      Vol. 26    Changed reporting location for        Annual Update                    Change reflected towns desire to thru        IV-21      Transportation Coordinator and        Drills / Exercise Comuments      revise operation.
3.5-11      thru        Staging Area personnel (from                                                                                                    '
IV-29      Comununity Building to the EOC).
Re-ordered procedures in logical order of progression.
Deleted reference to ERBS.            Annual Update                    Ensured the towns procedures reflect the EBS system currently employed by the State.
S c. 3.7  Vol. 26,    Deleted the following steps from      Annual Update                    1) Step no longer applicable based IV-36 to    Police Chief procedures                                                  on EOC location change.
IV-48      1) To have RADEF Officer set up in                                      2) Town relies on sirens and EBS.
Roost 212 of the Public Safety Complex. RADEF Officer will set up in new EOC location.
: 2) Dispatch patrols during sheltering to notify the public to a
take shelter.
              .      .  .      _. , __ _        _ _ . _ . _  ..      __        ._  .l______________        _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _
 
,, . u s  ,  .,
BBEF2P RET. 3 VOLUME:    23        SECTION:  ALL AFFECTED
. AFFECTED  VOLUMES PAG 5S    & PAGES                                                        REASON srrs6i REY. 3    REY. 2 _                    CHANGE Annual Update        School Superintendent no longer NA        Vol. 26      Deleted School Superintendent                            reports to the EOC. Now has stand Sec. IV      Procedure (procedure is part of a                        alone support plan.
Page 78      stand alone support plan).
Annual Update        Town only wants key responders Soc. 3.8,  Vol. 26      Revised Public Safety Dispatcher                          notified at an U.E. or Alert.
3.8-1 to  IV 49 to      procedure to reduce the number of 3.8-7      IV-53        personnel contacted at Unusual Event and Alert levels.
Annual Update        Added key responders who have Added Transportation Coordinator                          emergency responsibilities.
and EMS Coordinator to notification list for the Alert level.
Annual Update        Step deleted to reduce redondancy.
Vol. 26,      Removed redundant step from Town 3.2-6 IV-6          Manager procedure to hold weather briefings. Overall briefings will include weather information.
v
 
a VOLUME:
NRRF2P RET. 3 25        SECTION:  1.4  2.3. and 3 AFFECTED AFFECTED            VOLUMES PAGES              & PAGES REV. 3            REV. 2                    CHANGE                                                    REASON                      EFFECT VOL. 18 Sec. 1.4,          1-17      Moved Tcwn Manager block so that it Annual Update                                        This block diagram is now consistent pg. 1.4-3                      Indicates being in direct charge of                                                      with the text (Sec. 1.4, pg. 1.4-1).
the emergency organization.
S:c. 2.2            II-12b    Updated external communications                      Annual Update                      This change ensured the town's pg. 2.2-3                      block diagram.                                                                          diagram reflects the current comamunications system.
Sec. 3.0          IV-53      Deleted School Superintendent                        Annual Update thru        procedure (procedure is part of a                                                        School Superintendent no longer repcrts to the EOC. Now has stand IV-57      stand alone support plan).                                                              alone support plan.
1 -
            ,~-m.y,~.,,y    .      .v.,                --        ,e,..p-my. .4- #-,  rg,. m - ., ,w v -..      4 m  ,- ,.-%4-,.,., e% ~..e,+ , , , , , , ,,e-, , ,- .-            ,,
 
MIER3tRP REY. 3 VOLUME:    28        SECTION:      ALL r i AFFECTED
__AFFECTED  VOLUMES PAGES      & PAGES REV, 3    REY. 2                        CHANGE                                REASON                                  EFFECT YOL.' 28 SQc. 1.4    I-17            Updated Kingston Emergency Response Annual Update
      ' 1.4-3 The change to the chart reflected the                            '
Organization Chart.
current emergency response                                      '
organization.
t SGc. 3.12. NA            Created Transportation Coordinator      Annual Update                        Transportation Coordinator *s 3.12-1                      Procedure (Deleted transportation                                              procedure developed to ensure thru                        functions from Bnergency Management
'                                                                                                                  adequate coverage of the 3.12-10                    Director procedure).                                                            transportation functions.
NA        IV-33      . Deleted backup public alerting from Annual Update                                Fire Chief performs backup activation thru          Police Chief Procedure.
IV-36                                                                                          of the Public Alert and Notification System.                              '
Sec. 3.6    IV-37        Revised Police Office On Duty.or On Annual Update                              Updated to ensure all emergency 3.6-1      thru      ' Call to reflect the addition of the                                              responders, including the thru        IV-41        Transportation Coordinator to the 3.6-7 Transportation Coordinator, are on                                ;
notification list.
the notification list.
k 4
  ,w-c        -              Wiw  *            --r  i
* v  v  r-                      e  r e- w  c p--w_ ._  +---a__------2  -w  -------_-----  =- -- - - - - - _ -- --
 
e NHRREP REY. 3 VOLUME:    29          SECTION:      ALL                                                                                                                                              ,
AFFECTED AFFECTED      VOLUMES
      ~PAGES        fr PAGES
      ' REY. 3      REV. 2                          CHAM;E                                                    REASON                                  EFFECT VOL. 22                                                                                                                                                                    '
3.4-1          IV-11          Change Fire Chief to Fire Officer                      Annual Update in Charge. This title change is The Fire Chief and EM Director are the same individual. This change was reflected throughout the plan                                                                      provided for the Fire Chief to assume (i.e., organization chart, training                                                                the role of EM Director and placed matrix, etc.).
the Fire Officer in Charge in a position to fulfill the Fire Chief responsibilities.
3.5-1          IV-45          Changed Assistant Fire Chief to                        Annual Update                              This change was made to accurately RADEF Officer. This title change                                                                  reflect the Emergency Response is reflected throughout the plan                                                                  Organization currently in place.
(i.e., organization chart, training                                                                                                          '
matrix, etc.).
, __ _ . .    . . , .            ,      ,  * - , , -      - --            ~- --
                                                                                        -- -                -- -    --          ~ ~ - ' " ~ - ~ ~    ~ " " - ' ~ ' ' ' ~ ' ~ ~ ~ ~ ~ ~ ~ "
 
IIHRERP REY. 3 VOLUME:                      30        SECTION:    ALL AFFECTED AFFECTED                        VOLUMES
      'PAGES.                        & PAGES REV. 3                        REV. 2                    CHANGE                                              REASON                              EFFECT VOL. 25
    - 1.4-3                          I-17        Updated Newfields Faergency                      Annual Update                          Placed Emergency Management Director Response Organization Chart.                                                            In overall charge of the Secretary.to Board of Selectmen title changed to EOC Clerk.
organization. Title change denotes emergency position.
1.5-1                          1-22        Deleted description of                          Annual Update responsibilities of School School special facility plans Principal and School established as stand alone support documents.
Superintendent; added reference to school facility plans.
    -3.3-3                          IV-9        Added step to EMD procedure to                  Annual Update                          Placed Bnergency Management Director.
report to EOC at Alert ECL.                                                            in charge of EOC when activated.
-m-                        ----.m.-.              %~
                                                                                    ,*- .e, ,    ,  ww4 . ,- , ,      ,  ,=i-  ,.m,. M  -*r- +- %, . - . . ,,%., . - -*,- , ,_ ,,,r , .~we. , , . ...v
 
NREF2P REY. 3 VOLUME:      31                SECTION:                                  ALL AFFECTED AFFECTED      VOLUMES PAGES          & PAGES REVo 3        REV. 2                                                        CHANGE                                                                            REASON                            EFFECT
                -VOL. 32-1.4-3          I-16                                        Updated Newton Emergency Response                                          Annual Update                                  Placed Emergency Management Director Organization Chart.                                                                                                        in overall charge of the organization.
1.5-1          I-21                                        Deleted description of                                                      Annual Update responsibilities of School School special facility plans Principal and School established as stand alone support documents.
Superintendent. Added reference to school special facility plans.                                                                                                                                                                                                '
3.7-1          IV-36                                      Removed responsibility from Police - Annual Update                                                                            Fire Chief assigned responsibility Chief procedure for providing                                                                                                for backup activation of the Public backup public alerting.                                                                                                      Alert and Notification System.
i l
i.
y    y , , , - + . , , . ~                                          . g,  ,
y                              . - - ~ --- ,
                                                                                                                                    ..w .,                  . . - ,  w--a- ,, e_. ,  . ,  .,a. ~                                ,-                      _ , , . . , . . _ . , . - ,#-.w
 
M REY. 3 OLM:'          32                                            SECTION: - ALL AFFECTED AFFECTED                    VOLUMES PAGES-                  & PAGES REV. 3                REV. 2                                                  CHANGE                              REASON            EFFECT VOL. 19 1.5-1                                                                                                  #
I-22                                      Deleted description of                Annual Update        School special facility plans responsibilities of School established as stand alone support Principal and School                                      plans.
Superintendent; added reference to school special facility plans.
3.1-1                        III-15                                      Deleted reference to " Ambulance      Annual Update        Position deleted from plan:
Corps Director".                                          responsibility assumed by Deputy Fire Chief-Transportation.
3.10-1                      IV-44                                      Highway Agent title changed to        Annual Update        New designation for ex1; ting
                                                                                      . Public Works Director.                                    position.                                  '
e ..we-                    m  oe e    ,      e          e  e      ,    ,.c_w ew4 s - ,e m o a- a___-_  _ . - - . _. _ _ ~ -
 
BilRIE8tRP REY. 3 10LUME4            34              SECTION:                  ALL AFFECTED
\FFECTED          VOLUMES PACES          & PAGES REV. 3          REV. 2                                                              CHANGE                                REASON                      EFFECT VOL. 20 L.5-1              I-22                Deleted description of School                                      Annual Update                      School special facility plans Principal and School Superintendent                                                                    established as stand alone support responsibilities; added reference                                                                      plans.
to new location in special facility plans. Deleted School Superintendent procedures.
Y
 
                                                                                    *3
-VOLUME:            35        SECTION:        ALL AFFECTED AFFECTED            VOLUMES PAGES-            & PAGES REV. 3            REV. 2                      CHANGE                                REASON                EFFECT VOL. 16 1.5-1                I-22          Deleted description of School            Annual Update          School special facility plans I-23          Principal and School Superintendent                              established as stand alone support responsibilities; added reference                                plans.
to new location in special facility plans.
2.4-3                II-23        Revised EOC floor plan diagrams..          Annual Update          Revised diagrams to reflect move of 2.4-4                11-24 EOC to new facility.
3.9-1                IV-39        Procedure reassigned from Fire            Annual Update          Reflected reassignment of to                  to        Dispatcher to Police Dispatcher.                                    responsibilities for notification.
3.9-6                IV-44                                                                                                      -
                                                                                                                                        -l
 
                                                                                                    +
NmrF2P REV. 3 VOLUME:            36      SECTION:    ALL AFFECTED AFFECTED            VOLUMES PAGES              Tr PAGES REV. 3            REV. 2                      CHANGE                              REASON                EFFECT VOL. 31
< 3.5-10              IV-28c        Deleted Attachment 2. Special Needs Annual Update              Revised checklists to be consistent Vehicle descriptions, from                                    with responsibilities.
Transportation Coordinator checklist; added as Table 3.5-1 to the Assistant Emergency Management Director checklist.
4 9
      ,,p.-.., .w.n...    ~ .e    r-                                "            "~'' * ~ ^      '
 
lslaunP REY. 3 VOLUME:-    37      SECTION:          ALL AFFECTED AFFECTED      VOLUMES PAGES  & PAGES REV. 3  REV. 2                                  CHANGE                                      REASON                  EFFECT
                      'VOL. 24 1.4-3          I-17              Revised Figure 3, Stratham            Annual Update                            Revised chart to reflect current-Emergency Response Organization                                                organization.
2.4-1            II-18 to          Updated EOC floor plan.              Annual Update                            Reflected upgraded space and to      II-20                                                                                            equipment in the EOC.
2.4-4
    - 3.2-2          IV-3              Revised Selectmen procedure to        Annual Update                            Provided local 24-hour notification reflect notification by police                                                  and warning point.
officer on duty.
    ' 3.4-3          IV-11 to          Revised Fire Chief procedure to add Annual Update                              Ensured sufficient experienced IV-19              step to provide personnel to assist                                            personnel for traffic control.
traffic control if requested.                                                  Transferred responsibility for Removed Fire Chief responsibilities                                              transportation to Transportation for transportation, communications,                                            Coordinator; for conununications to and EOC maintenance.                                                            Communications Coordinator; for EOC maintenance to EMD.
3.5-1            NA              Created Medical Coordinator            Annual Update                            Replaced EMS Captain position.
procedure.                                                                      Designated responsibility for apecial needs persons within town.
3.7-1              NA              Changed title of Police Chief to      Annual Update                            Ensures 24-hour coverage of position.
Law Enforcement Officer.
3.8-1              NA              Created Police Office on Duty or on Annual Update                              Designated responsibility for Call procedure.                                                                notification within town.
l i
____xm~
 
A lentRIP REY. 3
  . VOLUME:    37        SECTION:          ALL AFFECTED AFFECTED      VOLUMES.
    .PAGES      & PAGES REV. 3      REY. 2                              CHANGE                                    REASON                          EFFECT 3.9-1          NA            -Created Transportation Coordinator              Annual Update procedure.
Designated responsibility for          >
coordinating transportation resources.
within town. Transferred responsibility front Fire Chief.
3.10-1        NA              Created Consnunications Coordinator            Annual Update procedure.
Designated responsibility for operation of commmunications equipment. Transferred responsibility from Fire Chief.
3.11-2          NA              Revised Highway Agent and Town                  Annual Update                  Full staffing of EOC is at discretion 3.12-2                          Clerk procedures to have them notified'and report only if EOC is of Selectmen to conserve resources.
fully activated.                                                                                            -
t me                                                                    .-e,m.o'"v
  ~.3    -            y  . . - - - - ,    -m. +4 y,. g +    e      <    r7
                                                                                .v                e  r we + -  w r --  -*w e  +--''m-:- r w  *-t, a =
 
IWIRREP REV. 3 VOLUME:              38      SECTION:    ALL AFFECTED AFFECTED              VOLUMES PAGES                & PAGES REV. 3                REY. 2                    CHANGE                              REASON              EFFECT VOL. 33 1.1-1                  I-1        General Information Section -        Annual Update          The reformat placed all generic explanation that material that is                            information which was reported in common to all EPZ and Host                                  each EPZ and Host Consnunity Plan in a Communities has been relocated to                            centralized location (Vol. 20). This Volume 20. This includes such                                provided a quick reference that is items as: Glossary of terms, State                          comanon to all participants.
authorities, references, abbreviations and acronyms, resident and mean peak populations and Federal, State and utility organizations.
1.4-1                  I-12        Added to the description of the        Annual Update          Provided clear direction as to who is response organization the line of                            responsible for directing the succession within the town                                  emergency response in the absence of organization.                                                the Emergency Management Director.
1.5-1                  NA        Added an Emergency Preparedness        Annual Update        Improved the level of pre-emergency Matrix which depicts activities and                          preparedness.
responsibilities that should be carried out on a routine basis prior to and in anticipation of an emergency.
1.6-1                    I-12        Moved the general synopsis of        Annual Update          Clarified general implementatloa of utility, State and Federal                                  the plan by placing commeon elements officials to Volume 20. Added                                in a central location. Addressed provision for 24-hour operations                            operations during extended periods, for a protracted time period.
                                                          ~ ' - -
 
NHRERP REY. 3 VOLMIE:  38      SECTION:                          ALL AFFECTED AFFECTED  VOLUMES PAGES    & PAGES REV. 3  REV. 2                                            CHANGE                                                                  REASON                                      EFFECT 1.6-3      NA                              Added plan / procedure cross                                          Annual Update                Provided a quick reference for reference.                                                                                          emergency response personnel to determine applicable plan and procedure responsibilities.
2.4-1    II-7                              Moved State, utility and county                                        Annual Update                Improved general implementation of facilities and equipment and their                                                                  the plan by placing comanon elements interrelationships to Vol. 20,                                                                      in a central location.
Sec. 2.7.
2.4-3    II-18                              Revised mass care shelter list;                                        Annual Update                Improved list and map will facilitate to      II-18a                            prioritizing facilities by                                                                          response by providing a clear list of 2.4-5    II-19                              capacity. Redrew Dover emergency                                                                    available facilities and their facilities location map.                                                                            locations.                                                                                            '
2.5-2      NA                                Added a Training Matrix to the                                        Annual Update                Clearly identified training that plan.                                                                                              responders should receive.
3.6-1    III-10                            Added a step to "if directed,                                          Annual Update                Assured, if required, the activate the back-up monitoring /                                                                  responsibility to open back-up decon decontamination facility at Dover                                                                  center is properly assigned.
Junior High School".
'3.7-1      NA                                Added a procedure-for Police Chief. Annual Update                                                  Formallred actions previously 3.7-2                                                                                                                                            performed on an ad-hoc basis.
 
M*3 VOLUME:  38        SECTION:  ALL AFFECTED AFFECTED    VOLUMES PAGES    & PAGES                                                                                                                ,
REV. 3    REV. 2                  CHANGE                              REASON            EFFECT 4.1-1    App. B      The procedure for opening,            Annual Update        Provided a central location of this staffing, operating and                                    information for easy reference by any deactivating a monitoring /                                responders.                                    ,
decontamination facility as well as the procedures for contamination monitoring and decontamination have been moved to Volume 8. Section 5.
4.1      App. B,    Revised monitoring / decontamination  Annual Update        Improved legibility and detail of B2-3        facility flow diagrams.                                    drawings.
thru B2-10 la r
                                                                                                    ,-m.  ,w,,  ,>,an-_r  w-ws
 
l l
l l
NRH5tP REY. 3 VOLUME:  39            SECTION:          ALL l
AFFECTED AFFECTED    VOLUMES PAGES.      & PAGES
!      REY. 3      REY. 2                          CHANGE                                        REASON                                EFFECT VOL. 36 1.1-1        I-1              General Information Section -              Annual Update                              The reformat placed all generic explanation that material that is                                                      information which was reported in i                                    common to all EPZ and Host                                                            each EPZ and Host Community Plan in a                        2 Consnunities has been relocated to                                                    centralized location (Vol. 20). This Volume 20. This includes such                                                          provided a quick reference that is itoms ast Glossary of terms, State                                                    ccamon to all participants.
authorities, references, abbreviations and acronyms, l                                    resident and mean peak populations and Federal, State and utility organizations.
1.4-1        I-12            Added to the description of the            Annual Update                              Provided clear direction as to who is response organization the line of                                                      responsible for directing the succession within the town                                                            emergency response in the absence'of organization.                                                                                                                                    .
the Emergency Management Director.                        .
1.5-2        NA              Added an Emergency Preparedness            Annual Update                              Clarified the level of pre-energency Matrix which depicts activities and                                                    preparedness.
responsibilities that should be carried out on a routine basis prior to and in anticipation,of an emergency.
1.6-1        I-12            Moved the general synopsis of            Annual Update                                Clarified general implementation of utility, State and Federal                                                            the plan by placing comunon elements officials to Volume 20. Added                                                          in a central location. Addressed provision for 24-hour operations                                                      operations during extended periods.
for a protracted time period.
    +  .%
y  a-'        "w  -w --
e w        -
T si y -'v = -7v'" " tie e-=''r  - - - - - reee  u*  **    vv d  +,__A*    y- ,* s  e- -r__vr +---^-ww-w
_. i
 
NRRRRP REV. 3 VOLUME: 39        SECTION:    ALL                                                                                            l AFFECTED AFFECTED  VOLUMES PAGES  f. PAGES REV. 3  REV. 2                      CHANGE                              REASON                      EFFECT 1.6-3      NA        Added plan / procedure cross          Annual Update                Provided a quick reference for reference.                                                        emergency response personnel to determine applicable plan and procedure responsibilities.
2.2-2    II-3,        Revised notification fan-out scheme Annual Update                  Accurately reflects current Fig. 3      diagram.                                                          notification fan-out scheme.
2.4-1    II-7        Moved State, utility and county      Annual Update                Clarified general implementation of facilities and equipment and their                                the plan by placing comunen elements interrelationships to Vol. 20,                                    in a central location.
Sec. 2.7.
2.4-2    II-12        Revised to indicate that Hillside      ASLB Hearing                Assured a dedicated facility for Jr. High School is Emergency Worker Commitments / Stipulations    Emergency Worker monitoring and Monitoring / Decontamination Center                                decontamination - sepacate from any only, and that Southside Jr. High                                  general population.
School is the backup monitoring /
decontamination facility for the general public.
2.4-2    II-18        Revised mass care shelter list;      Annual Update                Provided a clear list of available to      II-18a      prioritizing facilities by            ASLB Hearing Commitments /  facilities and their locations.
2.4-6    II-19        capacity. Redrew Manchester          Stipulations                Assured EWF will remain open for as emergency facilities location map.                                long as it is needed.
The EWF will remain staffed for as long as the need for monitoring / decontamination of emergency workers exists.
2.5-2      NA        Added a Training Matrix to the        Annual Update                Clearly identified training that plan.                                                              responders should receive.
I
 
R NHRERP REY.-3 VOLUME:              '39        SECTION:    ALL AFFECTED AFFECTED                  VOLUMES
            -- PAGES                & PAGES REV. 3                  REV. 2                    CHANGE                              REASON                  EFFECT 3.3-3                  II-12        1) Added a step to direct Fire      ASLB Hearing Connaitments/  Assured assigtunent of responsibility Chief to open Emergency Worker        Stipulations              to open EWF.
monitoring / decontamination facility.
: 2) Added a step to direct Fire      Annual Update              Assures assignment of responsibility Chief to activate the backup                                    to open secondary monitoring / decontamination                                    monitoring / decontamination facility.
facility, if needed.
3.6-1                    III-9        1) Added a step to "if directed,    Annual Update              Assured the responsibility to open activate the back-up monitoring /                                the back-up decon center and EWF, if decontamination facility at South                                required, is properly assigned.
Side Jr. High School".                                                                      -
: 2) Added a step to activate the      ASLB Hearing Comualtments/
EWF at Hillside Jr. High School.      Stipulations 3.7-1                        NA        Added a procedure for Police Chief. Annual Update                Formalized actions previously
      -3.7-2                                                                                                    performed on an ad-hoc basis.
4.1-1                      App. B.      The procedure for opening,          -Annual Update              Provided a central location of this staffing, operating and                                          information for easy reference by any deactivating a monitoring /.                                    responders.
decontamination facility as well as the procedures for contamination monitoring and decontamination have been moved to Volume 8, Section 5.
l
  .._m.,._.        - . . . . - -
 
1HIRERP REY. 3 VOLUME:  39        SECTION:  ALL AFFECTED AFFECTED    VOLUMES PAGES    & PAGES REV. 3    REV. 2                  CHANGE ~                                    REASON                  EFFECT 4.1      ' App. B,    Revised monitoring / decontamination        Annual Update                Improved legibility and detail of B2-6        facility flow diagrams.                                                  drawings.
thru B2-13 e
_._-------7          ,.v--  +n  Y v  '              -  ''- - - ' ' ' ' - - ~ - - ~ ' - ~ '
 
NMEREP REY. 3 VOLUME:                40        SECTION:    ALL AFFECTED AFFECTED-                VOLUMES PAGES                  &'PAGES REY. 3                  REY. 2                                    CHANGE                                              REASON                              EFFECT VOL. 35 1.1-1                    I-1          General Information Cection -                              Annual Update                                The reformat placed all generic explanation that material that is information which was reported in conanon to all EPZ and Host                                                                              each EPZ and Host Community Plan in a Communities has been relocated to                                                                        centralized location (Vol. 20). This Volume 20. This includes such                                                                            provided a quick reference that is items as: Glossary of terms, State.                                                                      comunon to all participants.
authorities, references, abbreviations and acronyms, resident and mean peak populations and Federal, State and utility organizations.-
1.4-1                    I-12        Added to the description of the                            Annual Update response organization the line of Provided clear direction as to who'is responsible for directing the succession within the town                                                                                emergency response in the ebsence of organization.                                                                                            the Bnergency Management Director.
  -1.4-2                    I-13        Revised Rochester Emergency                                Annual Update                                Accurately reflected the current city Response Organization Chart.                                                                              emergency response organization.
  -1.5-1                    NA          Added an Em rgency Preparedness                            Annual Update-                              ' Clarified the level of pre-emergency Matrix which depicts activities and                                                                      preparedness.
responsibilities that should be
                                        . carried out on a routine' basis prior to and in anticipation of an emergency.
i
                                  ,-              .a                    y-      rr---,e      s  -      -"g g      g #      y y, & a w  *rm-    --y            .-    ..-,--ew _ evw. m x ,e-s. ,
 
                                                                                            - 3 VOLUME:              40            SECTION:      ALL AFFECTED AFFECTED              VOLUMES
  -PACES                & PAGES REV. 3                REV. 2                              CHANGE                            REASON                                  EFFECT 1.6-1                  I-12              Moved the general synopsis of      Annual Update                            Clarified general implementation of utility, State and federal                                                  the plan by placing common elements officials to Volume 20. Added                                              in a central location. Addressed provision for 24-hour operations                                            operations during extended periods.
for a protracted time period.
1.6-3                    NA              Added plan / procedure cross      Annual Update                            Provided a quick reference for reference.                                                                  emergency response personnel to determine applicable plan and procedure responsibilities.
2.2-2,-                II-3,              Revised 24-hour notification fan-  Annual Update                            Accurately reflected current Fig.                    Fig. 3'            out scheme diagram.
2.2-1 notification fan-out' scheme.
2.4-1                  II-7              Moved State, utility and county    Annual Update                            Clarified general implementation of facilities and equipment and their                                          the plan by placing common elements interrelationships to Vol. 20,                                              in a central location.
Sec. 2.7.
2.4-3                  II-17              Revised mass care shelter list;    Annual Update to Provided a clear list of avaHable II-18              -prioritizing facilities by                                                  facilities and their locations.
2.4-5                                    capacity. Redrew Rochester emergency facilities location map.
i e_____ _ _ _ _ 'e-_  _______=s. '
m <  -=y-  +~a  w.  -
v                +  4.g"=-    -mwa <-w, TC-  y =v -
                                                                                                                            - * - m-% w      . . - = .- y  .,u-.-4f.,_- ,
 
NBRERP REY. 3 VOLUME:              40                    SECTION:              ALL AFFECTED AFFECTED                VOLUMES PACES                & PAGES REVS 3                REV. 2                                                  CHANGE                        REASON                              EFFECT 2.5-2                  NA.                              Added a Training Matrix to the          Annual Update                Clearly identified training that plan.
responders should receive.
3.3-3                II-5                              Added a step to *1f needed, direct      Annual Update                Assured the responsibility to open the Fire Chief to activate the                                        the back-up decon center, if back-up monitoring / decontamination                                  required, is properly assigned.
facility at Spaulding High School.
3.6-1                  III-9                            Added "If directed, activate the        Annual Update back-up monitoring / decontamination Assured the responsibility to open back-up decontamination center is facility at Spaulding High School.                                    properly assigned.
3.7-1                  NA                              Added a procedure for Police Chief. Annual Update                      Formalized actions previously 3.7-2 performed on an ad-hoc basis.
4.1-1                App. B                            The procedure for opening,              Annual Update                Provided a central location of this staffing, operating'and information for easy reference by any deactivating a monitoring /                                            responders.
decontamination facility as well as the procedures for contamination monitoring.and decontamination have been moved to volume 8, Section 5.
4.1-                  App. B,                          Revised monitoring / decontamination      Annual Update                Improved legibility and detail of B2-3                              facility flow diagrams.                                                drawings.
thru B2-10 4
e                                                                        -
: s. na__  _ . _    _.2_ . . . _.. _ _ _ _ _ _ _ _ _ . _ _'
                                                                          *---v..-            e e sv      --    e-- w
* w_-    =m.w. '
e< e , ,  p.~. .w w, =- - . .,e., , ..w. ,
m.- -. ..
 
MPTRRP REY. 3
'OLUME:      41      SECTION:    ALL AFFECTED 7
FFECTED    VOLUMES PAGES.      &-PAGES REV. 3      REV. 2_                    CHANGE                                                REASON                                                                                                  EFFECT VOL. 38
  .1-1        I-1          General Information Section -                        Annual Update                                      N reformat placed all generic                                                                                        '
explanation that material that is                                                                        inicrmation which was reported in common to all EPZ and Host                                                                              each EPZ and Host Conummity Plan in a .
Communities has been relocated to                                                                        centralized location (vol. 20).                                                                          This Volume 20. This includes such                                                                            provided a quick reference that is.
Items as: Glossary of terms, State                                                                      comanon to all participants.
authorities, references.
abbreviations and acronyms, resident and mean: peak populations and Federal, State and utility
_4 organizations.
  .4-1        I-12        .Added to the description of the                    .. Annual Update
                          ~ response organization the line of
                                                                                              '                                    Provided clear direction as to who is responsible for directing the succession within.the town                                                                              emergency response in the absence of organization.                                                                                          .the Emergency Management Director.
:.5-1          NA        'Added-an Emergency Preparedness                      Annual Update                                      Clarified the~1evel of pre-emergency Matrix which depicts activities and                                                                      preparedness.
responsibilities that should be-carried out on.a routine basis prior.to and in anticipation of an emergency.                                                                                                '
d-1        I-12        . Moved the general synopsis of.                      Annual Update                                      Clarified general. implementation of
                          .-utility, State and federal    .
the plan by placing common elements-officials to Volume 20. ~Added                                                                          -in a central location. Addressed provision for 24-hour operations                                                                        operations during extended. periods.
for.a protracted time period.
y
_ _,    ,          _        _                                                    _  ,4 #    -                        -  ~i,
                                                                                                                                -                                                          -                                - . ~ ~ " - - -    - -  -
 
NRRREP REY. 3 LVOLUME:      41            SECTION:            ALL
                'AFFECTED'-
AFFECTED    VOLUMES PAGES    & PAGES REV. 3  REV. 2                                    CHANGE                                                    REASON                                              EFFECT' 1.6-3        NA                    Added plan / procedure cross                          Annual Update                                            -Provided a quick reference for.
reference.
emergency response personnel to-determine applicable plan and procedure responsibilities.
2.4-1      II-7                  Moved State, utility and county                        Annual Update                                              Clarified general implementation of facilities and equipment and.their                                                                                  the plan by placing common elements interrelationships to Vol. 20, Sec. 2.7.
in a central location.
  - 2.4-3        II-17                  Revised mass care shelter list;                        Annual Update.
to      11-18                  prioritizing facilities by Provided a clear list of'available
-.2.4-5                                capacity. Redrew Salem emergency
                                                                                                                                                        - facilities and their locations.
facilities location map.                                                                                                                                    -
2.5-2          NA                  Added a Training Matrix to the                          Annual Update
                                      . plar..
Clearly. identified training that.                                  ]
                                                                                                                                                        . responders should receive.
3.3-3        III-5                  Added step "If.needed,' direct Fire                    Annual Update                                              Assured that the responsibility to Chief or designee to activate the'                                                                                open the back-up..
back-up monitoring / decontamination                                                                              monitoring / decontamination center is-                          :
facility.                                                                                                          properly assigned.
3.7-1        III-10                Added a step to."if~ directed,                          -Annual Update                                            Assured the_ responsibility to open activate the back-up monitoring /                                                                                  the back-up decon center, if~
decontamination facility.-                                                                                          required, is properly assigned.
3.8-1        NA                  Added a procedure for Police Chief. Annual Update                                                                  Formalized actions previously 3.8-2                                                                                                                                                . performed on an ad-hoc basis..
___7,_ . ,  _=        - - , _ . * . . . -    -y w.,  ,  +;--r                , ,>-v.'        --r-  . ,*%--    -  --ec#rr
                                                                                                                                . m y .-      -+vc: ,i- w.-  *.4 , . -,    vi. v. .  , ..<  -.%  ;--w-  , # n.t-  .
 
3RRRRP REV. 3 iTOLUME:          41                  SECTION:      ALL                                                                                                                            ,
AFFECTED                                                                                                                                                            _
'AFFECTED              VOLUMES
  -PAGES              & PAGES REV. 3              REV. 2                              CHANGE                                              REASON                                      EFFECT 4.1-1.              App. B-                  The. procedure for opening,                Annual Update                                            Provided a central location of this staffing, operating and                                                                              information for easy reference by any-deactivating a monitoring /                                                                          responders.
decontamination facility as well as the procedures for contamination monitoring and decontamination have been moved to volume 8, Section 5.
4.1                App. B,                  Revised monitoring / decontamination      Annual Update                                              - Improved legibility and detail ^of B2-3                    facility flow diagrams.                                                                              drawings.
thru 32-10
                                                                                                                    ._re.-2.:-...cm.----,,_-wa        _.2.,
                                                        -vm      -,. m. -.--m.,.-, .a~.    .r_c._
                        .m._,. _.m.      _--A .._S.
 
IMRERP REY. 3 VOLUME:        50        SECTION:      LOA's AFFECTED AFFECTED        VOLUMES PAGES        & PAGES
    -REV. 3        REV. 2                        CHANGE                            REASON            'EFFECT 4.0-2            NA            Revised LOA with FAA.                  Annual Update        LOA dated 12/17/88 replaced LOA dated 5/24/86 - changed contact from Concord FSS to Bangor AFSS.
5.0-1            NA          Revised LOA with WHEB.                Annual Update        LOA dated 1/20/89 replaced LOA dated 8/1/86 - new station manager.
5.0-6/          NA          Revised LOA with WUNH.                Annual Update          Signed. LOA dated 5/4/87 and adderdum 5.0-7 dated 5/4/87 replaced. unsigned LOA.
5.0-8            NA          Added LOA with WNNW.                  Annual Update        New LOA dated-1/20/89.
5.0-9            NA          Added LOA with WKOS.                  Annual Update        New LOA dated 8/25/89.'
5.0-10            NA          Added LOA with WQMI                  Annual Update        New LOA dated 9/9/87.
6.0-28            NA          Added 9 LOA's with Teamster          Annual Update        ' LOA's made 42 Teamsters' drivers to                        drivers' employers.                                        available for emergency driver pool.
6.0-36 6.0-17          NA            Deleted 4 LOA's with ambulance      Annual' Update        Remaining 10 LOA's.with ambulance to                        . providers.
6.0-26 providers provide 37 ambulances and 101 liMTs. Deleted LOA's accounted ~
for 13' ambulances and 28 ENTs.        .
'6'0-15/
    .              NA            Added 2 LOA's with bus. providers:  Annual Update          Added LOA's account for 119 6.0-16'                        deleted 1 LOA with bus provider.                            additional buses /100 additional drivers. Deleted LOA accounted for 8, buses.and 8 drivers.
= . _      . - ___  - - - _ =- - - _.- - - -                          _      -        -:                                          O
 
NMRPRP REY. 3 iVOLUME:            50      SECTION: LOA's AFFECTED
    -AFFECTED            VOLUMES                                                                                                                                                                                                '
PAGES-            & PAGES-
      -REV. 3            REV. 2                                CHANGE                                                                                                    REASON                EFFECT 6.0-38              NA        .Added 3 LOA's for tow trucks;                                                                                      Annual Update              Added LOA's account for 6 tow to                            deleted 3 LOA's for tow trucks.                                                                                                                trucks / drivers; deleted LOA's accounC 6.0-53 for 5 tow truck / drivers.
6.0-54              'NA        Added 1: LOA for fuel provider;                                                                                    . Annual Update          ' Replaced fuel provider in Exeter with to                          deleted 1 LOA for fuel provider.                                                                                                            -fuel provider in Portsmouth to serve.
6.0-58 Portsmouth Transportation Staging-Area.
7.0              NA        Added 5 additional hospital                                                                                        Annual Update              Capacity unchanged.
to                          responses to DPHS survey of
  -: 7.0-84                        -treatment capability for contaminated patients.
u_.    --.,..-.-..a..-.
            .                                - - . . ~ - -  --.-..~-au.                                                                    . . - . -        . . - . . _ - =    ~-
 
7- , -- -w--,-,------- - - , - - - - - - - ------,,, - - - - - , - - -
e----    - - - - , - - , - -
                                                                                                                                  .          .l R
                                                                                                              ~
                    -'                                                                                      ~
N 1
1 h
l
                                                                                                                                                  .i h
:y
      '    n                                                                                                                                  .j s.
to -                                                                                                                                ,
w
* t W      N                                                                                                                            i j                g            vi g            E
:                =            0                                                                                                                ,
1                y
                .O            E t
g"    =
i                E            I-                                                                                                              J l    ,            ,
5            -
1 8            E
    .      l    t u
l    .
r la                                                                                                                                  3 I
p                                                                                                                                              4 i
+
i 4
                                            -                                                .,... ,                                -,.q
 
SPIE REY. 1 4 VOLUME:      PLAN          SECTION:      1
    -AFFECTED. AFFECTED
        .PAGES        PAGES REV. 1        REV. O                      CHANGE                                            REASON                                  EFFECT
: 1.3        1.3          Deleted reference to "650 students" Annual Update                                                          ~
Eliminated duplication of school populations listed in Appendix M.
1.3-14      1.3-12          Deleted reference to "2500                          Annual Update                    - Eliminated duplication of-school students" in Amesbury                                                                  populations. listed in Appendix M.
Updated population of'Newburyport                  . Annual Update                    Incorporated updated population to "16800"                                          ASLB Hearing Commitments /.      - figures.
Stipulatioils Deleted reference to "3300                          Annual Update                      Eliminated duplication of school students" in Newburyport                                                                populations listed in Appendix M.
1.3-13          Deleted reference to "1400                          Annual Update                      Eliminated duplication of school students" in West Newbury                                                              populations listed in Appendix M.
Deleted reference to "600 students' Annual Update                                      Eliminated duplication of school-in Merrimac          ,
populations listed in Appendix M.                  -
:1.3-15        1.3-13          Deleted reference.to "2100                          Annual Update                      Eliminated duplication of school students" in'Newbury                                                                    populations listednin Appendix M.
1.3-14        : Updated MA-resident populations                      Annual Update                      Incorporated updated population ASLB Hearing Commitments /        figures.
Stipulations 1[3-16        '1.3-14        Updated MA resident. populations                      Annual Update                  :
Incorporated updated-population
                                                                                        ~ ASLB Hearing Connaitmentsf .
figures.-
Stipulations
  --%%. v,we4    w  e ;.-..s        .y-4..
7-  gew r%.-  -
: c.        +      -
roy
                                                                                              -.-e -
y    g -- -+- ..A- w=ev.  +-y      .e,ea es  w. ,, -.---** w+,
 
M..---.
1 SPIE REV. 1    .
VOLUME:  PLAN                  SECTION:        1 AFFECTED  AFFECTED P41GES        PAGES REU. 1        ~REV. O~                              CHANGE                                                REASON                            EFFECT~
      ~ Table    Table                        Updated MA population figures          Annual' Update                _
Incorporated updated population 1.3-1        1.3-1                                                            ASLB Hearing Commitments /                        ifigures.
Stipulations Figure    Figure                    . Updated MA and NH populations          Annual Update                    .
                                                                                                                                          ' Incorporated updated population 1.3-2        1.3-2                      figures                                ASLB Hearing Connaitments/_                        ' figures.
Stipulations FDfA Technical Assistance /
Plan Review 1.5-8      1.5-7                        Deleted reference to " vehicle and      Annual Update.                                      Helicopters are not utilized in the helicopter-mounted" sirens for PANS                                                        MA PANS since the VANS Backup Vans; provide adequate notification coverage.
E
                                                                                                                                                                ^ ~ ~ ~ ~
                                                                                        ~ ' - " ' - ^  ^ ' ~ ' " ~        ' ^ ' ' ' ~ '
                                                                  - ~ - - - - - - - ~
                          - . . . > . ~ . - . ...-.
 
M.--
SPIE REY. 1 VOLUME:        PLAN      SECTION:      2 AFFECTED        AFFECTED PAGES          PAGES REV. 1        REV. O                    CHANGE                              REASON                    EFFECT
      ' Table          Table        Department of Interior included as    FEMA Technical Assistance /  Made key position response function 2.0-1.          2.0-1        a_ federal response agency. USCG      Plan Review                -matrix consistent with the plan's and FAA noted as having primary                                      concept of operation.
responsibility for-their actions denoted in the concept of operations. Added responsibilities of Yankee Atomic Electric Company (YAEC).
2.1-1            2.1-1        Clarified that backup personnel        Annual Update                Made plan consistent with Yankee under the Yankee Emergency Mutual      FEMA Technical Assistance /  Emergency Assistance Agreement.
Assistance-Agreement are for the      Plan Review positions of monitoring /decontamin-ation personnel and dosimetry recordkeepers.
2.1-2            2.1-1        Clarified that the YAEC Service        Annual Update                Made plan' consistent with YAEC Agreement,is for Backup Traffic-      FEMA Technical Assistance /.
                                                                                  ~
Service Agreement.
Guides, Route Guides and Reception . Plan Review Center Staff.
2.1-3            2.1-3        The NHY Offsite. Response Director    ASLB Hearing Commitments /    Ensured MA cognizance of requests for-
                                    .is to confer with MA on requesting- Stipulations :                  federal assistance.
federal support (instead of directly contacting the federal agencies).
12.1-4              2.1-3        Added." Manager *'to prerequisite      Annual Update                ' Increased resource pool of candidates experiences needed for                                              for the Offsite Response Director.
qualification as a NHY_Offsite iResponse-Director.
. , , .-g    -    -
 
Mml  iIh                I ''I g
i i
_l IVOLUME:    PLAN                            SECTION:      -2 AFFECTED      AFFECTED PAGES                    PAGES REV. 1                  REV. O                                  CHANGE                                                    REASON                              EFFECT
~2.1-5          2.1-5                            Added that, if-directed by the                            Annual Update                            .Provided ability to delegate Offsite Response Director, the.                            ASLB Hearing Conunitments/                responsibilities ~for requesting ~
Assistant Offsite Response Director Stipulations                                                    federal assistance.
can initiate requests for federal assistance.
2.le6        2.1-5                            Added that the Emergency                                  ASLB Hearing Commitments /              Assigned a dedicated individual for.-
Preparedness Advisor will assume a                        Stipulations                            coordinating federal assistance..
liaison role for coordination of federal resources.
2.1-13        2.1-11                            Added that-Reception Center                              Annual Update                            Clarified responsibility for Coordinator is responsible for                                                                      activation of the Host Facilities and operation and activation of the                                                                    responsibility for registering Host Facilities, and for ensuring                                                                    evacuees..
evacuees are: registered ~and directed to the Host Facilities.
Added that the Assistant Reception-                        Annual Update                            Clarified responsibilities for Center Coordinator establishes and                                                                1 registering evacuees and maintaining maintains contact with the American                                                                  contact with the American Red Cross.
Red Cross and that he assists the Reception Center Coordinator in ensuring that all evacuees are-registered and directed to the Host-Facilities.and Congregate Care Centers.
'2.1-16.      2.1-14                            Deleted responsibilities of the                            Annual Update                            Airborne Alerting is.no longer.
Airborne Alerting Pilot. .                                                                          . utilized as the VANS provides adequate notification coverage.
                                                                                                                                ' ' ~ ^ ' " ~ '
                  . . , , , , _ .      .+. ..        . w.-~  ~ + - " - > + = " - ~ -"'":-"^ ' ~ ~ ' " ' -  ' " ~ ' ~ ~ ~ ~
 
M-r 1
        . VOLUME:                PLAN-      SECTION:      2
:AFFECTED                    AFFECTED PAGES                PAGES
  =
REV."1                REV. O                        CHANGE                                        REASON                EFFECT 2.1-21                  2.1-19        Deleted statement that the            Annual Update                        Allowed the position of.. Telephone Telephone Technician "is a contract                                        Technician to.be filled by other than
                                                . person".                                                                  a " contract person" provided they are trained and qualified.
      '2.1-22,23                  2.1-20,21      Changed NHY Offsite Response EOC      Annual Update                        Documented that there are two NHY l                                              " Contact" to
* Contacts".                                                  Offsite Response EOC Contacts.
2.1-23                    2.1-21        Deleted that the EOC Contact          Annual Update                        Eliminated redundancy in-
                                                  " returns to his security functions                                        . responsibility description.
as directed by the Support Services Coordinator".
2.1-25                    2.1-23        Changed the' Massachusetts State      Annual: Update-                      Redistributed responsibilities for:
Liaisons contact-for providing                                              obtaining status reports on the status on the State emergency-                                              State's response to more evenly response'from the Offsite Response.                                          distribute work load.
Director.to the Assistant Offsite Response Director.
2.1-26                    2.1-24        Added that the. Support Services      Annual Update                  _
Clarified responsibility for Coordinator, under:the direction of.-ASLB Hearing Comunitments/            . coordination of logistical support-the Emergency Preparedness; Advisor, Stipulations                          for the' deployment of federal-will coordinate logistical support                                          . resources.
l                                            .necessary for the deployment of federal-resources.
2.1-27'                    2.1-24,25. Deleted' responsibilities-of'EOC        : Annual Update                        Security personnel are no longer security personnel.                                                        needed atithe EOC since access to the.
EOC/ EOF.is controlled by EOFe security.
l -
e i
                                                                                        ~"    " ~ ~ ' " ''^ ~
                                            .-:'            c ev-
                                                                              "  ~
 
SPMC REY. 1 VOLUME:                      PLAN      SECTION:    2                                                                                                                                        ~
AFFECTED                      AFFECTED                                                                                                                                                                  '
                          ~PAGES            'PAGES REV. 1    REV. O                  CHANGE                                                          REASON                            EFFECT 2.1-30                      2.1-27      Added that a predesignated group of Annual Update                                                .
Provided specially trained Route.
Route Guides have been assigned to                          ASLB Hearing Conunitments/ -            Guides for Evacuation Bed Buses.
assist Evacuation Bed Buses and.                            Stipulations that these Guides are trained in First Ald/CPR.
2.1-31,32                    2.1-28      Added references to and                                    Annual Update                            Provided the capability for snow            w responsibilities for snow removal                                                                    removal.at designated locations ~to.
crews.                                                                                                                                                    '
support emergency. operations.
2.1-32                        2.1-28      Reference to dispatching " Ambulance Annual Update                                                  Made the Special Vehicle and Van. Drivers" changed to                                                                        Dispatcher's responsibilities
                                                      " contract special' vehicles-                                                                        consistent with the type of vehicles                  .1 (Ambulances, Vans,-Wheelchair Vans,                                                                  currently utilized in the, plan.                      .
Evacuation Bed Buses)."
2.1-34                          2.1-30      Removed statement that "for.                                Annual Update                            Removed redundancy within Bus subsequent dispatch to the bus                                                                      Dispatchers' description of garages."                                                                                          . responsibilities.
Figure                          Figure      Increased Reception Center Staff                            Annual Update                            Made organization chart consistent
:2.1-1                              2.1-1        from 34 to 36. Increased Reception                        ASLB Hearing Commitments /.              -with current ORO. staffing. Reception Center Mon /Decon from 60 to 82.                            Stipulations                            Center staffing increases to Removed reference'to EOC security.                                                                -accommodate plan changes.
Added snow removal. crews.
Increased the number of Traffic
                                                      . Guides from 95 to 101.          Increased..
the number:of Route Guides from 166 to 205.''Added an additional Media Relations Assistant. Increased the number of Radio' Operators from 4 to
: 6. .. Removed reference to Telephone Technician as " contract'
                                                      . personnel."
_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ -                    ___    _~          ---                      -      - -        ~ , -      -    ~-      ~        _      -    -      -
                                                                                                                                                                                ,_-____:____=_:.v__,- _    - - - -
 
1    --                                                                                                                                                                                  p.
      - VOLUME:
SPIE REY. 1 PLAN                  SECTION:                      2
                                                                                                                                                                                                                                        ' 'I '
    . AFFECTED        AFFECTED E
        ~ PAGES.                  PAGES
          'REV. 1                  ItEV. O                                                CHANGE                                                  REASON                                                EFFECT                            y 2.2-6            2.2-5                    ' Reference to availability of local                                          Annual Update                                                Clarified availability of local.
resources (i.e., equipment) in each                                                                                                                                                      ,
local and host consnunity has. been.                                                                                                      resources as consistent with NUREG--            ;
0654, Supp. 1, and how the ORO would          "
replaced by the statement that the local agencies will continue to assist them in their emergency-response.. This replaced the previous 4
carry out their normal; emergency                                                                                                        reference to local law enforcement, functions. Additionally, it'is-noted that the ORO will assist                                                                                                            fire and rescue -and' snow' removal-agencies as ' support organizations in -
these~ agencies with appropriate                                                                                                        Section 2.4.
emergency information and exposure control.
Table            Table                      Newburyport " Board of Selectmen"                                          Annual Update.                                                Corrected error in local government 2.2-2            2.2-2                      has been replaced by ' Mayor".                                                                                                            description.                -
2.3-1,2          2.3-1                      Added that' direct contact.to                                                Annual Update                                              . Specified pre-existing plans, federal agencies can be achieved
                                                                                                                                                                                          - procedures, and relationships for.
via existing plan / procedures as                                                                                                          directly contacting federal agencies follows:
U.'S. Coast
                                                                                                                                                                                          - to ensure consistency with the NHRERP            ;
Guard: USCG First'                                                                                    - and other. procedures.
District RRP and with'the USCG proceduree,.Vol. 4B'of the'NHitERP.
FAA: ; Via NHOEM EOC, Operations-Officer, Vol. 4 .NHRERP.-
DOI: .Via ORO in accord with Parker
                                                          ~
                                              . River National' Wildlife Refuge                      c      SOPS-for emergencies at Seabrook Station.
I e
              .3    n  -- . - , -
g  .c        ,- .~
n      -  -s,-        ,(+-        -s            -  -r--    ,.as. ~    r  w    wm m - ,,,        ,  y  ,,;  ,          ,        .,. ,
 
SPMC REV. 1 -
VOLUME:  PLAN      SECTION:      2 AFFECTED  AFFECTED PAGES      PAGES REV. 1    REV. O                    CHANGE                                  REASON                                    EFFECT 2.3-20    2.3-18      Added that the USCG will make              ASLB Hearing Conunitr ents/              disured USCG will not reconunend notification to boaters " consistent Stipulations                                  boater actions which are physically; with navigation conditions on the                                                  impossible due to navigational waterways".                                                                        conditions which may exist.
Clarified that communications              Annual Update                          Specified pre-existing relationship between the ORO and the USCG will                                                  for contacting the USCG consistent take place through NHOEM and not                                                  with the NHRERP.
the State of New Hampshire EOC Agency Liaison.
Table            Table        Included EP Advisor as a contact          ASLB Hearing Conunitments/              Assigned dedicated individual.for 2.3-1            2.3-1        for FEMA and other federal agencies Stipulations                                    federal support coordination.
: p. 1      p. 1      to coordinate assistance.
Replaced "NRC" with " federal--            Annual Update                            Clarified the coordination of public authorities' regarding coordination                                                information with all federal of public Information.                                                              authorities, not-just the NRC.
: p. 2      p. 2        Removed Accident Assessment                Annual Update                            This is an onsite ERO function Coordinator as contact.for managing                                                covered by ERO Licensing Coordinator federal response actions onsite.                                                    and Response Manager.
                                                                                                    - - - - - - - - - - - - - - - - - - - - - - - = = ' =
                                                = ~ - - --  -    - - - - -  - -    - = ~ -  - -              -
 
SPIE REY. 1 VOLUME:      PLAN                  SECTION:            2 AFFECTED      AFFECTED PAGES            PAGES REV. 1            REV. O                                            CHANGE                                      REASON                              EFFECT Table        Table                      Changed the contact for sup-                                  ASLB Hearing Commitments /
2.3-1                                                                                                                                      Allowed Assistant ORD/ Support Liaison 2.3-1                      plemental radiation monitoring                                Stipulations                        to concentrate on interface with
: p. 3              p. 3                assistance from federal agencies                                                                  state and local agencies.
from Assistant ORD/ Support Liaison                          Annual Update to EP Advisor.
Made consistent with functional responsibilities of these 3 Added Accident Assessment                                                                        positions.
Coordinator, EP Advisor, and Rad Health Advisor.
: p. 5              p. 5                Replaced Assistant ORD/ Support                              Annual Update Liaisen with Offsite Response                                                                    Made consistent with ORD's level of authority.
Director as-the. contact for procurement of food.                                                                                                        -
: p. 6        . p. 5                  ' Add Public-Information Coordinator                          Annual Update as a contact for information Made consistent with PIA's functionalT responsibility.
dissemination to farmers.
Replaced Assistant ORD/ Support                              Annual' Update Liaison with ORD as the contact for                                                              Made consistent'with ORD's level of authority.
reallocation of USDA food supplies.
: p. 10          p. 9                    Added EP Advisor and State and                                Annual Update                      Made consistent with functional Local Liaisons as contacts for                                                                  responsibilities of added positions.
coordination between federal / state / local authorities and Indian tribes.
                            .se-.--                -                                  --- + , - - - J  +  .-r        m's  -
g..*m-  y ,  -+y    we=,  r  w --            p    m
 
ri i s . .- .
SPMC REY. 1 VOLUME:                PLAN          SECTION:    2 AFFECTED                AFFECTED PAGES                  PAGES REV. 1                  REV. O                  CHANGE                              REASON                        EFFECT 2.4-2                    2.4-1          Changed reference to ARC procedure  Annual Update                  Incorporated reference to updated ARC from ARC 3050 to ARC 3031.                                          procedure, Disaster Services Regulations and Procedures.
2.4-4                  2.4-3,4        Removed state and local law          Annual Update                  State and local law enforcement, fire enforcement, fire and rescue, and                                    and rescue, and snow removal agencies snow removal agencies from support                                  are currently listed as local organization list.                                                  response agencies in Section 2.2.
2.4-4          Added statement that additional      Annual Update                  Documented support provided under manpower will be supplied by YAEC    FEMA Technic 1 Assistance /    YAEC Service Agreement.
through an existing service          Plan Review agreement.
2.4-5                    2.4-4          Clarified that " key officials"      ASLB Hearing Commitments /    Provided helicopter transport for eligible for helicopter transport    Stipulations                  officials from the Commonwealth of include officials from the                                          Massachusetts if necessary.
Commonwealth of Mascachusetts and the ORO.
2.4-5          Included " Trailer Drivers" as a    Annual Update                  Provided the capability for            l support organization.                                                repositioning of trainers if          I necessary.
l
 
_M            M SPPE REY. 1 PLAN    SECTION:      3 l VOLUME:
    "AFFECTED          AFFECTED PAGES            PAGES REV. 1            REV. O                CHANGE                                REASON                      EFFECT 3.1-2              3.1-2      Changed " Buses" and " Ambulances" to Annual Update                  Allowed for providing transportation
                                    " Transportation Resources."                                        ' resources other than buses and ambulances..
Added that the Governor may verify    ASLB Hearing Connitments/      Provided the Governor with a means-NHY ORO's response through MCDA's      Stipulations-                  for verifying the ORO's response.
NAS Line in the Framingham ECC to Seabrook Station.
3.1-3              3.1-3      The Assistant Offsite Response        Annual Update            .
Clarified coordination with MA in Director (AORD) verifies that MA      ASLB Hearing Commitments /      requesting Federal assistance.
has requested Federal support.        Stipulations through FEMA. .If contact was not made, the-AORD will offer to make                                                                  -
request.
Requests to DOI will be made          Annual Update                  Clarified coordination in requesting through the Parker River Wildlife                                      Federal assistance.
Refuge.
Requests to the USCG and FAA will'                                    Clarified coordination with NH in be coordinated through the State of                                  requesting Federal assistance.
New Hampshire.
  '3.1-4              3.1-3      Reference to'IP 2.14 and IP 1.1        Annual Update                  Referenced procedures for determining added.                                                                extent of OR0s response required,-      -
                                                                                                        . obtaining authorization to implement
                                                                                                        .that' response and detailing the ,
interfaces necessary if State,' Local and Federal organizations respond.
 
D e
SPIE RET. 1
    - VOLUME:      PLAN            SECTION:                              '3 AFFECTED    AFFECTED PAGES          PAGES
        .REV. 1        REV.-0                                                CHANGE                                                          - REASON                                                EFFECT 3.2-2        3.2-2            Deleted " Dimension 2000 System."                                          Annual Update                                                      Conenercial . telephone is utilized to provide a backup means of communication to the NAS line.
3.2-6        3.2-5              Bus companies will be notified of                                          ASLB Hearing Commitments /                                                                          ~
This. expedited the notification of' the emergency by telephone through                                        Stipulations                                                      Bus companies in an emergency.-
the Melita Emergency Telenotification' System (METS).
Deleted references to IP 2.1.                                              Annual Update.                                                    Eliminated redundant reference to IP 2.1'concerning provisions for manual callout. notification'since this information is detailed'in Appendix.                          -
G.                                                .
Deleted references to IP 2.1.
3.2-7        3.2-6                                                                                        Annual Update Eliminated redundant. reference to IP 2.1 concerning required notifications and mobilization consistent with FCLs since this information is addressed-
                                                                                                                                                                                                                                    ~
in Appendix G.
                                        ~
    . 3.2-8 3 . 2- 7'        Added that the EOC Contact will                                                                                                                                                                                .\
ASLB Hearing Commitments /                                        Bus companies are notified via METS.
also initiate notification to the                                          Stipulations                                                        to expedite the notification bus companies.                                                                                                                              . process.
4 Added that VANS drivers are                                                Annual- Update.                            ,
Incorporated implementation.of VANS'..
notified via VANS Alerting                                                ASLB Hearing ~ Connaitments/-                                      and associated comanunications system.
Communications System (VACS).                                            . Stipulations                                                                                                                        j 3.'2-9      ~3.2-8            -Added that the'TTIC is activated at Annual Update                                                                                            Made consistent with procedure.
the ALERT ECL.
.                                        n      ,- %. .--            -      a e:  s a - .v e ,-s
                                                                                                    ,    -s y  e.4-.e.          "W ' y  .oy e .: .-n ~- +  +-w-'      gSs,  a A 3+4    ~ rew+,  o m,,~ g ew p. 4 m,. , + , -      y + .r.cw, m
 
EM SPIE REY. 1 VOLUME:                  PLAN      SECTION:          3 AFFECTED                AFFECTED PAGES    PAGES REV. 1    REV. O                    CHANGE                                    REASON                                      EFFECT 3.2-9                  3.2-8'      Added that VANS vehicles will be            Annual Update                  Documented implementation of VANS.
deployed to their acoustic locations at the ALERT ECL.
Added that Bus Company Contacts            Annual Update                    Made consistent with procedutas that begin assessing resources at the                                            Bus Company Contacts begin 2'ssessing ALERT ECL.                                                                  resources at the ALERT ECL.
3.2-10                  3.2-9      Added " Bus Companies."                    Annual Update                    Documents that the EOC Contact notifies' bus companies via METS at the SAE or GE ECL.
Added that VANS Drivers are                Annual Update                    Documented implementation of VANS.
notified of the SAE ECL via VACS.          ASLB Hearing Commitments /
Stipulations 3.2-11                  3.2-10      Added that the YAEC Mutual                  Annual Update                  Made Plan consistent with the Assistance Agreement provides                                                provisions of the YAEC Mutual second shift--personnel for                                                  Assistant Agreement-and the YAEC monitoring / decontamination                                              ' Service Request.
positions and' dosimetry recordkeepers and that the YAEC Service Request provides personnel for Reception Center _ Staff. Traffic Guides and Route Guides.
3.2-12                  3.2-10    -Added that VANS vehicles will be            Annual Update-                  Documented that VANS vehicles will be'-
deployed to their acoustic              _
deployed to their acoustic locations
                                    ' locations if not already deployed.                                        -at the SAE or GE ECL if they were not already deployed previously.
I s  . -~    - ----i  -
                                                                    - -- -- -    ~-L- -    -i2-----      --  - - - - - ~' - - ~ ' ~ ~ ' ^ " ~ ~ - - ' -
 
1 VOLUME:                                  PLAN          SECTION:              3 AFFECTED                                AFFECTED PAGES-                        PAGES REV. 1                        REV.'O                                CHANGE                      REASON                      EFFECT 3.2-12                                  3.2-10        Added " Route Guides" and " Dosimetry Annual Update Recordkeepers" and deleted Clarified that YAEC provides second reference to EWF.
shift personnel for the positions of Mon /Decon personnel and Dosimetry Recordkeeper in addition'to Traffic Guides. Routes Guides and Reception Center staff. The reference to the EWF.was redundant with " Monitoring-Trailers
* since a monitoring trailer is located at the EWF.
3.2-13                                    3.2-11        Added "until the Local EOC Liaisons Annual Update.                    Documented that the NHY Offsite are available and in contact with                                      Response EOC Contact will provide a the Local Consnunities. "                                              backup notification to local dispatchers for an ALERT or higher emergency classification level until the Local EOC Liaisons are available and in contact with the local communities.
3.2-14,15                              3.2-12          Replaced "Offsite Response                Annual Update                Clarified'respons'ibilities for l Director
* with " Assistant Offsite
                                                                                                  ~ASLB Hearing Conunitments/    coordination of Federal resources.
Response Director" and " Emergency        Stipulations                  The Ar,.sistant Offsite Response Preparedness Advisor."                                                  Director and Emergency Preparedness Advisor coordinate Federal assistance.
3.2-15                                  3.2-13          Deleted reference to IP-2.15,          ' Annual Update                .Made Plan consistent with actual
                                                        - Airborne ALERT Activation.                                            operations as airborne alerting is no
                                                                                                                                ' longer-used.-
_s
          ,,.,#                      4M-.      s- y )
* 7            T*
 
4 I
VOLUME:                      PLAN SPIE REY. 1 SECTION:                3 4
AFFECTED                    AFFECTED PAGES                        PAGES REV. 1                        REV. O                                  CHANGE                          REASON                                  EFFECT 3.2-16                      3.2-14          ' Deleted discussion on airborne                  Annual Update                          Airborne alerting is no longer used alerting.
as a means for backup notification, since the VANS and backup VANS;                                i provides adequate coverage.
Deleted. reference to Table 3.2-3.              Annual Update                            Table 3.2-3 has been deleted from the Plan since the information it contained was both proprietary and already included in the FDfA-REP-10 Report.
3.2-17                    3.2-15            Added " Hearing Impaired Individuals Annual Update                                      Documented that hearing impaired (as needed)."
individuals are offered tone-alert-radios.                                  -
13.2-18                    3.2-16            Replaced " concurrent" with " prior to.*
FEMA Technical Assistance /            Documents that prior to activation of Plan-Review                              the EBS, the Communication Coordinator will' activate the siren system.
                                              ' Replaced " Airborne Alerting                    Annual Update                        . Airborne alerting is no longer used System" with." Backup VANS as a means for backup notification Vehicles."
since'the VANS and backup VANS provides adequate coverage.
i 3.2-20                    3.2-17            Noted that discussion applies only              Annual Update                          Clarified that the procedural if the EOC-is not staffed by the                                                        discussion for an lamediate SAE or GE Offsite Response Director and,the                                                    - applies..only if the EOC is-not manned
                                              - Public' Notification Coordinator.                                                        by the:Offsite Response Director and-the Public Notification Coordinator.
A O
m
                          .r  %a v      yw3    .y .        g      3      a      .m-  y    m-        4 g  .,s,  =+-,,wpy,-..3,,,. f.--_  ,
____y_  , , _ _ __. _.___.f.._. _,_, _ ._,gg
 
s f
SPIE REY. 1 VOLUME-            PLAN            SECTION:          3 AFFECTED          AFFECTED PAGES            'PAGES REV. 1              REV. O                        CHANGE                                                    REASON                          EFFECT 3.2-21            3.2-18          Replaced " concurrent" with " prior.                      Annual Update                      . Documents'that prior to activation of.
to."
the EBS, VANS is activated.
Deleted "Seabrook Station Emergency Annual Update                                              Upon activation of the EOC the Director."
Offsite Response Director (ORO) notifies the Short Term Emergency
                                                                                                                                        . Director, Site Emergency Director, or-EOF Coordinator (not the Seabrooks Station Emergency Director) that the ORO is. assuming responsibility for PANS and EBS' activation.
Corrected procedure references.                        Annual Update                          Made procedure reference consistent'-
with the Revision 1 procedutes.
Table              Table            Added method of. notification for                      Annual Update
                                                                                                                                      'Provides quick reference to the 3.2-1              3.2-1            reference.
t General          General                                                                                                        - method of notification.-
Made Table consistent with P. 1                                EOC' Contact referenced as P. 1 Annual Update                            notification procedures.
contacting VANS and Backup VANS                                                                                  '
Operators via VACS; and deleted reference to airborne-alerting.
  . P. , 2            P. 2              EOC Contact referenced as Annual Update.                            Made Table consistent with' contacting VANS and Backup VANS                                                                  notification procedures.
Operators via VACS; and deleted j                                        reference to airborne alerting.
* i 4
  .P. 3              P. 3              Added " Bus Companies" to other                    . Annual Update organizations' notified.
                                                                                                                                      -Made' Table consistent.with-Lnotification procedures.
                                                                                                                                  ~
      =        . - - .        ..      ~;- -          -
                                                          .~z-          L            -. ; .            u.      ~. a. -  , .~ ~ ; a-, _ - .      -    ..    . . . _ , . . .  -..
 
4 SPIE REY. 1 VOLUME:        PLAN          SECTION:                                    3
    - AFFECTED      AFFECTED
        'PAGES          PAGES
        'REV. 1        REV. O                                                    CHANGE                                  REASON                                          EFFECT Table        Table            Deleted " Trailer Drivers" and                                    Annual Update 3.2-1        3.2-1          - " Security" from ORO personnel                                                                        Made Table consistent with-P. 3          P. 3                                                                                                                  notification procedures.
notified.
P. 5          P. 5            Added that Road Crew Companies are                                Annual Update                      Made-Table consistent with
,                                    notified at the ALERT ECL.                                                                            notification procedures.
Added that school liaisons notify                              . Annual Update                      Made Table consistent with Day Care Centers (as opposed to the                                                                  notification procedures.
                                  -Special Population Liaison).
    - P. 6          P. 5-            Added that the Assistant Reception                                Annual Update                      Made Table consistent with-Center Coordinator assists the                                                                        notification procedures.
* Reception Center Coordinator in making notifications, including Host Facilities.
P.:8          P. 7            Deleted:" Trailer Drivers" and                                    Annual-Update.                      Made Table' consistent with
,                                    " Security" from'ORO personnel                                                                        notification procedures.
notified.
P.~10          P. 8            Added that the Staging Area. Leader-                              Annual Update                      Made Table' consistent with' contacts Road' Crew companies (as                                                                    notification procedures.
opposed to Transfer Point l
Dispatcher)..
Added. that School Liaisons notify                                Annual Update                    :Made Table consistent with
                                  ; Pay Care Centers-(as opposed to.the                                                                  _ notification procedures.
Special Population-' Liaison).
q
+
t'
                                                                                                                                    *    ~
 
s SPIE RET. 1 VOLUME:          PLAN        SECTION:      3 l
AFFECTED          AFFECTED PAGES            PAGES                                                                                                        !
REV. 1            REV. O                    CHANGE                            REASON              'EFFECT
  -Table              Table        Added that Route Guides perform      Annual Update        Made Table consistent with 3.2-1              3.2-1        Door-to-Door notification of                              notification procedures.
P. 10              P. 8          hearing impaired individuals as                                                                  j necessary.
Added that the Assistant Reception. Annual Update        'Made Table consistent with Center Coordinator assists the                            notification procedures.
Reception Center Coordinator in making notifications, including Host Facilities.
Table              Table        VANS Staging Areas and JTIC added    Annual Update        'Made Table consistent with updated 3.2-2              3.2-2          to list.                                                  Dnergency Response Facility-Activation levels.          .
None              Table        Deleted.                            Annual Update        The.Information contained in Table 3.2-3                                                                    3.2-3 was redundant with the FEMA-REP-10 Report.
  '3.321              3.3-1        Added 'Hampton-Harbor."              Annual-Update      ' Clarifies that'the Hampton Harbor, in
                                                                                              -addition to the Atlantic Ocean, influences the dilution: factor-
                                                                                                              ~
                                                                                              ~ pertaining to 11guld releases from Seabrook Station.
  ~3.3-2              3.3-2        Changed "Five" to "Six."            Annual Update        Increase the number of~ sampling teams from 5'to 6 to be consistent with-
                                                                                              ' procedures.
__._.__.:.m_._
                  =
 
e.
4
                                                                                                                                            *1 VOLUME:                        ' PLAN'    SECTION:      3
  -AFFECTED                          AFFECTED PAGES                  PAGES REV. l'                  REV. O'                CHANGE                                                                            REASON                                                                                              EFFECT
    -3.3-9                            3.3-8      Deleted statement that field            Annual Update                                                                                                  Made consistent with procedures; monitoring' teams will be-assigned a                                                                                                                    field monitoring teams'use their'own.
vehicle ~for transportation'into the-                                                                                                                  vehicles.
                                                -field.
,                                                Deleted references to field team        Annual Update.                                                                                        -Made consistent with procedures.. .The7 coordinator.                                                                                                                                    -field team dispatcher, in addition to an administrative staff member, is responsible for dispatching field ~
teams from the Staging Area.
3.3-10                          3.3-9      Deleted statement that Field Team      Annual Update                                                                                                  Made the field. team monitoring kits' kits contain a uR survey              - ASLB Hearing Commeitments/                                                                            --
consistent with NIAT kits. This-instrument.                            Stipulations                                                                                                    enhances data integration with the State and Seabrook Station teams.
  - 3.3.12                            3.3-11      " Field Team Coordinator" replaced    Annual Update                                                                                                  Made Plan consistent with procedures; by ' Administrative Staff Member."                                                                                                                      see 3.3-9 above.
1 Table                            Table      Revised field monitoring kit            Annual' Update                                                                                        -Makes Table / Equipment consistent with J3.3-1 3.3-1      contents.                              FEMA Technical Assistance /                                                                            .IP 2.3 and NIAT kits. See also-Plan Review                                                                                                    3.3-10 above.
                                                                                        -ASLB' Hearing Commitments /
Stipulations                                                                                                                                                                            .R
  . Table                            Table      Revised environmental sampling kit      Annual Update                                                                                                Made Table / Equipment consistent with 3.3-2                            3.3-2      contents.                              ASLB Hearing Conunitments/-                                                                                  NIAT kits.
                                                                                        ' Stipulations 6
d
                                                                                                                                                                                                                                                                                  -l
                                                                                                                                          . . _ _  __ _- . " _                                                              , . _ _                    s.__ . , . .  , - _ .
 
                                                                                                                                    .m.
                                  ~
l                                                              .                                                                          .
SPIE REY. 1 1 VOLUME:                  PLAN          SECTION:        3 AFFECTED                  AFFECTED PAGES                        PAGES REV. 1                        REV. O                    CHANGE                                          REASON-                                EFFECT 3.5-2                    3.5-2          Added statement concerning                    Annual Update                                    Delineated actions, responsibilities authorization, limits of, and                                                                  and references to procedures :for-reference to procedures concerning                                                              excess' exposure authorization.
excess exposure.
  '3.5-3                    3.5-2          Added statement on dosimetry                  Annual Update                                    Documented that helicopter pilots.-
provided to helicopter pilots.                                                                  receive. alarming dosimeters which are-maintained at the' helicopter companies.
3.5-3                    3.5-3          Removed reference to airborne                  Annual Update                              'Made Plan consistent with current'-
alerting pilot.                                                                                PANS. system.
Deleted " Dosimetry Chargers.'                Annual Update                                  Backup VANS Drivers report to the ORO Staging Area where dosimetry chargers :
are available hence they.do not need.
to receive chargers in their dosimetry kits.
  -3.5-4                    3.5-3          Deleted discussion ~on helicopter              Annual Update                                  The Accident Assessment Coordinator pilots reporting of dosimetry                                                                now maintains contact with helicopter readings.                                                                                    pilots regarding exposure control.~
3.5-7                  3.5-6            Deleted statement that waste water            Annual Update                                This. eliminated redundancy with the from decontamination of Emergency                                                            next sentence in the Plan.
Workers will be held for disposal.
e 6
                                                                                                                          ' ~ ' ~      ~ '
                                                          ~m.-      m- -==m--as* cw - *    *  ' " " ' ' " " "  * " " " '
                                ._            .,,,  s
 
I SPIC REY. 1 VOLUME:      PLAN        SECTION:                  3 4    'AFFECTED    AFFECTED PAGES      PAGES REV. 1      REV. O                                OttANGE                                                REASON                              EFFECT
    '3.5-10      3.5-8            Revised discussion of monitoring                                  Annual Update                    Documented' increased monitoring.
trailer complexes at the Reception                                ASLB Hearing-Commitments /      capacity and additional areas
                                  . Centers including updating                                        Stipulations                    available for capacity. and additional                                                                            monitoring / decontamination monitoring / decontamination areas                                                                  activities.
available.
3.5-12      3.5-10          Deleted statement that                                            Annual Update                    This eliminated redundancy in the-
                                  ' decontamination trailer waste water                                                                Plan. The next sentence clarifies-will be held for disposal.
that waste water will be collected            'I and disposed of properly.
3.5-13,14    3.5-11          Added provisions for'the ORO to                                    -Annual Update                    Provided additional radiological supply dosimetry /KI to the medical                                                                protection to institutionalized
                                . supervision at special' facilities individuals who cannot be evacuated .
for individuals who cannot evacuate                                                                  if requested by the State / Local
,                                  if-requested by State and-. Local                                                                    governments.
Officials.
Added statement that if MA changes                                  ASLB Hearing Conunitments/      Provides flexibility'to adhere to the.
its policy on distribution of.KI to Stipulations Commonwealth's policies on KI a
the.public, the ORO would acquire                                                                    distribution should they change in and maintain'an appropriate amount.                                                                  the future.
3.6-1        3.6-1-11        The majority of.the' changes relate . Annual Update                                                  Improved. presentation format of Plan.              !
through                      to reformatting / reorganization to 15                            enhance presentation.
j GENERAL o
              -              -- --                    --                      ~              - ..                    - . -        -      -      -      --        - -  -- . - .
 
l SPIE REY. 1 VOLUME:                            PLAN                        SECTION:            3
    ' AFFECTED                          AFFECTED
          'PAGES                            PAGES                                                                                                                                                                                                                                                  i REV. 1                          REV. O                                          CHANGE                                                                        REASON                                                        EFFECT                                                      '
3.6-1,2                          3.6-10,11                    Added statement that Traffic Guides Annual Update                                                                                                Provided reference to applicable will be dispatched on a priority'                                                                                                                appendix where details are presented.                                      '
basis in accordance with Appendix
: 3.                                                                                                                                                                                                                          -l 3.6-2                              ---
Added that notification within the                                        Annual Update Made consistent with the notification Parker River National Wildlife                                                                                                                    system within the Wildlife Refuge.
Refuge will'be supplemented by
,                                                                      route alerting by DOI personnel.
3.6-2,3                          ---
Incorporated description of                                              Annual Update sheltering procedures, how the Clarifies sheltering as a protective                                        (
;                                                                      public would be notified to                                                                                                                      action under the SPMC.- Documents the~                                      i details of sheltering as consistent shelter, and details on with the procedures.                                  -
implementing shelter in place.
3.6-6                            3.6-4                        Added that bus companies will be.                                        ASLB Hearing Conunitments/                                              Expedites notification'to bus notified by METS.                                                          Stipulations                                                            companies.
Added description.of the expedited ASLB Hearing Commitments /'                                                                                    Expedites the_ availability.of bus bus mobilization scheme using NECC. Stipulations                                                                                                  resources during very fast breaking accidents by Staging / Dispatching them from a Staging Area close to the EPZ.                                      -
3.6-6 0 7                          3.6-4                        Provided priority. scheme for FEMA. Technical Assistance /                                            Priority scheme allows for the most
                                                                    . allocating transportation resources                                      Plan-Review                                                              efficient use of transportation for transit dependent individuals.                                        ASLB Hearing Conunitments/-                                              resources.
schools.and special facilities.                                          Stipulations
  -3.6-7                              3.6-4,5                      Added statement on the maximum                                          .AnnualLUpdate                                                            Clarified the planning basis.for
                                                                                                                                                                                                                                                                                ~
number of buses per route guide.                                                                                                                  determining the number of route guides..
.i a
___.______._.____-___._____cf'__- ^'
_ _ _ _ _ _ _" ' ' '  __9~Ca'- -  N^'" #        #*'7-
* d''
W*^'"T 'a' * * '" ~~              ^"'T'^^  '
                                                                                                                                                                        ''f'*r'*'''"-Y
                                                                                                                                                                          - -          f" ' - - ''- "*''t=""" 'k  '* *7-  f'""t~'**W-* * 'C"*''    ~ ' " - * * *
* V 'T''***'      **  *#'
* 4
* SPM: REY. 1
: VOLUME:                                    PLAN                . SECTION:        3 AFFECTED                                AFFECTED PAGES                                              PAGES REV. 1                                            REV. O                      CHAFGE                                                  REASON                                      EFFECT 3.6-10                                  3.5-5                      Provided priority scheme for                          Annual Update                                Priority scheme enhances efficiency contacting special                                                                                  of notification.
facilities / individuals.
3.6-11                                  3.6-6                      Included description of vehicles                      Annual Update LN>cucented vehicle types used by the -
used to assist in implementing                          ASLB Bearing Comunitments/                  SPMC as consistent with Appendix M evacuation, including evacuation                        Stipulations                                and the procedures. This includes bed buses.                                                                                          the use of evacuation bed buses.
4 3.6-15                                3.6-10                      Added statement'that arrangements                      ASLB Hearing Comunitments/                  Enhances family reunificatloc* post will be ande to reunite students                        Stipulations                                evacuation.
with their families.
3.6-15                                3.6-11,12                                                                            Annual Update Added host-facilities to list of                                                                    Clarifles the role of last facilities supporting evacuation.-                                                                  facilities.
3.6-16                                3.6-12                        Added "through'New Hampshire.'                          Annual Update                                Clarifies coordination of requests for L*SCG support via N90EM.
Replaced 'Raception Center                              Annual Update                                Clarifles responsibility for Coordinator
* with ' Assistant                                                                      contacting the ARC.
Reception Center Coordinator.'
3.G-16                                3.6-13                        Replaced " ARC 3050' with ' ARC                        Annual Update                                Provides refsrence to updated /RC 3031.*                                                                                              procedure.                            ,
3.6-17                              3.6-13                          Added statement to coordinate with                      ASLB Hearing Commitments /                  Ensures continued opernion of MDFW on centinued operation of                          Stipulations                                drawbridges and identification of drawbridges, in addition to                                                                          them as potential 1.apediments to reporting problems with them to the                                                                  evacuation traffic flow.
EOC.
i,g.,      -v._._            .-                        ..w,  .-y,-    ,,y.w,c,.        ,.w'            wp*-y, ,----,-vw-w        .,ym-~,    &q            , , yr,~,    m %.-. %e 4-  , ,...r-, +. -
 
SP9E REY. 1 VOLUME:      PLAN    SECTION:      3 AFFECTED      AFFECTED PAGES      PAGES i
REV. 1      REV. O                CHANGE                                        REASON                      EFPECT 3.6-17        3.6-13    Added reference to evacuation bed        ASLB Hearing Consnitments/          Makes plan consistent with buses.                                  Stipulations                        procedures / Appendix M.
3.6-20        3.6-16    Added statements about impediment        Annual Update                        Enhances recognition of road recognition and implementing                                                  impediment and facilitates resolution        ~
;                          traffic rerouting.                                                            of traffic problems.
3.6-21.22    3.6-16,17  Listed actions that may be                FEMA Technical Assistance /
implemented to support reentry.                                                Enhances coordination of actions to Plan Review                          support reentry.
TABLE        TABLE'    Ircluded updated population              ASLB Hearing Ceauaitments/          Update Plan to 1990 demographic 3.6-1        3.6-1      figures.                                  Stipulations                        conditions.
3.7-2        3.7-1    Removed reference to airborne            Annual Update                        Reflects backup notification via alerting.
backup VANS not airborne alerting.
3.7-3        3.7-2    Deleted description of the                Annual Update                        Makes the Plan description consistent telephone book insert, and                ASLB Hearing Ceaunitments/            with current PI program. PI material-references to it.                          Stipulations                        redundant with the telephone book' insert provide adequate availability of emergency information.
Added, description of advertising ~      Annual Update                          Enhances public awareness of the campaign to heighten public                                                    dissemination of the special needs awareness of.the special needs                                                  survey.
survey.
3.7-6        3.7-5,6  Deleted reference to airborne            Annual Update                          Reflects backup notification via alerting.                                                                      VANS not airborne alerting.
__ _        _      -    , , ,      .    ,-.  .-    _ . ~  ,-    -
                                                                                                  ,.l.__--..-_.    . _ _ _ _ - ___ _ _ ._-_ ___
 
SPIE REY. 1 VOLUME                    PLAN            SECTION:-        3 AFFECTED                  AFFECTED PAGES                PAGES REV.' 1                REV. O                          CHANGE                                            REASON                                      EFFECT 3.8-2                      3.8-2              Deleted reference to *one"                        Annual Update ambulance being located at a                                                                    Other transportation resources may be reception center.
utilized at the reception centers for transporting individuals to MS-1 Hospitals.
3.8-3                    3.8-3              Changed ARC *3050* to A2C "3031."                Annual Update                                Provides reference to updated ARC procedure.
3.9-1                    3.9-1              Deleted reference to fonmation of                Annual Update                                Facilitates and allows flexibility in Recovery Action Comunittee,                                                                    the involvement of Local / State / Federal Officials as well as other Eheergency Response members.
3.0-1                    3.9-3              Revised Reentry / Recovery procedures FEMA Technical Assistance /
through                                      per latest EPA PAGs.
Makes Plan consistent with latest EPA Plan Review                                  PAGs regarding Reentry / Recovery.
3.9-0 3.0-12,13                3.9-6,7            Revised description of total                      FEMA Technical Assistance /                  Enhances clarity of and facilitates population exposure estimate                      Plan Review                                  the calculation of total population procedures to include details                                                                    exposure estimates.
regarding METPAC, factors to be considered and methodology.
TABLE                    TABLE            Revised Table to be consistent with FEMA Technical Assistance /                                  Makes Plan consistent with latest EPA 4  3.9-1                    3.9-1              latest EPA PAGs.                                  Plan Review                                  PAGs.regarding Reentry / Recovery.
    ,frs--    --ey - 3 %.+-    g  s y ~a , .,y          =w e  -ce"      'ev      - 7
                                                                                                'w-  -yv w- iw- -    ,a < - - ~ --  4.*p -wv-  --
                                                                                                                                                      * * - - -  w - -e--- ---m.=-- -
w=- -aw n -~ m  .
 
    .. VOLUME: PLAN SPIE: REY. 1 SECTION:        4 AFFECTED                        AFFECTED PAGES                  PAGES REV- 1                  REY. O                                        CHANGE                                                        REASON                                          EFFECT 4.4-1                          4.4-1                              Deleted reference to 'a full test                      Annual Update                                      A_ full test of METS is performed on a of the METS is conducted                                                                                  semi-annual basis. See IP 4.4, quarterly."
Attachment 1.
4.5-2                          4.5-2                              Added statement that the Offsite                        ASLB Hearing Commaitments/                          Enhances internal and external ORO Response Directors, Assistance                          Stlpulations Offsite Response Directors,                                                                                commmunications while the noted ORO Radiological Health Advisor, Public                                                                        members are in transit to the ORO EOC.
Notification Coordinator and the Technical Advisors are provided with cellular telephones.
4.5-3                          4.5-2                              Added statement that sample                          Annual Update collf:ction teams may utilize                                                                              Enhances communications.                          I cellular telephones.
  -4.7-1                          4.7-1                              Changed VANS Alarm System to                          Annual Update                                        Reflects installed equipmeent.
Vehicular Alert Comumunication System (VACS).
  -4.7-2                          4.7-2                              Deleted reference to airborne                        Annual Update                                        Reflects backup notification by alerting.
beckup VANS not airborne alerting.
FIGURE                          FIGURE                              Made commsunication;sumumary diagram                  Annual Update 4
4.0-1                          4.0-1                              consistent with current                                                                                    Provides internal consistency of ASLB Hearing Commaitments/                            Plan.
communication ~ links / contacts.                    Stipulations
                    ~  ,_.=. - _ -
______--.=:-ea    a    _                        a    __ * * + < ~_  v~  __+    ., ,--_ _ - -        -___-.w _____
                                                                                                                                                                              -,2_ ew-  ~ . _ -~,._w- -    . - _ - - - - _  _ _ -__
 
                                                                                                                                                  *I VOLUME:    PW                                                    SECTION:      5 AFFECTED          AFFECTED PAGES                            PAGES REY 1                          REV. O                                          CHANGE                                                              REASON                          EFFECT 5.2-3            5.2-2                                              Added that erroneous reports can be Annual Update                                                      Allows immediate Rumor Control and corrected over the telephone by                                                                        correction.
Rumor Control staff.
5.2-4            5.2-4                                            Added that Staging Area supports                      Annual Update                                    Clarified functions of the Staging.
Ingestion Exposure EPZ activities.                                                                    Area.
5.2-6            5.2-6                                              Deleted reference to EWF waste                        Annual Update                                    Holding of waste water not required, water tanks.                                                                                            however, waste water will still be held.
5.2-8            5.2-7                                              Updated description of monitoring                      Annual Update                                    Documents increased monitoring trailer complexes and their                            ASLB Hearing Cosatitments/                      capacity at the Reception Centers.
capacities, and additional                            Stipulations                                                                          *
,                                                                      monitoring areas at Reception Centers.
5.2-9,10        5.2-8                                                Included reference to VANS                            Annua' Update                                  VANS Satellite Staging Area reduces Satellite Staging Area.                                                                                VANS transit time during ananer season.
5.2-10          5.2-9                                                Removed reference to airborne                          Annual Update                                  Airborne alerting is no longer alerting and helicopter. facility.                                                                    . utilized since backup VANS provides                      ~
backup notification.
FIGURE          FIGURE                                                Updated diagram to show current                        Annual Update                                  Makes layout consistent with the Plan 5.2-2          5.2-2                                                layout and communications links                                                                        and procedures aid facility.
within EOC.
                                                                                      ~.          -  . - -            , ,~~                --    - -- - - - - - - - - -        --  ~-      - - - - - - -      - - - - - - - - -
 
SPIE REY. 1 VOLOME:            PLAN          SECTION:            5 AFFECTED              AFFECTED PAGES                PAGES REV. 1              REV. O                          CHANGE                                        REASON                                              EFFECT FIGURE                FIGURE          Updated diagram to show current                      Annual Update                                  Revised-layout reflects arrangessent 5.2-4                  5.2-4            layout of Staging Area and that the ASLB Hearing Commaitments/                                      at Haverhill staging area.
school liaisons have individual                      Stipulations telephones.
FIGURE              - FIGURE          Updated diagram to show larger                      ASLB Hearing Commaltments/                      Doctaaents increased monitoring 5.2-5                5.2-3            monitoring trailer complexes.                        Stipulations                                  capacity.
FIGURE                FIGURE            Updated diagram to show larger                      ASLB Hearing Commitments /                    Doctaments increased monitoring .
5.2-6                5.2-6            monitoring trailer complexes, flow                  Stipulations                                    capacity.
patterns and evacuee registration.
FIGURE                FIGURE            Updated diagram to show larger                      ASLB Hearing Commaitments/                    Documents increased anonitoring 5.2-7                  5.2-7            monitoring trailer consplexes.                      Stipulations                                  capacity.
* FIGURE                FIGURE          Updated diagram to show larger                      ASLB Hearing Comunitments/                  . Documents increased monitoring 5.2-8                  5.2-8            monitoring trailer complexes, flow                  Stipulations                                  capacity.
patterns and evacuee registration.
FIGURE                FIGURE          -Incorporated cosusunications                      FEMA Technical Assistance /                    Enhanced usabliity of diagram.
5.2-9                  5.2-9            equipment onto the diagram and                      Plan Review labeled Entrances / Exits                          ASLB Hearing Constituents /
appropriately.                                      Stipulations FIGURE                ---
Incorporated monitoring trailer                    ASLB Hearing Commitments /                      Provides diagram for layout of the 5.2-10                                  diagram.                                            Stipulations                                  monitoring trailers.
FIGURE                FIGURE            Incorporated communications                        ASLB Hearing Countitseents/                      Improves clarity of diagram.
5.2-11                5.2-10            equipament to the diagram.
Stipulations
                      . FIGURE            Deleted' diagram (helicopter                      Anntial Update                                  Airborne alerting no longer utilized
,                        5.2-13            facility layout).                                                                                  as backup notification.
t , i --- n +- w +v    yy.  -*m- %  y        -m-+- -m y+.w  wr + +- r--er - ruw.-,ww--  e?=e ew    +    .davw em  +-e e me-- --w-=&w-ee-=--w  e----m-----  =-mm-- ------- - - - - - ---" - - ' - -
 
                                                                    .1 VOLUME:  PLAN        SECTION:    5 AFFECTED  AFFECTED PAGES      PAGES REV. 1      REY. O                  CHANGE                            REASON                    EFFECT FIGURE    ---
Added diagram (supplemental          Annual Update              Provides additional areas if needed 5.2-13                  monitoring / decontamination area).                              for performing monitoring /
decontamination at the North Andover-Reception Center.
FIGURES                Included VANS Staging Areas, Backup. FEMA Technical Assistance /
Reflects implementation of VANS.
5.2-14                  Staging Area, and Satellite Staging Plan Review through                Area Diagrams.
5.2-21 5.4-1    5.4-1        Added that the Beergency            ASLB Hearing Commitments /  Assigns responsibilities for Preparedness Advisor assumes a      Stipulations                coordinating federal' resources.
liaison role for the coordination
* of federal resources.
 
SPIE REY. 1
      ' VOLUME:                                    -PLAN          SECTION:      6
      'AFFECTED                                        AFFECTED PAGES                                          PAGES REY. 1                                        REY. O                      CHANGE                                                    REASON                                  EFFECT 6.3-4                                          6.3-4        Deleted Reference to Airborne                                Annual Update                            Airborne alerting no longer used as a Alerting.                                                                                              backup.
Deleted ' Detailed Instructions on                            Annual Update                            Made description more accurately various [ PANS] Actuation comunands."                                                                  reflect the modules content.
Deleted " Exposure Control and the                            Annual Update                            Made description more accurately Use of Field Data" (Dose / Accident                                                                    reflect the modules content.
Assess).
I-                                                                  Deleted detailed description of                              Annual Update                            Made description more accurately skills exercised (Rad. surveys and                                                                    reflect the modules content.
analysis).
, 6.3-5                                              6.3-5        Deleted reference to procedures for Annual Update                                                      EOC security is performed by EOF maintaining EOC security.                                                                              security (see section 2).
6.3-6                                          6.3-6        Deleted detailed description of                              Annual Update                            Made description more accurately traffic operations (traffic and                                                                        reflect the modules content.
access control).
                                                                  ' Deleted " Contingency plans for                              Annual Update                            Made description more accurately impassable routes and deactivation reflect the modules contenti activities."
6.3-8                                        6.3-8        Added description of training                                FEMA Technical Assistance /              Docussents special training provided-provided to Bus Drivers and Route                            Plan Review                              to Drivers and Route Guides for Guides who are assigned to                                  . ASLB Betring Comunitments/              Evacuation Bed Buses.
Evacuat.lon Bed Buses.                          (Includes    Stipulations training for medical emergencies and.CPR.)
  .,                                      S - . , . -          5              .s        a                  .,,y%e        , .        .+,-e        ,-.e ., , , ... -ww-.-.    .- ,    y,..- ,..,,.,-% -.
                                                                                                                                                                                                        .w-+,. ,,e v,-, _,44,,--.,.-,,
 
SE9E REY. 1 VOLUME:  PLAN      SECTION:          6 _
'AFFECTED  AFFECTED PAGES    PAGES REV. 1    REY. O                    CHANGE                                          REASON                                      EFFECT 6.3-0    6.3-8    Clarified that practical                              Annual Update                            Clarified training module demonstration of the instruments is                                                            description.
used in lieu of a test.
Table    Table    Clarified the training modules                        Annual Update 6.3-1    6.3-1    provided to ORO members as follows:
Revised matrix of required training to more closely match emergency responsibilities and tasks to be RAD Health Advisor - Added:                                                                performed.
                        + Dose / accident assessment
                        . Radiation surveys and analysis
* Monitoring /decon. operations
                        . Dosimetry record keeping.
Tech Advisor - Addeds'                                                                                                                        .
* Emergency Management.
Support Services Coordinator -
Deleted:
* Emergency Management.
Public Notification Coordinator -
Deleted:
* Protective Action Decision making.
Public Information Staff - Added:
* Comumunications.
Reception Center Coordinator /
Assist.
Added:
                      + Bmergency Management.
ga,  g  .',qy -
                      .-ye      .-yc4-    n m-, ^ + twir. -a-      ey-----    ' esw +sw      -- +-ww ve  .
w-g e. 6.  +-s--. e- e. e es-,.a--e- -4. . ,e a-y ...- e , .w+. ,.. . - .ev.---
 
SPIE REY. 1 VOLUME:                  PLAN          SECTION:      6 AFFECTED                  AFFECTED PAGES  PAGES REV. 1  REV. O                      CHANGE                                REASON              EFFECT Table                      Table          Radio Operator - Added:                See previous page. See previous page.
6.3-1                      6.3-1          + PANS Activation.
Cont.                      Cont.
Local EOC Liaison Coordinator -
Mded:
* PANS Activation
* Traffic and Access Control
                                                          + Public Informention..
Local EOC Liaison - Added:
                                                          . Traffic and Access Control
                                                          + Public Information.
Bus Co. Liaison - Added:
* Bnergency knagement.
* Protective Actions Decision making.
Special Populations Coordinator -
Added:
                                                        + Emergency Management.
School Coordinator - Added:
                                                        + Emergency Management.
Staging Area Leader - Added:-
* Emergency Management.
Public Information Administrative Staff - Added:
* Communications.
 
                                                                        *1
: VOLUME:  PLAN      SECTION:      6 AFFECTED  AFFECTED PAGES    PAGES REV. 1    REY. O                  CHANGE                                  REASON                  EFFECT Tcble      Table.      Other Changes:                          Annual Update 6.3-1    6.3-1        Deleted Security Position and                                      Made description of training program cont.-    Cont.        Trailer Driver position, and consistent with the current ORO organization. See plan section 2 for Airborne Alerting Pilot.
changes in the organization.
Separate MA State liaisons into MDPH and MCDA liaison.
6.5-1,    6.5-1      Clarified that an off-hours              Annual Update              Made exercise description consistent
.6.5-2                exercise will start between 6:00 pm                                  with NUREG-0654. Rev. 1. Supp. 1.
and 4:00 am.
6.5-3    6.5-2      Added statement about government          Annual Update              Clarified process for documentation non-participation.
government non-participents in exercises.
.6.5-8    6.5-7    -Deleted reference that controllers        Annual Update              Controllers do not need copies of.
will be provided copies of                                            procedures since they have access to planstprocedures prior to a                                          them.
drill / exercise.
Tablo      Table    Deleted " Security"                        Annual Update 6.5-1      6.5-1    Deleted ' Airborne Alerting
* Made matrix reflect current ORO organization-(see section 2).
Deleted " Trailer Drivers."
6.G        6.6      Changed " Support Organizations' to      _ASLB Hearing Commitments / Remove term " Support Organizations'
                      'Other Organizations.'                    Stipulations              3n refererce to State and local emergency response workers.
__m. --
 
SPBC RET. 1 VOLUME:    PLAN          SECTION:          7 t
AFFECTED      AFFECTED PAGES        PAGES REV. 1      REV. O                        CHANGE                                              REASON                                      EFFECT 7.1-1          7.1-1          Added statement that the NHY                      Annual Update                                Makes plan consistent with NHY                    ;
Executive Director of EP & CR is                                                                EP & CR organization.                            t designated as the Emergency Planning Coordinator.
7.2-3          7.2        Added description for protecting                  Annual Update                                Ensures steps or paragraphs that steps in plans and procedures.                                                                  relate to regulatory guidance er.
commitments are not deleted in future updates.
7.3-2          7.3-2          Revised responsibility for                      Annual Update                                  Made plan consistent with NHY EP & CK' coordinating calibration of                                                                    responsibilities.-
equipment.                                                                                                                                        '
  -TABLE            TABLE          The following changes were made                  Annual Update                                  Testing schedules were modified to                >
7.4-1          7.4-1          . METS is now tested-semi-annually                                                              reflect need and in some cases ensure
                                    . NAS is tested monthly                                                                        - consistency with other plans (i.e.,
(Primary NAS in control room is NHRERP and SSREP). All. schedules tested weekly)                                                                            are consistent with regulatory.
                                    . Field radio communications are                                                                guidance and requirements.
tested quarterly
                                    . NHY ORO Faergency Communication System Quality. Assurance Test was deleted
                                    . Dimension ;'000 (cosumercial telephone) is tested quarterly
                                  ---ORO pager system is tested quarterly-
                                    . $1ren control equipment is tested quarterly u~
9yg-  ,  3 gyA      gy n-    gwg-    c y ye. y4      .--    + ' + . -      m --          + - - '      g- tr-'    ~+'s S-        ,*,,ws, g.+w  -
ev ep.- w  r.+-, 4 , e,-
 
VOLUME:                                  PLAN ~
SPIE RET. 1 SECTION:      7-
'AFFECTED                                  AFFECTED' PAGES                      PAGES REV. 1                      REV. O                  CHANGE                                      REASON              EFFECT 765-1                                    7.5-1      Deleted reference to special needs            Annual Update survey being dissestinated with the Special needs survey is distributed separately to reach the maximum PI materials.
                                                                                                                        . population and enhance response.
Deleted reference to
* posters
* and          Annual Update        Residential packages do not receive
                                                        " flyers'.
posters and flyers. These materials are provided to commercial establishments.
~7.5-2                                      7.5-2      Deleted reference to " Telephone              Annual Update Book Insert".
Telephone book-insert is ne longer used since there are multiple types of PI materials available.
                                                                      ,_,,_,__,n.a.mx-                            ''' '
 
SPIE RET. 1
  ' VOLUME: PROCEDURES    SECTION:    IP 1.1 AFFECTED    AFFECTED PAGES      PAGES REV. 1    REV. _0                  CHANGE                                    REASON                                      EFFECT P. 5,      P. 6        PANS responsibility turned over            Annual Update              Clarify responsibility for PANS 3.1.2      5.1.2.J      from onsite Response Manager to ORO                                    turnover.
if Public Notification Coordinator has reported for duty.
P. 9        P. 8        Inserted, " Emergency Preparedness          ASLB Hearing Conunitments/  Specify responsibility for federal
,  5.2.3      5.2.3      Advisor".in reference to using              Stipulations                support coordination by assigning EP Attachment 1, Federal Support                                            Advisor as a liaison.
Coordination (EP Advisor was given responsibility to act as liaison for coordination of federal resources)..
P. 10      P. 9,      Remove reference to recovery action Annual Update                        Allow flexibility in impleteenting 5.2.9      5.2.9      committee and changed to recovery                                        recovery actions.
actions as directed by ORO.
P. 13        P. 11,      Included EP Advisor as a contact            ASLB Hearing Commitments /  Specify responsibility for federal Attcch 1    Attach 1    for FEMA to coordinate assistance.          Stipulations                support coordination by assigning EP Advisor as a liaison.
Replaced. "NRC" with " Federal              Annual Update.
Clarify the coordination of public Authorities' regarding coordination                                      information with all federal of public information.                                                  authorities, not just the NRC.
Included EP Advisor as a contact            ASLB Hearing Consultments/  Specify responsibility for federal
                          -for integration of all federal              Stipulations                support coordination by assigning the agency implementing plans.                                              EP Advisor as a licinon.
P. 14      -P. 12,      Removed Accident Assessment                  Annual Update              This is an onsite ERO function Attach'l- Attach 1      Coordinator as contact for managing                                      covered by ERO Licensing Coordinator federal resp. actions onsite.                                            and Response Manager.
      -                          ,-                                e      <                ,            -- _-_ ,_- -.__. .._. -        -- .J. . - - . . .
 
SPIE REY. 1
  -VOLUME: PROCEDURES              SECTION:      IP 1.1 AFFECTED        AFFECTED PAGES-          PAGES REV- 1          REV. O                          CHANGE                            REASON                        EFFECT P. 16          P . '' 13 ,      . Removed Asst. ORD/ Support Liaison  ASLB Hearing Conunitments/    Specify responsibility for fed.
Attach 1      Attach 1          as the contact for supplemental        Stipulations                  support coordination by assigning EP rad. monitoring assistance from                                    Advisor as a liaison.
fed. agencies; added Accident        Annual Update Assessment Coord., EP Advisor, and                                  Make consistent with functional responsibilities of these 3 Rad. Health Advisor.                                                positions.
  'P. 18,        .P. IS,          Replaced Asst. ORD/ Support Liaison  Annual Update Attach 1      Attach I          with Offsite Response Director as Make' consistent with ORD's level of authority.
the contact for procurement of food.
Add Public Info. Coord. as a          Annual Update                  Make consistent with PIC's functional contact for' info. dissemination to                                  responsibility.
farmers.
Replaced Asst. ORD/ Support Liaison  Annual Update with ORD as the contact for                                          Make consistent with ORD's level of authority.
reallocation of USDA food supplies.
P. 23,          P. 19,            Added EP Advisor and State and        Annual Update
-Attach 1        Attach 1          Local Liaisons as' contacts for Make consistent with functional coordination between responsibilities of added positions.
fed /statellocal authorities and Indian tribes.
.P. 25,        .P. 21,          Added Unusual Event as a condition    Annual Update Atttch 2      Attach 2          for implementing IP 2.14.
Make consistent with implementing requirements of IP 2.14.
,          .m .              . , ,  y    -e-v -
o 4  -++      ___.___.--___-__mm.
                                                                                                                            -_        _ _ _ _ _ _ _ _ . _ _ _ _ e-_.,
 
                                                                                                                                            ' I SPMC REY. 1 VOLUME: PROCEDURES        SECTION:  IP 1.1 AFFECTED        AFFECTED PAGES      PAGES REV. 1    REV. O                  CHANGE                              REASON                    EFFECT P. 25          P. 21,      Added State Liaison as a              Annual Update              Make consistent with functional Attach 2        Attach 2,  responsible person for maintenance                                responsibilities of State Liaison.
Step 2          Step 2      of communication with state / local EOC's.
P. 25,          P. 21,    Added Asst. Offsite Resp.              Annual Update              Make consistent with functional Attach 2        Attach 2,  Director / Support Liaison as a                                    responsibilities and level of Step 4          Step 4      responsible person for requesting                                  authority of Asst. ORD/ Support authorization to implement SPMC.                                  Liaison in absence of ORD.
P. 26            P. 22,      Added note that if Governor wants      ASLB Hearing Commitments /  Satisfy stipulation employing Attsch 2        Attach 2    verify request for authorization to Stipulations                  existing dedicated means of implement the SPMC. He can do so                                  conununication between MA EOC and through the MA EOC NAS line.                                      Seabrook Station at NAS line.
P. 27            P. 22,      Added Assistant Reception Center      Annual Update              Make consistent with functional Attcch 2,        Attach 2    Coordinator as a responsible person                              responsibilities of Asst. Reception Step 7            Step 7      for the notification of Red Cross.                                Center Coordinatcr.
Added " host facilities" to            Annual Update notification list.
1 P. 28,            P. 23,      Added note to implement expedited      ASLB Hearing Commitments /  Activates expedited bus mobilization Attach 2          Attach 2    bus mobilization scheme at initial    Stipulations                scheme at lower emergency              ,
Site Area Emergency.                                              classification.
P. 28,            P. 23      Added Offsite Response Director as    Annual Update              Make consistent with Offsite Response Attech 2,          Attach 2,  a responsible person for                                          Director's functional Step 2            Step 2      recommend / notification of closure                                responsibilities (notification of of Parker River Refuge.                                            DOI).
 
SPIE RET. 1 VOLUME: PROCEDURES              SECTION: IP 1.1
,  AFFECTED. AFFECTED PAGES      PAGES REY. 1      REV. O                              CHANGE                                            REASON                            EFFECT P. 29. -      P. 23                  Ensure USCG notification to boaters ASLB Hearing Connaitments/                To ensure boaters are not instructed Attach 2,    Attach 2,            is consistent with navigation                  Stipulations                  to enter mouth of Merrimack River.
Step'3        Step 3                conditions of waterways.                                                      should passage be impeded.
P. 29        P. 23,                Added. step to ensure notification            Drills / Exercise Comunents    To ensure timely notification to Attech 2    Attach 2              for delayed release of schools is Step 4                            made prior to normal dismissal schools for possible precautionary action to prevent students in transit time.                                                                          during a PAR announcement.
P.31.-        P. 25,                Specified additional resources                Annual Update                  Clarification of resources provided Attach 2,    Attach 2, provided under Yankee Faergency by YAEC under two agreements Step 10      Step 9              _ Mutual Assistance Agreement'and                                                (technical and non-technical).
Yankee Service Request.
P. 31, .
            ~
P. 25,                Replace NH EOF Liaison with NHOEM              Annual Update                  Realign level of responsibility for Attcch 2, ' Attach 2,              Director as a backup to the cocununication between NUY ORO and Step 11      Step 10              Governor for ORO notification of                                                NH's responders (Director level to
                                      - facility activation.
Director level).
Remove FEMA reference.                          ASLB Hearing Conunitments/      ORO does not depend on NH to notify Stipulations                    FEMA. If Massachusetts does not notify FDfA, then ORO will request to make the initial contact.
P. 31, .      P. 25,              Added step for ORO to verify                    ASLB Hearing Comunitments/      Federal coordination to be primarily
; Attcch 2,      Attach 2            notification of FEMA with                        Stipulations                    coordinated through Massachusetts; Step 12                            Massachusetts.                                                                  secondarily by NHY ORO through FEMA.
3 P. 32        P. 25,              Added note for activation of                    ASLB Hearing Comunitments/      Provide expedited mobilization of Attcch 2    Attach 2              expedited bus mobilization scheme                Stipulations                    transportation resources for a fast at initial general emergency.                                                    breaking event.
l i*=                                                                                  ,
                    - + - u    ..w-  w-n, ,  ,y  e-v,-  w  -,-e  -    . , < - -          <wwe -w--  y                en-r<- w e- rwwrc+ , , - - - - v- -w *.-m. 4 -- --w
 
vuburu:,: PROCwunES    SECTION:    IP 1.1 AFFECTED      AFFECTED PAGES        PAGES REV. 1        REV. O                CHANGE                              REASON                  EFFECT P. 32        P. 26      Added Asst. Reception Center          Annual Update              Make consistent with Asst. Reception Attach 2      Attach 2,  Coordinator as a responsible person                            Center Coordinators functional Step 3        Step 3      for contacting American Red Cross                              responsibilities.
to activate congregate care centers.
P. 32        P. 26,    Replaced DPHS IFO controller with    Annual Update            Realign level of responsibility for Attach 2      Attach 2  NHOEM Director as a contact point                              conusunication between NHY ORO and NH Step 4        Step 4    for NHY ORD notification of                                    responders (Director level to                    ,
facility activation.                                            Director level).
P. 33.        P. 26,    Remove Public Information Advisor    Annual Update              Make consistent with PIA's functional Attach 2,    Attach 2    as a responsible person for PANS                                responsibilities.
Step 1        Step 1    activation and EBS message issuance.
P. 33        P. 26,      Added IP 2.14. Attach. 5 as a        Annual Update              Make reference list complete.
Attach 2      Attach 2,  reference.
Step 2        Step 2 P. 34,      P. 27,    Removed Public Information Advisor    Aratual Update            Make consistent with PIA's functional Attach 2      Attach 2,  as a responsible person for                                      responsibilities.
Step 2        Step 2    evaluating PAR; activation of PANS.
P. 35        P. 29,    Change request for fed. resources    ASLB Hearing Conunitments/ Federal resources to be primarily Attsch 2,    Attach 2. to first go to Governor of            Stipulations              coordinated through Massachusetts; Step 1.E      Step 1.E  Massachusetts then to FEMA as a                                  secondarily by NHY ORO through FEMA.              .
and Note    backup; remove note to coordinate through NH to obtain FEMA support.
 
e
                                                                                                                                          .1 VOLUME: PROCEDURES                                SECTION: IP 1.1 AFFECTED                AFFECTED PAGES                        PAGES REY. 1                        REV. O                                        CHANGE                                                REASON                                            EFFECT P. 35                    P. 29                      Requests coordination with                                          ASLB Hearing Comunitments/
Attcch 2,                Attach 2                    Comunonwealth of MA prior to Allow for coordination with MA on Stipulttions                                    establishment of access control to Stcp 2                  Step 2                      activating ACP's.                                                                                                    evacuated areas.
P. 37                    P. 31,                    Added, ' Requests for Federal                                        ASLB Hearing Comunitments/                      Ensure requests for federal Attcch 3,                Attach 3,                  Assistance.'                                                        Stipulations Stcp 2                    Step 2                                                                                                                                          assistance are coordinated with Governor of MA.
P. 37                    P. 31,                    Replaced titles of alternate NH                                      Annual Update Attcch 3,                Attach 3, Clarity and specify what the ORD will officials with, 'or his designee;'                                                                                    be discussing with the Governor of Stcp 3                  Step 3                      replaced public
* info
* activities                                                                                  New Hampshire to be consistent with with ' notification' activities;                                                                                      NHRERP.
added, ensure coordinated protective actions between NH and                                                                                                                                                                        -
MA; remove ' federal assistance.'
  'P.        37            P. 31,                    Added step for ORD to discuss ORO                                    Annual Update                                    Clarify and specify what the ORD will Attach 3,                Attach 3                  activities. PI, fed. assistance,                                                                                      be discussing with the NHOEM Director Stcp 4                                              etc..with Director of NHOEM.                                                                                          to be consistent with NHRERP.
P. 39,                    P. 32,                    Remove reference to recovery action Annual Update Allow flexibility in establishing Attsch 4                ' Attach 4,                comunittee and specific personnel.                                                                                    recovery actions depending on needs.
A                        I.A P. 39,                    P. 32,                    Added ' key ORO personnel.*                                          Annual Update                                    Allow flexibility in establishing Attsch 4,                Attach 4, recovery organization.
B                        I.B P. 39                    P. 32,                    -Added new step to coordinate                                          Annual Updat*                                    Ensure recovery action decisions are Attsch 4                  Attach 4.. recovery actions with state / local D                          I.C                        officials; removed. reference to coordinated with state / local officials.
                                                        "RAC recomumendations.'
  =,,,,,,---.,,mmmy--,..--v        -,- ,,,    m .
yr,~--es---#,          --~c-.      +- . . - < .
r          =w - +-    + , - + +  + + w    -- , . - - , -  +.-~v w    %--- ---m-. w,    _ - *- - _ _ - - _ _ - _ _ _ _ _ - - - - - - - - . - - - - -  s ----
 
SPIC REY. 1 VOLUME: PROCEDURES                  SECTION:    IP 1.1 AFFECTED      AFFECTED PACES                PAGES REV. 1                REV. O                    CHANGE              __          REASON                          EFFECT P. 39          P. 32,                  NHY ORO will ask MA if FDfA          ASLB Hearing Commitments / Ensure primary contact to FEMA is Attsch 4,      Attach 4                notification of recovery action was Stipulations E              I.D                    made; if not NHY ORO will offer to                              through MA and secondarily through NHY ORO if authorized.
do so prior to allowing Asst.
ORD/ Support Liaison to make notification to FEMA.
P. 33,                  Added "with key ORO personnel        Annual Update              Clarify with whom evaluation criteria Attach                  review the following.'
II.A will be discussed.
P.-42,          P. 36                    Put former Step 8 as Step 1.        Annual Update              Ensure chronological event log is Attcch 5        Attach 5, Stcp 1          Step 8 initiated before any response actions are implemented.
P. 42            P. 35,                  Provide copies of EBS messages to    Annual Update              Ensure State and Local EOC Liaisons Attcch 5          Attach              5,. State and Local EOC Liaisons.                                  are apprised of latest protective Stcp 3          Step 2 actions so that they can keep their state and local counterparts equally apprised.
        -P. 42,                    P. 35                  Added step for provision to contact Annual Update                Ensure coordination with state Attcch 5          Attach 5                MDPH and MCDA officials should they                              officials takes place should they Stcp 4                                    be present at the Newington                                      show up at Newington.
facility;. ensure EP Advisor participates in any conversations.
o-. .- ,__:_    <--e--- ' --- - - ' " - - -
 
SPIC REV. 1 YOLUME: PROCEDURES            SECTION: IP 1.1 AFFECTED            ATFECTED PACES        PAGES REV. 1          REV. O                          CHANGE                                            REASON                                            EFFECT
  'P.-43,              P. 36,      Specified titles-of Yankee                              Annual Update                                    Specify agreement titles eliminate
,  Attsch 5            Attach 5,  agreements providing additional                                                                            duplicate info in SPMC Figure 2.1  . Step 9              Step 7      support; removed numbers of                                                                                (org. chart); add positions provided personnel required; added route                                                                            for by the Yankee Service Request.
guide and dosimetry recordkeeper positions.                                                                                                                                                                                ,
t Added Governor of MA as primary                          ASLB Bearing Comunitments/                        Ensure primary contact for fed.
contact for fed. support / resources. Stipulations                                                        resources remains with Governor of.
* MA.
  -P. 44, .
                      'P. 37      Added step delineating instructions ASLB Hearing Commitments /                                              Specify actions NHY ORO will take to-                                          -;
Attcch 5,          Attach 5    for coordination of federal                              Stipulationr                                      coordinate fed. resources once                                                  '
Step 10                        resources (if authorized to do so).                                                                        authorized; make consistent with fed.
response plan; appoint. EP Advisor as a liaison for fed. support.
P. 45,-            P. 37,      Added dosimetry'recordkeepers and                        Annual Update                                    Ensure that non-tech. personnel Artsch 5,          _ Attach 5, route guides and their reporting                                                                            provided by Yankee Service Request.
Stcp 11            Step 9      locations.                                                                                                  are instructed to report to indicated facilities.
P. 46              P. 38      Put former step 10 as step 1.                            Annual Update Attach 6          ' Attach 6, Ensure chronological event log is initiated before any response actions
  .Stcp 1              Step 10                                                                                                                are implemented.
P. 4G,              P. 38      Included key Mass. officials when                        ASLB Hearing Comunitments/
Attsch 6            Attach 6, Ensure Mass. officials have trans.
providing helicopter                                      Stipulations                                      provided during emergency.
Stcp 5              Step 4      transportation.
    ,--g-v-y.,~yy e -      -~      ,vw-,r1 -re,-,e- -#+ y e a  = y ,ey *
* r-    g        y e- e-- -
y -v----wg-      y-e w - - wy  -e                    .,uer-,.--- _ _ - . . _ y%g -v. m y .
 
SPIE REY. 1 VOLUME: PROCEDURES      SECTION:      IP 1.1 AFFECTED  AFFECTED PAGES        PAGES REV 1        REY. O                      CHANGE                                        - REASON                                    EFFECT P. 47      P. 39,        Add new step for Asst. Director /                ASLB Hearing Comunitments/
Attach 6,                                                                                                            Ensure integration of fed. responders Attach 6      Response Implementation to get                    Stipulations                            with ORO responders as appropriate to Stcp 11                  involved in deployment of fed.                                                            ORO functions.
resources.
P. 47      P. 39          Removed numbers of personnel                      Annual Update Attsch 6  Attach 6, Eliminate duplicate info. In SPMC required.
Figure 2.1-1 (org. chart).
Step 12    Step 11 Added route guides and dosimetry                                                            Include non-technical resources                          !
recordkeepers.
provided by YAEC Service Request.
q s        %  s.g- .p, y.-            ~--=re-,  y .,  p,g--w 4 - -w -
p- .
y w ,q,  -- .* w-  --w-ns-g% - - -. - - - = , - _ c. .. __ . . m_ . - 4A
 
VOLUME: _ PROCEDURES      SECTION: _ IP 1.2 AFFECTED      AFFECTED
      -PAGES        PAGES REV. 1        REY. O                    CHANGE REASON EFFECT P. 5,'5.5    P. 5        Added step to request technical                ASLB Hearing Comunitments/
personnel assistance from YAEC for            Stipulations                        Provide ability to staff supplemental supplemental shower needs.                                                        mon /decon capability should the need arise.
P. 6, 5.6    P. 5        Added step to notify trailer                  Annual Update drivers if the monitoring trailers                                                Provide assigned responsibilities to or EWF need to be moved.                                                          perform this task should the need arise.
P. G. 5.8    P. 5, 5.6    Removed reference to Recovery                Annual Update Action Comunittee and added that                                                  Make consistent with plan change by recovery activities'will be                                                      deleting references to Rec. Action directed by the ORD.                                                              Committee.
P. 11,      'P. 9,      Added step to provide State Attsch 2                                                                  Drills / Exercise Comuments        Provide consistent, updated Attach 2    Liaisons with updated status Step 3                    reports (Attach 3).                                                                information to Mass. State officials.
:P. 13 6        P . 11, . Revised briefing sheet to include:              Drills / Exercise Comuments        Accommodate the informational needs-Attcch 3    Attach 3,    . Accident Classification                                                          of Mass. State officials.
(Entire)      (Entire)    + RAD Relcase Info
                            . Meteorological Info
                            + Offsite Dose Projections
                            - Precautionary Actions
                            . EBS' Authorization Info Monitoring Trailer Info
                                                                                                        ,____l_-------------------------'-~~'
 
SPMC REY. 1 VOLUME: PROCEDURES                                  SECTION:              IP 1.3 AFFECTED                                  AFFECTED PAGES                                    PAGES REY. 1                                    REY. O                                CHANGE                                REASON                  EFFECT P. 3, 2.1                                  F.3, 2.1    Replaced " notify" with " ensure                      Annual Update                Make consistent with functional notification of" special facilities, etc.                                                                  responsibilities of Evac. Support Coordinator.
  'P. 3, 2.4                                  P. 3, 2.4  Replaced " removal" with " response                    Annual Update                Make consistent with Evac. Support actions."
Coordinator's responsibility regarding road impediments; he/she coordinates decision-making response-which may or may not include removal.
P. 4                                      P. 4      Added step to recognize the                          ASLB Hearing Commitments /    Recognize Evac. Support Coordinator's 5.1.3                                                expedited bus mobilization scheme                      Stipulations in fast-breaking event (isumediate                                                  response actions regarding expedited SAE or GE).
bus mobilization scheme.    '
P.'5, 5.6                                  P. 4, 5.6  Removed reference to Recovery                        Annual-Update                Make consistent with plan change of' Action Comunittee and replaced with                                                  reasoving Recovery Action Committee.
                                                          " activities directed by ORD."
  .P. 7,                                  P. - 6 . Removed Transfer Point' Dispatcher                    Annual Update Attcch 1,                                  Attsch 1,  'as a responsible person for
                                                                                                                                            ' Make consistent with functional
'                                                                                                                                            responsibilities of Transfer Point Stcp 3                                    Step 3    determining staffing level needs.                                                  Dispatcher.
P. 7                                      P. 6      Specified 3 helicopters on                            Annual Update Attach 1                                  Attach 1,  standby.                                                                            Make consistent with LOA and-Stcp 5                                    Step 5 helicopter support plan.
Included key MA gov't officials.                      ASLB Hearing Commaitments/  Provide helicopter transportation Stipulations for MA officials should the need arise.
5 g  ,._,. - %      ~    '
                                                                                                                  -W~M '    ' ' ' *
* 1 SPIE REY. 1 VOLUME: PROCEDURES                SECTION:    IP 1.3 AFFECTED          'AFFECTED PAGES              PAGES REV. 1            REV. O                      CHANGE                                            REASON                                EFFECT P. 7. .            P. 6 -          Added step to establish                  Annual Update                                Ensure coordinetion takes place Attcch 1,          Attach 1        comununication with NH- State Police Step 6                              regarding TCP/ACP activities.
between the two offsite-organizations; make consistent with NBRERP.
P. 8                P. 7            Added reference to helicopter            Annual Update                                Make consistent with helicopter
  'Attcch 1,          Attach 1,. assignments being coordinated Stcp 8              Step 8          through the Comununications support plan; ensure process is Coordinator; added Comununications established to cosumunicate with pilots.
Coordinator as a responsible person.
P. 9, P. 7,          Added note to inusediately activate        FEMA Technical Assistance /                  Ensure access control is 1smediately Attach l'          Attach 1        ACP's near beaches for beach              Plan Review                                  implemented to support a bsach closure action, added reference to closure recommsendation.
App. J.
P. 9                P. 7,          Added step to ensure traffic / access Annual Update                                      Ensure coordination takes place
,  Attcch 1,          Attach 1        control activities are coordinated                                                      between the two offsite Stcp'12                            with NH State Police.                                                                  organizations; make consistent with
;-                                                                                                                            NHRERP.
,.P. 9                P. 8,          Added reference to road impediment        Drills / Exercise Comuments                  Baploy a new checklist to formulate Attrich 1          Attach 1,      checklist (new Attachment 4).                                                                                                      '{
' Stcp 1            ' Step 1-                                                                                                road impediment response actions (GE).
which provides Evac. Support Coordinator criteria to consider when mitigating road impediments.
P. 10              P. 8,            Added App. J as a reference for          Annual Update                                Include appropriate reference for Attech 1,          Attach 1,      . initiating traffic /accese control                                                    implementation of traffic / access Stcp 6            Step 6          activities.                                                                            control.
 
SITE RET. 1
: VOLUME: PROCEDURES                                            SECTION:          IP 1.3 AFFECTED        AFFECTED PAGES        PAGES REY. 1      REV. O                                        CHANGE                                      REASON                                              EFFECT P. 10            P. 9                          Added phrase to include time of Attcch 1            Attach 1, Annual Update                  Ensure bus route information is evac. bus route initiation into EBS                                                  included in EBS message.
Stcp 8            Step 8                        message.
P. 11            P. 9                          Added step to delay activation of                    ASLB Hearing Constitments/ '    Allow timely entry into the EPZ.
Attach 1            .Attsch 1-                      ACP's until 2 hours after                            Stipulations Step 9                                            evacuation order was given.
P. 11                P. 9,                        Added step to coordinate                              Annual Update                  Ensure coordination takes place
                  -Attcch 1,                            Attach 1                      traffic / access control info.                                                      between two offsite organizations Step 10                                                                                                                                  regarding traffic / access controls make consistent with NHRERP.
P. 12,                  P. 10,                        Added step to provide State                          Annual Update Attach 2, Ensure State Liaisons are apprised of.
Attach 2                      Liaisons with updates on ORO Stcp 6 status of ORO resources in order to resources.                                                                            update MA State officials.
              .P. 14,                                    P. 11,                        Added evac. bed buses and                            Annual Update                  Recognize all special vehicles
          ~ Attach 3,                                    Attach 3,                      wheelchair vans.                                                                      available to ORO.
, Item                                                  Item II.B.4                  II.B.4
                                                                                                                                                                                                                                                                                    ' l
                                                                                                                                                                                                                                                                                    -l
                                                          # #  ~ - , - =          .mv  --
* c y 4                            m r -e v          + *  -e vw  4-- r-  -        + ce v -              %  ,      e#                          e mm-- - - = , n ,ww we - e .ww
 
SPIC REY. 1 VOLUME: PROCEDURES                                  SECTION:        IP 1.3 i
AFFECTED                              AFFECTED PAGES                                PAGES-REV. 1'                              REY. 0-                      CHANGE                                REASON                                        EFFECT P.'15,                                P. 12,            Retitled item ' Restricted Area          Annual Update                                  Make consistent with Restricted Area                                        ;
Attech 3,                              Attach 3.          Established," as opposed to " Access                                                      concept.                                                                    "
Item II.D Item II.D Control Points.'
P. 13-14,          Moved to IP 2.5 as Attach 5.              Annual Update                                  Moved to more appropriate procedure.
Attach 4                                                                                                      plume exposure pathway PAR's to make (Entire)                                                                                                    info more accessible.                                                      ;
r P. 15-16,        Moved to IP 2.5 as Attach 6.                Annual Update                                  Moved to more appropriate procedure, Attach 5                                                                                                      plume exposure pathway PAR's to make (Entire)                                                                                                      Info more accessible.
P.'17,            Moved to IP 2.5 as Attach 7.                Annual Update                                    Moved to more appropriate procedure, Attach 6 plume exposure pathway PAR's to make
                                          '(Entire)                                                                                                      Info more accessible.
E P. 16,                                                    Added new attachment, road                  Drills / Exercise Comments
:Att ch 4 Assist Evac. Support Coordinator in impediment checklist.                                                                        mitigating road impediments and
  -(Entire)                                                                                                                                              formulating response actions.
i t
I e
                                                                                                                                                                                                                                      )
_ _ _ _ _ _ . _ _ 4.u. _ _ _ _ _ --e______._____.-___m
_ _ _ _ = - - .e-e -a  'r e-* r- -=      e    +      ,e--v-    w $ + s ,. w~=  = ,e - e-.-  m~    w , 2  _
e, ,- ,w .    ._u_ .. _ _ _ _ _ . - _ _ _ _ _ - _ <=4-=
 
SPIE: REF. 1 VOLUME: PROCEDURES          SECTION:        IP 1.4 AFFECTED      AFFEC~ 3 PAGES        PAGLi, REV. 1        REV. O                      CHANGE                            REASON                  EFFECT P. 3          P. 3-      Added step to collect all                  Annual Update 2.4 -                                                                                        Ensure all documentation on Baergency documentation relating to                                          Communications is retained.
                            ' comununications.
P. 5          P. 4        Rephrased step to brief Assistant        Annual Update            Ensure Conununication Coordinator 5.5.          5.5        ORD R&I of status changes as                                        briefs assistant ORD/ Response opposed to ' Regular Intervals."                                    Implementation anytime status changes.
P. 6          P. 6      Added EOC Contact and                      Annual Update            Make consistent with functional Attach. 1 Attach. 1 Comununications Room staff as                                              responsibilities of these positions.
Step 6        Step 6      responsible persons.
P . 7.        P. 6      Added step to assist with                Annual Update              Ensure there is adequate support-in Attcch. 1 Attach. 1 notification of primary / alternate                                        initial notification and staffing Step 7                    ORO members for initial staffing; _                                  process.
added NAS Comununicator. EOC Contact and Comununications Room staff as responsible persons.
LP. 7          P. 7      Added verification of EBS content.        Annual Update              Ensure there is provision to monitor Attcch. 1 Attach 1 Step 2      . Step 2                                                                          EBS message content as it.is being broadcast.                            'i P. 7        Deleted step.                            -Annual Update              Make consistent with removal of "Attac5 1                                                                        airborne alerting function in Plan.    -
Ster 5 P. 8          P. 8      Added note to allow for using MAGI        ASLB Hearing Comunitments/ Make consistent with FCC regulations.
iAttcch. 2 Attach.2          radio for. notification of_MA              Stipulations-                                                      ;
officials without FCC approval.
                                          ,.y.y,r  c,,y  4 V" p 1
* 1      Y Y-
 
u_...... _ _ _ _ . . _ . . ... .          .. . . . . . .        ..
SPMC REY. 1 VOLUME: _?ROCEDURES__    SECTION:  IP 1.4
    ;AFFECTED    AFFECTED
      .PAGES      PAGES
      -REV. 1    REV. 0-                CHANGE                                                            REASON                    EFFECT l- P . - 9    P. 8        Added step to monitor ORO radio                          Annual Update                        Ensure operability of ORO Attach. 2 Attach. 2 communicatiors.                                                                                  communication systems.
  ' Step 8  -
P. E        P. 8        Added step to fax the FCC special                      -ASLB Hearing Commitments /        -Make consistent with FCC-Attach.'2 Attach. 2 temporary authority' form to FCC.
Stipulations                        regulations.
  ' Step 9 P..10        P. 9        Replaced "PSNH" radios with                              Annual Update                      Make consistent with revise'd Attach. 3 Attach. 3 'Offsite Monitoring Team" radios.                                                                equipment.
Step 6      Step 6 P. 11      P. 9        Replaced
* VANS Alarm System
* with                      Annual Update                      Make consistent with, equipment'used.-
Attach. 3 Attach. 3 " Vehicle Alert and Communications Step 11    Step 11      (VACS) System."
P. 12        P. 10      Deleted item on airborne alerting                        Annual' Update                    .Make.. consistent with Plan change of  ~
jAttsch. 3 Attach. 3 status.                                                                                              deleting airborne alerting concept.
Item 2 P. 13        P. 12.    'Added responsibility for NHY ORO                        Annual Update                        Distribute workload between EOC Attach. 4 Attach.4      :EOC
 
==Contact:==
to assist' Communication                                                          Contact and Cosemnications Coordinator as' directed.                                                                    Coordinator.
P.'13'        P. 12      Added' responsibility for NAS~                          Annual Update                        Ensure EOC Contact has-support, iff Attach. 4 Attach. 4 Communicator to. assist NHY ORO EOC                                                                needed, to perform notification Contact as directed.                                                                          tasks.
 
                                                                                                                    ''r VOLUME: PROCEDURES              SECTION:        'IP 1 4  .
    'AFFECTFD    AFFECTED PAGES-          PAGES REV. 1          REV. O                            CHANGE                                      REASON                  EFFECT
  'P. 13'        P. 12          -Added responsibility to establish                Annual Update                .Make consistent with functional
  ' Attach. 4 -Attach. 4 communication with MA entities                                                          responsibilities of MA Government upon direction.                                                                Interface Conummicator to make provision for communication with any~
MA agencies, as needed.
  -P. 14        P. 12          Added responsibility for Radio                  Annual Update                  -Make consistent.with helicopter Attech. 4 Attach. 4 Operator to maintain communication                                                        support plan and to provide with. helicopter pilots.                                                        responsible person to maintain comununication with pilots.
s
                                                                                      ~a w-. --.e---  ---m-a--
              . _a..wm
                    -    .    ..u.we  ~
                                              ,s-e---s._.w.    -- m--u~.'-.- - -- %-L                        -
 
l    in i u 11 is  a i    i i SPPE REN. I VOLUME: PROCEDURES              SECTION:      IP 1.5 AFFECTED            AFFECTED PAGES              PAGES REV. 1              REV. O                    CHANGE                              REASON                    EFFECT P. 3, 2.2          P. 3          Added responsibility to act as        ASLB Hearing Conunitments/  To ensure Fed. Response efforts are liaison to coordinate Fed response    Stipulations                coordinated by a liaison.
efforts.
P. 3, 2.3          P. 3.2.2        Removed reference to Recovery          Annual Update              Make consistent w/ plan change of Action Committee.                                                  removing RAC.
P. 4, 5.5          P. 4            Added step for EP Advisor to          Annual Update              Ensure that interface is established, interface w/MA State officials                                    should MA officials show up.
should they arrive at Newington.                                                                        ..
P. 4-5,            P. 4            Added steps outlining actions to be ASLB Hearing Commitments /    Provide specific guidance to EP 5.6                                  taken for Fed Support Coordination    Stipulations              Advisor for Federal Support (Entire)                              . Obtain name of FEMA contact                                  Coordination; make consistent with    _.
                                      . Coord. w/MA                                                  federal response actions.
                                      . Identify type / quantity of                                                                          _
Fed. resources                                                                                        -
                                      . Logistical consideration
                                      . Use Support Services Coordinator to assist.
P. 5, 5.7          P. 4,    5.5 Remove reference to Recovery          Annual Update              Make consistent with plan change of Action Committee.                                                  removing RAC.
: n.      ..
SPIE REY. 1 VOLUMES PROCEDURES                        SECTION:    IP 1.6
  'AFFECTED                  AFFECTED PAGES                    PAGES
      'REV. 1
                                .REV. 0:                    CHANGE                                    REASON                  EFFECT P. 7,                    P. 7            Removed reference to Recovery          Annual Update                  Make consistent w/ plan change.
5.2.7                    5.2.7            Action Committee.
P.'9                      P. 9            Added note explaining contingency      Annual Update                  Clarify contact protocol for'American Attach 1                  Attach 1        action if contact with ARC is                                        . Red Cross.
unsuccessful.
P. 11                    P. 10        'Added note to inform ARC of need~        ASLB Hearing Commitments /  'Make consistent with ARC practice.
  . Attach 1                  Attach 1        for additional shelter managers for Stipulations congregate care fecilities with capacities greater than 1000 evacuees.
Inform ARC of Cong. Care Centers                                      . Ensure ARC is informed of dtatus of-
                                          ' designated for transit-dependent                                        CCC;for transit-dependent parents to parents.                                                              facilitate reunification with school
                                                                                                                    -children.;
P.212                    P. 10          Added note explaining contingency        Annual Update                  Clarify. contact-protocol-for American Attcch 1                  Attach 1        action if contact with' ARC is-                                        Red Cross..
unsuccessful..
P. 12                    P. 10        Added step to notify-host facility'        Annual Update                  Recognition of school host facility
  -Attach 1                  Attach 1        supervisor _and provide briefing.                                      staffLto be consistent with support.
plan.
l Added note to obtain Route Guides          Annual Update                Make consistent with support plan;
                                          -from Evac. Support Coordinator for                                        address planning concept for school-supplemental' staffing for school                                      host facility..
                                          ~ host facility.
                                                                      - - . = . - .        . - - _ -.          L.
                                              ---9..            --
 
                                                                                                                                                        -1 SPIE RET. 1 VOLUME: PROCEDURES                SECTION:          IP 1.6 AFFECTED            AFFECTED
        'PAGES                  PAGES REV. 1                REV. O                        CHANGE                          REASON                    EFFECT P. 13              P. 10            Rephrased step to specify status of Annual Update                  Make consistent with American Red Attach 1,          attach 1,        CCC in New Hampshire when informing                                Cross practice.
    -Step 7            Step 6            NH Red Cross.
P. 14              P. 11            Added note to inform ARC of need      . ASLB Hearing Connitments/  Ensure ARC is informed of status of
    -Attach 1          Attach 1          for additional shelter managers.for Stipulations                    CCC for transit-dependent parents to-congregate care facilities with                                    ' facilitate reunification with' school-capacities of greater than 1000                                    -children.-
evacuees.
Inform ARC of CCC's designated for transit-dependent parents.
P. 15            P. 11              Added note explaining contingency      Annual Update              l Clarify ARC notification' protocol.
Attcch 1          Attach 1          action if contact with ARC-is unsuccessful.
P. 15            P. 11            Added
* Schools" and;"Special Host-    . Annual Update              Clarify respons'.bilities regardingL Attach    1,. Attach 1,          Facilities"; added Reception Center                                  arranging for transportation and~
Step 4          Step 4            Coordinator / Assistant as                                          including host' facilities in these-responsible persons.                                                arrangements.
P. 15        .
P. 11              Added step to coordinate.              ASLB Hearing Commitments /  Ensure transportation is provided to Atach 1        . Attach 1          . transportation for school              Stipulations                these. school administrators who Step 5                              administrators.                                                      accompany. buses.
P. 16            P.-12              'Added-step to arrange for              ASLB Hearing Commitments /. Ensure shelter needs for-students are Attach _1,' Attach 1-                congregate care for those students. Stipulations                accommodated.
Stop 8                              not picked up at School ~ Host
                                      . Facility.                          -
(
l I'
L___ . .- --          _ ~ ,- _          m-      - - - - - -                  "-- " "- -      --~    ''                                                ~
 
SPIE RET. 1 l: VOLUME: PROCEDURES                        SECTION:          IP 1.6
:AFFFCTED                  AFFECTED PAGES                      PAGES
      ~~~REV.~1                  REV. O                            CHANGE                                                  REASON                                          ' EFFECT P. 17                    P. 13          Added reference to congregate care                              ASLB Hearing Commitments /                Facilitate: reunification of students.
Attach 2                  Attach 2,      centers assigned to acconunodate                                Stipulations                            with parents.
Step 7                    Step 7        transit-dependent parents.
P. 20                    P. 16          Added step to provide location of                              ASLB Hearing Conunitments/
Attach 4,                Attach 4      CCC's assigned to acconunodate Facilitate reunification'of students Stipulations                            with parents.
  .. Step 3.d                                transit-dependent parents.
P. 21. 22                P. 17, 18 Added number / time subcolumns under                                Annual Update                            Enhance form.
Attach 5                  Attach 5      ' existing " Expected Arrivals" &
Actual arrival. columns.
4                                                                                                                                        8 6    ._._l... _ ___________1      --_  .r'
* T  ' * ' *~ ' ' ~v V -'' " " * - ' ' -    *  '# "'    ' " ' ' *W  9 " ' *
* T  9 "'*'" ' * * - *
* f*^' '-
T'''' * * '''' ''** * * 'FN*''"S**'+ '
* SPIE REY. 1
. VOLUME:. PROCEDURES              .SECTION: IP 1.7 AFFECTED              AFFECTED
              ~PAGES      PAGES REV. 1      REV. O                  CHANGE                                                    REASON                                'EFFECT
<P. 7,                  P. 6        Added step to telecopy updated                    Drills / Exercise Consnents        Ensure ORO State Liaisons are Attach 2,' Attach 2                status reports to State Liaisons.                                                      apprised of latest information so
-Step 4 they-can apprise MA officials of the                                .
same.
P. 8,                  P. 7        Revised Briefing Sheet                            Drills / Exercise Conunents          Accomunodate information needed by.
Attach 3            ' Attach 3
.. (Entire )          .(Entire)
* Detail of plant' conditions-State Liaisons and to standardize
                                    + PARS similar-information exchanged between
                                                                                                                          ' Rad. Health Advisor & Tech Advisor.-
o
                                                                                                                                                                                                  -l
                                                                                            ~
e 3              4        -..'<---.%
                                                          .        - * "+p ' . ' - ~ * *-    r- 9  -q. -*e-  +  -
p.-"++ - .e - - . < . -s7%-e-s-  .i-r y -%v-.e--,        - iv-- - ogu
 
m.___      . . . _              . ._. _ _ _            .. _ _ .              .                    .
                                                                                                                                                            .:4 SPfE REY. 1 VOLUME: PROCEDURES            SECTION:      IP 1.8 AFFECTED        AFFECTED PAGES              PAGES                                                                                                                                                          .
REV. 1            REV. O                          CHANGE                                        REASON                                  EFFECT P. 6,            P. 4          Added step to recognize actions                      Drills / Exercise Consnents          Clarify use of IP 2.14 Emergency 5.1.5            5.1.7          required if ORO is in Mode 1                                                              Response Assessment Form.and (removed reference to form in                                                              Emergency Response Responsibility-former Step 5.1.7).                                                                      Checklist Form.
P. 6            P. 4          Added step to recognize actions                      Drills / Exercise Comments      ' Clarify use of IP 2.14 Emergency.                          '
5.1.6            5.1.7          required if ORO is in Mode 2                                                              Response Assessment Form and (removed reference to form in                                                            Bnergency Response Responsibility:
former Step 5.1.7).                                                                      Checklist Form.
P . ' 7,          P. 5,          Remove reference to Recovery Action Annual Update                                        Make consistent with plan change.
5.1.12            5.1.10        Committee.
P. 8,            P. 5          Added note with instructions for                    Annual Update.                        Clarify second shift reporting to1
'5.2.1            5.2.1          second shift ~ Local EOC' Liaisons.                                                      Staging Area. .
P. 8            P. 5.          Added step to obtain dosimetry.-                    . Annual Update                      .Specify instruction'for dosimetry 5.2.1.B          5.2.1                                                                                                    issuance.
P. 9,            P. 6,          Deleted step.                                        Annual-Update                        Removal of redundant step regarding 5.2.6~          5.2.6.C dosimetry (task accomplished.by Step.-
3.2.6.B)-
P. 10,          P. 7,        Added steps to recognize actions                      Drills / Exercise Comments          Clarify use of IP 2.14, Beergencyl ll,              5.2.6          required if ORO.is in Mode 1 or                                                        . Response' Assessment Form and
-5.2.6.J.                        Mode 2, respectively.
                                                ~
:Bnergency Response. Responsibility-
-Si2.6.K
                                                                                                                        ' Checklist Form.'
P. 11,          P. 7,        Added step to provide' copies of EBS Annual Update                                      . Ensure : local officials are apprised '
                                                                      ~
5.2.6.L          5.2.6        messages to local officials.                                                              of PAR' activities.
I
                                                                            . . . _              ..      .-  -_ . f_ .    , _ - _ ~. _ . .-
                                                                                                                                                      . , . .~ _ _ . . _ . _ _ _ . _
 
SPIE RET. 1 CVOLUMEi~' PROCEDURES      SECTION: -IP 1.8 AFFECTED      AFFECTED.
PAGES      PAGES
      ' REV. ' 1    REV. O                      CHANGE                                      REASON                    EFFECT P. 12,'      P. 8          Added steps to recognize actions            Drills / Exercise Comments      Clarify use of~IP 2.14. Emergency ~
15.2.7..D,    5.2.7        ' required if ORO is in Mode 1 or 2,                                      . Response Assessment Form and 5.2.7.E                      respectively.                                                              Emergency Response Responsibility.
Checklist Form.
P. 12        P. - 8,      Added inclusion of EBS messages.            Annual Update                - To ensure Local.EOC Liaisons keep
  '5.2.7.F      5.2.7.D                                                                                    local officials apprised of EBS-content.
v 3:. . .~ ,.  =  x...-+--' - u  --. - ~ ~ a :- - ---.-- L ~- A '
                                                                  ' - ~ ~ '            ~"'            ^^
 
i 3
SPIE RET. 'l VOLUME:' PROCEDURES                            SECTION:    IP 1.9
        'AFFECTED 'AFFECTED PAGES          PAGES REV. 1        REV. O                            CHANGE                                                              REASON                          EFFECT P. 7,                      P. 7              Reordered steps B and C.                                          Annual Update                          Correct action sequence recognize 5.2.1                      5.2.7 that permission must be first B and C                    B and C obtained~from School. Superintendents.                                          ,
by School Coordinators before Liaisons can contact individual
                                                                                                                                                                    -schools.
P. 7                      P. 7              Preceded step with,'"upon direction Annual Update 5.2.4                      5.2.4              from School Coordinator."                                                                                Make consistent with functional responsibilities of School Coordinator and Liaison.
P. 8                      P. 7              Added note to allow telephone to                                    Annual Update                          Ensure thorough effort is made'in ring at least 10 times;' retry if                                                                          notifying schools /daycares.
necessary.
P. 8,                        P. 7              Added step to have; school liaisons                                Annual' Update
      .5.2.5                                            assist others.
Minimize time taken in notifying schools /daycares.
                                                                                                                                                                                                                      ~
; P. 11,                              P . 10,-          Added word " private" in reference                                  Annual Update                          :To ensure protective action decision-
* Attach 2
                                    ' Attach 2,        to protective action decisions.                                                                            made by. private schools are.
Step'4                      Step 4                                                                                                                                                                                                        :
recognized:and tracked.
; P. 12                              P. 11,            Added phrase to inform                                            Annual' Update                            Clarify Superintendent's
, Attach 3,-Attach 3                                    Superintendent ~of notification to-authority / responsibility over s-Step 2                        Step 2          . individual schools.                                                                                          individual schools.-
,P. 12,-                              P. 11,          'Added note for.using' local police                                  ASLB Hearing Commitments /                Ensure thorough effort is mad'e in off i Attach 3                          Attach 3        . departments for.-assistance with off Stipulations                                                            hours notification.
hours notification to school
.                                                      officials.
                                                                                                                                                                                                                                                    -l 1                                                                                                                                                      .
    -u                . - , , . . -  -          . . _ . .      ,- -% ,_ w.                          , . - . - _ _. .~    -
                                                                                                                                      -.-,-,--.,.-,4      . _ . , ,      , _ _ ,  , ~ , . - . . . . . . _ - _ , .  , . . . _ , . , . _ . . , _ .
 
_ _ . _ . . ~
                                                                                                                    ,~
4 SPfC REY. 1 VOLUME: PROCEDURES      .SECTION:        IP 1.9 AFFECTED    AFFECTED PAGES      PAGES REV. 1    REV. 0                      ' CHANGE                            REASON                    EFFECT P. 13        P. 11,    Added note for instructions on use        ASLB Hearing Conunitments/~  Provide mechanism to verify emergency-Attach ~3    Attach 3  of authentication code.                    Stipulations                status.
P. 13        P. 11      Preceded step with "upon direction -Annual Update                      Recognize that permission must be Attach.3, Attach 3,    from School Coordinator"                                                first obtained from School
      -Step 3      Step 3                                                                            Superintendent by School Coordinator before Liaisons can contact
                                                                                                    . individual schools. Make consistent
                                                                                                                        ~
with functional responsibilities of School Coordinator and Liaisons.
Added phrase to use default values        ASLB Hearing Commitments /  Have contingency action in place in listed-in Appendix M.                    ' Stipulations                case transportation numbers can't be obtained atlthe time.of esse'rgency.-
P. 14,    _P. 12,    Added phrase to-inform School-          ' Annual Update                Recognize that permission must first-Attach 3    Attach 3, Superintendent that Liaisons will'                                      be obtained from School-
    '-Step 1      Step-1    _be-notifying individual sci.ools.                                      Superintendent by School Coordinator-
                                                                                                    . prior'to Liaisons. calling individual
: l.                                                                                                    schools.
P..15,      P.'12,    Added. note for using: local' police      ASLB Hearing Cosunitments/  Ensure thorough effort is made in
,'Attcch 3        Attach 3    departments for assistance with off. Stipulations                      off-hours notification.
l-                            hours notification of-school" officialst l P. 16,          P. 13.    'Added School Coordinator as a'            Annual Update                Make. consistent with functional
, Attech 3, ~ Attach.3        responsible. person..                                                  responsibilities of School LStep 3.D Step 3.D                                                                          Coordinator.
                                                                                                                ~
;_      ______.-a-~_-.        -        . - - --            -      --        - - - - -
 
sis' SPMC REY. 1                                                                              l
                                                                                                                                                            ?
VOLUME: PROCEDURES              SECTION:    IP 1.9 AFFECTED        AFFECTED PAGES          PAGES REV. 1          REV. O                    CHANGE                                    REASON                  EFFECT
  -P. 17,          P. 14,      Added phrase to refer to travel        FEMA Technical Assistance /      Assist in determination of. estimated.
Attach 3        Attach 3,  times to the host facilities.          Plan Review                      arrival times of. school evacuees.
Step 2          Step 2 P. 17          P. 14      Added phrase to offer Route Guides      ASLB Hearing Commitments /      Ensure that school-contracted buses Attach 3,      Attach 3,    to schools providing own                Stipulations                    can be directed to reception' center.
Step 1          Step 1      transportation.                                                          and host' school facility.
  -P.~17            P. 15      Added phrase to rafer to Appendix M Annual Update                        Recognize school priorities based on Attach 3,      Attach 3    If additional transportation is                                          their proximity to plant.
Step 2        Step 3      needed'(replaced former Step 3)
P.~18,        P. 15,      Reversed order of two steps.            Annual Update                  Correct action sequence.
Attach 3        Attach 3..
Steps 3,4* Steps 4,5 P. 18          P. 16,      Replaced School Liaison with School ~ Annual Update                    ~ Make consistent level of' authority .
Attach 3,      Attach 3,  ' Coordinator as responsible person.                                      for interaction with school officials:
: Step 1        Step 1                                                                              -(Coordinator to Superintendent).
P.'19          P. 17,      Preceded step with "upon direction- Annual Update                      : Recognize that permission must firstl Attech 4,      Attach 4    from School ~ Coordinator."                                              be.obtained from School; Superintendent by Schoo1 Coordinator
                                                                                                                                  ~
Step C          Step C prior to Liaisons calling individual.
schools.
3 l
l
?        - _ - . .        -    - - . _    = = = =    - -  - = =-- -            - - - -          ~-                --
 
SPIE RET. 1
    -VOLUME:' PROCEDURES                  SECTION: IP 1.10
    -AFFECTED            AFFECTED PAGES~            PAGES
          'REV. 1            REV. O                          CHANGE                                                          REASON                                          EFFECT P. 3                P. 3            Added evac. bed buses.                                          ASLB Hearing Comunitments/                Recognize evac. bed buses as spec.
2.1.3                2.1.3                                                                              Stipulations                            vehicle resource.
P. 6,                P. 6,          ' Removed reference to Recovery                                  Annual Update                            Make consistent with plan change.
5.1.8                5.1.8            Action Committee.
P. 7                P. 7            Reversed order of steps.                                        Annual Update                            Correct action sequence.
5.2.1 B,            5.2.1 B, C                    C
:  P. 8                P. 7,          Added detail regarding priority                                -FEMA Technical Assistance /              Recognition.of priority scheme 5 . 2. 4 -.          5.2.4            scheme:for notifications ~of' spec.                  '
Plan Review                              established for spec. pop's.
populations.                                                    .ASLB Hearing Commitments /.                                                        ~
Stipulations                                                                          -
0 Added note and step to' assist.                                  Annual Update                            To ensure each liaison has support other liaisons upon completion of                                              '
:available as'needed to complete assignment.-                                                                                                notifications-in a timely manner.
Added note to let phone ring 10-                                  Annual Update                                                                                          -l'l Minimize time'taken to notify spec.'
times, retry if necessary.
                                                                                                                                                      ~ pop's.-while ensuring a thorough.
effort is made to complete.
notifications.
P. 8,              P. 7              Added step to track need for Route                                ASLB Hearing Commitments /              ' Ensure ~need'for.these Route Guides is~
5.2.5                                -Guides for door-to-door-                                        ~ Stipulations                            tracked and provided to Spec. Pop.
notification >                                                                                            . Coordinator.
:I P. 8            -P. 7-                ~Added! step to refer. transportation                            Annual Update                        - Make consistent with functional.
, 5.2.6                                    requests.to Spec. Pop. Coordinator.
                                                                '                                                                                  l responsibilities'of. Spec. Pop.            .
                                                                                                                                                    -Coordinator.
%..,. _        ~ . . .      _ . , _      _
: .    ..        , , - _ . . . ~ . . . . -    .        -          .~        ,      -r-...    . , , , _ ._ , _ _ _ _ -                m m,__.-    ... . . .
_    ._ _a
 
                                                                                                                                                                  #i T SPIE REY. 1 VOLUMEi PROCEDURES      SECTION:          IP 1.10
                                                                                                                                                                      .i AFFECTED      AFFECTED PAGES          PAGES REV. 1        REV. O                        CHANGE                            REASON                            EFFECT~
P. 11,        P. 11,      Replaced ' medically homebound" with Annual Update Step 4 Make terminology consistent with Step 4      "special needs individuals."
remainder of the plan and procedures.
P. 11          P. 11      Added step to report need for door- ASLB Hearing Commitments /
    . Step 5                                                                                              Ensure need for Route Guides is to-door notifications to Evac.        Stipulations                      forwarded to. appropriate individual.
Support Coordinator.
4 P. 11,        P. 11      Added step to prioritize 12, Step FEMA Technical Assistance /        Recognition of priority scheme and transportation needs according to      Plan Review                    . provision of instructions for its
    '6                          predesignated priority scheme.          ASLB Hearing Commitments /        use.
Stipulations P. 12,        P. 11      Added step delineating where            Annual Update                      Different.iate between Step 7                    requests for transportation are
                              ' forwp.rded.
responsibilities of. Bus Comipany.-
                                                                                                        . Liaison and Spec. Vehicle Dispatcher-for different needs.
P. 13          P. 12,      Added phrase to use priorities        ~ FEMA Technical Assistance /-      Recognize priority' scheme outline in Attech 3,      Attach 3,  established in App. M.                  Plan ~ Review.          ..
                                                                                                      . App. M and Plan.
Step 1        Step 1                                              ASLB Hearing Comunitments/ '
Stipulations-P. 13          P. 12,      Added note to request l local. police  ASLBLHearing Commitments /    ~ Ensure thorough effort is made:in Attach 3      Attach 3    dept. assistance with'off. hours.      ' Stipulations'                    notifying; spec. facilities off hours.-
notification:of. spec. facilities.                                                ~
Added note that upon completion of      Annual. Update.                  Minimize time.taken to notify special-assigned notifications,Lassist .
                                              .                                                      ~ populations.
other' Liaisons.
                              = , -        -            -- - --              -
                                                                                    ~        -    ?- --              --      -  - - - = - - - - - - '
                                                                                                                                                        = - - - -
 
m              _. m .                                -
SPE REY. 1 VOLUME: PROCEDURES        SECTION:  IP 1.10 AFFECTED    AFFECTED PAGES            FAGES REV. 1          REV. O                CHANGE                                REASON                        EFFECT
-P. 15          P. 12,        Added to step use of default values ASLB Hearing Conunitments/          Ensure transportation is allocated Attach 3    Attach 3,      in App. M; notify Spec. Pop.            Stipulations                  -using default values.(when Step 1      Step 1        Coordinator of need for' door-to-                                      appropriate)'to special pop.; ensure door notifications.                                                    need for door-to-door notifications.
is forwarded to. appropriate individual.
P. 15,      P. 12,          Added note for upon completion of      Annual Update                  Minimize time taken to notify speciali Attach 3      Attach 3        assigned notifications, assist.                                        populations.
other liaisons.
-P. 15,        P. 12          Add step to notify MS-1/ho'st          Annual Update                  Ensure facilities are notified in the-Attach 3, . Attach 3,        medical facilities. .                                                  event that their? services are Step 2      -Step 2                                                                                  needed.                    -
P. 16        P. 12          Added step'for' Spec. Pop.: .          Annual Update                  Minimize time taken to notify spe,cial Attach 3      Attach 3        Coordinator to reassign liaisons as                                    populations.
Step 3                      they complete their. assignments.
;P.-16          P. 12,        ' Add step to use Attach 6 to track    ~ Annual Update                ' Allow for tracking availability of-Attach 3,      Attach 3        MS-1/ host medical facility status.                                    each facility.
Step 4 P. 16          P. 12,          Reorganized former' Step 2..          Annual Update                    Reordered ^ action sequence for better Attach 3, ' Attach 3,                                                                                  flow.
Step 5        Step 2
-P. 17        P. 13,          ' Reorder notification to match:        FEMA Technical Assistance /    Recognize priority scheme as outlined' Attach 3,    Attach 3,        prioritization scheme; offer other      Plan Review                    in App. M and Plan; recognize other-Step 1 A Step 1                assistance including dosimetry.        ASLB Hearing Commitments /      requests for assistance.
Stipulations-
 
1
                                                                                                                                                                                                        - [
SPfC RET. 1 VOLUME: PROCEDURES              SECTION:        IP 1.10
            . .                                                                                                                                                                                              ~;
LAFFECTED            AFFECTED PAGES          PAGES REV. 1          REV. 0                        - CHANGE                                        REASON                                  ' EFFECT P. 18,            P. 13 Annual Update                          , M.inimize time taken to notifyfspecial'..
    . Attach 3,          Attach 3 ~ -Added          step for Spec. Pop.
Coordinator to reassign Liaisons                as                                              populations.
Step C                            they complete their assignments.                                                                                                                                      ,
P. 18,            P. 14,          Add Staging Area Leader and Evac.                    . Annual Update                            Make' consistent with functional-Attach 3,          Attach 3,      Support Dispatcher as responsible .                                                              responsibilities of these positions..
IE                Step 1D        persons.
P. 20              ---
Added new condition and response                      ASLB Hearing .Connaitments/                Ensure needs of special pop. using Attach 3                            actions.for " requests for                            Stipulations                              TDD's are addressed.
assistance via.TDD* assigned to
                                        -Special Pop. Coordinator and Liaisons.
P . ~ 21 .          P. 16            Revise step detailing priority for ~ FEMA Technical Assistance /.
Recognize priority scheme outlined in- -
Attach 3,            Attach 3,        transportation resources.-                            Plan Review                              App. M and Plan.
Step 3              Step 3                                                              . ASLB Hearing Connitments/ --                                                                          .
Stipulations
    .Pi'21,              P. 16,        Reverse order of steps.                              -Annual Update                              Correct l action sequence.
Attach 3,            Attach 3
    - Steps 4,5          Steps 4,5 L
1P. 22,              P , 16 . -    -Added "special facilities" to'                        Annual' Update.                            Make consistent with Plan.
Attach 3            Attach 3      relocation condition.
    - P. 22,              P. 15,        Removed-phrase' describing' direct                    Annual Update                              Clarify process of coordination Attach 3            Attach 3,      communication between EPZ' facility                                                              . between EPZ facility, ORO, and. host Step 1              Step 1        and host facility; Special Pop.                                                                    facility.-
Coordinator contacts: host hospital'.
                                                                                                                                                                        ~
1 s
                                            .s.- ,,,-
                                                              ,.gr. .g,,.2p, 4.# g = m + y            .. - , - ,  %  ,.me-, w.. s..,.... g. . , 3      ,,y.,,..        is. ,,,w y,,, . . ,r4.-<w r+~+-- -
 
AFFECTED    AFFECTED PAGES      PAGES REV. 1      REV. O                CHANGE                            REASON              EFFECT P. 22,      P, 15,    Added reference to estimated travel Annual Update          Clarify ETA's for host facilities.
Attach 3  Attach 3,  times to host facilities.
Step 2      Step 2 P. 23,    P. 16,    Replaced former step 2 with new    Annual Update        Make consistent with functional Attach 3,  Attach 3,  step instructing Special Pop.                              responsibilities of Special Pop.
Step 2    Step 2    Coordinator to track individuals                          Coordinator.
relocated to host medical /MS-1 facilitien.
P. 23,      P. 17,    Add Special Pop. Coordinator as a    Annual Update        Make consistent with functional Attach 3,  Attach 3,  responsible person.                                        responsibilities of Special Pop.
Steps 1,2  Steps 1,2                                                            Coordinator.
P. 25,    P. 19,    Added line for " host special        Annual Update        Make consictent with terminology.
Attach 5  Attach 5  facility location."
P. 26,    ---
Created new form for MS-1 host      Annual Update        Make consistent with functional Attach 6              medical facility tracking.                                responsibility of Special Pop.
Coordinator.
Clarify process of coordination between EPZ facility, ORO, and host facility.
 
r SPMC RET. 1 VOLUME: PROCEDURES                    SECTION:              IP 1.11
      -AFFECTED        AFFECTED PAGES        PAGES REV. 1      REV. 0                                        CHANGE                          REASON                      EEFECT P.'4-10        P. 4-8                Reorganize procedure sections as          Annual Update                . Facilitate frocedure implementation.
follows:                                                                                                              ,
5.1 MCDA 5.1.1 initial actions 5.1.2 Authorization to report 5.2 MDPH 5.2.1 Initial actions 5.2.2 Authorized to support MDPH 5.2.3 Not authorized to support MDPH.-
P. 4,          P. 4,                  Changed reporting location of MCDA      Annual Update,                  Decrease travel time'for State-5.1.1.A        5.1.1.A                State Lisison from EOC to'YAFC,        . Drills / Exercise Comments ~  Liaison.
* Bolton.
P. 4            P. 4,                  Provide instruction to MCDA State        Annual Update,                  Clarify use of Beeq,ency Response 5.1.1.          5.1.1.F              ' Liaison operating in Mode 2.            Drills / Exercise Comments-    Responsibility' Checklist in IP 2.14.
  - F 1,2 P. 5            .P. 4                Add step to coordinate assistance        ASLB Hearing Commitments /:    Maximize available resources used in 5.1.1.G.                                with advocacy groups.                    Stipulations                    emergency..
H P. 6            P. 5                . Add step to provide' briefing _ sheets Annual Update                      Recognize use'of new briefing sheets-to-State officials (MCDA).
                                                                                                                                                            ~
5.1.2, E                                                                                                          sent by Radiological _ Health Advisor &
                                                                                                                      -Technical Advisor; keep State officials' apprised of available information.
P. 6          -P. 5                  Add step to provide. copies of EBS .-Annual: Update    '
Ensure State. officials are apprised-5.1.2, G.                          ' messages to State officials (MCDA).                                        of EBS message content.
s-
                                                                                                                    ~
                          . _ . . _ _ . . _        - - _ - . - ~ - -          =-1            x -"-                    -      --    -
 
SPIE REY. 1 VOLUME: PROCEDURES      SECTION:        IP 1'.11 AFFECTED        AFFECTED PAGES          PAGES
    'REV. 1          REV. O                  CHANGE                                      REASON                      EFFECT P. 6,          P. 5        Add step to coordinate w/MDPW on        ASLB Hearing Conunitments/          Ensure drawbridge operation is 5.1.2, H                    operation of drawbridges.              Stipulations                        accounted for in evacuation implementation.
P. 7            P. ' 5    Add step to provide status              Annual. Update 5.1.3, A                                                                                                Ensure State officials are kept up update /EBS messages to. State                                              to date.
officials at each emergency classification change.
P. 8,          P. 6        Add step to provide instructions to Annual Update,                            Clarify use' of Laergency Response
  '5.2.1, D,                  MDPH State Liaison.if ORO is in          Drills / Exercise Comunents        Responsibility Checklist of IP.2.14    '
:.1, 2                      Mode 2.
P. ' 9,        P. 6      " Add step to provide briefing sheets . Annual Update,                        Recognize use of new briefing sheets
.5.2.2, B                    to State officials (MDPH).              Drills / Exercise Comunents        'sent by: Radiological Health Advisor &
                                                                                                          .. Technical Advisor; keep State officials apprised of available
    ~
information.
P.{ 9,        P. 6      Add step to provide: copies of EBS.    : Annual Update,                      Ensure State officials.are apprised
-5.2.2,-F                  messages to State. officials (MDPH). Drills / Exercise Conunents              of EBS message content.
              .- --          -.-        --==:..---.-.
                                                    -                  -        . - - - - . - - - -~
 
                    ,                                                                                                                                                                            m SPMC REY. 1 VOLUME: PROCEDURES                SECTION:                  IP 1.12 AFFECTED              AFFECTED PAGES                PAGES REV. 1              REV. O                            CHANGE                                                        REASON                                EFFECT P. 5, 5.7            P. 4          Added step to evaluate need for                              Annual Update                                      -Make consistent with Accident' ambulance attendants to don                                                                                        Assessment Coordinator functional protective clothing.                                                                                              .. responsibility.
P. 5, 5.8            P. 4, 5.7    Removed reference to Recovery                                Annual Update                                        Make consistent with plan change Action Committee.
P. 7,                P. 7,          Added step to evaluate need for                              Annual Update                                      -Make consistent with' Accident Attach 1              Attach 1      ambulance attendants to don                                                                                        Assessment Coordinator functional
' Step 5                              protective clothing.                                                                                              responsibility.
                                                                                                                                                                                                    =
                                                                                                                                                                                              .s.
                                                                                                                                                                                                      ..-a
                                                                                                                                                                      ~ ~ ' ~ ^ ~ ~ ~ ^ ^ ^
                                                                                          ' ~ ~ ~ ~ ~ ~ - ~ ' ' ' ~ " " ' ' '        ^ ~ ' ' ' ~ ~ ~ ~
                                    - - + ~ ~ - - - ~ - . ---        - ~~- ' - - ~ ~ -                                                                  -
______x._-, , , - - , ~ .
 
SPfC REY. 1 VOLUME: PROCEDURES                  SECTION:        'IP 2.1
  .AFFECTED            AFFECTED PAGES          PAGES
          .REV. 1            REV. 0                        CHANGE                                  REASON                                    EFFECT'                                            y P. 5-              P.-4-7          Replaced instructions in former 5.1.1              5.1.1,A-P Annual Update              - Clarify notification process by step 5.1.1 with reference to                                            - eliminating duplicate instructions.:
notification activities in Appendix G.
P.:6                P. 8            Backup VANS Operators receive                Annual Update                Backup VANS Operators'provided a.                                                ;
5.1.4                5.1.4          notification from Offsite Response                                      " Melita Pager withLseparate call EOC Contact-instead.of Station                                          - number.-
Security and report to Backup Staging Area. '                                                            Backup Staging Area established for-shift turnover.
P. - 8          Deleted. step for Helicopter Pilot.          Annual Update Make consistent with' Plan change.
5.1.5            notification..                                                            Deletion of airborne alerting.
concept.
P. 6                P. 8-13          Removed 'NAS Conanunicator."                  Annual Update                Make consistent with~ functional
  - 5.2.1              - 5.2.1,A-W responsibilities of both positions.
Replaced instructions in former'              Annual Update                Ease of implementation.of
      ~R                                step 5.2.1 with' reference'to                                              notification process by eliminating.
notification. activities'in Appendix
                                                                                                                - duplicate instructions.
G.
P.2 61              P. 13            Backup YANS Operators: receive                Annual Update            ' Backup VANS Operators provided a
'5.2.3                  5.2.3            notification from Offsite Response                                      . Melita Pager with separate call i                                        EOC Contact.instead of Station .                                          number.
Security,! report to Backup Staging
,'                                    ; Area.
Backup Staging Area established for.
:  shift turnover.-
4
    ,.4_.            a    _ . -    i_,- w . A m ..J,..c.).,...M.-    C.C. .''i-,~<y-,
                                                                            -          I  w-  r- v --t,,  - -r  + +.
5,w,-+-', -
                                                                                                                                                  -w  .-.w        .-- ,, -vv-  - . - - - -- . .~
 
s SPIE REY. 1 VOLUME: PROCEDURES                            SECTION:      IP 2.1 AFFECTED              AFFECTED PAGES                PAGES REV. 1                REV. O                                CHANGE                                                                REASON                ' EFFECT P. 13                Deleted step for helicopter pilot                          Annual Update                            Make consistent.with Plan change.
5.2.4                notification.                                                                                      Deletion of airborne alerting concept.
P. 8                  P. 14                Add " Day Care Center" to                                  Annual Update                          Accurately reflect notification 5.2.10                5.2.11                notification scheme for School                                                                      responsibilities.
Liaisons.
P. 8                  P. 14                Removed " Day Care-Center" from                            Annual Update                          Accurately reflect notification 5.2.11                5.2.12              notification scheme for Special                                                                    responsibilities.
Population Liaisons.
P. 8                  P. 15                Change reference from Appendix M to Annual Update                                                  Recognize Appendix H as
  '5.2.12                5.2.13              Appendix H.                                                                                        -Communications Directory for.ORO..          ~
Annual Update
                                                                                ~
P. 8                  P. 15                Add " Host Facilities
* to                                                                          Make consistent with functional.
5.2.13                5.2.14              notification scheme; added                                                                          responsibilities of-Assistant reference to Appendix H.                                                                            Reception Center Coordinator; recognize Appendix H as-Comununications Directory for ORO.-
P. 8                  P. 15              Deleted step.for Transfer Point                              Annual Update                          .Make consistent with Plan change.
5.2.15              Dispatcher to. notify Road Crews.                                                                  . Staging Area Leader will notify Road Crews.
                                                                                                                                                                        ~
P. 8~                  P. 15            - Added instruction'for Staging Area                            Annual Update.                          Make consistent with Plan' change.
5.2.14                5.2.16              Leader.to notify. Road Crewsu                                                                        Staging Area Leader will notify Road
: Crews.
                                                                              ~
(replaced former~ step 5.2.15).
                                          . Added Appendix H as reference.                                                                      : Recogni:.e Appendix H as Communications Directory for ORO.
r                                                                                                              .                              .
                                                                                  -"'''"'''-"''-'#''*'''    ""    ' ' ' ' ~ " ' ' ' '
      .i. ....;_;.,.s.-      -..yr_--- 2 w.1-.._--s--"rh.re-s
 
SPMC REV. 1
    -VOLUME: PROCEDURES                      SECTION:      IP 2.1
  .~AFFECTED                  AFFECTED
          -PAGES_                PAGES REV. 1                REV. O                    CHANGE                                REASON                      EFFECT P. 9                      P. 15        Replaced Appendix M with Appendix H Annual Update                      Recognize Appendix-H as
  -5.2.15                      5.2.17      as a reference.                                                        Conununications Directory for ORO.
  .P.-9                        P. 15-22    Replace instructions in former step. Annual Update                      Ease.of implementation of 5.3.1                      5.3.1,A-Y    5.3.1 with reference to                                                notification process by eliminating notification activities in Appendiz                                  ' duplicate' instructions.
G.
P. 9                        P. 22        Backup VANS Operators receive          Annual ~ Update                Backup VANS operators provided a 5.3.3                      5.3.3      notification from Offsite Response                                      Melita pager with separate call EOC Contact instead of Station                                        number.
Security; report to Backup Staging-                                    . Backup Staging Area established for Area.                                                                  shift turnover.
F. ~ 9                      P. 22      Deleted step for helicopter pilot.      Annual Update                  Make~ consistent.with Plan change.
5.3.4        notification.                                                          Removal-of airborne' alerting concept.'
P. 10                      P. 23        Replace Appendix M reference with        Annual Update                  Recognize Appendix H as 5.3.9                      5.3.10      Appendix H.                                                            Communications Directory for ORO.
P. 11                      P. 23        Add " Day Cares" to. notification      ' Annual' Update                Accurately reflect. notification 15.3.11'                    5.3.12      scheme for School Liaisons.                                            responsibilities.
P. 11                      P. 23      Removed'' Day Cares" from
                                                                        ~
Annual Update                  Accurately reflect notification 5.3.12                      5.3.13-    notification' scheme for Special                                        responsibilities.
Population Liaisons.
                                                                                                                              ~
:P. 11                      P. 24      ; Replace Appendix M reference with':    Annual Update..              ' Recognize Appendix H as
;5.3.14                        5.3.15      Appendix H.                                                            Comununications Directory for ORO.
i        _
I
                                                                                                                ~
                                      =        - - =---            ---              --        -      =-  - - ~          --        ---
            - _ _ _ _ _ = - . -
 
SPBE REY. 1
    ^ VOLUME: PROCEDURES                  SECTION:                  IP 2.1 AFFECTED      AFFECTED
      .PAGES            PAGES REV. 1            REV. O                                      CHANGE                                                      -REASON              EFFECT P. il          P. 24                f.dd " Host Facilities" to                                                Annual Update            Make consistent with functional 5.3.15        5.3.16              notification scheme; added                                                                        ' responsibilities of Assistant l
reference to Appendix H.                                                                          Reception Center. Coordinator.
(Recognize Appendix H as Cc tunications Directory for ORO.
P. Il        P. 24                Deleted step for Transfer Point                                            Annual. Update          Make' consistent with Plan change.
5.3.17                Dispatcher to notify Road Crews.                                                                    Staging Area Leader will' notify Road Crews.
P. 11        P. 24                Added instruction for Staging Area                                        Annual Update ~          Make consistent with Plan change.
  ~5.3.16        5.3.18                Leader to notify: Road Crews                                                                      . Staging Area-Leader will. notify'. Road (replaced former step-5.3.17).                                                                  -Crews.-
                                      - Added Appendix H as a reference.                                                                  . Recognize Appendix H as Comununications Directory for ORO.
P. 12        P. 24                Replaced Appendix M reference with                                        Annual Update          . Recognize Appendix H as 5.3.17        5.3.19              Appendix H.                                                                                      . Comununications Directory for ORO.
P. 12        P. 25-28. - Replaced instructions in former                                                    ; Annual Update 5.4.2        5.4.2 A-J step 5.4.2 with reference to Clarify notification' process by.
eliminating duplicate' instructions.-
notification activities in Appendix G.                                                                            .-
  'P. 13        P. 29                Deleted step for helicopter pilot                                          Annual' Update -          Make consistent with Plan change.
5.4.7                notification.                                                                                        Removal of airborne alerting' concept.-
          ,, ,.      w.-w    ,.n ,w--  <a"<*ve- *=" " " ' * " * '    '
                                                                      ''"8'*" " " ' "  *"'"#~~^''~  ' '    '
 
SPIE REY. 1 VOLUME: PROCEDURES      SEC110N:    IP 2.1                                                                          1 I
AFFECTED    AFFECTED PAGES l
PAGES                                                                                                    l REV. 1  REV. O                  CHANGE                            REASON          EFFECT                      f l
P. 13      P. 30-34    Replaced instructions in former      Annual Update      Clarify notification process by      l 5.5.1      5.5.1 A-S    step 5.5.1 with reference to                            eliminating duplicate instructions. I notification activities in Appendir G.
I                                                                                                                        =
h
 
SPft: RET. 1 VOLUME: PROCEDURES'                                                          SECTION:        IP-2.2                                                                                              _
AFFECTED    AFFECTED PAGES                PAGES REV. 1              REV. O                                                                  CHANGE                            REASON                        EFFECT P. 8        P. 7                                                            Evacuation Time Study, KLD            Annual Update                    Evacuation ~ Time Study not needed as Associates, deleted as reference reference for procedure. It is for procedure.
referenced in IP 2.5.
P. 18 and  P. 15 and Form 1, HP-41 Dose Projection                                                                Annual Update                    Better organized and store usable
,    19          16                                                            Determination Worksheet, was                                              form.
revised.
P. 47      P. 40                                                          Specific section of Attachment 4        Annual Update given by title rather than                                                  Clarification on use of form referenced by location on form.
(Attachment 4).
P. 48      P. 41                                                        Model number of Eberline-                Annual Update instrument changed from 140 to                                              Clarification of instrument model number.                        .
140N.
i P. 50          None                                                        Guidance for adjusting thyroid dose FEMA' Technical Assistance /            Guidance.is intended to prevent undue rates.from' field measurements was        Plan Review                      conservatism.in actions. considered as
                                                                                                                                                                                                      ~
added to Attachment 4.                                                      a result of thyroid dose rate-
                                                                                                                                                                                                          ~
                                                                                                                                                          -calculated from a field measurement.
                                                                                                                                                          'The' lodine calculation on Attachment 4 assumes lodine ~1slpresent as I-131; P. 53        P. 44                                                      Child TID in step 2 changed to              Annual Update.                    Clarification-that'METPAC calculates infant TID.                                                              ' 11nfant thyroid dose rates and' doses.-
J P. 56, 58    P. 47, 49 Integrated dose equivalents are now Annual Update                                                                              Simplified the terminology for identified as "first-year''and                                              . integrated doses.
                                                                              "second-year" rather than "zero to first-year" and *zero to second-year."
_                            _                    __      __=________<        ..    .  - .        .
                                                                                                                                                              - ~ . -    - ~ - , . . . - ,  ..~---a-ll
 
I  hl I  h  I' '' ''
l s SPMC REY. 1 VOLUME:    PROCEDURES          SECTION:  IP-2.2.
AFFECTED          AFFECTED PAGES              PAGES REV. 1            REV. O                  CHANGE                REASON              EFFECT P. 60            P. 51        Revision to Figure 1. Annual Update        Change made to remain consistent with EPA guidance for the intermediate phase of an emergency.
P. 61          P. 52          Revision to Figure 2. Annual Update        Change made to remain consistent with EPA guidance for the intermediate phase of an emergency.
l
 
          ~
                                                                                        ' SPRE REF. 1 VOLUME: PROCEDURES                    SECTION:'            IP 2.3
  .AFFECTED                  AFFECTED PAGES                    PAGES REV. 1                    REV. O                                CHANGE                            REASON                  EFFECT                      1 P. 3                      P. 3        Staging Area Leader was assigned .              Annual Update            Coordinating' link between Field Team responsibility for assigning staff.                                        Dispatcher at EOC and Fieldt.
member to assist the Field Team                                            Monitoring Teams now identified in--
Dispatcher with dispatch of the                                          -procedure.
                                        -Field Monitoring Teams.
  .P. 5                      P. 4        Evaluation of the use of protective Annual' Update                        Resulted in a more consprehensive:
clothing extended to all field                                            exposure and contamination control personnel, transportation providers                                      . program for ORO..
and ambulance drivers instead of being:limiteltoFieldMonitorink Teams.
P. 6                      P. 5        Field Team Dispatcher directed to                Annual Update            Clarified actions for Field'-Team.
coordinate the' dispatch of-teams                                          Dispatchers'and identified how with Staging Area personnel rather                                          information:is to be transmitted to--
than wait for' call from Staging                                        .the' Field _ Monitoring Teams atithe Area personne!.;'means of                                                  Staging Area.
transmitting Information identified.
  ?. 7                      P. 6        1.      " Field Team Coordinator"                Annual Update            1. Clarifies the fact that the field changed to " Staging' Area-                                                team' coordinator is actuallyja Administrative Staff Meciber." '                                            Staging Area Staff member _whofis assigned that task by the Staging
                                                                                                                  ~ Area Leader.
: 2. Direction for Field Team                  ; Annual Update          ~2. Radio Eheck now performed prior to:
Dispatcher.to ensure that teams'                                          dispatch.
perform a. radio check was added.
l
                                            " ' -  "''-'-''"'#  ' ' ' ' ~ ' '' ' ' ^~
____________l_2.._.J^
 
v SPIE REY. 1
          -VOLUME: PROCEDURES                                            SECTION:        IP 2.3 AFFECTED                                      AFFECTED
,.              _- PAGES                                    PAGES REY. 1                                    REY. O                          CHANGE                                                                    REASON                                                                                      EFFECT P. 8                                          P. 6          1.  " Field Team Coordinator
* Annual Update                                  1.                              Clarifies the fact that the field changed to " Staging Area                                                                                              team coordinator is actually a Administrative Staff Member.'                                                                                          Staging Area Staff member who is assigned that task by the Staging Area Leader.-
: 2.  *10-mile EPZ" changed to *known Annual Update                                                                      2.                            Change ensures that tLa location or anticipated plume area.*                                                                                            selected for sample pick up is outside the affected area.
        - P. 9                                            P. 7          1. Note box added.                                                  Annual Update                                  1.                            The addition of the note box provides Field Monitoring Teas. relief personnel with instructions for obtaining a radio and where to report.
: 2. Step D.2 was added.                                              Annual Update                                  2.                              ' Convert-a-com' is a necessary piece of equi p nt for the radios used by Field Motitoring Teams and is now identified in procedure.
P. 10                                          P. 7            The words.*through the Staging Area Annual Update                                                                    Reinforces that the Staging Area Administrative Staff member
* added                                                                                  Administrative Staff member is the to note box.                                                                                                          c6 m unication link between Field Monitoring. Teams and the Field Team Dispatcher (at the EOC) while teams
'                                                                                                                                                                                              are at the Staging Ares prior to dispatch.
i b
        .,,,,_ee              c.m                3.<    ,y-        ,,        + . , . ,,,,.c s , , .., .                  < ,,,.mw...w..r    ...w.. ,v    w.~,--m... m                                                                                          ,,w.
                                                                .w_                                                                        ,            ,,-              _  v- . ,  4 - - . __ _          e..                      .                      s. .,.        , , . ,m_ ._ _..m....
 
SPMG RET. 1 UOLUME: PROCEDURES        SECTION:    IP 2.3 3  AFFECTED      AFFECTED l        PAGES          PAGES REV. 1        REV. O                CHANGE                              REASON                  EFFECT
}
i Steps D.1 .2, .3, and .4 have been  ASLB Hearing Conunitments/
P. 11        P. 8                                                                        Ludlum Model 19 survey meter is no e                              deleted.  (These steps deal with    Stipulations              longer used by Field Monitoring i                              the operational checks for the                                  Teams.
1                              Ludlum 19.)
: r. 12        P. 9          Step 5.3.4.B has been added.        Annual Update              Field Team Dispatcher is notified in f                                                                                              advance when Field Monitoring Teams are about to perform a radio check.
3 The radio check is now a more formal process.
Steps 5.3.4.C and D:    'MA Team    Annual Update            Clarifies that comununication is iscan Number
* has been changed to *0R0                              en ORO team. Also eliminates Team Number.'                                                  potential confusion if field teams from the Co:nmonwealth of Massachusetts respond.
The words " return to the assigned    Annual Update            Reinforces that the Staging Area Staging Area Administrative Staff                              Administrative Staff member is member in the Dosimetry Room
* were                            coordinating the dispatch of field added to step 5.3.5.                                            teams with the Field Team Dispatcher in the EOC.
P. 12      P. 10          *FieJd Team Coordinator
* changed to Annual Update              Clarifles the fact that the field
                              ' Staging Area Administrative Staff                            team coordinator is actually a member assigned to coordinate Field                            Staging Area Stsff member who is Monitoring activities
* in step                                assigned that task by the Steging 5.3.6.                                                          Area Leader.
P. 13      P. 10          1. Step 5.3.7 was re-worded.      Annual Update              1. Clarifles action to be performed.
 
SPIE REY. 1 VOLUME: PROCEDURES                                          SECTION:                        IP 2.3
    ' AFFECTED            AFFECTED
          - PAGES                PAGES REV- 1                REY. O                                                                    CHANGE                                                                                                        REASON            EFFECT
: 2.        Note box for performing battery Annual Update                                                                                                      2. Ensure this action is performed check was added.                                                                                                                                                periodically once teams are in the field.
: 3.          Note box for relating RO-2A                                                                                              Annual Update              3. Change provides additional readings to E-140N readings was                                                                                                                                information that Field Monitoring added.                                                                                                                                                          Teams may use to assess field measurements.
: 4.          In step 5.3.7.A, "Ludlum Model                                                                                          ASLB Hearing Commitments /  4. Instructions provided in step 19' was replaced with *E-140N's                                                                                                    Stipulations              5.3.7.A are specific for the E-140N
                                                                  *(0-25 mR/hr)* was replaced with                                                                                                                              and RO-2A instead of the Ludlum Model
                                                                  "(X1 cpm); 1000
* mR/hr* was                                                                                                  19 and 20-2A.
replaced with *10,800 cpan                                                                                                                                                                  -
(3mR/hr).*
P. 14              P. 10                                    References to Ludlum Model 19                                                                                                      ASLB Hearing Comatitments/  Field Monitoring Teams provided with deleted, and directions for using                                                                                                  Stipulations                criteria for use of radiation RO-2A for all readings of 3 mR/hr                                                                                                                              detection instruments. Ludium Model or greater were added.                                                                                                                                          19 is not used by Field Monitoring Teams.
P- 14                P. 11                                    Step 5.3.8.A.4 was added.                                                                                                          Annual Update                Ensure gamma radiation level measurement is taken at 2 inches above ground. Directions for this step were not includd in Rev. O.
Step 5.3.8.B was changed to reflect ASLB Hearing Commitments /                                                                                                  Ludium Model 19 not used by Field use of E-140N rather than Ludium                                                                                                  Stipulations                Monitoring Team. Changing to 3 mR/hr Model 19, and 5 mR/hr was replaced                                                                                                                                sede the procedure consistent with with-3 mR/hr as basis for instru-                                                                                                                                  regard to choice of' instrument.
ment choice.
l
                                                                                            '-" ':'f
                                                                                                    -'- '-' ' ' - -':m ' " " -'-"'' ''IF''"'' ' ' ' "*"' "'lii-''-'imlf o r''" d''f'5' = ' l''It'''ll ' I mirilitd mL -
                                                                  '': . , . . n-4"'-'" "'M m    r"2      _,m____.  'yrg-;.,,,,.,;,y f;'-- "-'?''': . , . _
 
4 S19E: REY. 1                                                                                                                                          '
      . VOLUME: PROCEDURES                  SECTION:                              IP 2.3
      .AFFECTED                  AFFECTED                                                                                                                                                                                                                          ,
PAGES                PAGES
_            REY. 1                REY. O                                            CHANGE                                      REASON                                                      EFFECT I P. - 16                  P. 12          "64-130' changed to 'GY-130.*                                      Annual Update                                Typographical error correction.:
P. 17                    P. 13        Instructions in the note box (under Annual Update                                                                Clarifies the flow of information Step 1) were rewcrded.                                                                                        ~ front Field Monitoring Teams to Field Team Dispatcher to Accident Assessment Coordinator.                                                                            i P. 20                    P. 15        The word ' Sampling" was deleted                                    Annual Update                              The attachment is now specific for                                                                  i from the title and first line of                                                                                Field Monitoring Teams only.
the attachment.
P. 23                    P. 18        Attachment 3 revised.                                                Annual Update                              Attachment 3 is established as an example of the Field Survey / Air Sample Calculation Worksheet to allow minor changes to worksheet without a.                                                            .
procedure revision. Also, the attachment has been simplified with                                                                ,
respect.to data entry.
P. 24, 25            P. 19            Attachment 4 revised.                                              ASLB Hearing Commitments /                  Attachment 4 now reflects current' Stipulations                                equipment used by Field Monitoring.
Teams and has been re-designed to be easier to use.
! P. 26 '              P. 20                '9-K-7' has been changed to                                        Annual Update                                Typographical error correction.
i                                            '9-K-6.*
I c,w r , , .      -
w  v  ,,,a                                    4          w +  -v g-' w t-+--t      3-w-'- = re v  ~
o ,w w  * .c w-rw * = e-                    ,,r%. < ,-se s- e -e~  ,- e e ,, .--e'em- , _ _        u+ _ _.--.,-ee
 
: VOT,UME: PROCEDURES SPMC RET. 1 SECTION:              IP 2.4 AFFECTED                    AFFECTED PACES    PAGES REV. 1'  REV. O                                        CHANGE                                                          REASON                                          EFFECT PAGE 4                      PAGE 4    1. Step 5.1.4 reworded.                                                          Annual Update                                    Field Team Dispatcher no longer waits until Staging Area staff member contacts him. Field Team Dispatcher also initiates coordination activities from the EOC.
: 2. The words *(via facsimile /                                                    Annual Update                                      Means of. communicating information telephone)* have been added to step 5.1.4.A.
now identified in procedure.
PAGE 5                      PAGE 4    " Field team coordinator" has been                                                Annual Update changed to " Staging Area                                                                                                            Reinforces the fact that the field Administrative Staff member".                                                                                                          team coordinator is actually a Staging Area staff member who is assigned that task by the Staging Area Leader.
PAGE 5                      PAGE 4    Step C has been added; remaining                                                  Annual Update steps re-lettered as *D', "E*, and                                                                                                  Means of communication (once Sample "F*.                                                                                                                                  Collection Teams are in the field).
now identified in the procedure.
'PAGE 6                        PAGE 5  1. The words ' cellular telephone'                                                Annual Update have been added to step
: 1. Communication mechanism for Sample Collection Team identified 5.2.1.D.
In procedure.
: 2. The words 'through the staging                                                  Annual Update                                      2. Reinforce the fact that the area administrative staff member                                                                                                        Staging Area Administrative Staff "have been added to note box.                                                                                                          member is the communication link between the teams and the Field Team Dispatcher while teams are at the Staging Area.
                                                                                                                                    ,..  -y-    , , , .
* ym . s.= r
* __    _______2 -
                                                                                                                                                                                                .__m.__ .,.m .._. _--..___-._--.--_ _ - -- -
 
SPIE REY. 1 VOLUMEt PROCEDURES                                                      SECTION:    IP 2.4 AFFECTED                                                    AFFECTED PAGES                                                PAGES REV. 1                                                REV. O                  CH WGE                            REASON                            EFFECT i
PAGE 8                                                        PAGE 7    1. The words " field team            Annual Update coordinator" have been replaced
: 1.      Reinforces the fact that the field team coordinator is with " assigned Staging Area                                  actually a Staging Area Administrative Staff member".                                Administrative Staff mentber who is assigned that task by the Staging Area Leader.
: 2. *5 mr/hr* has been replaced        Annual Update      2.      Allows IP 2.4 to be consistent-with '3000 pr/hr (3 mr/hr)".                                  with IP 2.3 in regard to criteria for choice of instruments.
'PAGE 9                                                      PAGE 7      1. Directions for gasuna radiation    Annual Update      1.      Allows IP 2.4-to be consistent level measurements at 2 inches                                with IP 2.3 in regard to how above ground have been added.                                radiation measurements are taken.
: 2. The words " items 12 and 13"      Annual Update      2.      Including _ specific item numbers                                          i have been deleted from step                                    was not necessary for D.
implementation of the procedure.
: 3. Step E has been changed to        Annual Update      3.      This change was intended as a reflect that specific units of                                safeguard against the misuse measurements are not reported                                  of field data in the event that when Sample Collection Teams                                  the transmission of data was report data.                                                  interpreted by persons outside the ORO.
PAGE 19                                                    PAGE 16 -    Space for~ cellular telephone        Annual Update      Facilitates equipment tracking.
numbers has been added-to Attachment 1.
                                                                                                                                    .g,,,_- . . < a_=2 _mmm---'-2---w_u----'---* - - - ------ - - - - '" ' ' --- "
 
SPIE REY. 1 VOLUME: PROCEDURES              SECTION:                                                    IF 2.4
:AFFECTED        AFFECTED
      ' PAGES PAGES REV. l'      REY. O                                                                      CHANGE                                                      REASON                                    EFFECT PAGE'21        PAGE 18          Attachment 2 revised.                                                                                  Annual Update                                Attachment 2 is established as an example of the Field Survey / Air Sample Calculation Worksheet to allow minor changes to the worksheet
                                                                                                                                                                                        - without a procedure change. Also, the attachment has been simplified with respect to data entry.
PAGE 22        PAGE 19          Attachment 3 revised                                                                                    ASLB Hearing Commaltments/                  Attachment 3 now reflects' current Stipulations                                equipment used by Sample Collection                                                                                                  i Teams and has been re-designed to be easier to use.
PAGE 24        PAGE 20          Eberline-140 changed to Eberline -                                                                      Annual Update                                Clarification of' instrument model 140N.                                                                                                                                                number.
PAGE 27        PAGE 22            Step 6 has been added; all                                                                              Annual Update                                Sample data non recorded on sample remaining steps have been re-                                                                                                                        submission form.
numbered.
                                                                                                                                                                                                                                                                                                                              .l
  .m-r.---. y .  .,_ws .. - , er                                                a      m.. v-    T e  --
4 - r--    - gr w    .
                                                                                                                                      ++ed-9    .er -=*  +-w--  '
1e e -
ve+
t- w- e vge  +~,7g...                                                ~-w-                  _, o-----i s.-s._._m._-_m_.i._.. s
 
SPIE RET. 1 VOLUME: PROCEDURES                              SECTION:            IP 2.5 4
AFFECTED      AFFECTED
          ~PAGES        PAGES REVm 1        REV. O                                                            CHANGE                              REASON                                    EFFECT P. 6          P. 5                                The words " Prompt Notification-                    !anual Update                            Reflects new title for IP 2.13.
System
* have been replaced with
                                                            'Public Alert and Notification System."
P. 7          P. 7                                Revision of step 5.2.2:                              FEMA Technical Assistance /              The information that used to be                ;
Radiological Health Advisor and                      Plan Review                              contained in two attachments has been ~_ ~
Technical Advisor refer to                                                                    consolidated'into a single attachment Attachment 1 in Rev. 1 rather than                                                            for easier use.
Attachment 1 and 2 in Rev. O.
P. 8          P. 7                                Step 5.2.3 has-been revised. RHA                    ASLB Hearing Commitments /              Change reflects the fact that the no longer reviews the " Estimated                    Stipulations                            Accident Assessment Coordinator is Evacuation Times for Massachusetts                                                            - not responsible for an evacuation Communities
* with the Accident                                                                time-estimate.                            ~ '
Assessment Coordinator.
[-P. 8                P. 8                              The attachment number in Step                        Annual Update                            Changes reflect renumbering of 5.2.8.A was changed from *5* to                                                                attachments after the deletion of
                                                          '4".                                                                                          Attachment 1, Rev. O.
    ;P. 9              P. 8                              Changes limited to attachment                        Annual Update                            Changes reflect renumbering of numbers.                                                                                      attachments after the deletion of Attachment 1, Rev..O.
P. 11        P. 11                              Step 5.5.1 changes limited to                        Annual Update                            Changes reflect renumbering of                  ;
attachment numbers.                                                                            attachments after the deletion of Attachment 1. Rev. D.
s
              -*      v *~<=t--          ~~Y      - *
* w*=5- =r+* -*-          e      e    "7
                                                                                                        *e-  **    *  -f<"' "e
* m -< +e --w- -r  w -e+ wvmw-='-+- m,--    +e-+*- -- =
* c~--
 
VOLUMEg PROCEDURES      SECTION:      IP 2.5 AFFECTED    AFFECTED PAGES      PAGES REV. 1      REV. O                    CHANGE                                          REASON                  EFFECT P. 12        P. 11        The words "and Accident Assessaient                ASLB Hearing Comunitments/ Ensures that the Assistant Offsite    c:
Coordinator" have been adled to                    Stipulations              Response Director.-Response step 5.5.4.                                                                  Implesientation provides an evacuation time estimate.to the Accident Assessment Coordinator who, in turn, uses.the time estimate in this PAR worksheet.
Reference section expanded.                                                  Additional references are applicaMe-to this procedure.
P. 13        P. 13        Revised Attachment 1.                              Annual dr. fate            New Attachment i replaces Attachments FDfA 7e@nical Assistancef  1 and 2 in IP 2.5, Rev. O. Thus,.
Plan Revity decision makers now refer to one attachment rather than two.
Corrected wind dependency placement on page and match PAR's to onsite PAR's.
P. 21        P. 20        ETE values in Attachment 3 have                    ASLB Hearing Comunitments/ Changes represent the most recent been revised..                                      Stipulations              evacuation time estimates.
p,      m  r,        y  ve  g-    -
                                                '*e" " ' - - '' F '""'f T * *    *    ' '
 
SPE REY. I VOLUME: PROCEDURES                    SECTION:      IP 2.6 AFFECTED                    AFFECTED PAGES            PAGES
;                      REY. 1            REY. 0 .                  CHANGE                                                  REASON                                          r.r r cAJ P. 2,                      P. 2,      Revised titles to match                                  FDIA Technical Assistance /                    Titles reflect revised attachments.
Contents                    Contents    attachments.                                            Plan Review P. 7                      P. 6        Revised to include reference to                          FEMA Technical Assistance /                    Ensures that the sampling strategy is Gtcp                        Step        IP 2.2.                                                  Plan Review                                    developed consistent with projected 5.3.1                      5.3.1                                                                Drills / Exercise Comments                      deposition.
P. 7                      P. 6        Added new Step 5.3.2.                                    FEMA Technical Assistance /                    Ensures proper sampling strategy is Step                      Step 5.3                                                              Plan Review                                    developed consistent with FDA 5.3.2                                                                                                                                            response levels.
P. 7,                      P. 6,        Renumbered step.                                        FEMA Technical Assistance /                    Clarify Accident Assessment-Step                        Step                                                                  Plan Review                                    Coordinator responsibilities and 5.3.3                      5.3.2                                                                Drills / Exercise Comments                      sequence of activities.                            -
(P. 6 Step
'.                                    5.3.5) t P. 7                        P. 6,      Renumbered step and reworded                              Drills / Exercise Comments                      Clarify Accident Assessment Stcp                        Step        sampling strategy review process.-                                                                      Coordinator responsibilities and 5.3.4                        5.3.3                                                                                                                actions.
i
        - P. 8                          P. 6,      Renumbered step and reworded                              Drills / Exercise Comments                      Ensures that the sampling teams Step                                                                                                                  receive appropriate information for Step                                    instructions to be given to Field
      ' 5.3.5                          5.3.4      Team Dispatcher regarding sampling                                                                        sampling activities.                                                      -
A-F                                      strategy.
P. 8                        P. 6,      Added new step (5.3.6) to ensure'                        Drills / Exercise Comments                    Reduces the possibility of j . Step                                Step 5.3    sampling programs are coordinated                                                                        duplication of efforts by various
!.5.3.6.                                            with other sampling groups.                                                                              sampling groups.
____,________-__1s____t_--_;___--        _        r _ "    =  f t v  W      C-'<a-ar-' m' " " *'* mu-          ve'- <  -1P=              ''e  f e *Y-'-  et-~  e $=v=  m -rw      4-w- -+,re---ee -e  ..ms_-- _ e e's--t
 
SPIE REY. 1
: VOLUME: PROCEDURES                  SECTION:            IP 2.6 AFFECTED            AFFECTED PAGES                  PAGES REY. 1                  REV. O                        CHANGE                      REASON                        EFFECT P. 8,                P.J7,          Identified attachments to be used    FEMA Technical Assistance /      Simplifies procedure by having a
    ' Step.            . Step-          for determining appropriate          Plan Review                      separate attaciument for each pathway.
5.3.8              -5.3.8          response levels.
P.:8                P.      7.,    Revised attachment number to match    FEMA Technical Assistance /    Ensure proper attachment is referred Step                Step          appropriate attachment.              Plan Review                      to by Accident Assessment 5.3.0                5.3.9                                                                                Coordinator.
P. 8. -            P. 7,          Revised attachment number to match  FEMA Technical Assistance /      Ensures proper attachment is referref
  . Step                  Step            appropriate attachment.              Plan Review                      to by Accident Assessment 5.3.10              5.3.10                                                                                Coordinator.
P. 9,'            P. 7          Revised attachment numbers; removed FEMA Technical Assistance /        Simplifies activities and ensures Step.                Step            specific item numbers for data      Plan Review                      proper attachment will be used.
5.3.11,              5.3.11,        entry..
A-H                  A-H
  'P. 10                  P. 8          Revised attachment numbers.          FEMA Technical Assistance /      Ensures proper attachments are Step-                Step                                                Plan Review                      referenced by Accident Assessment 5.3.12              5.3.12,                                                                              Coordinator.
5.3.13                5.3.13 P. 11                P. 10,        Added note referencing infant as    ASLB Hearing Commitments /        Ensures consistency with FEMA Attach 1 - Attach 1,                  critical segment of population..      Stipulations                    methodology.
Step 1A              Step 1A cnd 1B:              and 1B P. 13-16              N/A            Added derived preventative response FEMA Technical Assistance /    ~
                                                                                                              'Provides necessary information for Attcch 1,                              levels for drinking water and      _ Plan Review                .
completing assessment activities to Steps.2                              -vegetable foodstuffs.                ASLB Hearing Comunitments/        the Accident Assessment Coordinator.
'cnd 3                                                                        Stipulations
                                                - - -"'-"- "          ^ ' "
          .                  .um._  . -
: m.          ____..___f
 
4 SPIE REY. 1 VOLUME ' PROCEDURES -SECTION:            IP 2.6 AFFECTED      AFFECTED PAGES            PAGES REV. 1            REV. 0-                CHANGE                                            REASON                                          EFFECT
  , P. 17-32      P. 12-14    Made separate worksheets for P. 22,23 FEMA Technical Assistance /                      Clarify determination proces') and (Entiro                    determining protective actions for              Plan Review                                      ensures consistency with FEMA Attech-                    each pathway. Revised methodology              ASLB Hearing Comunitments/                      methodology.
ments)                      to reflect FEMA-REP-12 and 13                  Stipulations methodology.
P. 33-39      P. 15-21    Revised attachment numbers.                    FEMA Technical Assistance /                      Maintain consistency with procedural Plan Review                                      steps.
Annual Update P. 40          P. 24        Revised attachment number and added Annual Update                                                Provides needed information for
                              " Daily Consumption of Water."                                                                  completion of assessment activities.
      - ,,  ,.#  ,,-    ~                            -y      v. <-  y                    *        ~
w --' **- * * - -" * - - e*  ""* * +--*'------===e--- '---- - - -- - - - - - - - " " - -
 
SPIE RET. 1 VOLUME: PROCEDURES.                              SECTION:
IP 2.7
      'AFFECTED                      AFFECTED PAGES                            PAGES REV. 1                          REV. O                      CHANGE                                                            REASON                                    EFFECT i      P. 3, l.0                      P. 3, 1.0. Changed term from " medically home Annual Update                          Make consistent with terminology in bound
* to "home bound special                                                                            plan and special needs survey.
needs" individuals.
Changed activation level of                                        Annual Update procedure front " Site Area Make consistent with reporting levels-of special population / evacuation Emergency" to " Alert"                                                                                    support coordinators lP.-3,              2.3.. P. 3, 2.3_ Included in " day care centers
* Annual Update                          Correct previous ostission-                                              !
P. - 5,                      P. 5,                Deleted last sentence in step                                      Annual Update 5.2.2                        5.2.2 Instruction covered in new step 5.2.4 P . - 6. -                  P. 5,                Add phrase.to inform superintendent Annual Update                                                          Clarify Superintendent's                            '
                                                                                                                                                                                                                                              -i 5.2.3                        5.2.3                of notification to individual schools.
authority / responsibility over                                          '
Individual schools.
P. 6                        P. 5                  Added NOTE for.using local police                                  ASLB Hearing Comunitments/              Ensure thorough effort is made in departments'for~ assistance with off Stipulations-                                                          off-hours notifications.
hours notification to school.                                                                                                                                                      4 officials.
    - P . ., 6                                            Added step to' instruct liaisons to                                Annual Update                            Correct action sequence.
5.2.4                                              - use Appendix M to contact schools-
                                                          - for transportation needs
* verification..
' ' P. 6,                          P. 6                  Replaced, "When evacuation is                                      Annual Update
                                ~ 5.2.4 Correct action sequence by expediting 5.2.5                                              recomumended* with *as-                                                                                    - transportation coordination.
transportation need becomes available..."
  ..#.        . . - .      .r,                      s ,  ,  &  v  &,  ,,                              , , -S . - -.  ~.s                    %  . - ~ ~  v - v v      -.m. ____m__        mmm. . . <__m- _._ _,_ _ _ _ .- _ .._-.-.._-2
 
SPIE REY. 1 VOLUME: PROCEDURES                  SECTION:    IP 2.7 AFFECTED                  AFFECTED PAGES                    PAGES REV. 1                    REV. O                  CHANGE                              REASON                                                      EFFECT                                        -!
P. 6,                      P. 6      Reworded step.                        Annual Update                      Add clarity instruction; correct 5.2.6                      5.2.5                                                                                action sequence.
P. 7                      P. 6,      Insert " school" in reference to      Annual Update                      Clarify terminology; recognize 5.2.10                    5.2.9      Host facility.                                                            dedicated school host facility.
5.2.11                    5.2.10 P. 7                      P. 6,      Preceded steps with "upon              Annual Update                      Make consistent with functional 5.3.2                    5.3.2      direction'from the school                                                  responsibilities of school coordination
* coordinator and liaison.
    .P. 7,                  P. 6      Added note to allow telephone to        ASLB Hearing Commaitments/        - Ensure thorough effort-is made in 5.3.2                                ring at least 10 times;' retry.        S*.ipulations                      notifying schools /daycares:
P. 8                      P. 6      Deleted.last sentence referring to      Annual Update                      Step superceded by new NOTE added
    '5.3.3 E                  5.3.3 5      school's own bus drivers knowing                                          _ (see below) location of Reception Center.
P. 8..                P. 6        Added NOTE to regarding the            ASLB Hearing Comunitments/          Ensure that. school-contracted busses t 5.3.3                                  provision of route guides to those      Stipulations'                      can bel directed to Reception Center schools providing own                                                      and host school facility.
transportation.
P. 9                      -
Added step to have school liaisons      ASLB Hearing Comunitments/        Minimize time taken in notifying 5.3.6                                assist others.                          Stipulations                        schools /daycares.
y v 3,-g-. si y- gp e,    g          7            y - .-    e  v' 7' T    T        %          '
                                                                                                          '-*P W      "                          ''
                                                                                                                                  ----""2----a"^--'-----"          '-- '- ^- ----- ----'- - - ' - ----^--
 
SPfC REY. 1
-VOLUME: PRCCEDURES    SECTION:    IP 2.7 i
AFFECTED    AFFECTED PAGES        PAGES I
REY. 1      REV. 0                    CHANGE                                      REASON                                      EFFECT P. 10,      P. 8      Added reference to evacuation in                Annual Update                    Add clarity; recognize dedicated                                    ,
5.4.4        5.4.4    *EPZ'; added "special" to reference                                              host facility for special to host facility,                                                                populations.
P. 10        P. 8      Preceded step with "at a site area              Annual Update                    Clarify action sequence; recognize                              '
5.4.5        5.4.5      emergency": changed " standby" to                                                special vehicles report to staging                                '
                        " report" in reference to special                                                area at SAE.
vehicles.
t P. 10,      P. 8      Rewrite' entire steps to include                FEMA Technical Assistance /      Recognize priority scheme outlines-in 5.4.6        5.4.6      instructors or priority scheme used Plan Review                                  -plan / Appendix M.
for transportation requests.                  ASLB Hearing Constitments/                                                            '
                                                                    ' Stipulations P. 10-11,_  P. 8,    Added NOTE clarifying how priority              FEMA Technical Assistance!        Provide guidance on implementation of 5.4.6        5.4.6      scheme affect special needs                . Plan Review                          priority scheme.
individuals.                                    ASLB Hearing Comunitments/
Stipulations P. 11        P. 8      Replaced, 'if* with'* extent of"              Annual Update                      Minor edit changing tome of 5.4.7        8.4.7    door to door notification.                                                        Instruction notifications being a possibility to an anticipated action.
P. 11        P. 8      Inserted, "by State / local                    ASLB Hearing Comunitments/          Make consistent with MDPH's policy on--                            '
5.4.8        5.4.8    officials" in referring to where              Stipulations                        KI.                                                                ,
the requests for KI.
                                                                                                      .    ,    =__. _ _ _ _ _ _ _ - _    _ - , _ . - - _ .  . _ _ _ _ -
 
SPIE REV. 1
    - VOLUME: PROCEDURES                                SECTION:            IP 2.7
*~AFFECTED                AFFECTED PAGES-              PAGES REY. 1              REV. O                                            CHANGE                          REASON                                      EFFECT P. 11',            P. 8,                          Insert "special" in reference to      Annual Update                              Clarify teratinology; recognize
: 5.4.11              5.4.11                          host facility.                                                                  dedicated host facility for special, populations.
P. 12              P. 9                            Removed "special facility listing"    Annual Update                            - Make consistent with reformat of
    . 5.5.2              5.5.2                            in reference to Appendix M.                                                    - Appendix M.
    - P. 12,              P. 9                            Added note to request local police    ASLB Hearing Commaitments/                Ensure thorough effort in made in 5.5.2                                              department assistance with off-        Stipulations                              notifying special facilities off-hours notification of special                                                    hours.
facilities.
P. 12,            P. 9,                            Inserted. *1f requested by            ASLB Hearing Comunitments/                Make consistent with MDPH's policy on 5.5.3            5.5.3                          ' State / local officials' in referring Stipulations                              KI.
to requests for KI.
P. 12,            P. 9,                          - Added instructions for une of          FEMA Technical Assistance /              - Recognize priority scheme established 5.5.4              5.5.4                            priority scheme in Appendix M.        Plan Review                              for special populations.
ASLB Hearing Comunitments/
Stipulations P. 13              -
Added note to let phone ring 10      ~ ASLB Hearing Comunitments/ '              Ensure thorough effort is made 5.4.4                                                times, retry.                          Stipulations                            . notifying special populations.
4
    . rs _.w_- _z._    _  __z_m.__..__-_._____c______      _o  m o r -
* 4        ***'>r          T    w#''*    ~ -
* r    - + =e cr- g wv v y .ew we a- w, , --  _ ~-csi ,. %
 
SPIC REY. 1 VOLUME: PROCEDURES                  SECTION:    IP 2.7 AFFECTED            AFFECTED PAGES            PAGES REV. 1            REV. O                      CHANGE                                  REASON                      EFFECT P. 9            Deleted step.                            Annual Update                Make consistent with functional S.5.6                                                                                  responsibility of special population        '
liaisons. Step covered by 5.4.7 (Special' Population coordinator).
,    P. 14-16            P. 11-          Complete revision:                        ASLB Hearing Comunitmentsf. Overall enhancement to scripts;
-    Att. 1              Att. 1            enhanced instructions / script          Stipulations                  provide more detailed instructions (entire).            (entire)        - added script for sheltering                                          for liaisons to compensate for those-instructions.                                                          schools who may have accepted support
                                          - added script for evacuation                                          plans.
Instructions
                                          - clarified EBS instructions.
P. 17                P. 12,          - added phrase to ensure schools          Annual Update                                              ~
Ensure these parents will be notified Att. 2                Att. 2        outside the EPZ ensure parents of-                                      that their children will be retained affected-school children are                                            at the school.
notified.
i' clarified EBS instructions.
i'
  . _ . _ - , _ . _ . -    _,      __        ,      _    _    . . _ , .-        .  ..            .    . + . ,  ...    . . . . . _.,      u _ . _ _
 
SITE RET. 1                                                                                                                        ,
VOLUME: PROCEDURES    SECTIONr        IP 2.7
  .AFFECTED  AFFECTED
      -PAGES      PAGES REVm '1    REV. O                      CHANGE                                                      REASON                                                    EFFECT P. 18-20,  P.'~13-14    Complete revision:                                              Annual Update                                          Overall~ enhancement of script;                                        ;
Att. 3    Att. 3      - added Alert                                                  ASLB Hearing Comunitments/                              recognize Special Needs Survey;
  -(entire)  (entire)    -
refer.to info received on                                Stipulations                                            provide more detailed guidance for-Special Needs Survey for                                                                                                liaisons to provide complete PAR verification.                                                                                                          Information'to facilities and
                            - specified sheltering instructions                                                                                    individuals; accomanodate differences for facilities and individuals                                                                                          in instructions for facilities and
                            - specified evacuation instructions                                                                                    individuals for effective PAR for facilities and individuals                                                                                          implementation.
                            - added to script, offer to provide ASLB Hearing Connaitments/ -
any other assistance to special                                Stipulations populations.
    .                ....          ,  ,                  . .._                        .'    ,        s. , , - , . . -                    .% . _m,,.,...4m.....    ..  .,;..-.m_ . _.. _ . . _ _ _ _ __ . _ . __. .x~
 
SPIR: REY. 1 VOLUME: PROCEDURES  SECTION:                IP 2.8
.AFFECTED  AFFECTED' PAGES    PAGES REV. 1    REY. 0.                              CHANGE                                            REASON                EFFECT P.~6      P. 5      Step 5.1.2.D (Rev 0) has been                                      Annual Update 4
Ensures-that Radiological Health incorporated into the caution box                                                        Advisor is fully aware that the in Rev 1.                                                                                Offsite Response Director's approval is.needed for personnel exposures beyond 25R' .
P. 8      P. 6      New Step D has been inserted:                                      Annual Update        Ensures dosimetry'is distributed to remaining steps have been re-
                                                                                                                - evacuation bed bus drivers and route lettered appropriately.                                                                  guides who report to the Shriners-Auditorium.
P.'O      P. 7      Step 5.2.5.D.3 (Rev 0) has been                                    Annual Update          Emphasizes the fact that Radiological' incorporated intc a caution box'in                                                        Health Advisor and Offsite Response Rev 1.                                                                                    Director must approve exposures-
                                                                                                                'beyond emergency worker limits.-
P. 12:    P. 10      1. The words " VANS Operators and                                Annual Update          1. Exposure tracking responsibility Helicopter Pilots" have been of the Accident Assessment inserted into step 5.3.1.                                                            Coordinator now expanded to include VANS Operators and Helicopter Pilots.
: 2. Step 5.3.1.A has been reworded.                            ' Annual Update              2. Change identifies other personnel involved in relaying exposure information to the Accident Assessment Coordinator. Also ensures. exposure control and exposure tracking for these field personnel.
                                                                                                              ~
 
SPIE REY. 1 VOLUME: PROCEDURES                  SECTION:      IP 2.8 AFFECTED        AFFECTED PAGES          PAGES REV. 1        REV. O                            CHANGE                                          REASON                                  EFFECT                                                  i P. 13            P. 10                  1. The words " VANS Operators and            Annual Update                            1. Reinforces Accident Assessment Helicopter Pilots" added to                                                              Coordinator's expanded steps B.2 & C.1.                                                                        responsibility for exposure tracking.
: 2. Step C.2 has been reworded.              Annual Update                            2. Change makes procedure step                                            ;
applicable to VANS Operators                                        '
and Helicopter Pilots.
,                                          3. The words ' field data
* have been Annual Update                                    3. Changes makes procedure step replaced with " Assignment (s)*                                                          applicable to VANS Operators and                                      ,
and " Field Monitoring Teams'                                                            Helicopter Pilots.
replaced by "Bnergency Workers".
P. 13            P. 11                Step D 3 has been incorporated into Annual Update                                      Baphasized the fact that Radiological the caution box.
Health Adviser and Offsite Response.                                          '
Director must approve exposures beyond emergency worker limits.
P. 14            P. 11                ' Field Monitoring Teams' replaced            Annual Update                          Change makes procedure step by *Bnergency Workers' in step E,                                                    applicable to VANS Operators and
                                      - and the words 'and instruction to                                                      Helicopter Pilots.
the VANS Operators and. Helicopter Pilots through the Radio Operator' have been inserted in step F.
  - P. 38 .          P. 3                Directions for recording exposures            Annual Update                          Clarifles how and when emergency.
have been added.                                                                      workers record their dosimeter readings thereby enhancing the
: l.                                                                                                                              exposure control aspects of the SPMC.
y O
y-c.. _
                .g3  .sy -.s  y, -%3..,,,,e        c      ,      -4    v - -y.. y- t 3          -  < t s- = -= -*
* e-    gr  *e    ,-    e== m - __.-. -m_2---m--. w---------= -- --- -+
 
SPE REV. 1 VOLUME: PROCEDURES  SECTION:          IP 2.9 AFFECTED  AFFECTED
      ~PAGES      PAGES
      -REV. 1    REV. O                    CHANGE                                    REASON                    EFFECT P. 5        P. 5        Note box added regarding              ASLB Hearing Connaitments/ . Change gives the reassignment of monitoring            Stipulations                    Monitoring / Decontamination Leaders personnel.
the flexibility to reassign personnel as necessary to cover all monitoring trailer-related activities during an emergency and to control the flow of evacuees.-
    - P. 6      P. 5          - Number of Monitoring /              ASLB Hearing Comunitments/      Provides adequate staffing of trailer Decontamination Personnel changed      Stipulations                    based on a re-evaluation of expected  '
from " fourteen" to " twenty-four."                                    evacuee load at the trailers and
                              . Number of personnel assigned to                                      allow for rotation of personnel.      i decontamination area has been increased from two to three.                                                                            -
                              . The words *or equipment which becomes contaminated during Monitoring / Decontamination
                          . activities
* have been added to step 5.2.10.
P. 8        P. 6      Step A reworded and note box added. Annual Update                      -Procedure now identifies how Reception Center Leader obtains an    i ambulance end how the                  '
Monitoring / Decontamination Leader obtains information for use of protective clothing by the ambulance crew.
i Y
_ . . . . _ .      , J ._          ._,      _    _ . _ .
 
SPE REV. 1
    - VOLUME: PROCEDURES  SECTION:            IP 2.9
    . AFFECTED    AFFECTED PAGES      PAGES REV. 1    REV. O                      CHANGE                                REASON                                      EFFECT P. 8        P. 7      A new step 5.2.16 has been              ASLB Hearing Commitments /                        Reinforces the fact that special inserted.                              Stipulations                                      population evacuees who cannot be decontaminated at the Reception Center are transported to an MS-1 hospital for decontamination.
P. 9        P. 7      The words "and if the individual        Annual Update                                    Contaminated evacuees are provided would like to be examined by a                                                            referral / transport to an MS                              physician" have been added, and                                                          hospital for a physician's exam when step C has been added.                                                                    decontamination ef forts at the -
trailers have been unsuccessful.
    - P . 9 c, 10 P. 7      Step 5.2.18 and step 5.2.18A            ASLB Hearing Commitments /                        Shower capability of trailer can now through F have been added.              Stipulations                                      be supplemented through use of additional showers at the Reception Center.
    ' P. 10        P. 7      " Yankee Mutual Aid Plan" has been      Annual Update                                    The change corrects the title of the-replaced by ' Yankee Emergency                                                          - agreement.
Mutual Assistance Agreement."
P. 11      P. 8      . "(uncontaminated)" has been          Annual Update                                    Reinforces that the use of the word inserted into step 5.2.23 A.                                                                " clean" means " uncontaminated.'
                            . The words "the specified" has        Annual Update                                    . Enhances contamination control replaced "a''in steps 5.2.23 C and                                                        aspects of-SPMC by reinforcing the 5.2.23 F.                                                                                  fact that contamin ted items are placed in a-specified area.
3 f
v..,.-                  c            w _ . e- f  .,r-- ,-. - - . -  -
                                                                          'a+-' y----rv  c ---<r y--' 3 p-
* e-  + y    &<- -wy-
* _. __ _ . _
x .m_- -_-m-A-n i u.
 
SPE REY. 1
      .. VOLUME: PROCEDURES              SECTION:      IP 2.9 AFFECTED      AFFECTED PAGES            PAGES REV. 1.          REV. O                    CHANGE                                                        REASON                                            EFFECT P. 12        P. 8                - Step 5.3.7 A revised.
Identifies that a person is assigned'                    .
i                                                                                                                                                  as lead specifically for trailer activities.
                                          - Step 5.3.7 C revised.
Identifies that'a person is assigned                        i as lead specifically for vehicle
                                                                                                                                                  -monitoring activities.
P. 12          P. 9              The word " assist" has been added to Annual Update                                                      Reinforces that personnel can be                            -
step 5.3.10.                                                                                            reassigned tasks as required to ensure all activities are properly-staffed.
    -P. 13            P. 9              The words "and assistance" have                                Annual Update been added.
Reinforces,the fact that monitoring personnel.and EMT's work together when attending an injured person.
P. 13          P. 10              Step 5.3.11 D has been revised.                                Annual Update                            Clarifles that Monitoring / Decontamination Leader rather than Radiological Health Advisor notified when emergency worker is injured at EWF.
    .P. 14            P. 10              Steps 5.3.12 A and B have been                                Annual Update                            Steps A and B have been revised to revised; reflect a. logical sequence of action.
Step 5.3.12 C has been added.                                                                            Emergency workers now referred /-
transported to an MS-1 hospital for a physician's exam when decontaMnation efforts are unsuccessful.
e
        ,    n ,  ,
                        +-7.        w .      , +    u-e v        3*- r  "-e'                          *' -'w.~' -    "
w w- - + ---- - - -      -------------w - - - - =    - - - " - - - - - - - - - -
 
SPIE RET. 1 VOLUME: PROCEDURES    SECTION:            IP 2.9 AFFECTED. AFFECTED PAGES      PAGES
      'REV. 1    REV. O                        CHANGE                                    REASON                                            EFFECT P. 14      P. 10        " Yankee Mutual Aid Plan" has been          Annual Update Correction to assistance agreement changed to " Yankee Emergency Mutual                                                          title.-
Assistance Agreement."
P. 15      P. 11        *the specified" replaces      "a" in      Annual Update                                    Reinforces that the controlled area 4
step 5.3.17 C and E.                                                                          is specified by Monitoring /
Decontamination Leader.
The words " turn the instrument on          Annual Update                                    Clarifies instructions for equipment.
to" have-been inserted in step-                                                              check.
5.4.1 A.
The words "if necessary" have been Annual Update                                    Provides flexibility to the added to step 5.4.1 A.                                                                        procedure.
* P. 16      P. 11      Revision of step 5.4.1 D.                    Annual Update                                    Correction of typographical error.
Revision of step 5.4.1 E.                    Annual Update                                    Clarifies instructions for setting response of Bicron meter.
  - P. 18      P. 13      Revision of step 5.4.4 C.                    Annual Update                                    Clarification of decontamination process for special population.
i-i 3      ,      ,m.--.  . . - - .,*..                e      -wy                c- e g.. r-- %  y        y  ----s ,:w., .      ....,.-s-.,,. ,  # ., ,4 m .,,._-_m.. ,. m_we -
 
SPIE RET. 1
~ VOLUME: PROCEDURES    SECTION:        IP 2.9 AFFECTED    AFFECTED PACES-      PAGES REY. 1      REV. 0-                    CHANGE                                        REASON                                                EFFECT
.P. 19        P. 13      Revision of step 5.4.5 B.                          Annual Update                    Clarification of how students are processed through the Monitoring Trailer.
:P. 19        P. 13, 14 -Steps 5.4.6, 5.4.7 and 5.4.8 have                  Annual Update                    Change provides clarification of-been inserted.                                                                        actions required for shift-turnover / relief and for completion of-dutios.
4 P. 20        P. 14      Text in parenthesis added to step                  Annual Update                    Clarifies that Monitoring /
5.5.3 B.                                                                              Decontaminatien Personnel provide informatica to evacuees who have contaminated articles.
New step 5.5.3 C has been                          Annual Update                    Directions are now provided for the inserted.                                                                            distribution of the multi-part-Personnel Contamination Report.
'P. 21    P. 14      Text in parentheses added to step                  Annual. Update                  Adds. clarification for recording 5.5.2 D.                                                                              Information.
P. 22      P. 16        The words "and request if the                      Annual Update                    Reinforces the fact that individuals.
                                                                                                                                                                                                ~
individual would like to be                                                          who cannot be decontaminated are examined by a physician" have been                                                    offered medical treatment.
added.
      ==  r -                          ..,t                          , *    '+a.4    ,    r - ,-  , ,,o+.-,.,,  v._m_.___._m,__.___m._.m,__m,,,,_,m , _  ._,_.m.. , _ . ___ _,,, ___m._,_.
 
SPIE REV. 1
      - VOLUME: PROCEDURES                            SECTION:                IP 2.9 AFFECTED                    AFFECTED PAGES                      PAGES
            'REV 1                        REV. O                              CHANGE                                                          REASON EFFECT P.'23                        P. 16            Revision of step 5.5.7 D.                                            Annual Update                                Clarifies that arrangements and                              !
referrals are made by ORO for individuals who cannot be decontaminated.
: p. 25                        P.        17    The words 'and passengers as they"                                    Annual Update have been added.
Clarifies that hand and foot frisks'                          ;
are performed on all individuals.
exiting the vehicle decontamination area.
P. 28                        P. 20            Text in parentheses added to step                                    Annual Update                                Clarifies that ORO documentation is 5.8.3.A.2.                                                                                                          kept.
P. 28                        P. 20            Revision to step 5.8.3.A.4.                                            Annual Update                                Clarifies the procedure step.
I t
n y  v-.-      --m-ps # ,r .ww,-        .w--p  y    y w-w- y :7 -  g .r- y'          -.w            - w <v7'-^* *'
* gg --
r=*
                                                                                                                                                  .ev= -y      - v e-  wr.  -g e -w--5-~ w      w --,-w -
                                                                                                                                                                                                            - = .- 41 + - w = nm, ie.'. .
 
SPIE REY. 1 VOLUME: PROCEDURES                    SECTION:        IP 2.10 AFFECTED            AFFECTED
      ' PACES                  PAGES REV. 1                REV. O                        CHANGE                                                        REASON                                                      EFFECT P. 4'                P. 3                Removed reference to reporting                        Annual Update                                          Remove duplicate inforsuttion, see
  ' 2.2-                2.2                location for bus dispatchers.                                                                                Plan, section 2.0.
: P. 4                P. 3                Added Host Facilities as a                          Annual Update                                          Recognize Host Facilities as a 2.3                2.3                  destination for bus drivers.                                                                                destination for evacuation buses.                  I P. 4-              P. 3                Added responsibility description                    Annual Update                                          Assign responsibility for evac. bed
  .2.4                2.4                  for those Route Guides assigned to                  ASLB Hearing Comunitments/                              bus equipament installation and evac. bed bus operations.                            Stipulations                                          guiding certain buses recognize resources needed to support evac.
bed bus operations.
P. 4                P. 3                Added Special Vehicle Dispatcher                    Annual Update                                          Assign responsibility for dispatching 2.5              - 2.5                  responsibilities associated with                    ASLB Hearing Comunitments/                              evac. bed buses; make consistent evac. bed bus operations.                            Stipulations                                            with functional responsibilities of Special Vehicle Dispatcher.
P. 5                P. 3                Replaced " Ambulance / Van
* drivers                  Annual Update                                          Encompass other special vehicle 2.6                2.6 with *Special vehicle" drivers.
drivers in this responsibility (i.e.,
wheelchair van drivers, evac. bed bus drivers, etc.).
P. 5-            ' P. 3                Removed reference to-assigning bus                  Annual Update                                            Make consistent with' functional 2.7              - 2.7                  routes and added dispatching road                                                                            . responsibilities of Transfer Point
                                          . crews as responsibilities for                                                                                Dispatcher.
Transfer. Point Dispatcher.                                                                                                                                      .;
  . P. - 5          : P. 3                . Inserted "or other bus                              Annual Update                                            Recognize possibility of using                    ''
2.9                2.9-                mobilization areas
* in reference to                                                                          alternate staging location such as Staging Area Leaders responsibility                                                                          - Northern Essex Commuunity College.
for specialized briefings.
1 4
        ,..-_f  y.g.ie,._,.w. .g    .,c. [.,,--    y%s.y=      , + , - - - + , , . , <
                                                                                          - , , - +- ,      e-y. p ,, or      +-e.-  w w r _ z___  __--.___m-    - - - - ,- . - . . --    - . - - --
 
SPIE REY. 1
    ' VOLUME: PROCEDURES                                    SECTION:    IP 2.10 AFFECTED                                    AFFECTED PAGES                          .PAGES REV. 1                            REV. O                CHANGE                                                              REA",0N EFFECT
    - P. 6                                        P. 5      Added note regarding new Attach. 12 Annual Update 5.102                                      5.1.2    for expedited bus mobilization Recognize use'of new plannirg ASLB Hearing Coneitments/                    concept.
scheme.                                                            Stipulations P. 6                                      P. 5      Added note regarding initial                                      ASLB Hearing Commitments / .                Provide Bus Co. Liaison with guidance 5.1.3                                      5.1.3      notification of bus. companies by                                Stipulations                                on new planning concept.
Melita.-
P. 6                                        P. 5      Included " Evac. Bed Buses" in                                    ASLB Hearing Commitments /
    '5.1.3.B                                      5.1.3.B Recognize provision of evac. bed                                    ~
instruction for obtaining vehicle                                Stipulations                                buses by certain companies.
availability status.
  ' P. 7                                        P. 5      Included " Evac. Bed Buses
* in                                  ASLB Hearing Commitments /                ' Recognize need for Evac. Bed Buses 5.1.3.D.                                    5.1.3.D    instruction for obtaining vehicle
.;                                                                                                                            Stipulations                                by special populations.                            '
needs.
P. 8 ~                                      P. 6      Added note explaining priority FDfA Technical Assistance /                  Provide Bus Co. Liaison guidance on 5.1.3                                        3.1.3    scheme for transportation                                          Plan Review use of priority scheme outlined in                                  .l resources.                                                        ASLB Hearing Commitments /                  SPMC and App. M.
Stipulations P. 9                                        P. 6      Rewrote step detailing allocation                                  Annual Update                                                                                                      -
4                                                                                                                                                                          Provide clarity on Route Guide 5.1.3.I                                      5.1.3.I  scheme for Route Guides.-                                                                                      resource allocation.
P. O                                        P. 6      Removed " Qualified" in reference to Annual Update                                                            Assignment of qualified drivers
  ;5.1.4.B                                      5.1.4.B  drivers..
'                                                                                                                                                                          addressed previously in step 5.1.3B (remove duplicate info).
Direct VANS / Wheelchair Vans to                                  Annual Update                              Expedite the dispatch of these report to Staging Area as opposed                                                                              vehicles to the Staging Area.
to being on standby.
i e
.            *-r%,
* e  -  w      ~
p +c- - ,-            --w  wv    vw ~ * -    g- --a    . v6e-, -g          .  -m'  . , - .._-s _      2_ __m_2. m. , . _a-m  m .---- - --
 
SPMC REY. 1 VOLUME: PROCEDURES                                SECTION:          IP 2.10 AFFECTED                          AFFECTED PAGES                        PAGES REV. 1                        REV. O                                      CHANGE                                                                      REASON                              EFFECT P. 9                              P. 6            Added step providing instruction                                                            ASLB Hearing Commitments /              Provide guidance to. Bus Co. Liaison 5.1.4.C                          5.1.4            for evac. bed bus ~ providers.                                                              Stipulations                            for mobilizing evac. bed bus resources.
P. 10                              P. 6            Made-editorial changes to this                                                              Annual Update                            Provide clarity in procedure step.
5.1.4.E                            5.1.4.C          step.
P.-10                              P. 6            Added note to track Route Guide                                                            ASLB Hearing Commitments /              Ensure ~ Route Guide resources are made 5.1.4.E                            5.1.4            needs for schools providing own                                                            ' Stipulations                            available to. schools providing own transportation..                                                                                                                    transportation.
                                                                                                                                                                                                                    ~
                                                                                                                                                                                                                                                    -[
P. 11                            P.~7              Removed verbiage in step describing Annual Update-                                                                            .
Eliminated duplicate info on priority                j 5.1.5.A                          5.1.5.A          priorities for assignment of buses- FEMA Technical' Assistance /                                                                    scheme as Attachment I was..                          ?
(priorities covered in Attach. 1).                                                          Plan Review            _
reorganized according Jto the. priority
                                                                                                                                                      'ASLB Hearing Conunitments/              scheme outlined'in the Plan.
Stipulations P. 11                            P. 7            Added instruction to request ETA of Annuel. Update                                                                                  " Assist in establishing overall ETAs 15.1.5.B                              5.1.5.B          buses.                                                                                                                              ' of buses to. pick up locations.
                                                        -Added instruction to~ ensure buses                                                          Annual Update                            Prevent buses from. attempting to from yards in evacuated area do
                                                                                                                                                                                                          ~
return to Restricted Area.
not return to yard,r but instead go to Reception Centers.
P. 11                              P. 7            Included instruction to' estimate                                                          Annual Update                            - Provide ETA of buses to 5.1. 5. C -                          5.1.5.C          time of arrival to pick up                                                                                                            schools /special facilities.
locations and to provide this,.
estimate to. Spec. Pop / School / Evac.
Support Coordinators.
                                                                                                                                                                                -'mmmmess--'n          -
                                                                                                                --'+'-**--aa--'* * - - =- ' = ' -M-        w'- '- -'-e'mh-m
                                                                            -- dh-w-d-=rtra--  #---rm:sme'ew +-
n-: +-d.,ausn---.ea-'        -en *s. m... -a-J --- N
.--mm    wh +r e                          - .
 
s SPIE REY. 1
' VOLUME: PROCEDURES SECTION:            ~ IP 2.10                                                                                                            >  >
AFFECTED              AFFECTED PAGES                    PAGES REV. 1                  REV. O                          CHANGE                              REASON                              KFFECT
'P. 12                                                                            -Annual Update                          Standardize Staging Area reportingi
                                                  ~
P. 8          Instruct Bus Dispatcher to obtain.
5.2.1                5.2.1        dosimetry upon arrival at Staging                                                    and dosimetry issuance process.
Area.
P. 12                P. 8          Remove reference to dosimetry                Annual Update                          Standardize Staging Area reporting.
5.2.2                5.2.2          issuance (see 5.2.1 above).                                                          and dosimetry issuance process.
P. 12                P. 8          Added note regarding new Attachment Annual Update                          .
Recognize use of new planning-
: 12. Expedited Bus Mobilization              ASLB Hearing Conmiitments/            - concept..
                                    -Scheme.                                      Stipulations
                                                                                                ~
P. 13                'P. 8          Rewrote step.to summarize                  -Annual Update                            Eliminate extraneous info in 5.2.3.A      instruction.                                                                          Instruction.
5.2.3.A                                                                                                                                              .
P. 13                  P. 9          Removed reference to priority.              Annual _ Update                        ' Attachment 1. establishes bus need 5.2.3.C                5.2.3.C      Referenced. revised attachment              FEMA Technical Assistance /              priority.
number (Attachment 3 vs. 4).                Plan Review                .      .
                                                                                                                          ' Clarify reference to revised
                                                                                  ~ASLB Hearing Commitments /              attachment number for bus driver Stipulations                            procedure.
P. 13-                  P. 9        Added instruction on limiting' bus            ASLB Hearing Commitments /-              Provide instruction on convoy limit.
5.2.3.D                5.2.3.D        convoys to 20 vehicles.                      Stipulations P. 13                  P. 9          The words ' Day Cares" have been            Annual Update                            Include previously omitt+.1 info.
5.2.4.B                5.2.4.B      added.
P. 14                  P. 9          Added instruction to ensure buses'          Annual Update                            Prevent buses from attempting to, 5.2.4.C                5.2.4.C      from yards in evacuated areas do                                                      return to Restricted Area.
not. return to yard, but instead go to Reception Center.
_ _ _ _ _ _ ___%-  ---m-_.--.*
                                        ._.u, -.-  -- -    .---+--eE-eAa - - -
                                                                                                    -w,r---..
v
 
SITE REY. 1
  ; VOLUME: PROCEDURES                  SECTION:    IP 2.10 AFFECTED                  AFFECTED PAGES                      PAGES REV. 1                    REV. O                  CHANGE                                REASON                            EFFECT P. 14                      P. 9      Added.'To the bus-yard" in              Annual Update                        Add clarity to procedure step.
5.2.4.D                    5.2.4.D    reference'to requesting equipment.
P. 15                    P. 10      Instruct-Special Vehicle Dispatcher Annual Update                            Standardize Staging Area reporting 5.3.1                    5.3.1      to pick up dosimetry upon arrival                                            and dosimet ry issuance process.:
at Staging Area.
P. 15                    P. 10      Changed name of location from          Annual Update                      Accurately reflect function of room.
5.3.2                    5.3.2      " Ambulance / Van. Area" to "Special Vehi:::le Area."
4 P. 15                      P. 10      Added new step recognizing Lead        Annual Update                      Provide guidance on coordination of-5.3.3                                  Route Guide position and.              ASLB Hearing Commitments /          evacuation bed bus operations.
evacuation-bed-bus operations.          Stipulations P. 15                    P. 10      Added step instructing Spec.            ASLB Hearing Comunitments/ -        Ensure that.TDD is monitored for 5.3.4                                Vehicle Dispatcher to check fcr          Stipulations-                      requests for assistance and-forwarded incoming messages on TDD.                                                    to appropriate individual.
P. 15-                    P. 10      ' Included evac. bed bus certified      Annual Update                      . Recognize evac.' bed bus operation-5.3.5                    5.3.3      - Route Guides. Referenced new.        - ASLB Hearing Comunitments/ .        and provide guidance on use of' form.
                                        --attachment number;of spec. vehicle. Stipulations .
dispatch team.(formerly Attachment 5).
Removed reference to changes'.in.      Annual Update                      -Reformat condition into note format.
Info (put into note format, ee below).
Deleted note on priority listings.      Annual Update                      'Information covered in new step 5.3.7.
                                                                                                                ~
L,            - ._.                  T    :      = - . -      -        -  =--                      - - - ---
 
_ ._ _ _ _ _ _ _ . _ , _ _ ~ . _ . . _ _ _ _                                              _ _ _ . . .                    _                  _ _                            .                ..
SPfC REY. 1 VOLUME: PROCEDURES                                          SECTION:            IP 2.10 AFFECTED                              .AFFECTED
              -PAGES                                    PAGES REV. 1                                REV. O                                          CHANGE                                                                                REASON                                                            ' EFFECT
      .P. 15                                  P. 10                  Added step instructing Special                                                              Annual Update
;-5 3.6                                                                Vehicle Dispatcher to provide Lead                                                                                                                                Provide! instruction.on. info transfer.
ASLB Hearing Commitments /                                          - regarding evaci bed bus needs and-Route Guide with evac. bed bus                                                              Stipulations                                                          dispatch.
dispatch needs.
P. 16                                  P. 10                  Added step' instructing Special                                                            Annual Update
                                                                                                                                                                                                                                                            ~
Provide instruction on assignment of' 5.3.7                                                          Vehicle Dispatcher to confirm                                                                                                                                      host facilities.-
availability of host facilities and make appropriate assignment.
      'P.            16                        ---
Added note providing instructions                                                          Drills / Exercise Comments'                                            Provide guidance for the transfer of.-
on those evacuees who require                                                                                                                                      evacuees requiring medical medical care.                                                                                                                                                      attention..
,      P. 16                                  P. 11                  Changed provision of an ambulance                                                          Annual' Update                                                        Reflect Plan change regarding 5.3.9                                  5.3.5                  at each Reception Center to the-                                                                                                                                    reallocation of vehicles.                                                                    .
provision of a van at each                                                                                                                                                                                                                                      .j Reception Center.                                                                                                                                                                                                                                '
P. 16                                  P. 11'    .
Replace " ambulance / van" drivers                                                        :
Annual Update'                                                        Make' reference more. generic!to'                                                      '
5.3.10A                                5.3.6.A                with " vehicle" drivers.                                                                                                                                            recognize-all special vehicle
                                                                                                                                                                                                                                        - drivers.
                                                                                                                                                                                                                                                                            ~
.                                                                                                                                                                                                                                                                                                                                        i
,                                                                    Reference the revised attachment                                                            Annual Update                                                          Update references to match revised number.                                                                                                                                                            ~ attachment numbers.                                                                        -I
    -P. 16,                                  P.'11,                  Added' step to report special~                                                              - Annual Update'
                                                                                                                                                                                                ~
                                                                                                                                                                                                                                                                      ~
Provide more detailed' guidance 5.3.10B                                5.3.6                  vehicle availability to Special                                                                                                                                    - accommodating special vehicle                                                              -
                                                                    - Pop. Coordinator.                                                                                                                                                  . availability.and needs.
i 4
a.
____-.            .p__--                  ..s-. . ,    me-    m-<.m.-    a g-s*.        ,%--.            e-            .a-- -- *,m .=y-*.  .,e- =4 o=f    sum
* Am,-v'F--g-    m wv +
* g *-: ve*~  9ye -p g-a'-  v  a +ty ar  -e eg.->v*,4-yw-a    F      tg y y-    - -w. +aba,+-.g- -r+-+-g,- m wy .      ,+,vr'^r  e-
 
SPEC REY. 1
- .VOI.UME: PROCEDURES                                      SECTION:          IP 2.10 AFFECTED                        AFFECTED PAGES                          PAGES REV. 1                          REV. O                                      CHANGE                                REASON                          EFFECT P. 16-                          P. 11                        Added step to update special              Annual Update, ASLB Hearing        Provide more~ detailed guidance
  '5.3.10C                        5.3.6                        vehicle needs including evacuation        Commitments / Stipulations        ' accommodating special vehicle bed buses.                                                                    availability and.needs.
P. 17,                          ---                        Added step to keep apprised of            Annual Update                      Ensure host: facility availability and 5.3.10D                                                      status of host facilities.                                                  assignments are tracked.
P. 17,                          P. 11,                      Reference the revised attachment          Annual Update                      Update references to match revised.
5.3.10E                        5.3.6C                      number.                                                                      attachment numbers.
P. 17,                          P. 11                      Added step to brief ambulance              Training Comments. Annual.        . Ensure-ambulance drivers are properly
.5.3.10F                          5.3.6                      attendants and request they review ' Update                                  briefed and are provided guidance fors the standing orders (Attachment 7).                                          . management of contaminated and
                                                                                                                                            --injured patients.
' P . .- 17,                      P. 11,                      Changed ' ambulance" to " van" in.        ~ Annual Update                    Reflect reallocation of vehicles.
5.3.10H                        5.3.6E                      instruction to dispatch the vehicle to'the Reception Center.
P. 17,                          P. 11,                      Added step to dispatch evacuation.          Annual'. Update, ASLB. Hearing    Incorporates use of-evacuation bed 5.3.11B                        5.3.7                      bed buses.                                  Commitments / Stipulations    . buses ~.
P. 17,                          P. 11,                      Reviced instructions oniassigning    ~
Annual Update.                    Eliminate duplicate information on=
5.3.11C                        5.3.7B'                    drivers using Special Vehicla'                                                ' priority scheme;. simplify'.
Dispatch Form.                                                                instructions for this task..
P. 18. .                        P . 12, -                  Added " provide driver a telephone        . Annual Update                    ; Ensure drivers have a mechanism:for-5.3.11E                          5.3.7D                    number to'use."                                                              = reporting back to Special Vehicle-Dispatcher.
P-
                                                                                          ' - ~ ~  '
9      .. . - _ _ . _ _ _ _ _ .        :' -
                                        -"n.-''* *- - * ' ** ' ' ' * ' ^ * '
 
SPIE REY. 1 VOLUME: PROCEDURES      SECTION:            IP 2.10 AFFECTED  ~AFFECTED
        .PAGES.    'PAGES REV. 1      REV.-0                            CHANGE                                    REASON                                    EFFECT-
    .P. 18,    P. 12        Added note regarding conununications . Annual Update                                      Clarify proper meanstof "5.3.11                    with special vehicles.
comununication for special vehicles.'
(i.e., radio and telephone).                                                                        '
P. 18,      P. 12,      Added "Special Fopulation                            Annual Update 5.3.12      5.3.8 Make' consistent with' functional Coordinator."                                                                              responsibilities of Special-3 Population Coordinator.
P. 18      P. 12      Added. step to obtain status on                    . Annual Update, ASLB Hearing          Provide guidance.for following=up and 1  5.3.13                  evacuation bed-bus operations.                      Conunitments/ Stipulations          closing down evacuation bed bus
                                                                                                                        . operations.
P. 18,      P. 12,      Instruct Transfer Point' Dispatcher                  Annual Update                        Standardize Staging Area.
5~4.1        5.4.1        to pick up dosimetry upon arrival reporting / dosimetry issue process.'
at Staging-Area.
                                                                                                                                                                                                                        ~.
P. 19,      P. 12,      Replaced these steps with new 5.4.3 -Annual Update                                      . Reorder / Correct action s6quence.-
  .5.4.3 A-K      5.4.3 . A through K.
5.4.4
                -5.4.5,-                                                                                                                                                                                                ~
5.4.6
  -P. 20,        P. 14',      Added reference to Attachment 9,                    Annual Update                        Correc't references to appropriate.
5.4.4      5.4.8        bus schedule; changed reference                                                            attachments.
number for Transfer Point Dispatch l                            Form (Attachment 9 to 10)..
  'P. 20,        P. 14,      Added instructions,for' reporting                    Annua'l' Update.                      Provide. guidance consistent with the' c.5. 4. 5 -    5.4.9        road impediments.                                                                                                                                                                          d
                                                                                ' Drills / Exercise Conuments          information needs of the Staging Areaj Leader and Evacuation. Support-Coordinator for reporting. road,                                                                    ;
                                                                                                                      . impediments.
u                    .
                                                            ,. - . c .. . - _ , . , _ .    -._    ._ ,  .~_.,.'[_'.-,..__        , , , , , _ _ . . _ _ _ _ _ _ _ _ _ . , _ _ _ . _ _ _ . _ _ _ _ _ _  _ . _ . _ , _ ,
 
SPMC RET. 1 VOLUME: PROCEDURES                      SECTION:              IP 2.10 AFFECTED        AFFECTED PAGES PAGES REV. 1        REV. O                                                      CHANGE                                                                                        REASOni                                EFFECT P.' 21        -P. 14,                    Added note referring to new                                                                                    Annual Update, ASLB Hearing            Recognize use of-Northern Esser 5.5            5.5                        Attachment 12, Expedited Bus                                                                                  '
Commitments / Stipulations              Community. College for rapid                                    '
                                            ' Modifications Scheme.                                                                                                                                    deployment.
  ~ P. 22,          P. 15                      Reorganize bus requirements summary Annual Update,' FEMA                                                                                                Ease of implementing priority scheme Att. 1        .Att. 1                      according to predesignated priority ~ Technical Assistance / Plan-                                                                                    - outlined :in Plan / Appendix M.
scheme.                                                                                                    . Review, ASLB Hearing, Commitments / Stipulations Added note referencing convoy                                                                                    ASLB Hearing Connaitments/              Provide' instructions on convoy.
limitation.                                                                                                    Stipulations.                          limits.
T-
                                            ' Removal of-school /special facility                                                                              Annual Update; ASLB Hearing            Facilitate use of Attachment'1.
codes:(replaced by priority scheme                                                                              Commitments / Stipulations in revised Attachment 1).
P. 22-24                  Deleted Attachment.                                                                                              Annual Update, FMA.                  . Superceded by new Attachment 1.
Att. 2                                                                                                                                      Technical Assistance / Plan (entire)                                                                                                                                  Review, ASLB Hearing Commitments / Stipulations.
P. 24,          P. 25,                    Changed step to instruct Route                                                                                    Annual. Update -                      Standardize'. Staging Area Att. 2,        Att. 3,                ' Guides to pick.up dosimetry upon-                                                                                                                      1 reporting / dosimetry issue' process.
Step 1          Step 1                    entry into_ Staging Area.
Att. 2,~      'Att. 3,                  Remove " dosimetry issuance.'                                                                                    Annual Update                          Standardize; Staging Area Estep.2          Step 2 reporting / dosimetry issue process.
T 4
q  <--e- ,
                      .7,-
                          .      .,.,i.&.--  gc-    .  ..m-.+ .-v=--          3.,                g-                  3a      e.wm          -c-w, ,-- w,=e-      y.h-*-y a..g, y- y-,-.--->w
                                                                                                                                                                                                ,- ,  eph,- ,ww , g.y- e ww .e . .- , _.__.__,.p__j ... . ,,
_        . _ m. w
 
SPIR:  REY.' 1 VOLUME: PROCEDURES .                                            SECTION:                            IP 2.10                                                                                              ,
AFFECTED                  AFFECTED PAGES                        PAGES REV. 1                        REV. O                                                              CHANGE                                  REASON                    EFFECT
:Att. 2                      Att. 3                                  Added note explaining possible                            Annual Update, ASLB Hearing    Recognize use of evacuation bed evacuation bed bus assignment;                            Conmitments / Stipulations    buses.:
                                                                      ' referenced new Attachment 13, evacuation bed bus Route Guide process.
P. 29,                    P. 25,                                  Reordered instructions.                                    Annual Update                ' Corrected action sequence to reflect; Att. 2,                  Att. 3, Steps                    Steps updated Staging Area operations..
3,4,5,6                  3,4,5,6                                                                                                                                                                        "
  'P.'30,                      P. 25,                                  Added day care and reception center. Annual Update
    -Att. 2, More. accurately reflect 1possible    -
Att. 3                                -reference.                                                                                ' route guide / bus assignments.
    ' Step 7                    Step 7
* P. 30,                  P. 25,                                  Added step with specific                                  Drills / Exercise Conmaents Att. 2,                  Itt. 3 Provide detailed instructions on instructions for bus guidance.                                                          -evacuation bus procedure / protocol.
: Step 8                                                                                                                                                                                                      '
P- 31,                    P. 25,                                  Added note instructing Route Guides ASLB Hearing Commitments /.                            Ensure no deviations'from JAtt. 2                      Att. 3                                  not to deviate'from predesignated                          Stipulations-                  predesignated evacuation routes Step 9                                  routes..                                                                                  occur.
P. 31,                    P. 26,                                  Added references to." day cares" and ' Annual Update                                    .More accurately reflect bus-
  --Att. 2,                    Att. 3                                    ' reception centers."                                                                      assignments..
  . Step 11                    Step 10
' P. 31, P. 26                                  Added references to ' day cares" and . Annual Update                                      'More accurately reflect bus
,Att. 2                        Att. 3,                                  " reception centers"                                                                    ~ assignments.-
Step 12                  Step 11 I
                                                                                                                                                                                                            ~
g-                    _ _ _ _ _ - . - - - - - . - - . - . - - - - - - - - - - - - - - - - - - - - ' --
                                                                                                                      ^
 
SPMC REY. 1                                                      -
VOLUME: PROCEDURES                            SECTION:                IP 2.10                                                                                                                          y AFFECTED      AFFECTED PAGES              PAGES REV. 1              REV. O                                              CHANGE                                                          REASON                      EFFECT P. 31,        P. 26,                          'Added reference to host facilities                                            Annual Update                Recognize predesignated host facility Att. 2        Att. 3,                          for Route Guides / buses assigned to                                                                        assignments for schools / day. cares.
413B            12B                              schools / day care and special facilities.
P. 31,        P. 26                            Added step providing instructions                                            Annual Update                  Recognize assignments to Reception Att. 2        Att. 3,                          for Route Guides / buses assigned to'                                                                        Center.
13C          12                                reception center.
P. 31        P. 26,                          Added reference to Reception Center Annual Update                                                            Provide flexibility.following Att. 2,      Att. 3,                            following termination of                                                                                    termination of Route Guide 14          13                                assignment.                                                                                                . assignment..
P.-32,    .P. 27,                            Added reference to Reception Center Annual Update                                                            Recognize possible use of Northern'
  -Att. 3, 1 Att. 4, 1 following-termination-of                                                                                                                : Essex Comununity. College.
assignment.
P. 32        P. 27,                            Remove reference to bus driver                                              .. Annual Update                Make consistent with plan change - no Att. 3, 3 Att. 4, 3 packet..                                                                                                                                  position' packets for bus drivers.
                                                                                                                                                                                                        ~
P. 32,        P. 27,                            Added instruction to ' pair up'.with Annual Update                                                          l Parallel Route Guide's procedure to Att. 3, 4      Att. 4,'4                        bus driver.
* pair up" with bus driver.
                                                                                        ~" '*""^'#*""''' ""-- ' '--'"' "' " '~                '
  .                --m,z._.vm-4    -
mr.wem-.      Asw e=-'-N-a          -
                                                                              -ar"**
 
SP9E REY. 1 VOLUME: PROCEDURES                SECTION:            IP 2.10
.'AFFECTED            AFFECTED PAGES        PAGES-REV. 1        REV. O                                            CHANGE                                                                      REASON                EFFECT
~ P. 32-33,          P. 27,                Revised instructions:-                                                          Annual Update                        Recognize concept of Route Guides Att. 3, 6 Att. 4, 6 -. delete bus driver packet                                                                        ASLB Hearing Commitments /            assigned to buses; keep bus; driver's a,b,c,d,h                                reference                                                                    Stipulations                        ' procedures consistent with
* recognize Route Guide assignment                                                                                    transportation concepts.
                                            . added note not to deviate from evacuation routes notify Route Guide of impediments
                                              - in place of Transfer Point-Dispatcher add reference to host facility as a possible destination
-P. 33,            P. 28,                Added references to Reception                                                    Annual Update.                      . Remain consistent'with transportation.
Att. 3          Att. 4                  Centers following termination of                                                                                      planning concepts.                    ,
7 e,f          7 e,f                  assignment.
P. 34,          P. 28,                Replaced former; steps 8,9 with new-                                            Annual Update                        Remain consistent with. transportation:
Att. 3,          Att. 4,                steps 8a and 8b.                                                                                                      planning concepts.
-8 a,b            8,9 P. 35,          P. 29,                  Added " evacuation bed buses"'and                                              Annual Update, ASLB Hearing ' Update form with'use of evacuation
-Att. 4            Att. 4                  "other" under types of' vehicles                                              . Conenitments / Stipulations          bed buses.
required.
Added "MS-1*-hospital under                                                    Annual. Update, FEMA                ' Recognize MS-1 hospital'as location monitoring /decon' location.                                                    Technical Assistance / Plan          for' monitoring / decontamination of, Review                              _ contaminated injured' evacuees.
                                                                                                                                                                                                          .. w T
                                                                                                                                ' ' ' ' ' " '~ ' ' ''
                            .,-e%=-a..~_e      s A d-- #.idioi  1""""P'"d''*'N'#**''#"'" " ' ' " " ' ' " " ''"''N #"-''
, , , ,            _o
 
SPIE REV. 1
    ~ VOLUME: PROCEDURES    SECTION:          IP 2.10 AFFECTED      AFFECTED PAGES        PAGES REV. 1      REV. O                      CHANGE                              REASON                          EFFECT P. 37        P.-31      Revised instructions:                        Annual Update                    Make consistent-with changes made'to Att. 6      Att. 7
* replaced ' ambulance / van" room                                            Special-Vehicle Dispatcher procedures' Steps                          with "special vehicle area" .                                            (see Sec. 5.3 changes).
2,4,7,8,                . added reference to host-facility 10,11                          assignments.
                              + added note and instruction regarding use of EMS radio
* dosimetry' return P. 38-40,    ---        Developed new attachment detailing            Annual Update, FEMA            ' Ensure ambulance drivers'are provided' Att. 7                  instructions for~ ambulance drivers. Technical Assistance / Plan            . with' appropriate instructions.
Addressed:                                    Review, Drills / Exercise
                              . contaminated / injured patient            comments management
                              . life' threatening injuries P. 41,      P. 32,      Refined radio check instructions            Annual Update                  ' Add clarity to radio and dosimetry.
Att. 8,      Att. 8      and added "every 15 minutes"                                                  instructions.
Step 3,8                regarding reading dosimetry.
P 45,    ---        Added bus schedule-for Transfer              Annual Update                    . Clarify when Transfer. Point.
Att. 9                  Point Dispatchers. .                        ASLB Hearing Commitments /-      Dispatcher is to deploy. buses.
  -(entire)                                                              Stipulations P. 46-51,    P.33-      Incorporated revised                        . Annual Update .                Make consistent'with revised
'Att. 10 40, Att. distances / times for~ transit--            AGLB Hearing Commitments /    . evacuation routes and transfer point.
9            dependent routes.                            Stipulations                      locations.
._____ - _ _          =m        . ~ .    - _. -        - - --- - - - -            --    --        E--            --                -
                                                                                                                                            ~
 
        . _ _ . . ~ . - .                          ... _                        ..  . . _ _ _ .                            . . _            . .                          _
7 SPIE REY. 1
  -VOLUME: PROCEDURES              SECTION:                IP 2.10
  ~AFFECTED        AFFECTED PAGES            PAGES 4
REV 1            P_EV. O                                CHANGE                                                      REASON                                              EFFECT P. 53-57,      ---
Developed new Attachment 12,                                        ASLB Hearing.                              -
Incorporates rapid. deployment from Att. 12,                        expedited bus mobilization scheme                                    Commitments / Stipulations.
                                                                                                                                                        . Northern Esser Community College.
  -(entire)                        providing: specific instructions to Bus Co. Liaison, Bus' Dispatcher and Staging Area Leader.
P.-58-59,      ---
Developed new Attachment 13                                          Annual Update, ASLB Hearing                    Incorporates use-of evacuation be'd
  'Att. 13,                        evacuation bed bus guide procedure                                    Commitments / Stipulations-                  . buses.
(entire)                        providing instructions for those Route Guides. assigned to evacuation bed bus operations.
P. 60,          ---
Developed new Attachment 14,                                        Annual Update                                  Incorporates use..of evacuation bed
  ~Att. 14,                        evacuation bed' bus driver                                                                                      ' buses.                                    .
(entire)                        procedure providing specific instructions-for bus drivers.
9 d
                                .aw
                          ,, .._ _  ,.n.,...-,..,      -    - , . . - . , . ~    ..g,.        . - .  . - - , ,-- - . -    .~.<<.+,~..n...
                                                                                                                                                                              ',.n._
L_ , . - _ . _ _ _ _ _ _ _ _ _ _ , _ _ ._
 
r SPfC REY. 1
  ' VOLUME:' PROCEDURES      SECTION:    IP-2.11 AFFECTED    AFFECTED-PAGES        PAGES REV. 1      REV. O                    CHANGE                                REASON                      EFFECT P.-4-8,      P. 4-6        Reorganized procedure steps-by.        Annual Update              . Ease in implementing Traffic and
  ~5.1.2 &                    separating Traffic Guide and Route                                Route Guide dispatch..
5.1.3                    Guide dispatch.
P.-4,        P. 4,        Revise step to reflect use of          Annual Update              Recognize Appendix J as Traffic
_5.1.2 A      5.1.2        Appendix J for Traffic Guide                                      ~ Management Manual; eliminate assignment.                                                        duplicate information, providec instructions on use of Appendix J.
P. 4,        DELETED                                Annual' Update              Information built in to Appendix J.-
NOTE 1                                                                            staffing sequences.
'P. 4,                    Added note to instruct Evacuation      Annual Update                Expedite TCP staffing.
: NOTE 1                      Support Dispatcher to begin                                                                    -
staffing Region I until more specific information is available.-
P. 5,        P. 4        Reworded-step.                          Annual Update              Add clarity.to. instruction, correct 5.1.2 D      5.1.5-                                                                            action' sequence.
IP. 5,        P. 5,        Added note to obtain specific          Annual Update.
                                                                                                            ~
Recognize specific information
- 5 .1. 2 . E  5.1.6        details on road impediments                                        -required by Staging Area-Leader in reported in by-Traffic Guides.                                      order to mitigate traffic impedimentsi P. 5          P. 5,        Added instruction to'brief. Traffic    Annual' Update            . Ensure Traffic Guides are briefed on :
-5.1.2 F      5.1.7        Guides on alternative routes.'                                    alternative routes.
                                                          - - -~ = -                        "-                                    ~'
_ _ .    -    .- .-    - . - .  .  =- -                            - -    - - - -
                                                                                        '                    --        ~
 
7
                                                                                                                                        -SP2E REY. 1 VOLUME: PROCEDURES                                SECTION:                      IP 2.11 AFFECTED                            AFFECTED PAGES            PAGES REV. 1            REV. O                                          CHANGE                                                                        REASON'                                                        EFFECT P. 6,                                P. 5              Revised Route Guide assignment                                                    Annual Update                                                                    Incorporate planning concepts for ~
5.1.3 A-K                            5.1.9 -          instructions.                                                                                                                                                      evacuation bed buses and hearing-5.1.18                                                                                                                                                                                impaired notification provide
                                                            . Designate Lead Route Guide for                                                  Annual Update                                                                    detailed instructions for ease in evac. bed operations                                                                                                                                        implementing' planning. concepts.
                                                            - Reference position packet                                                      Annual Update supplemental material SM-6, predesignated Route Guides for evac. bed buses.
                                                            . Allocation of Route Guides for                                            . Annual Update hearing impaired notification and bus yards.
                                                          . Instructions for processing                                                      Annual Update hearing impaired notification needs (Attachments 2, 3, 4).
P. 8                                P. 6,            Added note referencing 2-hour delay ASLB Hearing Commitments /                                                                                                      Allows evacuees to return unimpeded 5.2.5                              5.2.5              in implementing access control.                                                    Stipulations                                                                  .during the early stage of evacuation.
P . 8. -                            P. 6              Revise step to show information                                                      Annual Update-                                                              fAccurately reflect'the way-5.2.6                              5.2.6            flow between EOC and Staging Area.                                                                                                                                  information is passed from Special:
regarding hearing-impaired.                                                                                                                                      ; Population Coordinator to Staging-notifications.                                                                                                                                                      Area Leader.to Evacuatica. Support.
Dispatcher.
  ----                                P. 7-10,        Deleted attachment.                                                                  Annual Update                                                                .. Superceded by revised Appendix J Attach l'                                                                                                                                                                            . staffing sequences.:
                                      -(Entire)
                                                                                                                                                                                                                          ., . , , , ,  --      ,_,,,_mu.,
                                                  -< -...s......o    - - - , . . , , ~ -  -
v - -. . -.=sti-.:i .*:i- - r_-- . .- w+ s $.  ..^-4mem-<. ...-.m.
                                                                                                                                                                - - ...gm., ..-34y.3.cy...,,
                                                                                                                                                                                      ...    .s . w.;. , , , , . ;,, ,.,f
 
e SPfC RET. 1 VOLUME: PROCEDURES          SECTION:    IP 2.11 AFFECTED            AFFECTED PAGES          PAGES
      ^REV. 1          REV. 0.                  CHANGE                          REASO'4                        EFFECT'
  ----                P. 11-    Deleted attachment.                  Annual Update                Superceded by-revised Appendix J-12,                                                                          . staffing; sequences.-
Attach 2 (Entire)
P. 10,            P. 13      Revise. Instructions.                Annual Update                Make consistent with Staging Area Att. 1,            Att. 3,                                                                        process; general update for ease'of
-Steps              Steps      . Route Guides to obtain dosimetry                                . implementation;-correct action 1,2,3,              1,2,3,          upon arrival at Staging Area.                                  sequence.
3A, 3B,            3A, 3B, 30, 3F,            3C, 3F,    . Provide instructions on filling 3G                  3G              out notificrtion forms,.
                                  . Add position packet.                                                                        -
                                  +; Reporting instructions upon-completion of assignment.
P. 12-14,          P. 14-16,  Revised messages.                    Annual Update                ' Increase clarity,for ease of.
'Att. 2            Att. 4                                                                        implementation make consistent with' Atti. 3            Att. 5
* Add note for hand delivery.-                                    Special Needs. Survey.-
-Att. 4              Att. 6
* Asking if relative / neighbor is available.
                                . Asking'If return trip is necessary.
* Confirming transportation need (Att.'4 only).-
w
 
4 SPIE REY. 1 VOLUME:~ PROCEDURES                          SECTION:                IP 2.11 c.
AFFECTED                AFFECTED PAGES                    PAGES
_    REV. 1                  REV. O                                              CHANGE                                                                      REASON                                                      EFFECT P. 15 0                                          Develop new attachment for Lead                                                        Annual Update i Att. 5                                                                                                                                                                                            Implement' evacuation bed bus planning
* Evac. Bed Bus. Route Guide providing ASLB Hearing Commitments / .                                                                              concept.
(Entire)                                        instructions for managing evac. bed Stipulations bus operations a~t Shriner's                                                              ~                                                                                                                                    -
Auditorium.
h k
l s
        =                                                                                                                                                                                                                                                                            +
b7    a  '&r+    g,. Ja.u as            ',4y.k -
aws'i
* p ". gMEPp w e'              y ~ v'+ W Aa ''''"g i      -*CY"F    'M*
7 G g'at  y +  'y Y'O>            d'M r #'w'''y1"--Wn ---
y'r" V y. M- .,%w.4 a yswvm'e Nyry g% W4'*Wh
 
                                                                                                                                                                                            =l
: p.                                        .
SPIE: REV. I                                                                              j
    ' VOLUME: PROCEDURES                                SECTION:
IP 2.12 AFFECTED                          AFFECTED
          .PAGES                            ~PAGES REV. 1                          REV. O                              CHANGE                            REASON                        EFF2CT
    -OVERALL CHANGES:
Attsch-                              Attach-          Retitled all checklists to reflect        Annual Update                      Make checklist: titles consistent'with ments                                ments            activation / deactivation.                                                  actions they contain.
1.5,8                              1,4,7,          Deleted repetitive steps that                                                Eliminate duplicate instructions.
9,10,                              10,13,          appear in procedure body.
11,14,                              16,18 17,19                                19 20
  -Attach-                              Attach-          Renumbered attachments.                    Annual Update                    ' Adjustment for addition of new-                      i
  .ments                                ments                                                                                        ' Attachment 3.
  -~4'--20                              3 - 19                                                                                                                      -
Pg.;7                                Pg. 6            Add-reference to.new Attachment 3          Drills / Exercise Comments        Clarify information gathering' process.
5.1. 3 -                            5.1.3            Public Information Advisor                                                    for both PIA and Public Information Information Checklist and                                                    Coordinator.
Instructions on its use.
  ' Pg . - 7                            Pg. 6          .R2 vise step to specify'how to brief Annual Update                          Clarify information' gathering process 5.1.4                                5.1.4          Public Information Coordinator at                                            for both PIA and Public-Information Media Center.                                                                Coordinator.-
  "Pg. 7.                              Pg. 6            Specify responsibilities regarding -Annual. Update                            Provide more detail for ease of-5.1.5c.A                            5.1.5. A          development.of news releases.,                                                implementation.-
Pg. 8                              Pg. 6              Changed "Seabrook Station Document        Annus1 Update                    " Corrected position' title.
5.1.5.C                            5.1.5.C            Control Center" to " Coordinator."
l t    , - - - _ _ - _ _ _ _ _ _ - - - ..        =u- ~ + . . - ~ . - - ~ ~ - - - ~ ~ - -  - - = ,  -L    .- - - - L ~ n & --- - - -        - - -              .
 
                                                                                                                                                                                                                                                  ~
SPIE RET. 1                                                                                                            -
VOLUME: PROCEDURES          SECTION:                            IP 2.12 AF'ECTED          AFFECTED PAGES          PAGES REV. 1        REV. 0                                                  CHANGE                                                                REASON-                                                  r.r r rA.i Pg. 10            Pg. 8        Added' instruction to remove 'THIS                                                                Annual. Update.
5.2.3.D          5.2.2.D      IS A DRILL
* verbiage from sample Clarify usefof sample releases during Drills / Exercise Comments                              -an actual emergency.-
News Releases if real emergency.
    - Pg. 11              Pg. 9      Added locations of recipients'of                                                                    Annual Update 5.2.3.F          5.2.2.F    news releases; added Joint Owner
                                                                                                                                                                                                  ' Ensure the two positions establish' contact.
Liaisons.
Pg. 11            Pg. 9        Added step to instruct PIC to                                                                      Annual Update 5.3.4
                                                                                                                                                                                                  . Ensure Media. Relations /Rtupor Control!
brief Media Relations / Rumor Control                                                                                                                        Liaison receives timely' briefing. ~                              '
Liaison.
Pg. 9      . Revised step; created'3 new steps                                                                  Annual Updat'e-                                        .. Clarify procedure implementation.
5.3.4        (see 5.3.6, 5.3.7                                                          3.3.8).                                                                                                                .
                                                                                                                                                                                                                                                                  .i Pg. 12            ---
Added new step to provide                                                                          Annual Updete                                              Provideiguidance on controlling news 5.3.7                          instruction on news release                                                                      ' Drills / Exercise Comunents                            ' release changes to ensure all" news
                                    . changes.
release changes are expedited and approved.
Pg. 12            Pg. 9      Added Seabrook Station Spokesman                                                                  Annual Update                                              Ensure all' key responders.~are 5.3.8              5.3.4      for-news release coordination.                                                                                                                            . coordinating information from each organization.
Pg. 12              Pg. 10-    Added step'to' keep Public                                                                      ' Annual Update                                          ' Keep PIA apprised so that he/she can .
5.3.11                          Information' Advisor cpprised of'                                                                                                                            keep.EOC. informed of media-_ inquiries: '
media inquiries.
                                                                                                                                                                                                - provide' option for addressing                                    !
inquiries in subse_quent news releases.                                                        .
4 4
5
                                                                                                                                                                                                                                                                    .3 e
  ., . . . . .                    w        ,..,,,x a+,      .-s*.      y .y 4.r&.      er,.    > = - - * - y  v*y' . , -4.~    .-wi  r - www'..-      ~w-t w--e,.,-        --r, w.y ,y  .- e  , r%,,-    - , ,
 
                      - ~ ~ =              ..                          . , . . -                    -  -              ~ .              . . . . --            -        .          .
4 SPIE REV. 1
      . VOLUME: PROCEDURES                                SECTION:            IP 2.12
    'AFFECTED                  AFFECTED PAGES                        PAGES REV. 1                      REV. O                                          CHANGE                                                                  REASON                                EFFECT Added note to have PIA research                                          Annual Update                                        Ensure all media inquiries are inquiries; requiring additional                                                                                                addressed.
information
    - Pg. 13                  Pg. 10                      Added step instructing Media                                              Annual Update 5.4.3                                                                                                                                                                                Ensure Media Relations / Rumor Control Relations / Rumor Control' Liaison to                                                                                          Liaisons.gets status expeditiously.
contact PIC for briefing when                                                                                                                                          '
reporting to Media Center.
Pg. 14                    Pg. 10                      Added step to ensure Media                                              -Annual Update                                        Ensure JTIC has all news releases.
5.4.4                                                  Relations / Rumor Control Supervisor (JTIC) has all news releases.
Pg. 14                  Pg. 10                      Added instruction'to brief Media                                          Annual Update                                        Ensure JTIC is apprised of trends in 5.4.6                    5.4.4                        Relations / Rumor Control Supervisor                                                                                        - media inquiries.-
;                                                            on media inquiries received at Media Center.
Pg. 15                    Pg. 11                      Added "using auto ringdown                                                  Annual Update                                        Recognize equipment for 5.5'3  .                  5.5.3                        telephone?                                                                                                        ~
communication to EOC.
i
  ' Pg.'15                    Pg. 11                    'Added " Rumor Control Assistants."                                        -Annual Update                                        Ensure RCA's receive news' release.
4 5.5.5.A                  5.5.5.A Pg. 15                    Pg. 11                      Replaced formerLStep B and added                                          Annual Update                                        Ensure status boards are maintained..
j 5.5.5.B                      5.5.5.B                    step to provide administrative
                                                                                                                                                      ~
staff instruction on upkeep of status boards.
  <    m .e  n.a v. A        , . -- y h o-    s- -~w.c  *v    s-3^~-*  4    -V'Y"    '""'sN't''*'
1* ' ' * ~ '''
V '&~    ''"    **'    'Y' #" ' ' ' ~ ^ ~"V    ~''' '      '' * ' ~
                                                                                                                                                                                                        #    ~ ~~''~ ' ~~~ ~ '~~
                                                                                                                                                                                                                                  ~
 
  ,, , , ,, , , iniu , ii.i.. i SPfC REY. 1 VOLUME: PROCEDURES                                        SECTION:      IP 2.12 AFFECTED                        AFFECTED PAGES                        PAGES REV. 1                        REV. O                                      CHANGE                                        REASON                    EFFECT Pg. 15                          Pg. 12                      Added step instructing Media                  Annual Update                    Ensure trends are identified: make?
5.5.6                                                        Relations / Rumor Control Supervisor                                          consistent with-functional to review documented inquiries to                                              responsibilities of Media identify trends.                                                              Relations / Rumor Control Supervisor.
Pg. 16                          Pg. 12                      Added " Media Relations Assistants." Annual Update                              Ensure Media Relations Assistants 5.5.8                          5.5.6.C                                                                                                      receive support in addressing.
unusual ~ requests (irs addition to RCA's).
Pg. 17                        Pg. 13                        Added instruction for RCA to. report Annual Update                              Ensure-the RCAs. request copies (if 5.7.2                          5.7.2                        to Supervisor and receive news                                                not already provided).
releases.
Pg. 19                        Pg. 15                        Reorganized Administrative Staff              Annual Update                    Clarify--implementation.
5.8                            5.8                          instructions'by reporting _ location.
(entire)                      (entire)
Pg. 19                          Pg. 15                      Added reference to Attachment 2.              Annual Update                    Reference log _aslan attachment to 5.8.1.B3                        5.9.2.B3                                                                                                    eliminate confusion.
Pg. 19                          Pg. 15                      Revised instructions for news                  Annual Update              .
Ensure timely, efficient; distribution 5.8.1.B4                      5.8.2.B4,                    release distribution at'EOC.                . Drills / Exercise Comments.    'of news releases.
5,6,7 Pg. 20                        Pg. 16                      Added reference to Attachment 2.                Annual' Update                    Reference log'as anLattachment to-5.8.1.C.1                    5. 8. 2. C .1 '.                                                                                              eliminate confusion.
Pg. 20                        Pg. 16                    _ Removed " Joint Owner-. Liaison."                Annual Update.                    Covered in new step 5.8.1.B.4.
5.8.1.C.2                    5.8.2.C.2
                . _              __ %  wA,..m,,. ecamir-.rJ=.
 
m _ . -                      , _ _ _ _                    . . .  ..  . ., .        _ _ . -        .          _ ,
SPIE. REY. 1 VOLUME: PROCBDURES                      SECTION:          IP 2.12 AFFECTED        AFFECTED
      -PAGES                PAGES REV. 1                REV. O                                CHANGE                                      REASON                                  EFFECT Pg. 21          Pg. 16                    Removed " Joint Owner Iiaison" and          Annual Update                                  Use correct. titles; remove reference-5.8.2.B.2        5.8.3.B.2                replaced "Spokesperson" with                                                                to position not present at Media "Public Information Coordinator.".                                                        Center (Joint Owner Liaison).:
Pg. 21          Pg. 16                  -Added note to instruct                        Drills / Exercise Conunents                    Ensure'PIC receives updated'
    -5.8.2.B.2                                  Administrative Staff to ensure PIC                                                          information expeditiously.
gets news release during a press
                                              -briefing.
Pg. 21          Pg. 16                    Revised instructions for news                Annual Update                                  Ensure timely, efficient distribution 5.8.2.B.3        5.8.3.B.'                  release distribution at Media                Drills / Exercise Comments                    of news releases.
3,4                        Center.
Pg. 22          Pg. 17                    Reworded instruction for flow of        .
Annual Update'                                Ensure timely, efficient distribution 5.8.3.B.2        5.8.4.B.2:. news. release at JTIC.                                    ; Drills / Exercise Conunents                  -of news releases.
  .Pg. 22          Pg. 17                    Added step providing instruction on- Annual Update.                                          Ensure JTIC status boards are~                  .'
  .5.8.3.B.3        5.8.4.B                  upkeep of status boards.                                                                    maintained.
                                                                                                                                                                                            ~.
  'Pg. 22          Pg. 17- ,. Replaced specified' response Annual ~ Update                                Made instruction more generic to
  ;5.8.3.B.4        5.8.4.B.5 organizations with.."other.' response                                                                                                                        .
encompass all news releases that may i-                                            organizations," added-instruction                                                            be received at Media Center.-
:for posting'of. news releases.
Pg. 24          Pg. 18.                  Re' vised instruction'for initial            Annual Update'.                                Clarify implementation.
1 Att. 1-          Att. I                    contact to PIC:
1.D-            1.D
                                              " auto ringdown telephone" "obtain status on Media Center Activation"
..:-.- ~-- ,          . , .    ~ - -,:.            . , , . ~  .,.:,.Q~~,.-            . :a .          :n . . ~ . , , -. L  .$,.., +    L,,,.,. L ~ ~ . . , , . _ _ .-___.__.._c __,
 
SPIE RET. 1
      -VOLUME: PROCEDURES                SECTION:      IP-2.12
      .AFFECTED 'AFFECTED
            'PAGES          PAGES REV. 1          REV. O                      CHANGE                                      RE%ON-                  'EFFECT Pg. 24          Pg. 18        Added note regarding need for Media Annual Update
                                                    ~                                                                Provide guidance if there.is a delay..
Att. 1          Att. 1        Center activation.                                                          in initial contact.
Pg. 24          Pg. 18        Combined two former steps (E,F)              Annual Update                Make consistent with'-functional Att. 1            Att. 1        and replaced " Communications                                              responsibilities of Assistant 1.E            1.E.F          Coordinator
* with " Assistant                                            Director /R&I.~
Director /R&I."
Pg. 24          Pg. 18        Deleted steps.                              Annual Update                Eliminate duplicate instruction found Att. 1-          Att. 1                                                                                    in body of procedure.
gh Pg. 27-29 ---                    Developed new Attachment 3, " PIA            Drills / Exercise Comments    Assist PIA.in forwarding need'ed' Att. 3                            Information Checklist
* using                                              information to the PIC in-a timely, (entire)                      information available during EOC                                          efficient manner.
briefings and on EOC status boards.
Pg. 31            Pg. 21        Deleted step.                                Annual' Update                Eliminate duplicate instruction found-
    -Att. 5 Att. 4,                                                                                    in body of procedure.
                        '1.E Pg. 32            -Pg. 22        Replaced " protective" with-                : Annual Update                Minor edit.
    -Att. 6,a            Att. 5,a        " emergency."
Pg.'32            Pg. 22        Replacedj" type of" with-                    Annual Update                Minor edit..
Att. 6.c            Att. 5,c        "information on."
hPg.32                    Pg. 22        - Added reference to-Farmers                  Annual Update'              [ Recognizes _..FarmersBrochureasan^
5 Att. 6,e            Att. 5,e      Brochure.                                                                  informational resource.
4
  , , . ,      ,%. .*m.,          -w.-    v --e <-        ,v* -""'* '*
                                                                          "'    * 'N ~    '~~#"  *      "  ~
r                      F*                                  '      ~    '              -  - - - -~ ~
 
4 SPPE' REY. 1                                                                                  '
VOLUME:" PROCEDURES  'SECTION:        IP 2.12                                                                                                                    s AFFECTED    AFFECTED
                    -PAGES        PAGES REV. 1      REV. O                        CHANGE                                            REASON                                          EFFECT                -
            .Pg. 36-37          Pg. 26      Replaced reference to Congregate'          ' Annual Update                                          Make consistent with Pl'an update Att. 7      Att. 7    ' Care for. school children with                                                                        (school host facility concept).
* school host facility.'
Pg. 41-42 Pg. 31-32 Replaced reference to Congregate.                Annual Update                                          .Make consistent with Plan update Att. 7          Att. 7      Care for school children with                                                                          (school' host. facility concept).
                                            " school host facility."
Pg. 50-51      Pg. 40-41 Removed' reference to ORO personnel            Annual:. Update                                        'Make consistent with staffing-Att. 7              Att. 7      staffing congregate care centers.                                                                      arrangements established by Plan.
Pg. 45-46 Pg. 35-36          Added phrase ' residents who have no' ASLB Hearing Conunitments/                                        Clarify services available at-
  -Att. 7                      -Att. 7      place to stay may go to Reception            Stipulations                                            Reception Center.
Centers."
Removed' phrase. *1f they have no          ~ ASLB Hearing Comunitments/'                              Info covered in Reception Center-other place to seek shelter" from
                                                              ~
Stipulations                                            paragraph.                  '
reference to Congregate Center.
Pg. 56-57                Pg. 46-47 Replaced-reference to Congregate              Annual Update                                            Make consistent.with Plan update Att. 7                    Att. 7    . Care for school children with                                                                          (school host facility concept).
                                          " school host facility.'
Removed reference to ORO personnel          ASLB Hearing Connaitments/                                Info covered in Reception Center      :,
staffing Congregate Care Centers. .          Stipulations                                            paragraph.-
Pg. 60--                  Pg. 50-    Added phrase '* residents'who have          ' ASLB Hearing Comunitments/ .                            ' Clarify services available at 61                        51,        no place to stay, may go-to                  Stipulations                                              Reception Center.
Att. 7                      Att. 7      Reception Center."
g .
                                                                                                                                                            ' ' ' ~ ~ ~ '
                                            ..e.  :--- -w-  ~    --- -        ' ~ ' ~ ' ' - ' ' " " - ~ " " ' " ~ ' ~ ~ ~ * - ~ ^ ^ ~ ' ~ ~ ~ '
 
i-l      .                      .                                                                  SPIE REY. 1
'; VOLUME: PROCEDURES                  SECTION:    IP 2.12 AFFECTED              AFFECTED
        - PAGES              PAGES REV. 1            REV. O                      CHANGE-                                                      REASON                                      EFFECT Removed phrase, "if they have no                                                                    Info covered-in Reception Center                              a other place to seek shelter" from                                                                    paragraph.
reference to " Congregate Care."
i Removed reference'to ORO personnel                                                                  Make consistent with staffing
;                                        staffing Congregate Care Centers.                                                              - arrangements established by-Plan.
Pg. 64                Pg. 54        Combined'former steps D,E into                                  Annual Update                        Minor edit to clarify-
    ; Att. 8              Att. 7        revised step D.                                                                                    '
implementation.
1.D                  1.D.E                                                                                                                                                                    -
'-Pg. 64                  Pg. 54        Reworded procedure step.                                        Annual Update                    ' Add clarity.
    -Att. 8                Att. 7
< . 1.E                    1.7 Pg. 54,      Deleted steps.                                                : Annual Update.                        Eliminate. duplicate instructions-
,                          Att. 7                                                                                                          .
found in body of procedure.
1.6,H,I
    -Pg.,65                Pg. 56-      Combined former steps D,E into                                  Annual Update                        Minor edit to clarify        -
  - Att. 9                Att. 8        ~ revised step D.                                                                                - implementation.
1.D                  1.D, E Pg. 56                                                                    . Annual Update Deleted steps.                                                                                        Eliminate duplicate instructions Att. 8'                                                                                                            found in body of procedure.
                                                                                                                                                                          ~
1.6,H.I Pg.-~66              Pg. 58        Combined former steps B I~into.                                Annual Update'                  . Minor edit to. clarify Art. 10              -Att.'9        revised step H.                                                                                  ; implementation.
1.H-                  l.H.I      : Added phrase,-*using auto ringdown                                                                                                                              ~
                                      ' telephone."
t
.    ,..C...~s..~.,.i. -
                                .m- g      -J      ,wed  ., * * - - - * '' -"M--    *v " " ' * ' " ~ ~ ' " "''"'"# "        *#
f t                              -C'                                              '' '#          ''            '    ''
                                                                                                                                                                              - ~ ' - -  - - -
 
                                                                    ' SPBE REY.1 LVOLUME: PROCEDURES            -SECTION:      IP 2.12
'AFFECTED          AFFECTED PAGFJ            PAGES REV.-1          REV. 0                      CHANGE                                REASON                    EFFECT Pg. 67.          Pg. 58        Combined former steps J & K into      Annual ~ Update                Minor edit to clarify
.Att. 10            Att. 9        revised step I.                                                      implementation.
1.I              1.J.K Pg. 58        Deleted steps.                        Annual Update                  Eliminate duplicate instructions Att. 9                                                                              found in. body of procedure.
1.L.M N
L.Pg. 68                          Replaced " Support Services          Annual Update.                  Make consistent with fun::tional
                                                                                                                        ~
Pg. 60
-Att. 11.E .Att. 11.E Coordinator" with Media                                                          responsibilities of Media Pg. 72          Pg. 64        Relations / Rumor Control                                            Relations / Rumor Control Supervisor.
Att. 14,E Att. 13,E Supervisor."
Pg. 78            Pg. 70                                                                                                                    -
Att. 20,D Att. 19,D-Pg. 60, Att. 11, F,G.H Pg. 72 Att. 14, F.G,H.
Pg. 75          Pg. 67        Reworded step instructing Admin.      Annual Update'                  Assure equipment operability.-
Att. 17,E "Att. 16,E Staff to ensure operability of Pg. 77          Pg. 69        .telecopier.
Att. 19,E' Att. 18,E Pg. 78            Pg. 70-Att. 2,E          Att. 19,E
                            -.              _ - :_.          =-- -        -    --= - -    =~ - - - = - -                ^ - - ~ ~ - - - -
 
SPIE RET. - 1 (VOLUME: PROCEDURES            SECTION:          IP 2.12 AFFECTED              AFFECTED PAGES                  PAGES REV.'1                REV. 0                          - CHANGE                                            REASON                  EFFECT
'Pg. 75                Pg. 67    Added' step for Admin Staff to                                Annual Update              Ensure PIA PIC MR/RC Supervisor can..
-Att. 17,F            Att'. 16  identify themselves to their                                                              -account.for staffing ~during Pg.,77.              Pg. 69    Supervisor upon arrival.                                                                  activation.
Att. 19,F Att. 18 Pg. 78                Pg. 70 Att. 20,F Att. 19
                                                                                                                    . =+-  ,m. wA
                                                -  ._.ms.    .ma,s m.m.,- _ s . + _wa.s_,s--        wr.*  -  m.m
              ,,w.._                -. _ _ -- 4,            1
        .s %        .
 
IiI  I  I  I    ll
                                                                                                                                                                                                            .i SPMC REF. 1                                                                    -l VOLUME: PROCEDURES                              SECTION:                  IP 2.13 AFFECTED              AFFECTED
          -- PAGES            PAGES REV. 1            REV. O                                                          CHANGE                                              ' REASON                  EFFECT Pages 2-6            Page 2                        Listed all attechments.(EBS                                                  Annual Update            Simplifies locating specific EBS.
messages) in Contents section.                                                                          messages.
  ~Page 7 -              Page 3 -                      Deleted reference to Airborne                                                Annual Update            Reflects plan change using backup Purpose              Purpose                      Alerting System                                                                                        . Vans,~not airborne alerting.
Page 7 -              Page 3 -                      Added note regarding use of EBS                                              Annual Update            -Ensures that responsible personnel Pre-                  Pre-                          activation tone.                                                                                        remind EBS station personnel that-the-cautions              cautions                                                                                                                              EBS activation tone must. precede all Page 13,                                                                                                                                                    EBS messages.
5.1.10.C Page 11              Page 5                        Deleted step referencing PNC                                                Annual Update            -Messages in procedure are controlled 5.1.7                          position packet containing EBS                                                                          via Document Control. Duplication ofi l'                                                      message; messages are contained as                                                                    messages.in position' packets is not attachments to procedure..                                                                              necessary. Ensures messages are l
current revisions.
lPageil                Page 6                          Deleted reference-to position                                              Annual Update              Ensures messages are current
;5'.1.7                5.1.8                        ' packet.                                                                                                revisions.
l Page 11              Page 6                        Deleted. reference to position                                              Annual' Update              Clarified actions required to 5.1.9-              - 5.1.10                        packet, made reference:to-                                                                              initiate generation of an EBS 5.1.9.A              5.1.10.A                      prerecorded and prescripted-                                                                            message.
messages; made reference tolEBS Station Support' Plan; made-
                                                      - reference that messages can be edited on EOC word processor;
                                                      . referenced existence of EBS tapes at-radio station..
                                                              -adm" ""= + = - -'b'= - - * ' ' - WW"-" N- # *- ''" W'" " ' '' ~ ' " "
g...c    ,          u    ,_.m.    .>e.  * *,i"      .m
 
SPMC REY. 1
        . VOLUME: PROCEDURES                                    SECTION:        IP 2.13 AFFECTED .AFFECTED PAGES                PAGES REV. 1                REV. O                                    CHANGE              ,            REASON                      EFFECT Page 13                      Page 7,                      Added time period required to        Annual Update              Ensures that.the New Hampshire IFO .
        -5.1.10.B                    -5.1.11.B                      complete notification.                                          Controller is-' aware of the proposedT
                                                                                                                                  'EBS activation time.
Page 13                      Page 7                      Revised to stinte that message will  Annual Update              Ensures that message-is-preceded by 5.1.10.C                    5.1.11.C                    be preceded by EBS activation tone.                              EBS. activation tone..
Page 14,                    Page 8                        Revised activation sequence of        Annual Update            ' Ensures public gets' prior 5.1.10.D                    5.1.11.D                      siren system relative to broadcast                              notification that the EBS is going.to of EBS message.                                                  be activated.
Annual Update
                                                                                                                                                  ^
Page 14                    Page 8                      Deleted step.                                                    Duplicates information contain'ed in 5.1.11.F                                                                                      I? 1.10.
Page 16,                    Page 9,                      Changed to direct activation of        Annual Update            Ensure public gets prior notification 5.2.8                      5.2.8                        siren system and appropriate time                                thatLthe EBS.is going-to be<
to activate. system.                                            activated.-
Pege 16                      Page 10                      Deleted reference to Airborne        Annual Update              Reflects plan change using backup.
NOTE                        Alerting. .                                                      VANS, not airborne alerting.
Page 17                      Page 11,                    Deleted step that refers to            Annual Update            Reflects-plan ~ change using backup
                                  -5.2.9.                        Airborne Alerting System.                                        VANS, not airborne alerting.-
E.F,G,H.I Page 18,                    Page 12,                    Deleted reference to Airborne ~        Annual Update            Reflects plan change using backup 5.7.12,                    5.2.12,                      Alerting.                                                        VANS, not nirborne alerting..
6.0                          6.0 i
l
                                                -.' ' " * * ' " = ' ' "  ''-  '"
6,o--      p.e wgeism miam.f 4 !.---h  T a S-1
 
SME REY. 1 VOLUME: PROCEDURES                    SECTION:          IP 2.13                                                                                                                                                                -
AFFECTED              AFFECTED PAGES                  PAGES REY. 1                REF. O                                  CHANGE                                                      REASON                                        EFFECT Pcges 19-            Not                Incorporated EBS messages into                                    Annual Update                                      . Messages are readily available for 91                    applica-          procedure; added a unique                                        ASLB Hearing Commitments /                          use, they are no longer contained in ble                designator code to each prerecorded Stipulations                                                                      a separate package; enhances message; added a sequential message                                                                                    comemnication of which message the letter to all messages.                                                                                                EBS station is to broadcast.                                    '
Provides a unique identifier for each message.
Pages 22,            Not                Deleted reference to local                                        ASLB Hearing Commitments /                            Made consistent with plan provisions 23,24,26,              applica-          telephone books.                                                Stipulations                                          for public information materials.
28.30,34,              ble 36,38,40,                                                                                                                                                                                                                        '
45,57,60, 65,70,74                                                                                                                                                                                                      -
78 kg2s 46-              Not              New messages for General Baergency. ASLB Hearing Commitments /                                                          Providea a pre-recorded message for 4
: 54.                    applica-                                                                            Stipulations                                        .various Entcuation/ Sheltering ble                                                                                                                                        scenarios in MA EPZ.
Pcgno -                Not              Deleted reference.to ad hoc                                      ASLB Hearing Commitments /                            Made consistent with FEMA practice.
33,35,                applica-          respiratory protection measures.                                  Stipulations                                                                                                          '
40,43,                  ble 55,58, 64,69 l
:Pcg2s 48,-              Not              Revised messages to instruct                                      ASLB Hearing Commitments /                            Minimized potential expsoure of
- 52.G3.68,              applica-          transit-dependents to remain                                      Stipulations                                          persons waiting for transportation.
,72.77                    ble-              indoors while waiting for buses.
6 y- ,,w-e*,  , *y--g-e-  - ~ - - = ,-e.-v  ,-,,,e., e,,-s.,  **+<r*ei,n      . -w--we d-v.- w--e=-- a,t-+w  ec--- -w--,--s.*- -e- __        - -
__.--e.,  ,---,ww-  -.<%-  .-,=~--e--v.--w  - .... - m- e- + . .w~.--  .-m. -m. -,m.-.. .
* I VOLUME: PROCEDURES      SECTION:      IP 2.13 AFFECTED- AFFECTED PAGES      PAGES REV. 1      REV. O                      CHANGE                                            REASON            EFFECT Page 82,    Not        Identified location and directions            Annual Update                Provides important information to the 85          applica-    of school and special population                                            general public.
ble        host facilities.
P. 59        N/A        Added referenet: to seasonal beach            ASLB Hearing Comunitments/  Correct inconsistency.
closure.                                      Stipulations
,    j , _ , _
                    ,  ,  ,m,  -p_%es =--        d-* * ' 'W- *~ *-'T T    F'"N' " '"  *"#
 
SPIE: REY. 1
    . VOLUME:iPROCEDURES                SECTION:        IP-2.14 AFFECTED          AFFECTED-PAGES      -PAGES REY. 1        REV. O                              CHANGE                                                                REASON                                                    EFFECT P. 4 Note        P. 4 Note Removed, "and Authorization                                                        Annual Update                                    Correct reference to attachment-Scheme."                                                                                                                      title.
P. 4,            P. 4,              Replaced, ' Control Room" with                                            Annual Update
                      ~                                                                                                                                                  Specify Control Room contact person                                                                  :
3.1.2,            5.1.2,            "Short Term Baergency Df. rector.'                                                                                            for ease in implementation.
P. 5,            P. 5, 5.2.2            5.2.2 P. 4,              P. 4              Replaced, ' Commonwealth of                                                Annue: Update                                    Specify agency for ease in 5.1.3              5.1.3              Massachusetts" with, 'MDPH."                                                                                                implementation.
P. 4,            P. 4,              Reworded step to add more detail on Annual Update                                                                            Specify positions for ease in 5.1.4            5.1.4              onsite contacts.                                                                                                            implementation.
P. 5              P. 5              Added phrases to:                                                          ASLB Hearing Commitments /
5.2.3,            5.2.3,                                                                                                                                          Enhance interaction between ORO/ MASS.
                                            - Inform MDPH of provisions at EOC                                        Stipulations 5.2.5            5.2.5                Ask if MDPH plans to respond to EOC.
P. 6 Note        P. 5              Added Note providing instruction on ASLB Hearing Commitments /                                                                Provide MASS Governor a mechanism to Governor's verification of                                                  Stipulations                                    verify emergency status.
emergency.
1
    - P. 12            P. 10,            Removed reference to School Liaison Annual Update                                                                            Make consistent with plan change                                                                      \
  - Att. 3            Att. 3            and Spec.. Pop.-Liaison reporting                                                                                            these positims remain at Staging to local EOC.                                                                                                              - Area.
Revised instruction regarding use                                          Annual Update                                  _ Esse in implementation.
of Attachment 5.
A 4
4
: r. e. _ . , _ ,          p. . ~ . ~ . y              y.- s er    .e--i,,            .ye      ,          gv.. .e--  vgg  ,<-v.w    t.mw e -*<d - s imr-  e ar+-  T,-  e ww w  %wp-,---:.e--  ,.m.,
                                                                                                                                                                                                          - . , _ - _,__._m _ _ _ . __ , _ _, ,_ ,__ -m__mm-_ .____w1m, -..m.
 
                                                                                                                                        ,e SPIE REY. 1 I
VOLUME: PROCEDURES          SECTION:    IP-2.14 AFFECTED          AFFECTED PAGES          PAGES REV. 1        REV. O                CHANGE                                REASON                EFFECT 4
Pa 13,            P. 10      Revised instruction regarding use  Annual Update              Ease in implesmentation; recognize App Att. 3.          Att. 3      of Attachment.6; Added App. H as                              H as comununications directory for reference                                                      ORO.
P. 15            P. 12,      Correct plan reference.              Annual Update              Correct plan reference-Att. 4            Att. 4 Added " State" Liaisons.            Annual Update              Ensure correct position title 3pecified.
Remove reference to School and      Annual Update            Make consistent with plan change; Special Pop. Liaisons reporting to                            these positions remain at Staging local EOC.                                                    Area.
P. 22,            P. 18      Changed contact title to            Annual Update            Correct title error.
23 Att.          20. Att.    " Radiological Health Advisor."
6, 24,            6, 21, 25, 27,            22, 24, 29                25 P. 25            P. 21,      Replaced Newburyport " Board of      Annual Update              Correctly reflect city organization Att. 6            Att. 6      Selectmen" with " Mayor.'                                      structure.
P. 25,                        Added full title of NHY ORD.        Annual Update              Ensure correct position title is Att. 6                                                                                        referenced.
P. 30,            P. 27,      Added activity regarding use of      ASLB Hearing Countituents/ Ensure proper frequency use and' Att. 7'          Att. 7      state, local frequencies.            Stipulations              protocol'is. implemented.
P. 31-37          P. 28-31,  Added column group titles for        Annual Update              Ease in implementation.
Att. 8'          Att. 8      clarity.
(Entiro)          (Entire)
I
                                                  - - - - ~ -
N~    --_....____w2_
 
-VOLUME: PROCEWRE      SECTION:  IP 2.15 AFFECTED    AFFECTED PAGES    PAGES REY. 1  REY. O                CHANGE                  REASON              EFFECT P. 1-9      Deleted entire procedure. Annual Update        Eliminated airborne alerting concept from SPMC since backup alerting                                    ,
provided by backup VANS.                                          !
I f
I
                                                                                      --~a= _n__. -a-.__:_---.2----__-  - - - - -' - -- -
 
                                                                          *I VOLUME: PROCEDURES      SECTION:    IP 2.16
    -AFFECTED      AFFECTED PAGES        PAGES
* REV. 1        REV. O                CHANGE                            REASON                                                r.rrrA,i PAGE 2        PAGE 2    Added VANS dispatch prioritization Annual Update                                Provides specific order of dispatch 14                        scheme.
to ensure that the vehicle with the farthest distance to travel leaves the staging area first.
PAGE 3        PAGE 3    Added reference to the satellite  Annual Update                                Recognizes satellite staging area-3.2            SECTION    VANS staging area.                ASLB Hearing Comunitments/ -                  which provides rapid deployment to an                                                          '
3.0                                          Stipulations                                  acoustical' location which may be in'                                                          ,
a high traffic area during the beach seasO3.
PAGE 4        PAGE 4,    Deleted non-emergency functions    Ancual Update                                Only emergency response functions 5.1.1      from procedure.                                                                  are contained in the procedure - Non-emergency functions are part of EPirCR procedures.
PAGE 4        PAGE 5    Revised consnunication system      Annual Update                                Identifies proper comununications 5.1.1.A      5.1.1.A    terminology.-                                                                    systems to be used.
PAGE 4        PAGE 6,    Added specific instructions for    Annual Update                                Ensures vehicles are dispetched in 5.1.4          5.1.2.D    VANS drivers prior to departing                                                  proper order and that appropriata staging areas; included dispatch                                                  safety systents/equipunent are order and special instructions for                                                operating.
                              ~MECO and Crow Lane locations.
PAGE 6          PAGE 6,    Added reference to the "Comunand    Annual Update
  -5.1.5 Reflects actual VANS equipment.                                                                .
5.1.2.E    Waiting
* light.
(Noto) 8      (Note) 8, 5.1.12          5.1.2.L 4
~__mm        r_---                                    --
                                                %_--                          ,-m..,. .o, _ , _ ,_.a, , . _.. 2 __,_m._._.mm .__m_-  __  m___,_ .;__. _- a _ , - .-_. _ . . . . _ . . . . . . - - - . _ _ -
 
SPIE RET. 1 VOLUME: PROCEDURES                            SECTION:                      IP 2.16 AFFECTED                            AFFECTED
          . PACES                            PAGES REY. 1                            REV. O                                                CHANGE                                                              REASON                                        EFFECT PAGE 6,                            PAGE 6.-. Referenced VANS set-up checklist;
    ; 5.1.6 Annual Update                        Reflects implementation of VANS.
5.1.2.F    added caution statement regarding PAGE 10,                                      placing VANS vehicle in an operable 5.1.17                                        position: added note regarding boom extension and siren activation.
    - PAGE 7                              PAGE 7    Changed " Interlock Light" to
* Boom                                                        Annual Update 5.1.11                            5.1.2.K    Up" light.
Reflects implementation of VANS.
    - PAGE 9,                              PAGE 8    Moved note.                                                                                  Annual Update                                                                                                                i 5.1.13                            5.1.2.M                                                                                                                                        Enhances procedure sequence.
PAGE D.                          PAGE 9,    Added more details to step.                                                                  Annual Update 5.1.13.                            5.1.2.M.
Reflects implementation of VANS.
A                                  1 PAGE 9                            PAGE 9,    Changed name of siren encoder.                                                              Annual Update-5.1.13.                            5.1.2.M-Identifies proper equipment name.
D.a                                  .4.A PAGE 11                          . PAGE 10,    Deleted assignment step.
                                                                                                                ~
Annual Update                          Eliminates duplication of 5.2.2.C information.
PAGE 11,                            PAGE 10    Deleted reference to non-emergency                                                          Annual Update 5.2.2.C                            5.2.2.D    functions, provided instruction for Provides guidance for Backup VANS Drivers prior to dispatch.
;                                                    preparing to depart from Backup                                                                                                                                                                                            !
Staging Area.
  ,,-sv  .--q-,.                s,..cuy..              *g--        , +- y.-          a                  .y.  . . yr, m . - - - , & --r                          _<        --
                                                                                                                                                                                            .._e___._    __ .r--u..m.
m,-  m. _ - - - - - - . _ - _ _ -    ._m.-  _-- - ---
 
        .                .    - _          _ . . _ .              . _  . _ . _      . . ~ . _ _ _    ._    _      __
SPIC REV. 1 VOLUME: PROCEDURES                SECTION:                IP 2.17 AFFECTED          AFFECTED                                                                                                                                                      ~i PACES            PAGES REV. 1            REV. O                                    CHANGE                                        REASON                                  EFFECT P. 3              P. 3            Reworded purpose to specify the                            Annual Update                                Improve clarity of the purpose of the 1.0                1.0            process of assembly for onsite ORO                                                                    procedure.
responders.
P. 3              P. 3            Specify *on-duty."                                        Annual Update 2.1                2.1 Differentiate between off-duty /on-duty responsibilities.
2.2                2.2 P. 3              ---
Added new responsibility for Back-                        Annual Update                              Recognize Back-Up Support Services 2.3                                .up Support Services Coordinator.                                                                      Coordinator's responsibility for coordinating assembly of personnel at GOB.
4 P. 4-6              P. 4            Section was rewritten.                                    Annual Update                              Ease in implementation; provide more-5.1.1.              5.1.1                  .
direction to responders.
(entire)          (entire)        Specify reporting levels for different responders.
Specify process for GOB reporting.
Define Back-up Support Services Coordinator's role.
e-P. 6-7              P. 4'-5        Section was rewritten.                                  Annual Update                              ' Provide more direction by clarifying.
5.1.2              5.1.2-steps for ease in implementation.
(entire)            (entire)        Clarify Asst. Director / Response ir Implementation's role.
Define interaction between GOB assembly area and EOC.
Provide instruction for filling vacancies using ORO personnel                                                                                                                  '
assembled at the GOB.
  , , _ . _ - _ . _ .              _  _            _ _ ~ _ _ . . _        _  ___      .  .,              ~~    _- _._ -.      , - ~ . _ - - _ , _ _ _ _        . . . .
 
SPIE RET. 1
: VOLUME: PROCEDURES                  SECTION:      IP 2.17 AFFECTED              AFFECTED PAGES                PAGES REV . ' l            REY. O                      CHANGE                                            REASON                                  EFFECT P. 7                  P._5              Former Steps A & B superceded by                    Annual Update                        Provide more direction for on-duty-5.1.3                5.1.3              new steps A, B, C.                                                                      Support Services Coordinator in order A-C                  A,B                                                                                                        to more effectively perform function.
Review list of responders.
Fill vacancies.
Call out additional personnel.
P. 7                  P. 5              Added, "At request of ORD."                        ArW al Update.
i 5.1.3 D
                                                                                                                                    . Make consistent with levels of 5.1.3 C                                                                                                    authority defined in Plan.
P. 8                  P. 6              Replaced former steps A & B with                    Annual Update                        Provide more accurate guidance for 5.2.1                  5.2.1              new instruction to follow                                                                responders in an off-hours information received over Melita A,B                                                                                                          notification.
and EBS.                                                                                                                        .
P._.9                P. 6              Added, "on-duty."                                    Annual Update                        Differentiate between on/off duty 5.2.2                5.2.2                                                                                                        responsibilities.
P. D.                P. 6              Reworded steps.                                      Annual Update                        Clarify Assistant ORD/REI role by.
5.2.2'                5.2.2                                                                                                        streamlining instructions.
A,B                    A,B 1
P. D                                    Added step for Assistant ORD/REI to Annual Update Make consistent with functional 5.2.2.E                                request Mutual Aid Responders from                                                        responsibilities.
Assistant ORD/ Support Liaison.
i P. O                  P. 7            Added "on-duty."                                      Annual Update                        Differentiate between on/off duty.
5.2.3-                -5.2.3                                                                                                        responsibilities.
  ,yrre  v t, ws w -.y      .w-+  vcy ,+wa            w  n ' - " g 1~ v V- , e 1 we+' ~ ' u  5                  *+e -<e- -
t '
e,-  4 "*=--t w-* -+%e=-    % ' ' * -+ww-w  - w a".mm-se-e w-
 
SPft: RET. 1 VOLUME: _ PROCEDURES      SECTION:    IP 2.17 AFFECTED        AFFECTED PAGES            PAGES
        'REV. 1          REV. O                  CHANGE                                            REASON              EFFECT P. 9              P. 7      Added new steps.                                        Annual Update        Make consistent with steps 5.1.3 A Tr 5.2.3            5.2.3                                                                                  B (off hours responsibilities are-A,B same as business hours responsibilities).
P. 10            P. 7      Changed " attempt to contact" with                    Annual Update        Recognize Comununications.
5.2.3 C          5.2.3 A    " coordinate notification."                                                  Coordinator's role in calling wt additional personnel.
P. 10            P. 7      Changed "conunence" to " coordinate;* Annual Update                          Recognize Communications-5.2.3 G          5.2.3 E    added "Conununications Coordinator."                                        Coordinator's role in calling out additional personnel.
P. 12            P. 8      Rewrote instructions for onsite ORO Annual Update                            Provide more detailed guldence for Att. 1            Att. 1    personnel prior to their release                                            these responders to clarify their
    . (entire)        (entire)  from GOB; added EBS stations.                                                responsibilities.
P. 13            P. 9      Revised headings of first 2                            Annual Update          Add clarity to log. .                        4 Att. 2            Att. 2    columns.
J t
L_e.    .m. _,. ._m--      ..                - -            ~ ^ ' -- ' - - - - ~ ~ ^ ^ - " ' "
                                                                                                                                ~ ^ ~ - - ~ ~
                                                                                                                                              ~ ~ ~ ~ ' ' '
 
SPIE REY. 1 VOLUME: PROCEDURES                  SECTION: IP 3.1 AFFECTED            AFFECTED PAGES          PAGES REV. 1          REV .' O                          CHANGE                                        REASON                                      EFFECT
  .P. 3, 2.2            P. 3, 2.2 Addad responsibility of providing                        Annual Update                        Recognize Support Services logistical support for deployment                  ASLB Hearing Conumitments/            Coordinator's role in assisting EP of Federal resources.                              Stipulations                        ~ Advisor in accomodating Federal Resources.
P. 3, 2.3        Deleted Security Officer.                        Annual Update                        Make consistent with plan change -
elimination of EOC Security position.-
P. 5,              P. 5              Added step to " ensure Massachusetts ASLB Hearing Conunitments/
5.2.3              5.2.3            Response documents are available.
Ensure documents are made available Stipulations                          should Massachussetts respond.                                        ,
P. 5              Delse step.                                      Annual Update 5.2.4' Make consistent with plan change -
elimination of EOC Security position.
P. 6,                P. 6            Changed attachment number.                        Annual Update                        Make consistent with renumeration of 5.2.6 B              5.2.7 B-attachments.
* P. - 7                P. 6            Added note to prevent State                        Drills / Exercise Comunents          Eliminates unnecessary transmittal.
5.2.8                                Notification Fact Sheet.from being
+
5.2.9 forwarded to Staging Area.
L.
P.-8                P. 7            Added new step to provide                        Annual Update                          Ensure that EP Advisor, appointed instructions to assist EP Advisor 5.2.13                                                                                  ASLB Hearing Comunitments/
(entire)
Federel TJaison, has the appropriate -
by providing logistical support to                Stipulations                          logis.ucal support for deployment of                                  '
federal responders.                                                                      federal resources.
l t                                              r        -
m                                      .w--.        w ...m. _ _ _ . _ _ _ _ _________.m_ _.,__._m__._  ._.,, m___m.
 
SPIE RET. 1 VOLUME: PROCEDURES                    SECTION:  IP 3.1 AFFECTED    AFFECTED                                                                                                                                      '
PAGES      PAGES REVo 1      REV. O                                    CIIANGE                                  REASON                          EFFECT P. 7, 5.3                  Deleted section.                          Annual Update                  _
Make consistent with plan change -
(entire) elimination of EOC Security.
P. 10                      Deleted Attachment.                    Annual Update                      Make. cons!. stent with plan change -
Att. B (entire) elimination of EOC Security.
o 4
1 e
-.    .--._.-m  - - - - . - - - . - , -                            . - - - - -  -
w
___.a. --_. . -      . . . - .-.x
 
SPIE RET. 1
    -VOLUME: PROCEDURES              SECTION:            IP 3.2 AFFECTED        AFFECTED 1PAGES          PAGES~
            ' REY. 1        REV. O                          CHANGE                                                  REASON
_                                      EFFECT                      .i P. 3,          P. 3,          Add additional supporting                                    Annual Update                Add more detail to support functions-
      -2.2              2.2            responsibilities of administrative                                                        of administrative staff.
staff.-
                                              + Traffic control
* Communications
* Field Team Dispatch P. 4          P. 4            Add note recognizing expedited bus                          Annual Update                Provide guidance to Staging Area mobilization scheme.                                        FDfA Technical Assistance /  Leader.
Plan Review ASLB Hearing Commitments /
Stipulations P. 4,            P. 4          Add step to assign administrative                            Annual Update                Provide support to Field Team 5.1.3                            staff to assist with Field Teaa                                                          . Dispatcher to expedite Field Team dispatch.                                                                                  dispatch.
  ~ P. 5              P . 4 ',      Changed title, " Yankee Mutual Aid                            Annual Update.
5.~1.10                                                                                                                    Correct reference to appropriate 5.1.9          Plan" to *Eervice Request *.                                                              mutual aid resource.
P. 5,            P. 4,          Changed ' mutual aid
* to.                                  Annual Update 5.1.11'          5.1.10
* replacement
* in reference to Minor clarification of second shift.
Traffic Guides.
P. 5,            P. 7,          Added detail to field te a                                  Annual Update                Enhanced instructions with more
  '5.3.4,            5.3.4,          coordination instructions.                                                                detailed guidance for ease in rieeld D.2-6            D.2-6 team coordination.                      -
P. 9            P. 7,          Added ' Route Guide" and' reference                          Annual Update                Combine support function that 5.3.4E,          5.3.4E,          to bar yards.
5.3.4E.1        5.3.4E.1 administrative aides provide.
 
SPIE REY. 1
_ VOLUME: ' PROCEDURES          . SECTIO.5                IP 3,2 AFFECTED              AFFECTED PAGES              PAGES REV. 1            REV. O                                    CHANr.;E                                      REASON                                        EFFECT P. 11                P. 9,      Add step to notify Road Cre.rs at                                Annual Update                              Allow Road Crew companies sufficient Att.2,                Att. 2      Alert.                                                                                                      time to mobilize Road Crews.
A.5 P. 12,                P. 9        Revised terminology.                                            Annual Update                              Minor editing.
Att. 2,                Att. 2 A.6                    A.6 P. 13,                P. 11      Added step to obtain Evac. Bed Bus                                Annual Update                              Incorporate evac. bed bus concept.
Att. 2                Att. 2      status.                                                          FEMA Technical Assistance /
B.6                                                                                                Plan Review P. 14,                                                                                              ASLB Hearing Commitments /
Att. 2,                                                                                            Stipulations B.8                                                                                                                                                                        -
P. 14                  P. 11      Changed " ambulance" to " van.'                                  Annual Update                              R(cognize plan change.
  'Att. 2,                Att. 2 B.11                  B.9 P. 14,                P. 11      Added step recognizing regionel                                  ASLB Hearing Comunitments/                  Recognize use of and concepts.
Att.-2,                Att. 2    manning sequence, 2 hour delay of                                Stipulations                                contained in Appendix J.
activating ACPs; supplemental
  .B.12' ACPs.
P. 16                  P. 12      Revised step                                                      Annual Update                              General enhancement of instructions Att. 2,              .Att. 2,          . Reference to " Service Request".                                                                      to improve clarity.
  "B.20,1-3.                B.17,1-3      . Reference to Traffic Support and Transportation rooms.-                      .
                                          . Reference to Route Guide procedures /assigtusents.
                                          - Reference to map books.                                                                                                              '
 
SPRE RET. 1
, . VOLUME: PROCEDURES                                      SECTION:    IP 3.2 AFFECTED            AFFECTED PAGES        PAGES REV. 1      Ri:,V. O                                      CHANGE                                                                                                                    REASON                      EFFECT P. 20,              P. 15                              Complete revision to facility sign- Annual Update                                                                                                      Provide additional information.
Att. 4              Att. 4                            in sheet.
(entire)          (entire)
~
P. 21              P. 15                              Added revised Staging Area diagram. Annual Update                                                                                                      Update diagram to reflect Att. 5              Att.'5                                                                                                                        ASLB Hearing Comitments/                                    enhancements, show liaison Stipulations                                                phones / work stations.
1 i
  ,3-s--v---e    __3__m    _ - _ _ -____.=--------:------
                                                                            - - - - - - - - - - - - - - - - - - ' - ' - - - - - - - - - - ' - - - - - - - - ' - - ' - - - - - - " ' " - ~ ^ - - ' - -      #    ~ '
 
E1 VOLUME: PROCEDURES            SECTION:      Ip 3,3 AFFECTED        AFFECTED PAGES        PAGES REY _4      REV. O                    CHANGE                                    RFASON                  EFFECT P. 4            P. 4          Revised steps 5.1.2 through 5.1.4. Annual Update                  Clarification of directions for
.                                                                                                      transporting the EWF.
O 1
f
  ,,y_ , , . _ - n        ,sy,-    ~ ~ ~ - - y  '
                                                      *4 **'' ' " ' * '    '''' ''  ~"      '
                                                                                                *#~
 
SPDE REY. 1 UOLUME: PROCEDURES  SECTION:    IP 3.4 AFFECTED    AFFECTED PAGES      PAGES REV. 1    REV. O                  CHANGE                            REASON              EFFECT P. 4/5    P. 4      Revised and expanded actions for    Annual Update          Clarifies actions required for the transport of Monitoring Trailer.                          transport and set-up of Monitoring Trailer.
P. 5        P. 4      The words " prior to transporting  Annual Update          Clarifles the procedure step.
the trailer" have been deleted in step 5.1.6 A.
P. 5      P. 4      Step 5.1.7 was reworded.            Annual Update          Clarifies the procedure step.
P. 6      P. 5      " Yankee Mutual Aid Plan
* was      Annual Update          Correction of agreement title.
j                        replaced with " Yankee Emergency Mutual Assistance Agreement.'
P. 6        P. 5      Reference to water in holding tank  Annual Update          Provides plan with flexibility in has been deleted in step 5.1.17.                          available options for the disposal of waste water.
P. 7        F. 6      Revision of step 5.1.20.            Annual Update          Provides Radiological Health Advisor flexibility in deciding where to place the trailers after an emergency.
P. 7      P. 6      Revision of steps 5.2.1 and 5.2.2. Annual Update          Clarifies the fact the trailer i                                                                                    drivers do not necessarily report to
'                                                                                    the Staging Area, but may be directed to report elsewhere.
P. 7      P. 6      Revision of step 5.2.3.              Annual Update          Reinforces the flexibility that the
[                                                                                    Radiological Health Advisor has in I
deciding where the trailers are placed after an emergency.
i
 
SI9E RET. 1 VOLUME: PROCEDURES        SECTION:    IP 3.4                                                                                                                                                    ^
AFFECTED          AFFECTED PAGES          PAGES l          REV. 1          REV. O                CHANGE                                                              REASON                          EFFEC _T P. 10,            P. 9,    Revised diagram.
Att. 2          Att. 2 FEMA Technical A::sistance/      Add more detail to diagram to Plan Review                      accurately represent mon /decon
* Changed title to " Layout of the                              ASLB Hearing Commitments /
Monitoring / Decontamination operations (including Plan changes).
Stipulations Trailer."
                                    + Added location of cordless telephone.
                                    . Added reference to 2 monitors per frisking station.                                                                                                                                                '
Specified flowpath by labelling i                                    entrances / exits.
j                                    Added storage location for bicrons.
P. 11,          N/A        New diagram.                                                  ASLB Hearing Comunitments/
, Att. 2 Account for additional monitoring.
Stipulations                      stations.
                                    . Addition of second trailer diagram showing add 3tional monitoring stations.
P. 13,          P. 11      Revised diagram.                                                Annual Update                      Enhance diagram to accurately Att. 4          Att. 4                                                                      ASLB Hearing Comunitments/          represent mon /decon operations
                                    = Added storage location for                                  Stipulations                        (including Plan changes).
bicrone.
Specified.flowpath by. labelling entrances / exists.
I
        ,#, m                                                    _y=--    -c e , ~ , - ~~        <++m-y          , - * , -            **+c
                    =%,,                          v. * % , ,            -                r            ,w~  -,e          -
e w-e      = ~ sa e e<  e-  --La 1 w-'-a= - - . - - -- -, s*- - - - -
 
1
  ~ VOLUME: PROCEDURES      SECTION:        IP 3.4
  .AFFECTED        AFFECTED PAGES          PAGES REV. 1        REV. O                    CHANGE                                REASON                                      EFFECT P. 14,      'N/A          New diagram.                              ASLB Hearing Conunitments/            Account for additional monitoring Att. 4                                                              Stipulations                          stations.
                                . Addition of second trailer diagram showing additional                                                                                                          I monitoring status.
P. 15        P. 12,      Revised diagram.                          Annual Update                          Enhance diagram by showing more Att. 5        Att. 5                                                ASLB Hearing Conunitments/            detail to more accurately reflect
                                . Title change to " Reception Center Stipulations                              operations prescribed by the Plan.
Traffic Control and Facility Layouts (North Andover).
* Added second trailer.
Location of temporary school bus /special vehicle waiting area.                                                                                                -
P. 16..        N/A          New diagram.                              Annual Update                          Show detail encompassing monitoring Att. 5                                                                ASLB Bearing Commaitments/            trailer and Reception Center Showing evacuee flowpath.            Stipulations                          operation.
' P. 17          P. 13      Revised diagram.                          Annual Update                          Enhance diagram by showing more Att. 5          Att. 5                                                ASLB Hearing Comualtments/            detail to more accurately reflect
                              . Title change to " Reception Center Stipulations                                operations prescribed by the Plan.
Traffic Control and Facility Layouts (Beverly).                                                                                                                    '
                              . Added second trailer.
                              . Location of temporary school bus /special vehicle waiting area.
.P. 18,        N/A          New diagram.                              Annual Update                          Show detail encompassing monitoring Att. 5                                                                ASLB Hearing Cosmiitments/            trailer and Reception Center
                              . Showing evacuee flowpath.                Stipulations                          operation.-
        .-    ,, .. ,        ...      ,  , ,            , .,          ..          .    . -  =-      . - . . -          _.~ _ - - -    - . - - - . _ - - - - - - - -
 
1 VOLUME: PROCEDURES          SECTION:          IP 3.4 AFFECTED          AFFECTED PAGES    PAGES REV. 1    REV. O                        CHANGE                            REASON                  EFFECT P. 19-20,          N/A      New diagram.
Att. 6 Annual Update              Illustrate Plan change.
ASLB Hearing Commitments /
                                  - Showing supplemental monitoring        Stipulations for North Andover.
P. 21              N/A      New diagram.                            Annual Update              Accurately reflect mon /decon Att. 7 operations.
                                  " Supplemental Monitoring /
Decontamination Facility Transportation Layout (North Andover)"
P. 22                        New diagram.                            Annual Update              Accurately reflect mon /decon
    ' Att. 7 operations.                *
                                  " Supplemental Monitoring /
Decontamination Facility Transportation Layout (Beverly)
O  r-e,=-,%..w*- s e            p      .- "
g=+        g v- e *
* f              - Oe  u 4r    w-              g m4    -r-
 
SPIE REY. 1 VOLUME: PROCEDURES        SECTION:              IP 3.5 AFFECTED    AFFECTED PAGES        PAGES REV. 1        REY. O                          CHANGE                                                      REASON                                            EFFECT P. 5 -      P. 4          The words
* ensure the parking                                  ASLB Hearing Conunitments/                                  The change assigns this task to the lot (s) is being cleared by                                    Stipulations                                                Reception Center Leader and assures Massachusetts Electric Co.' have                                                                                            that Massachusetts Electric Co.'s been added to Step 5.1.1.                                                                                                  property will be available for evacuee parking.                      '
P. 5        P. 4          New Step 5.1.6 has been inserted.                              ASLB Hearing Commitments /                                Reflects use of dedicated congregate Stipulations                                                care centers for transit-dependent-parents and their children.
P6 6        P. 4          " Yankee Mutual Aid Plan
* has been                            Annual Update                                              Correction of agreement's title.
replaced with " Yankee Emergency Mutual Assistance Agreement".
Steps 5.2.5, 5.2 6, and 5.2.7                                  Annual Update                                              Correction of out-of-sequence steps.
relocated to prop.. position.
  .P. 7      P. 6          Revision of Step 4.b.                                          Annual Update                                              Clarifies the fact that transportation is provided to evacuees who require it to get to a school or host facility in addition to those who require it to get to a congregate care center.
P. 8        P. 6          The words "and congregate care                                ASLB Hearing Comunitments/                                  Reinforces the fact that the referral for' were inserted in Step Stipulations                                                                          registration and congregate care C; and Step C.1 was added.
referral functions have been combined-into a single function.
  .P. 9      P. 10        Revision of Steps A through E.                                Annual Update                                              Clarifies the process of congregatei care referral and consolidates it with evacuee registration.
4
      ,-w ,v ,  r -              e v-  e rug  --er<                , - -    ~              g -      m-  y- -. ,  -+p      g -++vy-..  .,. -,-, ., -        *  -%_ y.,  , ., ..-.-.  ,
 
SI9E REY. 1 VOLUME: PROCEDURES    -SECTION:                            IP 3.5
    .AFFECTED      AFFECTED
        'PAGES        PAGES REV. 1      REV. O                                      CHANGE                                REASON                                    EFFECT P. 10          P. 7      Revision of Step 4.                                Annual Update                                        Clarifies the registration process for evacuees who do not need temporary shelter.
P. 10          P. 7      Revision of Steps 5 through 9.                      Annual Update                                      Clarifies actions required by Reception Center staff assigned to evacuee registration.
P. 11        P. 8      Revision of Steps D.1 and D.2.                      Annual Update                                      Clarifies actions required by Reception Center staff assigned to registration of school and special populations.
P. 12        P. 8      The words ' establish and" have been Annual Update                                                      Clarifies that the Reception Center added to Step E.1.                                                                                      staff assigned to this function are responsible for setting up the filing-system.
    . P . - 13      P. 9      The words "ask for appropriate                      Annual Update                                        Clarification of verification identification prior to releasing                                                                        actions.
the message" have been changed to
                              " verify identification prior to releasing the message".
P. 15          P. 11    A reference has been added to                      Annual Update                                        Procedure now provides reference to Section 6.0.                                                                                            Appendix M.
l              ,,,,        .
                              ... i,... , . , , . . ...i-i.-ii,,m      i i.
l5                    P M M P M W "' 1 M
 
SI9E:' RET. - 1 VOLUME: PROCEDURES              SECTION:              IP 3.5 AFFECTED- AFFECTED
                    .PAGES          PAGES
                    -REV. 1        REV. O                          CHANGE                        REASON                    EFFECT P. 17              P. 13      The words */ Congregate Care            ASLB Hearing Comunitments/  Reinforces the fact that the Referral" have been added after          Stipulations                fune.tions of evacuee registration and evacuee registration and the                                        congregate care referral are now number of people has been                                            combined. Also, the change provides changed from 3 to 6.                                                _an increased number of personnel to support. registration.
The words " Clean Tag Issue
* have      ASLB Hearing Comunitments/  Clarifies that Reception Center been replaced with " Monitoring        Stipulations                staff are responsible'for monitoring Trailer Registration".                                              trailer registration, not issuance of clean tags.
P. 18              P. 14        Revision of Item 9 on checklist.        ASLB Hearing Ceaunitments/. Reflects use of dedicated Congregate Stipulations                Care Centers for transit-dependent parents and their children.
The words " registration /" have been ASLB Hearing Comunitments/      Reinforces that evacuee registration added to Item 10 of checklist.          Stipulations                and congregate care referral have been combined.
P.'19                P. 14      Item numbers 12, 13, and 14 have        Annual Update                Clarifles actions required by been added to checklist.                                              Reception Center Leader in the performance of emergency duties.
P. 20                P. 14      Item number 15 has been added to        Annual Update-              Change establishes a mechanism for checklist.                                                            the Reception Center Leader to obtain l-                                                                                                                additional transportation resources
!                                                                                                                  if required at the Reception Center.
                                      .- .-        n--.
 
                                                                                      ~
VOLUME: PROCEDURES            SECTION:        IF 3.5
,      AFFECTED              AFFECTED PAGES          PAGES REV. 1          REY. O                CHANGE                                REASON                                                    EFFECT P. 20                P. 14    " Yankee Mutual Assistance Plan
* has Annual Update                                            Correction of the agreement's title.
been replaced with " Yankee Emergency Mutual Assistance Agreement".
P. 24                P. 19    "JMC" changed to *MC".                  Annual Update                                        Correction of Media Center's designation.
    -P.          25        P. 20    Two trailers (instead of one) shown ASLB Hearing Comunitments/
on Reception Center layout.
Reflects additional monitoring Stipulations                                          stations at Reception Centers (based on revised evacuee load estimates).
P. 26                P. 21    Two trailers (instead of one) shown ASLB Hearing Comunitments/
on layout.
Reflects additional monitoring Stipulations                                          stations at Reception Centdrs (based on revised evacuee load estimates).
e
                                                                                                  , . . . _ . . ____,...---_.3.__=.        ,__.__-x    ,, -.m,. a.,
 
VOLUME: PROCEDURE                        SECTION:      IP 4.1 AFFECTED                AFFECTED PAGES,                      PAGES.
REV- 1                      REV. O                      CHANGE                            REASON                                          EFFECT P. 3, 2.1              .P. 3, 2.1      Designated the Emergency            Annual Update                                    Made responsibility consistent with Preparedness Manager as being                                                          the EP Tr CR organization.
responsible for implementing IP 4.1.
P. 6                    ----
Provided procedure for protecting  Annual Update                                    Ensures regulatory commitment related 5.10                                      plan and procedure steps that need                                                    procedure steps are not deleted'or through.                                  to be preserved in future revisions
                                                                                                                                    ' changed in subsequent revisions.
5.13                                      due to regulatory commtitments.
e
_ . _ ,        __,.~...__-..-mm
                                            .,,  y    y  < W+  +      e  *    *        " ''  '    ' - - - - - - - -
                                                                                                                                  ~~ ~ ~ - '
 
SPIE REY. 1 VOLUME: PROCEDURE                  SECTION:      IP 4.2 4
AFFECTED 'AFFECTED PAGES-                PAGES REV. 1                REV. O                                  CHANGE                                              REASON                        EFFECT
    ..P. 3, 2.3        P. 3, 2.3            Replaced " Manager of Plans and i'
Annual Update              Made procedure consistent with Procedures
* with " Emergency                                                                    EP 4. CR organization.
Preparedness Manager" as the 4
Individual responsible for reviewing and revising plan / procedures.
    'P. 3, 2.4- P. 3, 2.4                Replaced.*NHY Manager of Plans and                                Annual Update                Made procedure consistent with' Procedures
* with EP Plans &                                                                    EP & CR organization.
Procedures Supervisor as the individual responsible for directing E-Plan staff.
P. 5,            P. 5,              Replaced ' Manager of Plans and                                    Annual Update                Made procedure consistent with 5.1.1 C,          5.1.1 C,            Procedures" with
* Emergency 5.1.2 C-                                                                                                                              EP & CR organization.
5.1.2 C            Preparedness Manager."
    ~P. 6, 5.3      ,P. 5, 5.3            Replaced " Manager of Plans and                                    Annual Update                Made procedure censistent with Procedures" with
* Emergency                                                                    EP & CR organization.
Preparedness Manager" and EP Plans and Procedures Supervisor.
  . P. 8,            P. 6,                Deleted statement that the Document Annual Update 5.3.4 B                                                                                                                                Eliminated redundancy with Change 5.3.4 B 3' Revision Form is to be attached to                                                                        Control Team form.
each revised document.
P. 8,            P. 6,                Deleted reference to NHY-Annual Update              Added flexibility by'not limiting 5.3.4 D          5.3.4 D-            Radiological Assessment Manager.                                                                onsite review to the Radiological Assessment Manager.
              . , , + . ,            -    f,        L.                        ~
 
SPIE REY. 1 VOLUMEi PROCEDURE              SECTION:      IP 4.2 AFFECTED          AFFECTED
            .PAGES            PAGES REV. 1            REV. O                        CHANGE                                                                          REASON                                              EFFECT P. 8              ----
Added step that proposed revisions                                                      Annual Update                                    Provided control'of changes to ensure
  -5.3.4 F                            must be approved by the Change-                                                                                                          integrity of plan is maintained.
also                                Control Team (CCT).
P. 9,              P. 8, 5.4.2 G            5.4.2 I,K P. 9              P.        7,    Replaced " Manager" with                                                                Annual Update                                    Made procedure consistent with 5.4.2 A.F          5.4.2 A,F
* Supervisor".
EP Te CR responsibilities.
P. 15,            P. 15,          Added reference to ER 3.6.                                                                Annual Update                                    Enhances consistency with SSREP.
, Att.. 4,          .Att. 6, P.'2,              P. 2 1P. 16,                P. 17,          Added reference to ER 5.8.                                                                Annual Update                                    Enhances consistency with SSREP.
Att. 4,            Att. 6, P. 3                P. 4 P. 17,              P. 17,.        Noted ER 6 series procedures were                                                        Annual Update                                    Enhances consistency with SSREP.
iAtt. 4,              Att. 6,          deleted.
; P; 4              P. 4
: P.18                P. 19,          A'dded additional references for                                                        Annual Update                                  . Enhances consistency with other-i A t .        '4,  Att. 6,          public information interfaces.                                                                                                            procedures.
I P. 3                P. 6 P. 20,          Deleted emergency preparedness                                                          Annual Updatei                                    Enhanced consistency with current Att. 7          revision tracking log.                                                                                                                    procedure.
I is
  . , - . -  9,%...  ,,p.._-y,,-      ,v,w-    ,.~
y3 yy  an y    ,                    ,,w      ,            ec- r uwr e    w              u e vwwv-w--- S r* g .vr-e w7e,  w www-  ,r- r---,r,%__ , m_ < u-m__o wr_.-m_ m- _ - _ _ m m----w.
 
SPIE: REY. 1 VOLUME: PROCEDURES    SECTION:      IP 4.3 AFFECTED      AFFECTED PAGES        PAGES REV. 1      REY. O                  CHANGE                            REASON                  -EFFECT P. 3          P. 3,    Clarified EP & CR title references    Annual Update              Made title references consistent with 2.1, 2.2-    2.1, 2.2  as follows:                                                      EP & CR organization.
                          " Emergency Preparedness Resources and Facilities Manager
* replaced the " Director of Energency Response and Implementation *, and the
                        " Radiological Assessment Manager".
P. 3, 3.0 'P. 3, 3.0 Added " alternative methods are            Annual Update-            Provides for the repair / calibration P.5, 5.2C P. 5,        :available".                                                      of equipment when replacements or 5.3.3C                                                                      alternative methods are available.
P. 4.-      P. 4 -    Deleted reference to 3 month          Annual Update              Inventory schedule is consistent with 5.1.1        5.1.1      inspection.                                                      "all regulatory guidance and-requirements.
P. % 5.1- P. 4, 5.1 Updated responsibilities / actions to Annual Update                    Made responsibilities consistent with be consistent with EP & CR                                        those of the EP & CR~ organization.
procedures and responsibilities.
Incorporate appropriate references    Annual Update              Facilitates reference to appropriate to EP & CR procedures.                                            EP & CR procedures.
P. - 4,      P. 4,      Deleted " Control Room' from those    Annual Update              EBS is activated by_the EOC.
5.1.7        5.1.7    who receive EBS Authentication Codes.
        ~_____.                  .-.                                              _.
 
s M1 nVOLUME: PROCEDURES. .SECTION: ,,,,,,Jp 4.3 AFFECTED- AFFECTED.
            'PAGES.        -PAGES REV. 1'      REV. O                      CHANGE              -
RF.* SON                                                          EFFECT P . 5,-            P.S.        Deleted reference to Attachment 1,              Annual Update                                                                                Equipmert discrepancies are recorded S.2.1A, B.        5.3.3.'A,. Equipment Discrepancy List, and                                                                                                              on the Facilfty Inventory Checklist
    .5.2.2, 3,          B, C.
replaced it with Facility                                                                                                                  .
maintained by the EP & CR A _                5.3.4, 5    Inventory Checklist.                                                                                                                          organization.
6 P. 7 ATT    Deleted 'E'quipment Discrepancy                  Annual-Update                                                                                Equipment discrepancies.are recorded:                                        -
1,1          List."                                                                                                                                        on the facility Inventory Checklist
                                                                                                                                                                                - mintained by the EP & CR i
organization.-
1 M
u W
M
        .,s.,4  w.  ,.      w  ... o -g u  .-a -eg-  _p +  e .,v.-- -
                                                                            -. +. -e n              .
4i-              s- =
p.-                              -y-y  o ,- m--  .-y,,--- y __ _-, ;-_. __u .;-  .__a_w
                                                                                                                                                                                                                              ;        _am_.,    ,  ..__m__,.
 
hif9%M
            ,,,,m. , . . . . -        . . .
. 3                                                                                                                                                                                            =
1
.              -                                                                                    SPBE REY. 1
  . VOLUME: PROCEDURES                      SECTION:        'IP 4.4                                                                                                                      -
  'AFFECTED                      AFFECTED
        ' PAGES                    PAGES REV. 1                  REV. O                          c:> ANGE
                                                                        .                                                      REASON                                EFFECT Jh 3, 2.0                    .P.3, 2.0      Replaced Director of Emergency                          Annual Update                                  Made procedure consistent with the lP.4, 5.0                      P.4, 5.0      Response and Implementation with EP                                                                    responsibilities of the EP & CR P.4,                        P.4            Resources and I'.icilities Manager.                                                                    organization.
C5.2.1                            5.2.1 P.10,                        P.11, 5.2s1                        5.2.4 1P.5,
      ~
P.4. 5,      NAS is tested on a monthly basis                        Annual Update                                  All, testing schedules are consistent 5.'2.3A                      5.2.3A        (control room NAS is tested weekly)                                                                    with regulatory guidance,and              -
requirements.
Deleted' details'of how NA!. testing . Annual Update                                                  .-Details of NAS' testing are provided
                                              'is conducted.                                                                                            in Attachment-2 to IP 4.4.
P.~-5..                      P. 5,        Deleted reference to Centre:t and                        Annual-Update-Testing.of-the Centrex Telephone-
: 5. 2.~3B                      5.2.3E        Dimension'2000; (replaced by                                                                            system and Dimension 2000 system are conaiercial telephone).                                                                                  subsumed under Comunercial Telephone :
                                                                                                                                                      . System..
P.-6,        Commercial and dedicated telephones Annual' Update                                                    :All testing-. schedules ~are consistent-5.2.3B.5      are now tested on a quarterly                                                                          with regulatory guidance and-basis.                                                                                                  requirements.
P. 5,                        P. 6        Deleted details on how conumercial  _
Annual Update                                ; Details of commercial.. telephone:
5.2'3B.1'.                    5.2.3B.4-    telephones are to be tested.                                                                            testing are providedLin Attachment-3 to IP 4.4.
P . 5 ,' .                    P. 6,'      Deleted details.on conducting test. Annual Update.                                                      Details'of' dedicated telephone
:5.2.3B.3                      5.2.38.5    of dedicated ring down circuits.                                                                        testing are provided-in Attachment 4' Lto IP 4.4.                              .
                                                                                                                                '------m---  - - -      -----m- - -
                                                                                                          ,-me.-        ----
                                                          -w r ms,-  w  = .%---e  s.w*%- *-w--sa-  -
m-
        .e  .
4
                                            . m-.m  ~ .r
 
                                                                                                      - SPIE REY. 1                                                                t iVOLUME:" PROCEDURES                        SECTION:      IP 4.4
    'AFFECTED                  AFFECTED
            - PACES                PAGES
            ' REV. 1                REV. O                                CHANGE                                      -REASON                          EFFECT P.-7..                P. 7                The~ORO paging system is tested                    Annual Update                      'All testing schedules are consistent
        '5.2.3C.                5.2.3C            _
quarterly.-                                                                            with regulatory guidance and-requirementss Deleted ~ reference to tbe Test                      Annual Update                      Eliminated duplication of information" Notificatica Message Form.                                                              Confirmation'of individual pager response is recorded on the METS        t printout.
The Melita Emergency'                                                                    All testing schedules are consistent Telenotification System (METS) is                .
with regulatory guidance and tested semiannually.                                                                      requirements.
P. 7                  P. 8              Added reference to Seabrook Station Annual U'date              p                          Provided reference to Seabrook 5.2.3E                5.2.3E            procedure for performing Siren                                                          Station procedure.for performing Testing.                                                                                - siren. testing'to reflect actual testing responsibilities..
The siren system is tested                                                                A71 testing schedules are consistent quarterly.                                                                                with regulatory guidance and-requirement.                            .
' P . 7_                        P. 8-            Added that no transmissions are to                    'ASLB-Hearing Commitments /.    - MAGI is tested only by receiving.
* 5.2. 3F '                  -. 5.2.3F          be made-for testing the MAGI radio                    Stipulations                      signals.- NHY is' authorized.to use system.                                                                                :  MAGI _only in the event of an emergency.
P. 7, P; 9,              Clarified that a portion'of.the                        Annual Update-                    All testing' schedules are consistent
  -5.2.3G                    5.2.3G~            field radio.crwenmication system is                                                      with regulatory guidance and~
tested quarterly such that'the                                                            requirements.
entire-system is tested annually.
                                                                                                                  .                1 94y,,  #      4- p    g ,  v!e .-i-v>-    i*%'-' '  N  - " " '
 
l    lllh r
SPMC          CJ. 1
  . VOLUME: PROCEDURES            SECTION:      IP 4.4 AFFECTED        AFFECTED PAGES      PAGES
          ~ REV. 1    REV. O                        CHINGE                                            REASON                        EFFECT
  . P. 8            P. 10            Clarified that Base Radios are.also Annual Update                                  Made procedure consistent with
  -5.2.3 G2        '5.2.3 G2        located at the VANS Staging Areas                                                  . facility comununication equipment. -
and Emergency Operations Center.
P. - 9,        P. 10          Removed reference to replacing                    Annual Update                      Itadio batteries are maintained on.
5.2.3 G3      .5.2.3 G3a batteries in portable radios.                                                              charge at the. facilities.
P. 10          P. 11,          Deleted ORO personnel's                        . Annual Update                      Eliminated duplication of 5.3            - responsibilities with respect to                                                    information. Confirmation of filling out-documentation for pager                                                  individual; response is recorded on testing.                                                                            the METS printout.
P. 11 .          P. 12          The following changes were made to              Annual Update                      Testing. schedules were' modified to ATT 1          ATT 1            the Conununications ~ Testing                                                        reflect need and in some cases ensure Schedule:                                                                            consistency with other plans-(i.e.,
NHRERP and SSREP). 'All schedules are
                                    . METS'is.now tested semi-annually                                                  consistent with regulatory guidance'
                                    *-NAS is tested monthly .                                                            and requirements.
                                                                                                                                ~'
(Primary NAS-in control room is tested weekly)
* Field radio communications.are tested quarterly-
                                  . NHY ORO Emergency Communication
                                      . System Quality l Assurance Test was
                                      ' deleted.
                                  - . Dimension 2000(commercial telephone) is tested quarterly
                                  - . ORO pager: system is tested' quarterly  .
                                  . Siren' control equipment is tested quarterly.
                                                                                                                                            ~-~~-~
          . . - -        - .-.....-.-A                    ~      - - - - - - - - - - - - - -        - :-          '-        --      -~
 
1 SPIE REV. 1
      . VOLUME: PROCEDURES                          SECTION: _ IP 4.4 AFFECTLS              AFFECTED.
PAGES'                  PAGES REV. i                  REV. O                                            CHANGE                                              REASON                                EFFECT iP. '12        ,        P. 13                Updated NAS test report to reflect                          Annual Update                                      'All testing schedules are consistent
      ~ATT.2                  ATT 2                monthly testing.                                                                                                with regulatory' guidance and.
requirements.
Replaced Radiological Assessment                          -Annual Update                                        Made procedure consistent with.the Manager with EP Resources and                                                                                    responsibilities of the EP.&-CR-Facilities Manager as the                                                                                        organization.
                                                                                                                                                                                                ~
Individual contacted to report problems with the.NAS.
P. 13,                P. 14                Added Emergency Telephone                                    Annual Update                                      Facilitates' implementation of ATT 3                  ATT 3                Conununication System Checklist.                                                                                communications testing.
P. 15                This checklist replaces the ATT 4                Dimension 2000 system log,                                                                                                                    -
P. 16                telephone.line quarterly-                                      2 ATT 5                comununications checklist and 'the Seabrook Station facilities and support organizations telephone communications' checklist.
P. 18                Deleted Test Notification Message                          - Annual Update                                      Eliminated' duplication of ATT 5                Form.                                                                                                            Information. Confirmation of individual pager response is recorded on the METS printout.
l l
l.
  ?
l l
b
                                                                                                                      ''-^ ^' ' " " ' ' '    ~' ' ' ' ' ''' ' ' ' ''
a .
1,s .,_h        .
                                      . U .~ e m. .,  ., - - - - - = - ' ' * - -+"'--w  '    - ~ - ~ -'
 
SPBE REV. 1                                                              '
VOLUMEi PROCEDURES                SECTION:          IP 4.5 JAFFECTED                      AFFECTED
                -PAGES              PAGES REV. 1          __ REV. O                          CHANGE                                                                  REASON                    EFFECT
:  P.'5, 5.3                  P. 4, 5.4  Deleted "NHY Vice President -                                                    Annual Update                    The Executive Director of Bnergency Nuclear Production" and added                                                                                      Preparedness and Community Relations-
                                          '" Executive Director of Emergency                                                                                  has the authority to submit the Preparedness and" Community                                                                                        Annual Letter of Certification.
Relations."-
N e-
                                                                                                                                            .$  m
                                                                                                                                                    ,, ' ~
a
                                                                      " * * " " - - - ' ' " * - * " " " ' ' - ' * * # #''  ' ' ' ' ~ '
                                                                                                                                        '~,.                                                  Y
_,_.m.- 1.e  .Aw        --'i: %+^F ' " ' " "#
{      _
 
i  ,  l lll u SPEC -RET. 1 JVOLUME: APPENDIX A        SECTION:
[AFFECTED        AFFECTED-
      ' PAGES'          PAGES REV.'1          REV. O                CHANGE                                          REASON                  EFFECT 1A-1/MA.          A-1/ Siren Replaced Siren. Pole Location Map                  Annual Update            Updated Appendix A to be consistent
    -Acous-          pole map with Massachusetts Acoustical                                                  with REP-10 report.
    -tical-                      location overview map.
overview
    -Emergency Emergency Replaced Emergency Response                          .
Annual Update            Provided unredacted version of' map. .
Response -Rerronse          Facility map with an unredacted Fccilit-        Ferrflit- copy.
ies Map        les rt.p
[
I'
  , x_    .      .:.__--..~---~z---.
                                                      - - - - - - - - - - - - - -              = cr = A A-'          --      ~ ~ ^
 
a--                            -
m . . . . . . .
l
                                                                                                                                                                                                          ~
y
        ~
SPIE REY. 1                                                                -
UOLUME: APPENDIX C                    SECTION:
AFFECTED- AFFECTED
              -PAGES                  PAGES REV. 1                REV. O                            CHANGE                                                                    ' REASON                  EFFECT
      '1 - Buses ~i - Buses Added Big W Transportation                                                                            Annual Update                  -[ Update agreements.with bus' companies:
agreement.                                                                                                      to provide and maintain adequate vehicle resources.
Deleted agreements with McKinney Bus Co., Marathon Lins, Inc.,
Michaud-Bus Lines, Paton Bus.Co.,
                                                'Flore Bus Service, Dunbar Bus Co.,                                                                                                    -
and Ryder Student Transportation.
Added agreements with Weybridge Bus Co., W. T. Holmes Transporation Co., Unda's Bus Services','Inc., R.
H. White Construction Co.,
Tremblay's Bus Co.. Inc., Oxford                                                                                                              -
Hills ~ Transit and an' additional-                                                                                                        -
agreement'with Weagle Brothers Bus Line for-the provision of evacuation bed buses.
1:- Amb.                      1 - Amb. Added BEL Ambulance agreement.                                                  Annual Update                  Update agreements with' ambulance Companies Companies                                                                      .
companies-to provide and maintain:
Deleted agreements with DiLuzio                                                                                adequate vehicle resources.
Ambulance Co.,-General AmbulanceL Service, Bay State Ambulance and Amoskeag A:nbulance.
Added agreements with Medec Ambulance -Frcnt Line Ambulance',
Kimball Ambulance Service, Russell Ambulance'and Air Service, Newton-Wellesley Ambulance, Quabong LValley-Ambulance and Act Ambulance
  =
Service.                                                                                                      ,
                                                                                                                                  ' ~ " " ' ~ ~ ' " ' ~ ~  ''
r      ~9'    -- " = ' - -    * " - - ' - ' ' * ' ~ ' " - " * - """'-"'--"#'  - -
    ,      r_______          _.m.---    -m. -
 
SPIE: RET. 1 VOLUMEi APPENDIX C                      SECTION:
AFFECTED                AFFECTED PAGES              PAGES
        ' REV. 1            REV. 0'                                CHANGE                                                            REASON                                                    EFFECT 11 -                    11 -              D61eted agreements with Federal                                  Annual Update                                            Update agreements with towing:
  -Towing                  Towing          . Auto Repair, Volpone Towing and                                                                                            companies to' provide and maintain-
  ; Companies Companies Newburyport Towing Service.                                                                                                                    adequate resources.-                                                            '
Added agreements with Hamstead Garage and R. M. Towing.
21 - EBS              11 - EBS          Deleted agreements with Radio                                    Annual Update                                            The'ORO maintains agreements with Station WCGY and Massachusetts                                                                                            'other radio station (s) to provide EBS; Emergency Broadcast System.
                                                                                                                                                                        - services.
            ~
; . cil' .-              : 11 -            Added agreements with St. John's                                  Annual Update                                            Update agreements with various
  . M dicall              Medical /- - Hospital,-Marlboro Hospital, Holy                                                                                                facilities to provide and maintain
  ; Host                  Host.            . Cross College and NEPSCO..                                                                                                adequate host space'and MS-1                                                          ,
4 capabilities..                                                                        >
111 -                  lii -            Deleted agreement with St. John's                                  Annual' Update                                          Update agreements with various CCC; RC,                CCC,~RC,          Prep. School (for congregate care-                                                                                          entities to provide and maintain'
  ~ e tc ."              etc.              space)..                                                                                                                    adequate Congregate Care Center                                                        ,
,                                                                                                                                                                        space.                                                                                ,
Added agreements with St. John's                                                                                                                                                                                  !
                                          ' Prep. School (for Congregate Care                                                                                                                                                                                  '
Space)
Added agreements with NEPSCO,-
                                        - Marlboro Boys Club, and Marboro Girls ~ Club for the provision of Congregate Care: Center. space.
      =v-%*p    .y            g,.m->  3  +  ---am-- h- u.m
* g  *'m"'                  ="-gv g *  *>8"  *r-**  N    #-ve*=''-                      .g*t-pVM*    --eM*.gpry ag7          g      m-                                    'mA-+..5:r g
                                                                                                        ]                                ..w4)  y'      q                                        --y -            w. a '
_-nt.g -_wv_._._, -y
 
            . . .      . . . . . _ .          _ - . . _ . _ - . . . . ~ _ - _ . . _ _ . - _ _ _ . -                      .__ . . . _ _ _ . _ _ .        .      .._._.._ _        - -- .    -      _.
                                                                                                                                                                                                            -a d'
SPIE REY. 1 VOLUME: ' APPENDIX C                SECTION:
    ..AFFECTED    AFFECTED PAGES        PAGES REV. 1      ~REV. 0                                      ' CHANGE                                                                      REASON                                  EFFECT-'
fili          11                        Added an agreement with                                                  Annual Update                                      ~ Update agreements with various' Massachusetts-Electric Company for                                                                                              companies to provide and maintain.
                                                                                                                                                                                                                            -i the provision of. space as a VANS                                                                                              adequate space for use as VANS-Staging'Araa.                                                                                                                  Staging Areas.
Added agreements with the Town of Seabrook, Northport Realty Trust.
Crow Lane Realty Trust, Gordon and Sons Inc., PSNH, and Capolupe &
Gundal Inc. for the provision of
                                            -space as VANS Staging-Areas.
Deleted the agreement with the                                            Annual Update                                          Coordination with the Coast Guard is      -
United States Coast Guard.                                                                                                    . handled'through NHOEM.            '
(
Added.an-_ additional agreement with                                    ' Annual Update                                        The agreement makes available an Yankee Atomic Electric Co. for ASLB Hearing Commitments /                            ' additional.. pool of personnel'and.        .;
emergency mutual assistance.                                              Stipulations .-                                        services ~to assist at the time of a-    ~d
                                                                                                                                                                            -Seabrook Station emergency..                .[
Added an: agreement with.Allcom Inc. Annual Update                                                                            .The agreement makes-available for personnel-and communication-                                                                                                personnel.and communication services:
services.-
to assist at the time'of a Seabrook^
Station emergency..
Added an agreement with the                                            ' Annual Update
                                                                                                                                                                            ~The agreement makes assistance
                                            ' Department of Health and Human.
                                                                                                                                                                            .available for radiochemical analysis:
Services / Food and Drug-Jin the event of ~an emergency at :
Administration to.prende                                                                                                        Seabrcok Station.
assistance with radiochemical analysis'.
                                                                                                        %                                                                                                                'l~
}'                                                                                                          ,
                                                                                                                                                                                                                  -__-__~.
_ -            .                - ..-          .          -              -                  --  - , .- ,                                  . , , .- . . , . , ~ . - , ,- a.                    _ ..
 
                                                                                                                                                                                                    /              ... ...-                                            .....~                    ,        . ;- .
                                                                                                                              ~                                                                                                                                                                                      .
                                                                              <r-                                                                                                          ,
                                                                                                                                                                    - - i * ''''                              - - 1
                                                                                                                                                                                                                                                        '^
                                                                                                                                                                                                                                                              ~ '- - - - -                    -
                                            ,. . . . . ,.- . ...                  ,;a
                                                                                              ^'
                                                                                                        - . s. ' ' -          - . - ' - - '
                                                                                                                                                                                                          -~                          := --
        ~.
SPIE - REY.1 VOLUME:' APPENDIX C                                      SECTION:
:AFFECTED                            AFFECTED PAGES-                          . PAGES "REV. 1                          ' REV. O                                                    CHANGE                                                                                                                REASON                                                                  EFFECT iii'                            ' il-                    - Added an agreement with Melrose-                                                                                . Annual Update                                                                              The agreement makes available a Wakefield Answering Service to                                                                                                                                                                                backup means of notifying ORO provide callout service.                                                                                                                                                                                      ' personnel at the-time of an emergency 1      ~ ~
                                                                                                                                                                                                                                                                                  - at Seabrook Station.
111-                              11                        Added an agreement with the Town of Annual Update                                                                                                                                                              The ageement makes space available at'.
Newington to have available space                                                                                                                                                                            - the Newington Town Hall for use as a for use as the Media Center.                                                                                                                                                                                  Media Center.
I. ?_
t V
                                                                                                                                                                                                                                                                            '" -a    %--'''e--*    ** *-      ---4  m u  = -m
                                                                                                                  ''****                  ' + ' ' ' '-"Y'  N'-''-l-- '
                                                                                                                                                                          '#I    'FHF'''"IF  :*'"''''t'C'T*'
                                                                                                                                                                                                  .- ' -        **:'*"''''*4'**'  - bit  -'""'''k>*-'"'    *M
                                                                    "'M'**""Li-#'  '
                                                                                          ^t''-b69F'F-T-'f''t8-**        f''  '-
                                                                                                                                  *'T'-W                  T                  -
d W-  ***8*--'V' FMP'A  '''                  --
 
a a.
SPIE REY. 1
:VOLUM22. APPENDIX D            SECTION:
    'AFFECTED 'AFFECTED.
        ~PAGES'            PAGESI REV. 1            REV. 0-                      CHANGE                                                      REASON
                                                                                                                                                                    'EFFECT
    'D-2                D          Updated NUREG-0654 cross -                                    Annual Update Updated NUREG-0654 cross - reference.
through            through      reference to be t. nsistent with                the
. D ~            D-8          current plan / procedures. Also
                                                                                                                                                .to be consistent.with the plan as-        '
revised.
deleted references to Appendix N.
d i
3.
                                                                                                                                                                                                                'i
                                                                                                                                                                                                                'l  i i
                                                                                                                                                                                                              .; I lj j
                                                                                                                                                                                                            . l t
:l w-  s J.-_ __ _ . _ Ji - ;._..--. ..
                                          .. r  - - m._~ ..;.---,.-          ,--2. ,. - ... . . , ,          ,, ,    -.-.,-~#. _- . .,.c.e,.....- . - , , , . , . _ , .  ,. ...m___.__. _ _ _ _ _ . .
 
m.m . . .
                                                                                                                                    ~
I i                                                                                #
4'a
                                                                                                      ~
[
y SP9E*. REY.~1
:VOLUMEr APPENDIX E          SECTION:                                                                                      _  _
1AFFECTED      AFFECTED PAGES. PAGES
      -REV. 1    'REV. 0 CHANGE                              REASON                  EFFECT Modified list of Implementing          Annual Update            Made list of Implementing Procedures Procedures as-follows:                                          consistent with.the procedures.
'E-1 E          Changed IP 1.11 from " State Liaison" to " Massachusetts State Liaison."-
~-E-2            E-2            Changed IP 2.11 from." Traffic
                              . Support to " Traffic Support and Notificetion to the-Hearing fImpaired.*
Changed IP'.2.12Ito "Public Information-Media Relations and.                                                            -
Rumor' Control."
Changed IP 2.13 to "Public Alert and Notification System Including.
EBS Activation."
Added 'IP 2.16 "VehictaiarJAlert and Notification System."-
                              ~ Added'IP.2.17." Manpower Staf'fing/-
Shift Turnover."
 
r-SPfC REY.'l
      ._ VOLUME: APPENDIX F                      SECTION:
      - AFFECTED                  AFFECTED PAGES              'PAGES REV. 1              . REV. ' O                        CHANGE                                                  _ REASON              EFFECT F-1,2                    F-1,2'          The following changes were made to                                Annual Update          Made list of supporting Plans the list of supporting plans:                                                            consistent with the support Plans in place.
                                                --Included reference to NHRERP Volume 4B, USCG Emergency Procedures for the Seabrook Station Nuclear Power Plant.
Clarified reference to the Parker River. Wildlife. Refuge SOP for emergencies at Seabrook Station.
Added Wiggins Airways (helicrpter                                                                                    ..
support for other than airbor.se alerting) Support. Plan.
Clarified WHAV/WLYT Emergency.
Broadcast System (EBS)' Radio
                                                              ~
Station-Support Plan.
                                                = Added notification of YA'2C Offsite
                                                . Response' Organization personnel.
Added backup notification of New                      ~
Hampshire Yankee Offsite Response.
Organization : Personnel Support Plan.
Clarified the-titles-of other existing.. support plans.
W*~  = - - ' - ' ' ' ~ " ' ' ' ' " " " ~ ' ' ~ " ' * '
t,.,    _ .
s ,. .*- - . . .                                                                          -
 
7 SPMC REY. 1
  ' , VOLUME: APPENDIX G                    SECTION:
  'AFFECTED            AFFECTED
        'PAGES              PAGES 1REV. 1              REV. 0                                      CHANGE                                        REASON                  EFFECT
  -P. TV              N/A                  Added introduction describing the                            Annual Update              This concept ensures that concept'of notification of CRO                              ASLB Hearing Conunitments/ ' notification of the ORO is personnel by the 2 LOC Contacts.-                            Stipulations              accomplished in as rapid a time' frame This was a major. revision to this                                                      as possible. One of the EOC Contacts
                                                              ~
document-in that additional                                                              has the sole responsibility for responsibilities have been                                                              activating the Melita Emergency delegated to the EOC contact.                                                            Telenotification System (METS), while the other EOC Contact notifies the VANS staging areas.
-P.:G-1,            P. G-1,              Revised format to establish                                  . Annual Update              Enhances user interface.
49, 25              4, 10                  separate sections for each 16, 19                emergency classification.
                                          -Added' note identifying concept'of 2 Annual Update                                      Enhances notification process.
                                          - EOC contacts per shift,
                                                                                                                                                        ~
P. G-2,          P. G-1                Identified the use_of-a low band                              Annual Update-            Clarifies response octione.
l10,i. 27          5, 11                .and a high-band test pager, and_the Melita computer key.
I.jG-3 .
P                P. G-5,                Clarified actions necessary prior                            Annual Update              Ensures proper _ tapes are loaded into y14, 32, .          12, 16..                to activating Melita.                                                                    METS towers.
142,-52            20 mev.      .amh-      -n- -'-e'L**w**  ---'w*-    - - "
 
w SPIE RET. 1
    -30LUME:' APPENDIX G SECTION:
AFFECTED            AFFECTED PAGES                  PAGES -
REV. 1                REV.-0'                    CHANGE                                                                              REASON                                                      EFFECT
                                                                                                                                                                                                                                                                              ~
    .P. C-3        -P. G-2              Revised pager/Melita activation                                            Annual Update                                                  . Clarifies actions required to                                                      q Step 1.9            Step 1.8          -instructions due to system.                                                                                                                        initiate notification to reflect
      ~B/C,              A/B,                configuration.                                                                                                                                    equipment.crufiguration.
P. G-16            P. G-6 Step 2.10 Step 2.10 B/C,              A/B, P. 32              P. G-12 Step'3.13 Step 3.10
    -B/C                A/B
:P. G-2              P. G-3              Revised VANS staging area                                                  Annual Update                                                    ..heflects-implementation of VANS.                                                      '
    ~ Step ~1.8          Step 1.10~; notification instructions to                                                                                                                        . Backup cotification provided by' iA-C,                A/B,                reflect changes in system                                                                                                                          b=:ckup. VANS not airborne Alerting.
P. G-11            P. G-5              operation, and deleted reference to                                                                                                                                                                      '
Step 2.8            Step 2.8            helicopter staging area.
    .A-G,                A/B,
    'P.-G-27              P. G                                                                                                                                                                                                                                                  '
    ; Step 3.8          : Step 3.8 1A-F                  .A/B.,-
IPUG              P."G-3              Added caution' statement clarifying- ' Annual: Update                                                                                      : Clarifies actions required to-                                                          ,
    -Stsp 1.12 Step 1.13 actions to be.taken in the event of                                                                                                                                      initiate notification..
. P. : G-22          P. G-8              a:linited response to notification.
Step.2.16 Step 2.16
  -P.:G-38              P. G-14
  ' Step 3.19. Step 3.18
    'P. C-48
          .              ~P. G-18 p-Step 4.5 -Step 4.7' e
s k
NN
  ,          -m.            . _ .        _      ,    -.
                                                              ,,                                      , ~ . -
                                                                                                              ~ . - _r...,    i- e . . , _ ~ - , . . , . <  [ ~ . .,                            -,yy,..,. ,  , , _ , .          z_.,__ __ _.._m.._  ,. .. . .m_,_m_m.
 
                                                                                                            ,. m ~                      . . .
    =.
SPMC RET. 1
: VOLUME: APPENDIX G                          ~SECTION:
AFFECTED: AFFECTED PAGES.                      PAGES REV. 1                  -REV. O                                  CHANGE                          REASON                        EFFECT-P. G-6                  .P. G-2.
Changed terminology from              Annual Update                  Accurately describes action being, Step 1.11 Step 1.9-                            "notificatior. verification" to                                      taken.    (Action-is a urnumentation.
    'P. G-7                    P.'G-3'                " notification' documentation."                                      not a' verification ~as ,,reviously
    ~. Step 1.13 Step 1.12'                                                                                                indicated.)
    . P. G-19                  P. G-3 1 Step-                    Step 1.14 2.10C P..G-20                  P. G-8
    --Step ~ 2.12 Step 2.17 P. G              -P; G-8 Step 2.17-- Step 2.19 P. G-23'                P.=G-14
    . Step'2.19- Step 3.14 P.1G-36:                P. G-15'                                                                                                                    .
Step                    Step 3.19                                                                        -
3.13C.                  P.'G        P._G-37. .-Step 3.21 Step 3.15.
P. G-39                  P. G-18 Step.3.20 Step 4.5:
P.:G 40                  P. G-22 Step ~3.22 Step 5.11                  -
; P.-G                  lP.'G-22
                          ~
;. Step 4.2C ~ Step (5.16'
  ,P.-G-48                    P. G-23 Step;4.5-                Step.5.17-P. G-23                  P G-9L                Deleted ~ step. . Information.is        Annual' Update                Eliminates duplication of-
                            -Step 2.21.taddressed.in' note at-beginning of'.
                                        ~
Information.
P. G-40                  P. G-16              appropriate;section.
  ~
: Step 3.23
  *                  *~
L b
l.
: y.                                                                .
                            - - . _ - - - - - - , - . ~ - - - -..- -. --<---        m. ,.
 
n      . i. .i .
l SPIE RET. 1
: VOLUME:-~ APPENDIX G                  SECTION:
    -AFFECTED                AFFECTED PACES                PAGES
        -REV. 1                REV. O                        CHANGE                                        REASON'                    EFFECT P.:G-11                P. G-5            Expanded VACS activation                  Annual Update                      Reflects implementation of_ VANS.
    -Step 2.8-              Step 2.8        instructions.-
    ^_A-G,
:P. G-27                P. G-11
    ~ Step 3.8_              Step 3.8' A-F' Annual Update-P. G-21                P. G-7        - Added note clarifying                                                          . Ensures local police dispatchers are.
Note.-              - Step 2.14 responsibility.for. completing the                                                    notified by appropriate personnel.
P.-G-38              - P. G          step which follows.
Note                    Step 3.33 P. G-22                  P. G-8          Revised note to identify use of            Annual Update                      Ensures'use of available resources as-Note                    Note            administrative staff.                                                          opposed to calling in addit'ional'-
                                                                                                                            -personnel.
l l,
                                                                                                  ' ' 'i~ 'Q
                                                      **  - - - - " ' ' * " ' " ~ ~ '    ' ~ ~ ~
  .wce -._--i-.-am  ..--rm.=c    - -- C* #ww--^***-
 
        ..m SPIE: RET. 1
    ;VOLUMEi1 APPENDIX ~G'                        'SECTION:
AFFECTED                AFFECTED 1PAGES                  PAGES'
            'REV. 11              REV. 0.                                CHANGE                                                                  REASON                                          EFFECT
:P. G-25                . P. G-10              -Added note directing EOC Contact #2 Annual Update                                                                            : Ensures rapid deployment' of VANS .
:2nd Note'                                        to initiate VACS and PANS.                                                                                                  2 vehicles in support of possible EBS-
                                                                                                                                                                                    . broadcast.
  'P.~G-37                  P.'G-14                Changed location of caution.                                              Annual Update
,' Caution                                                                                                                                                                            Caution is now in proper location in Caution                                                                                                                                                the procedure.
P. G-20                  P. G-7.                Eliminated reference to 45 minutes                                        Annual Update                                          Status of callouts will be more-
  ~ Step-                  :
Step                  before: calling'back status of                                                                                                  timely indication of actual J'2 13C-                  2.13C                  callouts.- Instead, specifies                                                                                                    responders-being contacted.
EP. G-38                  . P. G-14                calling back after initial attempts Step                    Step-                .to contact responders.
4 13.16C                  - 3.15C
  .P. G-38                  P. G-15                Removed caution. Already contained Annual Update                                                                              ' Eliminates duplication of Step 3.19 -in note at beginning of section..                                                                                                        'information.
                          ~ Caution
  -P..G-40                ' P. G-15'              . Moved note-to previous page.                                            Annual Update-
                          ' Note-Note applies to earlier step in procedure, as well as the one it was-
-                                                                                                                                                                                    originally located near.
P . '. G-41:.        ' P. G-16          _
Added instructions for EOC Contact                                      Annual Update                                          Ensures assistance is available to Step 3.25 Step 3.25 to stayLin Communication Room to                                                                                                                            NAS Communicator.as necessary.
assist'NAS communicator.as necessary.-
!P.G-42                      P. G-16              .Added no'e'specifying'.
t                                                          . Annual Update                                          Clarifies responsibility for actions
[ Step 4.0
                        - Step 4.0-                responsibilities'can be performed                                                                                                regardless of staffing status.
by either EOC Contact or-NAS Communicator._
q
                                                                              ',-                                                                                              .w
...<_,#        #  7 - , , . _  ~,~.-_._,..,m        ,,,,A...,,    .,.~-...-r                _ . ~ , . . .    ,          y-  -~.,.,.===,v,.,    - ~ ~ , . , . , .      ir ,      ,--c..    .,..,_r  , , m. % - ~ . -  . y'_,z.
 
SPDE REY. 1
  / VOLUME: ' APPENDIX G                    SECTION:
AFFECTED              AFFECTED PACES              PAGES
        ' REV. 1              REV. O                            CHANGE                                        REASON                                EFFECT P. G-54                P. G-22          Added note.                                          Annual. Update                    Clarify responsibilities for
    ; Step 5.10
                                                                                                                                    - notifying local EOC liaisons.
Note P. G-54                P. G-22          Deleted follow-up' notification                      Annual Update Step 5.10 Prevents unnecessary activities.
information.
P.-G-22 Step 5.11 P. G-22' Step 5.12 P. G-22 Step'5.15~
                          .P. G-22
                        .. Step 5.16                                                                                                                                        -
P. G                            Step 5.17' P. G-54                P.'G-23          Added step'to ensure METS will be.                  Annual Update                      Ensures readiness of METS.
Step 5.14                                ready when needed.                                                                                                                                    ~
PE G-58              P. G-29            Deleted Attachment          3.-                      Annual Update                      Eliminates duplication of recorded
                                                                                                                                    - information.
i~                                        -Added Melita system activation-                    ' Annual-Update                        Provides EOC Contact with' detailed checklist                                                                                informatica on use of Melita system.
.P.        G-66          N/A                Added VANS activation procedure.                    ASLB Hearing. Commitments /-
A'.tzch 4 Prowides EOC Contact.with detailed
                                                                                                ' Stipulations                        information on VACS System based on-implementation of VANS.
m m  ,p-
* we y
                    <-o..-n---  >m.gs a ~. y-<'we," - .me*+ m-        ,nw,~w pm  q9      r,~-+  g    ~    .w m--* W  <rm~-      ,vew s - - v ,~~--s s =m.wn,a,, e a  + ,, ,. ,,_.4 cw m
 
w SPIC RET. 1
        ; VOLUME: APPENDIX G JSECTION:
AFFECTED - AFFECTED' PAGES        'PAGES REV.~1        REV. 0                              ' CHANGE                                              REASON                  EFFECT
        - P. G-72:          P. G-30            Expanded PANS activation                                    Annual' Update            Ensures consistency with EBS station
: Attach 5                            . instructions; added siren address                                                    procedure VACS procedure and IP 2.13 codes.                                                                                (PANS /EBS); allows activation-of single' VANS unit if necessary.
e-v A
4-
                                                                                    " -'' '~''' '""'' '"'
                                                        -- *' " ' " ' ~-d''''"" ''#
    ,,%pygu,                  .e-v_.me. mm,a  ha.e**-
 
l SP9C REY. 1 VOLUME:-APPENDIX H                            SECTION:
AFFECTED- AFFECTED PAGES.                      -PAGES REV. 1                        REV. O                          CHANGE                                                REASON'                            EFFECT
  ~B-1 thru                            .H-71.thru Changed format. Placed listing of                                Annual. Update                    Minor changes to'the database would 1 H-24 and                          H-93          external organization (utility                                                                  result in the necessity to.. revise-H-25:thru H-1 thru                              connunications links, federal                                                                'every page.of the document (due to H-99 ~                              H-70          communications links, Massachusetts                                                            page numbering sequence changes).
governmental interface                                                                          The change minimizes the overall communications links, local                                                                    effect of minor changes to the communications links and special                                                              database on the entire document.
population facilities communication links) and the New Hampshire Yankee Offsite Response Organization facilities at the beginning of.the appendix.
Consequently, the listing-of the-NHY ORO personnel (i.e., METS                                                                                              '
database) became the'second half of the appendix.
: H-1,                                .H-81,        Changed " commercial telephone line" Annual Update                                              Provides specific location of;the'
  .l.1~.1.C,                            2.1.1.C.      to " Main Control Board Telephone."                                                            telephone line.
F1.1.2.C-                              2.1.2.C
. H-1                                  H-31          Deleted NAS extension from TSC.                              Annual Update                    NAS telephone does not exist.in TSC, 1.1.3                                2.1.3.A                                                                                                      listing identifies. proper system configuration.
H-1,                                H-81        .Added Joint Telephone'Information-                          Annual Update                  Provides necessary information for
.1.1.5.A                                            Center to telephone list.                                                                    contacting JTIC.
  -thru.
-1.1.5.D
                                                                                                                                                                                    ~~~
er'~~~
                                                                                                                          '        ~ ~ ~ ~ ' ^ ' ^ ~        '      ~ ^ ^ ~ ~
                                                                    - - --    ~-- c- - - - -~ ' ' ' ' " ' - - --
        . - - _ _ = _ _ _ - - _ _ _ _
              -                                . . -          m- n.
 
    ,d Ul SPBE REY. 1
  - OLUME:5 APPENDIX H'                      SECTION:
LAFFECTED- -AFFECTED
          .PAGES              PAGES-EREV. 1            REV. O                          CHANGE                                                  REASON                                          EFFECT Various                Various            -Revised name of " Radio Amateur                        Annual Update                                      Specifies proper name of Communicatious Emergency. Services"                                                                        organization.
to." Amateur Radio Emergency Services."
H-5,-                  H-84,-              Identified-telephone number for                        Annual Update                                      Ensures proper MA department is
  '1.3.4                    2.3.4                Public Health Direccor, Radiation                      ASLB Hearing Commitments /-                        notified.-if necessary.
Control Program.                                      Stipulations H-5,                    H-84,              ' Identified telephone number for~                      Annual. Update    .
Ensures proper MA department is.
1.3.5.                  2.3.5                Director of Dairying.                                .ASLB Hearing Commitments /-                        notified,-if necessary.
                                                                                                      ' Stipulations L H-5,                      H-84,              ~ Identified telephone number for                      Annual Update.          .
Ensures proper MA department is-
:1.3.9                    2.3.9              Director of DEQE; Divisions ~of..                    - ASLB Hearing Commitments /                        notified, if necessary.
Water Supply and Water Control.                        Stipulations
. H-6,                    H-85,                Identified Amesbury Fire Department. Annual Update- _                                                      Ensures proper department is 1.4.1.A                2.'4.1.A-            24-hour dispatch...                                    ASLB Hearing Commitments /                          notified.:if-necessary.
                                                                                                      ' Stipulations-H-7,                    H-86,              cIdentified Merrimac Police                              Annual Update-                                      Ensures proper department is                                          ,
1.4.2.A                2.4.2.A.            Department-24-hour dispatch.                          ASLB Hearing.Connaitments/                          notified, if necessary;                                                  ~#
                                                                                                      . Stipulations H-8,                    .H-87,                Identified Newbury Police.                            Annual Update        .
Ensuresiproper-department is 1.4.3.A                ~2.4.3.A            - Department'24-hour emergency                        :ASLB Hearing Commitments /                          notified, if.necessary..
dispatch.                                              Stipulations-H-9,                    H-87,                Changed _ School Principal to:                        Annual Update                      .
Ensures proper department is.'
.1.4.3.A                  2.4.3.A            : Superintendent of Schools.                            ASLB Hearing Comunitments/..                    -
notified. if necessary.
Stipulations s-as-  --      v - . - - - - . . - ---.L., --_-
                                                                                                              =a"w--            -=i=-ehv-  =--d-.----
                                                                    - - - - -. .m---=----- ' * - -aa.    +            -
                                                      -e-h-    - . __,a.,%me-i.      y=.-m- wi  -~      4    g.
 
SPIE REY. 1                                                                                                '
VOLUME: APPENDIX H                  SECTION:
  ~AFFECTED    AFFECTED PAGES      PAGES
      -REV. 1      REV. O                                      CHANGE                                                            REASON                                EFFECT H-10,      H-88,                        Identified Newburyport 24-hour                                    Annual Update                            Ensures proper department is 1.4.4.A    2.4.4.A                    police dispatch..                                                  ASLB Hearing Commitments /              notified, if necessary.
                                                                                                            ' Stipulations H-11      -H-89,                      Identified Salisbury Police                                        Annual Update                            Ensures proper department is
  '1.4.5 A
          . 2.4.5.A                    Department 24-hour. dispatch.                                      ASLB. Hearing Commitments /-            notified. if necessary.
Stipulations H-12,      H-90,                      Identified West Newbury Police                                    Annual Update                            Ensures proper department is
  -1.4.6.A      2.4.6.A                    Department 24-hour l dispatch.                                      ASLB Hearing Commitments /            ' notified, if necessary.-
Stipulations.
  -H-14,-    H-92,                      Identified various departments of                                  Annual Update.                . .      Provides information which may be 1.6.2.A  2.6.2.A                    the American Red Cross.                                          -ASLB Hearing Commitments /                used to obtain various' Red Cross Stipule.tions.                          resources, as necessary.
H-15,      H-93                      Added telephone numbers of METS                                    Annual Update-1.6.9,                                backup dispatchers and tractor Identifies 'available resources -
                                                                                                          .ASLB Hearing Commitments /                contracted by NHY ORD.
1.6.10                                trailer companies.-                                                  Stipulations H-16,.      H-93,                  -Deleted medical radio frequency.                                      Annual Update                            Information is duplicated in other
  '1.7.1 2.7.1.B
                                                                                                                                                    'part of. appendix.
H-93, 2.7.7.B
}H-16,        H-93                  .Added host facility to appendix.                                      ASLB Hearing' Commitments /~
Li.7.9                                                                                                                                                Identifies available. resources Stipulations                          - contracted:by NHY ORO.
iH-16          H-93                    Added special.needs hotline.                                        Annual Update.                            Provides'information which may be''
(1.7.10                                                                                                                  '
referenced by' personnel answering-
                                                                                                                                                    . calls from concerned individuals..
                        , . . . + . - - , - , -        w e..y-- .- - -7 4=v-                -~    7.- . - . ,              s ~.<      , W-    r M ~~ NA .  .- r.~.,    Udc .r d' . # - .-. .%, *. - .,.E' . m
 
s_
SPIE REY. 1 LVOLUME: APPENDIX H - SECTION:
  ~AFFECTED      AFFECTED
      'PAGES        PAGES REV. 1      REV. O                                    CHANGE                                                          REASON                                                    EFFECT
  .H-17..      -H-71,                      Identified high and low band pager                              Annual Update                                      Identifies numbers which may be'used:
2.2.1.C'    '1.2.1.C                  numbers.                                                                                                            by the EOC Contact'in the event that manual peger activation is necessary.
  -H-17,        H-71,                      Deleted verification numbers from                                Annual Update                                    . Numbers are included in notification 2.2.1.D      1.2.1.D                  Melita listing.                                                                                                      training and tapes identify proper            '
verification numbers.
H-18        H-72,                    Deleted admin.~-support room,                                    Annual Update                                    <
Identifies extensions available in-2.2.1.E      1.2.1.E-                  evacuation operations room, support-                                                                                ' the facility.
services room, conference room, and communications repair room. -Added executive conference room and-                                                                                                                                    .
telephone and radio repairmen.
H-20,-      H-75,                    Deleted American, Red Cross.                                    Annual' Update                                      Eliminates' duplication of 12.2.1.H      1.2.1.H                                                                                                                                      - information.
  'H-21        H-76,                    Deleted dedicated ringdown line to                                Annual Update                                        Eliminates duplication of 2.2;1        1.2.1.I-              - EBS-Station and Media Center.                                                                                          information.
H-21.-      H-76,                    Deleted remote progra-ing unit'              ~
Annual Update'                                        Eliminates duplication of__
! 2.2.1 -      1.2,1.S              - frequency.                                                                                                              information.
I (H-22,          B-77,                  Added Sample Collection Team                                    : Annual Update                                        Provides, ability to contact Sample L2.1.2.AL      1.1.2.A ~              cellular telephone numbers.                                                                                            Collection. Teams when dispatched frena l                                                                                                                                                              Staging Area.
s'nw%,. *-i-+- --          T. m. - - -mw ec.%em.-. e awamma_m.a,-
u r- -w--a.z  --ae-w+we-i-%-.munh.e
                                                                                                              +                ..Me-
                    -+4s He=-4+.e  ,a,*-,=w_-_    .- _ wwt.A em      .iim'.*- 6+a.mn.sme
 
_.        m .        .- --.            .            .
w                en M SPIE REY. 1 VOLUME: APPENDIX ~H        SECTION:
      -AFFECTED        AFFECTED PAGES          PAGES REV. 1          REV. O                      CHANGE                                          REASON                                  'EFFECT H-22            H-78,        Deleted radio frequencies.                            Annual Update                      Eliminates duplication of
    -2.1.2B,          1.1.2.B.                                                                                              information.
      -2.1.3B,        1.2.3.B H-23            H-79, 2.1.4.B,        1.2.4.B.
2.1.5.A,        1.2.5.A, 2.1.6.A.        H-80, 2.1.7.A        1.2.6.A, H-24,          1.2.7.A 2.1.9.B        1.2.9.B H-24,          H-80          Added'individusi VANS Staging                        Annual Update                      Provides necessary information for
      '2.1.9.A        1.2.9.A      Areas.                                                                                  contacting VANS Staging Areas in'the-event radio systems fail.-                                  '
  -H-24              H-81,          Deleted helicopter facility.                          Annual Update 1.2.10 Backup alerting no longer provided by                                        b airborne alerting.
A,B
    'H-25,            H-1,          Added mobile telephone numbers for -ASLB Hearing Commitments /
Enhances notification capabilities
  ' 2.2.1            .1.1.1        ORD.                                                  Stipulations                      for key ORO management.
H-26,          H-2, 2.2.1          1.1.1 '
H-27,          H-3,
' 2.2.1            1.1.1 H-29,          H-5, 2.2.1          1.1.1 H-30,        ~H-13,                                                                                                                                                                              . .-
2.2.1          1.1.1
~ H-39, 2.2.1 4
                -e        g                        - % 59 s--<-+.1*-g                                                                                                                              w..E
                                                                                    -y~a 9.w.--                            ~at--e                      , - ' =f e-            v        se,.- -  -.e-9                                                                                m        ym2- '%,w    er ,,%,-    -w  m__,, w _
_.-_.c.,_m._,_ _ _ _ .. . .y_._.        m-
 
SPfC REY. 1 VOLUME: APPENDIX H            SECTION:
AFFECTED      AFFECTED-PAGES      PAGES REV. 1      REV. O                      CHANGE                                                    REASON                  EFFECT H-29,        'H-5,            Added Radiological Health Advisor.              Annual Update                    Ensure all ORO positions are notified 2.2.1          1.1.1                                                                                              accordingly.
H-41          H-15            added EWF, North Andover, Beverly              Annual Update                      Ensure all ORO positions'are notified 22.2.1                            Mon /Decon Leaders.                                                                accordingly.
H-42 2.2.1 H-43, 2.2.1                                                                                                                                                        ^
H-53 thru H-24                  Added VANS drivers.                            Annual Update                      Ensure all ORO positions are notified.
  -H-55, accordingly.
242.1 H-62          H-30 thru - Combined Local EOC Liaisons onto                    Annua) Update                        Reduces size of document, 2.2.2          H-35            one page.                                                                          consolidates information.
H-76,          B-50,            Revised position title.                        Annual Update                        Proper positions indicated in 2.2.2          1.1.2                                                                                                listing.
H;78, 2.2.2 H-83,          H-55,            Added bus companies.                          Annual Update 2.2.2          1.1.2 Provides necessary information for I                                                                                                                      notification'in the event Melita
                                                                                                                      . system fails. .
fH-84,            H-56,            Identified positions by location.            Annual Update 2.2.3          1.1.3 Clarifies positions by location and-function.
H-85,          H-57,
*2.2.3            1.1.3 es.g-          ''M,    #h"'*
* r * ' ' ' e ''' "#'#'1 **  - - ' ' ' ' - * * " ' " '
J8'"*'** -
C'  "'W      ',% 'Y      N'***# *"-  @ '"-
9'          M-                    %.'@ 7
 
SPHC REY. 1 VOLUME: APPENDIX I              SECTION:
AFFECTED            AFFECTED PAGES              PAGES REV. 1            -REV. O                      CHANGE                                                                                      REASON                                                    EFFECT-I-1                N/A          Added introduction.                                                                              Annual Update                                      Provides clarification relating to :
the information contained in the.
appendix.
N/A                Part I,        Deleted inventory lists.                                                                        Annual Update                                      Lists did not accurately reflect.                                      .
P. 1-8,                                                                                                                                                            equipment maintained for use.by SPMC' Part II,                                                                                                                                                          facilities.
P. 1-4 I-2                N/A            Incorporated resources and                                                                      Annual Update                                      Revised format accurately identifies
    . through                          facilities database of equipment by FEMA Technical Assistance /                                                                                    equipment by facility, kit and I-72                              facility and/or kit and category.                                                            ' Plan Review'      .                                appropriate category.. Listing.also ASLB Hearing Comunitments/                          identifies quantities of equipment:
Stipulations                                      . available for use and consistency-with'NIAT.
                                    -' Included addition of VANS Staging                                                              Annual Update Area equipment;and identification
                                                      ~
ASLB Hearing Commitments /                          Reflects implementation of VANS and of. surplus radiation monitoring-                                                                Stipulations                                        consaltment to include surplus supplies.                                                                                                                                            radiation monitors.
                                                                                                                                                                                                                                                                -i
                                                                                                                                                                                                                                                              .1 e  s  . .  . . , . . -    .-%
9      .c      . v<        -<      -.                                          . . . - - + ~ - - - -                -  +-e, -
                                                                                                                                                                                *w--s---g.  -e t...n - - - -                - - -
v., -S., ,, hhe m-
:q
 
SPE REY. 1 UOLUME: APPENDIX J                                SECTION:
AFFECTED                                AFFECTED PAGES                  PAGES REV. 1                  REV. O                        CHANGE                                    REASON                                      EFFECT J-1                                      111        ' Revised Introduction to describe                    Annual Update                  Made introduction consistent with through                                              the current format of' App. J.                                                      document. Note that App. J. has been
:J-3 reformatted to facilitate Use/ Ease of Xeference.
J-4                                      J-1          Revised format.                                      Annual Update                - Makes traffic control procedure more            '
through                                  through                                                                                        straight forward.
J-8                                        J-3 J-6                                        J-2          Added note that traffic direction'                  Annual-Update                  Clarifies:that traffic guides are'to is to take place independent of.                                                    Ignore existing signals.
the signal head.
J-7, 8                                      J-2        Added note about rerouting traffic. Annual Update                                  - Facilitates implementing rerouting around traffic impediments.-
Added instruction on implementing a Annual Update                                    Facilitates-implementing's shift shift turnover.                                                                      turnover.
          ~J-9                                            J-13        Updated the number of personnel and ASLB, Hearing ~Commaitments/                    Provides updated numbers of traffic traffic cones at.TCPS.'Also removed Stipulations                                    guides and cones to be consistent-references to barricades.                                                            with the TCP diagrams.
l lQ
                                                        ..    .                    . . .                . -        . .;r      - -  r- -  ,-r < - ~ e-~  ~~    e ' - ~ * ' " ~ < ~ ~ - ~    - "'d * " '"
 
SPIR:'-REY. 1 EVOLUME: APPENDIX J SECTION:
AFFECTED  AFFECTED PAGES    PAGES REV. 1  .REV. O                                              CHANGE                                      REASON                            EFFECT J-10      J-20      The following changes were made through  through  throughout the denoted pages:
J-63 and  J-155      . Updated individual towns traffic                                          ASLB Hearing Commitments /        Updated sunumeries to reflect current' J-71                      and access control sununaries                                          Stipulations                      diagrams.
through                  based:on' current diagrams
'J-110                . Updated town TCP and ACP maps                                            Annual Update                      Updated' maps for consistency with (large maps) as necessary                                                                                TCP/ACP diagrams.
Updated traffic and access control                                          ASLB Hearing Commitments /.        Improved. clarity, accuracy, point diagrams as follows:                                                  Stipulations                      proportion and utility of the TCP and
                    . Replaced barricades by cones                                                                                  ACP diagrams made the diagrams
                    . Reevaluated numbers of traffic                                                                                consistent with'the ASLB's guides and equipment required                                                                          - recomunendations. Enhances the
                    . Introduced a more gradual cone                                                                                ability to acconunodate returning: .
taper at specific ACPS on                                                                              ~ comunuters by. utilizing cones instead of barricades.
interstates'                                      ..
                    . Improved the accuracy and clarity of-exposition of the TCP/ACP diagrams
                    . Indicated appropriate spacing between traffic cones-
                    . Improved proportions of the diagrams-                                    .
                    . Corrected errors /made changes to
                        . diagrams.as.a result of hearings
                    . Included-all existing traffic signals-
                    . Incorporated recent road construction
                    . Indicated an. internal diagram
                        . staffing priority w          -  <                  *ref    , _*r          - , -    . 6 ~-
_ . . . v z,_ .._ 2_m
 
SPIE REY. 1 VOLUME: APPENDIX J        SECTION:
AFFECTED    AFFECTED PAGES      ~PAGES REV. 1      REV. O                  CHANGE                                                    REASON                                                      ~ EFFECT J-64          J-4          Revised format.                              Annual Update                                                              Makes access. control. procedure more through-    through                                                                                                                                user friendly.
J-70          J-7 J-66        J-5            Added note that access control is            ASLB Hearing Commitments /'                                                Ensures returning comunuters will. not to be implemented approximately 2            Stipulations                                                              be delayed at ACPS at the early hours after the evacuation                                                                                              stages of an emergency. .This recommendation.                                                                                                          expedites the evacuee mobilization process.
Added note.to ensure..that screening of vehicles does not-result in the formation'of'long queues.                                                                                                                                      -
J-111        J-160        Modified table of TCPS converted to FEMA Technical Assistance /                                                          Facilitates implementation of access through      through      ACPS to include a sununary by ERPA            Plan Review                                                                control on the-periphery of,'and J-113        J-161        and region of ACPS activated                                                                                              internal to the EPZ: ' supports              i (Internal and Peripheral), TCPS                                                                                          establishment of ACPS for interstate -
converted to ACPS.                                                                                                        protective actions.
J-114        J-163        Updated TCP/ACP staffing sequence-            Annual Update                                                              Enhanced the utility'of manning
  - through      through      ' lists for accuracy..                                                                                                    sequencs lists.
J-154        J-196 Incorporated staffing sequences for off-season.
Deleted reference'to regions 2,3              Annual Update                                                          -Regions 2, 3.and.4 have been and 4.                                                                                                                . superceded by regions 11, 12 and 13. The former represented
                                                                                                                                                  -outdated ERPA combinations.
e6 Q
t r--~ -
n -~'-- &-          - - - - "      <        --          -
e-                        n  %-- -r-- --
                                                                                                                                                                        -=v-    +m4-c-- + - *
                                                                                                                                                                                          -      v 4-  + --    r
 
i SP9E ' RET. 1
' VOLUME:-APPENDIX J SECTION:
AFFECTED        AFFECTED PAGES            PAGES REV. 1          REV. O                      CHANGE                                                                            REASON                EFFECT J-160          J-14            Improved exposition of the bus                                        Annual Update                          ' Enhanced clarity of the bus route.
through        through        route maps.                                                                                                    maps.
J-166          J-19 J-165                          Added contihgency bus route for                                        ASLB Hearing Commitments /              Provides contingency route'if a Salisbury.                                                              Stipulations                            portion of Ferry Road is flooded.'
J-168            J-156          Clarified evacuation route                                            Annual Update                          Made evacuation route descriptions through        descriptions.                                                                                                  consistent with the public J-159                                                                                                                          information calender.
J-169                            Added a sample of table of TCPs and Annual Update                                                              Documented TCP/ACP dispatch' table.
ACPs as used for dispatch at the.                                                                            'used.
staging area.
J-32-37        Deleted route specific bus route                                        Annual Update                          Eliminated redundancy with the maps-J-46-47        maps.                                                                                                          contained in the route guide map J-56-50                                                                                                                        booklets.
J-74-78 J-94-98 J-112-114
- --              J-39          Deleted map showing route..from                                        Annual Update                            Eliminated redundancy with the maps-J-48          ' transfer point to reception center.                                                                            contained.'in the route guide map J-60                                                                                                                          booklets.
J                    J-99 J-115
                                      ,A                                                                          ~~^ ~ ' ~ ~ ^ ~ ~ ~
                            -N.-e.-a
                              -        s r -- ~ ~        ^ * " ' " "' * ' " - ^ " " " ^ ' ' ' " ~ ~ * ~ ~ ' ' '                            '
 
VOLUME: APPENDIX J    SECTION:
AFFECTED  AFFECTED PAGES      PAGES REV. 1    REV. O                CHANGE                        REASON                        EFFECT J-40        Delete town evacuation route  Annual Update                      . This material was redundant with the J-49        descriptions.
J-61 evacuation route descriptions J-80 provided in the ETE Study.
J-100 J-116 4
6 4              ,            ..
                                    ..c..            m ,        .g--
g        y-y          w 3
r,            .,
                                                                                                      ..7  .. r - <c. .,.    . . w
 
1-l SPIE: REY. 1
( VOLUME: APPENDIX K 'SECTION:
l l AFFECTED                                  AFFECTED PAGES                          PAGES REV. 1                        REV. O                            CHANGE                                                                                                                          REASON                                                                                                                        EFFECT P. K-2                                  P. K-2                  Deleted the responsibility of            Annual Update                                                                                                                                                                                                    This responsibility is assumed by the
                                                                                                                                                                                                                                                                                                                                                                ~
assisting and preparing table top                                                                                                                                                                                                                          Specialty Training Group.
materials from the Drill and Exercise Group.
  .P. K-3,                                K-3,                    Deleted walkthrough training from        Annual Update                                                                                                                                                                                                    Walkthroughs are defined in their own III.A & B III.A & B the definition of " training" and                                                                                                                                                                                                                                                                      section.
                                                                    "requalification training".
P. K-4,                                P. K-4,                Added use of procedures in                Annual Update                                                                                                                                                                                                    Tabletop sessions currently given
, III.D                                    III.D                  definition of "Tablatops.'                                                                                                                                                                                                                                  include hands-on use of procedures.-
P. K-8 0                              P. K-7,                  "Other documents
* were moved from        Annual Update IV.B                                  IV.B Allows the Training Manager to required reading materials to                                                                                                                                                                                                                                substitute required reading-for optional reading materials.
classroom instruction. as needed.
P.~K-10,                              P. K-9,                The description of'the                    Annual Update                                                                                                                                                                                                    This description is included in the v                                      V                      qualifications for training                                                                                                                                                                                                                                  referenced Training Group procedures.
exemptions were deleted from.
Appendir K and a reference to the Training Group procedures was added.
P. K-10                                P. K-9,                Added a step for maintaining              Annual. Update                                                                                                                                                                                                    Materials used for classroom
.VI                                      -VI                      classroom material in file (s).                                                                                                                                                                                                                              Instruction are maintained in training files for retrieval when necessary.
Reference to slide program was                                                                                                                                                                                                                              Other types of visual aids are used removed from the description of                                                                                                                                                                                                                            .for classroom training (i.e.,
classroom materials.                                                                                                                                                                                                                                        transparencies).
                                                    ~
                                                                                                                                                                                                                                                                                                                        ~
  -                                    .  ,.-                                x    _      _ -.    ,, ._                                    .                                                    ...                                                                        - .                                      - .    .- - _a __ _ _ _ _ _ _ _ -  _
 
S        REY. 1 VOLUME: APPENDIX K        SECTION:
AFFECTED        AFFECTED PAGES        PAGES REV. 1        REV. O                  CHANGE                                                                                              REASON EFFECT P. K-10        P. K-10    The title for the " Medical                                                                    Annual Update                                  The new title (Ambulance Co.
  ' VI.A            VI.A        Emergency
* module was changed to                                                                                                              Personnel) more accurately reflects
                                  " Ambulance Co. Personnel".
the topics covered by the module.                                    '
  - P. K-11,        P. K-10      The description for-the format of                                                              Annual Update VI A Lesson plans are developed in VI.E        lesson plans has been removed from                                                                                                            accordance with.the Training Group Attachment 4 of Appendix K and a                                                                                                            . procedures.
reference to the Training Group
                                - procedures'was added.
The title for " Protective Action                                                            - Annual Update.                                The new title more accurately Recommendations" was changed-to                                                                                                              reflects the intent of the module.
                                  " Protective Action Decision Making."                                                                                                                                                                                            -
P. K-12,        P. K-11      The reference to Attachment 5,                                                                Annual Update 1                                Cover sheets used for tests are found VI.D            VI.D          " Test Cover Sheet" was deleted and                                                                                                          in the Training Group procedures.
a reference to the Training Group
;.                                procedures was added.
P. K-12          P. K-11,    The reference to lesson plans was-                                                          :
Annual Update                                  Lesson plans and instructor guides                                  -
VI.E            VI.E        deleted, are the same.
P. K-14,        P. K-13      Specific steps regarding the                                                              . Annual' Update                                    Tests are conducted with an.
; VII.F            VII.F        testing cf students were condensed.                                                                                                            instructor present. and proper conduct by: students is' enforced.
1 P..K-14,        P. K-14,    The step to forward training                                                                  Annual Update                                  Comments are forwarded and" reviewed
!VII.I              VII.I        comments to the Manager of Response.                                                                                                          by.the Training Group.
Implementation for review and response was deleted.
                                                                                                                                                                                                                                                      .I 4
e-  -  w .,  .,w q  .~        w      w    gw' s .,ne'- n .v.r      +                                          w,  --rm-                  a~  em.r , -w m  %my-=e- =                      ,.a-w _ "  ,<.,.r+--, ,  -w -e m  es . -o ..~
 
l
                                                                                                                                                      )
SPMG REY. 1
    -VOLUME: APPENDIX K      SECTION:
    ' AFFECTED    AFFECTED PAGES      PAGES REV. 1      REV. O                  CHANGE                                    ' REASON                  EFFECT P. K-16,    P. K-16,    .The Drill and Exercise Group was          Annual Update                The Drill and Exercise Group may also IX.A        IX.A        added to the Narrative Sununary                                        use a narrative sununary to practice description.                                                          various planning elements.
                                          ~
P. K-19,    P. K-18,    .Added steps for scheduling the            Annual Update                Scheduling the Media Center, Staging.
X.A.5      X.A.5        Media Center, the Staging Area and                                    Area and Reception Centers is the Reception Centers.                                                required prior to use for drills, etc.
    . P. K-21,    P. K-20,    Added detail and specificity to the Annual Update                      Critique session guidelines have been'
    . X.D        X.C          description of how drill critiques                                    formalized and reflect current will be conducted.                                                    standards.
P. K-32    P. K-29      The training class exemption            . Annual Update                Training exemptions are handled in Att. 3        request form was deleted.                                              accordance with Training Group procedures.
P. K-32    P. K-30        The samples for the lesson plan          Annual Update                Instructor guides, tests and handouts thru K-35 format. test cover sheet, handout                                          are formatted'in~accordance with (Attach-    approval and instructor guide-                                          Training Group procedures.
ments        approval were' deleted.
4.5,6,7 &
8)
                                                                                                                                                    -l P. K-35    P. 40.        One scenario format section was        . Annual Update.                The reorganized and new text is more thru K-52  thru'K reorganized and text was added'to                                        .strcightforward and scenario describe mini-scenario and                                            . descriptions are easily retrieved.
radiological data formats.
                .      2- - -        w.  .
 
SPIE REY. 1 V
      .OLUME:  APPENDIX L      SECTION:
:  AFFECTED    AFFECTED PAGES    ~. PAGES REV. 1    REV. O                            CHANGE                                                        REASON                              EFFECT
    -L-8        L-8      . Added reference to Farmer's                                          ASLB Hearing Commitments /-              Describes Ingestion Pathway Brochure.                                                          Stipulations                              Information Program.
L      L      General' revision to data base                                    - Annual Update                            Eliminated those facilities that have-L-61        L-64        listing of forms etc., based on.                                                                            ceased operation since data was
                            -annual verification of information.                                                                            originally compiled.
Not        L      Removed those facilities not                                        Annual Update                            Reduced size.of Appendix by applic-    L-357        identified as a selected sample                                                                              identifying only those facilities able                    point.
that-may.be designated for-sampling-activities. The information removed is still maintained in the Appendix L data base.as supplemental information should the need to replace a designated sampling point arise.
wwe"                Wi    spe      p4-,,M r.'4j --% ..
g      v                      w  y '-  4*Y''* '4
                                                                                                              -.-54 p      "riw.,
p74a.,.% we,.-p.==.            e-          y. p .g
 
                                                                                                                                                                                                                                                                                                      -N
                                                                                                                                                      -SPMC REY. 1
: VOLUME: APPENDIX M                                    SECTION:
AFFECTED                                AFFECTED PAGES                                  PAGES REV. 1                                  REV. ' O                          CHANGE                                                                                    - REASON                                                    EFFECT                                                  _
i (table                              1 (table        Table of contents and the entire                                                                -FEMA Technical Assistance /                              Appendix M is easier to use and'the of                                      of              document have been reorganized for                                                                  Plan Review                                            priorities for notification are contents) contents) ease of use and to reflect'the                                                                                                          ASLB Hearing Commitments /                              straight forward and easily priority scheme for notification of Stipulations                                                                                                          . accessible ~ at the time of an special populations. The priority                                                                                                                          emergency.
scheme is as follows:
Schools / Day cares Special Facilities Hospitals Hearing Impaired Individuals Homebound Special Needs Individuals These priorities are then broken down by the communities' proximity                                                                                                                                                                                            -
to Seabrook Station as follows:
;                                                          Salisbury l                                                          Amesbury Newburyport Newbury West Newbury Merrimac i
l i
                                                                                                                                                                                                                              , N ,I,
                                                      ,_-    --n-  < ~ ~ - ~. ,m-  n s..< p                    -                                    , . , ,      xy        e            y                , -;                    +.yry..                                      g v+g  ~ ,.  , [-
 
SPfC REY. 1 VOT-UME:-APPENDIX M  SECTION:
AFFECTED    AFFECTED PAGES      PAGES REV. 1      REV. O                CHANGE _                                  REASON                      EFFECT M-1        M-16      SPECIAL FACILITIES                          Annual' Update            Appendir el has been updated to '
(Resource (Resource ASLB Hearing Commitments / reflect the most current informstion-and Needs and Needs    - ene special facility wr.s deleted        Stipulations              available.
Summary)  Summary)  from Appendix M
                          - the population figures for special population changed from                                                                                                                  '
1,864 to 2,471 20 evacuation bed buses vers added as needed for special facilities                                                                                                                                          '
the number of buses required for                                                                                                                ,
special facilities changes from 44 to 68
                          -the number cf ambulances required                                                                                -
for special facilities changed from 21 to 63
                          - the number of wheelchair vans required for special facilities changed from 34 to 51 a
e                                                                                                                                                                            b 8
e
: p. ,, .
g,p..      ,,.c .            - + = d'    v  W* **- - - - ' '-- - - - - - - - -'"-- -- * -- --  '
 
SPPE: REY. 1
. VOLUME: APPENDIX M                    SECTION:
                                                                                                                                                                                                      ~
AFFECTED                AFFECT *sD PAGES                      PAGES REV. 1                    REV. O                                  CHANGE                                                        REASON                                  EFFECT                                    .._
M-1                      M-16          SCHOOLS                                                              Annual Update                                      Appendix 11 has been updated to (Resource (Resource                                                                                          ASLB Hearing Connaitments/ .                        reflect the most current'information:
and N eds and Needs                        -
one school has been deleted                                    . Stipulations                                      available..
Summary)                Simmary)        - the school population changed from 9,447 to 9,465
                                          - the amount of buses required for schools changed from 226 to 188                                                                                                                                                          ,,
                                          -two wheelchair vans were added to the school requirements DAY CARES                                                                                                                                                                                    i
                                                                                                                                                                                                                                  ~
                                          - the number of day care facili. ties changed.from'76 to 125                                                                                                                                        -
the day care population changed from 924 to 1,424
                                          - the nutber of buses required for day care changed from 19 to 47 M-2                      M-17          HOSPITALS                                                            Annual Update                                      Appendix M has been updated to
-(Resource ~ (Resource                                                .                                        ASLB Hearing Conunitments/                          reflect the most current information
- and Needs and Needs                    - the number of buses required                                      Stipulations                                        available.
Summary)                  Summary)      changed'from 5 to 4
                                          - the number of. wheelchair vans changed from 0 to.8' j
                                                                                                      ~
                                          - 6 evacuation bed buses were added to hospital needs.                                                                                                                                                                    -
1 e.i.hr e-+e.. e--=,w .  ._.w-. ..a.  .wb.
s -u b.w-i_te. -p*r-me" 4mehuirth-mem=w=4.  -'=.m=  r, --mui__AmA=ee..    -m .k A.,.w--.um A ..m----              .r-g*  **'ne-.+ %,'  -t.+-- g -
__s_.    ..-- e
 
E1 VOLUME: APPENDIX M                SECTION:
AFFECTED    AFFECTED PAGES          PAGES REV. 1          REV. O                          CHANGE                                          REASON                              EFFECT M-2          M-17'                  SPECIAL NEEDS INDIVIDUALS                        Annual Update                  Appendix M has been updated to (Resource (Resource                    the number of special needs                  ASLB Hearing Commitments /      reflect the most current-information and Needs and Needs individuals changed from 555 to 585 Stipulations                                                  available.
Su:nmary)    Summary)              -8    buses were-deleted
                                        - 69 passenger vans were added to special needs individual requirements the number of wheelchair vans for special needs individuals changed from 19 to 17
                                        - 6 evacuation bed buses were added to special needs individual requirements
                                        - the number of ambulances needed                                                                                                      -
for special'needs individuals-changed from 10 to 2 RECEPTION CENTERS 2 ambulances were deleted from Reception Ce,nter requirements
                                      - 2 buses and 2 passenger vans were'added to Reception Center
,.                                  ' requirements M-3          M-18                  HOST MEDICAL.                                    Annual Update                  Appendix M has been updated to
.-(Resource (Resource                                                                  ASLB Hearing Commitments /-    reflect the most current information and Needs and Needs                -
the number of host medical                ' Stipulations                    available.
Summary)    Summary)              facilities changed from 6 to 5
                                      - the available capacity changed from 444 beds to.368 beds 4
p-
              #  ..w  ..-- m~, . +
3 w  f.
                                                                      - 4. --my %- u#A -, -      .y        ,yy%-- ,%,#  .-% .-y . +, w    r , -. ., .c.,__ _%. u,..m_,c,.. _
                                                                                                                                                                                  , ,_.,__-.m., ,. -y
 
SE REY. 1 VOLUME: APPENDIX M            SECTION:
AFFECTED    AFFECTED PAGES        PAGES
      'REV. 1        REV. O                                                    CHANGE                                REASON                    EFFECT                          ;
M-3          M-18              HOST' SCHOOL FACILITY                                        Annual Update                        Appendix M has been updated to (Resource (Resource                                                                        ASLB Hearing Conunitments/            reflect the most current infortsation and Needs and Needs              - the capacity changed from 9.636                          Stipulations                        available.
  . Summary)    Sunnnary)          to 11.079 HOST SPECIAL FACILITY                                                                                                                        >
the capacity changed from 2,000 to 2,965 CONGREGATE CARE CENTERS the number of centers changed from 27 to 26 the available capacity changed i                                  from 21,590 to 15,846 EVACUATION BED' BUSES                                        Annual Update                        The ORO resources have been adjusted ASLB Hcaring Commitments /            to include evacuation bed buses.
                                  - 70 buses and 35 kits were added Stipulations to Appendix M '
BUSES                                                        Annual Update                        Appendix M has been updated to ASLB Hearing Conunitments/.          reflect the nost current-information:
                                  - the number of buses available                              Stipulations                          available.
changed from 537 to'710 M-4            M-18          ' VANS / WAGONS                                                Annual Update                      -Appendix M has been updated to l(Resource (Resource                                                            .
                                                                                              . ASLB Hearing Coneitments/            reflect the most current information:
and Needs and Needs            - the number of vans available.                              ' Stipulations-                        available.-
ISummary)        Sununary) -      changed from 189 to 243 (includes wagons)-
I i
                          ~
 
                                                                                                                - SPMC REY. 1
  -VOLUME: APPENDIX M                              SECTION:
AFFECTED                    AFFECTED PAGES                            PAGES
        -REV. 1                            REV. O                            CHANGE                                                    REA3ON                                            EFFECT M-4                        M-18                  WHEELCHAIR BUSES                                              Annual Update                                          Appendix M has been updated to
    .(Resource (Resource                                                                                            ASLB Hearing Comitments/                                reflect the most current information and Needs and Needs                                - 6 wheelchair buses were added                              Stipulations                                            available Summary)                    Summary)
WHEELCHAIR VANS the number of wheelchair vans available changed from 62 to 97 HALF BUSES 53 half buses were added                                                                                                                      -
AMBULANCES
                                                      - the number.of ambulances available changed from 61.to 88 ROAD CREWS I
t                                                    - the ntnaber of road crews changed l                                                    from 24 to 21-M-5                      M-18                      HELICOPTERS                                                    Annual Update.                                          Appendix M has been updated to (Resource (Resource                                                                    ..
reflect the most current information-and Nxds and Needs                                    '5 helicopters were added (for                                                                                      available.
Summary)                  Summary)                support other than airborne alerting) e
_ . - - - . -  m        .au,w_.u.--.m-,-.m            - - . - _
s -.,-. .        -        -------_.--.--._m,_
_~---_.s
                              - ~ . . - , _ . , -        a ~~
 
SPIE REY. 1 VOLUME: APPENDIX M            SECTION:
AFFECTED      AFFECTED PAGES            PAGES REV. 1          REV. O                                                        CHANGE                                                                            REASON                  EFFECT M-6, M-7      M-1              The Reception Hospital listing from Annual Update                                                                                                    Hospital data is easier to retrieve.
(Resource (Resource Rev. O has been split into 2 and Needs and Needs separate listings, MS-1 Hospital Sumary)        Sumary)        Listing and Host Medical Facility Listing.
M-8 thru      -
A new listing titled "Other                                                                                ASLB. Hearing Comitments/                This new information is available, if M-14                          Hospital Facilities'in Proximity to Stipulations                                                                                                    needed, at the time of an emergency.
the EPZ" was added to Appendix M.
M-16          -
An aircraft. company was added.                                                                            Annual Update                            Appendix M has been updated to reflect most current ORO resource availability.
M-22 thru M-9 thru            CONGREGATE CARE CENTER LISTING ~                                                                            ASLB Hearing Commitments /.              Appendix-M reflects current ARC-M-26        'M-12                                                                                                                        Stipuletions                              standards.
                                  . added a note.to ensure the ARC are informed of our facilities that may required additional shelter managers
                                  .. dedicated 2 facilitieslto                                                                              ASLB Hearing Comitments/                Change reflects use of two dedicated accomodate transit-dependent                                                                                Stipulations                            congregate care centers for transit.
_~ parents and their children                                                                                                                        dependent parents and their children..
M-27          M-13            HOST SCHOOL FACILITIES                                                                                    -Drills / Exercise Comments Estimating' travel times from the EPZ.
                                                                                                                                                                                    ' area to the host school facility is
                                  . added a note to estimate travel                                                                                                                  facilitated with the added note.
time from the EPZ to the host
'.                              school facility
                                                                                                                                                  ~
        -  , ,            L        a                    , ,                                                        ~-  +, . , . - -                              ~  ,  ~  .=--....:.              .    . _ -_.a.
 
                                                                                                          - SPIE REY. 1 VOLUME: APPENDIX M              SECTION:
AFFECTED              AFFECTED PAGES                  PAGES REV. 1                REV. O                        CHANGE                                                                ' REASON                  EFFECT M-28                  M-14        HOST SPECIAL FACILITY                                                    Drills / Exercise Comments. Appendix M has been updated to
                                        - 2 host special facilities are now reflect most current resources available.
included. One serves as a primary host facility and'the other as a secondary host facility.
                                      - added note to' estimate travel                                          Drills / Exercise Comments    Estimating travel times from the EPZ times from the FPZ to the Host                                                                          area to the Host Special Facilities Special . Faci'. ities .
is facilitated with the added note.
M-34                  -
A listing of EPZ school districts                                          Drills / Exercise Comments    .The School Coordinator can easily; was added.                                                                                                find which district a specific EPZ:
school falls under..
r M e'    hu, .. . , , . . _      *a ,
A      .m.. ----.w 4=--am.w6+%e---,--- .:.--+- - - --s~w--' ' - - * ~ -      +----m---. -          -
v  -sy-,    -.
                                                                                                                                                                    , . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ . . _m. __
                                                                                                                                                                                                                                        .y m u    ,,m.}}

Latest revision as of 06:10, 23 December 2024

Forwards Analysis of Rev 3 Changes to State of Nh Radiological Emergency Response Plan & Rev 1 Changes to Seabrook Plan for Massachusetts Communities
ML20006C132
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 02/02/1990
From: Feigenbaum T
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NYN-90028, NUDOCS 9002060355
Download: ML20006C132 (367)


Text