{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 04, 2014 Mr. Ernie Kapopoulos Site Vice President Duke Energy Progress, Inc.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 04, 2014 Mr. Ernie Kapopoulos Site Vice President Duke Energy Progress, Inc.
Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165
Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165  


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2013001
ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2013001  


==Dear Mr. Kapopoulous:==
==Dear Mr. Kapopoulous:==
On February 18, 2014, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Shearon Harris Nuclear Power Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
On February 18, 2014, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Shearon Harris Nuclear Power Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information.
This performance review and enclosed inspection plan do not include security information.
The NRC determined that overall, Shearon Harris Nuclear Power Plant, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Shearon Harris Nuclear Power Plant, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The NRC determined that overall, Shearon Harris Nuclear Power Plant, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Shearon Harris Nuclear Power Plant, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Plant performance for the first quarter of the assessment period was within the Regulatory Response column of the NRCs ROP Action Matrix based on one inspection finding being classified as having low-to-moderate safety significance (i.e., White) and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). The White finding involved the failure to adequately maintain the ventilation system equipment of the Emergency Operations Facility for protracted periods of time. This White finding was closed on March 22, 2013, as documented in our letter to you dated April 23, 2013 (ADAMS Accession No. ML13114A069). Unit 1 returned to the Licensee Response Column of the ROP Action Matrix in the second quarter of 2013.
Plant performance for the first quarter of the assessment period was within the Regulatory Response column of the NRCs ROP Action Matrix based on one inspection finding being classified as having low-to-moderate safety significance (i.e., White) and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). The White finding involved the failure to adequately maintain the ventilation system equipment of the Emergency Operations Facility for protracted periods of time. This White finding was closed on March 22, 2013, as documented in our letter to you dated April 23, 2013 (ADAMS Accession No. ML13114A069). Unit 1 returned to the Licensee Response Column of the ROP Action Matrix in the second quarter of 2013.  


E. Kapopoulos                                 2 The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
E. Kapopoulos 2
The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events is ongoing. This audit includes an onsite component in order for the NRC to evaluate mitigating strategies as described in licensee submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events is ongoing. This audit includes an onsite component in order for the NRC to evaluate mitigating strategies as described in licensee submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The calendar year (CY) 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The calendar year (CY) 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  


E. Kapopoulos                                 3 Please contact George Hopper at 404-997-4645 with any questions you may have regarding this letter.
E. Kapopoulos 3
Sincerely,
Please contact George Hopper at 404-997-4645 with any questions you may have regarding this letter.
                                              /RA/
Sincerely,  
Richard P. Croteau, Director Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63
/RA/
Richard P. Croteau, Director Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63  


==Enclosure:==
==Enclosure:==
Harris Inspection/Activity Plan (03/01/2014 - 06/30/2015) cc Distribution via ListServ
Harris Inspection/Activity Plan (03/01/2014 - 06/30/2015) cc Distribution via ListServ


_________________________                    SUNSI REVIEW COMPLETE   FORM 665 ATTACHED OFFICE             RII:DRP         RII:DRP       RII:DRP       RII:DRP SIGNATURE           JSD /RA/       GTH /RA/                     RPC /RA/
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE JSD /RA/
NAME               JDodson         GHopper       WJones         RCroteau DATE                   02/25/2014     02/25/2014                   02/26/2014 E-MAIL COPY?         YES     NO     YES     NO   YES   NO     YES     NO     YES   NO   YES   NO     YES   NO E. Kapopoulos                             4 Letter to Ernie Kapopoulos from Richard P. Croteau dated March 4, 2014
GTH /RA/
RPC /RA/
NAME JDodson GHopper WJones RCroteau DATE 02/25/2014 02/25/2014 02/26/2014 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO  
 
E. Kapopoulos 4
Letter to Ernie Kapopoulos from Richard P. Croteau dated March 4, 2014  


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2013001 Distribution w/encl:
ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2013001 Distribution w/encl:
C. Evans, RII L. Douglas, RII R. Hannah, RII J. Ledford, RII J. Pelchat, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource Institute of Nuclear Power Operations (INPO)
C. Evans, RII L. Douglas, RII R. Hannah, RII J. Ledford, RII J. Pelchat, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource Institute of Nuclear Power Operations (INPO)
ROP Assessment
ROP Assessment  


Page 1 of 2                                                                                   Harris 03/04/2014     08:42:48                                                         Inspection / Activity Plan Report 22 03/01/2014 - 06/30/2015 Unit          Planned Dates                                                                                                                                  No. of Staff Number          Start    End      Inspection Activity                                                              Title                                      on Site TFPI         - TRIENNIAL FIRE PROTECTION INSP                                                                                     10 1         04/21/2014   04/25/2014   IP 7111105x            Fire Protection - NFPA 805 (Triennial) 1          05/05/2014   05/09/2014   IP 7111105x            Fire Protection - NFPA 805 (Triennial)
Page 1 of 2 03/04/2014 08:42:48 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris Inspection / Activity Plan 03/01/2014 - 06/30/2015 TFPI
EP            - EP PROGRAM INSPECTION                                                                                               3 1         04/07/2014  04/11/2014  IP 7111402              Alert and Notification System Testing 1          04/07/2014   04/11/2014   IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System 1          04/07/2014   04/11/2014   IP 7111404              Emergency Action Level and Emergency Plan Changes 1          04/07/2014   04/11/2014   IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1          04/07/2014   04/11/2014   IP 71151                Performance Indicator Verification CDBI         - COMPONENT DESIGN BASES INSPECTION                                                                                   7 1         05/19/2014   05/23/2014   IP 7111121              Component Design Bases Inspection 1          06/23/2014   06/27/2014   IP 7111121              Component Design Bases Inspection 1          07/07/2014   07/11/2014   IP 7111121              Component Design Bases Inspection 1          07/21/2014   07/25/2014   IP 7111121              Component Design Bases Inspection RP           - RP PUBLIC RADIATION SAFETY BASELINE                                                                                 3 1         08/18/2014  08/22/2014  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          08/18/2014   08/22/2014   IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment 1          08/18/2014   08/22/2014   IP 71124.07            Radiological Environmental Monitoring Program 1          08/18/2014   08/22/2014   IP 71151                Performance Indicator Verification RP            - TRANSPORTATION                                                                                                      1 1          10/27/2014   10/31/2014   IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EP           - EP EXERCISE                                                                                                         1 1         03/09/2015  03/13/2015  IP 7111404              Emergency Action Level and Emergency Plan Changes 1          03/09/2015   03/13/2015   IP 7111407              Exercise Evaluation - Hostile Action (HA) Event 1          03/09/2015   03/13/2015   IP 71151                Performance Indicator Verification ISI           - UNIT 1 IN-SERVICE INSPECTION & RVH EXAM                                                                             2 1         04/27/2015   05/01/2015   IP 7111108P            Inservice Inspection Activities - PWR RP           - RP OCCUPATIONAL BASELINE WEEK 1                                                                                     3 1         04/27/2015  05/01/2015  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          04/27/2015   05/01/2015   IP 71124.02            Occupational ALARA Planning and Controls 1          04/27/2015   05/01/2015   IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          04/27/2015   05/01/2015   IP 71124.04             Occupational Dose Assessment 1          04/27/2015   05/01/2015   IP 71124.05             Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities.
- TRIENNIAL FIRE PROTECTION INSP 10 1
IP Fire Protection - NFPA 805 (Triennial) 7111105x 04/21/2014 04/25/2014 1
IP Fire Protection - NFPA 805 (Triennial) 7111105x 05/05/2014 05/09/2014 EP
- EP PROGRAM INSPECTION 3
1 IP Alert and Notification System Testing 7111402 04/07/2014 04/11/2014 1
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 04/07/2014 04/11/2014 1
IP Emergency Action Level and Emergency Plan Changes 7111404 04/07/2014 04/11/2014 1
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 04/07/2014 04/11/2014 1
IP Performance Indicator Verification 71151 04/07/2014 04/11/2014 CDBI
- COMPONENT DESIGN BASES INSPECTION 7
1 IP Component Design Bases Inspection 7111121 05/19/2014 05/23/2014 1
IP Component Design Bases Inspection 7111121 06/23/2014 06/27/2014 1
IP Component Design Bases Inspection 7111121 07/07/2014 07/11/2014 1
IP Component Design Bases Inspection 7111121 07/21/2014 07/25/2014 RP
- RP PUBLIC RADIATION SAFETY BASELINE 3
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/18/2014 08/22/2014 1
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/18/2014 08/22/2014 1
IP Radiological Environmental Monitoring Program 71124.07 08/18/2014 08/22/2014 1
IP Performance Indicator Verification 71151 08/18/2014 08/22/2014 RP
- TRANSPORTATION 1
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/27/2014 10/31/2014 EP
- EP EXERCISE 1
1 IP Emergency Action Level and Emergency Plan Changes 7111404 03/09/2015 03/13/2015 1
IP Exercise Evaluation - Hostile Action (HA) Event 7111407 03/09/2015 03/13/2015 1
IP Performance Indicator Verification 71151 03/09/2015 03/13/2015 ISI
- UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2
1 IP Inservice Inspection Activities - PWR 7111108P 04/27/2015 05/01/2015 RP
- RP OCCUPATIONAL BASELINE WEEK 1 3
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/27/2015 05/01/2015 1
IP Occupational ALARA Planning and Controls 71124.02 04/27/2015 05/01/2015 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/27/2015 05/01/2015 1
IP Occupational Dose Assessment 71124.04 04/27/2015 05/01/2015 1
IP Radiation Monitoring Instrumentation 71124.05 04/27/2015 05/01/2015 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Enclosure
Enclosure


Page 2 of 2                                                                                   Harris 03/04/2014     08:42:48                                                         Inspection / Activity Plan Report 22 03/01/2014 - 06/30/2015 Unit          Planned Dates                                                                                            No. of Staff Number          Start    End      Inspection Activity                                                              Title  on Site RP           - RP OCCUPATIONAL BASELINE WEEK 1                                               3 1         04/27/2015   05/01/2015   IP 71151                Performance Indicator Verification SGISI         - UNIT 1 SG IN-SERVICE INSPECTION                                               1 1         05/04/2015   05/09/2015   IP 7111108P            Inservice Inspection Activities - PWR RP           - RP OCCUPATIONAL BASELINE WEEK 2                                               2 1         05/11/2015  05/15/2015  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          05/11/2015   05/15/2015   IP 71124.02            Occupational ALARA Planning and Controls 1          05/11/2015   05/15/2015   IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          05/11/2015   05/15/2015   IP 71124.04             Occupational Dose Assessment 1          05/11/2015   05/15/2015   IP 71124.05             Radiation Monitoring Instrumentation 1          05/11/2015   05/15/2015   IP 71151                Performance Indicator Verification This report does not include INPO and OUTAGE activities.                     Enclosure This report shows only on-site and announced inspection procedures.}}
Page 2 of 2 03/04/2014 08:42:48 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris Inspection / Activity Plan 03/01/2014 - 06/30/2015 RP
- RP OCCUPATIONAL BASELINE WEEK 1 3
1 IP Performance Indicator Verification 71151 04/27/2015 05/01/2015 SGISI
- UNIT 1 SG IN-SERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 05/04/2015 05/09/2015 RP
- RP OCCUPATIONAL BASELINE WEEK 2 2
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/11/2015 05/15/2015 1
IP Occupational ALARA Planning and Controls 71124.02 05/11/2015 05/15/2015 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/11/2015 05/15/2015 1
IP Occupational Dose Assessment 71124.04 05/11/2015 05/15/2015 1
IP Radiation Monitoring Instrumentation 71124.05 05/11/2015 05/15/2015 1
IP Performance Indicator Verification 71151 05/11/2015 05/15/2015 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure}}

Latest revision as of 22:55, 10 January 2025

2013 Annual Assessment Letter for Shearon Harris Nuclear Plant
ML14063A149
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/04/2014
From: Croteau R
Division Reactor Projects II
To: Kapopoulos E
Duke Energy Progress
References
IR-13-001
Download: ML14063A149 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 04, 2014 Mr. Ernie Kapopoulos Site Vice President Duke Energy Progress, Inc.

Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2013001

Dear Mr. Kapopoulous:

On February 18, 2014, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Shearon Harris Nuclear Power Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information.

The NRC determined that overall, Shearon Harris Nuclear Power Plant, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Shearon Harris Nuclear Power Plant, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

Plant performance for the first quarter of the assessment period was within the Regulatory Response column of the NRCs ROP Action Matrix based on one inspection finding being classified as having low-to-moderate safety significance (i.e., White) and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). The White finding involved the failure to adequately maintain the ventilation system equipment of the Emergency Operations Facility for protracted periods of time. This White finding was closed on March 22, 2013, as documented in our letter to you dated April 23, 2013 (ADAMS Accession No. ML13114A069). Unit 1 returned to the Licensee Response Column of the ROP Action Matrix in the second quarter of 2013.

E. Kapopoulos 2

The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events is ongoing. This audit includes an onsite component in order for the NRC to evaluate mitigating strategies as described in licensee submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The calendar year (CY) 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

E. Kapopoulos 3

Please contact George Hopper at 404-997-4645 with any questions you may have regarding this letter.

Sincerely,

/RA/

Richard P. Croteau, Director Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63

Enclosure:

Harris Inspection/Activity Plan (03/01/2014 - 06/30/2015) cc Distribution via ListServ

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE JSD /RA/

GTH /RA/

RPC /RA/

NAME JDodson GHopper WJones RCroteau DATE 02/25/2014 02/25/2014 02/26/2014 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

E. Kapopoulos 4

Letter to Ernie Kapopoulos from Richard P. Croteau dated March 4, 2014

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2013001 Distribution w/encl:

C. Evans, RII L. Douglas, RII R. Hannah, RII J. Ledford, RII J. Pelchat, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource Institute of Nuclear Power Operations (INPO)

ROP Assessment

Page 1 of 2 03/04/2014 08:42:48 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris Inspection / Activity Plan 03/01/2014 - 06/30/2015 TFPI

- TRIENNIAL FIRE PROTECTION INSP 10 1

IP Fire Protection - NFPA 805 (Triennial) 7111105x 04/21/2014 04/25/2014 1

IP Fire Protection - NFPA 805 (Triennial) 7111105x 05/05/2014 05/09/2014 EP

- EP PROGRAM INSPECTION 3

1 IP Alert and Notification System Testing 7111402 04/07/2014 04/11/2014 1

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 04/07/2014 04/11/2014 1

IP Emergency Action Level and Emergency Plan Changes 7111404 04/07/2014 04/11/2014 1

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 04/07/2014 04/11/2014 1

IP Performance Indicator Verification 71151 04/07/2014 04/11/2014 CDBI

- COMPONENT DESIGN BASES INSPECTION 7

1 IP Component Design Bases Inspection 7111121 05/19/2014 05/23/2014 1

IP Component Design Bases Inspection 7111121 06/23/2014 06/27/2014 1

IP Component Design Bases Inspection 7111121 07/07/2014 07/11/2014 1

IP Component Design Bases Inspection 7111121 07/21/2014 07/25/2014 RP

- RP PUBLIC RADIATION SAFETY BASELINE 3

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/18/2014 08/22/2014 1

IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/18/2014 08/22/2014 1

IP Radiological Environmental Monitoring Program 71124.07 08/18/2014 08/22/2014 1

IP Performance Indicator Verification 71151 08/18/2014 08/22/2014 RP

- TRANSPORTATION 1

1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/27/2014 10/31/2014 EP

- EP EXERCISE 1

1 IP Emergency Action Level and Emergency Plan Changes 7111404 03/09/2015 03/13/2015 1

IP Exercise Evaluation - Hostile Action (HA) Event 7111407 03/09/2015 03/13/2015 1

IP Performance Indicator Verification 71151 03/09/2015 03/13/2015 ISI

- UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2

1 IP Inservice Inspection Activities - PWR 7111108P 04/27/2015 05/01/2015 RP

- RP OCCUPATIONAL BASELINE WEEK 1 3

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/27/2015 05/01/2015 1

IP Occupational ALARA Planning and Controls 71124.02 04/27/2015 05/01/2015 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/27/2015 05/01/2015 1

IP Occupational Dose Assessment 71124.04 04/27/2015 05/01/2015 1

IP Radiation Monitoring Instrumentation 71124.05 04/27/2015 05/01/2015 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 03/04/2014 08:42:48 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris Inspection / Activity Plan 03/01/2014 - 06/30/2015 RP

- RP OCCUPATIONAL BASELINE WEEK 1 3

1 IP Performance Indicator Verification 71151 04/27/2015 05/01/2015 SGISI

- UNIT 1 SG IN-SERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 05/04/2015 05/09/2015 RP

- RP OCCUPATIONAL BASELINE WEEK 2 2

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/11/2015 05/15/2015 1

IP Occupational ALARA Planning and Controls 71124.02 05/11/2015 05/15/2015 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/11/2015 05/15/2015 1

IP Occupational Dose Assessment 71124.04 05/11/2015 05/15/2015 1

IP Radiation Monitoring Instrumentation 71124.05 05/11/2015 05/15/2015 1

IP Performance Indicator Verification 71151 05/11/2015 05/15/2015 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure