{{#Wiki_filter:t                                                                   6 ACCELERATED DIjRIBUTION DEMONSTiTION                                           SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
{{#Wiki_filter:t 6
ESSION NBR: 9101280251             DOC. DATE:   91/01/26     NOTARIZED: NO       DOCKET FACIL:50-335 St. Lucie Plant., Unit 1, Florida Power & Light Co.                     05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co.                     05000389 AUTH. NAME           AUTHOR AFFILIATION GOLDBERG,J.'H.       Florida Power & Light Co.
ACCELERATED DIjRIBUTION DEMONSTiTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
ESSION NBR: 9101280251 DOC. DATE: 91/01/26 NOTARIZED: NO FACIL:50-335 St. Lucie Plant., Unit 1, Florida Power
SUM'ECT: Clarifies 900413 response to violations noted in Insp Repts 50-335/90-02 & 50-389/90-02.Corrective actions:nuclear job planning sys changed to include speed governor oil changes consistent w/vendor recommendations.
& Light Co.
DISTRIBUTION CODE: ZE01D COPIES RECEIVED:LTR                     ENCL     SIZE:
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NAME AUTHOR AFFILIATION GOLDBERG,J.'H.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUM'ECT: Clarifies 900413 response to violations noted in Insp Repts 50-335/90-02
& 50-389/90-02.Corrective actions:nuclear job planning sys changed to include speed governor oil changes consistent w/vendor recommendations.
DISTRIBUTION CODE:
ZE01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES:
TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES:
RECIPIENT               COPIES                RECIPIENT        COPIES ID CODE/NAME           LTTR ENCL          ID  CODE/NAME    LTTR ENCL PD2-2 PD                                     NORRIS,J INTERNAL: ACRS                           2              AEOD                  1 AEOD/DEIIB                   1              AEOD/TPAB            1 DEDRO                         1              NRR MORISSEAU,D      1 NRR SHANKMAN,S               1              NRR/DLPQ/LPEB10      1 NRR/DOEA/OEAB                 1              NRR/DREP/PEPB9 D      1 NRR/DRIS/DIR                 1            - NRR/DST/DIR 8E2      1 NRR/PMAS/ILRB12               1              NUDOCS-ABSTRACT      1 OE DI                         1              OGC/HDS2                ib RE ~FILE         0           1              RGN2    FILE 01      1 EXTERNAL: EG&G/BRYCE ~ J. H.                             NRC PDR NSZC NOTE TO ALL "RIDS" RECIPIENTS:
DOCKET 05000335 05000389 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DOEA/OEAB NRR/DRIS/DIR NRR/PMAS/ILRB12 OE DI RE ~FILE 0
EXTERNAL: EG&G/BRYCE ~ J. H.
NSZC COPIES LTTR ENCL 2
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME NORRIS,J AEOD AEOD/TPAB NRR MORISSEAU,D NRR/DLPQ/LPEB10 NRR/DREP/PEPB9 D
- NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
ib 1
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELliVIINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELliVIINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                   24   ENCL       Q
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL Q


P.O. Box14000, Juno Beach, FL 33408-0420 JANUARY   2 4 1991 L-91-26 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
P.O. Box14000, Juno Beach, FL 33408-0420 JANUARY 2 4 1991 L-91-26 U. S. Nuclear Regulatory Commission Attn:
Re:     St. Lucie Unit 1 and 2 Docket Nos. 50-335 and 50-389 Response to Notice of Violation Clarification Ins ection Re ort 90-02 Reference A:             St. Lucie Unit 1 and 2 Docket Nos. 50-335 and 50-389 Response to Notice of Violation Ins ection Re ort 90-02 L-90-138, dated     April     13, 1990 On   January 10, 1991, a discussion between NRC Region                               II   personnel NRC for and the St. Lucie             Plant staff resulted   in   a request       by   the clarification of             the   "specific   procedures"       mentioned         in   Finding     B, Response 3,           in   Reference   A. In Reference     A,   Florida       Power       &   Light Company         (FPL)     stated:
Document Control Desk Washington, D.
: 3.       The     specific vendor recommendation regarding the speed governor         oil change was completed. The specific procedures were changed to reflect the oil changes at a frequency consistent with the vendor's recommendation.
C.
20555 Gentlemen:
Re:
St. Lucie Unit 1 and 2
Docket Nos.
50-335 and 50-389
 
===Response===
to Notice of Violation Clarification Ins ection Re ort 90-02 Reference A:
St. Lucie Unit 1 and 2
Docket Nos.
50-335 and 50-389 Response to Notice of Violation Ins ection Re ort 90-02 L-90-138, dated April 13, 1990 On January 10,
: 1991, a discussion between NRC Region II personnel and the St. Lucie Plant staff resulted in a request by the NRC for clarification of the "specific procedures" mentioned in Finding B,
 
===Response===
3, in Reference A.
In Reference A, Florida Power
& Light Company (FPL) stated:
3.
The specific vendor recommendation regarding the speed governor oil change was completed.
The specific procedures were changed to reflect the oil changes at a
frequency consistent with the vendor's recommendation.
FPL submits the following clarification:
FPL submits the following clarification:
The Nuclear Job Planning System (NJPS) was changed to include the speed governor oil changes at a frequency consistent with the vendor's recommendation on February 2, 1990. The NJPS is a system designed to ensure preventative maintenance is scheduled within the desired time frames and tracked to completion.
The Nuclear Job Planning System (NJPS) was changed to include the speed governor oil changes at a
A detailed set of written work instructions was developed using the guidance in the vendor technical manual to perform the required preventative maintenance.                   This detailed set of written work instructions             was in the form of an attachment which was issued with the maintenance work order. When this maintenance was subsequently performed, it was done using the developed set of detailed 92022S02~
frequency consistent with the vendor's recommendation on February 2, 1990.
an FPL Group company 25i OCK    91012~
The NJPS is a system designed to ensure preventative maintenance is scheduled within the desired time frames and tracked to completion.
05000735                                               ~go/
A detailed set of written work instructions was developed using the guidance in the vendor technical manual to perform the required preventative maintenance.
PDR                                                /gp
This detailed set of written work instructions was in the form of an attachment which was issued with the maintenance work order.
When this maintenance was subsequently performed, it was done using the developed set of detailed 92022S02~25i 91012~
OCK 05000735 PDR
~go/
/gp an FPL Group company


L-91-26 Page 2 instructions. In addition, this maintenance was performed under the supervision of the Instrument and Control supervisor and the System Engineer.
L-91-26 Page 2
instructions.
In addition, this maintenance was performed under the supervision of the Instrument and Control supervisor and the System Engineer.
FPL regrets any confusion caused by our response of April 13, 1990.
FPL regrets any confusion caused by our response of April 13, 1990.
A detailed written procedure was     issued on January 11, 1991, replacing the written instructions discussed above.
A detailed written procedure was issued on January 11,
Very tru y yours, J. H. Goldberg President Nuclear Division t4 JHG/ JWH cc: Stewart D. Ebneter, Regional Administrator, USNRC Region IZ Senior Resident Inspector, USNRC, St. Lucie Plant}}
: 1991, replacing the written instructions discussed above.
Very tru y yours, J.
H. Goldberg President Nuclear Division t4 JHG/ JWH cc: Stewart D. Ebneter, Regional Administrator, USNRC Region IZ Senior Resident Inspector, USNRC, St. Lucie Plant}}

Latest revision as of 14:14, 8 January 2025

Clarifies 900413 Response to Violations Noted in Insp Repts 50-335/90-02 & 50-389/90-02.Corrective Actions:Nuclear Job Planning Sys Changed to Include Speed Governor Oil Changes Consistent W/Vendor Recommendations
ML17223B066
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/24/1991
From: Goldberg J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-26, NUDOCS 9101280251
Download: ML17223B066 (4)


Text

t 6

ACCELERATED DIjRIBUTION DEMONSTiTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ESSION NBR: 9101280251 DOC. DATE: 91/01/26 NOTARIZED: NO FACIL:50-335 St. Lucie Plant., Unit 1, Florida Power

& Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION GOLDBERG,J.'H.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUM'ECT: Clarifies 900413 response to violations noted in Insp Repts 50-335/90-02

& 50-389/90-02.Corrective actions:nuclear job planning sys changed to include speed governor oil changes consistent w/vendor recommendations.

DISTRIBUTION CODE:

ZE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES:

DOCKET 05000335 05000389 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DOEA/OEAB NRR/DRIS/DIR NRR/PMAS/ILRB12 OE DI RE ~FILE 0

EXTERNAL: EG&G/BRYCE ~ J. H.

NSZC COPIES LTTR ENCL 2

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME NORRIS,J AEOD AEOD/TPAB NRR MORISSEAU,D NRR/DLPQ/LPEB10 NRR/DREP/PEPB9 D

- NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

ib 1

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELliVIINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL Q

P.O. Box14000, Juno Beach, FL 33408-0420 JANUARY 2 4 1991 L-91-26 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

St. Lucie Unit 1 and 2

Docket Nos.

50-335 and 50-389

Response

to Notice of Violation Clarification Ins ection Re ort 90-02 Reference A:

St. Lucie Unit 1 and 2

Docket Nos.

50-335 and 50-389 Response to Notice of Violation Ins ection Re ort 90-02 L-90-138, dated April 13, 1990 On January 10,

1991, a discussion between NRC Region II personnel and the St. Lucie Plant staff resulted in a request by the NRC for clarification of the "specific procedures" mentioned in Finding B,

Response

3, in Reference A.

In Reference A, Florida Power

& Light Company (FPL) stated:

3.

The specific vendor recommendation regarding the speed governor oil change was completed.

The specific procedures were changed to reflect the oil changes at a

frequency consistent with the vendor's recommendation.

FPL submits the following clarification:

The Nuclear Job Planning System (NJPS) was changed to include the speed governor oil changes at a

frequency consistent with the vendor's recommendation on February 2, 1990.

The NJPS is a system designed to ensure preventative maintenance is scheduled within the desired time frames and tracked to completion.

A detailed set of written work instructions was developed using the guidance in the vendor technical manual to perform the required preventative maintenance.

This detailed set of written work instructions was in the form of an attachment which was issued with the maintenance work order.

When this maintenance was subsequently performed, it was done using the developed set of detailed 92022S02~25i 91012~

OCK 05000735 PDR

~go/

/gp an FPL Group company

L-91-26 Page 2

instructions.

In addition, this maintenance was performed under the supervision of the Instrument and Control supervisor and the System Engineer.

FPL regrets any confusion caused by our response of April 13, 1990.

A detailed written procedure was issued on January 11,

1991, replacing the written instructions discussed above.

Very tru y yours, J.

H. Goldberg President Nuclear Division t4 JHG/ JWH cc: Stewart D. Ebneter, Regional Administrator, USNRC Region IZ Senior Resident Inspector, USNRC, St. Lucie Plant