IR 05000313/2006006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams|number = ML063120158}}
{{Adams
| number = ML063120158
| issue date = 05/08/2006
| title = IR 05000313-06-006, and IR 05000368-06-006, on 03/27/2006 - 03/30/2006, for Arkansas Nuclear One, Units 1 and 2, Security Limited Baseline Inspection of Equipment Performance, Testing and Maintenance - Letter Only
| author name = Shannon M P
| author affiliation = NRC/RGN-IV/DRS/PSB
| addressee name = Forbes J S
| addressee affiliation = Entergy Operations, Inc
| docket = 05000313, 05000368
| license number = DPR-051, NPF-006
| contact person =
| document report number = IR-06-006
| document type = Inspection Report, Letter
| page count = 3
}}


{{IR-Nav| site = 05000313 | year = 2006 | report number = 006 }}
{{IR-Nav| site = 05000313 | year = 2006 | report number = 006 }}
Line 8: Line 22:
1448 S. R. 333Russellville, AR 72801-0967
1448 S. R. 333Russellville, AR 72801-0967


SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 and 2 - NRC PHYSICAL SECURITYLIMITED BASELINE INSPECTION REPORT 05000313/2006006 and 05000368/2006006
SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 and 2 - NRC PHYSICAL SECURITYLIMITED BASELINE INSPECTION REPORT 05000313/2006006 and
 
05000368/2006006


==Dear Mr. Forbes:==
==Dear Mr. Forbes:==
On March 30, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspectionat your Arkansas Nuclear One, Units 1 and 2 facility. The enclosed inspection reportdocuments the inspection results, which were discussed on March 30, 2006, with Mr. T. Mitchell, General Manager, Plant Operations and other members of your staff.This inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.
On March 30, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspectionat your Arkansas Nuclear One, Units 1 and 2 facility. The enclosed inspection reportdocuments the inspection results, which were discussed on March 30, 2006, with Mr. T. Mitchell, General Manager, Plant Operations and other members of your staff.This inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.


The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.This report documents one NRC-identified finding of very low safety significance (Green). Thisfinding was determined to involve a violation of NRC requirements. However, because of thevery low safety significance and because it is entered into your corrective action program, the NRC is treating this finding as a non-cited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy. If you contest the NCV, you should provide a response within30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region IV; the Director, Office of Enforcement, United Entergy Operations, Inc.-2 Document transmitted herewith contains . Whenseparated from enclosure(s) or attachment(s), this document is decontrolled. States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC ResidentInspector at the Arkansas Nuclear One facility.If Safeguards Information is necessary to provide an acceptable response, please provide thelevel of protection described in 10 CFR 73.21. Otherwise, mark your entire response
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.This report documents one NRC-identified finding of very low safety significance (Green). Thisfinding was determined to involve a violation of NRC requirements. However, because of thevery low safety significance and because it is entered into your corrective action program, the NRC is treating this finding as a non-cited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy. If you contest the NCV, you should provide a response within30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region IV; the Director, Office of Enforcement, United Entergy Operations, Inc.-2 Document transmitted herewith contains . Whenseparated from enclosure(s) or attachment(s), this document is decontrolled. States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resi dentInspector at the Arkansas Nuclear One facility.If Safeguards Information is necessary to provide an acceptable response, please provide thelevel of protection described in 10 CFR 73.21. Otherwise, mark your entire response
"Security-Related Information - Withhold Under 10 CFR 2.390." and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC iswaiving the affidavit requirements for your response.The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. While we are fully committed to our goal of ensuring openness in our regulatory process, wemust balance that goal with the more immediate need of ensuring the continued safety andsecure operation of nuclear facilities and the protection of nuclear materials in our country. Thus, due to the security-related concerns contained in this correspondence, and in accordance with 10 CFR 2.390, a copy of this letter and its enclosure will not be available for publicinspection in either the NRC Public Document Room or the Publicly Available Records (PARS)
"Security-Related Information - Withhold Under 10 CFR 2.390." and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC iswaiving the affidavit requirements for your response.The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. While we are fully committed to our goal of ensuring openness in our regulatory process, wemust balance that goal with the more immediate need of ensuring the continued safety andsecure operation of nuclear facilities and the protection of nuclear materials in our country. Thus, due to the security-related concerns contained in this correspondence, and in accordance with 10 CFR 2.390, a copy of this letter and its enclosure will not be available for publicinspection in either the NRC Public Document Room or the Publicly Available Records (PARS)
component of the NRC's Document system (ADAMS).
component of the NRC's Document system (ADAMS).
Line 23: Line 39:


===w/attachment:===
===w/attachment:===
Supplemental Information Entergy Operations, Inc.-3 Document transmitted herewith contains . Whenseparated from enclosure(s) or attachment(s), this document is decontrolled. cc (without enclosure)Senior Vice President  
Supplemental Information Entergy Operations, Inc.-3 Document transmitted herewith contains . Whenseparated from enclosure(s) or attachment(s), this document is decontrolled. cc (without enclosure
)Senior Vice President  
  & Chief Operating Officer Entergy Operations, Inc.
  & Chief Operating Officer Entergy Operations, Inc.



Revision as of 17:22, 25 October 2018

IR 05000313-06-006, and IR 05000368-06-006, on 03/27/2006 - 03/30/2006, for Arkansas Nuclear One, Units 1 and 2, Security Limited Baseline Inspection of Equipment Performance, Testing and Maintenance - Letter Only
ML063120158
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/08/2006
From: Shannon M P
Plant Support Branch Region IV
To: Forbes J S
Entergy Operations
References
IR-06-006
Download: ML063120158 (3)


Text

WARNING: Violation of Section 147 of the AtomicEnergy Act, protection requirements for "SAFEGUARDSINFORMATION," is subject to civil and criminal penalties.Safeguards Information determination made by:Name/Title M. Shannon, Chief, PSB, RIV Organization PSB/DRS/RIV Basis 10 CFR 73 Signature /RA/ MPShannon Date 5/8/06 Document transmitted herewith contains . Whenseparated from enclosure(s) or attachment(s), this document is decontrolled. Mr. Jeffrey S. ForbesMay 8, 2006Vice President Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S. R. 333Russellville, AR 72801-0967

SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 and 2 - NRC PHYSICAL SECURITYLIMITED BASELINE INSPECTION REPORT 05000313/2006006 and

05000368/2006006

Dear Mr. Forbes:

On March 30, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspectionat your Arkansas Nuclear One, Units 1 and 2 facility. The enclosed inspection reportdocuments the inspection results, which were discussed on March 30, 2006, with Mr. T. Mitchell, General Manager, Plant Operations and other members of your staff.This inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.This report documents one NRC-identified finding of very low safety significance (Green). Thisfinding was determined to involve a violation of NRC requirements. However, because of thevery low safety significance and because it is entered into your corrective action program, the NRC is treating this finding as a non-cited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy. If you contest the NCV, you should provide a response within30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region IV; the Director, Office of Enforcement, United Entergy Operations, Inc.-2 Document transmitted herewith contains . Whenseparated from enclosure(s) or attachment(s), this document is decontrolled. States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resi dentInspector at the Arkansas Nuclear One facility.If Safeguards Information is necessary to provide an acceptable response, please provide thelevel of protection described in 10 CFR 73.21. Otherwise, mark your entire response

"Security-Related Information - Withhold Under 10 CFR 2.390." and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC iswaiving the affidavit requirements for your response.The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. While we are fully committed to our goal of ensuring openness in our regulatory process, wemust balance that goal with the more immediate need of ensuring the continued safety andsecure operation of nuclear facilities and the protection of nuclear materials in our country. Thus, due to the security-related concerns contained in this correspondence, and in accordance with 10 CFR 2.390, a copy of this letter and its enclosure will not be available for publicinspection in either the NRC Public Document Room or the Publicly Available Records (PARS)

component of the NRC's Document system (ADAMS).

Sincerely,/RA/Michael P. Shannon, ChiefPlant Support Branch Division of Reactor SafetyDocket Nos.50-313 50-368 License Nos. DPR-51NPF-6

Enclosure:

NRC Inspection Report 05000313 and 05000368/2006006

w/attachment:

Supplemental Information Entergy Operations, Inc.-3 Document transmitted herewith contains . Whenseparated from enclosure(s) or attachment(s), this document is decontrolled. cc (without enclosure

)Senior Vice President

& Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995Vice PresidentOperations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995