ML20003A352: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:- | ||
~ | |||
Rev. 1 - 1/22/81 OPERATING DATA REPORT DOCKET NO. | |||
50-346 DATE _May 6, 1980 COMPLETED BY Bilal Sarsour TELEPHONE 419-259-5000, OPERATING STATUS Ext. 251 | |||
DATE _May 6, 1980 COMPLETED BY Bilal Sarsour | : 1. Unit Name: | ||
Davis-Besse Unit 1 Notes | |||
: 1. Unit Name: | : 2. Reporting Period: | ||
: 2. Reporting Period: | Anril. 1980 | ||
: 3. Licensed Thermal Power (. | : 3. Licensed Thermal Power (. tWr): | ||
: 4. Nameplate Rating (Gross 31We): | 2772 | ||
: 5. Design Electrical Rating (Net SIWE): | \\ | ||
: 6. Slaximum Dependable Capacity (Gross SIWE): | : 4. Nameplate Rating (Gross 31We): | ||
: 7. blaximum Dependable Capacity (Net SIWE): | 925 | ||
: 5. Design Electrical Rating (Net SIWE): | |||
906 | |||
: 6. Slaximum Dependable Capacity (Gross SIWE): | |||
934 | |||
: 7. blaximum Dependable Capacity (Net SIWE): | |||
890 | |||
: 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Gise Reasons: | : 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Gise Reasons: | ||
: 9. Power Lesel To Which Restricted, if Any (Net MWe): | : 9. Power Lesel To Which Restricted, if Any (Net MWe): | ||
: 10. Reasons For Restrictions,If Any: | : 10. Reasons For Restrictions,If Any: | ||
"Ihis Month Yr.-to-Date Cumulative II. Hours In Reporting Period 719 2,903 23:428 | |||
: 12. Number Of Hours Reactor Was Critical | : 12. Number Of Hours Reactor Was Critical 159.3 2.078 13.042 1l | ||
: 14. Hours Generator On-Line | : 13. Reactor Reserve Shutdown Hours 0 | ||
: 15. Unit Resene Shutdown Hours | 0 2,875.8- | ||
: 16. Gross Thermal Energy Generated (31WH) | : 14. Hours Generator On-Line 159.3 2,008.7 11,883.0 | ||
: 17. Gross Electrical Energy Generated t31WH) | : 15. Unit Resene Shutdown Hours 0 | ||
1,583,559 | 0 1.728 | ||
: 18. Net Electrical Energy Generated (SIWH) | : 16. Gross Thermal Energy Generated (31WH) 315,675 4,687,305 24,886,812 | ||
: 19. Unit Service Factor | : 17. Gross Electrical Energy Generated t31WH) 104,487 1,583,559 8,307,070 | ||
: 20. Unit Asailability Factor | : 18. Net Electrical Energy Generated (SIWH) 94,347 1,483,787 7,654,365 | ||
: 31. Unit Capacity Factor (Using SIDC Neti | : 19. Unit Service Factor 22.2 | ||
: 22. Unit Capacity Factor (Using DER Net) | : 69. ? | ||
: 23. Unit Forced Outage Rate | 59.0 | ||
: 20. Unit Asailability Factor 22.2 69.2 60.2 | |||
: 31. Unit Capacity Factor (Using SIDC Neti 14.7 57.4 39.6 | |||
: 22. Unit Capacity Factor (Using DER Net) 14.5 56.4 38.9 | |||
: 23. Unit Forced Outage Rate 0 | |||
14.3 25,6 | |||
: 24. Shutdowns Scheduled Over Ne.st 6 Slonths (Type. Date,and Duration of Eachl: | : 24. Shutdowns Scheduled Over Ne.st 6 Slonths (Type. Date,and Duration of Eachl: | ||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | ||
: 26. Units In Test Status (Prior to Commercial Operation): | 1Y | ||
INITIAL CRITICA LITY | : 26. Units In Test Status (Prior to Commercial Operation): | ||
INITIA L ELECTRICITY | Forecast Achieved O | ||
CON!%IERCIAL OPERATION | INITIAL CRITICA LITY INITIA L ELECTRICITY CON!%IERCIAL OPERATION (9/77) 8a02030S h x}} | ||
x}} | |||
Latest revision as of 15:04, 23 December 2024
| ML20003A352 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/22/1981 |
| From: | Sarsour B TOLEDO EDISON CO. |
| To: | |
| Shared Package | |
| ML20003A329 | List: |
| References | |
| NUDOCS 8102030542 | |
| Download: ML20003A352 (1) | |
Text
-
~
Rev. 1 - 1/22/81 OPERATING DATA REPORT DOCKET NO.
50-346 DATE _May 6, 1980 COMPLETED BY Bilal Sarsour TELEPHONE 419-259-5000, OPERATING STATUS Ext. 251
- 1. Unit Name:
Davis-Besse Unit 1 Notes
- 2. Reporting Period:
Anril. 1980
- 3. Licensed Thermal Power (. tWr):
2772
\\
- 4. Nameplate Rating (Gross 31We):
925
- 5. Design Electrical Rating (Net SIWE):
906
- 6. Slaximum Dependable Capacity (Gross SIWE):
934
- 7. blaximum Dependable Capacity (Net SIWE):
890
- 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Gise Reasons:
- 9. Power Lesel To Which Restricted, if Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
"Ihis Month Yr.-to-Date Cumulative II. Hours In Reporting Period 719 2,903 23:428
- 12. Number Of Hours Reactor Was Critical 159.3 2.078 13.042 1l
- 13. Reactor Reserve Shutdown Hours 0
0 2,875.8-
- 14. Hours Generator On-Line 159.3 2,008.7 11,883.0
- 15. Unit Resene Shutdown Hours 0
0 1.728
- 16. Gross Thermal Energy Generated (31WH) 315,675 4,687,305 24,886,812
- 17. Gross Electrical Energy Generated t31WH) 104,487 1,583,559 8,307,070
- 18. Net Electrical Energy Generated (SIWH) 94,347 1,483,787 7,654,365
- 19. Unit Service Factor 22.2
- 69. ?
59.0
- 20. Unit Asailability Factor 22.2 69.2 60.2
- 31. Unit Capacity Factor (Using SIDC Neti 14.7 57.4 39.6
- 22. Unit Capacity Factor (Using DER Net) 14.5 56.4 38.9
- 23. Unit Forced Outage Rate 0
14.3 25,6
- 24. Shutdowns Scheduled Over Ne.st 6 Slonths (Type. Date,and Duration of Eachl:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
1Y
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved O
INITIAL CRITICA LITY INITIA L ELECTRICITY CON!%IERCIAL OPERATION (9/77) 8a02030S h x