ML20003A367: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 30: | Line 30: | ||
925 | 925 | ||
: 5. Design Electrical Rating (Net MWe): 906 | : 5. Design Electrical Rating (Net MWe): 906 | ||
: 6. Maximum Dependable Capacity (Gross MWe): 934 | : 6. Maximum Dependable Capacity (Gross MWe): 934 | ||
: 7. Maximum Dependable Capacity (Net MWe): 890 | : 7. Maximum Dependable Capacity (Net MWe): 890 | ||
Revision as of 23:38, 17 February 2020
| ML20003A367 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/22/1981 |
| From: | Sarsour B TOLEDO EDISON CO. |
| To: | |
| Shared Package | |
| ML20003A329 | List: |
| References | |
| NUDOCS 8102030564 | |
| Download: ML20003A367 (1) | |
Text
- . . .
i
'I; .
Rev. 1 - 1/22/81 ,
, i OPERATING DATA REPORT DOCKET NO. 50-346 DATE Annust 7. 1980 i COMPLETED BY Bilal Sarsour TELEPHONE 259-5000 Ext.251 1 I OPERATING STATUS !
Davis-Besse Wir di N' f
- 1. Unit Name:
- 2. Reporting Period: Julv. 1980 ,
- 3. Licensed Thermal Power (MWt):
2772
- 4. Nameplate Rating (Gross MWe):
925
- 5. Design Electrical Rating (Net MWe): 906
- 6. Maximum Dependable Capacity (Gross MWe): 934
- 7. Maximum Dependable Capacity (Net MWe): 890
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: t i
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
1 1
l' This Month Yr.-to-Date Cumulative 744 5.111 79.616 II. Hours in Reporting Period 0 2.07R 11.na? )
- 12. Number Of Hours Reactor Was Critical 2,875.8 0 0
- 1l 13. Reactor Reserve Shutdown Hours 11,RR1.0 n ?,nna 7
- 14. Hours Generator On-Line 0 0 1.728 !
- 15. Unit Reserve Shutdown Hours !
- 16. Gross Thermal Energy Generated (MWH) 0 4.687.305 24.886.812 -
- 17. Gross Electrical Energy Generated (MWH) 0 _ _ ,
1.583.559 R;107 07n i
- 18. Net Electrical Energy Generated (MWH) 0 1.4R1_7R7 7.654.365 .i 9 10 1 A7 1
- 19. Unit Service Factor I
- 20. Unit ' Availability Factor _
39.3 54.6 17 6 35.9 l
- 21. Unit Capacity Factor (Using MDC Net)
- _._ _
d 12.0 15.3
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit ; orced Outage Rate 0 14.3 25.6
- 24. Shr.tdowns Scheduled Over Next 6 Monti.s (Type. Date.and Duration of Each): )
i August 11, 1980 ,
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
Forecast Achieved l i 26. Units in Test States (Prior to Commercial Operation):
INITIAL CRITICALITY INITIA L ELECTRICITY
. COMMERCIAL OPERATION
'" l
-810 2 0 3 0 SW
,w e- , - - +_- ev /