==Dear Mr. Sheppard:== | ==Dear Mr. Sheppard:== | ||
By {{letter dated|date=January 10, 2005|text=letter dated January 10, 2005}}, the Commission issued Amendment No. 170 to Facility Operating License No. NPF-76 and Amendment No. 158 to Facility Operating License No. | |||
By letter dated January 10, 2005, the Commission issued Amendment No. 170 to Facility Operating License No. NPF-76 and Amendment No. 158 to Facility Operating License No. | NPF-80 for South Texas Project, Units 1 and 2 respectively. The amendments consisted of changes to the Technical Specifications (TSs) in response to your application dated February 3, 2004, as supplemented by {{letter dated|date=December 1, 2004|text=letter dated December 1, 2004}}. The amendments modified TS requirements to adopt the provisions of industry/TS Task Force (TSTF) change TSTF-359. | ||
NPF-80 for South Texas Project, Units 1 and 2 respectively. The amendments consisted of changes to the Technical Specifications (TSs) in response to your application dated February 3, 2004, as supplemented by letter dated December 1, 2004. The amendments modified TS requirements to adopt the provisions of industry/TS Task Force (TSTF) change TSTF-359. | |||
The Commission inadvertently issued the subject amendments with TS page 3/4 3-61 reflecting a page version based on previous Amendment No. 151 to Facility Operating License No. | The Commission inadvertently issued the subject amendments with TS page 3/4 3-61 reflecting a page version based on previous Amendment No. 151 to Facility Operating License No. | ||
NPF-76 and Amendment No. 139 to Facility Operating License No. NPF-80 for South Texas Project, Units 1 and 2 respectively; rather than the Amendment No. 163 to Facility Operating License No. NPF-76 and Amendment No. 152 to Facility Operating License No. NPF-80 for South Texas Project, Units 1 and 2 respectively. | NPF-76 and Amendment No. 139 to Facility Operating License No. NPF-80 for South Texas Project, Units 1 and 2 respectively; rather than the Amendment No. 163 to Facility Operating License No. NPF-76 and Amendment No. 152 to Facility Operating License No. NPF-80 for South Texas Project, Units 1 and 2 respectively. | ||
The TS page 3/4 3-61 has been corrected and attached for incorporation in the subject amendments. We regret any inconvenience caused by this error. | The TS page 3/4 3-61 has been corrected and attached for incorporation in the subject amendments. We regret any inconvenience caused by this error. | ||
Sincerely, | Sincerely, | ||
/RA by M.Thadani for D.Jaffe/ | |||
David H. Jaffe, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 | David H. Jaffe, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 | ||
| Line 43: | Line 42: | ||
==Dear Mr. Sheppard:== | ==Dear Mr. Sheppard:== | ||
By {{letter dated|date=January 10, 2005|text=letter dated January 10, 2005}}, the Commission issued Amendment No. 170 to Facility Operating License No. NPF-76 and Amendment No. 158 to Facility Operating License No. | |||
By letter dated January 10, 2005, the Commission issued Amendment No. 170 to Facility Operating License No. NPF-76 and Amendment No. 158 to Facility Operating License No. | NPF-80 for South Texas Project, Units 1 and 2 respectively. The amendments consisted of changes to the Technical Specifications (TSs) in response to your application dated February 3, 2004, as supplemented by {{letter dated|date=December 1, 2004|text=letter dated December 1, 2004}}. The amendments modified TS requirements to adopt the provisions of industry/TS Task Force (TSTF) change TSTF-359. | ||
NPF-80 for South Texas Project, Units 1 and 2 respectively. The amendments consisted of changes to the Technical Specifications (TSs) in response to your application dated February 3, 2004, as supplemented by letter dated December 1, 2004. The amendments modified TS requirements to adopt the provisions of industry/TS Task Force (TSTF) change TSTF-359. | |||
The Commission inadvertently issued the subject amendments with TS page 3/4 3-61 reflecting a page version based on previous Amendment No. 151 to Facility Operating License No. | The Commission inadvertently issued the subject amendments with TS page 3/4 3-61 reflecting a page version based on previous Amendment No. 151 to Facility Operating License No. | ||
NPF-76 and Amendment No. 139 to Facility Operating License No. NPF-80 for South Texas Project, Units 1 and 2 respectively; rather than the Amendment No. 163 to Facility Operating License No. NPF-76 and Amendment No. 152 to Facility Operating License No. NPF-80 for South Texas Project, Units 1 and 2 respectively. | NPF-76 and Amendment No. 139 to Facility Operating License No. NPF-80 for South Texas Project, Units 1 and 2 respectively; rather than the Amendment No. 163 to Facility Operating License No. NPF-76 and Amendment No. 152 to Facility Operating License No. NPF-80 for South Texas Project, Units 1 and 2 respectively. | ||
The TS page 3/4 3-61 has been corrected and attached for incorporation in the subject amendments. We regret any inconvenience caused by this error. | The TS page 3/4 3-61 has been corrected and attached for incorporation in the subject amendments. We regret any inconvenience caused by this error. | ||
Sincerely, | Sincerely, | ||
/RA by M.Thadani for D.Jaffe/ | |||
David H. Jaffe, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 | David H. Jaffe, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 | ||
==Enclosure:== | ==Enclosure:== | ||
Corrected TS page 3/4 3-61 cc w/encl: See next page DISTRIBUTION: | Corrected TS page 3/4 3-61 cc w/encl: See next page DISTRIBUTION: | ||
PUBLIC | PUBLIC RidsNrrDlpmLpdiv (HBerkow) | ||
PDIV-1 r/f | PDIV-1 r/f RidsNrrDlpmLpdiv1 (AHowe) | ||
RidsNrrPMDJaffe | RidsNrrPMDJaffe RidsNrrLADBaxley RidsAcrsAcnwMailCenter GHill (4) | ||
RidsOgcRp | RidsOgcRp RidsRgn4MailCenter (AHowell,BJohnson) | ||
RidsNrrDlpmDpr ACCESSION NO: ML050390192 OFFICE | RidsNrrDlpmDpr ACCESSION NO: ML050390192 OFFICE PDIV-1/PM PDIV-1/LA PDIV-1/SC NAME DJaffe DBaxley AHowe DATE 2/4/05 2/4/05 2/8/05 OFFICIAL RECORD COPY | ||
South Texas Project, Units 1 & 2 cc: | November 2004 South Texas Project, Units 1 & 2 cc: | ||
Senior Resident Inspector | Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX 77414 C. Kirksey/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Mr. J. J. Nesrsta Mr. R. K. Temple City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Mr. C. A. Johnson/ R. P. Powers AEP Texas Central Company P. O. Box 289 Mail Code: N5022 Wadsworth, TX 77483 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 D. G. Tees/R. L. Balcom Texas Genco, LP P. O. Box 1700 Houston, TX 77251 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414 A. H. Gutterman, Esq. | ||
U.S. Nuclear Regulatory Commission | Morgan, Lewis & Bockius 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. T. J. Jordan, Vice President Engineering & Technical Services STP Nuclear Operating Company P. O. Box 289 Wadsworth, TX 77483 S. M. Head, Manager, Licensing STP Nuclear Operating Company P. O. Box 289, Mail Code: N5014 Wadsworth, TX 77483 Environmental and Natural Resources Policy Director P. O. Box 12428 Austin, TX 78711-3189 Jon C. Wood Cox Smith Matthews 112 East Pecan, Suite 1800 San Antonio, TX 78205 Director Division of Compliance & Inspection Bureau of Radiation Control Texas Department of State Health Services 1100 West 49th Street Austin, TX 78756 Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 | ||
South Texas Project, Units 1 & 2 | South Texas Project, Units 1 & 2 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Mr. Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Division P. O. Box 12157 Austin, TX 78711 Mr. Ted Enos 4200 South Hulen Suite 630 Ft. Worth, Texas 76109 | ||
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM LIMITING CONDITION FOR OPERATION 3.3.3.5 | SOUTH TEXAS - UNITS 1 & 2 3/4 3-61 Unit 1 - Amendment No. 151, 163, 170 Unit 2 - Amendment No. 139, 152, 158 NOTE: This corrected page was issued by {{letter dated|date=February 8, 2005|text=letter dated February 8, 2005}} INSTRUMENTATION REMOTE SHUTDOWN SYSTEM LIMITING CONDITION FOR OPERATION 3.3.3.5 The Remote Shutdown System Functions shall be OPERABLE. | ||
APPLICABILITY: | APPLICABILITY: | ||
MODES 1, 2, and 3. | |||
ACTION: | ACTION: | ||
With one or more required channels of one or more Remote Shutdown System Functions inoperable, restore the inoperable Function(s) to OPERABLE status within 30 days, or be in HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 6 hours. | With one or more required channels of one or more Remote Shutdown System Functions inoperable, restore the inoperable Function(s) to OPERABLE status within 30 days, or be in HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 6 hours. | ||
| Line 74: | Line 73: | ||
SURVEILLANCE REQUIREMENTS 4.3.3.5.1 Each normally energized Remote Shutdown System monitoring instrumentation channel shall be demonstrated OPERABLE by performance of a CHANNEL CHECK at least once per 31 days. | SURVEILLANCE REQUIREMENTS 4.3.3.5.1 Each normally energized Remote Shutdown System monitoring instrumentation channel shall be demonstrated OPERABLE by performance of a CHANNEL CHECK at least once per 31 days. | ||
4.3.3.5.2 Each Remote Shutdown System transfer switch, power and control circuit including the actuated components, shall be demonstrated OPERABLE at least once per 18 months. | 4.3.3.5.2 Each Remote Shutdown System transfer switch, power and control circuit including the actuated components, shall be demonstrated OPERABLE at least once per 18 months. | ||
4.3.3.5.3 Each Remote Shutdown System required instrumentation channel shall be demonstrated OPERABLE by performance of a CHANNEL CALIBRATION at least once per 18 months. [NOTE: Neutron detectors and reactor trip breaker indication are excluded from CHANNEL CALIBRATION.] | 4.3.3.5.3 Each Remote Shutdown System required instrumentation channel shall be demonstrated OPERABLE by performance of a CHANNEL CALIBRATION at least once per 18 months. [NOTE: Neutron detectors and reactor trip breaker indication are excluded from CHANNEL CALIBRATION.]}} | ||
Latest revision as of 22:31, 15 January 2025
| ML050390192 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 02/08/2005 |
| From: | Jaffe D NRC/NRR/DLPM/LPD4 |
| To: | Sheppard J South Texas |
| Jaffe D, NRR/DLPM, 415-1439 | |
| References | |
| TAC MC1944, TAC MC1945 | |
| Download: ML050390192 (6) | |
Text
February 8, 2005 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNIT 2 - CORRECTION LETTER RE: ISSUANCE OF AMENDMENT NOS. 170 AND 158 ON MODE CHANGE LIMITATIONS (TAC NO. MC1944 AND TAC NO. MC1945)
Dear Mr. Sheppard:
By letter dated January 10, 2005, the Commission issued Amendment No. 170 to Facility Operating License No. NPF-76 and Amendment No. 158 to Facility Operating License No.
NPF-80 for South Texas Project, Units 1 and 2 respectively. The amendments consisted of changes to the Technical Specifications (TSs) in response to your application dated February 3, 2004, as supplemented by letter dated December 1, 2004. The amendments modified TS requirements to adopt the provisions of industry/TS Task Force (TSTF) change TSTF-359.
The Commission inadvertently issued the subject amendments with TS page 3/4 3-61 reflecting a page version based on previous Amendment No. 151 to Facility Operating License No.
NPF-76 and Amendment No. 139 to Facility Operating License No. NPF-80 for South Texas Project, Units 1 and 2 respectively; rather than the Amendment No. 163 to Facility Operating License No. NPF-76 and Amendment No. 152 to Facility Operating License No. NPF-80 for South Texas Project, Units 1 and 2 respectively.
The TS page 3/4 3-61 has been corrected and attached for incorporation in the subject amendments. We regret any inconvenience caused by this error.
Sincerely,
/RA by M.Thadani for D.Jaffe/
David H. Jaffe, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosure:
Corrected TS page 3/4 3-61 cc w/encl: See next page
Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNIT 2 - CORRECTION LETTER RE: ISSUANCE OF AMENDMENT NOS. 170 AND 158 ON MODE CHANGE LIMITATIONS (TAC NO. MC1944 AND TAC NO. MC1945)
Dear Mr. Sheppard:
By letter dated January 10, 2005, the Commission issued Amendment No. 170 to Facility Operating License No. NPF-76 and Amendment No. 158 to Facility Operating License No.
NPF-80 for South Texas Project, Units 1 and 2 respectively. The amendments consisted of changes to the Technical Specifications (TSs) in response to your application dated February 3, 2004, as supplemented by letter dated December 1, 2004. The amendments modified TS requirements to adopt the provisions of industry/TS Task Force (TSTF) change TSTF-359.
The Commission inadvertently issued the subject amendments with TS page 3/4 3-61 reflecting a page version based on previous Amendment No. 151 to Facility Operating License No.
NPF-76 and Amendment No. 139 to Facility Operating License No. NPF-80 for South Texas Project, Units 1 and 2 respectively; rather than the Amendment No. 163 to Facility Operating License No. NPF-76 and Amendment No. 152 to Facility Operating License No. NPF-80 for South Texas Project, Units 1 and 2 respectively.
The TS page 3/4 3-61 has been corrected and attached for incorporation in the subject amendments. We regret any inconvenience caused by this error.
Sincerely,
/RA by M.Thadani for D.Jaffe/
David H. Jaffe, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosure:
Corrected TS page 3/4 3-61 cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsNrrDlpmLpdiv (HBerkow)
PDIV-1 r/f RidsNrrDlpmLpdiv1 (AHowe)
RidsNrrPMDJaffe RidsNrrLADBaxley RidsAcrsAcnwMailCenter GHill (4)
RidsOgcRp RidsRgn4MailCenter (AHowell,BJohnson)
RidsNrrDlpmDpr ACCESSION NO: ML050390192 OFFICE PDIV-1/PM PDIV-1/LA PDIV-1/SC NAME DJaffe DBaxley AHowe DATE 2/4/05 2/4/05 2/8/05 OFFICIAL RECORD COPY
November 2004 South Texas Project, Units 1 & 2 cc:
Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX 77414 C. Kirksey/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Mr. J. J. Nesrsta Mr. R. K. Temple City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Mr. C. A. Johnson/ R. P. Powers AEP Texas Central Company P. O. Box 289 Mail Code: N5022 Wadsworth, TX 77483 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 D. G. Tees/R. L. Balcom Texas Genco, LP P. O. Box 1700 Houston, TX 77251 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414 A. H. Gutterman, Esq.
Morgan, Lewis & Bockius 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. T. J. Jordan, Vice President Engineering & Technical Services STP Nuclear Operating Company P. O. Box 289 Wadsworth, TX 77483 S. M. Head, Manager, Licensing STP Nuclear Operating Company P. O. Box 289, Mail Code: N5014 Wadsworth, TX 77483 Environmental and Natural Resources Policy Director P. O. Box 12428 Austin, TX 78711-3189 Jon C. Wood Cox Smith Matthews 112 East Pecan, Suite 1800 San Antonio, TX 78205 Director Division of Compliance & Inspection Bureau of Radiation Control Texas Department of State Health Services 1100 West 49th Street Austin, TX 78756 Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326
South Texas Project, Units 1 & 2 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Mr. Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Division P. O. Box 12157 Austin, TX 78711 Mr. Ted Enos 4200 South Hulen Suite 630 Ft. Worth, Texas 76109
SOUTH TEXAS - UNITS 1 & 2 3/4 3-61 Unit 1 - Amendment No. 151, 163, 170 Unit 2 - Amendment No. 139, 152, 158 NOTE: This corrected page was issued by letter dated February 8, 2005 INSTRUMENTATION REMOTE SHUTDOWN SYSTEM LIMITING CONDITION FOR OPERATION 3.3.3.5 The Remote Shutdown System Functions shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3.
ACTION:
With one or more required channels of one or more Remote Shutdown System Functions inoperable, restore the inoperable Function(s) to OPERABLE status within 30 days, or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
NOTE: Separate condition entry is allowed for each Function.
SURVEILLANCE REQUIREMENTS 4.3.3.5.1 Each normally energized Remote Shutdown System monitoring instrumentation channel shall be demonstrated OPERABLE by performance of a CHANNEL CHECK at least once per 31 days.
4.3.3.5.2 Each Remote Shutdown System transfer switch, power and control circuit including the actuated components, shall be demonstrated OPERABLE at least once per 18 months.
4.3.3.5.3 Each Remote Shutdown System required instrumentation channel shall be demonstrated OPERABLE by performance of a CHANNEL CALIBRATION at least once per 18 months. [NOTE: Neutron detectors and reactor trip breaker indication are excluded from CHANNEL CALIBRATION.]