{{#Wiki_filter:==SUBJECT:==
{{#Wiki_filter:May 23, 2019
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000346/2019501
 
==SUBJECT:==
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1NRC EMERGENCY  
 
PREPAREDNESS INSPECTION REPORT 05000346/2019501


==Dear Mr. Bezilla:==
==Dear Mr. Bezilla:==
Line 29: Line 33:


Sincerely,
Sincerely,
/RA Gregory Roach Acting for/
/RA Gregory Roach Acting for/  
David E. Hills, Acting Chief Operations Branch Division of Reactor Safety Docket No. 05000346 License No. NPF-3
 
David E. Hills, Acting Chief Operations Branch Division of Reactor Safety  
 
Docket No. 05000346 License No. NPF-3  


===Enclosure:===
===Enclosure:===
Inspection Report 05000346/2019501
Inspection Report 05000346/2019501  


==Inspection Report==
==Inspection Report==
Docket Number: 05000346 License Number: NPF-3 Report Number: 05000346/2019501 Enterprise Identifier: I-2019-501-0015 Licensee: FirstEnergy Nuclear Operating Co.
Docket Number:
05000346  
 
License Number:
NPF-3  
 
Report Number:
05000346/2019501  
 
Enterprise Identifier: I-2019-501-0015  
 
Licensee:
FirstEnergy Nuclear Operating Co.  
 
Facility:
Davis-Besse, Unit 1
 
Location:
Oak Harbor, OH 43449
 
Inspection Dates:
April 15, 2019, to April 18, 2019
 
Inspectors:
D. Chyu, Reactor Engineer
 
G. Hansen, Sr. Emergency Preparedness Inspector
 
S. Hedger, Emergency Preparedness Inspector
 
J. Rutkowski, Project Engineer


Facility: Davis-Besse, Unit 1 Location: Oak Harbor, OH 43449 Inspection Dates: April 15, 2019, to April 18, 2019 Inspectors: D. Chyu, Reactor Engineer G. Hansen, Sr. Emergency Preparedness Inspector S. Hedger, Emergency Preparedness Inspector J. Rutkowski, Project Engineer Approved By: David E. Hills, Acting Chief Operations Branch Division of Reactor Safety Enclosure
Approved By:
David E. Hills, Acting Chief
Operations Branch
Division of Reactor Safety  


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an Emergency Preparedness Inspection at Davis-Besse Nuclear Power Station, Unit 1 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an Emergency Preparedness Inspection at Davis-Besse Nuclear Power Station, Unit 1 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.


List of Findings and Violations No findings or violations were identified.
===List of Findings and Violations===
No findings or violations were identified.


Additional Tracking Items None.
===Additional Tracking Items===
None.


=INSPECTION SCOPES=
=INSPECTION SCOPES=
Line 54: Line 96:


==REACTOR SAFETY==
==REACTOR SAFETY==
 
==71114.01 - Exercise Evaluation==
==71114.01 - Exercise Evaluation     Inspection Review (IP Section 02.01-02.11)==
===Inspection Review (IP Section 02.01-02.11) (1 Sample)===
{{IP sample|IP=IP 71114.01|count=1}}
 
The inspectors evaluated the Biennial Emergency Plan Exercise. The exercise scenario simulated an event at the Davis-Besse Nuclear Power Station, Unit 1 that initiated with the declaration and notification of an Alert in response to damage to a safety system due to tornado activity in the vicinity of the plant on April 16, 2019. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
The inspectors evaluated the Biennial Emergency Plan Exercise. The exercise scenario simulated an event at the Davis-Besse Nuclear Power Station, Unit 1 that initiated with the declaration and notification of an Alert in response to damage to a safety system due to tornado activity in the vicinity of the plant on April 16, 2019. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.


==71114.08 - Exercise Evaluation Scenario Review     Inspection Review (IP Section 02.01 - 02.04)==
==71114.08 - Exercise Evaluation Scenario Review==
{{IP sample|IP=IP 71114.08|count=1}}
===Inspection Review (IP Section 02.01 - 02.04) (1 Sample)===
 
The inspectors reviewed and evaluated the proposed scenario for Biennial Emergency Plan Exercise on March 13,
The inspectors reviewed and evaluated the proposed scenario for Biennial Emergency Plan Exercise on March 13,


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification
The inspectors verified licensee Performance Indicators submittals listed below:


===71151 - Performance Indicator Verification The inspectors verified licensee Performance Indicators submittals listed below:
Alert & Notification System Reliability (IP Section 02.14)===
Alert & Notification System Reliability (IP Section 02.14) ===
{{IP sample|IP=IP 71151|count=1}}
{{IP sample|IP=IP 71151|count=1}}
January 2018 - December 2018
 
January 2018 - December 2018  


===Drill/Exercise Performance (IP Section 02.12) (1 Sample)===
===Drill/Exercise Performance (IP Section 02.12) (1 Sample)===
January 2018 - December 2018
January 2018 - December 2018  


===ERO Drill Participation (IP Section 02.13) (1 Sample)===
===ERO Drill Participation (IP Section 02.13) (1 Sample)===
Line 87: Line 129:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation   Description or Title                                           Revision or
Inspection
Procedure                                                                                                  Date
Procedure
71114.01   Corrective Action CR-2017-04331 During the CANS Weekly Test conducted on 4/17/17,
Type
Documents                      all circuits are busy now messages were received
Designation
CR-2017-05010 2017 NRC Evaluated Exercise EP Drill Roll Up (Site Protection
Description or Title
Revision or
Date
71114.01
Corrective Action
Documents
CR-2017-04331
During the CANS Weekly Test conducted on 4/17/17,
all circuits are busy now messages were received
CR-2017-05010
2017 NRC Evaluated Exercise EP Drill Roll Up (Site Protection
Lessons Learned)
Lessons Learned)
CR-2017-05030 EP-Drill: 2017 Evaluated Exercise TSC summary
CR-2017-05030
CR-2017-06306 Continuing Trend in Site Protection for not Meeting Required
EP-Drill: 2017 Evaluated Exercise TSC summary
CR-2017-06306
Continuing Trend in Site Protection for not Meeting Required
Timeline for ERO Pager Test
Timeline for ERO Pager Test
CR-2017-06382 NEI 99-01 Rev. 6 Bases document for HU3.2, CA6.1, and
CR-2017-06382
NEI 99-01 Rev. 6 Bases document for HU3.2, CA6.1, and
SA9.1, Internal Flooding
SA9.1, Internal Flooding
CR-2017-06400 NEI 99-01 Rev. 6 Bases document information may result in
CR-2017-06400
NEI 99-01 Rev. 6 Bases document information may result in
determination of Potential Loss of RCS, with RCS intact.
determination of Potential Loss of RCS, with RCS intact.
CR-2017-06973 Several individuals experienced issues calling into CANS
CR-2017-06973
Several individuals experienced issues calling into CANS
during June 27th call in drill.
during June 27th call in drill.
CR-2017-07722 ERO on call responder did not call in for the weekly drill
CR-2017-07722
CR-2017-08351 EP Drill 8-8-17 OSC performance summary
ERO on call responder did not call in for the weekly drill
CR-2017-10357 EP Drill - Site protection performance
CR-2017-08351
CR-2017-10537 EP Drill - Summary of dose assessment performance from
EP Drill 8-8-17 OSC performance summary
CR-2017-10357
EP Drill - Site protection performance
CR-2017-10537
EP Drill - Summary of dose assessment performance from
10/10/17 EP integrated drill
10/10/17 EP integrated drill
CR-2017-11279 MS-C-17-11-24: Emergency facility inventory issues
CR-2017-11279
CR-2018-04604 EP Drill: May 15, 2018 Integrated Drill - TSC improvement
MS-C-17-11-24: Emergency facility inventory issues
CR-2018-04604
EP Drill: May 15, 2018 Integrated Drill - TSC improvement
area for drill professionalism
area for drill professionalism
CR-2018-04605 EP Drill: May 15, 2018, Integrated Drill - TSC improvement
CR-2018-04605
EP Drill: May 15, 2018, Integrated Drill - TSC improvement
area for critique performance
area for critique performance
CR-2018-06805 Lessons learned when determining EAL applicability
CR-2018-06805
CR-2019-01160 EP Drill - February 5, 2019, Integrated Drill Objective F.2 not
Lessons learned when determining EAL applicability
met for dose assessment
CR-2019-01160
Inspection Type             Designation     Description or Title                                               Revision or
EP Drill - February 5, 2019, Integrated Drill Objective F.2 not
Procedure                                                                                                      Date
met for dose assessment  
CR-2019-01161   EP Drill - February 5, 2019, Integrated Drill Objective F.5 not
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CR-2019-01161
EP Drill - February 5, 2019, Integrated Drill Objective F.5 not
met RMT air sampling
met RMT air sampling
CR-2019-01162   EP Drill - February 5, 2019, Integrated Drill Objective F.10 not
CR-2019-01162
EP Drill - February 5, 2019, Integrated Drill Objective F.10 not
met (RMT plume assessment)
met (RMT plume assessment)
CR-2019-01177   EP Drill - Failure to notify on-call ERO personnel within ten (10)
CR-2019-01177
EP Drill - Failure to notify on-call ERO personnel within ten (10)
minutes of classification of an event that requires initial
minutes of classification of an event that requires initial
activation
activation
Procedures       DBNPS           Davis-Besse Nuclear Power Station Emergency Plan                  33
Procedures
DBNPS
Emergency Plan
Emergency Plan
DBRM-EMER-     Davis-Besse EAL Wallboards                                        2
Davis-Besse Nuclear Power Station Emergency Plan
DBRM-EMER-
1500B
1500B
NOP-LP-2001     Corrective Action Program                                         46
Davis-Besse EAL Wallboards
RA-EP-01500     Emergency Classification                                           16
NOP-LP-2001
RA-EP-01700     Alert                                                             9
Corrective Action Program
RA-EP-01800     Site Area Emergency                                               8
RA-EP-01500
RA-EP-01900     General Emergency                                                 10
Emergency Classification
RA-EP-02010     Emergency Management                                               20
RA-EP-01700
RA-EP-02110     Emergency Notification                                             18
Alert
RA-EP-02220     Emergency Operations Facility Activation and Response             16
RA-EP-01800
RA-EP-02240     Off Site Dose Assessment                                           9
Site Area Emergency
RA-EP-02245     Protective Action Guidelines                                       7
RA-EP-01900
RA-EP-02260     Radiological Controls in the DBAB                                 8
General Emergency
RA-EP-02320     Emergency Technical Assessment                                     8
RA-EP-02010
Self-Assessments SA-BN-2017-0547 May 2, 2017, Evaluated Exercise Report                             05/22/2017
Emergency Management
SA-BN-2018-1063 May 15, 2018, EP Integrated Drill Report                           05/29/2018
RA-EP-02110
SA-BN-2019-1344 September 25, 2018, Integrated Drill Report                       01/31/2019
Emergency Notification
Inspection Type         Designation     Description or Title                                         Revision or
RA-EP-02220
Procedure                                                                                              Date
Emergency Operations Facility Activation and Response
SA-BN-2019-1345 October 23, 2018, Integrated Drill Report                     01/31/2019
RA-EP-02240
SA-BN-2019-1381 February 5, 2019, EP Integrated Drill Performance             02/28/2019
Off Site Dose Assessment
SN-SA-2015-0037 May 5, 2015, Evaluated Exercise Self-Assessment               06/04/2015
RA-EP-02245
71151     Miscellaneous NOBP-LP-4012-54 Performance Indicator Data Sheets - Drill / Exercise         1st Quarter
Protective Action Guidelines
Performance                                                  2018 - 4th
RA-EP-02260
Radiological Controls in the DBAB
RA-EP-02320
Emergency Technical Assessment
Self-Assessments
SA-BN-2017-0547 May 2, 2017, Evaluated Exercise Report
05/22/2017
SA-BN-2018-1063 May 15, 2018, EP Integrated Drill Report
05/29/2018
SA-BN-2019-1344 September 25, 2018, Integrated Drill Report
01/31/2019  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SA-BN-2019-1345 October 23, 2018, Integrated Drill Report
01/31/2019
SA-BN-2019-1381 February 5, 2019, EP Integrated Drill Performance
2/28/2019
SN-SA-2015-0037 May 5, 2015, Evaluated Exercise Self-Assessment
06/04/2015
71151
Miscellaneous
NOBP-LP-4012-54 Performance Indicator Data Sheets - Drill / Exercise
Performance
1st Quarter
2018 - 4th
Quarter 2018
Quarter 2018
NOBP-LP-4012-55 Performance Indicator Data Sheets - Emergency Response       1st Quarter
NOBP-LP-4012-55 Performance Indicator Data Sheets - Emergency Response
Organization Participation                                    2018 - 4th
Organization Participation
1st Quarter
2018 - 4th
Quarter 2018
Quarter 2018
NOBP-LP-4012-56 Performance Indicator Data Sheets - Alert Notification System 1st Quarter
NOBP-LP-4012-56 Performance Indicator Data Sheets - Alert Notification System
1st Quarter
2018 - 4th
2018 - 4th
Quarter 2018
Quarter 2018
7
}}
}}

Latest revision as of 02:20, 5 January 2025

NRC Emergency Preparedness Inspection Report 05000346/2019501 (Gph)
ML19143A409
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/23/2019
From: Dave Hills
Operations Branch III
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
IR 2019501
Download: ML19143A409 (9)


Text

May 23, 2019

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1NRC EMERGENCY

PREPAREDNESS INSPECTION REPORT 05000346/2019501

Dear Mr. Bezilla:

On April 18, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Davis-Besse Nuclear Power Station, Unit 1 and discussed the results of this inspection with Mr. B. Blair and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more-than-minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA Gregory Roach Acting for/

David E. Hills, Acting Chief Operations Branch Division of Reactor Safety

Docket No. 05000346 License No. NPF-3

Enclosure:

Inspection Report 05000346/2019501

Inspection Report

Docket Number:

05000346

License Number:

NPF-3

Report Number:

05000346/2019501

Enterprise Identifier: I-2019-501-0015

Licensee:

FirstEnergy Nuclear Operating Co.

Facility:

Davis-Besse, Unit 1

Location:

Oak Harbor, OH 43449

Inspection Dates:

April 15, 2019, to April 18, 2019

Inspectors:

D. Chyu, Reactor Engineer

G. Hansen, Sr. Emergency Preparedness Inspector

S. Hedger, Emergency Preparedness Inspector

J. Rutkowski, Project Engineer

Approved By:

David E. Hills, Acting Chief

Operations Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an Emergency Preparedness Inspection at Davis-Besse Nuclear Power Station, Unit 1 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.

List of Findings and Violations

No findings or violations were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

The inspectors evaluated the Biennial Emergency Plan Exercise. The exercise scenario simulated an event at the Davis-Besse Nuclear Power Station, Unit 1 that initiated with the declaration and notification of an Alert in response to damage to a safety system due to tornado activity in the vicinity of the plant on April 16, 2019. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.

71114.08 - Exercise Evaluation Scenario Review

Inspection Review (IP Section 02.01 - 02.04) (1 Sample)

The inspectors reviewed and evaluated the proposed scenario for Biennial Emergency Plan Exercise on March 13,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee Performance Indicators submittals listed below:

Alert & Notification System Reliability (IP Section 02.14)===

January 2018 - December 2018

Drill/Exercise Performance (IP Section 02.12) (1 Sample)

January 2018 - December 2018

ERO Drill Participation (IP Section 02.13) (1 Sample)

January 2018 - December

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 18, 2019, the inspectors presented the Emergency Preparedness inspection results to Mr. B. Blair and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.01

Corrective Action

Documents

CR-2017-04331

During the CANS Weekly Test conducted on 4/17/17,

all circuits are busy now messages were received

CR-2017-05010

2017 NRC Evaluated Exercise EP Drill Roll Up (Site Protection

Lessons Learned)

CR-2017-05030

EP-Drill: 2017 Evaluated Exercise TSC summary

CR-2017-06306

Continuing Trend in Site Protection for not Meeting Required

Timeline for ERO Pager Test

CR-2017-06382

NEI 99-01 Rev. 6 Bases document for HU3.2, CA6.1, and

SA9.1, Internal Flooding

CR-2017-06400

NEI 99-01 Rev. 6 Bases document information may result in

determination of Potential Loss of RCS, with RCS intact.

CR-2017-06973

Several individuals experienced issues calling into CANS

during June 27th call in drill.

CR-2017-07722

ERO on call responder did not call in for the weekly drill

CR-2017-08351

EP Drill 8-8-17 OSC performance summary

CR-2017-10357

EP Drill - Site protection performance

CR-2017-10537

EP Drill - Summary of dose assessment performance from

10/10/17 EP integrated drill

CR-2017-11279

MS-C-17-11-24: Emergency facility inventory issues

CR-2018-04604

EP Drill: May 15, 2018 Integrated Drill - TSC improvement

area for drill professionalism

CR-2018-04605

EP Drill: May 15, 2018, Integrated Drill - TSC improvement

area for critique performance

CR-2018-06805

Lessons learned when determining EAL applicability

CR-2019-01160

EP Drill - February 5, 2019, Integrated Drill Objective F.2 not

met for dose assessment

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR-2019-01161

EP Drill - February 5, 2019, Integrated Drill Objective F.5 not

met RMT air sampling

CR-2019-01162

EP Drill - February 5, 2019, Integrated Drill Objective F.10 not

met (RMT plume assessment)

CR-2019-01177

EP Drill - Failure to notify on-call ERO personnel within ten (10)

minutes of classification of an event that requires initial

activation

Procedures

DBNPS

Emergency Plan

Davis-Besse Nuclear Power Station Emergency Plan

DBRM-EMER-

1500B

Davis-Besse EAL Wallboards

NOP-LP-2001

Corrective Action Program

RA-EP-01500

Emergency Classification

RA-EP-01700

Alert

RA-EP-01800

Site Area Emergency

RA-EP-01900

General Emergency

RA-EP-02010

Emergency Management

RA-EP-02110

Emergency Notification

RA-EP-02220

Emergency Operations Facility Activation and Response

RA-EP-02240

Off Site Dose Assessment

RA-EP-02245

Protective Action Guidelines

RA-EP-02260

Radiological Controls in the DBAB

RA-EP-02320

Emergency Technical Assessment

Self-Assessments

SA-BN-2017-0547 May 2, 2017, Evaluated Exercise Report

05/22/2017

SA-BN-2018-1063 May 15, 2018, EP Integrated Drill Report

05/29/2018

SA-BN-2019-1344 September 25, 2018, Integrated Drill Report

01/31/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SA-BN-2019-1345 October 23, 2018, Integrated Drill Report

01/31/2019

SA-BN-2019-1381 February 5, 2019, EP Integrated Drill Performance

2/28/2019

SN-SA-2015-0037 May 5, 2015, Evaluated Exercise Self-Assessment

06/04/2015

71151

Miscellaneous

NOBP-LP-4012-54 Performance Indicator Data Sheets - Drill / Exercise

Performance

1st Quarter

2018 - 4th

Quarter 2018

NOBP-LP-4012-55 Performance Indicator Data Sheets - Emergency Response

Organization Participation

1st Quarter

2018 - 4th

Quarter 2018

NOBP-LP-4012-56 Performance Indicator Data Sheets - Alert Notification System

1st Quarter

2018 - 4th

Quarter 2018