ML13228A269: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000424/2013404]]
| number = ML13228A269
| issue date = 08/16/2013
| title = IR 05000424-13-404, 05000425-13-404, Vogtle - Cyber Security Notification Letter, Milestone 1-7 Inspection
| author name = King M
| author affiliation = NRC/RGN-II/DRS/EB2
| addressee name = Tynan T
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000424, 05000425
| license number = NPF-068, NPF-081
| contact person =
| document report number = IR-13-404
| document type = Letter
| page count = 4
}}
See also: [[see also::IR 05000425/2013404]]
 
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
                                                  UNITED STATES
                                      NUCLEAR REGULATORY COMMISSION
                                                      REGION II
                                  245 PEACHTREE CENTER AVENUE NE, SUITE 1200
                                            ATLANTA, GEORGIA 30303-1257
                                                  August 16, 2013
      Mr. T. E. Tynan
      Vice President - Vogtle
      Vogtle Electric Generating Plant
      7821 River Road
      Waynesboro, GA 30830
      SUBJECT:        VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF CYBER
                      SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR
                      INFORMATION (NRC INSPECTION REPORT NO. 05000424/2013404 AND
                      05000425/2013404)
      Dear Mr. Tynan:
      The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
      Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements
      specified by the conditions of your operating license at the Vogtle Electric Generating Plant on
      November 18 - 22, 2013. The inspection team will be led by Mr. David Jones, Reactor
      Inspector, of the NRC RII office. The team will be composed of personnel from the NRC RII
      office and personnel from the NRC office of Nuclear Security and Incident Response (NSIR).
      The inspection will be conducted in accordance with Temporary Instruction (TI) 2201/004,
      Inspection of Implementation of Interim Cyber Security Milestones 1-7. The TI inspection will
      be performed to evaluate and verify your ability to meet the interim milestone requirements of
      the NRCs Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73,
      Section 54, Protection of Digital Computer and Communication Systems and Networks.
      On August 12, 2013, during a telephone conversation between Mr. Kevin Walden of your staff,
      and Miss Melana Singletary, NRC RII, our respective staff, confirmed arrangements for a three-
      day information gathering onsite visit and a one-week onsite inspection. The schedule is as
      follows:
          *  Information gathering visit: October 8 - 10, 2013
          *  Onsite inspection: November 18 - 22, 2013
      The purpose of the information gathering visit is to: (1) obtain information and documentation
      needed to support the TI inspection; (2) become familiar with the Vogtle Electric Generating
      Plant Cyber Security Program and plant layout; and (3) arrange administrative details, such as
      office space, availability of knowledgeable office personnel and to ensure unescorted site
      access privileges.
      In order to assure a productive TI inspection, we have enclosed a request for documents
      needed to ensure the inspectors are adequately prepared. These documents have been
      divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in
Enclosure transmitted herewith contain SUNSI. When separated from enclosure, this
transmittal document is decontrolled.
                  OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
 
                  OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
T. Tynan                                      2
planning for the TI inspection prior to the information gathering visit. It is requested that this
information be provided to the lead inspector via mail no later than September 20, 2013. Group
II lists information and possible areas for discussion necessary to assist the inspectors during
the TI inspection. It is requested this information be available during the information gathering
visit (Oct 8, 2013). Group III consists of those items that the inspectors will review, or need
access to, during the TI inspection. Group III also lists the information necessary to aid the
inspectors in tracking questions and answers identified as a result of the TI inspection. It is
requested that this information be provided to the lead inspector as the information is generated
during the TI inspection. It is important that all of these documents are up to date and complete
in order to minimize the number of additional documents requested during the preparation
and/or the onsite portions of the TI inspection.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection, or the inspection team's information or logistical needs, please
contact Mr. Jones at (404) 997-4631, or me at (404) 997-4511.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room). However, because of the security-related concerns
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters
enclosure will not be available for public inspection.
                                                Sincerely,
                                                /RA/
                                                Michael F. King, Chief
                                                Engineering Branch 2
                                                Division of Reactor Safety
Docket Nos.: 50-424, 50-425
License Nos.: NPF-68, NPF-81
Enclosure:
Document Request For Cyber Security
Temporary Instruction (TI) 2201/004
  Interim Milestones 1-7 Inspection
  (OFFICIAL USE ONLY)
cc: (See page 3)
                  OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
 
 
___ML13228A269______________                      SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE              RII:DRS          RII:DRS          RII:DRS
SIGNATURE                            RA                RA
NAME                JONES            KING              SINGLETARY
DATE                    8/  /2013        8/16/2013        8/ 16 /2013
E-MAIL COPY?          YES    NO      YES      NO      YES      NO      YES      NO      YES    NO        YES    NO      YES NO
       
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
T. Tynan                                3
cc:
Keith Wooten
Project Manager
Nuclear Fleet Security
Southern Nuclear Operating Company, Inc.
40 Iverness Center Parkway
Birmingham, AL 35242
David Burford
Manager
Nuclear Fleet Security
Southern Nuclear Operating Company, Inc.
40 Iverness Center Parkway
Birmingham, AL 35242
L. B. Hogg
Nuclear Licensing
Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway
Birmingham, AL 35242
K. C. Dyar
Security Manager
Vogtle Electric Generating Plant
7821 River Road
Waynesboro, GA 30830
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
}}

Revision as of 14:30, 20 December 2019