SUBJECT:         DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2
SUBJECT:
                NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2
                INSPECTION 05000315/2006002(DRS); 05000316/2006002(DRS)
NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE
INSPECTION 05000315/2006002(DRS); 05000316/2006002(DRS)
Dear Mr. Nazar:
Dear Mr. Nazar:
On January 23, 2006, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire
On January 23, 2006, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire
protection baseline inspection at the Donald C. Cook Nuclear Power Plant, Units 1 and 2. This
protection baseline inspection at the Donald C. Cook Nuclear Power Plant, Units 1 and 2. This
inspection will be performed in accordance with the NRC baseline Inspection
inspection will be performed in accordance with the NRC baseline Inspection
Procedure 71111.05T.
Procedure 71111.05T.
The schedule for the inspection is as follows:
The schedule for the inspection is as follows:
*       Information gathering visit - January 11 - 13, 2006
*
*       On-site inspection activity - January 23 - 27, 2006, and February 6 - 10, 2006
Information gathering visit - January 11 - 13, 2006
The purpose of the information gathering visit is: (1) to obtain information and documentation
*
On-site inspection activity - January 23 - 27, 2006, and February 6 - 10, 2006
The purpose of the information gathering visit is: (1) to obtain information and documentation
needed to support the inspection; (2) to become familiar with the Donald C. Cook Nuclear
needed to support the inspection; (2) to become familiar with the Donald C. Cook Nuclear
Power Plants fire protection program, fire protection features, post-fire safe shutdown
Power Plants fire protection program, fire protection features, post-fire safe shutdown
Line 42: Line 45:
availability of knowledgeable office personnel and to ensure unescorted site access privileges.
availability of knowledgeable office personnel and to ensure unescorted site access privileges.
Experience has shown that the baseline fire protection inspections are extremely resource
Experience has shown that the baseline fire protection inspections are extremely resource
intensive both for the NRC inspectors and the licensee staff. In order to minimize the
intensive both for the NRC inspectors and the licensee staff. In order to minimize the
inspection impact on the site and to ensure a productive inspection for both organizations, we
inspection impact on the site and to ensure a productive inspection for both organizations, we
have enclosed a request for documents needed for the inspection. These documents have
have enclosed a request for documents needed for the inspection. These documents have
been divided into four groups. The first group lists information necessary to aid the inspection
been divided into four groups. The first group lists information necessary to aid the inspection
team in choosing specific focus areas for the inspection. It is requested that this information be
team in choosing specific focus areas for the inspection. It is requested that this information be
provided to the lead inspector via mail or electronically no later than December 16, 2005. The
provided to the lead inspector via mail or electronically no later than December 16, 2005. The
second group lists information necessary to ensure that the inspection team is adequately
second group lists information necessary to ensure that the inspection team is adequately
prepared for the inspection. This information should be available on-site no later than
prepared for the inspection. This information should be available on-site no later than
January 11, 2006. The third group of requested documents are those items that the team will
January 11, 2006. The third group of requested documents are those items that the team will
review, or need access to, during the inspection. Please have this information available by the
review, or need access to, during the inspection. Please have this information available by the
first day of the on-site portion of the inspection (January 23, 2006). The fourth group lists
first day of the on-site portion of the inspection (January 23, 2006). The fourth group lists


M. Nazar                                       -2-
M. Nazar
-2-
information necessary to aid the inspection team in tracking issues identified as a result of the
information necessary to aid the inspection team in tracking issues identified as a result of the
inspection. It is requested that this information be provided to the lead inspector as the
inspection. It is requested that this information be provided to the lead inspector as the
information is generated during the inspection. It is important that all of these documents are
information is generated during the inspection. It is important that all of these documents are
up to date and complete in order to minimize the number of additional documents requested
up to date and complete in order to minimize the number of additional documents requested
during the preparation and/or the on-site portions of the inspection.
during the preparation and/or the on-site portions of the inspection.
The lead inspector for this inspection is Mr. George M. Hausman. We understand that our
The lead inspector for this inspection is Mr. George M. Hausman. We understand that our
regulatory contact for this inspection is Mr. Rick Jervey of your organization. If there are any
regulatory contact for this inspection is Mr. Rick Jervey of your organization. If there are any
questions about the inspection or the material requested, please contact the lead inspector at
questions about the inspection or the material requested, please contact the lead inspector at
(630) 829-9743 or via e-mail at gmh1@nrc.gov.
(630) 829-9743 or via e-mail at gmh1@nrc.gov.
Line 67: Line 71:
and its enclosure will be available electronically for public inspection in the NRC Public
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                              Sincerely,
Sincerely,
                                              /RA/
/RA/  
                                              Julio F. Lara, Chief
Julio F. Lara, Chief
                                              Engineering Branch 3
Engineering Branch 3
                                              Division of Reactor Safety
Division of Reactor Safety
Docket Nos. 50-315; 50-316
Docket Nos. 50-315; 50-316
License Nos. DPR-58; DPR-74
License Nos. DPR-58; DPR-74
Enclosure:     Fire Protection Inspection Document Request
Enclosure:
cc w/encl:     J. Jensen, Site Vice President
Fire Protection Inspection Document Request
                L. Weber, Plant Manager
cc w/encl:
                G. White, Michigan Public Service Commission
J. Jensen, Site Vice President
                L. Brandon, Michigan Department of Environmental Quality -
L. Weber, Plant Manager
                  Waste and Hazardous Materials Division
G. White, Michigan Public Service Commission
                Emergency Management Division
L. Brandon, Michigan Department of Environmental Quality -
                  MI Department of State Police
  Waste and Hazardous Materials Division
                D. Lochbaum, Union of Concerned Scientists
Emergency Management Division
  MI Department of State Police
D. Lochbaum, Union of Concerned Scientists


M. Nazar                                                                   -2-
M. Nazar
-2-
information necessary to aid the inspection team in tracking issues identified as a result of the
information necessary to aid the inspection team in tracking issues identified as a result of the
inspection. It is requested that this information be provided to the lead inspector as the
inspection. It is requested that this information be provided to the lead inspector as the
information is generated during the inspection. It is important that all of these documents are
information is generated during the inspection. It is important that all of these documents are
up to date and complete in order to minimize the number of additional documents requested
up to date and complete in order to minimize the number of additional documents requested
during the preparation and/or the on-site portions of the inspection.
during the preparation and/or the on-site portions of the inspection.
The lead inspector for this inspection is Mr. George M. Hausman. We understand that our
The lead inspector for this inspection is Mr. George M. Hausman. We understand that our
regulatory contact for this inspection is Mr. Rick Jervey of your organization. If there are any
regulatory contact for this inspection is Mr. Rick Jervey of your organization. If there are any
questions about the inspection or the material requested, please contact the lead inspector at
questions about the inspection or the material requested, please contact the lead inspector at
(630) 829-9743 or via e-mail at gmh1@nrc.gov.
(630) 829-9743 or via e-mail at gmh1@nrc.gov.
Line 99: Line 106:
and its enclosure will be available electronically for public inspection in the NRC Public
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                                            Sincerely,
Sincerely,
                                                                            /RA/
/RA/  
                                                                            Julio F. Lara, Chief
Julio F. Lara, Chief
                                                                            Engineering Branch 3
Engineering Branch 3
                                                                            Division of Reactor Safety
Division of Reactor Safety
Docket Nos. 50-315; 50-316
Docket Nos. 50-315; 50-316
License Nos. DPR-58; DPR-74
License Nos. DPR-58; DPR-74
Enclosure:               Fire Protection Inspection Document Request
Enclosure:
cc w/encl:               J. Jensen, Site Vice President
Fire Protection Inspection Document Request
                          L. Weber, Plant Manager
cc w/encl:
                          G. White, Michigan Public Service Commission
J. Jensen, Site Vice President
                          L. Brandon, Michigan Department of Environmental Quality -
L. Weber, Plant Manager
                            Waste and Hazardous Materials Division
G. White, Michigan Public Service Commission
                          Emergency Management Division
L. Brandon, Michigan Department of Environmental Quality -
                            MI Department of State Police
  Waste and Hazardous Materials Division
                          D. Lochbaum, Union of Concerned Scientists
Emergency Management Division
DOCUMENT NAME: E:\Filenet\ML053140325.wpd
  MI Department of State Police
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy
D. Lochbaum, Union of Concerned Scientists
OFFICE             RIII                           E RIII                               RIII                             RIII
DOCUMENT NAME: E:\\Filenet\\ML053140325.wpd
NAME               GHausman:jb                         CLipa                           JLara
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure   "E" = Copy with attachment/enclosure   "N" = No copy
DATE               10/31/05                             10/31/05                       10/31/05
OFFICE
                                                          OFFICIAL RECORD COPY
RIII
E RIII
RIII
RIII
NAME
GHausman:jb
CLipa
JLara
DATE
10/31/05
10/31/05
10/31/05
OFFICIAL RECORD COPY


M. Nazar                                     -3-
M. Nazar
-3-
ADAMS Distribution:
ADAMS Distribution:
HKN
HKN
Line 140: Line 160:
ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)
ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)


                    FIRE PROTECTION INSPECTION DOCUMENT REQUEST
FIRE PROTECTION INSPECTION DOCUMENT REQUEST
                                          INITIAL REQUEST
INITIAL REQUEST
Inspection Report:               05000315/2006002(DRS); 05000316/2006002(DRS)
Enclosure
Inspection Dates:               January 11 - 13, 2006 (Information Gathering Visit)
1
                                January 23 - 27, 2006 (On-site Inspection Activity)
Inspection Report:
                                February 6 - 10, 2006 (On-site Inspection Activity)
05000315/2006002(DRS); 05000316/2006002(DRS)
Inspection Procedures:           IP 71111.05T, Fire Protection (Triennial)
Inspection Dates:
                                IP 71152, "Identification and Resolution of Problems"
January 11 - 13, 2006 (Information Gathering Visit)
Inspectors:                     Lead Inspector: George M. Hausman
January 23 - 27, 2006 (On-site Inspection Activity)
                                Team Members: Audrey L. Klett
February 6 - 10, 2006
                                                    Mohammad Munir
(On-site Inspection Activity)
I.     Information Requested Prior to the Information Gathering Visit
Inspection Procedures:
The following information is requested by December 16, 2005. If you have any questions
IP 71111.05T, Fire Protection (Triennial)
regarding this information, please call the lead inspector as soon as possible. All information
IP 71152, "Identification and Resolution of Problems"
Inspectors:
Lead Inspector:  
George M. Hausman
Team Members:
Audrey L. Klett
Mohammad Munir
I.
Information Requested Prior to the Information Gathering Visit
The following information is requested by December 16, 2005. If you have any questions
regarding this information, please call the lead inspector as soon as possible. All information
may be sent electronically (to Mr. George M. Hausman, e-mail address gmh1@nrc.gov) or
may be sent electronically (to Mr. George M. Hausman, e-mail address gmh1@nrc.gov) or
provided on compact disc (preferred method).
provided on compact disc (preferred method).
(1)     The reactor plant's Individual Plant Examination for External Events (IPEEE) for fire,
(1)
        results of any post-IPEEE reviews for fire, and listings of actions taken and/or plant
The reactor plant's Individual Plant Examination for External Events (IPEEE) for fire,
        modifications conducted in response to IPEEE information for fire. Alternatively,
results of any post-IPEEE reviews for fire, and listings of actions taken and/or plant
        probabilistic risk analyses for fire and associated information, if it exists and is more
modifications conducted in response to IPEEE information for fire. Alternatively,
        recent than the IPEEE.
probabilistic risk analyses for fire and associated information, if it exists and is more
(2)     A list of fire areas requiring alternative shutdown capability, i.e., those areas for which
recent than the IPEEE.
        10 CFR Part 50, Appendix R, Section III.G requirements are satisfied under
(2)
        Section III.G.3.
A list of fire areas requiring alternative shutdown capability, i.e., those areas for which
II.     Information Requested During the Information Gathering Visit
10 CFR Part 50, Appendix R, Section III.G requirements are satisfied under
        (January 11 - 13, 2006)
Section III.G.3.
II.
Information Requested During the Information Gathering Visit
(January 11 - 13, 2006)
This information is requested to be available on-site during the information gathering visit.
This information is requested to be available on-site during the information gathering visit.
(1)     The current version of the Fire Protection Program and Fire Hazards Analysis.
(1)
(2)     Listing of plant fire protection licensing basis documents.
The current version of the Fire Protection Program and Fire Hazards Analysis.
                                                    1                                      Enclosure
(2)
Listing of plant fire protection licensing basis documents.


                FIRE PROTECTION INSPECTION DOCUMENT REQUEST
FIRE PROTECTION INSPECTION DOCUMENT REQUEST
                                      INITIAL REQUEST
INITIAL REQUEST
(3) Copies of the NRC Safety Evaluation Reports (SERs) and of the 50.59 reviews which
Enclosure
    form the licensing basis for the reactor plant's post-fire safe shutdown configuration.
2
(4) A list of Generic Letter 86-10 evaluations.
(3)
(5) A list of applicable codes and standards related to the design of plant fire protection
Copies of the NRC Safety Evaluation Reports (SERs) and of the 50.59 reviews which
    features. The list should include National Fire Protection Association (NFPA) code
form the licensing basis for the reactor plant's post-fire safe shutdown configuration.
    versions committed to (i.e., the NFPA codes of record).
(4)
(6) A list of plant deviations from code commitments.
A list of Generic Letter 86-10 evaluations.
(7) Post-fire safe shutdown analyses, including post-fire safe shutdown systems and
(5)
    separation analysis.
A list of applicable codes and standards related to the design of plant fire protection
(8) Piping and instrumentation (flow) diagrams showing the components used to achieve
features. The list should include National Fire Protection Association (NFPA) code
    and maintain hot standby and cold shutdown for fires outside the control room and those
versions committed to (i.e., the NFPA codes of record).
    components used for those areas requiring alternative shutdown capability.
(6)
(9) Plant layout and equipment drawings which identify the physical plant locations of hot
A list of plant deviations from code commitments.
    standby and cold shutdown equipment for selected fire zones/areas (to be determined
(7)
    during information gathering visit).
Post-fire safe shutdown analyses, including post-fire safe shutdown systems and
(10) Plant layout drawings which identify plant fire area delineation, areas protected by
separation analysis.
    automatic fire suppression and detection, and the locations of fire protection equipment
(8)
    for selected fire zones/areas (to be determined during information gathering visit).
Piping and instrumentation (flow) diagrams showing the components used to achieve
(11) Listing of open and closed fire protection condition reports (i.e., problem identification
and maintain hot standby and cold shutdown for fires outside the control room and those
    forms and their resolution reports) for the past three years.
components used for those areas requiring alternative shutdown capability.
(12) Listing of fire impairments for the previous year.
(9)
(13) Pre-fire plans for selected fire zones/areas (to be determined during information
Plant layout and equipment drawings which identify the physical plant locations of hot
    gathering visit).
standby and cold shutdown equipment for selected fire zones/areas (to be determined
(14) Plant operating procedures which would be used and describe shutdown for a
during information gathering visit).
    postulated fire in selected fire zones/areas (to be determined during information
(10)
    gathering visit).
Plant layout drawings which identify plant fire area delineation, areas protected by
(15) A listing of the protection methodologies identified under 10 CFR Part 50, Appendix R,
automatic fire suppression and detection, and the locations of fire protection equipment
    Section III.G used to achieve compliance for selected fire zones/areas (to be
for selected fire zones/areas (to be determined during information gathering visit).
    determined during information gathering visit). That is, please specify whether 3-hour
(11)
    rated fire barriers (Section III.G.2.a), 20-foot separation along with detection and
Listing of open and closed fire protection condition reports (i.e., problem identification
    suppression (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression
forms and their resolution reports) for the past three years.
    (Section III.G.2.c), or alternative shutdown capability (Section III.G.3) is used for each
(12)
    selected fire zone/area.
Listing of fire impairments for the previous year.
                                                2                                      Enclosure
(13)
Pre-fire plans for selected fire zones/areas (to be determined during information
gathering visit).
(14)
Plant operating procedures which would be used and describe shutdown for a
postulated fire in selected fire zones/areas (to be determined during information
gathering visit).
(15)
A listing of the protection methodologies identified under 10 CFR Part 50, Appendix R,
Section III.G used to achieve compliance for selected fire zones/areas (to be
determined during information gathering visit). That is, please specify whether 3-hour
rated fire barriers (Section III.G.2.a), 20-foot separation along with detection and
suppression (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression
(Section III.G.2.c), or alternative shutdown capability (Section III.G.3) is used for each
selected fire zone/area.


                    FIRE PROTECTION INSPECTION DOCUMENT REQUEST
FIRE PROTECTION INSPECTION DOCUMENT REQUEST
                                          INITIAL REQUEST
INITIAL REQUEST
(16)   One-line schematic drawings of the electrical distribution system for 4160 Volts -
Enclosure
        alternating current (Vac) down to 480 Vac.
3
(17)   One-line schematic drawings of the electrical distribution system for 250 Volts - direct
(16)
        current (Vdc) and 125 Vdc systems as applicable.
One-line schematic drawings of the electrical distribution system for 4160 Volts -
(18)   A listing of abbreviations and/or designators for plant systems.
alternating current (Vac) down to 480 Vac.
(19)   Organization charts of site personnel down to the level of fire protection staff personnel.
(17)
(20)   A phone list for on-site licensee personnel.
One-line schematic drawings of the electrical distribution system for 250 Volts - direct
current (Vdc) and 125 Vdc systems as applicable.
(18)
A listing of abbreviations and/or designators for plant systems.
(19)
Organization charts of site personnel down to the level of fire protection staff personnel.
(20)
A phone list for on-site licensee personnel.
In addition, during the information gathering visit, it is requested that licensee staff be available
In addition, during the information gathering visit, it is requested that licensee staff be available
for the following:
for the following:
(21)   Informal discussion on plant procedures operators would use in the event of fire and
(21)
        under what conditions would the plant be shutdown using alternative shutdown
Informal discussion on plant procedures operators would use in the event of fire and
        methodology.
under what conditions would the plant be shutdown using alternative shutdown
(22)   Informal discussion on the plants safe shutdown cable routing database and the
methodology.
        plant-wide cable routing database, as applicable.
(22)
(23)   A tour of alternative shutdown and risk significant fire areas.
Informal discussion on the plants safe shutdown cable routing database and the
III.   Information Requested to be Available on First Day of Inspection
plant-wide cable routing database, as applicable.
        (January 23, 2006)
(23)
(1)     List of the fire protection program implementing procedures (e.g., administrative
A tour of alternative shutdown and risk significant fire areas.
        controls, surveillance testing, fire brigade).
III.
(2)     List of maintenance and surveillance testing procedures for alternative shutdown
Information Requested to be Available on First Day of Inspection
        capability and fire barriers, detectors, pumps and suppression systems.
(January 23, 2006)
(3)     List of maintenance procedures which routinely verify fuse breaker coordination in
(1)
        accordance with the post-fire safe shutdown coordination analysis.
List of the fire protection program implementing procedures (e.g., administrative
(4)     List of procedures and/or instructions that control the configuration of the reactor plant's
controls, surveillance testing, fire brigade).
        fire protection program, features, and post-fire safe shutdown methodology and system
(2)
        design.
List of maintenance and surveillance testing procedures for alternative shutdown
(5)     List of procedures and/or instructions that govern the implementation of plant
capability and fire barriers, detectors, pumps and suppression systems.
        modifications, maintenance, and special operations, and their impact on fire protection.
(3)
                                                  3                                      Enclosure
List of maintenance procedures which routinely verify fuse breaker coordination in
accordance with the post-fire safe shutdown coordination analysis.
(4)
List of procedures and/or instructions that control the configuration of the reactor plant's
fire protection program, features, and post-fire safe shutdown methodology and system
design.
(5)
List of procedures and/or instructions that govern the implementation of plant
modifications, maintenance, and special operations, and their impact on fire protection.


                FIRE PROTECTION INSPECTION DOCUMENT REQUEST
FIRE PROTECTION INSPECTION DOCUMENT REQUEST
                                      INITIAL REQUEST
INITIAL REQUEST
(6) Coordination calculations and/or justifications that verify fuse/breaker coordination for
Enclosure
    selected fire zones/areas (to be determined during information gathering visit) that are
4
    fed off of the same electrical buses as components in the protected safe shutdown train.
(6)
(7) Copies of significant fire protection and post-fire safe shutdown related design change
Coordination calculations and/or justifications that verify fuse/breaker coordination for
    package descriptions (including their associated 10 CFR Part 50.59 evaluations) and
selected fire zones/areas (to be determined during information gathering visit) that are
    Generic Letter (GL) 86-10 evaluations.
fed off of the same electrical buses as components in the protected safe shutdown train.
(8) Gaseous suppression system pre-operational testing, if applicable, for selected fire
(7)
    zones/areas (to be determined during information gathering visit).
Copies of significant fire protection and post-fire safe shutdown related design change
(9) Hydraulic calculations and supporting test data which demonstrate operability for water
package descriptions (including their associated 10 CFR Part 50.59 evaluations) and
    suppression systems, if applicable, for selected fire zones/areas (to be determined
Generic Letter (GL) 86-10 evaluations.
    during information gathering visit).
(8)
(10) Alternating current (ac) coordination calculations for 4160 Vac down to 480 Vac
Gaseous suppression system pre-operational testing, if applicable, for selected fire
    electrical systems.
zones/areas (to be determined during information gathering visit).
(11) The three most recent fire protection Quality Assurance (QA) audits and/or fire
(9)
    protection self-assessments.
Hydraulic calculations and supporting test data which demonstrate operability for water
(12) Corrective action documents (e.g., condition reports, including status of corrective
suppression systems, if applicable, for selected fire zones/areas (to be determined
    actions) generated as a result of the three most recent fire protection Quality
during information gathering visit).
    Assurance (QA) audits and/or fire protection self-assessments.
(10)
IV. Information Requested to Be Provided Throughout the Inspection
Alternating current (ac) coordination calculations for 4160 Vac down to 480 Vac
(1) Copies of any corrective action documents generated as a result of the teams questions
electrical systems.
    or queries during this inspection.
(11)
(2) Copies of the list of questions submitted by the team members and the status/resolution
The three most recent fire protection Quality Assurance (QA) audits and/or fire
    of the information requested (provide daily during the inspection to each team member).
protection self-assessments.
                                              4                                      Enclosure
(12)
Corrective action documents (e.g., condition reports, including status of corrective
actions) generated as a result of the three most recent fire protection Quality
Assurance (QA) audits and/or fire protection self-assessments.
IV.
Information Requested to Be Provided Throughout the Inspection
(1)
Copies of any corrective action documents generated as a result of the teams questions
or queries during this inspection.
(2)
Copies of the list of questions submitted by the team members and the status/resolution
of the information requested (provide daily during the inspection to each team member).
}}
}}

Latest revision as of 13:42, 15 January 2025

D.C. Cook Re Notification of an NRC Triennial Fire Protection Baseline Inspection (05000315-06-002 (Drs); 05000316-06-002 (Drs))
ML053140325
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/31/2005
From: Julio Lara
Engineering Branch 3
To: Nazar M
Indiana Michigan Power Co
References
IR-06-002
Download: ML053140325 (8)


See also: IR 05000315/2006002

Text

October 31, 2005

Mr. M. Nazar

Senior Vice President and

Chief Nuclear Officer

Indiana Michigan Power Company

Nuclear Generation Group

One Cook Place

Bridgman, MI 49106

SUBJECT:

DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2

NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE

INSPECTION 05000315/2006002(DRS); 05000316/2006002(DRS)

Dear Mr. Nazar:

On January 23, 2006, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire

protection baseline inspection at the Donald C. Cook Nuclear Power Plant, Units 1 and 2. This

inspection will be performed in accordance with the NRC baseline Inspection

Procedure 71111.05T.

The schedule for the inspection is as follows:

Information gathering visit - January 11 - 13, 2006

On-site inspection activity - January 23 - 27, 2006, and February 6 - 10, 2006

The purpose of the information gathering visit is: (1) to obtain information and documentation

needed to support the inspection; (2) to become familiar with the Donald C. Cook Nuclear

Power Plants fire protection program, fire protection features, post-fire safe shutdown

capabilities and plant layout; and (3) to arrange administrative details such as office space,

availability of knowledgeable office personnel and to ensure unescorted site access privileges.

Experience has shown that the baseline fire protection inspections are extremely resource

intensive both for the NRC inspectors and the licensee staff. In order to minimize the

inspection impact on the site and to ensure a productive inspection for both organizations, we

have enclosed a request for documents needed for the inspection. These documents have

been divided into four groups. The first group lists information necessary to aid the inspection

team in choosing specific focus areas for the inspection. It is requested that this information be

provided to the lead inspector via mail or electronically no later than December 16, 2005. The

second group lists information necessary to ensure that the inspection team is adequately

prepared for the inspection. This information should be available on-site no later than

January 11, 2006. The third group of requested documents are those items that the team will

review, or need access to, during the inspection. Please have this information available by the

first day of the on-site portion of the inspection (January 23, 2006). The fourth group lists

M. Nazar

-2-

information necessary to aid the inspection team in tracking issues identified as a result of the

inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. It is important that all of these documents are

up to date and complete in order to minimize the number of additional documents requested

during the preparation and/or the on-site portions of the inspection.

The lead inspector for this inspection is Mr. George M. Hausman. We understand that our

regulatory contact for this inspection is Mr. Rick Jervey of your organization. If there are any

questions about the inspection or the material requested, please contact the lead inspector at

(630) 829-9743 or via e-mail at gmh1@nrc.gov.

In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Julio F. Lara, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-315; 50-316

License Nos. DPR-58; DPR-74

Enclosure:

Fire Protection Inspection Document Request

cc w/encl:

J. Jensen, Site Vice President

L. Weber, Plant Manager

G. White, Michigan Public Service Commission

L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division

Emergency Management Division

MI Department of State Police

D. Lochbaum, Union of Concerned Scientists

M. Nazar

-2-

information necessary to aid the inspection team in tracking issues identified as a result of the

inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. It is important that all of these documents are

up to date and complete in order to minimize the number of additional documents requested

during the preparation and/or the on-site portions of the inspection.

The lead inspector for this inspection is Mr. George M. Hausman. We understand that our

regulatory contact for this inspection is Mr. Rick Jervey of your organization. If there are any

questions about the inspection or the material requested, please contact the lead inspector at

(630) 829-9743 or via e-mail at gmh1@nrc.gov.

In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Julio F. Lara, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-315; 50-316

License Nos. DPR-58; DPR-74

Enclosure:

Fire Protection Inspection Document Request

cc w/encl:

J. Jensen, Site Vice President

L. Weber, Plant Manager

G. White, Michigan Public Service Commission

L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division

Emergency Management Division

MI Department of State Police

D. Lochbaum, Union of Concerned Scientists

DOCUMENT NAME: E:\\Filenet\\ML053140325.wpd

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE

RIII

E RIII

RIII

RIII

NAME

GHausman:jb

CLipa

JLara

DATE

10/31/05

10/31/05

10/31/05

OFFICIAL RECORD COPY

M. Nazar

-3-

ADAMS Distribution:

HKN

DWS

RidsNrrDipmIipb

GEG

KGO

BJK1

CAA1

C. Pederson, DRS (hard copy - IRs only)

DRPIII

DRSIII

PLB1

JRK1

ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

FIRE PROTECTION INSPECTION DOCUMENT REQUEST

INITIAL REQUEST

Enclosure

1

Inspection Report: 05000315/2006002(DRS); 05000316/2006002(DRS)

Inspection Dates:

January 11 - 13, 2006 (Information Gathering Visit)

January 23 - 27, 2006 (On-site Inspection Activity)

February 6 - 10, 2006

(On-site Inspection Activity)

Inspection Procedures:

IP 71111.05T, Fire Protection (Triennial)

IP 71152, "Identification and Resolution of Problems"

Inspectors:

Lead Inspector:

George M. Hausman

Team Members:

Audrey L. Klett

Mohammad Munir

I.

Information Requested Prior to the Information Gathering Visit

The following information is requested by December 16, 2005. If you have any questions

regarding this information, please call the lead inspector as soon as possible. All information

may be sent electronically (to Mr. George M. Hausman, e-mail address gmh1@nrc.gov) or

provided on compact disc (preferred method).

(1)

The reactor plant's Individual Plant Examination for External Events (IPEEE) for fire,

results of any post-IPEEE reviews for fire, and listings of actions taken and/or plant

modifications conducted in response to IPEEE information for fire. Alternatively,

probabilistic risk analyses for fire and associated information, if it exists and is more

recent than the IPEEE.

(2)

A list of fire areas requiring alternative shutdown capability, i.e., those areas for which

10 CFR Part 50, Appendix R, Section III.G requirements are satisfied under

Section III.G.3.

II.

Information Requested During the Information Gathering Visit

(January 11 - 13, 2006)

This information is requested to be available on-site during the information gathering visit.

(1)

The current version of the Fire Protection Program and Fire Hazards Analysis.

(2)

Listing of plant fire protection licensing basis documents.

FIRE PROTECTION INSPECTION DOCUMENT REQUEST

INITIAL REQUEST

Enclosure

2

(3)

Copies of the NRC Safety Evaluation Reports (SERs) and of the 50.59 reviews which

form the licensing basis for the reactor plant's post-fire safe shutdown configuration.

(4)

A list of Generic Letter 86-10 evaluations.

(5)

A list of applicable codes and standards related to the design of plant fire protection

features. The list should include National Fire Protection Association (NFPA) code

versions committed to (i.e., the NFPA codes of record).

(6)

A list of plant deviations from code commitments.

(7)

Post-fire safe shutdown analyses, including post-fire safe shutdown systems and

separation analysis.

(8)

Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdown for fires outside the control room and those

components used for those areas requiring alternative shutdown capability.

(9)

Plant layout and equipment drawings which identify the physical plant locations of hot

standby and cold shutdown equipment for selected fire zones/areas (to be determined

during information gathering visit).

(10)

Plant layout drawings which identify plant fire area delineation, areas protected by

automatic fire suppression and detection, and the locations of fire protection equipment

for selected fire zones/areas (to be determined during information gathering visit).

(11)

Listing of open and closed fire protection condition reports (i.e., problem identification

forms and their resolution reports) for the past three years.

(12)

Listing of fire impairments for the previous year.

(13)

Pre-fire plans for selected fire zones/areas (to be determined during information

gathering visit).

(14)

Plant operating procedures which would be used and describe shutdown for a

postulated fire in selected fire zones/areas (to be determined during information

gathering visit).

(15)

A listing of the protection methodologies identified under 10 CFR Part 50, Appendix R,

Section III.G used to achieve compliance for selected fire zones/areas (to be

determined during information gathering visit). That is, please specify whether 3-hour

rated fire barriers (Section III.G.2.a), 20-foot separation along with detection and

suppression (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression

(Section III.G.2.c), or alternative shutdown capability (Section III.G.3) is used for each

selected fire zone/area.

FIRE PROTECTION INSPECTION DOCUMENT REQUEST

INITIAL REQUEST

Enclosure

3

(16)

One-line schematic drawings of the electrical distribution system for 4160 Volts -

alternating current (Vac) down to 480 Vac.

(17)

One-line schematic drawings of the electrical distribution system for 250 Volts - direct

current (Vdc) and 125 Vdc systems as applicable.

(18)

A listing of abbreviations and/or designators for plant systems.

(19)

Organization charts of site personnel down to the level of fire protection staff personnel.

(20)

A phone list for on-site licensee personnel.

In addition, during the information gathering visit, it is requested that licensee staff be available

for the following:

(21)

Informal discussion on plant procedures operators would use in the event of fire and

under what conditions would the plant be shutdown using alternative shutdown

methodology.

(22)

Informal discussion on the plants safe shutdown cable routing database and the

plant-wide cable routing database, as applicable.

(23)

A tour of alternative shutdown and risk significant fire areas.

III.

Information Requested to be Available on First Day of Inspection

(January 23, 2006)

(1)

List of the fire protection program implementing procedures (e.g., administrative

controls, surveillance testing, fire brigade).

(2)

List of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps and suppression systems.

(3)

List of maintenance procedures which routinely verify fuse breaker coordination in

accordance with the post-fire safe shutdown coordination analysis.

(4)

List of procedures and/or instructions that control the configuration of the reactor plant's

fire protection program, features, and post-fire safe shutdown methodology and system

design.

(5)

List of procedures and/or instructions that govern the implementation of plant

modifications, maintenance, and special operations, and their impact on fire protection.

FIRE PROTECTION INSPECTION DOCUMENT REQUEST

INITIAL REQUEST

Enclosure

4

(6)

Coordination calculations and/or justifications that verify fuse/breaker coordination for

selected fire zones/areas (to be determined during information gathering visit) that are

fed off of the same electrical buses as components in the protected safe shutdown train.

(7)

Copies of significant fire protection and post-fire safe shutdown related design change

package descriptions (including their associated 10 CFR Part 50.59 evaluations) and

Generic Letter (GL) 86-10 evaluations.

(8)

Gaseous suppression system pre-operational testing, if applicable, for selected fire

zones/areas (to be determined during information gathering visit).

(9)

Hydraulic calculations and supporting test data which demonstrate operability for water

suppression systems, if applicable, for selected fire zones/areas (to be determined

during information gathering visit).

(10)

Alternating current (ac) coordination calculations for 4160 Vac down to 480 Vac

electrical systems.

(11)

The three most recent fire protection Quality Assurance (QA) audits and/or fire

protection self-assessments.

(12)

Corrective action documents (e.g., condition reports, including status of corrective

actions) generated as a result of the three most recent fire protection Quality

Assurance (QA) audits and/or fire protection self-assessments.

IV.

Information Requested to Be Provided Throughout the Inspection

(1)

Copies of any corrective action documents generated as a result of the teams questions

or queries during this inspection.

(2)

Copies of the list of questions submitted by the team members and the status/resolution

of the information requested (provide daily during the inspection to each team member).