{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                                  NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                REGION II
REGION II  
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
245 PEACHTREE CENTER AVENUE NE, SUITE 1200  
                                      ATLANTA, GEORGIA 30303-1257
ATLANTA, GEORGIA 30303-1257  
                                          December 15, 2015
Mr. Scott Batson
Vice President, Oconee Nuclear Station
Duke Energy Corporation
December 15, 2015  
7800 Rochester Highway
Seneca, SC 29672-0752
SUBJECT: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 - NOTIFICATION OF
Mr. Scott Batson
              CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION-
Vice President, Oconee Nuclear Station  
              U. S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT
Duke Energy Corporation  
              NOS. 05000269/2016007, 05000270/2016007, AND 05000287/2016007
7800 Rochester Highway  
Dear Mr. Batson:
Seneca, SC 29672-0752  
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
staff will conduct a triennial fire protection baseline inspection at the Oconee Nuclear Station,
SUBJECT: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 - NOTIFICATION OF  
Units 1, 2, and 3, in February and March 2016. The inspection will be conducted in accordance
CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION-
with IP 71111.05XT, the NRCs baseline fire protection inspection procedure for plants that have
U. S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT
transitioned their fire protection program to meet the requirements of 10 CFR 50.48(c). The
NOS. 05000269/2016007, 05000270/2016007, AND 05000287/2016007
inspection will also review the status of the Milestone 6 Item and related information from the
NRC Notice of Violation and Confirmatory Order dated July 1, 2013 (ML13114A928). The
Dear Mr. Batson:  
inspection team will be led by Jonathan Montgomery, a Senior Reactor Inspector from the NRC
Region II Office. The team will be composed of personnel from the Region II Office.
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
On December 1, 2015, during a telephone conversation between Judy Smith of your staff and
staff will conduct a triennial fire protection baseline inspection at the Oconee Nuclear Station,  
Mr. Montgomery, our respective staffs confirmed arrangements for a three-day information
Units 1, 2, and 3, in February and March 2016. The inspection will be conducted in accordance  
gathering onsite visit and a two-week onsite inspection. The schedule for the inspection is as
with IP 71111.05XT, the NRCs baseline fire protection inspection procedure for plants that have  
follows:
transitioned their fire protection program to meet the requirements of 10 CFR 50.48(c). The  
    *   Information gathering visit: February 16-18, 2016
inspection will also review the status of the Milestone 6 Item and related information from the  
    *   Week 1 of onsite inspection: February 29-March 4, 2016
NRC Notice of Violation and Confirmatory Order dated July 1, 2013 (ML13114A928). The  
    *   Week 2 of onsite inspection: March 14-18, 2016
inspection team will be led by Jonathan Montgomery, a Senior Reactor Inspector from the NRC  
The purposes of the information gathering visit are to obtain information and documentation
Region II Office. The team will be composed of personnel from the Region II Office.  
needed to support the inspection, to become familiar with the Oconee Nuclear Station fire
protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,
On December 1, 2015, during a telephone conversation between Judy Smith of your staff and  
mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR)
Mr. Montgomery, our respective staffs confirmed arrangements for a three-day information  
50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for
gathering onsite visit and a two-week onsite inspection. The schedule for the inspection is as  
unescorted site access.
follows:  
*  
Information gathering visit:  
February 16-18, 2016  
*  
Week 1 of onsite inspection: February 29-March 4, 2016
*  
Week 2 of onsite inspection: March 14-18, 2016
The purposes of the information gathering visit are to obtain information and documentation  
needed to support the inspection, to become familiar with the Oconee Nuclear Station fire  
protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,  
mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR)  
50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for  
unescorted site access.  


S. Batson                                     2
S. Batson  
The types of documents the team will be reviewing during conduct of the inspection are listed in
2  
Enclosures 1 and 2. Please contact Mr. Montgomery at (404) 997-4880 prior to preparing
copies of the materials listed in the Enclosures. The inspection team will try to minimize your
administrative burden by specifically identifying those documents required for inspection
The types of documents the team will be reviewing during conduct of the inspection are listed in  
preparation.
Enclosures 1 and 2. Please contact Mr. Montgomery at (404) 997-4880 prior to preparing  
During the information gathering visit, the team will also discuss the following inspection support
copies of the materials listed in the Enclosures. The inspection team will try to minimize your  
administrative details: office space; specific documents to be made available to the team in their
administrative burden by specifically identifying those documents required for inspection  
office space; arrangements for unescorted site access (including, as necessary, radiation
preparation.  
protection training, security, safety and fitness for duty requirements); and the availability of
knowledgeable plant engineering and licensing organization personnel to serve as points of
During the information gathering visit, the team will also discuss the following inspection support  
contact during the inspection.
administrative details: office space; specific documents to be made available to the team in their  
We request that during the onsite inspection weeks you ensure that copies of analyses,
office space; arrangements for unescorted site access (including, as necessary, radiation  
evaluations or documentation regarding the implementation and maintenance of the Oconee fire
protection training, security, safety and fitness for duty requirements); and the availability of  
protection program, including post-fire safe shutdown capability, be readily accessible to the
knowledgeable plant engineering and licensing organization personnel to serve as points of  
team for their review. Of specific interest for the fire protection portion of the inspection are
contact during the inspection.
those documents which establish that your fire protection program satisfies NRC regulatory
requirements and conforms to applicable NRC and industry fire protection guidance (i.e. fire
We request that during the onsite inspection weeks you ensure that copies of analyses,  
protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of the
evaluations or documentation regarding the implementation and maintenance of the Oconee fire  
inspection, those documents implementing your mitigating strategies and demonstrating the
protection program, including post-fire safe shutdown capability, be readily accessible to the  
management of your commitments for the strategies are of specific interest. Also, personnel
team for their review. Of specific interest for the fire protection portion of the inspection are  
should be available at the site during the inspection who are knowledgeable regarding those
those documents which establish that your fire protection program satisfies NRC regulatory  
plant systems required to achieve and maintain safe shutdown conditions from inside and
requirements and conforms to applicable NRC and industry fire protection guidance (i.e. fire  
outside the control room (including the electrical aspects of the relevant post-fire safe shutdown
protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of the  
analyses), reactor plant fire protection systems and features, and the Oconee fire protection
inspection, those documents implementing your mitigating strategies and demonstrating the  
program and its implementation.
management of your commitments for the strategies are of specific interest. Also, personnel  
This letter does not contain new or amended information collection requirements subject to the
should be available at the site during the inspection who are knowledgeable regarding those  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
plant systems required to achieve and maintain safe shutdown conditions from inside and  
requirements were approved by the Office of Management and Budget, under control number
outside the control room (including the electrical aspects of the relevant post-fire safe shutdown  
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
analyses), reactor plant fire protection systems and features, and the Oconee fire protection  
a request for information or an information collection requirement unless the requesting
program and its implementation.  
document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
This letter does not contain new or amended information collection requirements subject to the  
enclosures will be available electronically for public inspection in the NRC Public Document
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
Room or from the Publicly Available Records (PARS) component of NRCs document system
requirements were approved by the Office of Management and Budget, under control number  
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,  
rm/adams.html (the Public Electronic Reading Room).
a request for information or an information collection requirement unless the requesting  
document displays a currently valid Office of Management and Budget control number.  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
enclosures will be available electronically for public inspection in the NRC Public Document  
Room or from the Publicly Available Records (PARS) component of NRCs document system  
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).


S. Batson                                   3
S. Batson  
Your cooperation and support during this inspection will be appreciated. If you have questions
3  
concerning this inspection, or the inspection team's information or logistical needs, please
Your cooperation and support during this inspection will be appreciated. If you have questions  
contact Mr. Montgomery, the team leader, in the Region II Office at (404) 997-4880, or me
concerning this inspection, or the inspection team's information or logistical needs, please  
at (404) 997-4521.
contact Mr. Montgomery, the team leader, in the Region II Office at (404) 997-4880, or me
                                              Sincerely,
at (404) 997-4521.
                                              /RA/
                                              Scott M. Shaeffer, Chief
Sincerely,  
                                              Engineering Branch 2
                                              Division of Reactor Safety
/RA/  
Docket Nos: 50-269; 50-270; 50-287
License Nos: DPR-38, DPR-47, DPR-55
Enclosures:
Scott M. Shaeffer, Chief  
1. Triennial Fire Protection Inspection
Engineering Branch 2  
    Supporting Documentation
Division of Reactor Safety
2. Mitigating Strategies Supporting
    Documentation
Docket Nos:  
cc: Distribution via ListServ
50-269; 50-270; 50-287
License Nos: DPR-38, DPR-47, DPR-55
Enclosures:  
1. Triennial Fire Protection Inspection
    Supporting Documentation
2. Mitigating Strategies Supporting
    Documentation
cc: Distribution via ListServ




___ ____________               SUNSI REVIEW COMPLETE   FORM 665 ATTACHED
___ ____________  
OFFICE           RII:DRS         RII:DRS
SIGNATURE         JMM9 VIA EMAIL   SMS
SUNSI REVIEW COMPLETE  
NAME             MONTGOMERY       SHAEFFER
FORM 665 ATTACHED  
DATE                   12/7/2015   12/ 15/2015 12/ /2015
OFFICE  
E-MAIL COPY?       YES     NO      YES     NO YES    NO    YES   NO      YES   NO    YES   NO    YES  NO
RII:DRS  
       
RII:DRS  
                  Triennial Fire Protection Inspection Supporting Documentation
The documents and information requested below should generally be made available to the
inspection team during the on-site information gathering visit for the team's use both on-site and
off-site during the inspection. Electronic format is the preferred media, except where specifically
noted. If electronic media is made available via an internet based remote document
management system, then the remote document access must allow inspectors to download,
SIGNATURE  
save, and print the documents in the NRC's regional office. Electronic media on compact disc
JMM9 VIA EMAIL  
or paper records (hard copy) are acceptable. At the end of the inspection, the documents in the
SMS  
team's possession will not be retained.
Approximately three weeks before the on-site information gathering visit, the following
documents should be made available to the team leader for review in the regional office:
    *   Post-fire Nuclear Safety Capability, Systems, and Separation Analysis (request A.1)
    *  Fire Hazards Analysis and/or NFPA 805 Design Basis Document (request A.2)
    *   Fire Probabilistic Risk Assessment (PRA) Summary Document or full PRA Document
NAME  
        (request A.3)
MONTGOMERY  
    *  NFPA 805 Transition Report, developed in accordance with NEI 04-02 (request A.4)
SHAEFFER  
    *   Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3) (request A.5)
    *  Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4) (request A.6)
    *  Analysis that demonstrates nuclear safety performance criteria can be achieved and
        maintained for those areas that require recovery actions (request A.7)
Based on review of the above seven documents, team leader should identify a preliminary list of
fire areas being considered for inspection prior to the on-site information gathering visit. During
DATE  
the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
12/7/2015  
determined.
12/ 15/2015  
This document request is based on typical documents that a generic plant might have. As such,
12/   /2015  
this generic document request is not meant to imply that any specific plant is required to have all
of the listed documents. It is recognized that some documents listed below may not be
available for your plant. In addition, the document titles listed below are based on typical
industry document names; your plant specific document titles may vary.
                                                                                          Enclosure 1
E-MAIL COPY?  
     YES  
NO     
   YES  
NO    YES  
NO     
   YES
NO   
   YES
NO      YES
NO   
   YES
NO   


                                              2
A. DESIGN AND LICENSING BASIS DOCUMENTS
Enclosure 1
  A.1 Post-fire Nuclear Safety Capability, Systems, and Separation Analysis.
Triennial Fire Protection Inspection Supporting Documentation 
  A.2  Fire Hazards Analysis and/or NFPA 805 Design Basis Document.
  A.3  Fire PRA Summary Document or full PRA Document (if summary document not
The documents and information requested below should generally be made available to the
        available).
inspection team during the on-site information gathering visit for the team's use both on-site and
  A.4  NFPA 805 Transition Report, developed in accordance with NEI 04-02.
off-site during the inspection.  Electronic format is the preferred media, except where specifically
  A.5  Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3).
noted.  If electronic media is made available via an internet based remote document
  A.6  Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4).
management system, then the remote document access must allow inspectors to download,
  A.7  Analysis that demonstrates nuclear safety performance criteria can be achieved and
save, and print the documents in the NRC's regional office.  Electronic media on compact disc
        maintained for those areas that require recovery actions.
or paper records (hard copy) are acceptable. At the end of the inspection, the documents in the
  A.8 Fire Protection Program and/or Fire Protection Plan.
team's possession will not be retained.  
  A.9  LIST of post-fire safe shutdown components (i.e., safe shutdown equipment list).
  A.10 Fire Protection System Design Basis Document.
Approximately three weeks before the on-site information gathering visit, the following
  A.11 LIST of applicable NFPA codes and standards and issuance dates (i.e., codes of
documents should be made available to the team leader for review in the regional office:
        record).
   
  A.12 LIST of deviations from (a) NFPA codes of record, or (b) NFPA 805 fundamental fire
*
        protection program and design elements (i.e., NFPA 805, Chapter 3).
Post-fire Nuclear Safety Capability, Systems, and Separation Analysis (request A.1)
  A.13 NFPA Compliance Review Report.
*
  A.14 Report or evaluation that compares the fire protection program to the NRC Branch
Fire Hazards Analysis and/or NFPA 805 Design Basis Document (request A.2)
        Technical Position (BTP) 9.5-1 Appendix A.
*
  A.15 COPY of licensee submittals and NRC safety evaluation reports that are specifically
Fire Probabilistic Risk Assessment (PRA) Summary Document or full PRA Document
        listed in the facility operating license for the approved fire protection program.
(request A.3)
  A.16 COPY of NRC Safety Evaluation Reports that form the licensing basis for:
*
        * Fire Protection Program; and
NFPA 805 Transition Report, developed in accordance with NEI 04-02 (request A.4)
        * Post-fire Nuclear Safety Capability.
*
  A.17 COPY of NRC approved exemptions for plant fire protection and post-fire nuclear
Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3) (request A.5)
        safety capability features.
*
Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4) (request A.6)
*
Analysis that demonstrates nuclear safety performance criteria can be achieved and  
maintained for those areas that require recovery actions (request A.7)
   
Based on review of the above seven documents, team leader should identify a preliminary list of  
fire areas being considered for inspection prior to the on-site information gathering visit. During
the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
determined.  
This document request is based on typical documents that a generic plant might have. As such,  
this generic document request is not meant to imply that any specific plant is required to have all
of the listed documents. It is recognized that some documents listed below may not be
available for your plant. In addition, the document titles listed below are based on typical
industry document names; your plant specific document titles may vary.  


                                            3
2
  A.18 COPY of exemption requests submitted but not yet approved for plant fire protection
        and post-fire nuclear safety capability features.
  A.19 LIST of nuclear safety capability design changes completed in the last three years
A.
        (including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).
DESIGN AND LICENSING BASIS DOCUMENTS
  A.20 Facility Operating License.
  A.21 Technical Specifications (electronic format only).
A.1
  A.22 Technical Requirements Manual (electronic format only).
Post-fire Nuclear Safety Capability, Systems, and Separation Analysis.  
  A.23 Updated Final Safety Analysis Report (electronic format only).
B. GENERAL PLANT DESIGN DOCUMENTS
A.2
  B.1  Piping and instrumentation diagrams (P&IDs) and legend list for components used to
Fire Hazards Analysis and/or NFPA 805 Design Basis Document.  
        achieve and maintain nuclear safety performance criteria for: (C-size paper drawings
        & electronic format)
A.3
        * Fires outside the main control room; and
Fire PRA Summary Document or full PRA Document (if summary document not
        * Fires in areas requiring recovery actions at other than primary control stations.
available).  
  B.2  P&IDs and legend list for fire protection systems, including fire water supply, water
        suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper
A.4
        drawings & electronic format).
NFPA 805 Transition Report, developed in accordance with NEI 04-02.  
  B.3  Yard layout drawings for underground fire protection buried piping (C-size paper
        drawings & electronic format).
A.5
  B.4 AC and DC electrical system single line diagrams, from off-site power down to the
Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3).  
        highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings &
        electronic format).
A.6
  B.5  Single line diagrams for motor control centers (MCCs) that supply post-fire nuclear
Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4).  
        safety component loads (only for selected fire areas) (C-size paper drawings &
        electronic format).
A.7
  B.6  Equipment location drawings which identify the physical plant locations of post-fire
Analysis that demonstrates nuclear safety performance criteria can be achieved and  
        nuclear safety capability equipment (electronic format).
maintained for those areas that require recovery actions.  
  B.7 Plant layout drawings which identify: (electronic format)
        *  Plant fire area boundaries;
A.8
        *   Combustible control zone drawings;
Fire Protection Program and/or Fire Protection Plan.
        *   Areas protected by automatic fire suppression and detection; and
        *  Locations of fire protection equipment.
A.9
LIST of post-fire safe shutdown components (i.e., safe shutdown equipment list).  
A.10 Fire Protection System Design Basis Document.
   
A.11 LIST of applicable NFPA codes and standards and issuance dates (i.e., codes of
record).  
A.12 LIST of deviations from (a) NFPA codes of record, or (b) NFPA 805 fundamental fire  
protection program and design elements (i.e., NFPA 805, Chapter 3).
A.13 NFPA Compliance Review Report.  
A.14 Report or evaluation that compares the fire protection program to the NRC Branch
Technical Position (BTP) 9.5-1 Appendix A.
A.15 COPY of licensee submittals and NRC safety evaluation reports that are specifically
listed in the facility operating license for the approved fire protection program.  
   
A.16 COPY of NRC Safety Evaluation Reports that form the licensing basis for:  
* Fire Protection Program; and
* Post-fire Nuclear Safety Capability.
A.17 COPY of NRC approved exemptions for plant fire protection and post-fire nuclear
safety capability features.  


                                                4
3
C. CLASSIC FIRE PROTECTION
  C.COPY of fire protection program implementing procedures (e.g., administrative
        controls, surveillance testing, fire brigade).
A.18 COPY of exemption requests submitted but not yet approved for plant fire protection  
  C.LIST of calculations and engineering analyses, studies, or evaluations for the fire
and post-fire nuclear safety capability features.  
        protection system, including the fire water system.
  C.3 Hydraulic calculation or analysis for fire protection water system.
A.19 LIST of nuclear safety capability design changes completed in the last three years
  C.4 Last two completed surveillance's of fire protection features in the selected fire areas
(including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).  
        (detection, suppression, damper inspections, damper tests, penetration inspections,
        barrier inspections, etc.).
A.20 Facility Operating License.  
  C.5 LIST of routine tests, surveillances, and preventive maintenance on fire pumps,
   
        including pump controllers and batteries.
A.21 Technical Specifications (electronic format only).  
  C.6 Last two completed annual fire pump pressure and flow tests.
  C.7 Last two completed monthly and/or quarterly fire pump tests.
A.22 Technical Requirements Manual (electronic format only).  
  C.8 Last two completed fire loop flow tests and loop flushes.
   
  C.9  CO2 and Halon initial discharge testing or calculation that determined appropriate
A.23 Updated Final Safety Analysis Report (electronic format only).
        concentrations and soak or hold times can be achieved (only for selected fire areas).
  C.10 Last five hot work permits (at power).
B.
  C.11 Last five transient combustible permits (at power).
GENERAL PLANT DESIGN DOCUMENTS
  C.12 For Fire Brigade Drills, provide the following:
        * Last five fire brigade drill critiques;
B.1
        * Last drill critique for a drill with off-site fire department support;
Piping and instrumentation diagrams (P&IDs) and legend list for components used to
        * Last unannounced drill critique;
achieve and maintain nuclear safety performance criteria for:  (C-size paper drawings
        * Last back-shift drill critique;
& electronic format)
        *  Dates, shifts, and locations of unannounced drills for last three years;
        * Summary of any unsatisfactory drill performance items for last three years; and
* Fires outside the main control room; and
        *  Last unannounced drill critique by a qualified individual independent of the
* Fires in areas requiring recovery actions at other than primary control stations.  
          licensee's staff.
   
  C.13 For fire brigade equipment provide the following:
B.2
        * Procedure for inventory and inspection; and
P&IDs and legend list for fire protection systems, including fire water supply, water
        * Most recent inspection and inventory results.
suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper
drawings & electronic format).  
   
B.3
Yard layout drawings for underground fire protection buried piping (C-size paper
drawings & electronic format).  
   
B.4
AC and DC electrical system single line diagrams, from off-site power down to the
highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings &
electronic format).  
   
B.5
Single line diagrams for motor control centers (MCCs) that supply post-fire nuclear
safety component loads (only for selected fire areas) (C-size paper drawings &
electronic format).
B.6
Equipment location drawings which identify the physical plant locations of post-fire
nuclear safety capability equipment (electronic format).  
B.7
Plant layout drawings which identify: (electronic format)
   
*  
Plant fire area boundaries;  
*  
Combustible control zone drawings;  
*  
Areas protected by automatic fire suppression and detection; and
*  
Locations of fire protection equipment.  


                                          5
4
C.14 Fire Brigade Qualifications, including self-contained breathing apparatus (SCBA) and
    training lesson plans.
C.15 COPY of the mutual aid agreement for the first-due local fire department that is
C. CLASSIC FIRE PROTECTION
    currently in effect.
C.16 COPY of the evaluation or analysis of the effects of fire suppression activities on the
C.1 COPY of fire protection program implementing procedures (e.g., administrative
    ability to achieve the nuclear safety performance criteria (only for selected fire areas),
controls, surveillance testing, fire brigade).
    including:
    * An automatic or manually actuated suppression system, due to a fire in a single
C.2 LIST of calculations and engineering analyses, studies, or evaluations for the fire  
        location, will not indirectly cause damage to the success path; and
protection system, including the fire water system.  
    * inadvertent actuation or rupture of a suppression system will not indirectly cause
        damage to the success path; and
C.3 Hydraulic calculation or analysis for fire protection water system.
    * demonstration of adequate drainage for areas protected by water suppression
        systems;
C.4 Last two completed surveillance's of fire protection features in the selected fire areas
    * hydrostatic rating of any floor penetration seals installed within the fire areas that
(detection, suppression, damper inspections, damper tests, penetration inspections,
        are credited with keeping water from leaking into fire areas below.
barrier inspections, etc.).
C.17 Pre-fire plans for all fire areas.
C.18 For Emergency Lighting Units (ELU), provide the following:
C.5 LIST of routine tests, surveillances, and preventive maintenance on fire pumps,
    *  COPY of performance based emergency light assessments;
including pump controllers and batteries.
    *   LIST of Preventive Maintenance tasks, frequencies, and bases;
    *   Most recently performed monthly or quarterly functional test;
C.6 Last two completed annual fire pump pressure and flow tests.
    *   Most recently performed battery discharge performance test;
    *   ELU battery loading analysis;
C.7 Last two completed monthly and/or quarterly fire pump tests.
    *   vendor manual(s) for on-site inspector use;
    *   results of black-out testing (if performed);
C.8 Last two completed fire loop flow tests and loop flushes.
    *  Maintenance Rule program information related to the ELU; and
    *   Compensatory measures taken when ELU are out of service
C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate
C.19 Impairment Log (at start of inspection), for fire protection features that are out of
concentrations and soak or hold times can be achieved (only for selected fire areas).  
    service.
C.20 Three Fire Protection screening reviews for recent design changes, modifications, or
C.10 Last five hot work permits (at power).  
    temporary modifications (i.e., an NFPA 805 plant change evaluation that screened
    out).
C.11 Last five transient combustible permits (at power).
C.21 LIST of penetration seal work, re-work, or installation activities, in the last three years.
C.22 LIST of fire wrap work, re-work, or installation activities, in the last three years.
C.12 For Fire Brigade Drills, provide the following:  
C.23 Fire protection system health reports for the two most recent quarters.
C.24 Fire protection program health report for the two most recent quarters.
* Last five fire brigade drill critiques;  
* Last drill critique for a drill with off-site fire department support;  
* Last unannounced drill critique;  
* Last back-shift drill critique;  
* Dates, shifts, and locations of unannounced drills for last three years;  
* Summary of any unsatisfactory drill performance items for last three years; and  
* Last unannounced drill critique by a qualified individual independent of the
licensee's staff.  
C.13 For fire brigade equipment provide the following:
* Procedure for inventory and inspection; and
* Most recent inspection and inventory results.  


                                            6
5
  C.25 Emergency lighting system health reports for the two most recent quarters.
  C.26 LIST of fire protection system design changes completed in the last three years
        (including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).
C.14 Fire Brigade Qualifications, including self-contained breathing apparatus (SCBA) and  
  C.27 LIST of fire protection system NFPA 805 engineering equivalency evaluations
training lesson plans.  
        completed in the last three years.
  C.28 Licensee evaluation of industry operating experience, such as:
C.15 COPY of the mutual aid agreement for the first-due local fire department that is
        (specific items to be selected by the inspector)
currently in effect.  
        * NRC IN 2005-03, Inadequate Design and Installation of Seismic-Gap Fire Barriers;
        * NRC IN 2006-22, Ultra-Low Sulfur Diesel Fuel Oil Usage, for diesel fire pump;
C.16 COPY of the evaluation or analysis of the effects of fire suppression activities on the
        NRC IN 2009-02, Bio-Diesel Fuel Oil Usage, for diesel fire pump; and
ability to achieve the nuclear safety performance criteria (only for selected fire areas),
        * NRC IN 2009-29, Fire Pumps Fail to Start due to a Fire.
including:
  C.29 COPY of any test, surveillance, or maintenance procedure (current revision),
        including any associated data forms, for any requested "last performed" test,
* An automatic or manually actuated suppression system, due to a fire in a single
        surveillance, or maintenance.
location, will not indirectly cause damage to the success path; and  
D. ELECTRICAL
* inadvertent actuation or rupture of a suppression system will not indirectly cause
  D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or
damage to the success path; and
        Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire
* demonstration of adequate drainage for areas protected by water suppression
        areas.
systems;  
  D.2 Nuclear safety circuit coordination analysis for fuse and breaker coordination of
* hydrostatic rating of any floor penetration seals installed within the fire areas that
        nuclear safety capability components.
are credited with keeping water from leaking into fire areas below.
  D.3  Administrative or configuration control procedures that govern fuse replacement (e.g.,
   
        fuse control procedures).
C.17 Pre-fire plans for all fire areas.
  D.4 Maintenance procedures that verify breaker over-current trip settings to ensure
   
        coordination remains functional, for post-fire nuclear safety capability components.
C.18 For Emergency Lighting Units (ELU), provide the following:
  D.5  Electrical system health reports for the two most recent quarters.
  D.6 Last surveillance demonstrating operability of those components operated from the
* COPY of performance based emergency light assessments;
        primary control stations.
* LIST of Preventive Maintenance tasks, frequencies, and bases;
  D.7  LIST of post-fire nuclear safety capability system and component design changes
* Most recently performed monthly or quarterly functional test;
        completed, in the last three years.
* Most recently performed battery discharge performance test;
  D.8 LIST of identified fire induced circuit failure configurations (only for selected fire
* ELU battery loading analysis;
        areas).
* vendor manual(s) for on-site inspector use; 
* results of black-out testing (if performed);
* Maintenance Rule program information related to the ELU; and
* Compensatory measures taken when ELU are out of service
   
C.19 Impairment Log (at start of inspection), for fire protection features that are out of
service.  
   
C.20 Three Fire Protection screening reviews for recent design changes, modifications, or
temporary modifications (i.e., an NFPA 805 plant change evaluation that screened
out).  
C.21 LIST of penetration seal work, re-work, or installation activities, in the last three years.  
   
C.22 LIST of fire wrap work, re-work, or installation activities, in the last three years.  
C.23 Fire protection system health reports for the two most recent quarters.  
   
C.24 Fire protection program health report for the two most recent quarters.  
   


                                            7
6
E. OPERATIONS
  E.1  LIST of calculations and engineering analyses, studies, or evaluations for the nuclear
        safety capability methodology.
C.25 Emergency lighting system health reports for the two most recent quarters.
  E.LIST of licensed operator Job Performance Measures (JPMs) for operator actions
        required to achieve and maintain post-fire nuclear safety performance criteria.
C.26 LIST of fire protection system design changes completed in the last three years
  E.LIST of non-licensed operator training associated with non-licensed operator actions
(including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).
        to achieve and maintain post-fire nuclear safety performance criteria (including JPMs,
        in-field training walkdowns, simulations, or initial qualification).
C.27 LIST of fire protection system NFPA 805 engineering equivalency evaluations
  E.4 Lesson plans for post-fire nuclear safety capability training for licensed and non-
completed in the last three years.  
        licensed operators.
   
  E.5 For recovery actions, provide the following:
C.28 Licensee evaluation of industry operating experience, such as:
        *   Manual Action Feasibility Study;
   
        *   Operator Time Critical Action Program;
(specific items to be selected by the inspector)
        *   Time lines for time-critical recovery actions; and
        *   Time line validations.
* NRC IN 2005-03, Inadequate Design and Installation of Seismic-Gap Fire Barriers;  
  E.6  Thermal hydraulic calculation or analysis that determines the time requirements for
* NRC IN 2006-22, Ultra-Low Sulfur Diesel Fuel Oil Usage, for diesel fire pump;  
        time-critical manual operator actions.
* NRC IN 2009-02, Bio-Diesel Fuel Oil Usage, for diesel fire pump; and  
  E.7 Operating procedures to achieve and maintain nuclear safety performance criteria
* NRC IN 2009-29, Fire Pumps Fail to Start due to a Fire.  
        from the control room, with a postulated fire in the selected fire areas.
  E.8  Operating procedures to achieve and maintain nuclear safety performance criteria
C.29 COPY of any test, surveillance, or maintenance procedure (current revision),
        from outside the control room, with a postulated fire in the control room, cable
including any associated data forms, for any requested "last performed" test,
        spreading room, or any area requiring recovery actions (other than recovery actions
surveillance, or maintenance.  
        performed in the control room or primary control stations).
  E.9 For safe shutdown equipment and tools, provide the following:
D. ELECTRICAL
        *    Procedure for inventory and inspection; and
   
        *    Most recent inspection and inventory results.
D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or
  E.10 LIST of procedures that implement Cold Shutdown Repairs.
Thermoplastic.  Specifically identify any Thermoplastic cable in the selected fire  
  E.11 For Cold Shutdown Repairs, provide the following:
areas.  
        * Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
        * Most recent inspection and inventory results.
D.2 Nuclear safety circuit coordination analysis for fuse and breaker coordination of
nuclear safety capability components.
D.3 Administrative or configuration control procedures that govern fuse replacement (e.g.,
fuse control procedures).  
D.4 Maintenance procedures that verify breaker over-current trip settings to ensure
coordination remains functional, for post-fire nuclear safety capability components.
   
D.5 Electrical system health reports for the two most recent quarters.  
D.6 Last surveillance demonstrating operability of those components operated from the
primary control stations.  
D.7 LIST of post-fire nuclear safety capability system and component design changes
completed, in the last three years.
D.8 LIST of identified fire induced circuit failure configurations (only for selected fire
areas).  


                                            8
7
    E.12 For Radio communications, provide the following:
        *  Communications Plan for fire fighting and post-fire safe shutdown manual actions;
        *  Repeater locations;
E.  
        *  Cable routing for repeater power supply cables;
OPERATIONS
        *  Radio coverage test results; and
        *  Radio Dead Spot locations in the plant.
E.1
    E.13 Environmental and habitability evaluations for post-fire operator actions (temperature,
LIST of calculations and engineering analyses, studies, or evaluations for the nuclear
        smoke, humidity, SCBAs, etc.).
safety capability methodology.  
F. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS
    F.1  Corrective actions for fire-induced circuit failures (including but not limited to NRC
E.2
        IN 92-18), both single and multiple spurious actuations (only for selected fire areas).
LIST of licensed operator Job Performance Measures (JPMs) for operator actions
    F.2  Corrective actions associated with operator actions to achieve and maintain post-fire
required to achieve and maintain post-fire nuclear safety performance criteria.  
        nuclear safety performance criteria.
   
    F.3  Self assessments, peer assessments, and audits of fire protection activities for the
E.3
        last three years.
LIST of non-licensed operator training associated with non-licensed operator actions  
    F.4 Self assessments, peer assessments, and audits of post-fire nuclear safety capability
to achieve and maintain post-fire nuclear safety performance criteria (including JPMs,
        methodology for the last three years.
in-field training walkdowns, simulations, or initial qualification).
    F.5  LIST of open and closed condition reports for the fire protection system for the last
        three years.
E.4  
    F.6 LIST of fire event analysis reports for the last three years.
Lesson plans for post-fire nuclear safety capability training for licensed and non-
    F.7 LIST of open and closed condition reports for emergency lighting units for the last
licensed operators.  
        three years.
    F.8 LIST of open and closed condition reports for post-fire nuclear safety capability issues
E.5  
        for the last three years. This includes issues affecting the nuclear safety capability
For recovery actions, provide the following:
        analysis, fire hazards analysis, NFPA 805 design basis, fire risk evaluations, plant
   
        change evaluations, post-fire operating procedures and/or training, timeline
* Manual Action Feasibility Study;
        evaluations for operator actions, and supporting engineering evaluations, analysis, or
* Operator Time Critical Action Program;
        calculations.
* Time lines for time-critical recovery actions; and  
  F.LIST of procedures that control the configuration of the fire protection program,
* Time line validations.  
        features, and post-fire nuclear safety capability methodology and system design.
E.6  
Thermal hydraulic calculation or analysis that determines the time requirements for  
time-critical manual operator actions.  
E.7  
Operating procedures to achieve and maintain nuclear safety performance criteria
from the control room, with a postulated fire in the selected fire areas.
E.8  
Operating procedures to achieve and maintain nuclear safety performance criteria
from outside the control room, with a postulated fire in the control room, cable
spreading room, or any area requiring recovery actions (other than recovery actions
performed in the control room or primary control stations).
E.9
For safe shutdown equipment and tools, provide the following:
*
Procedure for inventory and inspection; and  
*
Most recent inspection and inventory results.  
E.10 LIST of procedures that implement Cold Shutdown Repairs.
E.11 For Cold Shutdown Repairs, provide the following:
* Procedure for inventory and inspection (i.e., needed tools, material, etc.); and  
* Most recent inspection and inventory results.  


                      Mitigating Strategies Supporting Documentation
8
G. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
  G.1 LIST of all changes to regulatory commitments made to meet the requirements of
        Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).
E.12 For Radio communications, provide the following:
  G.2 LIST of procedures and guidelines that were revised or generated to implement the
        mitigating strategies. These could be extensive damage mitigation guidelines
* Communications Plan for fire fighting and post-fire safe shutdown manual actions;
        (EDMGs), severe accident management guidelines (SAMGs), emergency operating
* Repeater locations;
        procedures (EOPs), abnormal operating procedures (AOPs), etc.
* Cable routing for repeater power supply cables;
  G.3  A matrix that shows the correlation between the mitigation strategies identified in
* Radio coverage test results; and
        Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"
* Radio Dead Spot locations in the plant.  
        issued December 2006, and the site-specific procedures or guidelines that are used
   
        to implement each strategy.
E.13 Environmental and habitability evaluations for post-fire operator actions (temperature,
  G.4 LIST of engineering evaluations or calculations that were used to verify the
smoke, humidity, SCBAs, etc.).  
        engineering bases for the mitigating strategies.
  G.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow
F. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS
        diagrams for systems relied upon in the mitigating strategies. These could be the
   
        type used for training (C-size paper drawings).
F.1
  G.6 LIST of modification packages or summary descriptions of modifications with
Corrective actions for fire-induced circuit failures (including but not limited to NRC
        simplified drawings, for necessary facility changes to implement the mitigating
IN 92-18), both single and multiple spurious actuations (only for selected fire areas).  
        strategies.
  G.7 LIST of routine tests, surveillances, and preventive maintenance for equipment and
F.2
        tools needed to implement 10 CFR 50.54(hh)(2) strategies.
Corrective actions associated with operator actions to achieve and maintain post-fire
  G.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,
nuclear safety performance criteria.  
        provide the following:
        * Procedures for inventory and inspection; and
F.3  
        * Most recent inspection and inventory results.
Self assessments, peer assessments, and audits of fire protection activities for the  
  G.9  LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that
last three years.  
        differ from that documented in the submittals or the safety evaluation report.
                                                                                  Enclosure 2
F.4  
Self assessments, peer assessments, and audits of post-fire nuclear safety capability
methodology for the last three years.  
F.5  
LIST of open and closed condition reports for the fire protection system for the last
three years.  
F.6  
LIST of fire event analysis reports for the last three years.
F.7  
LIST of open and closed condition reports for emergency lighting units for the last
three years.  
F.8  
LIST of open and closed condition reports for post-fire nuclear safety capability issues
for the last three years. This includes issues affecting the nuclear safety capability
analysis, fire hazards analysis, NFPA 805 design basis, fire risk evaluations, plant
change evaluations, post-fire operating procedures and/or training, timeline
evaluations for operator actions, and supporting engineering evaluations, analysis, or
calculations.  
F.9  LIST of procedures that control the configuration of the fire protection program,
features, and post-fire nuclear safety capability methodology and system design.  


                                        2
G.10 Site general arrangement drawings that show the majority of buildings and areas
    referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings).
Enclosure 2  
G.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).
Mitigating Strategies Supporting Documentation
G.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)
    required to implement any mitigating strategies.
G. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
G.1 LIST of all changes to regulatory commitments made to meet the requirements of
Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).
G.2 LIST of procedures and guidelines that were revised or generated to implement the
mitigating strategies.  These could be extensive damage mitigation guidelines
(EDMGs), severe accident management guidelines (SAMGs), emergency operating
procedures (EOPs), abnormal operating procedures (AOPs), etc.
G.3 A matrix that shows the correlation between the mitigation strategies identified in
Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"
issued December 2006, and the site-specific procedures or guidelines that are used
to implement each strategy.
G.4 LIST of engineering evaluations or calculations that were used to verify the
engineering bases for the mitigating strategies.
G.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow
diagrams for systems relied upon in the mitigating strategies.  These could be the
type used for training (C-size paper drawings).
G.6 LIST of modification packages or summary descriptions of modifications with
simplified drawings, for necessary facility changes to implement the mitigating
strategies.
G.7 LIST of routine tests, surveillances, and preventive maintenance for equipment and
tools needed to implement 10 CFR 50.54(hh)(2) strategies.
G.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,
provide the following:
* Procedures for inventory and inspection; and
* Most recent inspection and inventory results.
G.9 LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that
differ from that documented in the submittals or the safety evaluation report.
 
2
G.10 Site general arrangement drawings that show the majority of buildings and areas  
referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings).  
G.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).  
G.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)  
required to implement any mitigating strategies.
}}
}}

Latest revision as of 05:59, 10 January 2025

Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U.S. Nuclear Regulatory Commission Inspection Report Nos. 05000269/2016007, 05000270/2016007 and 05000287/2016007
ML15352A163
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/15/2015
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Batson S
Duke Energy Corp
References
IR 2016007
Download: ML15352A163 (14)


See also: IR 05000269/2016007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

December 15, 2015

Mr. Scott Batson

Vice President, Oconee Nuclear Station

Duke Energy Corporation

7800 Rochester Highway

Seneca, SC 29672-0752

SUBJECT: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 - NOTIFICATION OF

CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION-

U. S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT

NOS. 05000269/2016007, 05000270/2016007, AND 05000287/2016007

Dear Mr. Batson:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct a triennial fire protection baseline inspection at the Oconee Nuclear Station,

Units 1, 2, and 3, in February and March 2016. The inspection will be conducted in accordance

with IP 71111.05XT, the NRCs baseline fire protection inspection procedure for plants that have

transitioned their fire protection program to meet the requirements of 10 CFR 50.48(c). The

inspection will also review the status of the Milestone 6 Item and related information from the

NRC Notice of Violation and Confirmatory Order dated July 1, 2013 (ML13114A928). The

inspection team will be led by Jonathan Montgomery, a Senior Reactor Inspector from the NRC

Region II Office. The team will be composed of personnel from the Region II Office.

On December 1, 2015, during a telephone conversation between Judy Smith of your staff and

Mr. Montgomery, our respective staffs confirmed arrangements for a three-day information

gathering onsite visit and a two-week onsite inspection. The schedule for the inspection is as

follows:

Information gathering visit:

February 16-18, 2016

Week 1 of onsite inspection: February 29-March 4, 2016

Week 2 of onsite inspection: March 14-18, 2016

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the Oconee Nuclear Station fire

protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,

mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR)

50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for

unescorted site access.

S. Batson

2

The types of documents the team will be reviewing during conduct of the inspection are listed in

Enclosures 1 and 2. Please contact Mr. Montgomery at (404) 997-4880 prior to preparing

copies of the materials listed in the Enclosures. The inspection team will try to minimize your

administrative burden by specifically identifying those documents required for inspection

preparation.

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space; specific documents to be made available to the team in their

office space; arrangements for unescorted site access (including, as necessary, radiation

protection training, security, safety and fitness for duty requirements); and the availability of

knowledgeable plant engineering and licensing organization personnel to serve as points of

contact during the inspection.

We request that during the onsite inspection weeks you ensure that copies of analyses,

evaluations or documentation regarding the implementation and maintenance of the Oconee fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection are

those documents which establish that your fire protection program satisfies NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance (i.e. fire

protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of the

inspection, those documents implementing your mitigating strategies and demonstrating the

management of your commitments for the strategies are of specific interest. Also, personnel

should be available at the site during the inspection who are knowledgeable regarding those

plant systems required to achieve and maintain safe shutdown conditions from inside and

outside the control room (including the electrical aspects of the relevant post-fire safe shutdown

analyses), reactor plant fire protection systems and features, and the Oconee fire protection

program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, under control number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

S. Batson

3

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Montgomery, the team leader, in the Region II Office at (404) 997-4880, or me

at (404) 997-4521.

Sincerely,

/RA/

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos:

50-269; 50-270; 50-287

License Nos: DPR-38, DPR-47, DPR-55

Enclosures:

1. Triennial Fire Protection Inspection

Supporting Documentation

2. Mitigating Strategies Supporting

Documentation

cc: Distribution via ListServ

___ ____________

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

JMM9 VIA EMAIL

SMS

NAME

MONTGOMERY

SHAEFFER

DATE

12/7/2015

12/ 15/2015

12/ /2015

E-MAIL COPY?

YES

NO

YES

NO YES

NO

YES

NO

YES

NO YES

NO

YES

NO

Enclosure 1

Triennial Fire Protection Inspection Supporting Documentation

The documents and information requested below should generally be made available to the

inspection team during the on-site information gathering visit for the team's use both on-site and

off-site during the inspection. Electronic format is the preferred media, except where specifically

noted. If electronic media is made available via an internet based remote document

management system, then the remote document access must allow inspectors to download,

save, and print the documents in the NRC's regional office. Electronic media on compact disc

or paper records (hard copy) are acceptable. At the end of the inspection, the documents in the

team's possession will not be retained.

Approximately three weeks before the on-site information gathering visit, the following

documents should be made available to the team leader for review in the regional office:

Post-fire Nuclear Safety Capability, Systems, and Separation Analysis (request A.1)

Fire Hazards Analysis and/or NFPA 805 Design Basis Document (request A.2)

Fire Probabilistic Risk Assessment (PRA) Summary Document or full PRA Document

(request A.3)

NFPA 805 Transition Report, developed in accordance with NEI 04-02 (request A.4)

Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3) (request A.5)

Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4) (request A.6)

Analysis that demonstrates nuclear safety performance criteria can be achieved and

maintained for those areas that require recovery actions (request A.7)

Based on review of the above seven documents, team leader should identify a preliminary list of

fire areas being considered for inspection prior to the on-site information gathering visit. During

the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be

determined.

This document request is based on typical documents that a generic plant might have. As such,

this generic document request is not meant to imply that any specific plant is required to have all

of the listed documents. It is recognized that some documents listed below may not be

available for your plant. In addition, the document titles listed below are based on typical

industry document names; your plant specific document titles may vary.

2

A.

DESIGN AND LICENSING BASIS DOCUMENTS

A.1

Post-fire Nuclear Safety Capability, Systems, and Separation Analysis.

A.2

Fire Hazards Analysis and/or NFPA 805 Design Basis Document.

A.3

Fire PRA Summary Document or full PRA Document (if summary document not

available).

A.4

NFPA 805 Transition Report, developed in accordance with NEI 04-02.

A.5

Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3).

A.6

Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4).

A.7

Analysis that demonstrates nuclear safety performance criteria can be achieved and

maintained for those areas that require recovery actions.

A.8

Fire Protection Program and/or Fire Protection Plan.

A.9

LIST of post-fire safe shutdown components (i.e., safe shutdown equipment list).

A.10 Fire Protection System Design Basis Document.

A.11 LIST of applicable NFPA codes and standards and issuance dates (i.e., codes of

record).

A.12 LIST of deviations from (a) NFPA codes of record, or (b) NFPA 805 fundamental fire

protection program and design elements (i.e., NFPA 805, Chapter 3).

A.13 NFPA Compliance Review Report.

A.14 Report or evaluation that compares the fire protection program to the NRC Branch

Technical Position (BTP) 9.5-1 Appendix A.

A.15 COPY of licensee submittals and NRC safety evaluation reports that are specifically

listed in the facility operating license for the approved fire protection program.

A.16 COPY of NRC Safety Evaluation Reports that form the licensing basis for:

  • Post-fire Nuclear Safety Capability.

A.17 COPY of NRC approved exemptions for plant fire protection and post-fire nuclear

safety capability features.

3

A.18 COPY of exemption requests submitted but not yet approved for plant fire protection

and post-fire nuclear safety capability features.

A.19 LIST of nuclear safety capability design changes completed in the last three years

(including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).

A.20 Facility Operating License.

A.21 Technical Specifications (electronic format only).

A.22 Technical Requirements Manual (electronic format only).

A.23 Updated Final Safety Analysis Report (electronic format only).

B.

GENERAL PLANT DESIGN DOCUMENTS

B.1

Piping and instrumentation diagrams (P&IDs) and legend list for components used to

achieve and maintain nuclear safety performance criteria for: (C-size paper drawings

& electronic format)

  • Fires outside the main control room; and
  • Fires in areas requiring recovery actions at other than primary control stations.

B.2

P&IDs and legend list for fire protection systems, including fire water supply, water

suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper

drawings & electronic format).

B.3

Yard layout drawings for underground fire protection buried piping (C-size paper

drawings & electronic format).

B.4

AC and DC electrical system single line diagrams, from off-site power down to the

highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings &

electronic format).

B.5

Single line diagrams for motor control centers (MCCs) that supply post-fire nuclear

safety component loads (only for selected fire areas) (C-size paper drawings &

electronic format).

B.6

Equipment location drawings which identify the physical plant locations of post-fire

nuclear safety capability equipment (electronic format).

B.7

Plant layout drawings which identify: (electronic format)

Plant fire area boundaries;

Combustible control zone drawings;

Areas protected by automatic fire suppression and detection; and

Locations of fire protection equipment.

4

C. CLASSIC FIRE PROTECTION

C.1 COPY of fire protection program implementing procedures (e.g., administrative

controls, surveillance testing, fire brigade).

C.2 LIST of calculations and engineering analyses, studies, or evaluations for the fire

protection system, including the fire water system.

C.3 Hydraulic calculation or analysis for fire protection water system.

C.4 Last two completed surveillance's of fire protection features in the selected fire areas

(detection, suppression, damper inspections, damper tests, penetration inspections,

barrier inspections, etc.).

C.5 LIST of routine tests, surveillances, and preventive maintenance on fire pumps,

including pump controllers and batteries.

C.6 Last two completed annual fire pump pressure and flow tests.

C.7 Last two completed monthly and/or quarterly fire pump tests.

C.8 Last two completed fire loop flow tests and loop flushes.

C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate

concentrations and soak or hold times can be achieved (only for selected fire areas).

C.10 Last five hot work permits (at power).

C.11 Last five transient combustible permits (at power).

C.12 For Fire Brigade Drills, provide the following:

  • Last five fire brigade drill critiques;
  • Last drill critique for a drill with off-site fire department support;
  • Last unannounced drill critique;
  • Last back-shift drill critique;
  • Dates, shifts, and locations of unannounced drills for last three years;
  • Summary of any unsatisfactory drill performance items for last three years; and
  • Last unannounced drill critique by a qualified individual independent of the

licensee's staff.

C.13 For fire brigade equipment provide the following:

  • Procedure for inventory and inspection; and
  • Most recent inspection and inventory results.

5

C.14 Fire Brigade Qualifications, including self-contained breathing apparatus (SCBA) and

training lesson plans.

C.15 COPY of the mutual aid agreement for the first-due local fire department that is

currently in effect.

C.16 COPY of the evaluation or analysis of the effects of fire suppression activities on the

ability to achieve the nuclear safety performance criteria (only for selected fire areas),

including:

  • An automatic or manually actuated suppression system, due to a fire in a single

location, will not indirectly cause damage to the success path; and

  • inadvertent actuation or rupture of a suppression system will not indirectly cause

damage to the success path; and

  • demonstration of adequate drainage for areas protected by water suppression

systems;

are credited with keeping water from leaking into fire areas below.

C.17 Pre-fire plans for all fire areas.

C.18 For Emergency Lighting Units (ELU), provide the following:

  • COPY of performance based emergency light assessments;
  • LIST of Preventive Maintenance tasks, frequencies, and bases;
  • Most recently performed monthly or quarterly functional test;
  • Most recently performed battery discharge performance test;
  • ELU battery loading analysis;
  • vendor manual(s) for on-site inspector use;
  • results of black-out testing (if performed);
  • Compensatory measures taken when ELU are out of service

C.19 Impairment Log (at start of inspection), for fire protection features that are out of

service.

C.20 Three Fire Protection screening reviews for recent design changes, modifications, or

temporary modifications (i.e., an NFPA 805 plant change evaluation that screened

out).

C.21 LIST of penetration seal work, re-work, or installation activities, in the last three years.

C.22 LIST of fire wrap work, re-work, or installation activities, in the last three years.

C.23 Fire protection system health reports for the two most recent quarters.

C.24 Fire protection program health report for the two most recent quarters.

6

C.25 Emergency lighting system health reports for the two most recent quarters.

C.26 LIST of fire protection system design changes completed in the last three years

(including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).

C.27 LIST of fire protection system NFPA 805 engineering equivalency evaluations

completed in the last three years.

C.28 Licensee evaluation of industry operating experience, such as:

(specific items to be selected by the inspector)

  • NRC IN 2009-02, Bio-Diesel Fuel Oil Usage, for diesel fire pump; and
  • NRC IN 2009-29, Fire Pumps Fail to Start due to a Fire.

C.29 COPY of any test, surveillance, or maintenance procedure (current revision),

including any associated data forms, for any requested "last performed" test,

surveillance, or maintenance.

D. ELECTRICAL

D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or

Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire

areas.

D.2 Nuclear safety circuit coordination analysis for fuse and breaker coordination of

nuclear safety capability components.

D.3 Administrative or configuration control procedures that govern fuse replacement (e.g.,

fuse control procedures).

D.4 Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional, for post-fire nuclear safety capability components.

D.5 Electrical system health reports for the two most recent quarters.

D.6 Last surveillance demonstrating operability of those components operated from the

primary control stations.

D.7 LIST of post-fire nuclear safety capability system and component design changes

completed, in the last three years.

D.8 LIST of identified fire induced circuit failure configurations (only for selected fire

areas).

7

E.

OPERATIONS

E.1

LIST of calculations and engineering analyses, studies, or evaluations for the nuclear

safety capability methodology.

E.2

LIST of licensed operator Job Performance Measures (JPMs) for operator actions

required to achieve and maintain post-fire nuclear safety performance criteria.

E.3

LIST of non-licensed operator training associated with non-licensed operator actions

to achieve and maintain post-fire nuclear safety performance criteria (including JPMs,

in-field training walkdowns, simulations, or initial qualification).

E.4

Lesson plans for post-fire nuclear safety capability training for licensed and non-

licensed operators.

E.5

For recovery actions, provide the following:

  • Manual Action Feasibility Study;
  • Operator Time Critical Action Program;
  • Time lines for time-critical recovery actions; and
  • Time line validations.

E.6

Thermal hydraulic calculation or analysis that determines the time requirements for

time-critical manual operator actions.

E.7

Operating procedures to achieve and maintain nuclear safety performance criteria

from the control room, with a postulated fire in the selected fire areas.

E.8

Operating procedures to achieve and maintain nuclear safety performance criteria

from outside the control room, with a postulated fire in the control room, cable

spreading room, or any area requiring recovery actions (other than recovery actions

performed in the control room or primary control stations).

E.9

For safe shutdown equipment and tools, provide the following:

Procedure for inventory and inspection; and

Most recent inspection and inventory results.

E.10 LIST of procedures that implement Cold Shutdown Repairs.

E.11 For Cold Shutdown Repairs, provide the following:

  • Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
  • Most recent inspection and inventory results.

8

E.12 For Radio communications, provide the following:

  • Communications Plan for fire fighting and post-fire safe shutdown manual actions;
  • Repeater locations;
  • Cable routing for repeater power supply cables;
  • Radio coverage test results; and
  • Radio Dead Spot locations in the plant.

E.13 Environmental and habitability evaluations for post-fire operator actions (temperature,

smoke, humidity, SCBAs, etc.).

F. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS

F.1

Corrective actions for fire-induced circuit failures (including but not limited to NRC

IN 92-18), both single and multiple spurious actuations (only for selected fire areas).

F.2

Corrective actions associated with operator actions to achieve and maintain post-fire

nuclear safety performance criteria.

F.3

Self assessments, peer assessments, and audits of fire protection activities for the

last three years.

F.4

Self assessments, peer assessments, and audits of post-fire nuclear safety capability

methodology for the last three years.

F.5

LIST of open and closed condition reports for the fire protection system for the last

three years.

F.6

LIST of fire event analysis reports for the last three years.

F.7

LIST of open and closed condition reports for emergency lighting units for the last

three years.

F.8

LIST of open and closed condition reports for post-fire nuclear safety capability issues

for the last three years. This includes issues affecting the nuclear safety capability

analysis, fire hazards analysis, NFPA 805 design basis, fire risk evaluations, plant

change evaluations, post-fire operating procedures and/or training, timeline

evaluations for operator actions, and supporting engineering evaluations, analysis, or

calculations.

F.9 LIST of procedures that control the configuration of the fire protection program,

features, and post-fire nuclear safety capability methodology and system design.

Enclosure 2

Mitigating Strategies Supporting Documentation

G. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS

G.1 LIST of all changes to regulatory commitments made to meet the requirements of

Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).

G.2 LIST of procedures and guidelines that were revised or generated to implement the

mitigating strategies. These could be extensive damage mitigation guidelines

(EDMGs), severe accident management guidelines (SAMGs), emergency operating

procedures (EOPs), abnormal operating procedures (AOPs), etc.

G.3 A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"

issued December 2006, and the site-specific procedures or guidelines that are used

to implement each strategy.

G.4 LIST of engineering evaluations or calculations that were used to verify the

engineering bases for the mitigating strategies.

G.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow

diagrams for systems relied upon in the mitigating strategies. These could be the

type used for training (C-size paper drawings).

G.6 LIST of modification packages or summary descriptions of modifications with

simplified drawings, for necessary facility changes to implement the mitigating

strategies.

G.7 LIST of routine tests, surveillances, and preventive maintenance for equipment and

tools needed to implement 10 CFR 50.54(hh)(2) strategies.

G.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,

provide the following:

  • Procedures for inventory and inspection; and
  • Most recent inspection and inventory results.

G.9 LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that

differ from that documented in the submittals or the safety evaluation report.

2

G.10 Site general arrangement drawings that show the majority of buildings and areas

referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings).

G.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).

G.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)

required to implement any mitigating strategies.