ML19309H864: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:.. _ _ _ _ _ _ _ . | {{#Wiki_filter:.. _ _ _ _ _ _ _ . | ||
LPDR Coossopus nc " | |||
NSIC The Light ""'""= | NSIC The Light ""'""= | ||
COMPMy Houstor Lighting & Power P O. Box 1700 Houston. Texas 77001 (713) 228-9211 March 17, 1980 ST-HL-AE-430 SFN: V-0540 Director, Region IV Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76102 | COMPMy Houstor Lighting & Power P O. Box 1700 Houston. Texas 77001 (713) 228-9211 March 17, 1980 ST-HL-AE-430 SFN: V-0540 Director, Region IV Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76102 | ||
| Line 32: | Line 29: | ||
Very truly yours, f=2w E. A. Turner Vice President Power Plant Construction | Very truly yours, f=2w E. A. Turner Vice President Power Plant Construction | ||
& Technical Services PLW:bf l | & Technical Services PLW:bf l | ||
1 | 1 | ||
\ l | \ l | ||
"5& * % ST-HL-AE-430 Page.2 cc: Director, Division of Fuel Facility and Materials Safety Inspection Office of Inspection and Enforcement M. D. Schwarz (Baker & Botts) | "5& * % ST-HL-AE-430 Page.2 cc: Director, Division of Fuel Facility and Materials Safety Inspection Office of Inspection and Enforcement M. D. Schwarz (Baker & Botts) | ||
R. Gordon Gooch (Baker & Botts) | R. Gordon Gooch (Baker & Botts) | ||
Revision as of 09:49, 1 February 2020
| ML19309H864 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 03/17/1980 |
| From: | Eric Turner HOUSTON LIGHTING & POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| IEB-80-03, IEB-80-3, NUDOCS 8005200211 | |
| Download: ML19309H864 (2) | |
Text
.. _ _ _ _ _ _ _ .
LPDR Coossopus nc "
NSIC The Light ""'""=
COMPMy Houstor Lighting & Power P O. Box 1700 Houston. Texas 77001 (713) 228-9211 March 17, 1980 ST-HL-AE-430 SFN: V-0540 Director, Region IV Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76102
Dear Sir:
South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 IE Bulletin No. 80-03 Bulletin No. 80-03, received February 7,1980, has been reviewed by Houston Lighting and Power Company. Charcoal adsorber cells have been purchased for the South Texas Project; however, a visual inspection is not possible since the cells have not yet been manufactured.
Problems of the sort described in the Bulletin are not expected at the South Texas Project due to di fferences in adsorber cell construction. Rather than attaching the perforated screens with rivets spaced 6 inches apart, the South Texas Project adsorber cell screens will be spot welded at 1-3/4 inch spacing.
This will ensure adequate contact between the adsorber cell casings and screens.
If you have any questions, please contact us.
Very truly yours, f=2w E. A. Turner Vice President Power Plant Construction
& Technical Services PLW:bf l
1
\ l
"5& * % ST-HL-AE-430 Page.2 cc: Director, Division of Fuel Facility and Materials Safety Inspection Office of Inspection and Enforcement M. D. Schwarz (Baker & Botts)
R. Gordon Gooch (Baker & Botts)
J. R. Newman (Lowenstein, Newman, Reis, Axelrad & Toll)
D. G. Barker A. J. Granger R. A. Frazar G. B. Painter '
R. L. Waldrop H. R. Dean l
l l
l
.