{{#Wiki_filter:October 1974
{{#Wiki_filter:October 1974
              -Nl         U.S. ATOMIC ENERGY COMMISSION
-Nl U.S. ATOMIC ENERGY COMMISSION  
                          REGULATORY                                                                                   GUIDE
REGULATORY GUIDE  
                            DIRECTORATE OF RIGULATORY STANDARDS
DIRECTORATE OF RIGULATORY STANDARDS  
                                                          'REGULATORY GUIDE.9.3 INFORMATION NEEDED BY THE AEC REGULATORY STAFF IN CONNECTION
'REGULATORY GUIDE.9.3 INFORMATION NEEDED BY THE AEC REGULATORY STAFF IN CONNECTION  
                WITH ITS ANTITRUST REVIEW OF OPERATING LICENSE APPLICATIONS
WITH ITS ANTITRUST REVIEW OF OPERATING LICENSE APPLICATIONS  
                                                    FOR NUCLEAR POWER PLANTS
FOR NUCLEAR POWER PLANTS


==A. INTRODUCTION==
==A. INTRODUCTION==
items and any related changes that have occurred or are planned to occur since submission iof the As required by the December 19, 1970, amendments                               construction permit application:
As required by the December 19, 1970, amendments to the Atomic Energy Act of 1954, the Atomic Energy Commission conducts antitrust reviews with respect to construction permits and operating licenses it issues for commercial nuclear facilitie
to the Atomic Energy Act of 1954, the Atomic Energy Commission conducts antitrust reviews with respect to                               a. Anticipated excess or shortage in generating construction permits and operating licenses it issues for                               capacity resources not expected at the construc commercial nuclear facilities. The Commission must                                       tion permit stage. Reasons for the excess or
 
"under certain circumstances, make a finding as to                                     shortage along with data on how the excess will be whether the activities under the permit or license would                                allocated, distributed, or otherwise utiize4 or how create or maintain a situation inconsistent with the                                     the shortage will be obtained.
====s. The Commission must ====
"under certain circumstances, make a finding as to whether the activities under the permit or license would create or maintain a situation inconsistent with the antitrust laws. An antitrust review at the operating license stage is not required unless the AEC determines such review is advisable on the ground that significant changes in the licensee's activities or proposed activities have occurred subsequent to the previous antitrust review conducted by the Attorney General and the Commission at the construction permit stage. This rejulatory guide identifies -the type of information that the Regulatory staff considers germane for a decision as to whether a second antitrust review is required at the operating license stage.
 
B. INFORMATION NEEDED BY THE AEC
REGULATORY STAFF IN CONNECTION
WITH ITS ANTITRUST REVIEW
OF OPERATING LICENSE APPLICATIONS
FOR NUCLEAR POWER PLANTS
1. To assist the regulatory staff in Its review, an applicant for a license to operate a commercial nuclear power plant should consider the following items and any related changes that have occurred or are planned to occur since submission iof the construction permit application:
a. Anticipated excess or shortage in generating capacity resources not expected at the construc tion permit stage. Reasons for the excess or shortage along with data on how the excess will be allocated, distributed, or otherwise utiize4 or how the shortage will be obtained.
 
b. New power pools or coordinating groups or changes in structure, activities, policies, practices, or membership of power pools or coordinating groups in which the licensee was, is, or will be a participant.
 
c. Changes in transmission with respect to!(l) the nuclear plant,
(2)
interconnections, or (3)
connections to wholesale customers.
 
d. Changes in the ownership or contractual allocation of the output of the nuclear facility. Reasons and basis for such changes should be included.
 
e. Changes In design, provisions, or conditions of rate schedules and remasons for such changes. Rate increases or decreases are not necessary.
 
f. List of all (I) new wholesale customers, (2)
transfers from one rate schedule to another, including copies of schedules not previously furnished, (3) changes in licensee's service area, and (4) licensee's acquisitions or mergers.
 
UWAEC REGULATORY GUIDES
Copin of aukle my be obtainpd by .q t kdImcl*m, b drivilom desird ,
Wee US.Ammic Em p ComnrIAon. Vdngton. D9. 20564.
 
Adutsey GuOvld an ba m
to rlp med soke muitale w fte pub*ic Amne mn: Director O fRegulato*y Stuncdrd.


antitrust laws. An antitrust review at the operating license stage is not required unless the AEC determines                              b. New power pools or coordinating groups or such review is advisable on the ground that significant                                changes in structure, activities, policies, practices, changes in the licensee's activities or proposed activities                            or membership of power pools or coordinating have occurred subsequent to the previous antitrust                                      groups in which the licensee was, is, or will be a review conducted by the Attorney General and the                                        participant.
Comirmns ried ugagtiews for
"t06
1*mm s
010 AEC  
New"tor s  
t gmnphnutte g
e e
a Iuomw nU In pu fdds are Nrou-rage*
d shoavid be wit so Ow Secrmtmy d. C
=
a fuone ubtlon


Commission at the construction permit stage. This rejulatory guide identifies -the type of information that                            c. Changes in transmission with respect to!(l) the the Regulatory staff considers germane for a decision as                                nuclear plant, (2) interconnections, or (3)
====s. to isinete q ====
to whether a second antitrust review is required at the                                  connections to wholesale customers.
e by
=
d"
e10f 1In ohif.


operating license stage.
Camnewluon. US. Atomic Energy orni*


d. Changes in the ownership or contractual allocation of the output of the nuclear facility. Reasons and B. INFORMATION NEEDED BY THE AEC                                                  basis for such changes should be included.
====e. WinonW ====
oe on..C. 20645.


REGULATORY STAFF IN CONNECTION
eSaletig dic problem. or poeulated aucidm, . w o
                                                                                    e. Changes In design, provisions, or conditions of rate WITH ITS ANTITRUST REVIEW                                                  schedules and remasons for such changes. Rate OF OPERATING LICENSE APPLICATIONS                                                increases or decreases are not necessary.
pro I-"
guidmiem g
Antion: Socketirel and Servim S ection.


FOR NUCLEAR POWER PLANTS
sopme'S.
                                                                                    f. List of all (I) new wholesale customers, (2)
 
                                                                                        transfers from one rate schedule to another,
eieery Goultn an tt metlttuee for rqubtlom ened ecomnm wkj Uým b m 0qqied.
1. To assist the regulatory staff in Its review, an                                      including copies of schedules not previously applicant for a license to operate a commercial                                      furnished, (3) changes in licensee's service area, nuclear power plant should consider the following                                    and (4) licensee's acquisitions or mergers.
 
@N;hd ed gluiee diffe fem in U out I  
Mb pkln am Isied In ow lotowir "n bd brow om:
d.
 
m *~ee~r
.ahwnm t a p k
wor~* g tm*
by d. Cseum.


UWAEC REGULATORY GUIDES                                    Copin of            aukle my be obtainpd by .q t kdImcl*m,b drivilom desird , WeeUS.Ammic Em p ComnrIAon. Vdngton. D9. 20564.
010.


Adutsey GuOvldan ba            to m    rlp med soke muitale w fte pub*ic      Amne mn: Director OfRegulato*y Stuncdrd. Comirmns ried ugagtiews for
eacm ators I. Poducw
"t06            s 1*mm
2. neemrcd Wd Tom Rtaectors
                    010 AEC              s    t gmnphnutte eg q    = e by d"
                                                                      e a New"tor e10f1In Iuomw      nUIn      fdds areNrou-rage* d shoavidbe wit so Ow Secrmtmy pu ohif. Camnewluon. US. Atomic Energy                        oeon..C. 20645.


orni*
===7. lmmortatlose ===
&3. F.k eMd e
Its
0"
L OW4etom Heah PAM"4.


====e. WinonW====
= bnv 9~010l.
d. C =              ubtlons. to isinete a fuone eSaletig  dic problem. or poeulated aucidm, . w    o  proI-" guidmiem g    Antion: Socketirel    and Servim Section.


sopme'S.     eieery Goultn an tt metlttuee for rqubtlom ened ecomnm wkj Uým b m    0qqie
spl t w.


====d. ed  gluiee====
Amttrnt eview omteesom 4s ml bl if t waitl w
                                        @N;hd    diffe  fem      U  out in I    Mbpkln am Isied In ow      lotowir "n bd brow      om:
aW
d.      m .ahwnm
gepohm.
              *~ee~r      t ap    k g wor~*      by d. Cseum.


tm*                                    010.    ators eacm                          I. Poducw
IL Mie wd PaeM Portoal
                                                                                2. neemrcd WdTom Rtaectors               
5.


===7. lmmortatlose===
I&  
                                                                                &3.F.k eMd e              Its
eertw
                                                                                                            0"              L OW4etom Heah PAM"4.    = bnv 9~010l. spl t            w.      Amttrnt eview omteesom 4s    ml bl    waitl ift        w gepohm.


aW                                IL Mie      wd PaeM Portoal              5.
g List of those generating capacity additions committed for operation after the nuclear facility, including ownership rights or power output'
allocations.


I&    eertw
h. Sumrma'y of requests or indications of Interest by other electric power wholesale or retail dis tributors, and licensee's response, for any typ, of electric service or cooperative venture or study.


g List of those generating capacity additions                2. licensees whose construction permits Include con committed for operation after the nuclear facility,          ditions pertaining to antitrust aspects should list and including ownership rights or power output'                  discuss those actions or policies which have been allocations.                                                Implemented In accordance with such conditions.
2. licensees whose construction permits Include con ditions pertaining to antitrust aspects should list and discuss those actions or policies which have been Implemented In accordance with such conditions.


3. Fve copies of a separate document entitled
3. Fve copies of a separate document entitled  
                                                                "Information for Antitrust Review of Operating h. Sumrma'y of requests or indications of Interest by          License Application" and containing the above other electric power wholesale or retail dis                requested information should be submitted when the tributors, and licensee's response, for any typ, of          operating license application documents are sub electric service or cooperative venture or study.            mitted or a soon thereafter as possible.
"Information for Antitrust Review of Operating License Application"  
and containing the above requested information should be submitted when the operating license application documents are sub mitted or a soon thereafter as possible.


9.3-2 t}}
9.3-2 t}}


{{RG-Nav}}
{{RG-Nav}}

Latest revision as of 02:07, 17 January 2025

Information Needed by the AEC Regulatory Staff in Connection with Its Antitrust Review of Operating License Applications for Nuclear Power Plants
ML003740168
Person / Time
Issue date: 10/31/1974
From:
Office of Nuclear Regulatory Research
To:
References
RG-9.3
Download: ML003740168 (2)


October 1974

-Nl U.S. ATOMIC ENERGY COMMISSION

REGULATORY GUIDE

DIRECTORATE OF RIGULATORY STANDARDS

'REGULATORY GUIDE.9.3 INFORMATION NEEDED BY THE AEC REGULATORY STAFF IN CONNECTION

WITH ITS ANTITRUST REVIEW OF OPERATING LICENSE APPLICATIONS

FOR NUCLEAR POWER PLANTS

A. INTRODUCTION

As required by the December 19, 1970, amendments to the Atomic Energy Act of 1954, the Atomic Energy Commission conducts antitrust reviews with respect to construction permits and operating licenses it issues for commercial nuclear facilitie

s. The Commission must

"under certain circumstances, make a finding as to whether the activities under the permit or license would create or maintain a situation inconsistent with the antitrust laws. An antitrust review at the operating license stage is not required unless the AEC determines such review is advisable on the ground that significant changes in the licensee's activities or proposed activities have occurred subsequent to the previous antitrust review conducted by the Attorney General and the Commission at the construction permit stage. This rejulatory guide identifies -the type of information that the Regulatory staff considers germane for a decision as to whether a second antitrust review is required at the operating license stage.

B. INFORMATION NEEDED BY THE AEC

REGULATORY STAFF IN CONNECTION

WITH ITS ANTITRUST REVIEW

OF OPERATING LICENSE APPLICATIONS

FOR NUCLEAR POWER PLANTS

1. To assist the regulatory staff in Its review, an applicant for a license to operate a commercial nuclear power plant should consider the following items and any related changes that have occurred or are planned to occur since submission iof the construction permit application:

a. Anticipated excess or shortage in generating capacity resources not expected at the construc tion permit stage. Reasons for the excess or shortage along with data on how the excess will be allocated, distributed, or otherwise utiize4 or how the shortage will be obtained.

b. New power pools or coordinating groups or changes in structure, activities, policies, practices, or membership of power pools or coordinating groups in which the licensee was, is, or will be a participant.

c. Changes in transmission with respect to!(l) the nuclear plant,

(2)

interconnections, or (3)

connections to wholesale customers.

d. Changes in the ownership or contractual allocation of the output of the nuclear facility. Reasons and basis for such changes should be included.

e. Changes In design, provisions, or conditions of rate schedules and remasons for such changes. Rate increases or decreases are not necessary.

f. List of all (I) new wholesale customers, (2)

transfers from one rate schedule to another, including copies of schedules not previously furnished, (3) changes in licensee's service area, and (4) licensee's acquisitions or mergers.

UWAEC REGULATORY GUIDES

Copin of aukle my be obtainpd by .q t kdImcl*m, b drivilom desird ,

Wee US.Ammic Em p ComnrIAon. Vdngton. D9. 20564.

Adutsey GuOvld an ba m

to rlp med soke muitale w fte pub*ic Amne mn: Director O fRegulato*y Stuncdrd.

Comirmns ried ugagtiews for

"t06

1*mm s

010 AEC

New"tor s

t gmnphnutte g

e e

a Iuomw nU In pu fdds are Nrou-rage*

d shoavid be wit so Ow Secrmtmy d. C

=

a fuone ubtlon

s. to isinete q

e by

=

d"

e10f 1In ohif.

Camnewluon. US. Atomic Energy orni*

e. WinonW

oe on..C. 20645.

eSaletig dic problem. or poeulated aucidm, . w o

pro I-"

guidmiem g

Antion: Socketirel and Servim S ection.

sopme'S.

eieery Goultn an tt metlttuee for rqubtlom ened ecomnm wkj Uým b m 0qqied.

@N;hd ed gluiee diffe fem in U out I

Mb pkln am Isied In ow lotowir "n bd brow om:

d.

m *~ee~r

.ahwnm t a p k

wor~* g tm*

by d. Cseum.

010.

eacm ators I. Poducw

2. neemrcd Wd Tom Rtaectors

7. lmmortatlose

&3. F.k eMd e

Its

0"

L OW4etom Heah PAM"4.

= bnv 9~010l.

spl t w.

Amttrnt eview omteesom 4s ml bl if t waitl w

aW

gepohm.

IL Mie wd PaeM Portoal

5.

I&

eertw

g List of those generating capacity additions committed for operation after the nuclear facility, including ownership rights or power output'

allocations.

h. Sumrma'y of requests or indications of Interest by other electric power wholesale or retail dis tributors, and licensee's response, for any typ, of electric service or cooperative venture or study.

2. licensees whose construction permits Include con ditions pertaining to antitrust aspects should list and discuss those actions or policies which have been Implemented In accordance with such conditions.

3. Fve copies of a separate document entitled

"Information for Antitrust Review of Operating License Application"

and containing the above requested information should be submitted when the operating license application documents are sub mitted or a soon thereafter as possible.

9.3-2 t