ML003773998: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML003773998 | | number = ML003773998 | ||
| issue date = 11/30/2000 | | issue date = 11/30/2000 | ||
| title = | | title = Memo to S. Shankman from: T.J. Kobetz Subject: Summary of the November 17, 2000, Meeting Between the NRC and Pacific Gas and Electric Co. Attachments: 1.) Attendance List; 2.) Pge Slides | ||
| author name = Kobetz T | | author name = Kobetz T | ||
| author affiliation = NRC/NMSS/SFPO | | author affiliation = NRC/NMSS/SFPO | ||
| Line 13: | Line 13: | ||
| document type = Meeting Summary, Slides and Viewgraphs | | document type = Meeting Summary, Slides and Viewgraphs | ||
| page count = 43 | | page count = 43 | ||
| project = TAC:L23221 | |||
| stage = Meeting | |||
}} | }} | ||
Revision as of 03:49, 24 December 2019
| ML003773998 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon, Humboldt Bay |
| Issue date: | 11/30/2000 |
| From: | Kobetz T NRC/NMSS/SFPO |
| To: | Shankman S NRC/NMSS/SFPO |
| Kobetz T NMSS/SFPO (301) 415-8538 | |
| References | |
| +sispmjr200505, -nr, -RFPFR, TAC L23221, TAC L23221/Review 040S | |
| Download: ML003773998 (43) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 30, 2000 MEMORANDUM TO: Susan F. Shankman, Deputy Director Licensing and Inspection Directorate Spent Fuel Project Office, NMSS FROM: Timothy Kobetz, Project Manage Licensing Section Spent Fuel Project Office, N SS
SUBJECT:
SUMMARY
OF THE NOVEMBER 17, 2000, MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION STAFF AND PACIFIC GAS AND ELECTRIC COMPANY (TAC NO. L23221)
On November 17, 2000, a meeting was held between the Nuclear Regulatory Commission (NRC) staff and representatives of Pacific Gas and Electric Company (PG&E) to discuss PG&E's plans for licensing independent spent fuel storage installations (ISFSls) at Diablo Canyon and Humboldt Bay. At this meeting, PG&E provided a status update and specific information regarding the proposed ISFSIs. Members of the public also attended the meeting. is an attendance list. Attachment 2 contains the slides used in PG&E's presentation. This meeting was noticed on October 31, 2000.
PG&E stated that the schedules for the submittal of the site-specific ISFSI license applications for both facilities had slipped from the previous goal of October 2000. The Diablo Canyon application is now scheduled to be submitted in April 2001 and Humboldt Bay in the fourth quarter of 2001. In addition, PG&E presented the following regarding the Diablo Canyon ISFSI:
PG&E has initiated discussions with local and state officials and other special interest groups for siting an ISFSI at Diablo Canyon.
PG&E plans to begin construction of the ISFSI in 2004. Full core off-load capability will be lost in 2006.
PG&E requested that NRC review the Diablo Canyon ISFSI application concurrently with the Holtec Hi-Storm amendment that was submitted in August 2000. PG&E proposed this type of review to eliminate duplication of effort between applications. NRC staff stated they would consider the request but did not commit to granting the request.
PG&E briefly discussed ongoing engineering work for the cask transfer station and the high seismic requirement of the site.
PG&E presented an overview of its existing Quality Assurance Program and described its implementation for oversight of the ISFSI design.
S. Shankman November 30, 2000 PG&E and NRC staff agreed to hold future meetings to address specific technical issues resulting from vendor selections and associated design details and project status updates.
No proprietary information was disseminated or presented at this meeting. No regulatory decisions were requested or made.
Docket Nos. 72-26 (50-275, -323) 72-27 (50-133)
Attachments: 1. Attendance List
Dockets NRC File Center PUBLIC NMSS R/F SFPO R/F SGagner, OPA BSpitzburg, RIV VEverett, RIV NJensen, OGC FLyon, NRR NRC attendees Anorris DWheeler,NRR GShukla, NRR G:\PG&E\1 1-17-00, Meeting Summary.wpd ADAMS:
OFC: SFPO E SFPO ýESEPO L NAME: TKobetz t-* rpe SBaggo DATE: 11/'700 11 kJ100 i11[/V/00 OFFICIAL RECORD COPY
S. Shankman November 30, 2000 PG&E and NRC staff agreed to hold future meetings to address specific technical issues resulting from vendor selections and associated design details and project status updates.
No proprietary information was disseminated or presented at this meeting. No regulatory decisions were requested or made.
Docket Nos. 72-26 (50-275, -323) 72-27 (50-133)
Attachments: 1. Attendance List
- 2. PG&E Slides cc: Service Lists
November 17, 2000 Meeting between the Nuclear Regulatory Commission and Pacific Gas and Electric ATTENDANCE LIST Name Affiliation David Taggart PG&E Terry Grebel PG&E Chris Hartz PG&E Jearl Strickland PG&E Wayne Hodges NRC/NMSS/SFPO Tim Kobetz NRC/NMSS/SFPO Chet Poslusny NRC/NMSS/SFPO K.C. Leu NRC/NMSS/SFPO David Tang NRC/NMSS/SFPO Steven Baggett NRC/NMSS/SFPO Thomas Matula NRC/NMSS/SFPO Duke Wheeler NRC/NRR Girja Shukla NRC/NRR Brian Gutherman Hotec Jack Bashoven TN-West Attachment 1
Diablo Canyon Power Plant Spent Fuel Storage Project Presentation to the NRC November 17, 2000 I -I" Attachment 2
AGENDA
° Introduction
- Projects Update
- DC Project Overview
° Holtec Licensing Actions
- Holtec Work Scope
- Future Meetings 2
HB ISFSI PROJECTS UPDATE Summary Status
- Cask vendors bids review complete
- Final scope development for cask specification in Process
- Preparation for contract negotiations underway Planning in process for Coastal Commission and other required permitting
- Scheduling and Planning Issues
- Series licensing effort with DC
- Potential of the same cask vendor as DC
PreliminarySchedule for HB ISFSI 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 Prep, ire License tpplication Cask Iendor Sele ted V
NRC Re iiew License Applicatior NRC Issue HBPP ISFSI Licens.
PG&E Fin, I Decision o Build ISF I Manufa ture/Delive Cask ysty m Buil I HBPP IS I and Move Fuel 4
"* DC project office established
- Engineering, licensing, quality assurance, legal, government and community affairs
"* Site specific design for DC is in progress
"* Initiated permitting discussions with local and state agencies
"* Briefings for local officials and special interest groups 5
PreliminarySchedule for DC ISFSI 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
- -
Cask %j endor Selectd V
Prepare Uce se Applicatic n NR C Review LI ense Appllcg lion Pc tentlal Pubil Hearings Fabrlcalt *Cask System Construct I SI and Mo%e Fuel Full Core E-Load Cap bility Lost 6
U.-U I"U"L STURAGF Lawrence F. Womack Executive Sponsor Ops - C. Harvey Ops - S. Westcott ------------------------................
Mtce - Mike Oien Licensing Land Use Permits Gov't and Public Relations Project Manager Terry Grebel Pat Kelly Bruce Patton Assurance Eng.
Missie Hobson Chris Hartz Roger Johnson Bob Schiebelhut
- Pat Mullen Richard Klimczak Phil Lang Bob Dietrich
- LSA Associates
- Responsibilities Mark Timmerman Rich Hagler M. Sullivan Jay Young* Ed Bedwell Al Tafoya* Rick Bell Bob Webb* Oversight of contracts Responsibilities Phil Isenberg
- Edwin Olweny* process Responsibilities Jeff Lewis Tien Lee* Contract Administrator Responsibilities Secure coastal permits Sohrab Esfandiari* Vendor qualifications Speakers Bureau Process invoices Interface with county Patrick Huang Oversee fabrication &
Secure NRC Part 50, planning, building & Mark Somerville construction quality John Wathen 72 licenses engineering depts. Steve Chesnut Project QA & Oversight NRC Environmental CEQA Process (Env. Jim Tomkins Responsibilities Review Process Impact Report) Rudy Ortega Support potential Mike Meko Manage Vendors hearings Jacquie Hinds Set engineering Legal I...........
requirements Environmental Issues Legal HBPP Used Fuel Program Responsibilities Drew Squyres Richard Locke Manage construction Project Manager Local political Perform engineering Roy Willis coordination /
Contract engineering Responsibilities Leigh Cassidy
- community public services affairs I statewide Dave Repka
- Responsibilities political gov't Ensure compliance with Bob Schiebelhut*
coordination Air pollution permits Ensure DCPP & HBPP NPDES permit Responsibilities Used Fuel Storage Obtain NPDES Project is aligned with Construction Stormwater Provide legal advice and DCPP project permit strategy for all regulatory Meet APCD Permit matters and contracts conditions Conduct potential hearings Obtain additional APCD permits
- Consultant Wells/borings permits
DC PROJECT OVERVIEW
- Facility will be licensed for two phased usage
- Operational
- Decommissioning
- DC will license for the Holtec 32 and 24 assembly storage canisters
- Cask Transfer Facility to be located adjacent to the storage site 8
CASK LAYOUT PHASE I - OPERATIONAL N. T, S.
CASK LAYOUT PHASE II - DECOMMISSIONING N. ToSo
HOL TEC LICENSING A C TIONS Item Submittal SER Date Date MPC-32/5% Enrich. 8/31/00 9/01 High Burnup 8/31/00 9/01 Increased Decay Heat 8/31/00 9/01 High Seismic 8/31/00 9/01 PWR Damaged Fuel/Debris (4% Enrich.) 8/31/00 9/01 Non-Fuel Hardware 8/31/00 9/01 11
HOLTEC LICENSING ACTIONS - Cont.
Item Submittal SER Date Date MPC-32/5% HI-STAR Part 71 12/01 8/02 MPC-32/5% HI-STAR Part 72 10/01 10/02 High Seismic - HI-STAR 10/01 10/02 Damaged Fuel/Debris - 5% TBD TBD
/
I I .1 mm 12 Ta'
HOL TEC/PG&E DOCKET INTERFACE
"* DC ISFSI License refers to Holtec FSAR and LAR 1014-1
" DC SAR demonstrates how HI-STORM 100 System design envelopes site-specific criteria
- Where HI-STORM 100 System does not envelope DC Criteria, site-specific analyses are performed DC SAR will be updated periodically to reflect the HI-STORM 100 System licensing actions
HOL TEC MAJOR WORK ITEMS Analysis Work
- Drop and seismic events in Part 50 facility
- Site-specific dose evaluations
- Site-specific fire and explosion evaluation
- Methods and codes used Lj MCNP u LS DYNA L ANSYS V 5.6 u Working Model 3D 14
HOLTEC MAJOR WORK ITEMS - Cont.
Engineering Work
- CTF design u Design criteria per HI-STORM CoC/FSAR
- Pad design criteria L Embedment per high seismic requirements
- Cask Transporter
- FHB seismic restraint systems
- Drop and seismic loads to building structure 15
HOLTEC MAJOR WORK ITEMS- Cont.
Miscellaneous Ancillaries
" Lift Yoke "n MPC lid restraint system Li Transport Frame L3 HI-TRAC Bottom Shield
"*J Impact Limiters "i Lift Rigging and Slings i Cask Mating Device 16 19
HOLTEC MAJOR WORK ITEMS - Cont.
e Licensing Work
- Prepare Cask-Specific SAR sections
- Review PG&E Part 72 LA sections u ER Plan, Training Plan, Decommissioning Plan, Technical Specifications
- Review PG&E Part 72 SAR sections
- Review PG&E Part 50 License Amendment 17
- DIABLO CANYON DIABLO CANYON ISFSI PROJECT QUALITY ASSURANCE 18
DISCUSSION TOPICS
"* ISFSI Oversight Philosophy
"*Nuclear Quality Services
"*Design Specification
"* ISFSI Projects Oversight
- Geo-Technical Oversight
- 10CFR50 Activities Oversight
- Holtec Oversight
- Fabrication Oversight 19
PURPOSE OF DISCUSSION To facilitate a proactive information exchange between the NRC and PG&E with relation to Quality Assurance for the ISFSI Projects 20
HISTORICAL
.OVERSIGHTPHILOSOPHY
"*Audits/assessments based on commitments and safety significance
"*Performance based "vertical slice" audits 1987 SSOMIs SSFIs Other topical areas (PRA, MOVs, EQ, etc.)
21
CURRENT ISFSI
.OVERSIGHTPHILOSOPHY o To be proactively involved by providing input to project personnel
- To perform daily monitoring o To conduct "performance based" intrusive audits and assessments of key project activities Irr&
22 22 Ikrfil q
NUCLEAR QUALITY SERVICES Diversified Expertise
- Mechanical Engineering
- Civil Engineering
- Nuclear Engineering
- ASME Codes & Standards
- Safety Analysis
- Welding
- Quality Assurance Current Organization 23
ISFSI Project Quality & Oversight Functions Diablo Canyon & Humboldt Bay Nuclear Quality Services C Dave Taggart Director, Nuclear Quality Services - Engineering, Procurement & Maintenance r
Supervisor - Engineering & Projects Assessment)
-I I Supervisor - Procurement Assessment 11 ISFSI PG&E Engineering & Licensing Oversight - ISFSI Supplier Audit/Evaluation Support
- ISFSI Project Oversight - ISFSI Procurement Assessment & Audit
- HOLTEC Engineering & Licensing Oversight - ISFSI Receipt Inspection
"- "Vertical Slice" ISFSI Engineering Audits
- ISFSI Fabrication Oversight
- ISFSI Project Quality Assurance Support r
11 13 I
Supervisor - Maintenance Assessment f K I
Supervisor - Nuclear Quality Services Humboldt Bay Ii
- DC ISFSI Installation/Construction Assessment & Audit - HB Onsite NQS ISFSI Interface
- DC ISFSI Installation/Construction Inspection - HB Onsite Installation Monitoring/Assessment
- HB/DC Welding Inspection Support - HB Onsite Monitoring/Assessment Support
- HB ISFSI Inspection Support HB Quality Verification Plan Development
- HB QA Program Interface 24 WS;
ISFSI Projects Quality & Oversight Functions Dave Taggart Director, Nuclear Quality Services I
Jeff Hodges Supervisor - Engineering & Projects Assessment Engineering & Project Technical Audit Staff I ~ Derek Bell 1 Chris Hartz q HB ISFSI Project QA Engineer DC ISFSI Project QA Engineer
- ISFSI Project Engineering Oversight - ISFSI Project Engineering Oversight
- ISFSI Project Licensing Oversight - ISFSI Project Licensing Oversight
- HB Project Geoscience Oversight - DC Project Geoscience Oversight HB ISFSI TES SAR Support Oversight - HOLTEC Engineering/Licensing Oversih 25
DESIGN SPECIFICA TION QA REQUIREMENTS
- 10CFR71 Subpart H
- 10CFR72 Subpart G
- NQA-1
- MPC/HI-TRAC
- ANI
- NPT Stamp 26
DESIGN SPECIFICA TION QA REQUIREMENTS- Cont.
- Welding inspectors
- AWS CWI's only
° Special controls on ASME materials
- Small Products
- Material Organizations
- Special controls on commercial grade items 27 Ikr~l;
DIABLO CANYON ISFSI PROJECT OVERSIGHT
"* Early involvement
"*Intrusive - performance based assessments of all phases of the project
- Pre-award surveys (multi-disciplined team)
- 5 Designers
- 5 Canister Fabricators 28
DIABLO CANYON ISFSI PROJECT OVERSIGHT- Cont.
"* Industry involvement
- ASME
- EPRI
- DSQG
- NEI
- Yucca Mountain Project
"* QA kickoff meeting at Holtec
"° Engineering oversight at Holtec
"* Technical experts
- Specification review
- Review of Holtec calculations/analysis 29 Ik1=1 29 irai
OVERSIGHT A TTRIBUTES
"* Clear responsibilities
"* Establishes the role of the PQAE
"* Oversight activities
- Geo-Technical
- Part 50 License Amendment Request
- Part 72 License Application
- PG&E Project Engineering
- Holtec
- ENERCON
- Fabrication 30
OVERSIGHT A TTRIBUTES - Cont.
- Oversight Activities (Cont.)
Site preparation/pad construction Cask loading Cask transportation ISFSI operation 31
GEO- TECHINCAL OVERSIGHT
"* Active involvement in earliest stages
"* Expert opinion/peer review
- Seismic Hazard Analysis "L LTSP
" Road Stability
- Geological oversight
- Geophysics oversight
- Slope stability
- On-going 32
IOCFR50 OVERSIGHT
"* Fuel movement
"* Building loads
- Walls
- Floor
"* Movement of heavy loads
- Crane
- Load drop analysis
"* Fuel pool issues
- Criticality
- Chemistry
"* Safety evaluations 33
HOLTEC OVERSIGHT
"*On-going engineering oversight
- Design control
- Design interfaces
- Corrective action program
- Licensing activities
"* PQAE review of various Holtec products (analyses, evaluations, etc.)
- Technical experts
- Vertical slice audit planned - 1st quarter 2001
- Extensive use of technical experts 34
OTHER OVERSIGHT ACTIVITIES
- Participation as observers on Holtec's internal audit
° Welding program review planned 2nd quarter 2001
- ASME code compliance
- Welding/welder qualification
- Filler material procurement and control
- Control of in-process welding
- PG&E senior welding engineer participation
° Monitoring industry experience (e.g., Hatch, Information Notice 2000-11)
I 35 35 Ikril 4I
FABRICATION OVERSIGHT e Full time source surveillance
- Category A items
- MPC/HI-TRAC Fabricators
- Various locations
- Intermittent source surveillance
- Category B & C items 36
FUTURE MEETINGS
"* HB Issues
"* DC Security 37w