{{#Wiki_filter:Shield Building 3.6.15 3.6 CONTAINMENT SYSTEMS 3.6.15 Shield Building LCO 3.6.15 | {{#Wiki_filter:Shield Building 3.6.15 3.6 CONTAINMENT SYSTEMS 3.6.15 Shield Building LCO 3.6.15 APPLICABILITY: | ||
The Shield Building shall be OPERABLE. | |||
ACTIONS CONDITION | MODES 1, 2, 3, and 4. | ||
B. | ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. | ||
Shield building Inoperable. | |||
A.1 Restore shield building to 24 hours OPERABLE status. | |||
B. | |||
NOTE------ | |||
8.1 Restore annulus pressure 8 hours Annulus pressure within limits. | |||
requirement Is not applicable during venting operations, required annulus entries, or Auxiliary Building Isolations not exceeding 1 hour in duration or while Penetration 1-EQH-271 -0010 or 1-EQH-271-0011 In the Shield Building dome Is open until annulus pressure Is restored.* | requirement Is not applicable during venting operations, required annulus entries, or Auxiliary Building Isolations not exceeding 1 hour in duration or while Penetration 1-EQH-271 -0010 or 1-EQH-271-0011 In the Shield Building dome Is open until annulus pressure Is restored.* | ||
Annulus pressure not within limits. | Annulus pressure not within limits. | ||
C. | C. | ||
Required Action and C.1 Be In MODE S. | |||
6 hours associated Completlon Time not met. | |||
AND 0.2 Be In MODE 5. | |||
36 hours | |||
*1. The combined opening ime of Penetrations 1-EQ-H-271-0010 or 1-EQH-271-0011 Is limited lo a total time of five hours a day, six days a week during Cycle 7 operation. | *1. The combined opening ime of Penetrations 1-EQ-H-271-0010 or 1-EQH-271-0011 Is limited lo a total time of five hours a day, six days a week during Cycle 7 operation. | ||
: 2. Penetrations 1-EQOI-271 -0010 or 1-EQH-271-001 1 | : 2. | ||
: 3. Upon opening Penetration 1-EQI-l271-0010 or 1-EQ-I-271-0011 | Penetrations 1-EQOI-271 -0010 or 1-EQH-271-001 1 In the Shield Building Dome may not be opened If In Action Conditions LCO 3.6.9A or 3.8.1B. | ||
Walls Bar-Unit I | : 3. | ||
Upon opening Penetration 1-EQI-l271-0010 or 1-EQ-I-271-0011 In the Shield BuIldirig Dome, both' EGTS control loops shall be placed In the A-Auto Stand-by position and returned to normal position following closure of penetration. | |||
Walls Bar-Unit I 3.8-40 Amendment No. 59 | |||
Containment Pressure 3.6A 3.6 CONTAINMENT SYSTEMS 3.6.4 Containment Pressure LCO 3.6.4 | Containment Pressure 3.6A 3.6 CONTAINMENT SYSTEMS 3.6.4 Containment Pressure LCO 3.6.4 Containment pressure shall be a -0.1 and 5 +0.3 psid relative to the annulus. | ||
APPLICABILITY: | APPLICABILITY: | ||
ACTIONS CONDITION | MODES 1, 2, 3, and 4. | ||
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. | |||
NOTE--.- | |||
A.1 Restore containment pressure 1 hour to within Emits. | |||
When opening or dosing Penetration 1-EQH-271-0010 or 1-EQH-271-0011 in the Shield Building Dome during Cycle 7 operation, time is allowed for Containment Annulus pressure equalization to occur. | When opening or dosing Penetration 1-EQH-271-0010 or 1-EQH-271-0011 in the Shield Building Dome during Cycle 7 operation, time is allowed for Containment Annulus pressure equalization to occur. | ||
Containment pressure not within limits. | Containment pressure not within limits. | ||
B. | B. | ||
Required Action and B.1 Be In MODE 3. | |||
6 hours associated Completion Time not met. | |||
AND B.2 Be In MODE 5. | |||
SS hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1 Verify containment pressure Is within limits. | |||
12 hours Watts Bar-Unit I 8.6-15 Amendment No.59}} | |||
Latest revision as of 12:24, 15 January 2025
| ML060090345 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 01/06/2006 |
| From: | Plant Licensing Branch III-2 |
| To: | |
| Pickett D, NRR/DLPM, 415-1364 | |
| Shared Package | |
| ML060050408 | List: |
| References | |
| TAC MC6569 | |
| Download: ML060090345 (2) | |
Text
Shield Building 3.6.15 3.6 CONTAINMENT SYSTEMS 3.6.15 Shield Building LCO 3.6.15 APPLICABILITY:
The Shield Building shall be OPERABLE.
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
A.1 Restore shield building to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE status.
B.
NOTE------
8.1 Restore annulus pressure 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Annulus pressure within limits.
requirement Is not applicable during venting operations, required annulus entries, or Auxiliary Building Isolations not exceeding 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in duration or while Penetration 1-EQH-271 -0010 or 1-EQH-271-0011 In the Shield Building dome Is open until annulus pressure Is restored.*
Annulus pressure not within limits.
C.
Required Action and C.1 Be In MODE S.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completlon Time not met.
AND 0.2 Be In MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />
- 1. The combined opening ime of Penetrations 1-EQ-H-271-0010 or 1-EQH-271-0011 Is limited lo a total time of five hours a day, six days a week during Cycle 7 operation.
- 2.
Penetrations 1-EQOI-271 -0010 or 1-EQH-271-001 1 In the Shield Building Dome may not be opened If In Action Conditions LCO 3.6.9A or 3.8.1B.
- 3.
Upon opening Penetration 1-EQI-l271-0010 or 1-EQ-I-271-0011 In the Shield BuIldirig Dome, both' EGTS control loops shall be placed In the A-Auto Stand-by position and returned to normal position following closure of penetration.
Walls Bar-Unit I 3.8-40 Amendment No. 59
Containment Pressure 3.6A 3.6 CONTAINMENT SYSTEMS 3.6.4 Containment Pressure LCO 3.6.4 Containment pressure shall be a -0.1 and 5 +0.3 psid relative to the annulus.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
NOTE--.-
A.1 Restore containment pressure 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to within Emits.
When opening or dosing Penetration 1-EQH-271-0010 or 1-EQH-271-0011 in the Shield Building Dome during Cycle 7 operation, time is allowed for Containment Annulus pressure equalization to occur.
Containment pressure not within limits.
B.
Required Action and B.1 Be In MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND B.2 Be In MODE 5.
SS hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1 Verify containment pressure Is within limits.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Watts Bar-Unit I 8.6-15 Amendment No.59