IR 05000333/2006009: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ber 17, 2006
{{#Wiki_filter:October 17, 2006


==SUBJECT:==
==SUBJECT:==
Line 34: Line 34:
In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


WARNING: Violation of Section 147, Safeguards Safeguards information determination made by:
WARNING: Violation of Section 147, Safeguards Information, of the Atomic Agency Act is subject to civil and criminal penalties.
Information, of the Atomic Agency Act is subject Name/Title Barry C.Westreich, Chief to civil and criminal penalties. Organization NSIR/DNS/SOS Basis 2/25/02 NRC Order Signature /RA/
 
Safeguards information determination made by:
Name/Title Barry C.Westreich, Chief Organization NSIR/DNS/SOS Basis 2/25/02 NRC Order Signature /RA/
Date 5/12/06 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Date 5/12/06 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.


Sincerely,
Sincerely,
/RA/
/RA/
Eugene Cobey, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-333 License No. DPR-59 Enclosure: NRC Inspection Report 05000333/2006009 ( )
Eugene Cobey, Chief Projects Branch 2 Division of Reactor Projects Docket No.
 
50-333 License No.
 
DPR-59 Enclosure: NRC Inspection Report 05000333/2006009 ( )
cc w/o encl:
cc w/o encl:
K. Mulligan, General Manager, Plant Operations J. Costedio, Manager Regulatory Compliance cc w/encl; w/SGI:
K. Mulligan, General Manager, Plant Operations J. Costedio, Manager Regulatory Compliance cc w/encl; w/SGI:
J. LaPlante, Site Security Manager, FitzPatrick Station J. Spath, State Liaison Officer to the NRC, State of New York F. Tabert, Homeland Security Advisor, State of New York
J. LaPlante, Site Security Manager, FitzPatrick Station J. Spath, State Liaison Officer to the NRC, State of New York F. Tabert, Homeland Security Advisor, State of New York
}}
}}

Latest revision as of 05:45, 15 January 2025

IR 05000333-06-009, James A. FitzPatrick Nuclear Generating Station; Ti 2515/168
ML062900532
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/17/2006
From: Cobey E
Reactor Projects Branch 2
To: Peter Dietrich
Entergy Nuclear Northeast
References
IR-06-009
Download: ML062900532 (3)


Text

October 17, 2006

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000333/2006009

Dear Mr. Dietrich:

On August 18, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your James A. Fitzpatrick Nuclear Power Plant. The enclosed inspection report documents the inspection results, which were discussed on September 19, 2006, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

WARNING: Violation of Section 147, Safeguards Information, of the Atomic Agency Act is subject to civil and criminal penalties.

Safeguards information determination made by:

Name/Title Barry C.Westreich, Chief Organization NSIR/DNS/SOS Basis 2/25/02 NRC Order Signature /RA/

Date 5/12/06 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Sincerely,

/RA/

Eugene Cobey, Chief Projects Branch 2 Division of Reactor Projects Docket No.

50-333 License No.

DPR-59 Enclosure: NRC Inspection Report 05000333/2006009 ( )

cc w/o encl:

K. Mulligan, General Manager, Plant Operations J. Costedio, Manager Regulatory Compliance cc w/encl; w/SGI:

J. LaPlante, Site Security Manager, FitzPatrick Station J. Spath, State Liaison Officer to the NRC, State of New York F. Tabert, Homeland Security Advisor, State of New York