{{#Wiki_filter: | {{#Wiki_filter:Oconee Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 03/01/2007 10:01:49 Report 22 2 | ||
OL RQ | |||
- REQUALIFICATION INSPECTION Baseline Inspections 03/26/2007 03/30/2007 1, 2, 3 7111111B IP Licensed Operator Requalification Program 1 | |||
PSB1-RP | |||
- RP PRE-INSP VISIT/ISFSI Baseline Inspections 04/10/2007 04/12/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 1 | |||
EB3-ISI | |||
- UNIT 2 INSERVICE INSPECTION Baseline Inspections 04/23/2007 04/27/2007 2 | |||
7111108P IP Inservice Inspection Activities - PWR 4 | |||
95002 | |||
- 95002 SUP INSPECT (MSPI, SSF, U3RBES) | |||
Supplemental Program 04/30/2007 05/04/2007 1, 2, 3 95002 IP Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perform 2 | |||
PSB1-RP | |||
- RP OCCUPATIONAL BASELINE INSP WK1 Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 71151 IP Performance Indicator Verification 1 | |||
EB1-SUMP | |||
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) | |||
Safety Issues 05/06/2007 05/11/2007 2 | |||
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] | |||
1 EB3SGISI | |||
- UNIT 2 STEAM GENERATOR ISI Baseline Inspections 05/07/2007 05/11/2007 2 | |||
7111108P IP Inservice Inspection Activities - PWR 3 | |||
PSB1-RP | |||
- RP OCCUPATIONAL BASELINE INSP WK2 Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 71151 IP Performance Indicator Verification 5 | |||
PB1-PI&R | |||
- BIENNIAL PI&R INSPECTION Baseline Inspections 07/09/2007 07/13/2007 1, 2, 3 71152B IP Identification and Resolution of Problems Baseline Inspections 07/23/2007 07/27/2007 1, 2, 3 71152B IP Identification and Resolution of Problems 1 | |||
60855.1 | |||
- OPERATIONAL ISFSI RESIDENT INSPECTION Other Routine 07/09/2007 07/13/2007 1 | |||
60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 4 | |||
OL PREP | |||
- INITIAL EXAM PREPARATION Not Applicable 08/06/2007 08/10/2007 1 | |||
V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 1 | |||
PSB1-EP | |||
- EP INSP Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111402 IP Alert and Notification System Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP01 IP Drill/Exercise Performance This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Package: ML070600231 Document: ML070600252 | |||
Oconee Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 03/01/2007 10:01:49 Report 22 1 | |||
PSB1-EP | |||
- EP INSP Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP03 IP Alert & Notification System 4 | |||
OL EXAM | |||
- INITIAL EXAM WEEK 1 Not Applicable 08/27/2007 08/31/2007 1 | |||
V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 3 | |||
OL EXAM | |||
- INITIAL EXAM WEEK 2 Not Applicable 09/10/2007 09/14/2007 1 | |||
V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 1 | |||
EB3-ISI | |||
- UNIT 3 INSERVICE INSPECTION Baseline Inspections 10/29/2007 11/02/2007 3 | |||
7111108P IP Inservice Inspection Activities - PWR 1 | |||
EB3SGISI | |||
- UNIT 3 STEAM GENERATOR ISI Baseline Inspections 11/05/2007 11/09/2007 3 | |||
7111108P IP Inservice Inspection Activities - PWR 8 | |||
EB1-CDBI | |||
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 01/14/2008 01/18/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 01/28/2008 02/01/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 02/11/2008 02/15/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 02/25/2008 02/29/2008 1, 2, 3 7111121 IP Component Design Bases Inspection 3 | |||
PSB1-EP | |||
- EP EXERCISE Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 7111401 IP Exercise Evaluation Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP03 IP Alert & Notification System 1 | |||
EB3-ISI | |||
- U-1 INSERVICE INSPECTION Baseline Inspections 04/07/2008 04/11/2008 1 | |||
7111108P IP Inservice Inspection Activities - PWR 1 | |||
PSB1-RP | |||
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 06/16/2008 06/18/2008 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 1 | |||
EB3 - MR | |||
- MAINT RULE Baseline Inspections 06/23/2008 06/27/2008 1, 2, 3 7111112B IP Maintenance Effectiveness 5 | |||
EB2-TFP | |||
- TRIENNIAL FIRE PROTECTION Baseline Inspections 07/01/2008 07/03/2008 1, 2, 3 7111105T IP Fire Protection [Triennial] | |||
Baseline Inspections 07/21/2008 07/25/2008 1, 2, 3 7111105T IP Fire Protection [Triennial] | |||
Baseline Inspections 08/04/2008 08/08/2008 1, 2, 3 7111105T IP Fire Protection [Triennial] | |||
4 PSB1-RP | |||
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | This report shows only on-site and announced inspection procedures. | ||
Oconee Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 03/01/2007 10:01:49 Report 22 4 | |||
PSB1-RP | |||
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 71151-PR01 IP RETS/ODCM Radiological Effluent 4 | |||
EB1-MODS | |||
- MODIFICATIONS-10CFR50.59 Baseline Inspections 08/11/2008 08/15/2008 1, 2, 3 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 08/11/2008 08/15/2008 1, 2, 3 7111117B IP Permanent Plant Modifications 2 | |||
OL PREP | |||
- INITIAL EXAM PREP Not Applicable 08/18/2008 08/22/2008 1 | |||
V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 3 | |||
OL EXAM | |||
- INITIAL EXAM WEEK 1 Not Applicable 09/08/2008 09/12/2008 1 | |||
V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 3 | |||
OL EXAM | |||
- INITIAL EXAM WEEK 2 Not Applicable 09/22/2008 09/26/2008 1 | |||
V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures.}} | This report shows only on-site and announced inspection procedures.}} | ||
Latest revision as of 03:03, 15 January 2025
| ML070600252 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/01/2007 |
| From: | NRC/RGN-II |
| To: | |
| Shared Package | |
| ML070600231 | List: |
| References | |
| Download: ML070600252 (3) | |
Text
Oconee Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 03/01/2007 10:01:49 Report 22 2
- REQUALIFICATION INSPECTION Baseline Inspections 03/26/2007 03/30/2007 1, 2, 3 7111111B IP Licensed Operator Requalification Program 1
PSB1-RP
- RP PRE-INSP VISIT/ISFSI Baseline Inspections 04/10/2007 04/12/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 1
EB3-ISI
- UNIT 2 INSERVICE INSPECTION Baseline Inspections 04/23/2007 04/27/2007 2
7111108P IP Inservice Inspection Activities - PWR 4
95002
- 95002 SUP INSPECT (MSPI, SSF, U3RBES)
Supplemental Program 04/30/2007 05/04/2007 1, 2, 3 95002 IP Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perform 2
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP WK1 Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 71151 IP Performance Indicator Verification 1
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Safety Issues 05/06/2007 05/11/2007 2
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
1 EB3SGISI
- UNIT 2 STEAM GENERATOR ISI Baseline Inspections 05/07/2007 05/11/2007 2
7111108P IP Inservice Inspection Activities - PWR 3
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP WK2 Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 71151 IP Performance Indicator Verification 5
PB1-PI&R
- BIENNIAL PI&R INSPECTION Baseline Inspections 07/09/2007 07/13/2007 1, 2, 3 71152B IP Identification and Resolution of Problems Baseline Inspections 07/23/2007 07/27/2007 1, 2, 3 71152B IP Identification and Resolution of Problems 1
60855.1
- OPERATIONAL ISFSI RESIDENT INSPECTION Other Routine 07/09/2007 07/13/2007 1
60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 4
OL PREP
- INITIAL EXAM PREPARATION Not Applicable 08/06/2007 08/10/2007 1
V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 1
PSB1-EP
- EP INSP Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111402 IP Alert and Notification System Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP01 IP Drill/Exercise Performance This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Package: ML070600231 Document: ML070600252
Oconee Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 03/01/2007 10:01:49 Report 22 1
PSB1-EP
- EP INSP Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP03 IP Alert & Notification System 4
OL EXAM
- INITIAL EXAM WEEK 1 Not Applicable 08/27/2007 08/31/2007 1
V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 3
OL EXAM
- INITIAL EXAM WEEK 2 Not Applicable 09/10/2007 09/14/2007 1
V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 1
EB3-ISI
- UNIT 3 INSERVICE INSPECTION Baseline Inspections 10/29/2007 11/02/2007 3
7111108P IP Inservice Inspection Activities - PWR 1
EB3SGISI
- UNIT 3 STEAM GENERATOR ISI Baseline Inspections 11/05/2007 11/09/2007 3
7111108P IP Inservice Inspection Activities - PWR 8
EB1-CDBI
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 01/14/2008 01/18/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 01/28/2008 02/01/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 02/11/2008 02/15/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 02/25/2008 02/29/2008 1, 2, 3 7111121 IP Component Design Bases Inspection 3
PSB1-EP
- EP EXERCISE Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 7111401 IP Exercise Evaluation Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP03 IP Alert & Notification System 1
EB3-ISI
- U-1 INSERVICE INSPECTION Baseline Inspections 04/07/2008 04/11/2008 1
7111108P IP Inservice Inspection Activities - PWR 1
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 06/16/2008 06/18/2008 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 1
EB3 - MR
- MAINT RULE Baseline Inspections 06/23/2008 06/27/2008 1, 2, 3 7111112B IP Maintenance Effectiveness 5
EB2-TFP
- TRIENNIAL FIRE PROTECTION Baseline Inspections 07/01/2008 07/03/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]
Baseline Inspections 07/21/2008 07/25/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]
Baseline Inspections 08/04/2008 08/08/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]
4 PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Oconee Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 03/01/2007 10:01:49 Report 22 4
PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 71151-PR01 IP RETS/ODCM Radiological Effluent 4
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 08/11/2008 08/15/2008 1, 2, 3 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 08/11/2008 08/15/2008 1, 2, 3 7111117B IP Permanent Plant Modifications 2
OL PREP
- INITIAL EXAM PREP Not Applicable 08/18/2008 08/22/2008 1
V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 3
OL EXAM
- INITIAL EXAM WEEK 1 Not Applicable 09/08/2008 09/12/2008 1
V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 3
OL EXAM
- INITIAL EXAM WEEK 2 Not Applicable 09/22/2008 09/26/2008 1
V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.