{{#Wiki_filter:Page 1 of 3                                                                                      Oconee 03/01/2007    10:01:49                                                                Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit                                                                                                                          No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                                        on Site       Start    End              Type OL RQ         - REQUALIFICATION INSPECTION                                                                                 2 1, 2, 3       IP 7111111B              Licensed Operator Requalification Program                                                             03/26/2007 03/30/2007 Baseline Inspections PSB1-RP       - RP PRE-INSP VISIT/ISFSI                                                                                   1 1, 2, 3       IP 7112101              Access Control to Radiologically Significant Areas                                                   04/10/2007 04/12/2007 Baseline Inspections EB3-ISI       - UNIT 2 INSERVICE INSPECTION                                                                               1 2          IP 7111108P              Inservice Inspection Activities - PWR                                                                04/23/2007 04/27/2007 Baseline Inspections 95002         - 95002 SUP INSPECT (MSPI, SSF, U3RBES)                                                                     4 1, 2, 3       IP 95002                Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perform             04/30/2007 05/04/2007 Supplemental Program PSB1-RP        - RP OCCUPATIONAL BASELINE INSP WK1                                                                          2 1, 2, 3       IP 7112101              Access Control to Radiologically Significant Areas                                                   04/30/2007 05/04/2007 Baseline Inspections 1, 2, 3       IP 7112102              ALARA Planning and Controls                                                                           04/30/2007 05/04/2007 Baseline Inspections 1, 2, 3       IP 7112202              Radioactive Material Processing and Transportation                                                   04/30/2007 05/04/2007 Baseline Inspections 1, 2, 3       IP 71151                Performance Indicator Verification                                                                   04/30/2007 05/04/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)                                                                           1 2           IP 2515/166             Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]                     05/06/2007 05/11/2007 Safety Issues EB3SGISI       - UNIT 2 STEAM GENERATOR ISI                                                                                 1 2          IP 7111108P              Inservice Inspection Activities - PWR                                                                05/07/2007 05/11/2007 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL BASELINE INSP WK2                                                                         3 1, 2, 3       IP 7112101              Access Control to Radiologically Significant Areas                                                   05/14/2007 05/18/2007 Baseline Inspections 1, 2, 3       IP 7112102              ALARA Planning and Controls                                                                           05/14/2007 05/18/2007 Baseline Inspections 1, 2, 3       IP 7112202              Radioactive Material Processing and Transportation                                                   05/14/2007 05/18/2007 Baseline Inspections 1, 2, 3       IP 71151                Performance Indicator Verification                                                                   05/14/2007 05/18/2007 Baseline Inspections PB1-PI&R       - BIENNIAL PI&R INSPECTION                                                                                   5 1, 2, 3        IP 71152B                Identification and Resolution of Problems                                                            07/09/2007 07/13/2007 Baseline Inspections 1, 2, 3       IP 71152B                Identification and Resolution of Problems                                                             07/23/2007 07/27/2007 Baseline Inspections 60855.1       - OPERATIONAL ISFSI RESIDENT INSPECTION                                                                     1 1             IP 60855.1               Operation of an Independent Spent Fuel Storage Installation at Operating Plants                       07/09/2007 07/13/2007 Other Routine OL PREP        - INITIAL EXAM PREPARATION                                                                                  4 1                 V23266               OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES                                                           08/06/2007 08/10/2007 Not Applicable PSB1-EP        - EP INSP                                                                                                    1 1, 2, 3       IP 7111402              Alert and Notification System Testing                                                                 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3       IP 7111403              Emergency Response Organization Augmentation Testing                                                 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3       IP 7111404              Emergency Action Level and Emergency Plan Changes                                                     08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3       IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies                                     08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3       IP 71151-EP01           Drill/Exercise Performance                                                                           08/06/2007 08/10/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.                                                 Package: ML070600231 Document: ML070600252 This report shows only on-site and announced inspection procedures.
{{#Wiki_filter:Oconee Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 03/01/2007 10:01:49 Report 22 2
OL RQ
- REQUALIFICATION INSPECTION Baseline Inspections 03/26/2007 03/30/2007 1, 2, 3 7111111B IP Licensed Operator Requalification Program 1
PSB1-RP
- RP PRE-INSP VISIT/ISFSI Baseline Inspections 04/10/2007 04/12/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 1
EB3-ISI
- UNIT 2 INSERVICE INSPECTION Baseline Inspections 04/23/2007 04/27/2007 2
7111108P IP Inservice Inspection Activities - PWR 4
95002
- 95002 SUP INSPECT (MSPI, SSF, U3RBES)
Supplemental Program 04/30/2007 05/04/2007 1, 2, 3 95002 IP Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perform 2
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP WK1 Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 71151 IP Performance Indicator Verification 1
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Safety Issues 05/06/2007 05/11/2007 2
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
1 EB3SGISI
- UNIT 2 STEAM GENERATOR ISI Baseline Inspections 05/07/2007 05/11/2007 2
7111108P IP Inservice Inspection Activities - PWR 3
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP WK2 Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 71151 IP Performance Indicator Verification 5
PB1-PI&R
- BIENNIAL PI&R INSPECTION Baseline Inspections 07/09/2007 07/13/2007 1, 2, 3 71152B IP Identification and Resolution of Problems Baseline Inspections 07/23/2007 07/27/2007 1, 2, 3 71152B IP Identification and Resolution of Problems 1
60855.1
- OPERATIONAL ISFSI RESIDENT INSPECTION Other Routine 07/09/2007 07/13/2007 1
60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 4
OL PREP
- INITIAL EXAM PREPARATION Not Applicable 08/06/2007 08/10/2007 1
V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 1
PSB1-EP
- EP INSP Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111402 IP Alert and Notification System Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP01 IP Drill/Exercise Performance This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Package: ML070600231 Document: ML070600252


Page 2 of 3                                                                                      Oconee 03/01/2007    10:01:49                                                                Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit                                                                                                          No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                        on Site       Start    End            Type PSB1-EP       - EP INSP                                                                                   1 1, 2, 3       IP 71151-EP02           ERO Drill Participation                                                               08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3       IP 71151-EP03           Alert & Notification System                                                           08/06/2007 08/10/2007 Baseline Inspections OL EXAM       - INITIAL EXAM WEEK 1                                                                       4 1                V23266                OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES                                          08/27/2007 08/31/2007 Not Applicable OL EXAM        - INITIAL EXAM WEEK 2                                                                        3 1                 V23266               OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES                                           09/10/2007 09/14/2007 Not Applicable EB3-ISI       - UNIT 3 INSERVICE INSPECTION                                                               1 3        IP 7111108P              Inservice Inspection Activities - PWR                                                10/29/2007 11/02/2007 Baseline Inspections EB3SGISI       - UNIT 3 STEAM GENERATOR ISI                                                                 1 3        IP 7111108P              Inservice Inspection Activities - PWR                                                11/05/2007 11/09/2007 Baseline Inspections EB1-CDBI       - COMPONENT DESIGN BASES INSPECTION                                                         8 1, 2, 3        IP 7111121              Component Design Bases Inspection                                                    01/14/2008 01/18/2008 Baseline Inspections 1, 2, 3       IP 7111121              Component Design Bases Inspection                                                     01/28/2008 02/01/2008 Baseline Inspections 1, 2, 3       IP 7111121              Component Design Bases Inspection                                                     02/11/2008 02/15/2008 Baseline Inspections 1, 2, 3       IP 7111121              Component Design Bases Inspection                                                     02/25/2008 02/29/2008 Baseline Inspections PSB1-EP       - EP EXERCISE                                                                               3 1, 2, 3       IP 7111401              Exercise Evaluation                                                                   03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3       IP 7111404              Emergency Action Level and Emergency Plan Changes                                     03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3       IP 71151-EP01           Drill/Exercise Performance                                                           03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3       IP 71151-EP02           ERO Drill Participation                                                               03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3       IP 71151-EP03           Alert & Notification System                                                           03/10/2008 03/14/2008 Baseline Inspections EB3-ISI       - U-1 INSERVICE INSPECTION                                                                   1 1              IP 7111108P              Inservice Inspection Activities - PWR                                                04/07/2008 04/11/2008 Baseline Inspections PSB1-RP       - RADIATION PROTECTION PREINSPECTION VISIT                                                   1 1, 2, 3       IP 7112101              Access Control to Radiologically Significant Areas                                   06/16/2008 06/18/2008 Baseline Inspections EB3 - MR      - MAINT RULE                                                                                1 1, 2, 3       IP 7111112B              Maintenance Effectiveness                                                             06/23/2008 06/27/2008 Baseline Inspections EB2-TFP       - TRIENNIAL FIRE PROTECTION                                                                 5 1, 2, 3        IP 7111105T              Fire Protection [Triennial]                                                          07/01/2008 07/03/2008 Baseline Inspections 1, 2, 3       IP 7111105T              Fire Protection [Triennial]                                                           07/21/2008 07/25/2008 Baseline Inspections 1, 2, 3       IP 7111105T              Fire Protection [Triennial]                                                           08/04/2008 08/08/2008 Baseline Inspections PSB1-RP       - RADIATION PROTECTION PUBLIC BASELINE                                                       4 1, 2, 3       IP 7112101              Access Control to Radiologically Significant Areas                                   07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3       IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                         07/14/2008 07/18/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
Oconee Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 03/01/2007 10:01:49 Report 22 1
PSB1-EP
- EP INSP Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP03 IP Alert & Notification System 4
OL EXAM
- INITIAL EXAM WEEK 1 Not Applicable 08/27/2007 08/31/2007 1
V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 3
OL EXAM
- INITIAL EXAM WEEK 2 Not Applicable 09/10/2007 09/14/2007 1
V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 1
EB3-ISI
- UNIT 3 INSERVICE INSPECTION Baseline Inspections 10/29/2007 11/02/2007 3
7111108P IP Inservice Inspection Activities - PWR 1
EB3SGISI
- UNIT 3 STEAM GENERATOR ISI Baseline Inspections 11/05/2007 11/09/2007 3
7111108P IP Inservice Inspection Activities - PWR 8
EB1-CDBI
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 01/14/2008 01/18/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 01/28/2008 02/01/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 02/11/2008 02/15/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 02/25/2008 02/29/2008 1, 2, 3 7111121 IP Component Design Bases Inspection 3
PSB1-EP
- EP EXERCISE Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 7111401 IP Exercise Evaluation Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP03 IP Alert & Notification System 1
EB3-ISI
- U-1 INSERVICE INSPECTION Baseline Inspections 04/07/2008 04/11/2008 1
7111108P IP Inservice Inspection Activities - PWR 1
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 06/16/2008 06/18/2008 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 1
EB3 - MR
- MAINT RULE Baseline Inspections 06/23/2008 06/27/2008 1, 2, 3 7111112B IP Maintenance Effectiveness 5
EB2-TFP
- TRIENNIAL FIRE PROTECTION Baseline Inspections 07/01/2008 07/03/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]
Baseline Inspections 07/21/2008 07/25/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]
Baseline Inspections 08/04/2008 08/08/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]
4 PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 3 of 3                                                                                    Oconee 03/01/2007    10:01:49                                                              Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit                                                                                                                        No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                  Title                                          on Site       Start    End            Type PSB1-RP       - RADIATION PROTECTION PUBLIC BASELINE                                                                     4 1, 2, 3       IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                             07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3       IP 7112203              Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P             07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3       IP 71151-OR01           Occupational Exposure Control Effectiveness                                                         07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3       IP 71151-PR01           RETS/ODCM Radiological Effluent                                                                     07/14/2008 07/18/2008 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59                                                                                       4 1, 2, 3       IP 7111102              Evaluation of Changes, Tests, or Experiments                                                         08/11/2008 08/15/2008 Baseline Inspections 1, 2, 3       IP 7111117B              Permanent Plant Modifications                                                                       08/11/2008 08/15/2008 Baseline Inspections OL PREP       - INITIAL EXAM PREP                                                                                         2 1                V23286                OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES                                                      08/18/2008 08/22/2008 Not Applicable OL EXAM        - INITIAL EXAM WEEK 1                                                                                       3 1                V23286               OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES                                                       09/08/2008 09/12/2008 Not Applicable OL EXAM        - INITIAL EXAM WEEK 2                                                                                      3 1                 V23286               OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES                                                       09/22/2008 09/26/2008 Not Applicable This report does not include INPO and OUTAGE activities.
Oconee Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 03/01/2007 10:01:49 Report 22 4
PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 71151-PR01 IP RETS/ODCM Radiological Effluent 4
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 08/11/2008 08/15/2008 1, 2, 3 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 08/11/2008 08/15/2008 1, 2, 3 7111117B IP Permanent Plant Modifications 2
OL PREP
- INITIAL EXAM PREP Not Applicable 08/18/2008 08/22/2008 1
V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 3
OL EXAM
- INITIAL EXAM WEEK 1 Not Applicable 09/08/2008 09/12/2008 1
V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 3
OL EXAM
- INITIAL EXAM WEEK 2 Not Applicable 09/22/2008 09/26/2008 1
V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 03:03, 15 January 2025

Inspection/Activity Plan 03/01/2007 - 09/30/2008
ML070600252
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/01/2007
From:
NRC/RGN-II
To:
Shared Package
ML070600231 List:
References
Download: ML070600252 (3)


Text

Oconee Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 03/01/2007 10:01:49 Report 22 2

OL RQ

- REQUALIFICATION INSPECTION Baseline Inspections 03/26/2007 03/30/2007 1, 2, 3 7111111B IP Licensed Operator Requalification Program 1

PSB1-RP

- RP PRE-INSP VISIT/ISFSI Baseline Inspections 04/10/2007 04/12/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 1

EB3-ISI

- UNIT 2 INSERVICE INSPECTION Baseline Inspections 04/23/2007 04/27/2007 2

7111108P IP Inservice Inspection Activities - PWR 4

95002

- 95002 SUP INSPECT (MSPI, SSF, U3RBES)

Supplemental Program 04/30/2007 05/04/2007 1, 2, 3 95002 IP Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perform 2

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WK1 Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 71151 IP Performance Indicator Verification 1

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)

Safety Issues 05/06/2007 05/11/2007 2

2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

1 EB3SGISI

- UNIT 2 STEAM GENERATOR ISI Baseline Inspections 05/07/2007 05/11/2007 2

7111108P IP Inservice Inspection Activities - PWR 3

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WK2 Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 71151 IP Performance Indicator Verification 5

PB1-PI&R

- BIENNIAL PI&R INSPECTION Baseline Inspections 07/09/2007 07/13/2007 1, 2, 3 71152B IP Identification and Resolution of Problems Baseline Inspections 07/23/2007 07/27/2007 1, 2, 3 71152B IP Identification and Resolution of Problems 1

60855.1

- OPERATIONAL ISFSI RESIDENT INSPECTION Other Routine 07/09/2007 07/13/2007 1

60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 4

OL PREP

- INITIAL EXAM PREPARATION Not Applicable 08/06/2007 08/10/2007 1

V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 1

PSB1-EP

- EP INSP Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111402 IP Alert and Notification System Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP01 IP Drill/Exercise Performance This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Package: ML070600231 Document: ML070600252

Oconee Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 03/01/2007 10:01:49 Report 22 1

PSB1-EP

- EP INSP Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP03 IP Alert & Notification System 4

OL EXAM

- INITIAL EXAM WEEK 1 Not Applicable 08/27/2007 08/31/2007 1

V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 3

OL EXAM

- INITIAL EXAM WEEK 2 Not Applicable 09/10/2007 09/14/2007 1

V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 1

EB3-ISI

- UNIT 3 INSERVICE INSPECTION Baseline Inspections 10/29/2007 11/02/2007 3

7111108P IP Inservice Inspection Activities - PWR 1

EB3SGISI

- UNIT 3 STEAM GENERATOR ISI Baseline Inspections 11/05/2007 11/09/2007 3

7111108P IP Inservice Inspection Activities - PWR 8

EB1-CDBI

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 01/14/2008 01/18/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 01/28/2008 02/01/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 02/11/2008 02/15/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 02/25/2008 02/29/2008 1, 2, 3 7111121 IP Component Design Bases Inspection 3

PSB1-EP

- EP EXERCISE Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 7111401 IP Exercise Evaluation Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP03 IP Alert & Notification System 1

EB3-ISI

- U-1 INSERVICE INSPECTION Baseline Inspections 04/07/2008 04/11/2008 1

7111108P IP Inservice Inspection Activities - PWR 1

PSB1-RP

- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 06/16/2008 06/18/2008 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 1

EB3 - MR

- MAINT RULE Baseline Inspections 06/23/2008 06/27/2008 1, 2, 3 7111112B IP Maintenance Effectiveness 5

EB2-TFP

- TRIENNIAL FIRE PROTECTION Baseline Inspections 07/01/2008 07/03/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]

Baseline Inspections 07/21/2008 07/25/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]

Baseline Inspections 08/04/2008 08/08/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]

4 PSB1-RP

- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Oconee Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 03/01/2007 10:01:49 Report 22 4

PSB1-RP

- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 71151-PR01 IP RETS/ODCM Radiological Effluent 4

EB1-MODS

- MODIFICATIONS-10CFR50.59 Baseline Inspections 08/11/2008 08/15/2008 1, 2, 3 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 08/11/2008 08/15/2008 1, 2, 3 7111117B IP Permanent Plant Modifications 2

OL PREP

- INITIAL EXAM PREP Not Applicable 08/18/2008 08/22/2008 1

V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 3

OL EXAM

- INITIAL EXAM WEEK 1 Not Applicable 09/08/2008 09/12/2008 1

V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 3

OL EXAM

- INITIAL EXAM WEEK 2 Not Applicable 09/22/2008 09/26/2008 1

V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.