ML071940242: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
Line 21: Line 21:


==Dear Sir:==
==Dear Sir:==
              "-. *


==Subject:==
==Subject:==
Line 33: Line 31:
: .:,-The PSEG proposed license amendment would increase, the NRC authorized, reactor.
: .:,-The PSEG proposed license amendment would increase, the NRC authorized, reactor.
power level from 3339 !megawatts thermal (MV) to 3840 MWt, an increase of approximately 15 percentt.a..
power level from 3339 !megawatts thermal (MV) to 3840 MWt, an increase of approximately 15 percentt.a..
                  .
percent..
percent..
                      ..    . :;:*
                             ,,-.        :..    *...  :.::,>...-....      .x.:      .:.....        ., . .;. -.  .    -:    -'        .,  " .
                             ,,-.        :..    *...  :.::,>...-....      .x.:      .:.....        ., . .;. -.  .    -:    -'        .,  " .
The New.Jersey Department of Environmental Protection's (DEP) Bure au of Nuclear Engineering (BNE) has reviewed both the proposed Facility Operating License amendment and the proposed No SignificantHazardsCgonsideration Determination. Based on these reviews in conjunction with variousldiscussionsand-meetings with the NRC and PSEG, the BNE has no comments on either the-proposed amendment or the proposed no significant hazards determination.,,:                ,                            -    ,          .-                                    *'".'
The New.Jersey Department of Environmental Protection's (DEP) Bure au of Nuclear Engineering (BNE) has reviewed both the proposed Facility Operating License amendment and the proposed No SignificantHazardsCgonsideration Determination. Based on these reviews in conjunction with variousldiscussionsand-meetings with the NRC and PSEG, the BNE has no comments on either the-proposed amendment or the proposed no significant hazards determination.,,:                ,                            -    ,          .-                                    *'".'

Revision as of 12:57, 13 March 2020

Comment (1) of Patrick Mulligan on Behalf of New Jersey Dept. of Environmental Protection Bureau of Nuclear Engineering, Regarding Hope Creek License Change Request (LCR) H05-01 Extended Power Uprate
ML071940242
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/01/2007
From: Mulligan P
State of NJ, Dept of Environmental Protection
To:
Rulemaking, Directives, and Editing Branch
References
72FR244627 00001, 72FR24627 00001
Download: ML071940242 (2)


Text

Optate of Xew 3Jerse" DEPARTMENT OF ENViIRONMENTAL PROTECTION JON S. CORZINE Division of Environnnental Safety and Health LISA P. JACKSON Governor Radiation Protection and Release Prevention Element Commissioner Bureau of Nu clear Engineering PO1 3ox 415 Trenton, New Jrersey 08625-0415 Phone: (609) 984-7700 Fax: (609)984-7513

,7 C-n June 1, 2007 7 )D Chief CQ Rulemaking, Directives and Editing Branch cf)

Division of Administrative Services Office of Administration United States Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sir:

Subject:

Hope Creek Generating Station (HCGS)

Docket N.5-5

..:,.."License Change Request (LCR) H05-01:,:

Extended Power Uprate On-May 3, -2007 the Nuclear Regulatory Commission (NRC),had published in the Federal Register (Volume 72, Number 85, pages 24627 - 24630) a Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for. a Hearing for the. PSEG Nuclear. LTIC (PSEG) proposed.

extended.power.*aprate amendment to the Hjope Creek Generating Station.Facility. Oprating "

License No. NPF-57.

.:,-The PSEG proposed license amendment would increase, the NRC authorized, reactor.

power level from 3339 !megawatts thermal (MV) to 3840 MWt, an increase of approximately 15 percentt.a..

percent..

,,-.  :.. *...  :.::,>...-.... .x.: .:..... ., . .;. -. . -: -' ., " .

The New.Jersey Department of Environmental Protection's (DEP) Bure au of Nuclear Engineering (BNE) has reviewed both the proposed Facility Operating License amendment and the proposed No SignificantHazardsCgonsideration Determination. Based on these reviews in conjunction with variousldiscussionsand-meetings with the NRC and PSEG, the BNE has no comments on either the-proposed amendment or the proposed no significant hazards determination.,,: , - , .- *'".'

6 &k~. 2 ~ 3~'~e~- 7.~,~~/67ie4~i2

":;ý. /-/ X,ýl C-_

New Jersey Is An Equal Opportunity Employer 0 Printedon Recycled Paperand Recyclable

If you have any questions, please contact Jerry Humphreys at (609) 984-7469.

SincerelX yours, Patrick Mulligan Acting Manager, BNE c: R. Pinney, New'Jersey DEP N. McNamara, NRC Region I State Liaison Officer R. Ennis, NRC Hope Creek Project Manager J. Shea, NRC Hope Creek Extended Power Uprate Project Manager M. Gaffney, PSEG Hope Creek Regulatory Assurance