{{#Wiki_filter:June 25, 2018
{{#Wiki_filter:June 25, 2018  
Mr. David B. Hamilton
Site Vice President
Mr. David B. Hamilton  
FirstEnergy Nuclear Operating Company
Site Vice President
Perry Nuclear Power Plant
FirstEnergy Nuclear Operating Company  
Reg Affairs-A210
Perry Nuclear Power Plant  
10 Center Road, P.O. Box 97
Reg Affairs-A210  
Perry, OH 44081-0097
10 Center Road, P.O. Box 97
SUBJECT: PERRY NUCLEAR POWER PLANTNOTIFICATION OF NRC TRIENNIAL FIRE
Perry, OH 44081-0097  
            PROTECTION BASELINE INSPECTION AND REQUEST FOR INFORMATION;
            INSPECTION REPORT 05000440/2018011
SUBJECT: PERRY NUCLEAR POWER PLANTNOTIFICATION OF NRC TRIENNIAL FIRE  
Dear Mr. Hamilton:
PROTECTION BASELINE INSPECTION AND REQUEST FOR INFORMATION;  
On September 17, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin a Triennial
INSPECTION REPORT 05000440/2018011  
Fire Protection Baseline Inspection at your Perry Nuclear Power Plant. This inspection will be
performed in accordance with Inspection Procedure (IP) 71111.05T, the NRCs Baseline Fire
Dear Mr. Hamilton:  
Protection IP.
Changes were made to the IP 71111.05T which now requires the Fire Protection Inspection to
On September 17, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin a Triennial  
review your actions to mitigate postulated events that could potentially cause loss of large
Fire Protection Baseline Inspection at your Perry Nuclear Power Plant. This inspection will be  
areas of power reactor facilities due to explosions or fires. This requirement was implemented
performed in accordance with Inspection Procedure (IP) 71111.05T, the NRCs Baseline Fire  
by the issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b,
Protection IP.  
and the subsequent requirements of Title 10 of the Code of Federal Regulations,
Part 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this
Changes were made to the IP 71111.05T which now requires the Fire Protection Inspection to  
inspection, the B.5.b requirements review will be performed during the first onsite week of the
review your actions to mitigate postulated events that could potentially cause loss of large  
inspection starting on September 19, 2018.
areas of power reactor facilities due to explosions or fires. This requirement was implemented  
The schedule for the onsite inspection activity is as follows:
by the issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b,  
      Information Gathering Visit: September 17-18, 2018;
and the subsequent requirements of Title 10 of the Code of Federal Regulations,  
      B.5.b Requirements:           September 19-21, 2018; and
Part 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this  
      Fire Protection Inspection:   October 1-5, 2018, and October 15-19, 2018.
inspection, the B.5.b requirements review will be performed during the first onsite week of the  
inspection starting on September 19, 2018.  
The schedule for the onsite inspection activity is as follows:  
Information Gathering Visit: September 17-18, 2018;  
B.5.b Requirements:  
September 19-21, 2018; and  
Fire Protection Inspection:  
October 1-5, 2018, and October 15-19, 2018.  


D. Hamilton                                     -2-
D. Hamilton  
The purpose of the information gathering visit is: (1) to obtain information and documentation
-2-  
needed to support the inspection; (2) to become familiar with the Perry Nuclear Power Plant Fire
Protection Programs, fire protection features, post-fire safe shutdown capabilities, and plant
The purpose of the information gathering visit is: (1) to obtain information and documentation  
layout; and (3) to arrange administrative details, such as office space, availability of
needed to support the inspection; (2) to become familiar with the Perry Nuclear Power Plant Fire  
knowledgeable office personnel and to ensure unescorted site access privileges.
Protection Programs, fire protection features, post-fire safe shutdown capabilities, and plant  
Experience has shown that the Baseline Fire Protection Inspections are extremely resource
layout; and (3) to arrange administrative details, such as office space, availability of  
intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection
knowledgeable office personnel and to ensure unescorted site access privileges.  
impact on the site and to ensure a productive inspection for both organizations, we have
enclosed a request for documents needed for the inspection. These documents have been
Experience has shown that the Baseline Fire Protection Inspections are extremely resource  
divided into four groups.
intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection  
      The first group lists information necessary to aid the inspection team in choosing specific
impact on the site and to ensure a productive inspection for both organizations, we have  
        focus areas for the inspection. It is requested that this information be provided to the
enclosed a request for documents needed for the inspection. These documents have been  
        lead inspector via mail or electronically no later than August 24, 2018.
divided into four groups.
      The second group also lists information and areas for discussion necessary to aid the
        inspection team in choosing specific fire protection focus areas for the inspection and
        to ensure that the inspection team is adequately prepared for the inspection. It is
The first group lists information necessary to aid the inspection team in choosing specific  
        requested this information be available during the information gathering visit on
focus areas for the inspection. It is requested that this information be provided to the  
        September 17, 2018.
lead inspector via mail or electronically no later than August 24, 2018.
      The third group of requested documents consists of those items that the team will
        review, or need access to, during the inspection. Please have this information available
        by the first day of the second onsite inspection week beginning October 1, 2018.
The second group also lists information and areas for discussion necessary to aid the  
      The fourth group lists the information necessary to aid the inspection team in tracking
inspection team in choosing specific fire protection focus areas for the inspection and  
        issues identified as a result of the inspection. It is requested that this information be
to ensure that the inspection team is adequately prepared for the inspection. It is  
        provided to the lead inspector as the information is generated during the inspection. It is
requested this information be available during the information gathering visit on  
        important that all of these documents are up to date and complete in order to minimize
September 17, 2018.
        the number of additional documents requested during the preparation and/or the onsite
        portions of the inspection.
The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory
The third group of requested documents consists of those items that the team will  
contact for this inspection is Mr. George Dujanovic of your organization. If there are any
review, or need access to, during the inspection. Please have this information available  
questions about the inspection or the material requested, please contact the lead inspector at
by the first day of the second onsite inspection week beginning October 1, 2018.
630-829-9810 or via e-mail at Alan.Dahbur@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
The fourth group lists the information necessary to aid the inspection team in tracking  
collection requirements were approved by the Office of Management and Budget, Control
issues identified as a result of the inspection. It is requested that this information be  
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
provided to the lead inspector as the information is generated during the inspection. It is  
respond to, a request for information or an information collection requirement unless the
important that all of these documents are up to date and complete in order to minimize  
requesting document displays a currently valid Office of Management and Budget Control
the number of additional documents requested during the preparation and/or the onsite  
Number.
portions of the inspection.  
The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory  
contact for this inspection is Mr. George Dujanovic of your organization. If there are any  
questions about the inspection or the material requested, please contact the lead inspector at  
630-829-9810 or via e-mail at Alan.Dahbur@nrc.gov.  
This letter does not contain new or amended information collection requirements subject  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
collection requirements were approved by the Office of Management and Budget, Control  
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
respond to, a request for information or an information collection requirement unless the  
requesting document displays a currently valid Office of Management and Budget Control  
Number.  


D. Hamilton                                 -3-
D. Hamilton  
This letter and its enclosure will be made available for public inspection and copying at
-3-  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
This letter and its enclosure will be made available for public inspection and copying at  
                                            Sincerely,
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
                                            /RA Dariusz Szwarc Acting for/
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.  
                                            Alan Dahbur, Senior Reactor Inspector
                                            Engineering Branch 3
Sincerely,  
                                            Division of Reactor Safety
Docket No. 50-440
/RA Dariusz Szwarc Acting for/  
License No. NPF-58
Enclosure:
Document Request for Fire Protection
Alan Dahbur, Senior Reactor Inspector  
  Inspection
Engineering Branch 3  
cc: Distribution via LISTSERV
Division of Reactor Safety  
Docket No. 50-440  
License No. NPF-58  
Enclosure:  
Document Request for Fire Protection
  Inspection
   
cc: Distribution via LISTSERV  


D. Hamilton                               -4-
D. Hamilton  
Letter to David B. Hamilton from Alan Dahbur dated June 25, 2018
-4-  
SUBJECT: PERRY NUCLEAR POWER PLANTNOTIFICATION OF NRC TRIENNIAL FIRE
            PROTECTION BASELINE INSPECTION AND REQUEST FOR INFORMATION;
Letter to David B. Hamilton from Alan Dahbur dated June 25, 2018  
            INSPECTION REPORT 05000440/2018011
DISTRIBUTION:
SUBJECT: PERRY NUCLEAR POWER PLANTNOTIFICATION OF NRC TRIENNIAL FIRE  
Jeremy Bowen
PROTECTION BASELINE INSPECTION AND REQUEST FOR INFORMATION;  
RidsNrrPMPerry Resource
INSPECTION REPORT 05000440/2018011  
RidsNrrDorlLpl3
RidsNrrDirsIrib Resource
DISTRIBUTION:  
Steven West
Jeremy Bowen  
Darrell Roberts
RidsNrrPMPerry Resource  
Richard Skokowski
RidsNrrDorlLpl3  
Allan Barker
RidsNrrDirsIrib Resource  
DRPIII
Steven West  
DRSIII
Darrell Roberts  
ADAMS Accession Number ML: 18176A374
Richard Skokowski  
OFFICE RIII                       RIII             RIII       RIII
Allan Barker  
  NAME       ADahbur:cl
DRPIII  
  DATE       06/25/18
DRSIII  
                                  OFFICIAL RECORD COPY
ADAMS Accession Number ML: 18176A374  
OFFICE  
RIII  
RIII  
RIII  
RIII  
   
NAME  
ADahbur:cl  
   
DATE  
06/25/18  
OFFICIAL RECORD COPY  


                DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION  
Inspection Report:                       05000440/2018011
Enclosure
Onsite Inspection Dates:                 September 17-18, 2018           (Information Gathering Visit)
Inspection Report:  
                                        September 19-21, 2018           (B.5.b Requirements)
05000440/2018011  
                                        October 1-5, 2018               (Fire Protection Inspection)
                                        October 15-19, 2018             (Fire Protection Inspection)
Inspection Procedures:                   IP 71111.05T, Fire Protection (Triennial)
Onsite Inspection Dates:  
                                        IP 71152, Identification and Resolution of Problems
September 17-18, 2018  
Inspectors:                             Alan Dahbur, Lead Inspector
(Information Gathering Visit)  
                                        630-829-9810
September 19-21, 2018  
                                        Alan.Dahbur@nrc.gov
(B.5.b Requirements)  
                                        Atif Shaikh,                   Ijaz Hafeez,
October 1-5, 2018  
                                        Senior Reactor Inspector       Reactor Inspector
(Fire Protection Inspection)  
                                        630-829-9824                   630-829-9843
October 15-19, 2018  
                                        Atif.Shaikh@nrc.gov             Ijaz.Hafeez@nrc.gov
(Fire Protection Inspection)  
I.     Information Requested Prior To the Information Gathering Visit
      The following information is requested by August 24, 2018. If you have any questions
      regarding this request, please call the lead inspector as soon as possible. All
Inspection Procedures:  
      information should be sent to Alan Dahbur (e-mail address Alan Dahbur@nrc.gov).
IP 71111.05T, Fire Protection (Triennial)  
      Electronic media is preferred. The preferred file format is a searchable pdf file on a
IP 71152, Identification and Resolution of Problems  
      compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of
      use, if possible. Please provide three copies of each CD submitted (one for each
      inspector).
Inspectors:  
      1.       The most risk-significant fire areas as determined by probabilistic risk analyses, if
Alan Dahbur, Lead Inspector  
                available. Otherwise, the reactor plant's Individual Plant Examination for External
630-829-9810  
                Events for fire and results of any post- Individual Plant Examination for External
Alan.Dahbur@nrc.gov  
                Events reviews for fire.
      2.       A copy of the current version of the Fire Protection Program, fire hazards
                analysis, safe shutdown analysis, updated safety analysis report, technical
Atif Shaikh,  
                specifications, license (including the fire protection license condition), and
Ijaz Hafeez,  
                technical requirements manual or equivalent for fire protection structures,
Senior Reactor Inspector  
                systems, and components.
Reactor Inspector  
      3.       A list of fire areas requiring alternative shutdown capability, (i.e., those areas for
630-829-9824  
                which Title 10 of the Code of Federal Regulations (CFR), Part 50, Appendix R,
630-829-9843  
                Section III.G, requirements are satisfied under Section III.G.3), or where both
Atif.Shaikh@nrc.gov  
                safe shutdown trains can be affected.
Ijaz.Hafeez@nrc.gov  
                                                                                            Enclosure
I.  
Information Requested Prior To the Information Gathering Visit  
The following information is requested by August 24, 2018. If you have any questions  
regarding this request, please call the lead inspector as soon as possible. All  
information should be sent to Alan Dahbur (e-mail address Alan Dahbur@nrc.gov).
Electronic media is preferred. The preferred file format is a searchable pdf file on a  
compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of  
use, if possible. Please provide three copies of each CD submitted (one for each  
inspector).  
1.  
The most risk-significant fire areas as determined by probabilistic risk analyses, if  
available. Otherwise, the reactor plant's Individual Plant Examination for External  
Events for fire and results of any post- Individual Plant Examination for External  
Events reviews for fire.  
2.  
A copy of the current version of the Fire Protection Program, fire hazards  
analysis, safe shutdown analysis, updated safety analysis report, technical  
specifications, license (including the fire protection license condition), and  
technical requirements manual or equivalent for fire protection structures,  
systems, and components.  
3.  
A list of fire areas requiring alternative shutdown capability, (i.e., those areas for  
which Title 10 of the Code of Federal Regulations (CFR), Part 50, Appendix R,  
Section III.G, requirements are satisfied under Section III.G.3), or where both  
safe shutdown trains can be affected.  


            DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION  
    4.     Plant operating procedures which would be used and describe shutdown for a
2
            postulated fire (for both areas requiring alternative shutdown and areas which do
4.  
            not require alternative shutdown). Only those procedures with actions specific to
Plant operating procedures which would be used and describe shutdown for a  
            shutdown in the event of a fire need be included. In addition, please include the
postulated fire (for both areas requiring alternative shutdown and areas which do  
            procedure which directs operators to the applicable safe shutdown procedure.
not require alternative shutdown). Only those procedures with actions specific to  
    5.     Analysis performed in support of plant evaluation regarding multiple spurious
shutdown in the event of a fire need be included. In addition, please include the  
            operation (MSO), which includes the following:
procedure which directs operators to the applicable safe shutdown procedure.  
    6.     List of identified multiple spurious fire-induced circuit failure configurations.
            a. List of the generic and plant specific MSOs.
5.  
            b. Results of expert panel process and associated review/evaluation of the
Analysis performed in support of plant evaluation regarding multiple spurious  
                generic and plant specific MSOs and existing safe shutdown analysis.
operation (MSO), which includes the following:  
            c. Evaluations and corrective actions taken for resolution of MSO issues.
II. Information Requested During the Information Gathering Visit
6.  
    (September 17, 2018)
List of identified multiple spurious fire-induced circuit failure configurations.  
    The following information is requested to be provided to the inspection team during the
    onsite information gathering visit. Except for Item 8, it is requested that the following
a. List of the generic and plant specific MSOs.  
    information be provided on three sets of CDs (searchable, if possible) with the B.5.b
    Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD.
b. Results of expert panel process and associated review/evaluation of the  
    In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d.
generic and plant specific MSOs and existing safe shutdown analysis.  
    1.     One set of hard-copy documents for facility layout drawings which identify plant
            fire area delineation; areas protected by automatic fire suppression and
c. Evaluations and corrective actions taken for resolution of MSO issues.  
            detection; and locations of fire protection equipment.
    2.     Licensing Information:
II.  
            a. All U.S. Nuclear Regulatory Commission (NRC) Safety Evaluation
Information Requested During the Information Gathering Visit  
                Reports (SERs) applicable to fire protection (specifically including those
(September 17, 2018)  
                SERs referenced by the plant fire protection license condition) and all
                licensing correspondence referenced by the SERs;
The following information is requested to be provided to the inspection team during the  
            b. All licensing correspondence associated with the comparison to Standard
onsite information gathering visit. Except for Item 8, it is requested that the following  
                Review Plan (NUREG-0800), Section 9.5.1, or equivalent for licensing
information be provided on three sets of CDs (searchable, if possible) with the B.5.b  
                purposes;
Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD.
            c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and
In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d.  
                associated licensing correspondence;
            d. For pre-1979 plants, all licensing correspondence associated with those
1.  
                sections of 10 CFR Part 50, Appendix R, that are not applicable to the plant
One set of hard-copy documents for facility layout drawings which identify plant  
                under 10 CFR 50.48(b)(1). Specifically, the licensing correspondence
fire area delineation; areas protected by automatic fire suppression and  
                associated with those fire protection features proposed or implemented by
detection; and locations of fire protection equipment.  
                the licensee that have been accepted by the NRC staff as satisfying the
                provisions of Appendix A to Branch Technical Position APCSB 9.5-1
2.  
                                              2
Licensing Information:  
a. All U.S. Nuclear Regulatory Commission (NRC) Safety Evaluation  
Reports (SERs) applicable to fire protection (specifically including those  
SERs referenced by the plant fire protection license condition) and all  
licensing correspondence referenced by the SERs;  
b. All licensing correspondence associated with the comparison to Standard  
Review Plan (NUREG-0800), Section 9.5.1, or equivalent for licensing  
purposes;  
c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and  
associated licensing correspondence;  
d. For pre-1979 plants, all licensing correspondence associated with those  
sections of 10 CFR Part 50, Appendix R, that are not applicable to the plant  
under 10 CFR 50.48(b)(1). Specifically, the licensing correspondence  
associated with those fire protection features proposed or implemented by  
the licensee that have been accepted by the NRC staff as satisfying the  
provisions of Appendix A to Branch Technical Position APCSB 9.5-1  


  DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION  
      reflected in the NRC fire protection SERs issued before February 19, 1981,
3
      (10 CFR 50.48(b)(1)(i)); or those fire protection features, which were
reflected in the NRC fire protection SERs issued before February 19, 1981,  
      accepted by the NRC staff in comprehensive fire protection SERs issued
(10 CFR 50.48(b)(1)(i)); or those fire protection features, which were  
      before Appendix A to Branch Technical Position APCSB 9.5-1 was published
accepted by the NRC staff in comprehensive fire protection SERs issued  
      in August 1976 (10 CFR 50.48(b)(1)(ii)); and
before Appendix A to Branch Technical Position APCSB 9.5-1 was published  
  e. The final safety analysis report sections applicable to fire protection, fire
in August 1976 (10 CFR 50.48(b)(1)(ii)); and  
      hazards analysis, and safe shutdown analysis in effect at the time of original
      licensing.
e. The final safety analysis report sections applicable to fire protection, fire  
3. Fire Protection Program:
hazards analysis, and safe shutdown analysis in effect at the time of original  
  a. A listing of changes made to the Fire Protection Program since the last
licensing.  
      Triennial Fire Protection Inspection;
  b. For pre-1979 plants, a listing of the protection methodologies identified under
3.  
      10 CFR Part 50, Appendix R, Section III.G, used to achieve compliance for
Fire Protection Program:  
      selected fire zones/areas (to be determined during information gathering
      visit). That is, please specify whether 3-hour rated fire barriers;
a. A listing of changes made to the Fire Protection Program since the last  
      (Section III.G.2.a), 20 foot separation along with detection and suppression;
Triennial Fire Protection Inspection;  
      (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;
      (Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used
b. For pre-1979 plants, a listing of the protection methodologies identified under  
      as a strategy for each selected fire zone/area;
10 CFR Part 50, Appendix R, Section III.G, used to achieve compliance for  
  c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to
selected fire zones/areas (to be determined during information gathering  
      safe-shutdown evaluations);
visit). That is, please specify whether 3-hour rated fire barriers;  
  d. A list of applicable codes and standards related to the design of plant fire
(Section III.G.2.a), 20 foot separation along with detection and suppression;  
      protection features. The list should include National Fire Protection
(Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;  
      Association code versions committed to (i.e., the National Fire Protection
(Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used  
      Association Codes of Record); and
as a strategy for each selected fire zone/area;  
  e. List of plant deviations from code commitments and associated evaluations.
4. Facility Information:
c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to  
  a. Piping and instrumentation (flow) diagrams showing the components used to
safe-shutdown evaluations);  
      achieve and maintain hot standby and cold shutdown for fires outside the
      control room, those components used for those areas requiring alternative
d. A list of applicable codes and standards related to the design of plant fire  
      shutdown capability, and systems relied upon for B.5.b mitigation strategies.
protection features. The list should include National Fire Protection  
      These can be of the type that are used for training;
Association code versions committed to (i.e., the National Fire Protection  
  b. One-line schematic drawings of the electrical distribution system for
Association Codes of Record); and  
      4160 Volts alternating current (Vac) down to 480 Vac;
  c. One-line schematic drawings of the electrical distribution system for 250 Volts
e. List of plant deviations from code commitments and associated evaluations.  
      direct current and 125 Volts direct current systems as applicable;
  d. Logic diagrams showing the components used to achieve and maintain hot
4.  
      standby and cold shutdown; and
Facility Information:  
                                      3
a. Piping and instrumentation (flow) diagrams showing the components used to  
achieve and maintain hot standby and cold shutdown for fires outside the  
control room, those components used for those areas requiring alternative  
shutdown capability, and systems relied upon for B.5.b mitigation strategies.
These can be of the type that are used for training;  
b. One-line schematic drawings of the electrical distribution system for  
4160 Volts alternating current (Vac) down to 480 Vac;  
c. One-line schematic drawings of the electrical distribution system for 250 Volts  
direct current and 125 Volts direct current systems as applicable;  
d. Logic diagrams showing the components used to achieve and maintain hot  
standby and cold shutdown; and  


  DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION  
  e. Safe shutdown cable routing database (requested electronically, such as on
4
      compact disc, if available).
e. Safe shutdown cable routing database (requested electronically, such as on  
5. Operations Response for Fire Protection:
compact disc, if available).  
  a. Pre-fire plans for selected fire zones/areas (to be determined during
      information gathering visit);
5.  
  b. Plant operating procedures which specify the initial operations response to a
Operations Response for Fire Protection:  
      fire alarm or annunciator; and
  c. Procedure for calling out the fire brigade and requesting off-site assistance.
a. Pre-fire plans for selected fire zones/areas (to be determined during  
6. Corrective Actions:
information gathering visit);  
  a. Listing of open and closed fire protection condition reports (i.e., problem
      identification forms and their resolution reports) since the date of the last
b. Plant operating procedures which specify the initial operations response to a  
      Triennial Fire Protection Inspection; and
fire alarm or annunciator; and  
  b. List of current fire impairments, including duration.
7. General Information:
c. Procedure for calling out the fire brigade and requesting off-site assistance.  
  a. A listing of abbreviations and/or designators for plant systems;
  b. Organization charts of site personnel down to the level of fire protection staff
6.  
      personnel; and
Corrective Actions:  
  c. A phone list for onsite licensee personnel.
8. B.5.b Mitigating Strategies:
a. Listing of open and closed fire protection condition reports (i.e., problem  
  a. A list of all modifications to regulatory commitments made to meet the
identification forms and their resolution reports) since the date of the last  
      requirements of Section B.5.b of the ICM Order, EA-02-026, dated
Triennial Fire Protection Inspection; and
      February 25, 2002, the subsequently imposed license conditions, and
      10 CFR 50.54(hh)(2);
b. List of current fire impairments, including duration.  
  b. Copies of procedures/guidelines that were revised or generated to implement
      the mitigation strategies. These could be extensive damage mitigation
7.  
      guidelines, severe accident management guidelines, emergency operating
General Information:  
      procedures, abnormal operating procedures, etc.;
  c. A matrix that shows the correlation between the mitigation strategies
a. A listing of abbreviations and/or designators for plant systems;
      identified in Nuclear Energy Institute 06-12 and the site-specific procedures
      or guidelines that are used to implement each strategy;
b. Organization charts of site personnel down to the level of fire protection staff  
  d. A listing of engineering evaluations/calculations that were used to verify
personnel; and
      engineering bases for the mitigation strategies;
  e. Copies of procedures used to inventory equipment (hoses, fittings, pumps,
c. A phone list for onsite licensee personnel.  
      etc.) required to be used to implement the mitigation strategies;
                                      4
8.  
B.5.b Mitigating Strategies:  
a. A list of all modifications to regulatory commitments made to meet the  
requirements of Section B.5.b of the ICM Order, EA-02-026, dated  
February 25, 2002, the subsequently imposed license conditions, and  
10 CFR 50.54(hh)(2);  
b. Copies of procedures/guidelines that were revised or generated to implement  
the mitigation strategies. These could be extensive damage mitigation  
guidelines, severe accident management guidelines, emergency operating  
procedures, abnormal operating procedures, etc.;  
c. A matrix that shows the correlation between the mitigation strategies  
identified in Nuclear Energy Institute 06-12 and the site-specific procedures  
or guidelines that are used to implement each strategy;
d. A listing of engineering evaluations/calculations that were used to verify  
engineering bases for the mitigation strategies;  
e. Copies of procedures used to inventory equipment (hoses, fittings, pumps,  
etc.) required to be used to implement the mitigation strategies;  


              DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION  
              f. A list of B.5.b mitigating strategies, if any, which have implementing details
5
                  that differ from that documented in the submittals and the safety evaluation
f. A list of B.5.b mitigating strategies, if any, which have implementing details  
                  report;
that differ from that documented in the submittals and the safety evaluation  
              g. Copies of Memoranda of Understanding (e.g., with local fire departments)
report;  
                  required to implement any mitigating strategies; and
              h. A list of changes made to B.5.b mitigating strategies and associated
g. Copies of Memoranda of Understanding (e.g., with local fire departments)  
                  procedures since the previous NRC inspection of B.5.b mitigating strategies
required to implement any mitigating strategies; and  
                  (April 29, 2014).
    9.       Onsite Discussions:
h. A list of changes made to B.5.b mitigating strategies and associated  
              In addition, during the information gathering visit, it is requested that licensee
procedures since the previous NRC inspection of B.5.b mitigating strategies  
              staff be available for the following:
(April 29, 2014).  
              a. Informal discussion on plant procedures operators would use in the event of
                  fire or explosion (including B.5.b mitigation strategies) and under what
9.  
                  conditions would the plant be shutdown using alternative shutdown
Onsite Discussions:  
                  methodology;
              b. Informal discussion on the plants safe shutdown cable routing database and
In addition, during the information gathering visit, it is requested that licensee  
                  the plant-wide cable routing database, as applicable; and
staff be available for the following:  
              c. A tour of alternative shutdown and risk significant fire areas.
              d. A discussion of scheduling of fire drills which may occur during the inspection
a. Informal discussion on plant procedures operators would use in the event of  
                  so that the inspectors may be able to observe a fire drill, if possible.
fire or explosion (including B.5.b mitigation strategies) and under what  
III. Information Requested to be Available on first Day of the Second Onsite
conditions would the plant be shutdown using alternative shutdown  
    Inspection Week (October 1, 2018)
methodology;  
    The following information is requested to be provided on the first day of inspection.
    It is requested that this information be provided on three sets of CDs (searchable, if
b. Informal discussion on the plants safe shutdown cable routing database and  
    possible).
the plant-wide cable routing database, as applicable; and  
    1.       Program Procedures:
              a. Procedures for:
c. A tour of alternative shutdown and risk significant fire areas.  
                      i. Administrative controls (such as allowed out of service times and
                          compensatory measures) for fire protection systems and components
d. A discussion of scheduling of fire drills which may occur during the inspection  
                      ii. Control of transient combustibles
so that the inspectors may be able to observe a fire drill, if possible.  
                    iii. Control of hot work
              b. List of maintenance and surveillance testing procedures for alternative
III.  
                  shutdown capability and fire barriers, detectors, pumps, and suppression
Information Requested to be Available on first Day of the Second Onsite  
                  systems; and
Inspection Week (October 1, 2018)  
                                                  5
The following information is requested to be provided on the first day of inspection.
It is requested that this information be provided on three sets of CDs (searchable, if  
possible).  
1.  
Program Procedures:  
a. Procedures for:  
i.  
Administrative controls (such as allowed out of service times and  
compensatory measures) for fire protection systems and components  
ii.  
Control of transient combustibles  
iii.  
Control of hot work  
b. List of maintenance and surveillance testing procedures for alternative  
shutdown capability and fire barriers, detectors, pumps, and suppression  
systems; and  


              DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION
DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION  
              c. List of maintenance procedures which routinely verify fuse breaker
6
                  coordination in accordance with the post-fire safe shutdown coordination
c. List of maintenance procedures which routinely verify fuse breaker  
                  analysis.
coordination in accordance with the post-fire safe shutdown coordination  
        2.   Design and Equipment Information:
analysis.  
              a. Coordination calculations and/or justifications that verify fuse/breaker
                  coordination for selected fire zones/areas (to be determined during
2.  
                  information gathering visit) that are fed off of the same electrical buses
Design and Equipment Information:  
                  as components in the protected safe shutdown train;
              b. Copies of significant fire protection and post-fire safe shutdown related
a. Coordination calculations and/or justifications that verify fuse/breaker  
                  design change package descriptions (including their associated
coordination for selected fire zones/areas (to be determined during  
                  10 CFR 50.59 evaluations) and Generic Letter 86-10 (or adverse to
information gathering visit) that are fed off of the same electrical buses  
                  safe shutdown) evaluations;
as components in the protected safe shutdown train;  
              c. Gaseous suppression system pre-operational testing, if applicable, for
                  selected fire zones/areas (to be determined during information gathering
b. Copies of significant fire protection and post-fire safe shutdown related  
                  visit);
design change package descriptions (including their associated  
              d. Hydraulic calculations and supporting test data which demonstrate operability
10 CFR 50.59 evaluations) and Generic Letter 86-10 (or adverse to  
                  for water suppression systems, if applicable, for selected fire zones/areas (to
safe shutdown) evaluations;  
                  be determined during information gathering visit);
              e. Alternating current coordination calculations for 4160Vac down to 480Vac
c. Gaseous suppression system pre-operational testing, if applicable, for  
                  electrical systems; and
selected fire zones/areas (to be determined during information gathering  
              f.   List of all fire protection or Appendix R calculations.
visit);  
        3.   Assessment and Corrective Actions:
              The three most recent fire protection Quality Assurance audits and/or fire
d. Hydraulic calculations and supporting test data which demonstrate operability  
              protection self-assessments.
for water suppression systems, if applicable, for selected fire zones/areas (to  
        4.   Any updates to information previously provided.
be determined during information gathering visit);  
IV.     Information Requested to Be Provided Throughout the Inspection
        1.   Copies of any corrective action documents generated as a result of the
e. Alternating current coordination calculations for 4160Vac down to 480Vac  
              inspection teams questions or queries during this inspection.
electrical systems; and  
        2.   Copies of the list of questions submitted by the inspection team members and
              the status/resolution of the information requested (provided daily during the
f. List of all fire protection or Appendix R calculations.  
              inspection to each inspection team member).
3.  
Assessment and Corrective Actions:  
The three most recent fire protection Quality Assurance audits and/or fire  
protection self-assessments.  
4.  
Any updates to information previously provided.  
IV.  
Information Requested to Be Provided Throughout the Inspection  
1.  
Copies of any corrective action documents generated as a result of the  
inspection teams questions or queries during this inspection.  
2.  
Copies of the list of questions submitted by the inspection team members and  
the status/resolution of the information requested (provided daily during the  
inspection to each inspection team member).  
If you have questions regarding the information requested, please contact the lead inspector.
If you have questions regarding the information requested, please contact the lead inspector.
                                                    6
}}
}}

Latest revision as of 18:09, 5 January 2025

Notification of Triennial Fire Protection Baseline Inspection and Request for Information; Inspection Report 05000440/2018011 (DRS-A.Dahbur)
ML18176A374
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/25/2018
From: Alan Dahbur
Engineering Branch 3
To: Hamilton D
FirstEnergy Nuclear Operating Co
References
IR 2018011
Download: ML18176A374 (10)


See also: IR 05000440/2018011

Text

June 25, 2018

Mr. David B. Hamilton

Site Vice President

FirstEnergy Nuclear Operating Company

Perry Nuclear Power Plant

Reg Affairs-A210

10 Center Road, P.O. Box 97

Perry, OH 44081-0097

SUBJECT: PERRY NUCLEAR POWER PLANTNOTIFICATION OF NRC TRIENNIAL FIRE

PROTECTION BASELINE INSPECTION AND REQUEST FOR INFORMATION;

INSPECTION REPORT 05000440/2018011

Dear Mr. Hamilton:

On September 17, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin a Triennial

Fire Protection Baseline Inspection at your Perry Nuclear Power Plant. This inspection will be

performed in accordance with Inspection Procedure (IP) 71111.05T, the NRCs Baseline Fire

Protection IP.

Changes were made to the IP 71111.05T which now requires the Fire Protection Inspection to

review your actions to mitigate postulated events that could potentially cause loss of large

areas of power reactor facilities due to explosions or fires. This requirement was implemented

by the issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b,

and the subsequent requirements of Title 10 of the Code of Federal Regulations,

Part 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this

inspection, the B.5.b requirements review will be performed during the first onsite week of the

inspection starting on September 19, 2018.

The schedule for the onsite inspection activity is as follows:

Information Gathering Visit: September 17-18, 2018;

B.5.b Requirements:

September 19-21, 2018; and

Fire Protection Inspection:

October 1-5, 2018, and October 15-19, 2018.

D. Hamilton

-2-

The purpose of the information gathering visit is: (1) to obtain information and documentation

needed to support the inspection; (2) to become familiar with the Perry Nuclear Power Plant Fire

Protection Programs, fire protection features, post-fire safe shutdown capabilities, and plant

layout; and (3) to arrange administrative details, such as office space, availability of

knowledgeable office personnel and to ensure unescorted site access privileges.

Experience has shown that the Baseline Fire Protection Inspections are extremely resource

intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection

impact on the site and to ensure a productive inspection for both organizations, we have

enclosed a request for documents needed for the inspection. These documents have been

divided into four groups.

The first group lists information necessary to aid the inspection team in choosing specific

focus areas for the inspection. It is requested that this information be provided to the

lead inspector via mail or electronically no later than August 24, 2018.

The second group also lists information and areas for discussion necessary to aid the

inspection team in choosing specific fire protection focus areas for the inspection and

to ensure that the inspection team is adequately prepared for the inspection. It is

requested this information be available during the information gathering visit on

September 17, 2018.

The third group of requested documents consists of those items that the team will

review, or need access to, during the inspection. Please have this information available

by the first day of the second onsite inspection week beginning October 1, 2018.

The fourth group lists the information necessary to aid the inspection team in tracking

issues identified as a result of the inspection. It is requested that this information be

provided to the lead inspector as the information is generated during the inspection. It is

important that all of these documents are up to date and complete in order to minimize

the number of additional documents requested during the preparation and/or the onsite

portions of the inspection.

The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory

contact for this inspection is Mr. George Dujanovic of your organization. If there are any

questions about the inspection or the material requested, please contact the lead inspector at

630-829-9810 or via e-mail at Alan.Dahbur@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

D. Hamilton

-3-

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA Dariusz Szwarc Acting for/

Alan Dahbur, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket No. 50-440

License No. NPF-58

Enclosure:

Document Request for Fire Protection

Inspection

cc: Distribution via LISTSERV

D. Hamilton

-4-

Letter to David B. Hamilton from Alan Dahbur dated June 25, 2018

SUBJECT: PERRY NUCLEAR POWER PLANTNOTIFICATION OF NRC TRIENNIAL FIRE

PROTECTION BASELINE INSPECTION AND REQUEST FOR INFORMATION;

INSPECTION REPORT 05000440/2018011

DISTRIBUTION:

Jeremy Bowen

RidsNrrPMPerry Resource

RidsNrrDorlLpl3

RidsNrrDirsIrib Resource

Steven West

Darrell Roberts

Richard Skokowski

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number ML: 18176A374

OFFICE

RIII

RIII

RIII

RIII

NAME

ADahbur:cl

DATE

06/25/18

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION

Enclosure

Inspection Report: 05000440/2018011

Onsite Inspection Dates:

September 17-18, 2018

(Information Gathering Visit)

September 19-21, 2018

(B.5.b Requirements)

October 1-5, 2018

(Fire Protection Inspection)

October 15-19, 2018

(Fire Protection Inspection)

Inspection Procedures:

IP 71111.05T, Fire Protection (Triennial)

IP 71152, Identification and Resolution of Problems

Inspectors:

Alan Dahbur, Lead Inspector

630-829-9810

Alan.Dahbur@nrc.gov

Atif Shaikh,

Ijaz Hafeez,

Senior Reactor Inspector

Reactor Inspector

630-829-9824

630-829-9843

Atif.Shaikh@nrc.gov

Ijaz.Hafeez@nrc.gov

I.

Information Requested Prior To the Information Gathering Visit

The following information is requested by August 24, 2018. If you have any questions

regarding this request, please call the lead inspector as soon as possible. All

information should be sent to Alan Dahbur (e-mail address Alan Dahbur@nrc.gov).

Electronic media is preferred. The preferred file format is a searchable pdf file on a

compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of

use, if possible. Please provide three copies of each CD submitted (one for each

inspector).

1.

The most risk-significant fire areas as determined by probabilistic risk analyses, if

available. Otherwise, the reactor plant's Individual Plant Examination for External

Events for fire and results of any post- Individual Plant Examination for External

Events reviews for fire.

2.

A copy of the current version of the Fire Protection Program, fire hazards

analysis, safe shutdown analysis, updated safety analysis report, technical

specifications, license (including the fire protection license condition), and

technical requirements manual or equivalent for fire protection structures,

systems, and components.

3.

A list of fire areas requiring alternative shutdown capability, (i.e., those areas for

which Title 10 of the Code of Federal Regulations (CFR), Part 50, Appendix R,

Section III.G, requirements are satisfied under Section III.G.3), or where both

safe shutdown trains can be affected.

DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION

2

4.

Plant operating procedures which would be used and describe shutdown for a

postulated fire (for both areas requiring alternative shutdown and areas which do

not require alternative shutdown). Only those procedures with actions specific to

shutdown in the event of a fire need be included. In addition, please include the

procedure which directs operators to the applicable safe shutdown procedure.

5.

Analysis performed in support of plant evaluation regarding multiple spurious

operation (MSO), which includes the following:

6.

List of identified multiple spurious fire-induced circuit failure configurations.

a. List of the generic and plant specific MSOs.

b. Results of expert panel process and associated review/evaluation of the

generic and plant specific MSOs and existing safe shutdown analysis.

c. Evaluations and corrective actions taken for resolution of MSO issues.

II.

Information Requested During the Information Gathering Visit

(September 17, 2018)

The following information is requested to be provided to the inspection team during the

onsite information gathering visit. Except for Item 8, it is requested that the following

information be provided on three sets of CDs (searchable, if possible) with the B.5.b

Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD.

In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d.

1.

One set of hard-copy documents for facility layout drawings which identify plant

fire area delineation; areas protected by automatic fire suppression and

detection; and locations of fire protection equipment.

2.

Licensing Information:

a. All U.S. Nuclear Regulatory Commission (NRC) Safety Evaluation

Reports (SERs) applicable to fire protection (specifically including those

SERs referenced by the plant fire protection license condition) and all

licensing correspondence referenced by the SERs;

b. All licensing correspondence associated with the comparison to Standard

Review Plan (NUREG-0800), Section 9.5.1, or equivalent for licensing

purposes;

c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and

associated licensing correspondence;

d. For pre-1979 plants, all licensing correspondence associated with those

sections of 10 CFR Part 50, Appendix R, that are not applicable to the plant

under 10 CFR 50.48(b)(1). Specifically, the licensing correspondence

associated with those fire protection features proposed or implemented by

the licensee that have been accepted by the NRC staff as satisfying the

provisions of Appendix A to Branch Technical Position APCSB 9.5-1

DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION

3

reflected in the NRC fire protection SERs issued before February 19, 1981,

(10 CFR 50.48(b)(1)(i)); or those fire protection features, which were

accepted by the NRC staff in comprehensive fire protection SERs issued

before Appendix A to Branch Technical Position APCSB 9.5-1 was published

in August 1976 (10 CFR 50.48(b)(1)(ii)); and

e. The final safety analysis report sections applicable to fire protection, fire

hazards analysis, and safe shutdown analysis in effect at the time of original

licensing.

3.

Fire Protection Program:

a. A listing of changes made to the Fire Protection Program since the last

Triennial Fire Protection Inspection;

b. For pre-1979 plants, a listing of the protection methodologies identified under

10 CFR Part 50, Appendix R, Section III.G, used to achieve compliance for

selected fire zones/areas (to be determined during information gathering

visit). That is, please specify whether 3-hour rated fire barriers;

(Section III.G.2.a), 20 foot separation along with detection and suppression;

(Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;

(Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used

as a strategy for each selected fire zone/area;

c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to

safe-shutdown evaluations);

d. A list of applicable codes and standards related to the design of plant fire

protection features. The list should include National Fire Protection

Association code versions committed to (i.e., the National Fire Protection

Association Codes of Record); and

e. List of plant deviations from code commitments and associated evaluations.

4.

Facility Information:

a. Piping and instrumentation (flow) diagrams showing the components used to

achieve and maintain hot standby and cold shutdown for fires outside the

control room, those components used for those areas requiring alternative

shutdown capability, and systems relied upon for B.5.b mitigation strategies.

These can be of the type that are used for training;

b. One-line schematic drawings of the electrical distribution system for

4160 Volts alternating current (Vac) down to 480 Vac;

c. One-line schematic drawings of the electrical distribution system for 250 Volts

direct current and 125 Volts direct current systems as applicable;

d. Logic diagrams showing the components used to achieve and maintain hot

standby and cold shutdown; and

DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION

4

e. Safe shutdown cable routing database (requested electronically, such as on

compact disc, if available).

5.

Operations Response for Fire Protection:

a. Pre-fire plans for selected fire zones/areas (to be determined during

information gathering visit);

b. Plant operating procedures which specify the initial operations response to a

fire alarm or annunciator; and

c. Procedure for calling out the fire brigade and requesting off-site assistance.

6.

Corrective Actions:

a. Listing of open and closed fire protection condition reports (i.e., problem

identification forms and their resolution reports) since the date of the last

Triennial Fire Protection Inspection; and

b. List of current fire impairments, including duration.

7.

General Information:

a. A listing of abbreviations and/or designators for plant systems;

b. Organization charts of site personnel down to the level of fire protection staff

personnel; and

c. A phone list for onsite licensee personnel.

8.

B.5.b Mitigating Strategies:

a. A list of all modifications to regulatory commitments made to meet the

requirements of Section B.5.b of the ICM Order, EA-02-026, dated

February 25, 2002, the subsequently imposed license conditions, and

10 CFR 50.54(hh)(2);

b. Copies of procedures/guidelines that were revised or generated to implement

the mitigation strategies. These could be extensive damage mitigation

guidelines, severe accident management guidelines, emergency operating

procedures, abnormal operating procedures, etc.;

c. A matrix that shows the correlation between the mitigation strategies

identified in Nuclear Energy Institute 06-12 and the site-specific procedures

or guidelines that are used to implement each strategy;

d. A listing of engineering evaluations/calculations that were used to verify

engineering bases for the mitigation strategies;

e. Copies of procedures used to inventory equipment (hoses, fittings, pumps,

etc.) required to be used to implement the mitigation strategies;

DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION

5

f. A list of B.5.b mitigating strategies, if any, which have implementing details

that differ from that documented in the submittals and the safety evaluation

report;

g. Copies of Memoranda of Understanding (e.g., with local fire departments)

required to implement any mitigating strategies; and

h. A list of changes made to B.5.b mitigating strategies and associated

procedures since the previous NRC inspection of B.5.b mitigating strategies

(April 29, 2014).

9.

Onsite Discussions:

In addition, during the information gathering visit, it is requested that licensee

staff be available for the following:

a. Informal discussion on plant procedures operators would use in the event of

fire or explosion (including B.5.b mitigation strategies) and under what

conditions would the plant be shutdown using alternative shutdown

methodology;

b. Informal discussion on the plants safe shutdown cable routing database and

the plant-wide cable routing database, as applicable; and

c. A tour of alternative shutdown and risk significant fire areas.

d. A discussion of scheduling of fire drills which may occur during the inspection

so that the inspectors may be able to observe a fire drill, if possible.

III.

Information Requested to be Available on first Day of the Second Onsite

Inspection Week (October 1, 2018)

The following information is requested to be provided on the first day of inspection.

It is requested that this information be provided on three sets of CDs (searchable, if

possible).

1.

Program Procedures:

a. Procedures for:

i.

Administrative controls (such as allowed out of service times and

compensatory measures) for fire protection systems and components

ii.

Control of transient combustibles

iii.

Control of hot work

b. List of maintenance and surveillance testing procedures for alternative

shutdown capability and fire barriers, detectors, pumps, and suppression

systems; and

DOCUMENT REQUEST FOR FIRE PROTECTION INSPECTION

6

c. List of maintenance procedures which routinely verify fuse breaker

coordination in accordance with the post-fire safe shutdown coordination

analysis.

2.

Design and Equipment Information:

a. Coordination calculations and/or justifications that verify fuse/breaker

coordination for selected fire zones/areas (to be determined during

information gathering visit) that are fed off of the same electrical buses

as components in the protected safe shutdown train;

b. Copies of significant fire protection and post-fire safe shutdown related

design change package descriptions (including their associated

10 CFR 50.59 evaluations) and Generic Letter 86-10 (or adverse to

safe shutdown) evaluations;

c. Gaseous suppression system pre-operational testing, if applicable, for

selected fire zones/areas (to be determined during information gathering

visit);

d. Hydraulic calculations and supporting test data which demonstrate operability

for water suppression systems, if applicable, for selected fire zones/areas (to

be determined during information gathering visit);

e. Alternating current coordination calculations for 4160Vac down to 480Vac

electrical systems; and

f. List of all fire protection or Appendix R calculations.

3.

Assessment and Corrective Actions:

The three most recent fire protection Quality Assurance audits and/or fire

protection self-assessments.

4.

Any updates to information previously provided.

IV.

Information Requested to Be Provided Throughout the Inspection

1.

Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during this inspection.

2.

Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have questions regarding the information requested, please contact the lead inspector.