{{#Wiki_filter: | {{#Wiki_filter:December 17, 2018 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 24: | Line 24: | ||
==Dear Mr. Powell:== | ==Dear Mr. Powell:== | ||
July 16, 2018 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 47: | Line 39: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
David A. Holman, Chief Plant Support Branch 1 Division Reactor Safety Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80 Enclosure: | |||
NRC Inspection Report 05000498/2018403, 05000499/2018403 | David A. Holman, Chief Plant Support Branch 1 Division Reactor Safety | ||
Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80 | |||
Enclosure: | |||
NRC Inspection Report 05000498/2018403, 05000499/2018403 | |||
Enclosure | |||
U.S. NUCLEAR REGULATORY COMMISSION Region IV | |||
Docket Nos.: | |||
05000498, 05000499 | |||
License Nos.: | |||
NPF-76, NPF-80 | |||
Report Nos.: | |||
05000445/2018403; 05000446/2018403 | |||
Enterprise Identifier: | |||
I-2018-403-0008 | |||
Licensee: | |||
STP Nuclear Operating Company | |||
Facility: | |||
South Texas Project Electric Generating Station, Units 1 and 2 | |||
Location: | |||
Wadsworth, Texas 77483 | |||
Dates: | |||
June 18, 2018 to June 21, 2018 | |||
Inspector: | |||
A. Meyen, Physical Security Inspector | |||
Approved By: | |||
David A. Holman | |||
Chief, Plant Support Branch 1 | |||
Division of Reactor Safety | |||
=SUMMARY= | =SUMMARY= | ||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at South Texas Project Electric Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below. | The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at South Texas Project Electric Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below. | ||
List of Findings and Violations No Findings Additional Tracking Items No Additional Items | ===List of Findings and Violations=== | ||
No Findings | |||
===Additional Tracking Items=== | |||
No Additional Items | |||
=INSPECTION SCOPES= | =INSPECTION SCOPES= | ||
| Line 63: | Line 100: | ||
==SAFEGUARDS== | ==SAFEGUARDS== | ||
==71130.02 - Access Control== | ==71130.02 - Access Control== | ||
{{IP sample|IP=IP 71130.02|count=1}} | {{IP sample|IP=IP 71130.02|count=1}} | ||
The inspector evaluated the security program. The following elements were evaluated: | The inspector evaluated the security program. The following elements were evaluated: | ||
===71151 - Performance Indicator Verification === | Tier I: all 19 requirements Tier II: all 7 requirements Tier III: all 1 requirement | ||
===71151 - Performance Indicator Verification=== | |||
{{IP sample|IP=IP 71151|count=1}} | {{IP sample|IP=IP 71151|count=1}} | ||
The inspector verified licensee performance indicators submittals listed below for the period from October 2017 through June 2018 Protected Area Security Equipment Performance Index. | The inspector verified licensee performance indicators submittals listed below for the period from October 2017 through June 2018 Protected Area Security Equipment Performance Index. | ||
: (1) Protected Area Security Equipment Performance Index | : (1) Protected Area Security Equipment Performance Index | ||
| Line 84: | Line 122: | ||
71130.02 - Access Control | 71130.02 - Access Control | ||
Procedure Type | Procedure | ||
71130.02 Procedure | Type | ||
Access Control | Designation | ||
OPGP03-ZS-0005 Control of Keys, Locks, Cores, | Description or Title | ||
Keycards and Passwords | Revision | ||
OPGO-ZA-0001 Plant Access Authorization | 71130.02 | ||
Procedure | |||
OPGP03-ZS-0001 Vehicle, Material and Personnel | |||
Access Control | |||
OPGP03-ZS-0005 Control of Keys, Locks, Cores, | |||
Keycards and Passwords | |||
OPGO-ZA-0001 | |||
Plant Access Authorization | |||
Program | Program | ||
Security | Security | ||
Instructions | 1005 | ||
Calculation | Security Incidents | ||
2101 | Instructions | ||
2402 | 1006 | ||
3701 | Security Performance Indicator | ||
Test | |||
3702 | Calculation | ||
Test | |||
3001 | 2101 | ||
Misc. | Access Control | ||
Security | |||
2402 | |||
Logs | Alarm Station Operator | ||
Dates, 6/1/18 - 6/20/18 | |||
Self-Assessment Access Control Self-Assessment | 3701 | ||
Audits | Security Equipment Operability | ||
Audit 17-02 | |||
Report | Test | ||
3702 | |||
Explosive Detector Operability | |||
Test | |||
3001 | |||
Security Force Communications | |||
Misc. | |||
Designated Vehicle List 5-30-18 | |||
N/A | |||
Security | |||
Logs | |||
SEL | |||
Security Event Logs Dates, | |||
10-03-17 to 5-31-18 | |||
N/A | |||
Logs | |||
Security Daily Logs(CAS) | |||
N/A | |||
Dates, 6/1/18 - 6/20/18 | |||
Self-Assessment | |||
Access Control Self-Assessment | |||
N/A | |||
Audits | |||
5-10-18 | |||
Audit 17-02 | |||
Physical Security Quality Audit | |||
N/A | |||
Report | |||
Condition Reports | Condition Reports | ||
17-21674 | 17-21674 | ||
17-21678 | 17-21675 | ||
17-21741 | 17-21680 | ||
17-21346 | 17-21728 | ||
17-21742 | |||
17-21678 | |||
17-21714 | |||
17-21717 | |||
17-21720 | |||
17-21740 | |||
17-21741 | |||
17-15288 | |||
17-02145 | |||
17-17882 | |||
17-22663 | |||
17-21346 | |||
18-542 | |||
18-818 | |||
18-233 | |||
18-1620 | |||
ML18351A428 | ML18351A428 | ||
Cover Letter | Cover Letter | ||
SUNSI Review By: ADM | ADAMS: | ||
OFFICE | Non-Publicly Available | ||
NAME | Non-Sensitive | ||
SIGNATURE | Keyword: | ||
DATE | SUNSI Review By: ADM Yes No | ||
Publicly Available | |||
Sensitive | |||
OFFICE | |||
PSI:PSB1 | |||
C:PSB1 | |||
C:RPB | |||
C:PSB1 | |||
NAME | |||
AMeyen | |||
DHolman | |||
NTaylor | |||
DHolman | |||
SIGNATURE | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
DATE | |||
2/13/18 | |||
2/13/18 | |||
2/13/18 | |||
2/17/18 | |||
ML18351A428 | ML18351A428 | ||
Entire Report: | Entire Report: | ||
SUNSI Review By: ADM | ADAMS: | ||
OFFICE | Non-Publicly Available | ||
NAME | Non-Sensitive | ||
SIGNATURE | Keyword: | ||
DATE | SUNSI Review By: ADM Yes No | ||
Publicly Available | |||
Sensitive | |||
NRC-002 | |||
OFFICE | |||
PSI:PSB1 | |||
C:PSB1 | |||
C:PBB | |||
C:PSB1 | |||
NAME | |||
AMeyen | |||
DHolman | |||
NTaylor | |||
DHolman | |||
SIGNATURE | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
DATE | |||
2/12/18 | |||
2/14/18 | |||
2/15/18 | |||
2/17/18 | |||
}} | }} | ||
Latest revision as of 08:14, 5 January 2025
| ML18351A428 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 12/17/2018 |
| From: | David Holman Plant Support Branch-1 |
| To: | Gerry Powell South Texas |
| References | |
| IR 2018403 | |
| Download: ML18351A428 (10) | |
Text
December 17, 2018
SUBJECT:
ERRATA - SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403
Dear Mr. Powell:
July 16, 2018
SUBJECT:
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403
Dear Mr. Powell:
On, June 21, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your South Texas Project Electric Generating Station, Units 1 and 2, facility. The NRC inspector discussed the results of this inspection with Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspector did not identify any finding or violation of more than minor significance.
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
David A. Holman, Chief Plant Support Branch 1 Division Reactor Safety
Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80
Enclosure:
NRC Inspection Report 05000498/2018403, 05000499/2018403
Enclosure
U.S. NUCLEAR REGULATORY COMMISSION Region IV
Docket Nos.:
05000498, 05000499
License Nos.:
Report Nos.:
05000445/2018403; 05000446/2018403
Enterprise Identifier:
I-2018-403-0008
Licensee:
STP Nuclear Operating Company
Facility:
South Texas Project Electric Generating Station, Units 1 and 2
Location:
Wadsworth, Texas 77483
Dates:
June 18, 2018 to June 21, 2018
Inspector:
A. Meyen, Physical Security Inspector
Approved By:
David A. Holman
Chief, Plant Support Branch 1
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at South Texas Project Electric Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.
List of Findings and Violations
No Findings
Additional Tracking Items
No Additional Items
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspector evaluated the security program. The following elements were evaluated:
Tier I: all 19 requirements Tier II: all 7 requirements Tier III: all 1 requirement
71151 - Performance Indicator Verification
The inspector verified licensee performance indicators submittals listed below for the period from October 2017 through June 2018 Protected Area Security Equipment Performance Index.
- (1) Protected Area Security Equipment Performance Index
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
On June 21, 2018, the inspector presented the Baseline Security Inspection results to Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report.
DOCUMENTS REVIEWED
71130.02 - Access Control
Procedure
Type
Designation
Description or Title
Revision
Procedure
OPGP03-ZS-0001 Vehicle, Material and Personnel
Access Control
OPGP03-ZS-0005 Control of Keys, Locks, Cores,
Keycards and Passwords
OPGO-ZA-0001
Plant Access Authorization
Program
Security
1005
Security Incidents
Instructions
1006
Security Performance Indicator
Calculation
2101
Access Control
2402
Alarm Station Operator
3701
Security Equipment Operability
Test
3702
Explosive Detector Operability
Test
3001
Security Force Communications
Misc.
Designated Vehicle List 5-30-18
N/A
Security
Logs
SEL
Security Event Logs Dates,
10-03-17 to 5-31-18
N/A
Logs
Security Daily Logs(CAS)
N/A
Dates, 6/1/18 - 6/20/18
Self-Assessment
Access Control Self-Assessment
N/A
Audits
5-10-18
Audit 17-02
Physical Security Quality Audit
N/A
Report
Condition Reports
17-21674
17-21675
17-21680
17-21728
17-21742
17-21678
17-21714
17-21717
17-21720
17-21740
17-21741
17-15288
17-02145
17-17882
17-22663
17-21346
18-542
18-818
18-233
18-1620
Cover Letter
ADAMS:
Non-Publicly Available
Non-Sensitive
Keyword:
SUNSI Review By: ADM Yes No
Publicly Available
Sensitive
OFFICE
PSI:PSB1
C:PSB1
C:RPB
C:PSB1
NAME
AMeyen
DHolman
NTaylor
DHolman
SIGNATURE
/RA/
/RA/
/RA/
/RA/
DATE
2/13/18
2/13/18
2/13/18
2/17/18
Entire Report:
ADAMS:
Non-Publicly Available
Non-Sensitive
Keyword:
SUNSI Review By: ADM Yes No
Publicly Available
Sensitive
OFFICE
PSI:PSB1
C:PSB1
C:PBB
C:PSB1
NAME
AMeyen
DHolman
NTaylor
DHolman
SIGNATURE
/RA/
/RA/
/RA/
/RA/
DATE
2/12/18
2/14/18
2/15/18
2/17/18