ML993500387: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:December | {{#Wiki_filter:December | ||
==== | |||
14, | |||
==== | |||
1999 | |||
==== | |||
Mr. | |||
==== | |||
Anthony | |||
==== | |||
Brooks | |||
==== | |||
Nuclear | |||
==== | |||
Energy | |||
==== | |||
Institute | |||
==== | |||
Suite | |||
==== | |||
400 | |||
==== | |||
1776 | |||
==== | |||
I | |||
==== | |||
Street, | |||
==== | |||
NW | |||
==== | |||
Washington, | |||
==== | |||
DC | |||
==== | |||
20006-3708 | |||
==== | |||
Mr. | |||
==== | |||
Brooks: | |||
==== | |||
The | |||
==== | |||
purpose | |||
==== | |||
of | |||
==== | |||
this | |||
==== | |||
letter | |||
==== | |||
is | |||
==== | |||
to | |||
==== | |||
transmit | |||
==== | |||
the | |||
==== | |||
summary | |||
==== | |||
of | |||
==== | |||
two | |||
==== | |||
meetings | |||
==== | |||
with | |||
==== | |||
the | |||
==== | |||
Risk-Informed | |||
==== | |||
Technical | |||
==== | |||
Specifications | |||
==== | |||
Task | |||
==== | |||
Force. | |||
==== | |||
The | |||
==== | |||
first | |||
==== | |||
meeting | |||
==== | |||
was | |||
==== | |||
held | |||
==== | |||
at | |||
==== | |||
the | |||
==== | |||
San | |||
==== | |||
Onofre | |||
==== | |||
Nuclear | |||
==== | |||
Generating | |||
==== | |||
Station | |||
==== | |||
on | |||
==== | |||
October | |||
==== | |||
6-7, | |||
==== | |||
1999. | |||
==== | |||
The | |||
==== | |||
second | |||
==== | |||
meeting | |||
==== | |||
was | |||
==== | |||
held | |||
==== | |||
at | |||
==== | |||
the | |||
==== | |||
U.S. | |||
==== | |||
Nuclear | |||
==== | |||
Regulatory | |||
==== | |||
Commission | |||
==== | |||
(NRC) | |||
==== | |||
Headquarters | |||
==== | |||
offices | |||
==== | |||
in | |||
==== | |||
Rockville, | |||
==== | |||
Maryland, | |||
==== | |||
on | |||
==== | |||
November | |||
==== | |||
10, | |||
==== | |||
1999. | |||
==== | |||
Sincerely, | |||
==== | |||
Original | |||
==== | |||
signed | |||
==== | |||
by: | |||
==== | |||
William | |||
==== | |||
D. | |||
==== | |||
Beckner, | |||
==== | |||
Chief | |||
==== | |||
Technical | |||
==== | |||
Specifications | |||
==== | |||
Branch | |||
==== | |||
Division | |||
==== | |||
of | |||
==== | |||
Regulatory | |||
==== | |||
Improvement | |||
==== | |||
Programs | |||
==== | |||
Office | |||
==== | |||
of | |||
==== | |||
Nuclear | |||
==== | |||
Reactor | |||
==== | |||
Regulation | |||
==== | |||
==Enclosures:== | ==Enclosures:== | ||
==== | |||
1. | |||
==== | |||
Meeting | |||
==== | |||
Summary | |||
==== | |||
2. | |||
==== | |||
Attendance | |||
==== | |||
List | |||
==== | |||
3. | |||
==== | |||
October | |||
==== | |||
Meeting | |||
==== | |||
Presentations | |||
==== | |||
4. | |||
==== | |||
November | |||
==== | |||
Meeting | |||
==== | |||
Presentations | |||
==== | |||
cc: | |||
==== | |||
See | |||
==== | |||
attached | |||
==== | |||
list | |||
==== | |||
December | |||
==== | |||
14, | |||
==== | |||
1999 | |||
==== | |||
Mr. | |||
==== | |||
Anthony | |||
==== | |||
Brooks | |||
==== | |||
Nuclear | |||
==== | |||
Energy | |||
==== | |||
Institute | |||
==== | |||
Suite | |||
==== | |||
400 | |||
==== | |||
1776 | |||
==== | |||
I | |||
==== | |||
Street, | |||
==== | |||
NW | |||
==== | |||
Washington, | |||
==== | |||
DC | |||
==== | |||
20006-3708 | |||
==== | |||
Mr. | |||
==== | |||
Brooks: | |||
==== | |||
The | |||
==== | |||
purpose | |||
==== | |||
of | |||
==== | |||
this | |||
==== | |||
letter | |||
==== | |||
is | |||
==== | |||
to | |||
==== | |||
transmit | |||
==== | |||
the | |||
==== | |||
summary | |||
==== | |||
of | |||
==== | |||
two | |||
==== | |||
meetings | |||
==== | |||
with | |||
==== | |||
the | |||
==== | |||
Risk-Informed | |||
==== | |||
Technical | |||
==== | |||
Specifications | |||
==== | |||
Task | |||
==== | |||
Force. | |||
==== | |||
The | |||
==== | |||
first | |||
==== | |||
meeting | |||
==== | |||
was | |||
==== | |||
held | |||
==== | |||
at | |||
==== | |||
the | |||
==== | |||
San | |||
==== | |||
Onofre | |||
==== | |||
Nuclear | |||
==== | |||
Generating | |||
==== | |||
Station | |||
==== | |||
on | |||
==== | |||
October | |||
==== | |||
6-7, | |||
==== | |||
1999. | |||
==== | |||
The | |||
==== | |||
second | |||
==== | |||
meeting | |||
==== | |||
was | |||
==== | |||
held | |||
==== | |||
at | |||
==== | |||
the | |||
==== | |||
U.S. | |||
==== | |||
Nuclear | |||
==== | |||
Regulatory | |||
==== | |||
Commission | |||
==== | |||
(NRC) | |||
==== | |||
Headquarters | |||
==== | |||
offices | |||
==== | |||
in | |||
==== | |||
Rockville, | |||
==== | |||
Maryland, | |||
==== | |||
on | |||
==== | |||
November | |||
==== | |||
10, | |||
==== | |||
1999. | |||
==== | |||
Sincerely, | |||
==== | |||
Original | |||
==== | |||
signed | |||
==== | |||
by: | |||
==== | |||
William | |||
==== | |||
D. | |||
==== | |||
Beckner, | |||
==== | |||
Chief | |||
==== | |||
Technical | |||
==== | |||
Specifications | |||
==== | |||
Branch | |||
==== | |||
Division | |||
==== | |||
of | |||
==== | |||
Regulatory | |||
==== | |||
Improvement | |||
==== | |||
Programs | |||
==== | |||
Office | |||
==== | |||
of | |||
==== | |||
Nuclear | |||
==== | |||
Reactor | |||
==== | |||
Regulation | |||
==== | |||
==Enclosures:== | ==Enclosures:== | ||
Multiple Addressees | ==== | ||
Mr. Alan Hackerott | 1. | ||
==== | |||
Meeting | |||
==== | |||
Summary | |||
==== | |||
2. | |||
==== | |||
Attendance | |||
==== | |||
List | |||
==== | |||
3. | |||
==== | |||
October | |||
==== | |||
Meeting | |||
==== | |||
Presentations | |||
==== | |||
4. | |||
==== | |||
November | |||
==== | |||
Meeting | |||
==== | |||
Presentations | |||
==== | |||
cc: | |||
==== | |||
See | |||
==== | |||
attached | |||
==== | |||
list | |||
==== | |||
DISTRIBUTION: | |||
==== | |||
See | |||
==== | |||
attached. | |||
==== | |||
DOCUMENT | |||
==== | |||
NAME: | |||
==== | |||
G:\RTSB\GILLES\MTGSUMRITSTF111099.WPD | |||
==== | |||
OFFICE | |||
==== | |||
NRR/DRIP/RTSB | |||
==== | |||
NRR/DRIP/RTSB | |||
==== | |||
NRR/DRIP/RTSB | |||
==== | |||
NAME | |||
==== | |||
NVGilles | |||
==== | |||
RLDennig | |||
==== | |||
WDBeckner | |||
==== | |||
DATE | |||
==== | |||
12/14/99 | |||
==== | |||
12/14/99 | |||
==== | |||
12/14/99 | |||
==== | |||
OFFICIAL | |||
==== | |||
RECORD | |||
==== | |||
COPY | |||
==== | |||
Multiple | |||
==== | |||
Addressees | |||
==== | |||
December | |||
==== | |||
14, | |||
==== | |||
1999 | |||
==== | |||
cc: | |||
==== | |||
Mr. | |||
==== | |||
Alan | |||
==== | |||
Hackerott | |||
==== | |||
Mr. | |||
==== | |||
Dennis | |||
==== | |||
Henneke | |||
==== | |||
Omaha | |||
==== | |||
Public | |||
==== | |||
Power | |||
==== | |||
District | |||
==== | |||
San | |||
==== | |||
Onofre | |||
==== | |||
Nuclear | |||
==== | |||
Generating | |||
==== | |||
Station | |||
==== | |||
Ft. | |||
==== | |||
Calhoun | |||
==== | |||
Nuclear | |||
==== | |||
Station | |||
==== | |||
Southern | |||
==== | |||
California | |||
==== | |||
Edison | |||
==== | |||
P.O. | |||
==== | |||
Box | |||
==== | |||
399 | |||
==== | |||
5000 | |||
==== | |||
Pacific | |||
==== | |||
Coast | |||
==== | |||
Highway | |||
==== | |||
Ft. | |||
==== | |||
Calhoun, | |||
==== | |||
NE | |||
==== | |||
68023-0399 | |||
==== | |||
San | |||
==== | |||
Clemente, | |||
==== | |||
California | |||
==== | |||
92674-0128 | |||
==== | |||
Mr. | |||
==== | |||
Noel | |||
==== | |||
Clarkson | |||
==== | |||
Ms. | |||
==== | |||
Sharon | |||
==== | |||
Mahler | |||
==== | |||
Duke | |||
==== | |||
Energy/Oconee | |||
==== | |||
Cooper | |||
==== | |||
Nuclear | |||
==== | |||
Station | |||
==== | |||
Mail | |||
==== | |||
Code: | |||
==== | |||
0N03RC | |||
==== | |||
Nebraska | |||
==== | |||
Pulic | |||
==== | |||
Power | |||
==== | |||
District | |||
==== | |||
Highways | |||
==== | |||
130 | |||
==== | |||
& | |||
==== | |||
183 | |||
==== | |||
(29678) | |||
==== | |||
P.O. | |||
==== | |||
Box | |||
==== | |||
98 | |||
==== | |||
P.O. | |||
==== | |||
Box | |||
==== | |||
14393652 | |||
==== | |||
Brownville, | |||
==== | |||
NE | |||
==== | |||
68321-0098 | |||
==== | |||
Seneca, | |||
==== | |||
SC | |||
==== | |||
29679-1439 | |||
==== | |||
Mr. | |||
==== | |||
Frank | |||
==== | |||
Rahn | |||
==== | |||
Mr. | |||
==== | |||
Greg | |||
==== | |||
Krueger | |||
==== | |||
Electric | |||
==== | |||
Power | |||
==== | |||
Research | |||
==== | |||
Institute | |||
==== | |||
PECO | |||
==== | |||
Energy | |||
==== | |||
Company | |||
==== | |||
P. | |||
==== | |||
O. | |||
==== | |||
Box | |||
==== | |||
10412 | |||
==== | |||
Mail | |||
==== | |||
Code | |||
==== | |||
63A-3 | |||
==== | |||
Palo | |||
==== | |||
Alto, | |||
==== | |||
CA | |||
==== | |||
94303 | |||
==== | |||
965 | |||
==== | |||
Chesterbrook | |||
==== | |||
Boulevard | |||
==== | |||
Wayne, | |||
==== | |||
PA | |||
==== | |||
19087 | |||
==== | |||
Mr. | |||
==== | |||
Donald | |||
==== | |||
Hoffman | |||
==== | |||
EXCEL | |||
==== | |||
Services | |||
==== | |||
Corporation | |||
==== | |||
Mr. | |||
==== | |||
Wayne | |||
==== | |||
Harrison | |||
==== | |||
11921 | |||
==== | |||
Rockville | |||
==== | |||
Pike, | |||
==== | |||
Suite | |||
==== | |||
100 | |||
==== | |||
South | |||
==== | |||
Texas | |||
==== | |||
Project | |||
==== | |||
Electric | |||
==== | |||
Generating | |||
==== | |||
Rockville, | |||
==== | |||
MD | |||
==== | |||
20852 | |||
==== | |||
Station | |||
==== | |||
STP | |||
==== | |||
Nuclear | |||
==== | |||
Operating | |||
==== | |||
Company | |||
==== | |||
Mr. | |||
==== | |||
Jack | |||
==== | |||
Stringfellow | |||
==== | |||
P. | |||
==== | |||
O. | |||
==== | |||
Box | |||
==== | |||
289 | |||
==== | |||
Southern | |||
==== | |||
Nuclear | |||
==== | |||
Operating | |||
==== | |||
Company | |||
==== | |||
Wadsworth, | |||
==== | |||
TX | |||
==== | |||
77483 | |||
==== | |||
P.O. | |||
==== | |||
Box | |||
==== | |||
1295 | |||
==== | |||
Birmingham, | |||
==== | |||
AL | |||
==== | |||
35201-1295 | |||
==== | |||
Multiple | |||
==== | |||
Addressees | |||
==== | |||
December | |||
==== | |||
14, | |||
==== | |||
1999 | |||
==== | |||
DISTRIBUTION: | |||
==== | |||
E-Mail | |||
==== | |||
w/o | |||
==== | |||
Enclosures | |||
==== | |||
3 | |||
==== | |||
& | |||
==== | |||
4 | |||
==== | |||
SCollins/RPZimmerman | |||
==== | |||
JJohnson | |||
==== | |||
BWSheron | |||
==== | |||
DBMatthews | |||
==== | |||
SFNewberry | |||
==== | |||
GMHolahan | |||
==== | |||
WDBeckner | |||
==== | |||
RJBarrett | |||
==== | |||
RLDennig | |||
==== | |||
FMReinhart | |||
==== | |||
MLWohl | |||
==== | |||
NTSaltos | |||
==== | |||
TSB | |||
==== | |||
Staff | |||
==== | |||
JAZwolinski | |||
==== | |||
JFWilliams | |||
==== | |||
AWMarkley | |||
==== | |||
MACunningham, | |||
==== | |||
RES | |||
==== | |||
MMarkley, | |||
==== | |||
ACRS | |||
==== | |||
Staff | |||
==== | |||
HARD | |||
==== | |||
COPY | |||
==== | |||
FILE | |||
==== | |||
CENTER | |||
==== | |||
PUBLIC | |||
==== | |||
TSB | |||
==== | |||
R/F | |||
==== | |||
NVGilles | |||
==== | |||
NRC/INDUSTRY | |||
==== | |||
MEETING | |||
==== | |||
OF | |||
==== | |||
THE | |||
==== | |||
RISK-INFORMED | |||
==== | |||
TECHNICAL | |||
==== | |||
SPECIFICATION | |||
==== | |||
TASK | |||
==== | |||
FORCE | |||
==== | |||
Meeting | |||
==== | |||
Summaries | |||
==== | |||
October | |||
==== | |||
6-7 | |||
==== | |||
and | |||
==== | |||
November | |||
==== | |||
10, | |||
==== | |||
1999 | |||
==== | |||
Two | |||
==== | |||
meetings | |||
==== | |||
between | |||
==== | |||
the | |||
==== | |||
NRC | |||
==== | |||
staff | |||
==== | |||
and | |||
==== | |||
industry | |||
==== | |||
representatives | |||
==== | |||
comprising | |||
==== | |||
the | |||
==== | |||
Risk- | |||
==== | |||
Informed | |||
==== | |||
Technical | |||
==== | |||
Specifications | |||
==== | |||
Task | |||
==== | |||
Force | |||
==== | |||
(RITSTF) | |||
==== | |||
were | |||
==== | |||
held | |||
==== | |||
on | |||
==== | |||
October | |||
==== | |||
6-7 | |||
==== | |||
and | |||
==== | |||
November | |||
==== | |||
10, | |||
==== | |||
1999. | |||
==== | |||
The | |||
==== | |||
attendees | |||
==== | |||
are | |||
==== | |||
listed | |||
==== | |||
in | |||
==== | |||
Enclosure | |||
==== | |||
2. | |||
==== | |||
The | |||
==== | |||
meetings | |||
==== | |||
were | |||
==== | |||
a | |||
==== | |||
continuation | |||
==== | |||
of | |||
==== | |||
earlier | |||
==== | |||
meetings | |||
==== | |||
where | |||
==== | |||
the | |||
==== | |||
NRC | |||
==== | |||
staff | |||
==== | |||
and | |||
==== | |||
the | |||
==== | |||
industry | |||
==== | |||
discussed | |||
==== | |||
ongoing | |||
==== | |||
risk- | |||
==== | |||
informed | |||
==== | |||
technical | |||
==== | |||
specification | |||
==== | |||
initiatives | |||
==== | |||
and | |||
==== | |||
the | |||
==== | |||
creation | |||
==== | |||
of | |||
==== | |||
a | |||
==== | |||
fully | |||
==== | |||
risk-informed | |||
==== | |||
set | |||
==== | |||
of | |||
==== | |||
standard | |||
==== | |||
technical | |||
==== | |||
specifications | |||
==== | |||
(STS). | |||
==== | |||
The | |||
==== | |||
main | |||
==== | |||
purpose | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
October | |||
==== | |||
6-7 | |||
==== | |||
meeting | |||
==== | |||
was | |||
==== | |||
to | |||
==== | |||
have | |||
==== | |||
a | |||
==== | |||
more | |||
==== | |||
detailed | |||
==== | |||
discussion | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
probabilistic | |||
==== | |||
risk | |||
==== | |||
analysis | |||
==== | |||
(PRA) | |||
==== | |||
work | |||
==== | |||
done | |||
==== | |||
to | |||
==== | |||
support | |||
==== | |||
the | |||
==== | |||
current | |||
==== | |||
technical | |||
==== | |||
specification | |||
==== | |||
(TS) | |||
==== | |||
initiatives | |||
==== | |||
being | |||
==== | |||
prepared | |||
==== | |||
for | |||
==== | |||
submittal | |||
==== | |||
to | |||
==== | |||
the | |||
==== | |||
staff. | |||
==== | |||
There | |||
==== | |||
was | |||
==== | |||
limited | |||
==== | |||
RITSTF | |||
==== | |||
representation | |||
==== | |||
at | |||
==== | |||
this | |||
==== | |||
meeting. | |||
==== | |||
Southern | |||
==== | |||
California | |||
==== | |||
Edison | |||
==== | |||
has | |||
==== | |||
volunteered | |||
==== | |||
San | |||
==== | |||
Onofre | |||
==== | |||
Nuclear | |||
==== | |||
Generating | |||
==== | |||
Station | |||
==== | |||
(SONGS) | |||
==== | |||
to | |||
==== | |||
be | |||
==== | |||
the | |||
==== | |||
industrys | |||
==== | |||
lead | |||
==== | |||
plant | |||
==== | |||
for | |||
==== | |||
the | |||
==== | |||
majority | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
seven | |||
==== | |||
initiatives | |||
==== | |||
currently | |||
==== | |||
being | |||
==== | |||
pursued | |||
==== | |||
by | |||
==== | |||
the | |||
==== | |||
RITSTF. | |||
==== | |||
These | |||
==== | |||
include: | |||
==== | |||
1. | |||
==== | |||
Define | |||
==== | |||
preferred | |||
==== | |||
end | |||
==== | |||
states | |||
==== | |||
for | |||
==== | |||
TS | |||
==== | |||
actions | |||
==== | |||
(e.g., | |||
==== | |||
hot | |||
==== | |||
shutdown | |||
==== | |||
vs. | |||
==== | |||
cold | |||
==== | |||
shutdown) | |||
==== | |||
2. | |||
==== | |||
Increase | |||
==== | |||
the | |||
==== | |||
time | |||
==== | |||
allowed | |||
==== | |||
to | |||
==== | |||
delay | |||
==== | |||
entering | |||
==== | |||
required | |||
==== | |||
actions | |||
==== | |||
when | |||
==== | |||
a | |||
==== | |||
surveillance | |||
==== | |||
is | |||
==== | |||
missed | |||
==== | |||
3. | |||
==== | |||
Modify | |||
==== | |||
existing | |||
==== | |||
mode | |||
==== | |||
restraint | |||
==== | |||
logic | |||
==== | |||
to | |||
==== | |||
allow | |||
==== | |||
use | |||
==== | |||
risk | |||
==== | |||
assessments | |||
==== | |||
for | |||
==== | |||
entry | |||
==== | |||
into | |||
==== | |||
limiting | |||
==== | |||
conditions | |||
==== | |||
for | |||
==== | |||
operation | |||
==== | |||
(LCOs) | |||
==== | |||
with | |||
==== | |||
inoperable | |||
==== | |||
equipment | |||
==== | |||
based | |||
==== | |||
on | |||
==== | |||
low | |||
==== | |||
risk | |||
==== | |||
4. | |||
==== | |||
Develop | |||
==== | |||
a | |||
==== | |||
risk-informed | |||
==== | |||
extension | |||
==== | |||
of | |||
==== | |||
current | |||
==== | |||
allowed | |||
==== | |||
outage | |||
==== | |||
times | |||
==== | |||
based | |||
==== | |||
on | |||
==== | |||
a | |||
==== | |||
configuration | |||
==== | |||
risk | |||
==== | |||
management | |||
==== | |||
program | |||
==== | |||
(CRMP) | |||
==== | |||
5. | |||
==== | |||
Optimize | |||
==== | |||
surveillance | |||
==== | |||
requirements | |||
==== | |||
(SRs) | |||
==== | |||
6. | |||
==== | |||
Modify | |||
==== | |||
LCO | |||
==== | |||
3.0.3 | |||
==== | |||
actions | |||
==== | |||
and | |||
==== | |||
timing | |||
==== | |||
by | |||
==== | |||
extending | |||
==== | |||
minimum | |||
==== | |||
time | |||
==== | |||
to | |||
==== | |||
begin | |||
==== | |||
LCO | |||
==== | |||
3.0.3 | |||
==== | |||
shutdown | |||
==== | |||
from | |||
==== | |||
1 | |||
==== | |||
hour | |||
==== | |||
to | |||
==== | |||
24 | |||
==== | |||
hours | |||
==== | |||
and | |||
==== | |||
allowing | |||
==== | |||
for | |||
==== | |||
a | |||
==== | |||
risk-informed | |||
==== | |||
evaluation | |||
==== | |||
to | |||
==== | |||
determine | |||
==== | |||
whether | |||
==== | |||
it | |||
==== | |||
is | |||
==== | |||
better | |||
==== | |||
to | |||
==== | |||
shut | |||
==== | |||
down | |||
==== | |||
or | |||
==== | |||
continue | |||
==== | |||
to | |||
==== | |||
operate | |||
==== | |||
7. | |||
==== | |||
Define | |||
==== | |||
actions | |||
==== | |||
to | |||
==== | |||
be | |||
==== | |||
taken | |||
==== | |||
when | |||
==== | |||
equipment | |||
==== | |||
is | |||
==== | |||
not | |||
==== | |||
operable | |||
==== | |||
but | |||
==== | |||
is | |||
==== | |||
still | |||
==== | |||
functional | |||
==== | |||
The | |||
==== | |||
staff | |||
==== | |||
and | |||
==== | |||
the | |||
==== | |||
industry | |||
==== | |||
discussed | |||
==== | |||
the | |||
==== | |||
meaning | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
term | |||
==== | |||
risk-informed | |||
==== | |||
as | |||
==== | |||
it | |||
==== | |||
relates | |||
==== | |||
to | |||
==== | |||
regulatory | |||
==== | |||
applications. | |||
==== | |||
The | |||
==== | |||
industry | |||
==== | |||
stated | |||
==== | |||
that | |||
==== | |||
it | |||
==== | |||
was | |||
==== | |||
their | |||
==== | |||
general | |||
==== | |||
philosophy | |||
==== | |||
to | |||
==== | |||
use | |||
==== | |||
qualitative | |||
==== | |||
risk | |||
==== | |||
assessments | |||
==== | |||
where | |||
==== | |||
they | |||
==== | |||
believed | |||
==== | |||
the | |||
==== | |||
benefits | |||
==== | |||
of | |||
==== | |||
a | |||
==== | |||
proposed | |||
==== | |||
change | |||
==== | |||
were | |||
==== | |||
obvious, | |||
==== | |||
and | |||
==== | |||
to | |||
==== | |||
use | |||
==== | |||
quantitative | |||
==== | |||
assessments | |||
==== | |||
where | |||
==== | |||
the | |||
==== | |||
outcome | |||
==== | |||
was | |||
==== | |||
not | |||
==== | |||
as | |||
==== | |||
obvious. | |||
==== | |||
The | |||
==== | |||
industry | |||
==== | |||
also | |||
==== | |||
stated | |||
==== | |||
that | |||
==== | |||
they | |||
==== | |||
take | |||
==== | |||
into | |||
==== | |||
account | |||
==== | |||
other | |||
==== | |||
aspects | |||
==== | |||
such | |||
==== | |||
as | |||
==== | |||
defense | |||
==== | |||
in | |||
==== | |||
depth | |||
==== | |||
and | |||
==== | |||
safety | |||
==== | |||
margins | |||
==== | |||
when | |||
==== | |||
considering | |||
==== | |||
a | |||
==== | |||
proposed | |||
==== | |||
change. | |||
==== | |||
The | |||
==== | |||
industry | |||
==== | |||
believed | |||
==== | |||
such | |||
==== | |||
an | |||
==== | |||
approach | |||
==== | |||
was | |||
==== | |||
consistent | |||
==== | |||
with | |||
==== | |||
the | |||
==== | |||
guidance | |||
==== | |||
in | |||
==== | |||
Regulatory | |||
==== | |||
Guide | |||
==== | |||
1.174, | |||
==== | |||
An | |||
==== | |||
Approach | |||
==== | |||
for | |||
==== | |||
Using | |||
==== | |||
Probabilistic | |||
==== | |||
Risk | |||
==== | |||
Assessment | |||
==== | |||
in | |||
==== | |||
Risk-Informed | |||
==== | |||
Decisions | |||
==== | |||
on | |||
==== | |||
Plant-Specific | |||
==== | |||
Changes | |||
==== | |||
to | |||
==== | |||
the | |||
==== | |||
Licensing | |||
==== | |||
Basis, | |||
==== | |||
to | |||
==== | |||
use | |||
==== | |||
PRA | |||
==== | |||
to | |||
==== | |||
improve | |||
==== | |||
decision | |||
==== | |||
making | |||
==== | |||
and | |||
==== | |||
regulatory | |||
==== | |||
effectiveness. | |||
==== | |||
The | |||
==== | |||
staff | |||
==== | |||
reserved | |||
==== | |||
judgement | |||
==== | |||
of | |||
==== | |||
such | |||
==== | |||
an | |||
==== | |||
approach | |||
==== | |||
noting | |||
==== | |||
that | |||
==== | |||
benefits | |||
==== | |||
that | |||
==== | |||
are | |||
==== | |||
obvious | |||
==== | |||
to | |||
==== | |||
one | |||
==== | |||
person | |||
==== | |||
or | |||
==== | |||
group | |||
==== | |||
might | |||
==== | |||
not | |||
==== | |||
be | |||
==== | |||
obvious | |||
==== | |||
to | |||
==== | |||
another. | |||
==== | |||
SONGS | |||
==== | |||
representatives | |||
==== | |||
then | |||
==== | |||
presented | |||
==== | |||
some | |||
==== | |||
details | |||
==== | |||
regarding | |||
==== | |||
their | |||
==== | |||
PRA | |||
==== | |||
work | |||
==== | |||
in | |||
==== | |||
support | |||
==== | |||
of | |||
==== | |||
some | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
RITSTF | |||
==== | |||
initiatives. | |||
==== | |||
The | |||
==== | |||
San | |||
==== | |||
Onofre | |||
==== | |||
presentations | |||
==== | |||
are | |||
==== | |||
contained | |||
==== | |||
in | |||
==== | |||
Enclosure | |||
==== | |||
3. | |||
==== | |||
The | |||
==== | |||
SONGS | |||
==== | |||
representatives | |||
==== | |||
presented | |||
==== | |||
information | |||
==== | |||
regarding | |||
==== | |||
their | |||
==== | |||
living | |||
==== | |||
PRA | |||
==== | |||
and | |||
==== | |||
Safety | |||
==== | |||
Monitor, | |||
==== | |||
including | |||
==== | |||
the | |||
==== | |||
full | |||
==== | |||
power, | |||
==== | |||
transition, | |||
==== | |||
and | |||
==== | |||
low | |||
==== | |||
power | |||
==== | |||
and | |||
==== | |||
shutdown | |||
==== | |||
risk | |||
==== | |||
models. | |||
==== | |||
The | |||
==== | |||
SONGS | |||
==== | |||
representatives | |||
==== | |||
stated | |||
==== | |||
that | |||
==== | |||
they | |||
==== | |||
had | |||
==== | |||
their | |||
==== | |||
own | |||
==== | |||
transition | |||
==== | |||
model | |||
==== | |||
development | |||
==== | |||
document | |||
==== | |||
1 | |||
==== | |||
Enclosure | |||
==== | |||
1 | |||
==== | |||
that | |||
==== | |||
would | |||
==== | |||
likely | |||
==== | |||
be | |||
==== | |||
referenced | |||
==== | |||
or | |||
==== | |||
included | |||
==== | |||
in | |||
==== | |||
the | |||
==== | |||
SONGS | |||
==== | |||
plant-specific | |||
==== | |||
submittal | |||
==== | |||
for | |||
==== | |||
Initiative | |||
==== | |||
#1. | #1. | ||
==== | |||
The | |||
==== | |||
staff | |||
==== | |||
and | |||
==== | |||
the | |||
==== | |||
RITSTF | |||
==== | |||
discussed | |||
==== | |||
some | |||
==== | |||
specific | |||
==== | |||
submittal | |||
==== | |||
and | |||
==== | |||
implementation | |||
==== | |||
and | |||
==== | |||
technical | |||
==== | |||
issues | |||
==== | |||
related | |||
==== | |||
to | |||
==== | |||
a | |||
==== | |||
few | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
initiatives. | |||
==== | |||
With | |||
==== | |||
regard | |||
==== | |||
to | |||
==== | |||
Initiative | |||
==== | |||
#1 | |||
==== | |||
related | |||
==== | |||
to | |||
==== | |||
safe | |||
==== | |||
end | |||
==== | |||
states, | |||
==== | |||
the | |||
==== | |||
RITSTF | |||
==== | |||
indicated | |||
==== | |||
that | |||
==== | |||
the | |||
==== | |||
Combustion | |||
==== | |||
Engineering | |||
==== | |||
Owners | |||
==== | |||
Group | |||
==== | |||
(CEOG) | |||
==== | |||
was | |||
==== | |||
preparing | |||
==== | |||
a | |||
==== | |||
draft | |||
==== | |||
report | |||
==== | |||
to | |||
==== | |||
support | |||
==== | |||
this | |||
==== | |||
initiative | |||
==== | |||
and | |||
==== | |||
that | |||
==== | |||
the | |||
==== | |||
report | |||
==== | |||
would | |||
==== | |||
accompany | |||
==== | |||
an | |||
==== | |||
industry | |||
==== | |||
request | |||
==== | |||
for | |||
==== | |||
a | |||
==== | |||
generic | |||
==== | |||
change | |||
==== | |||
to | |||
==== | |||
the | |||
==== | |||
STS. | |||
==== | |||
The | |||
==== | |||
RITSTF | |||
==== | |||
indicated | |||
==== | |||
that | |||
==== | |||
changes | |||
==== | |||
to | |||
==== | |||
the | |||
==== | |||
TS | |||
==== | |||
end | |||
==== | |||
states | |||
==== | |||
would | |||
==== | |||
be | |||
==== | |||
proposed | |||
==== | |||
for | |||
==== | |||
the | |||
==== | |||
vast | |||
==== | |||
majority | |||
==== | |||
of | |||
==== | |||
LCOs | |||
==== | |||
in | |||
==== | |||
the | |||
==== | |||
STS. | |||
==== | |||
The | |||
==== | |||
RITSTF | |||
==== | |||
indicated | |||
==== | |||
that | |||
==== | |||
uncertainties | |||
==== | |||
and | |||
==== | |||
sensitivities | |||
==== | |||
of | |||
==== | |||
PRA | |||
==== | |||
results | |||
==== | |||
will | |||
==== | |||
be | |||
==== | |||
investigated. | |||
==== | |||
The | |||
==== | |||
group | |||
==== | |||
discussed | |||
==== | |||
that | |||
==== | |||
additional | |||
==== | |||
known | |||
==== | |||
shutdown | |||
==== | |||
issues | |||
==== | |||
which | |||
==== | |||
may | |||
==== | |||
impact | |||
==== | |||
the | |||
==== | |||
results | |||
==== | |||
(e.g., | |||
==== | |||
external | |||
==== | |||
events | |||
==== | |||
and | |||
==== | |||
boron | |||
==== | |||
dilution) | |||
==== | |||
should | |||
==== | |||
be | |||
==== | |||
addressed. | |||
==== | |||
Representatives | |||
==== | |||
from | |||
==== | |||
the | |||
==== | |||
Boiling | |||
==== | |||
Water | |||
==== | |||
Reactor | |||
==== | |||
Owners | |||
==== | |||
Group | |||
==== | |||
(BWROG) | |||
==== | |||
stated | |||
==== | |||
that | |||
==== | |||
they | |||
==== | |||
are | |||
==== | |||
still | |||
==== | |||
considering | |||
==== | |||
this | |||
==== | |||
initiative | |||
==== | |||
and | |||
==== | |||
that | |||
==== | |||
the | |||
==== | |||
risk | |||
==== | |||
of | |||
==== | |||
operating | |||
==== | |||
in | |||
==== | |||
hot | |||
==== | |||
shutdown | |||
==== | |||
and | |||
==== | |||
in | |||
==== | |||
cold | |||
==== | |||
shutdown | |||
==== | |||
is | |||
==== | |||
relatively | |||
==== | |||
the | |||
==== | |||
same, | |||
==== | |||
whereas | |||
==== | |||
for | |||
==== | |||
the | |||
==== | |||
pressurized | |||
==== | |||
water | |||
==== | |||
reactors | |||
==== | |||
there | |||
==== | |||
appears | |||
==== | |||
to | |||
==== | |||
be | |||
==== | |||
a | |||
==== | |||
clear | |||
==== | |||
risk | |||
==== | |||
benefit | |||
==== | |||
to | |||
==== | |||
operating | |||
==== | |||
in | |||
==== | |||
hot | |||
==== | |||
shutdown | |||
==== | |||
in | |||
==== | |||
most | |||
==== | |||
cases. | |||
==== | |||
They | |||
==== | |||
indicated | |||
==== | |||
that | |||
==== | |||
they | |||
==== | |||
would | |||
==== | |||
be | |||
==== | |||
more | |||
==== | |||
interested | |||
==== | |||
in | |||
==== | |||
changing | |||
==== | |||
the | |||
==== | |||
current | |||
==== | |||
TS | |||
==== | |||
to | |||
==== | |||
allow | |||
==== | |||
them | |||
==== | |||
to | |||
==== | |||
use | |||
==== | |||
PRA | |||
==== | |||
in | |||
==== | |||
deciding | |||
==== | |||
whether | |||
==== | |||
to | |||
==== | |||
stay | |||
==== | |||
at | |||
==== | |||
power | |||
==== | |||
or | |||
==== | |||
shut | |||
==== | |||
the | |||
==== | |||
reactor | |||
==== | |||
down. | |||
==== | |||
They | |||
==== | |||
also | |||
==== | |||
indicated | |||
==== | |||
that | |||
==== | |||
they | |||
==== | |||
may | |||
==== | |||
be | |||
==== | |||
interested | |||
==== | |||
in | |||
==== | |||
extending | |||
==== | |||
the | |||
==== | |||
time | |||
==== | |||
requirements | |||
==== | |||
for | |||
==== | |||
going | |||
==== | |||
to | |||
==== | |||
cold | |||
==== | |||
shutdown. | |||
==== | |||
This | |||
==== | |||
would | |||
==== | |||
allow | |||
==== | |||
them | |||
==== | |||
to | |||
==== | |||
operate | |||
==== | |||
longer | |||
==== | |||
in | |||
==== | |||
hot | |||
==== | |||
shutdown | |||
==== | |||
conditions. | |||
==== | |||
The | |||
==== | |||
BWROG | |||
==== | |||
is | |||
==== | |||
considering | |||
==== | |||
a | |||
==== | |||
pilot | |||
==== | |||
plant | |||
==== | |||
for | |||
==== | |||
this | |||
==== | |||
issue. | |||
==== | |||
The | |||
==== | |||
RITSTF | |||
==== | |||
and | |||
==== | |||
the | |||
==== | |||
staff | |||
==== | |||
discussed | |||
==== | |||
how | |||
==== | |||
the | |||
==== | |||
SONGS | |||
==== | |||
assessment | |||
==== | |||
results | |||
==== | |||
for | |||
==== | |||
Initiative | |||
==== | |||
#1 | |||
==== | |||
could | |||
==== | |||
be | |||
==== | |||
applied | |||
==== | |||
to | |||
==== | |||
other | |||
==== | |||
plants. | |||
==== | |||
The | |||
==== | |||
Westinghouse | |||
==== | |||
Owners | |||
==== | |||
Group | |||
==== | |||
(WOG) | |||
==== | |||
indicated | |||
==== | |||
that | |||
==== | |||
they | |||
==== | |||
would | |||
==== | |||
attempt | |||
==== | |||
to | |||
==== | |||
show | |||
==== | |||
how | |||
==== | |||
the | |||
==== | |||
SONGS | |||
==== | |||
results | |||
==== | |||
apply | |||
==== | |||
using | |||
==== | |||
qualitative | |||
==== | |||
assessments | |||
==== | |||
and | |||
==== | |||
comparisons, | |||
==== | |||
and | |||
==== | |||
that | |||
==== | |||
they | |||
==== | |||
did | |||
==== | |||
not | |||
==== | |||
plan | |||
==== | |||
to | |||
==== | |||
perform | |||
==== | |||
any | |||
==== | |||
further | |||
==== | |||
plant-specific | |||
==== | |||
analyses. | |||
==== | |||
The | |||
==== | |||
Babcock | |||
==== | |||
and | |||
==== | |||
Wilcox | |||
==== | |||
Owners | |||
==== | |||
Group | |||
==== | |||
indicated | |||
==== | |||
that | |||
==== | |||
they | |||
==== | |||
intended | |||
==== | |||
to | |||
==== | |||
pursue | |||
==== | |||
a | |||
==== | |||
similar | |||
==== | |||
approach. | |||
==== | |||
The | |||
==== | |||
group | |||
==== | |||
indicated | |||
==== | |||
that | |||
==== | |||
they | |||
==== | |||
could | |||
==== | |||
use | |||
==== | |||
the | |||
==== | |||
SONGS | |||
==== | |||
model | |||
==== | |||
to | |||
==== | |||
help | |||
==== | |||
develop | |||
==== | |||
sensitivity | |||
==== | |||
studies | |||
==== | |||
to | |||
==== | |||
address | |||
==== | |||
some | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
design | |||
==== | |||
differences | |||
==== | |||
between | |||
==== | |||
the | |||
==== | |||
plants. | |||
==== | |||
The | |||
==== | |||
staff | |||
==== | |||
stated | |||
==== | |||
that | |||
==== | |||
they | |||
==== | |||
could | |||
==== | |||
not | |||
==== | |||
make | |||
==== | |||
any | |||
==== | |||
definitive | |||
==== | |||
decisions | |||
==== | |||
on | |||
==== | |||
what | |||
==== | |||
type | |||
==== | |||
of | |||
==== | |||
submittals | |||
==== | |||
they | |||
==== | |||
would | |||
==== | |||
find | |||
==== | |||
acceptable | |||
==== | |||
and | |||
==== | |||
that | |||
==== | |||
the | |||
==== | |||
burden | |||
==== | |||
of | |||
==== | |||
proof | |||
==== | |||
of | |||
==== | |||
similarity | |||
==== | |||
to | |||
==== | |||
the | |||
==== | |||
CEOG | |||
==== | |||
work | |||
==== | |||
would | |||
==== | |||
rest | |||
==== | |||
with | |||
==== | |||
the | |||
==== | |||
other | |||
==== | |||
owners | |||
==== | |||
groups. | |||
==== | |||
With | |||
==== | |||
regard | |||
==== | |||
to | |||
==== | |||
Initiative | |||
==== | |||
#2 | |||
==== | |||
related | |||
==== | |||
to | |||
==== | |||
missed | |||
==== | |||
SRs, | |||
==== | |||
the | |||
==== | |||
group | |||
==== | |||
discussed | |||
==== | |||
the | |||
==== | |||
PRA | |||
==== | |||
aspects | |||
==== | |||
of | |||
==== | |||
that | |||
==== | |||
initiative. | |||
==== | |||
In | |||
==== | |||
order | |||
==== | |||
to | |||
==== | |||
assess | |||
==== | |||
the | |||
==== | |||
increase | |||
==== | |||
in | |||
==== | |||
risk | |||
==== | |||
it | |||
==== | |||
is | |||
==== | |||
necessary | |||
==== | |||
to | |||
==== | |||
make | |||
==== | |||
an | |||
==== | |||
assumption | |||
==== | |||
about | |||
==== | |||
the | |||
==== | |||
frequency | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
various | |||
==== | |||
expected | |||
==== | |||
missed | |||
==== | |||
surveillances. | |||
==== | |||
This | |||
==== | |||
requires | |||
==== | |||
an | |||
==== | |||
understanding | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
reasons, | |||
==== | |||
the | |||
==== | |||
nature | |||
==== | |||
and | |||
==== | |||
circumstances | |||
==== | |||
under | |||
==== | |||
which | |||
==== | |||
surveillances | |||
==== | |||
are | |||
==== | |||
missed. | |||
==== | |||
The | |||
==== | |||
RITSTF | |||
==== | |||
pointed | |||
==== | |||
out | |||
==== | |||
that | |||
==== | |||
even | |||
==== | |||
if | |||
==== | |||
the | |||
==== | |||
failure | |||
==== | |||
rate | |||
==== | |||
of | |||
==== | |||
a | |||
==== | |||
component | |||
==== | |||
is | |||
==== | |||
doubled, | |||
==== | |||
due | |||
==== | |||
to | |||
==== | |||
the | |||
==== | |||
missed | |||
==== | |||
surveillance | |||
==== | |||
on | |||
==== | |||
that | |||
==== | |||
component, | |||
==== | |||
the | |||
==== | |||
plant | |||
==== | |||
risk | |||
==== | |||
would | |||
==== | |||
not | |||
==== | |||
be | |||
==== | |||
affected | |||
==== | |||
significantly. | |||
==== | |||
The | |||
==== | |||
staff | |||
==== | |||
agreed | |||
==== | |||
that | |||
==== | |||
most | |||
==== | |||
likely | |||
==== | |||
the | |||
==== | |||
risk | |||
==== | |||
increase | |||
==== | |||
would | |||
==== | |||
not | |||
==== | |||
be | |||
==== | |||
significant | |||
==== | |||
unless | |||
==== | |||
some | |||
==== | |||
licensees | |||
==== | |||
abuse | |||
==== | |||
the | |||
==== | |||
proposed | |||
==== | |||
flexibility. | |||
==== | |||
The | |||
==== | |||
development | |||
==== | |||
and | |||
==== | |||
implementation | |||
==== | |||
of | |||
==== | |||
an | |||
==== | |||
appropriate | |||
==== | |||
regulatory | |||
==== | |||
oversight | |||
==== | |||
process | |||
==== | |||
could | |||
==== | |||
address | |||
==== | |||
this | |||
==== | |||
issue. | |||
==== | |||
The | |||
==== | |||
industry | |||
==== | |||
and | |||
==== | |||
the | |||
==== | |||
staff | |||
==== | |||
agreed | |||
==== | |||
that | |||
==== | |||
the | |||
==== | |||
staffs | |||
==== | |||
review | |||
==== | |||
of | |||
==== | |||
this | |||
==== | |||
issue | |||
==== | |||
would | |||
==== | |||
involve | |||
==== | |||
more | |||
==== | |||
of | |||
==== | |||
a | |||
==== | |||
policy | |||
==== | |||
decision | |||
==== | |||
than | |||
==== | |||
a | |||
==== | |||
technical | |||
==== | |||
decision. | |||
==== | |||
With | |||
==== | |||
regard | |||
==== | |||
to | |||
==== | |||
Initiative | |||
==== | |||
#3 | |||
==== | |||
related | |||
==== | |||
to | |||
==== | |||
mode | |||
==== | |||
restraints, | |||
==== | |||
SONGS | |||
==== | |||
has | |||
==== | |||
been | |||
==== | |||
studying | |||
==== | |||
this | |||
==== | |||
issue | |||
==== | |||
by | |||
==== | |||
comparing | |||
==== | |||
the | |||
==== | |||
relative | |||
==== | |||
importance | |||
==== | |||
of | |||
==== | |||
functions | |||
==== | |||
and | |||
==== | |||
associated | |||
==== | |||
systems | |||
==== | |||
at | |||
==== | |||
various | |||
==== | |||
modes | |||
==== | |||
of | |||
==== | |||
operation. | |||
==== | |||
The | |||
==== | |||
proposed | |||
==== | |||
change | |||
==== | |||
would | |||
==== | |||
allow | |||
==== | |||
a | |||
==== | |||
licensee | |||
==== | |||
to | |||
==== | |||
use | |||
==== | |||
a | |||
==== | |||
CRMP | |||
==== | |||
to | |||
==== | |||
decide | |||
==== | |||
whether | |||
==== | |||
to | |||
==== | |||
enter | |||
==== | |||
into | |||
==== | |||
a | |||
==== | |||
mode | |||
==== | |||
or | |||
==== | |||
other | |||
==== | |||
specified | |||
==== | |||
condition | |||
==== | |||
within | |||
==== | |||
the | |||
==== | |||
applicability | |||
==== | |||
with | |||
==== | |||
inoperable | |||
==== | |||
equipment. | |||
==== | |||
The | |||
==== | |||
staff | |||
==== | |||
agreed | |||
==== | |||
that | |||
==== | |||
the | |||
==== | |||
study | |||
==== | |||
of | |||
==== | |||
conditions | |||
==== | |||
and | |||
==== | |||
risks | |||
==== | |||
associated | |||
==== | |||
with | |||
==== | |||
various | |||
==== | |||
likely | |||
==== | |||
transitions | |||
==== | |||
could | |||
==== | |||
help | |||
==== | |||
focus | |||
==== | |||
the | |||
==== | |||
issue | |||
==== | |||
and | |||
==== | |||
identify | |||
==== | |||
an | |||
==== | |||
appropriate | |||
==== | |||
regulatory | |||
==== | |||
oversight | |||
==== | |||
mechanism. | |||
==== | |||
2 | |||
==== | |||
Enclosure | |||
==== | |||
1 | |||
==== | |||
With | |||
==== | |||
regard | |||
==== | |||
to | |||
==== | |||
Initiative | |||
==== | |||
#6 | |||
==== | |||
related | |||
==== | |||
to | |||
==== | |||
changes | |||
==== | |||
to | |||
==== | |||
LCO | |||
==== | |||
3.0.3, | |||
==== | |||
the | |||
==== | |||
RITSTF | |||
==== | |||
stated | |||
==== | |||
that | |||
==== | |||
this | |||
==== | |||
initiative | |||
==== | |||
is | |||
==== | |||
very | |||
==== | |||
closely | |||
==== | |||
tied | |||
==== | |||
to | |||
==== | |||
the | |||
==== | |||
maintenance | |||
==== | |||
rule | |||
==== | |||
as | |||
==== | |||
it | |||
==== | |||
addresses | |||
==== | |||
what | |||
==== | |||
actions | |||
==== | |||
to | |||
==== | |||
take | |||
==== | |||
for | |||
==== | |||
a | |||
==== | |||
loss | |||
==== | |||
of | |||
==== | |||
safety | |||
==== | |||
function. | |||
==== | |||
The | |||
==== | |||
industry | |||
==== | |||
indicated | |||
==== | |||
that | |||
==== | |||
the | |||
==== | |||
frequency | |||
==== | |||
of | |||
==== | |||
plant | |||
==== | |||
conditions | |||
==== | |||
for | |||
==== | |||
which | |||
==== | |||
this | |||
==== | |||
TS | |||
==== | |||
change | |||
==== | |||
is | |||
==== | |||
applicable | |||
==== | |||
is | |||
==== | |||
low. | |||
==== | |||
The | |||
==== | |||
staff | |||
==== | |||
mentioned | |||
==== | |||
that | |||
==== | |||
the | |||
==== | |||
identification | |||
==== | |||
and | |||
==== | |||
study | |||
==== | |||
of | |||
==== | |||
examples | |||
==== | |||
of | |||
==== | |||
plant | |||
==== | |||
specific | |||
==== | |||
LCO | |||
==== | |||
3.0.3 | |||
==== | |||
entries | |||
==== | |||
and | |||
==== | |||
conditions | |||
==== | |||
that | |||
==== | |||
would | |||
==== | |||
drive | |||
==== | |||
the | |||
==== | |||
plant | |||
==== | |||
to | |||
==== | |||
shutdown, | |||
==== | |||
including | |||
==== | |||
associated | |||
==== | |||
risks, | |||
==== | |||
could | |||
==== | |||
help | |||
==== | |||
focus | |||
==== | |||
the | |||
==== | |||
issue. | |||
==== | |||
The | |||
==== | |||
group | |||
==== | |||
discussed | |||
==== | |||
the | |||
==== | |||
process | |||
==== | |||
for | |||
==== | |||
plants | |||
==== | |||
to | |||
==== | |||
adopt | |||
==== | |||
approved | |||
==== | |||
changes | |||
==== | |||
to | |||
==== | |||
the | |||
==== | |||
STS. | |||
==== | |||
The | |||
==== | |||
staff | |||
==== | |||
briefly | |||
==== | |||
discussed | |||
==== | |||
processes | |||
==== | |||
being | |||
==== | |||
considered | |||
==== | |||
to | |||
==== | |||
make | |||
==== | |||
adoption | |||
==== | |||
of | |||
==== | |||
such | |||
==== | |||
approved | |||
==== | |||
changes | |||
==== | |||
more | |||
==== | |||
efficient. | |||
==== | |||
Finally, | |||
==== | |||
the | |||
==== | |||
group | |||
==== | |||
discussed | |||
==== | |||
submittal | |||
==== | |||
schedules | |||
==== | |||
for | |||
==== | |||
some | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
initiatives. | |||
==== | |||
The | |||
==== | |||
RITSTF | |||
==== | |||
stated | |||
==== | |||
that | |||
==== | |||
they | |||
==== | |||
expected | |||
==== | |||
to | |||
==== | |||
submit | |||
==== | |||
Initiatives | |||
==== | |||
#2 | |||
==== | |||
and | |||
==== | |||
#3 | |||
==== | |||
to | |||
==== | |||
the | |||
==== | |||
staff | |||
==== | |||
around | |||
==== | |||
October | |||
==== | |||
30, | |||
==== | |||
1999, | |||
==== | |||
and | |||
==== | |||
that | |||
==== | |||
they | |||
==== | |||
might | |||
==== | |||
be | |||
==== | |||
able | |||
==== | |||
to | |||
==== | |||
submit | |||
==== | |||
some | |||
==== | |||
of | |||
==== | |||
their | |||
==== | |||
PRA | |||
==== | |||
assessment | |||
==== | |||
for | |||
==== | |||
Initiative | |||
==== | |||
#1 | |||
==== | |||
by | |||
==== | |||
December | |||
==== | |||
31, | |||
==== | |||
1999. | |||
==== | |||
The | |||
==== | |||
RITSTF | |||
==== | |||
stated | |||
==== | |||
that | |||
==== | |||
Initiatives | |||
==== | |||
#4 | |||
==== | |||
and | |||
==== | |||
#6 | |||
==== | |||
would | |||
==== | |||
come | |||
==== | |||
sometime | |||
==== | |||
in | |||
==== | |||
2000. | |||
==== | |||
The | |||
==== | |||
November | |||
==== | |||
10, | |||
==== | |||
1999 | |||
==== | |||
meeting | |||
==== | |||
was | |||
==== | |||
a | |||
==== | |||
meeting | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
full | |||
==== | |||
RITSTF | |||
==== | |||
to | |||
==== | |||
discuss | |||
==== | |||
high-level | |||
==== | |||
objectives | |||
==== | |||
and | |||
==== | |||
the | |||
==== | |||
status | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
current | |||
==== | |||
initiatives. | |||
==== | |||
All | |||
==== | |||
presentations | |||
==== | |||
for | |||
==== | |||
the | |||
==== | |||
meeting | |||
==== | |||
are | |||
==== | |||
contained | |||
==== | |||
in | |||
==== | |||
Enclosure | |||
==== | |||
4. | |||
==== | |||
The | |||
==== | |||
staff | |||
==== | |||
opened | |||
==== | |||
the | |||
==== | |||
meeting | |||
==== | |||
with | |||
==== | |||
a | |||
==== | |||
general | |||
==== | |||
discussion | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
status | |||
==== | |||
of | |||
==== | |||
risk-informed | |||
==== | |||
regulatory | |||
==== | |||
activities | |||
==== | |||
at | |||
==== | |||
the | |||
==== | |||
NRC. | |||
==== | |||
The | |||
==== | |||
staff | |||
==== | |||
pointed | |||
==== | |||
out | |||
==== | |||
that | |||
==== | |||
there | |||
==== | |||
was | |||
==== | |||
a | |||
==== | |||
high | |||
==== | |||
level | |||
==== | |||
of | |||
==== | |||
interest | |||
==== | |||
in | |||
==== | |||
the | |||
==== | |||
RITSTF | |||
==== | |||
activities | |||
==== | |||
and | |||
==== | |||
that | |||
==== | |||
we | |||
==== | |||
needed | |||
==== | |||
to | |||
==== | |||
understand | |||
==== | |||
how | |||
==== | |||
broad | |||
==== | |||
the | |||
==== | |||
interest | |||
==== | |||
in | |||
==== | |||
the | |||
==== | |||
industry | |||
==== | |||
was. | |||
==== | |||
The | |||
==== | |||
staff | |||
==== | |||
presented | |||
==== | |||
several | |||
==== | |||
thoughts | |||
==== | |||
on | |||
==== | |||
a | |||
==== | |||
long-term | |||
==== | |||
vision | |||
==== | |||
for | |||
==== | |||
risk- | |||
==== | |||
informed | |||
==== | |||
TS | |||
==== | |||
and | |||
==== | |||
acknowledged | |||
==== | |||
that | |||
==== | |||
structure | |||
==== | |||
and | |||
==== | |||
resource | |||
==== | |||
issues | |||
==== | |||
will | |||
==== | |||
need | |||
==== | |||
to | |||
==== | |||
be | |||
==== | |||
worked | |||
==== | |||
out. | |||
==== | |||
The | |||
==== | |||
staff | |||
==== | |||
also | |||
==== | |||
pointed | |||
==== | |||
out | |||
==== | |||
that | |||
==== | |||
it | |||
==== | |||
will | |||
==== | |||
need | |||
==== | |||
to | |||
==== | |||
address | |||
==== | |||
the | |||
==== | |||
four | |||
==== | |||
strategic | |||
==== | |||
performance | |||
==== | |||
goals | |||
==== | |||
identified | |||
==== | |||
in | |||
==== | |||
the | |||
==== | |||
Commissions | |||
==== | |||
Nuclear | |||
==== | |||
Reactor | |||
==== | |||
Safety | |||
==== | |||
Strategic | |||
==== | |||
Plan. | |||
==== | |||
Those | |||
==== | |||
performance | |||
==== | |||
goals | |||
==== | |||
are: | |||
==== | |||
(1) | |||
==== | |||
Maintain | |||
==== | |||
safety; | |||
==== | |||
(2) | |||
==== | |||
Increase | |||
==== | |||
public | |||
==== | |||
confidence; | |||
==== | |||
(3) | |||
==== | |||
Reduce | |||
==== | |||
unnecessary | |||
==== | |||
regulatory | |||
==== | |||
burden; | |||
==== | |||
and | |||
==== | |||
(4) | |||
==== | |||
Make | |||
==== | |||
NRC | |||
==== | |||
activities | |||
==== | |||
and | |||
==== | |||
decisions | |||
==== | |||
more | |||
==== | |||
effective, | |||
==== | |||
efficient, | |||
==== | |||
and | |||
==== | |||
realistic. | |||
==== | |||
The | |||
==== | |||
RITSTF | |||
==== | |||
presented | |||
==== | |||
some | |||
==== | |||
of | |||
==== | |||
its | |||
==== | |||
thoughts | |||
==== | |||
on | |||
==== | |||
a | |||
==== | |||
long-term | |||
==== | |||
vision | |||
==== | |||
for | |||
==== | |||
risk-informed | |||
==== | |||
TS. | |||
==== | |||
Much | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
discussion | |||
==== | |||
focused | |||
==== | |||
on | |||
==== | |||
a | |||
==== | |||
slide | |||
==== | |||
which | |||
==== | |||
presented | |||
==== | |||
the | |||
==== | |||
Westinghouse | |||
==== | |||
Owners | |||
==== | |||
Group | |||
==== | |||
(WOG) | |||
==== | |||
five | |||
==== | |||
year | |||
==== | |||
risk-informed | |||
==== | |||
TS | |||
==== | |||
strategy. | |||
==== | |||
The | |||
==== | |||
group | |||
==== | |||
discussed | |||
==== | |||
at | |||
==== | |||
what | |||
==== | |||
point | |||
==== | |||
rulemaking | |||
==== | |||
might | |||
==== | |||
be | |||
==== | |||
needed | |||
==== | |||
to | |||
==== | |||
accommodate | |||
==== | |||
all | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
envisioned | |||
==== | |||
changes | |||
==== | |||
to | |||
==== | |||
TS. | |||
==== | |||
The | |||
==== | |||
group | |||
==== | |||
also | |||
==== | |||
discussed | |||
==== | |||
the | |||
==== | |||
issue | |||
==== | |||
of | |||
==== | |||
PRA | |||
==== | |||
quality | |||
==== | |||
and | |||
==== | |||
the | |||
==== | |||
fact | |||
==== | |||
that | |||
==== | |||
the | |||
==== | |||
ASME | |||
==== | |||
PRA | |||
==== | |||
standard | |||
==== | |||
currently | |||
==== | |||
being | |||
==== | |||
developed | |||
==== | |||
did | |||
==== | |||
not | |||
==== | |||
address | |||
==== | |||
configuration | |||
==== | |||
risk | |||
==== | |||
management | |||
==== | |||
tools | |||
==== | |||
like | |||
==== | |||
those | |||
==== | |||
envisioned | |||
==== | |||
as | |||
==== | |||
necessary | |||
==== | |||
to | |||
==== | |||
implement | |||
==== | |||
many | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
TS | |||
==== | |||
changes | |||
==== | |||
under | |||
==== | |||
development. | |||
==== | |||
Representatives | |||
==== | |||
from | |||
==== | |||
the | |||
==== | |||
South | |||
==== | |||
Texas | |||
==== | |||
Project | |||
==== | |||
presented | |||
==== | |||
a | |||
==== | |||
concept | |||
==== | |||
of | |||
==== | |||
a | |||
==== | |||
fully | |||
==== | |||
risk-informed | |||
==== | |||
set | |||
==== | |||
of | |||
==== | |||
TS | |||
==== | |||
that | |||
==== | |||
essentially | |||
==== | |||
relies | |||
==== | |||
on | |||
==== | |||
a | |||
==== | |||
CRMP | |||
==== | |||
as | |||
==== | |||
the | |||
==== | |||
backbone | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
TS. | |||
==== | |||
They | |||
==== | |||
likened | |||
==== | |||
the | |||
==== | |||
proposed | |||
==== | |||
risk | |||
==== | |||
limits | |||
==== | |||
in | |||
==== | |||
their | |||
==== | |||
concept | |||
==== | |||
to | |||
==== | |||
radiation | |||
==== | |||
protection | |||
==== | |||
limits | |||
==== | |||
(i.e., | |||
==== | |||
ALARA | |||
==== | |||
limits). | |||
==== | |||
The | |||
==== | |||
NRC | |||
==== | |||
regulates | |||
==== | |||
ALARA | |||
==== | |||
limits | |||
==== | |||
at | |||
==== | |||
a | |||
==== | |||
high | |||
==== | |||
level | |||
==== | |||
and | |||
==== | |||
licensees | |||
==== | |||
control | |||
==== | |||
these | |||
==== | |||
limits | |||
==== | |||
at | |||
==== | |||
a | |||
==== | |||
lower | |||
==== | |||
level | |||
==== | |||
administratively. | |||
==== | |||
The | |||
==== | |||
group | |||
==== | |||
also | |||
==== | |||
discussed | |||
==== | |||
whether | |||
==== | |||
there | |||
==== | |||
was | |||
==== | |||
a | |||
==== | |||
need | |||
==== | |||
for | |||
==== | |||
an | |||
==== | |||
instantaneous | |||
==== | |||
risk | |||
==== | |||
cap | |||
==== | |||
for | |||
==== | |||
TS. | |||
==== | |||
The | |||
==== | |||
RITSTF | |||
==== | |||
stated | |||
==== | |||
that | |||
==== | |||
the | |||
==== | |||
major | |||
==== | |||
question | |||
==== | |||
is | |||
==== | |||
the | |||
==== | |||
cost | |||
==== | |||
benefit | |||
==== | |||
of | |||
==== | |||
going | |||
==== | |||
to | |||
==== | |||
this | |||
==== | |||
extreme. | |||
==== | |||
For | |||
==== | |||
example, | |||
==== | |||
if | |||
==== | |||
plant | |||
==== | |||
PRAs | |||
==== | |||
essentially | |||
==== | |||
become | |||
==== | |||
the | |||
==== | |||
TS, | |||
==== | |||
then | |||
==== | |||
licensees | |||
==== | |||
would | |||
==== | |||
have | |||
==== | |||
to | |||
==== | |||
control | |||
==== | |||
changes | |||
==== | |||
to | |||
==== | |||
the | |||
==== | |||
PRA | |||
==== | |||
model | |||
==== | |||
to | |||
==== | |||
the | |||
==== | |||
same | |||
==== | |||
degree | |||
==== | |||
as | |||
==== | |||
TS | |||
==== | |||
changes | |||
==== | |||
are | |||
==== | |||
currently | |||
==== | |||
controlled. | |||
==== | |||
The | |||
==== | |||
RITSTF | |||
==== | |||
presented | |||
==== | |||
a | |||
==== | |||
status | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
seven | |||
==== | |||
initiatives | |||
==== | |||
currently | |||
==== | |||
under | |||
==== | |||
development. | |||
==== | |||
The | |||
==== | |||
group | |||
==== | |||
discussed | |||
==== | |||
Initiative | |||
==== | |||
#1 | |||
==== | |||
related | |||
==== | |||
to | |||
==== | |||
safe | |||
==== | |||
end | |||
==== | |||
states. | |||
==== | |||
The | |||
==== | |||
RITSTF | |||
==== | |||
stated | |||
==== | |||
that | |||
==== | |||
the | |||
==== | |||
expected | |||
==== | |||
results | |||
==== | |||
were | |||
==== | |||
confirmed | |||
==== | |||
by | |||
==== | |||
the | |||
==== | |||
PRA | |||
==== | |||
work | |||
==== | |||
done | |||
==== | |||
by | |||
==== | |||
SONGS. | |||
==== | |||
The | |||
==== | |||
group | |||
==== | |||
again | |||
==== | |||
discussed | |||
==== | |||
what | |||
==== | |||
work | |||
==== | |||
the | |||
==== | |||
other | |||
==== | |||
owners | |||
==== | |||
groups | |||
==== | |||
planned | |||
==== | |||
to | |||
==== | |||
do | |||
==== | |||
to | |||
==== | |||
justify | |||
==== | |||
the | |||
==== | |||
changes | |||
==== | |||
for | |||
==== | |||
their | |||
==== | |||
plant | |||
==== | |||
types | |||
==== | |||
by | |||
==== | |||
taking | |||
==== | |||
3 | |||
==== | |||
Enclosure | |||
==== | |||
1 | |||
==== | |||
advantage | |||
==== | |||
of | |||
==== | |||
the | |||
==== | |||
SONGS | |||
==== | |||
and | |||
==== | |||
CEOG | |||
==== | |||
work. | |||
==== | |||
Updated | |||
==== | |||
schedules | |||
==== | |||
for | |||
==== | |||
the | |||
==== | |||
various | |||
==== | |||
initiatives | |||
==== | |||
were | |||
==== | |||
discussed. | |||
==== | |||
The | |||
==== | |||
RITSTF | |||
==== | |||
stated | |||
==== | |||
that | |||
==== | |||
they | |||
==== | |||
expected | |||
==== | |||
to | |||
==== | |||
submit | |||
==== | |||
Initiative | |||
==== | |||
#1 | |||
==== | |||
in | |||
==== | |||
February | |||
==== | |||
or | |||
==== | |||
March | |||
==== | |||
2000. | |||
==== | |||
Initiatives | |||
==== | |||
#2 | |||
==== | |||
and | |||
==== | |||
#3 | |||
==== | |||
were | |||
==== | |||
expected | |||
==== | |||
to | |||
==== | |||
be | |||
==== | |||
submitted | |||
==== | |||
in | |||
==== | |||
the | |||
==== | |||
very | |||
==== | |||
near | |||
==== | |||
future. | |||
==== | |||
Initiative | |||
==== | |||
#4 | |||
==== | |||
was | |||
==== | |||
planned | |||
==== | |||
for | |||
==== | |||
submittal | |||
==== | |||
in | |||
==== | |||
late | |||
==== | |||
2000. | |||
==== | |||
Initiatives | |||
==== | |||
5, | |||
==== | |||
6, | |||
==== | |||
and | |||
==== | |||
7 | |||
==== | |||
were | |||
==== | |||
also | |||
==== | |||
expected | |||
==== | |||
in | |||
==== | |||
mid | |||
==== | |||
to | |||
==== | |||
late | |||
==== | |||
2000. | |||
==== | |||
The | |||
==== | |||
group | |||
==== | |||
briefly | |||
==== | |||
discussed | |||
==== | |||
the | |||
==== | |||
staffs | |||
==== | |||
planned | |||
==== | |||
process | |||
==== | |||
for | |||
==== | |||
reviewing | |||
==== | |||
and | |||
==== | |||
adopting | |||
==== | |||
these | |||
==== | |||
initiatives | |||
==== | |||
as | |||
==== | |||
changes | |||
==== | |||
to | |||
==== | |||
the | |||
==== | |||
STS. | |||
==== | |||
The | |||
==== | |||
group | |||
==== | |||
also | |||
==== | |||
discussed | |||
==== | |||
support | |||
==== | |||
for | |||
==== | |||
the | |||
==== | |||
December | |||
==== | |||
16, | |||
==== | |||
1999 | |||
==== | |||
meeting | |||
==== | |||
with | |||
==== | |||
the | |||
==== | |||
Advisory | |||
==== | |||
Committee | |||
==== | |||
for | |||
==== | |||
Reactor | |||
==== | |||
Safeguards | |||
==== | |||
Reliability | |||
==== | |||
and | |||
==== | |||
PRA | |||
==== | |||
Subcommittee | |||
==== | |||
and | |||
==== | |||
agreed | |||
==== | |||
to | |||
==== | |||
a | |||
==== | |||
possible | |||
==== | |||
future | |||
==== | |||
meeting | |||
==== | |||
in | |||
==== | |||
late | |||
==== | |||
February | |||
==== | |||
2000. | |||
==== | |||
4 | |||
==== | |||
Enclosure | |||
==== | |||
1 | |||
==== | |||
Meeting | |||
==== | |||
Attendees | |||
==== | |||
October | |||
==== | |||
6-7, | |||
==== | |||
1999 | |||
==== | |||
Name | |||
==== | |||
Affiliation | |||
==== | |||
Dennis | |||
==== | |||
Henneke | |||
==== | |||
Southern | |||
==== | |||
California | |||
==== | |||
Edison | |||
==== | |||
Sharon | |||
==== | |||
Mahler | |||
==== | |||
Southern | |||
==== | |||
California | |||
==== | |||
Edison | |||
==== | |||
Gary | |||
==== | |||
Chung | |||
==== | |||
Southern | |||
==== | |||
California | |||
==== | |||
Edison | |||
==== | |||
Brian | |||
==== | |||
Woods | |||
==== | |||
Southern | |||
==== | |||
California | |||
==== | |||
Edison | |||
==== | |||
Thomas | |||
==== | |||
Hook | |||
==== | |||
Southern | |||
==== | |||
California | |||
==== | |||
Edison | |||
==== | |||
Ed | |||
==== | |||
Scherer | |||
==== | |||
Southern | |||
==== | |||
California | |||
==== | |||
Edison | |||
==== | |||
Don | |||
==== | |||
McCamy | |||
==== | |||
Tennessee | |||
==== | |||
Valley | |||
==== | |||
Authority | |||
==== | |||
Kent | |||
==== | |||
Sulton | |||
==== | |||
Nebraska | |||
==== | |||
Public | |||
==== | |||
Power | |||
==== | |||
District | |||
==== | |||
S. | |||
==== | |||
Visweswaran | |||
==== | |||
General | |||
==== | |||
Electric | |||
==== | |||
Thomas | |||
==== | |||
Sihko | |||
==== | |||
Vermont | |||
==== | |||
Yankee | |||
==== | |||
Jerry | |||
==== | |||
André | |||
==== | |||
Westinghouse | |||
==== | |||
Mike | |||
==== | |||
Kitlan | |||
==== | |||
Duke | |||
==== | |||
Power | |||
==== | |||
Rick | |||
==== | |||
Wachowiak | |||
==== | |||
Nebraska | |||
==== | |||
Public | |||
==== | |||
Power | |||
==== | |||
District | |||
==== | |||
Frank | |||
==== | |||
Rahn | |||
==== | |||
Electric | |||
==== | |||
Power | |||
==== | |||
Research | |||
==== | |||
Institute | |||
==== | |||
Nicholas | |||
==== | |||
Saltos | |||
==== | |||
NRC/NRR/SPSB | |||
==== | |||
Millard | |||
==== | |||
Wohl | |||
==== | |||
NRC/NRR/SPSB | |||
==== | |||
Nanette | |||
==== | |||
Gilles | |||
==== | |||
NRC/NRR/RTSB | |||
==== | |||
ÿýüûúø÷ | |||
==== | |||
Enclosure | |||
==== | |||
2 | |||
==== | |||
Meeting | |||
==== | |||
Attendees | |||
==== | |||
November | |||
==== | |||
10, | |||
==== | |||
1999 | |||
==== | |||
Name | |||
==== | |||
Affiliation | |||
==== | |||
Ray | |||
==== | |||
Schneider | |||
==== | |||
ABB-Combustion | |||
==== | |||
Engineering | |||
==== | |||
Nuclear | |||
==== | |||
Fuel | |||
==== | |||
Company | |||
==== | |||
Alan | |||
==== | |||
Hackerott | |||
==== | |||
Omaha | |||
==== | |||
Public | |||
==== | |||
Power | |||
==== | |||
District | |||
==== | |||
Dennis | |||
==== | |||
Henneke | |||
==== | |||
Southern | |||
==== | |||
California | |||
==== | |||
Edison | |||
==== | |||
Sharon | |||
==== | |||
Mahler | |||
==== | |||
Southern | |||
==== | |||
California | |||
==== | |||
Edison | |||
==== | |||
Biff | |||
==== | |||
Bradley | |||
==== | |||
Nuclear | |||
==== | |||
Energy | |||
==== | |||
Institute | |||
==== | |||
Noel | |||
==== | |||
Clarkson | |||
==== | |||
Duke | |||
==== | |||
Power | |||
==== | |||
Wayne | |||
==== | |||
Harrison | |||
==== | |||
South | |||
==== | |||
Texas | |||
==== | |||
Project | |||
==== | |||
Rick | |||
==== | |||
Grantom | |||
==== | |||
South | |||
==== | |||
Texas | |||
==== | |||
Project | |||
==== | |||
Donald | |||
==== | |||
Hoffman | |||
==== | |||
EXCEL | |||
==== | |||
Services | |||
==== | |||
Jerry | |||
==== | |||
André | |||
==== | |||
Westinghouse | |||
==== | |||
Jim | |||
==== | |||
Andrachek | |||
==== | |||
Westinghouse | |||
==== | |||
Jack | |||
==== | |||
Stringfellow | |||
==== | |||
Southern | |||
==== | |||
Nuclear | |||
==== | |||
Don | |||
==== | |||
McCamy | |||
==== | |||
Tennessee | |||
==== | |||
Valley | |||
==== | |||
Authority | |||
==== | |||
E. | |||
==== | |||
D. | |||
==== | |||
Ingram | |||
==== | |||
Southern | |||
==== | |||
Nuclear | |||
==== | |||
Glenn | |||
==== | |||
Warren | |||
==== | |||
BWR | |||
==== | |||
Owners | |||
==== | |||
Group | |||
==== | |||
David | |||
==== | |||
Stellfox | |||
==== | |||
McGraw | |||
==== | |||
Hill | |||
==== | |||
John | |||
==== | |||
Fehringer | |||
==== | |||
INEEL | |||
==== | |||
J. | |||
==== | |||
E. | |||
==== | |||
Rhoads | |||
==== | |||
Energy | |||
==== | |||
Northwest | |||
==== | |||
Richard | |||
==== | |||
Harris | |||
==== | |||
Entergy | |||
==== | |||
Mike | |||
==== | |||
Kitlan | |||
==== | |||
Duke | |||
==== | |||
Power | |||
==== | |||
Rodney | |||
==== | |||
Johnson | |||
==== | |||
Detroit | |||
==== | |||
Edison | |||
==== | |||
Bert | |||
==== | |||
Morris | |||
==== | |||
Tennessee | |||
==== | |||
Valley | |||
==== | |||
Authority | |||
==== | |||
Gregory | |||
==== | |||
Norris | |||
==== | |||
Entergy | |||
==== | |||
Rick | |||
==== | |||
Wachowiak | |||
==== | |||
Nebraska | |||
==== | |||
Public | |||
==== | |||
Power | |||
==== | |||
District | |||
==== | |||
Scott | |||
==== | |||
Newberry | |||
==== | |||
NRC/NRR/DRIP | |||
==== | |||
Rich | |||
==== | |||
Barrett | |||
==== | |||
NRC/NRR/SPSB | |||
==== | |||
Mark | |||
==== | |||
Reinhart | |||
==== | |||
NRC/NRR/SPSB | |||
==== | |||
Mark | |||
==== | |||
Rubin | |||
==== | |||
NRC/NRR/SPSB | |||
==== | |||
Millard | |||
==== | |||
Wohl | |||
==== | |||
NRC/NRR/SPSB | |||
==== | |||
Nick | |||
==== | |||
Saltos | |||
==== | |||
NRC/NRR/SPSB | |||
==== | |||
William | |||
==== | |||
Beckner | |||
==== | |||
NRC/NRR/RTSB | |||
==== | |||
Bob | |||
==== | |||
Dennig | |||
==== | |||
NRC/NRR/RTSB | |||
==== | |||
Jack | |||
==== | |||
Foster | |||
==== | |||
NRC/NRR/RTSB | |||
==== | |||
Nanette | |||
==== | |||
Gilles | |||
==== | |||
NRC/NRR/RTSB | |||
==== | |||
ÿýüûúø÷ | |||
==== | |||
Enclosure | |||
==== | |||
2 | |||
==== | |||
ENCLOSURE | |||
==== | |||
3 | |||
==== | |||
OCTOBER | |||
==== | |||
6-7, | |||
==== | |||
1999 | |||
==== | |||
MEETING | |||
==== | |||
PRESENTATIONS | |||
==== | |||
ÿýüûúø÷ | |||
==== | |||
Enclosure | |||
==== | |||
2 | |||
==== | |||
ENCLOSURE | |||
==== | |||
4 | |||
==== | |||
NOVEMBER | |||
==== | |||
10, | |||
==== | |||
1999 | |||
==== | |||
MEETING | |||
==== | |||
PRESENTATIONS | |||
==== | |||
ÿýüûúø÷ | |||
==== | |||
Enclosure | |||
==== | |||
2}} | |||
Revision as of 12:01, 28 November 2019
| ML993500387 | |
| Person / Time | |
|---|---|
| Issue date: | 12/14/1999 |
| From: | Beckner W Technical Specifications Branch |
| To: | Brooks A Nuclear Energy Institute |
| Gilles N, NRR/DRIP, 415-1180 | |
| References | |
| Download: ML993500387 (3) | |
Text
December
==
14,
==
1999
==
Mr.
==
Anthony
==
Brooks
==
Nuclear
==
Energy
==
Institute
==
Suite
==
400
==
1776
==
I
==
Street,
==
NW
==
==
==
20006-3708
==
Mr.
==
Brooks:
==
The
==
purpose
==
of
==
this
==
letter
==
is
==
to
==
transmit
==
the
==
summary
==
of
==
two
==
meetings
==
with
==
the
==
Risk-Informed
==
Technical
==
Specifications
==
Task
==
Force.
==
The
==
first
==
meeting
==
was
==
held
==
at
==
the
==
San
==
Onofre
==
Nuclear
==
Generating
==
Station
==
on
==
October
==
6-7,
==
1999.
==
The
==
second
==
meeting
==
was
==
held
==
at
==
the
==
U.S.
==
Nuclear
==
Regulatory
==
Commission
==
(NRC)
==
Headquarters
==
offices
==
in
==
Rockville,
==
==
on
==
November
==
10,
==
1999.
==
Sincerely,
==
Original
==
signed
==
by:
==
William
==
D.
==
Beckner,
==
Chief
==
Technical
==
Specifications
==
Branch
==
Division
==
of
==
Regulatory
==
Improvement
==
Programs
==
Office
==
of
==
Nuclear
==
Reactor
==
Regulation
==
Enclosures:
==
1.
==
Meeting
==
Summary
==
2.
==
Attendance
==
List
==
3.
==
October
==
Meeting
==
Presentations
==
4.
==
November
==
Meeting
==
Presentations
==
cc:
==
See
==
attached
==
list
==
December
==
14,
==
1999
==
Mr.
==
Anthony
==
Brooks
==
Nuclear
==
Energy
==
Institute
==
Suite
==
400
==
1776
==
I
==
Street,
==
NW
==
==
==
20006-3708
==
Mr.
==
Brooks:
==
The
==
purpose
==
of
==
this
==
letter
==
is
==
to
==
transmit
==
the
==
summary
==
of
==
two
==
meetings
==
with
==
the
==
Risk-Informed
==
Technical
==
Specifications
==
Task
==
Force.
==
The
==
first
==
meeting
==
was
==
held
==
at
==
the
==
San
==
Onofre
==
Nuclear
==
Generating
==
Station
==
on
==
October
==
6-7,
==
1999.
==
The
==
second
==
meeting
==
was
==
held
==
at
==
the
==
U.S.
==
Nuclear
==
Regulatory
==
Commission
==
(NRC)
==
Headquarters
==
offices
==
in
==
Rockville,
==
==
on
==
November
==
10,
==
1999.
==
Sincerely,
==
Original
==
signed
==
by:
==
William
==
D.
==
Beckner,
==
Chief
==
Technical
==
Specifications
==
Branch
==
Division
==
of
==
Regulatory
==
Improvement
==
Programs
==
Office
==
of
==
Nuclear
==
Reactor
==
Regulation
==
Enclosures:
==
1.
==
Meeting
==
Summary
==
2.
==
Attendance
==
List
==
3.
==
October
==
Meeting
==
Presentations
==
4.
==
November
==
Meeting
==
Presentations
==
cc:
==
See
==
attached
==
list
==
DISTRIBUTION:
==
See
==
attached.
==
DOCUMENT
==
NAME:
==
G:\RTSB\GILLES\MTGSUMRITSTF111099.WPD
==
OFFICE
==
NRR/DRIP/RTSB
==
NRR/DRIP/RTSB
==
NRR/DRIP/RTSB
==
NAME
==
NVGilles
==
RLDennig
==
WDBeckner
==
DATE
==
12/14/99
==
12/14/99
==
12/14/99
==
OFFICIAL
==
RECORD
==
COPY
==
Multiple
==
Addressees
==
December
==
14,
==
1999
==
cc:
==
Mr.
==
Alan
==
Hackerott
==
Mr.
==
Dennis
==
Henneke
==
Omaha
==
Public
==
Power
==
District
==
San
==
Onofre
==
Nuclear
==
Generating
==
Station
==
Ft.
==
Calhoun
==
Nuclear
==
Station
==
Southern
==
==
Edison
==
P.O.
==
Box
==
399
==
5000
==
Pacific
==
Coast
==
Highway
==
Ft.
==
Calhoun,
==
NE
==
68023-0399
==
San
==
Clemente,
==
==
92674-0128
==
Mr.
==
Noel
==
Clarkson
==
Ms.
==
Sharon
==
Mahler
==
Duke
==
Energy/Oconee
==
Cooper
==
Nuclear
==
Station
==
==
Code:
==
0N03RC
==
==
Pulic
==
Power
==
District
==
Highways
==
130
==
&
==
183
==
(29678)
==
P.O.
==
Box
==
98
==
P.O.
==
Box
==
14393652
==
Brownville,
==
NE
==
68321-0098
==
Seneca,
==
SC
==
29679-1439
==
Mr.
==
Frank
==
Rahn
==
Mr.
==
Greg
==
Krueger
==
Electric
==
Power
==
Research
==
Institute
==
==
Energy
==
Company
==
P.
==
O.
==
Box
==
10412
==
==
Code
==
==
Palo
==
Alto,
==
CA
==
94303
==
965
==
Chesterbrook
==
Boulevard
==
Wayne,
==
==
19087
==
Mr.
==
Donald
==
Hoffman
==
EXCEL
==
Services
==
Corporation
==
Mr.
==
Wayne
==
Harrison
==
11921
==
Rockville
==
Pike,
==
Suite
==
100
==
South
==
==
Project
==
Electric
==
Generating
==
Rockville,
==
==
20852
==
Station
==
==
Nuclear
==
Operating
==
Company
==
Mr.
==
Jack
==
Stringfellow
==
P.
==
O.
==
Box
==
289
==
Southern
==
Nuclear
==
Operating
==
Company
==
Wadsworth,
==
TX
==
77483
==
P.O.
==
Box
==
1295
==
Birmingham,
==
==
35201-1295
==
Multiple
==
Addressees
==
December
==
14,
==
1999
==
DISTRIBUTION:
==
==
w/o
==
Enclosures
==
3
==
&
==
4
==
SCollins/RPZimmerman
==
JJohnson
==
BWSheron
==
DBMatthews
==
SFNewberry
==
GMHolahan
==
WDBeckner
==
RJBarrett
==
RLDennig
==
FMReinhart
==
MLWohl
==
NTSaltos
==
==
Staff
==
JAZwolinski
==
JFWilliams
==
AWMarkley
==
MACunningham,
==
==
MMarkley,
==
==
Staff
==
HARD
==
COPY
==
FILE
==
CENTER
==
PUBLIC
==
==
R/F
==
NVGilles
==
NRC/INDUSTRY
==
MEETING
==
OF
==
THE
==
RISK-INFORMED
==
TECHNICAL
==
SPECIFICATION
==
TASK
==
FORCE
==
Meeting
==
Summaries
==
October
==
6-7
==
and
==
November
==
10,
==
1999
==
Two
==
meetings
==
between
==
the
==
NRC
==
staff
==
and
==
industry
==
representatives
==
comprising
==
the
==
Risk-
==
Informed
==
Technical
==
Specifications
==
Task
==
Force
==
(RITSTF)
==
were
==
held
==
on
==
October
==
6-7
==
and
==
November
==
10,
==
1999.
==
The
==
attendees
==
are
==
listed
==
in
==
Enclosure
==
2.
==
The
==
meetings
==
were
==
a
==
continuation
==
of
==
earlier
==
meetings
==
where
==
the
==
NRC
==
staff
==
and
==
the
==
industry
==
discussed
==
ongoing
==
risk-
==
informed
==
technical
==
specification
==
initiatives
==
and
==
the
==
creation
==
of
==
a
==
fully
==
risk-informed
==
set
==
of
==
standard
==
technical
==
specifications
==
(STS).
==
The
==
main
==
purpose
==
of
==
the
==
October
==
6-7
==
meeting
==
was
==
to
==
have
==
a
==
more
==
detailed
==
discussion
==
of
==
the
==
probabilistic
==
risk
==
analysis
==
(PRA)
==
work
==
done
==
to
==
support
==
the
==
current
==
technical
==
specification
==
(TS)
==
initiatives
==
being
==
prepared
==
for
==
submittal
==
to
==
the
==
staff.
==
There
==
was
==
limited
==
==
representation
==
at
==
this
==
meeting.
==
Southern
==
==
Edison
==
has
==
volunteered
==
San
==
Onofre
==
Nuclear
==
Generating
==
Station
==
(SONGS)
==
to
==
be
==
the
==
industrys
==
==
plant
==
for
==
the
==
majority
==
of
==
the
==
seven
==
initiatives
==
currently
==
being
==
pursued
==
by
==
the
==
==
These
==
include:
==
1.
==
Define
==
preferred
==
end
==
states
==
for
==
TS
==
actions
==
(e.g.,
==
hot
==
shutdown
==
vs.
==
cold
==
shutdown)
==
2.
==
Increase
==
the
==
time
==
allowed
==
to
==
delay
==
entering
==
required
==
actions
==
when
==
a
==
surveillance
==
is
==
missed
==
3.
==
Modify
==
existing
==
mode
==
restraint
==
logic
==
to
==
allow
==
use
==
risk
==
assessments
==
for
==
entry
==
into
==
limiting
==
conditions
==
for
==
operation
==
(LCOs)
==
with
==
==
equipment
==
based
==
on
==
low
==
risk
==
4.
==
Develop
==
a
==
risk-informed
==
extension
==
of
==
current
==
allowed
==
outage
==
times
==
based
==
on
==
a
==
configuration
==
risk
==
management
==
program
==
(CRMP)
==
5.
==
Optimize
==
surveillance
==
requirements
==
(SRs)
==
6.
==
Modify
==
LCO
==
3.0.3
==
actions
==
and
==
timing
==
by
==
extending
==
minimum
==
time
==
to
==
begin
==
LCO
==
3.0.3
==
shutdown
==
from
==
1
==
hour
==
to
==
24
==
hours
==
and
==
allowing
==
for
==
a
==
risk-informed
==
evaluation
==
to
==
determine
==
whether
==
it
==
is
==
better
==
to
==
shut
==
down
==
or
==
continue
==
to
==
operate
==
7.
==
Define
==
actions
==
to
==
be
==
taken
==
when
==
equipment
==
is
==
not
==
==
but
==
is
==
still
==
functional
==
The
==
staff
==
and
==
the
==
industry
==
discussed
==
the
==
meaning
==
of
==
the
==
term
==
risk-informed
==
as
==
it
==
relates
==
to
==
regulatory
==
applications.
==
The
==
industry
==
stated
==
that
==
it
==
was
==
their
==
general
==
philosophy
==
to
==
use
==
qualitative
==
risk
==
assessments
==
where
==
they
==
believed
==
the
==
benefits
==
of
==
a
==
proposed
==
change
==
were
==
obvious,
==
and
==
to
==
use
==
quantitative
==
assessments
==
where
==
the
==
outcome
==
was
==
not
==
as
==
obvious.
==
The
==
industry
==
also
==
stated
==
that
==
they
==
take
==
into
==
account
==
other
==
aspects
==
such
==
as
==
defense
==
in
==
depth
==
and
==
safety
==
margins
==
when
==
considering
==
a
==
proposed
==
change.
==
The
==
industry
==
believed
==
such
==
an
==
approach
==
was
==
consistent
==
with
==
the
==
guidance
==
in
==
Regulatory
==
Guide
==
1.174,
==
An
==
Approach
==
for
==
Using
==
Probabilistic
==
Risk
==
Assessment
==
in
==
Risk-Informed
==
Decisions
==
on
==
Plant-Specific
==
Changes
==
to
==
the
==
Licensing
==
Basis,
==
to
==
use
==
==
to
==
improve
==
decision
==
making
==
and
==
regulatory
==
effectiveness.
==
The
==
staff
==
reserved
==
judgement
==
of
==
such
==
an
==
approach
==
noting
==
that
==
benefits
==
that
==
are
==
obvious
==
to
==
one
==
person
==
or
==
group
==
might
==
not
==
be
==
obvious
==
to
==
another.
==
==
representatives
==
then
==
presented
==
some
==
details
==
regarding
==
their
==
==
work
==
in
==
support
==
of
==
some
==
of
==
the
==
==
initiatives.
==
The
==
San
==
Onofre
==
presentations
==
are
==
contained
==
in
==
Enclosure
==
3.
==
The
==
==
representatives
==
presented
==
information
==
regarding
==
their
==
living
==
==
and
==
Safety
==
Monitor,
==
including
==
the
==
full
==
power,
==
transition,
==
and
==
low
==
power
==
and
==
shutdown
==
risk
==
models.
==
The
==
==
representatives
==
stated
==
that
==
they
==
had
==
their
==
own
==
transition
==
model
==
development
==
document
==
1
==
Enclosure
==
1
==
that
==
would
==
likely
==
be
==
referenced
==
or
==
included
==
in
==
the
==
==
plant-specific
==
submittal
==
for
==
Initiative
==
- 1.
==
The
==
staff
==
and
==
the
==
==
discussed
==
some
==
specific
==
submittal
==
and
==
implementation
==
and
==
technical
==
issues
==
related
==
to
==
a
==
few
==
of
==
the
==
initiatives.
==
With
==
regard
==
to
==
Initiative
==
- 1
==
related
==
to
==
safe
==
end
==
states,
==
the
==
==
indicated
==
that
==
the
==
Combustion
==
Engineering
==
Owners
==
Group
==
(CEOG)
==
was
==
preparing
==
a
==
draft
==
report
==
to
==
support
==
this
==
initiative
==
and
==
that
==
the
==
report
==
would
==
accompany
==
an
==
industry
==
request
==
for
==
a
==
generic
==
change
==
to
==
the
==
STS.
==
The
==
==
indicated
==
that
==
changes
==
to
==
the
==
TS
==
end
==
states
==
would
==
be
==
proposed
==
for
==
the
==
vast
==
majority
==
of
==
LCOs
==
in
==
the
==
STS.
==
The
==
==
indicated
==
that
==
uncertainties
==
and
==
sensitivities
==
of
==
==
results
==
will
==
be
==
investigated.
==
The
==
group
==
discussed
==
that
==
additional
==
known
==
shutdown
==
issues
==
which
==
may
==
impact
==
the
==
results
==
(e.g.,
==
external
==
events
==
and
==
==
dilution)
==
should
==
be
==
addressed.
==
Representatives
==
from
==
the
==
Boiling
==
Water
==
Reactor
==
Owners
==
Group
==
(BWROG)
==
stated
==
that
==
they
==
are
==
still
==
considering
==
this
==
initiative
==
and
==
that
==
the
==
risk
==
of
==
operating
==
in
==
hot
==
shutdown
==
and
==
in
==
cold
==
shutdown
==
is
==
relatively
==
the
==
same,
==
whereas
==
for
==
the
==
pressurized
==
water
==
reactors
==
there
==
appears
==
to
==
be
==
a
==
clear
==
risk
==
benefit
==
to
==
operating
==
in
==
hot
==
shutdown
==
in
==
most
==
cases.
==
They
==
indicated
==
that
==
they
==
would
==
be
==
more
==
interested
==
in
==
changing
==
the
==
current
==
TS
==
to
==
allow
==
them
==
to
==
use
==
==
in
==
deciding
==
whether
==
to
==
stay
==
at
==
power
==
or
==
shut
==
the
==
reactor
==
down.
==
They
==
also
==
indicated
==
that
==
they
==
may
==
be
==
interested
==
in
==
extending
==
the
==
time
==
requirements
==
for
==
going
==
to
==
cold
==
shutdown.
==
This
==
would
==
allow
==
them
==
to
==
operate
==
longer
==
in
==
hot
==
shutdown
==
conditions.
==
The
==
==
is
==
considering
==
a
==
pilot
==
plant
==
for
==
this
==
issue.
==
The
==
==
and
==
the
==
staff
==
discussed
==
how
==
the
==
==
assessment
==
results
==
for
==
Initiative
==
- 1
==
could
==
be
==
applied
==
to
==
other
==
plants.
==
The
==
==
Owners
==
Group
==
(WOG)
==
indicated
==
that
==
they
==
would
==
attempt
==
to
==
show
==
how
==
the
==
==
results
==
apply
==
using
==
qualitative
==
assessments
==
and
==
comparisons,
==
and
==
that
==
they
==
did
==
not
==
plan
==
to
==
perform
==
any
==
further
==
plant-specific
==
analyses.
==
The
==
Babcock
==
and
==
Wilcox
==
Owners
==
Group
==
indicated
==
that
==
they
==
intended
==
to
==
pursue
==
a
==
similar
==
approach.
==
The
==
group
==
indicated
==
that
==
they
==
could
==
use
==
the
==
==
model
==
to
==
help
==
develop
==
sensitivity
==
studies
==
to
==
address
==
some
==
of
==
the
==
design
==
differences
==
between
==
the
==
plants.
==
The
==
staff
==
stated
==
that
==
they
==
could
==
not
==
make
==
any
==
definitive
==
decisions
==
on
==
what
==
type
==
of
==
submittals
==
they
==
would
==
find
==
acceptable
==
and
==
that
==
the
==
burden
==
of
==
proof
==
of
==
similarity
==
to
==
the
==
==
work
==
would
==
rest
==
with
==
the
==
other
==
owners
==
groups.
==
With
==
regard
==
to
==
Initiative
==
- 2
==
related
==
to
==
missed
==
SRs,
==
the
==
group
==
discussed
==
the
==
==
aspects
==
of
==
that
==
initiative.
==
In
==
order
==
to
==
assess
==
the
==
increase
==
in
==
risk
==
it
==
is
==
necessary
==
to
==
make
==
an
==
assumption
==
about
==
the
==
frequency
==
of
==
the
==
various
==
expected
==
missed
==
surveillances.
==
This
==
requires
==
an
==
understanding
==
of
==
the
==
reasons,
==
the
==
nature
==
and
==
circumstances
==
under
==
which
==
surveillances
==
are
==
missed.
==
The
==
==
pointed
==
out
==
that
==
even
==
if
==
the
==
failure
==
rate
==
of
==
a
==
component
==
is
==
doubled,
==
due
==
to
==
the
==
missed
==
surveillance
==
on
==
that
==
component,
==
the
==
plant
==
risk
==
would
==
not
==
be
==
affected
==
significantly.
==
The
==
staff
==
agreed
==
that
==
most
==
likely
==
the
==
risk
==
increase
==
would
==
not
==
be
==
significant
==
unless
==
some
==
licensees
==
abuse
==
the
==
proposed
==
flexibility.
==
The
==
development
==
and
==
implementation
==
of
==
an
==
appropriate
==
regulatory
==
oversight
==
process
==
could
==
address
==
this
==
issue.
==
The
==
industry
==
and
==
the
==
staff
==
agreed
==
that
==
the
==
staffs
==
review
==
of
==
this
==
issue
==
would
==
involve
==
more
==
of
==
a
==
policy
==
decision
==
than
==
a
==
technical
==
decision.
==
With
==
regard
==
to
==
Initiative
==
- 3
==
related
==
to
==
mode
==
restraints,
==
==
has
==
been
==
studying
==
this
==
issue
==
by
==
comparing
==
the
==
relative
==
importance
==
of
==
functions
==
and
==
associated
==
systems
==
at
==
various
==
modes
==
of
==
operation.
==
The
==
proposed
==
change
==
would
==
allow
==
a
==
licensee
==
to
==
use
==
a
==
==
to
==
decide
==
whether
==
to
==
enter
==
into
==
a
==
mode
==
or
==
other
==
specified
==
condition
==
within
==
the
==
applicability
==
with
==
==
equipment.
==
The
==
staff
==
agreed
==
that
==
the
==
study
==
of
==
conditions
==
and
==
risks
==
associated
==
with
==
various
==
likely
==
transitions
==
could
==
help
==
focus
==
the
==
issue
==
and
==
identify
==
an
==
appropriate
==
regulatory
==
oversight
==
mechanism.
==
2
==
Enclosure
==
1
==
With
==
regard
==
to
==
Initiative
==
- 6
==
related
==
to
==
changes
==
to
==
LCO
==
3.0.3,
==
the
==
==
stated
==
that
==
this
==
initiative
==
is
==
very
==
closely
==
tied
==
to
==
the
==
maintenance
==
rule
==
as
==
it
==
addresses
==
what
==
actions
==
to
==
take
==
for
==
a
==
loss
==
of
==
safety
==
function.
==
The
==
industry
==
indicated
==
that
==
the
==
frequency
==
of
==
plant
==
conditions
==
for
==
which
==
this
==
TS
==
change
==
is
==
applicable
==
is
==
low.
==
The
==
staff
==
mentioned
==
that
==
the
==
identification
==
and
==
study
==
of
==
examples
==
of
==
plant
==
specific
==
LCO
==
3.0.3
==
entries
==
and
==
conditions
==
that
==
would
==
drive
==
the
==
plant
==
to
==
shutdown,
==
including
==
associated
==
risks,
==
could
==
help
==
focus
==
the
==
issue.
==
The
==
group
==
discussed
==
the
==
process
==
for
==
plants
==
to
==
adopt
==
approved
==
changes
==
to
==
the
==
STS.
==
The
==
staff
==
briefly
==
discussed
==
processes
==
being
==
considered
==
to
==
make
==
adoption
==
of
==
such
==
approved
==
changes
==
more
==
efficient.
==
Finally,
==
the
==
group
==
discussed
==
submittal
==
schedules
==
for
==
some
==
of
==
the
==
initiatives.
==
The
==
==
stated
==
that
==
they
==
expected
==
to
==
submit
==
Initiatives
==
- 2
==
and
==
- 3
==
to
==
the
==
staff
==
around
==
October
==
30,
==
1999,
==
and
==
that
==
they
==
might
==
be
==
able
==
to
==
submit
==
some
==
of
==
their
==
==
assessment
==
for
==
Initiative
==
- 1
==
by
==
December
==
31,
==
1999.
==
The
==
==
stated
==
that
==
Initiatives
==
- 4
==
and
==
- 6
==
would
==
come
==
sometime
==
in
==
2000.
==
The
==
November
==
10,
==
1999
==
meeting
==
was
==
a
==
meeting
==
of
==
the
==
full
==
==
to
==
discuss
==
high-level
==
objectives
==
and
==
the
==
status
==
of
==
the
==
current
==
initiatives.
==
All
==
presentations
==
for
==
the
==
meeting
==
are
==
contained
==
in
==
Enclosure
==
4.
==
The
==
staff
==
opened
==
the
==
meeting
==
with
==
a
==
general
==
discussion
==
of
==
the
==
status
==
of
==
risk-informed
==
regulatory
==
activities
==
at
==
the
==
NRC.
==
The
==
staff
==
pointed
==
out
==
that
==
there
==
was
==
a
==
high
==
level
==
of
==
interest
==
in
==
the
==
==
activities
==
and
==
that
==
we
==
needed
==
to
==
understand
==
how
==
broad
==
the
==
interest
==
in
==
the
==
industry
==
was.
==
The
==
staff
==
presented
==
several
==
thoughts
==
on
==
a
==
long-term
==
vision
==
for
==
risk-
==
informed
==
TS
==
and
==
acknowledged
==
that
==
structure
==
and
==
resource
==
issues
==
will
==
need
==
to
==
be
==
worked
==
out.
==
The
==
staff
==
also
==
pointed
==
out
==
that
==
it
==
will
==
need
==
to
==
address
==
the
==
four
==
strategic
==
performance
==
goals
==
identified
==
in
==
the
==
Commissions
==
Nuclear
==
Reactor
==
Safety
==
Strategic
==
Plan.
==
Those
==
performance
==
goals
==
are:
==
(1)
==
Maintain
==
safety;
==
(2)
==
Increase
==
public
==
confidence;
==
(3)
==
Reduce
==
unnecessary
==
regulatory
==
burden;
==
and
==
(4)
==
Make
==
NRC
==
activities
==
and
==
decisions
==
more
==
effective,
==
efficient,
==
and
==
realistic.
==
The
==
==
presented
==
some
==
of
==
its
==
thoughts
==
on
==
a
==
long-term
==
vision
==
for
==
risk-informed
==
TS.
==
Much
==
of
==
the
==
discussion
==
focused
==
on
==
a
==
slide
==
which
==
presented
==
the
==
==
Owners
==
Group
==
(WOG)
==
five
==
year
==
risk-informed
==
TS
==
strategy.
==
The
==
group
==
discussed
==
at
==
what
==
point
==
rulemaking
==
might
==
be
==
needed
==
to
==
accommodate
==
all
==
of
==
the
==
envisioned
==
changes
==
to
==
TS.
==
The
==
group
==
also
==
discussed
==
the
==
issue
==
of
==
==
quality
==
and
==
the
==
fact
==
that
==
the
==
==
==
standard
==
currently
==
being
==
developed
==
did
==
not
==
address
==
configuration
==
risk
==
management
==
tools
==
like
==
those
==
envisioned
==
as
==
necessary
==
to
==
implement
==
many
==
of
==
the
==
TS
==
changes
==
under
==
development.
==
Representatives
==
from
==
the
==
South
==
==
Project
==
presented
==
a
==
concept
==
of
==
a
==
fully
==
risk-informed
==
set
==
of
==
TS
==
that
==
essentially
==
relies
==
on
==
a
==
==
as
==
the
==
backbone
==
of
==
the
==
TS.
==
They
==
likened
==
the
==
proposed
==
risk
==
limits
==
in
==
their
==
concept
==
to
==
radiation
==
protection
==
limits
==
(i.e.,
==
==
limits).
==
The
==
NRC
==
regulates
==
==
limits
==
at
==
a
==
high
==
level
==
and
==
licensees
==
control
==
these
==
limits
==
at
==
a
==
lower
==
level
==
administratively.
==
The
==
group
==
also
==
discussed
==
whether
==
there
==
was
==
a
==
need
==
for
==
an
==
instantaneous
==
risk
==
cap
==
for
==
TS.
==
The
==
==
stated
==
that
==
the
==
major
==
question
==
is
==
the
==
cost
==
benefit
==
of
==
going
==
to
==
this
==
extreme.
==
For
==
example,
==
if
==
plant
==
==
essentially
==
become
==
the
==
TS,
==
then
==
licensees
==
would
==
have
==
to
==
control
==
changes
==
to
==
the
==
==
model
==
to
==
the
==
same
==
degree
==
as
==
TS
==
changes
==
are
==
currently
==
controlled.
==
The
==
==
presented
==
a
==
status
==
of
==
the
==
seven
==
initiatives
==
currently
==
under
==
development.
==
The
==
group
==
discussed
==
Initiative
==
- 1
==
related
==
to
==
safe
==
end
==
states.
==
The
==
==
stated
==
that
==
the
==
expected
==
results
==
were
==
confirmed
==
by
==
the
==
==
work
==
done
==
by
==
==
The
==
group
==
again
==
discussed
==
what
==
work
==
the
==
other
==
owners
==
groups
==
planned
==
to
==
do
==
to
==
justify
==
the
==
changes
==
for
==
their
==
plant
==
types
==
by
==
taking
==
3
==
Enclosure
==
1
==
advantage
==
of
==
the
==
==
and
==
==
work.
==
Updated
==
schedules
==
for
==
the
==
various
==
initiatives
==
were
==
discussed.
==
The
==
==
stated
==
that
==
they
==
expected
==
to
==
submit
==
Initiative
==
- 1
==
in
==
February
==
or
==
March
==
2000.
==
Initiatives
==
- 2
==
and
==
- 3
==
were
==
expected
==
to
==
be
==
submitted
==
in
==
the
==
very
==
near
==
future.
==
Initiative
==
- 4
==
was
==
planned
==
for
==
submittal
==
in
==
late
==
2000.
==
Initiatives
==
5,
==
6,
==
and
==
7
==
were
==
also
==
expected
==
in
==
mid
==
to
==
late
==
2000.
==
The
==
group
==
briefly
==
discussed
==
the
==
staffs
==
planned
==
process
==
for
==
reviewing
==
and
==
adopting
==
these
==
initiatives
==
as
==
changes
==
to
==
the
==
STS.
==
The
==
group
==
also
==
discussed
==
support
==
for
==
the
==
December
==
16,
==
1999
==
meeting
==
with
==
the
==
Advisory
==
Committee
==
for
==
Reactor
==
Safeguards
==
Reliability
==
and
==
==
Subcommittee
==
and
==
agreed
==
to
==
a
==
possible
==
future
==
meeting
==
in
==
late
==
February
==
2000.
==
4
==
Enclosure
==
1
==
Meeting
==
Attendees
==
October
==
6-7,
==
1999
==
Name
==
Affiliation
==
Dennis
==
Henneke
==
Southern
==
==
Edison
==
Sharon
==
Mahler
==
Southern
==
==
Edison
==
Gary
==
Chung
==
Southern
==
==
Edison
==
Brian
==
Woods
==
Southern
==
==
Edison
==
Thomas
==
Hook
==
Southern
==
==
Edison
==
Ed
==
Scherer
==
Southern
==
==
Edison
==
Don
==
McCamy
==
==
Valley
==
Authority
==
Kent
==
Sulton
==
==
Public
==
Power
==
District
==
S.
==
Visweswaran
==
General
==
Electric
==
Thomas
==
Sihko
==
==
Yankee
==
Jerry
==
André
==
==
Mike
==
Kitlan
==
Duke
==
Power
==
Rick
==
Wachowiak
==
==
Public
==
Power
==
District
==
Frank
==
Rahn
==
Electric
==
Power
==
Research
==
Institute
==
Nicholas
==
Saltos
==
NRC/NRR/SPSB
==
Millard
==
Wohl
==
NRC/NRR/SPSB
==
Nanette
==
Gilles
==
NRC/NRR/RTSB
==
ÿýüûúø÷
==
Enclosure
==
2
==
Meeting
==
Attendees
==
November
==
10,
==
1999
==
Name
==
Affiliation
==
Ray
==
Schneider
==
ABB-Combustion
==
Engineering
==
Nuclear
==
Fuel
==
Company
==
Alan
==
Hackerott
==
Omaha
==
Public
==
Power
==
District
==
Dennis
==
Henneke
==
Southern
==
==
Edison
==
Sharon
==
Mahler
==
Southern
==
==
Edison
==
Biff
==
Bradley
==
Nuclear
==
Energy
==
Institute
==
Noel
==
Clarkson
==
Duke
==
Power
==
Wayne
==
Harrison
==
South
==
==
Project
==
Rick
==
Grantom
==
South
==
==
Project
==
Donald
==
Hoffman
==
EXCEL
==
Services
==
Jerry
==
André
==
==
Jim
==
Andrachek
==
==
Jack
==
Stringfellow
==
Southern
==
Nuclear
==
Don
==
McCamy
==
==
Valley
==
Authority
==
E.
==
D.
==
Ingram
==
Southern
==
Nuclear
==
Glenn
==
Warren
==
==
Owners
==
Group
==
David
==
Stellfox
==
McGraw
==
Hill
==
John
==
Fehringer
==
INEEL
==
J.
==
E.
==
Rhoads
==
Energy
==
Northwest
==
Richard
==
Harris
==
Entergy
==
Mike
==
Kitlan
==
Duke
==
Power
==
Rodney
==
Johnson
==
Detroit
==
Edison
==
Bert
==
Morris
==
==
Valley
==
Authority
==
Gregory
==
Norris
==
Entergy
==
Rick
==
Wachowiak
==
==
Public
==
Power
==
District
==
Scott
==
Newberry
==
NRC/NRR/DRIP
==
Rich
==
Barrett
==
NRC/NRR/SPSB
==
Mark
==
Reinhart
==
NRC/NRR/SPSB
==
Mark
==
Rubin
==
NRC/NRR/SPSB
==
Millard
==
Wohl
==
NRC/NRR/SPSB
==
Nick
==
Saltos
==
NRC/NRR/SPSB
==
William
==
Beckner
==
NRC/NRR/RTSB
==
Bob
==
Dennig
==
NRC/NRR/RTSB
==
Jack
==
Foster
==
NRC/NRR/RTSB
==
Nanette
==
Gilles
==
NRC/NRR/RTSB
==
ÿýüûúø÷
==
Enclosure
==
2
==
ENCLOSURE
==
3
==
OCTOBER
==
6-7,
==
1999
==
MEETING
==
PRESENTATIONS
==
ÿýüûúø÷
==
Enclosure
==
2
==
ENCLOSURE
==
4
==
NOVEMBER
==
10,
==
1999
==
MEETING
==
PRESENTATIONS
==
ÿýüûúø÷
==
Enclosure
==
2