ML080630243: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 March 3, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B) | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 March 3, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B) | ||
ATTN: Supervisor, Licensing & | ATTN: Supervisor, Licensing & | ||
Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708 | Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708 | ||
==SUBJECT:== | ==SUBJECT:== | ||
ANNUAL ASSESSMENT LETTER - CRYSTAL RIVER NUCLEAR PLANT (NRC INSPECTION REPORT 05000302/2008001) | ANNUAL ASSESSMENT LETTER - CRYSTAL RIVER NUCLEAR PLANT (NRC INSPECTION REPORT 05000302/2008001) | ||
==Dear Mr. Young:== | ==Dear Mr. Young:== | ||
On February 7, 2008, the NRC staff completed its performance review of the Crystal River Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. | On February 7, 2008, the NRC staff completed its performance review of the Crystal River Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. | ||
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information," will include the security cornerstone review and resultant inspection plan. | This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information," will include the security cornerstone review and resultant inspection plan. | ||
Overall, Crystal River operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include TI 2515/171, Verification of Site Specific (B.5.b) Phase 2 and 3 Mitigation Strategies and TI 2515/172, Reactor Coolant System Dissimilar Metal. | Overall, Crystal River operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include TI 2515/171, Verification of Site Specific (B.5.b) Phase 2 and 3 Mitigation Strategies and TI 2515/172, Reactor Coolant System Dissimilar Metal. | ||
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. | The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. | ||
FPC | FPC 2 | ||
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4629 with any questions you may have regarding this letter or the inspection plan. | If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4629 with any questions you may have regarding this letter or the inspection plan. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72 | Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72 | ||
==Enclosure:== | ==Enclosure:== | ||
Crystal River Inspection/Activity Plan (03/01/08 - 09/30/09) cc w/encl: (See page 3) | Crystal River Inspection/Activity Plan (03/01/08 - 09/30/09) cc w/encl: (See page 3) | ||
Distribution: | Distribution: | ||
Normal distribution list | Normal distribution list | ||
FPC | FPC 3 | ||
Jon A. Franke | cc w/encl.: | ||
Crystal River Nuclear Plant (NA2C) | Jon A. Franke Director Site Operations Crystal River Nuclear Plant (NA2C) | ||
Electronic Mail Distribution Michael J. Annacone Plant General Manager Crystal River Nuclear Plant (NA2C) | |||
Electronic Mail Distribution Phyllis Dixon Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C) | Electronic Mail Distribution Phyllis Dixon Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C) | ||
Electronic Mail Distribution Stephen J. Cahill Crystal River Nuclear Plant (NA2C) | Electronic Mail Distribution Stephen J. Cahill Crystal River Nuclear Plant (NA2C) | ||
Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A) | Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A) | ||
Florida Power Corporation Electronic Mail Distribution Steven R. Carr Associate General Counsel Legal Department Progress Energy Service Company, LLC Electronic Mail Distribution William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 | Florida Power Corporation Electronic Mail Distribution Steven R. Carr Associate General Counsel Legal Department Progress Energy Service Company, LLC Electronic Mail Distribution William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Jim Mallay Framatome ANP, Inc. | ||
Electronic Mail Distribution | |||
Crystal River Inspection / Activity Plan 03/03/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 12:09:21 Report 22 1 | |||
PI&R | |||
- PREP TRIP-PROBLEM ID AND RESOL Baseline Inspections Identification and Resolution of Problems 03/05/2008 03/06/2008 3 | |||
71152B IP 5 | |||
PI&R | |||
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 04/07/2008 04/11/2008 3 | |||
71152B IP Baseline Inspections Identification and Resolution of Problems 04/21/2008 04/25/2008 3 | |||
71152B IP 3 | |||
PSB1-EP | |||
- EP EXERCISE EP Baseline Inspection Exercise Evaluation 05/19/2008 05/23/2008 3 | |||
7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 05/19/2008 05/23/2008 3 | |||
7111404 IP Baseline Inspections Drill/Exercise Performance 05/19/2008 05/23/2008 3 | |||
71151-EP01 IP Baseline Inspections ERO Drill Participation 05/19/2008 05/23/2008 3 | |||
71151-EP02 IP Baseline Inspections Alert & Notification System 05/19/2008 05/23/2008 3 | |||
71151-EP03 IP 1 | |||
EB3-HS | |||
- HEAT SINK Baseline Inspections Heat Sink Performance 07/21/2008 07/25/2008 3 | |||
7111107B IP 3 | |||
TI-171 | |||
- B.5.B PHASE 2&3 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/20/2008 10/24/2008 3 | |||
2515/171 IP 1 | |||
PSB1-RP | |||
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 10/27/2008 10/29/2008 3 | |||
7112101 IP 4 | |||
PSB1-RP | |||
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections Access Control to Radiologically Significant Areas 12/01/2008 12/05/2008 3 | |||
7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 12/01/2008 12/05/2008 3 | |||
7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 12/01/2008 12/05/2008 3 | |||
7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 12/01/2008 12/05/2008 3 | |||
7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 12/01/2008 12/05/2008 3 | |||
71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 12/01/2008 12/05/2008 3 | |||
71151-PR01 IP 1 | |||
EB3TI172 | |||
- TI-172 Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 12/08/2008 12/12/2008 3 | |||
2515/172 IP 4 | |||
EB1-MODS | |||
- MODIFICATIONS-10CFR50.59 Baseline Inspections Evaluation of Changes, Tests, or Experiments 02/23/2009 02/27/2009 3 | |||
7111102 IP Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 02/23/2009 02/27/2009 3 | |||
7111117B IP Baseline Inspections Evaluation of Changes, Tests, or Experiments 03/09/2009 03/13/2009 3 | |||
7111102 IP Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 03/09/2009 03/13/2009 3 | |||
7111117B IP 1 | |||
PSB1EP | |||
- EP INSPECTION EP Baseline Inspection Alert and Notification System Testing 05/04/2009 05/08/2009 3 | |||
7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 05/04/2009 05/08/2009 3 | |||
7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 05/04/2009 05/08/2009 3 | |||
7111404 IP This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Enclosure | |||
Crystal River Inspection / Activity Plan 03/03/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 12:09:21 Report 22 1 | |||
PSB1EP | |||
- EP INSPECTION EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 05/04/2009 05/08/2009 3 | |||
7111405 IP Baseline Inspections Drill/Exercise Performance 05/04/2009 05/08/2009 3 | |||
71151-EP01 IP Baseline Inspections ERO Drill Participation 05/04/2009 05/08/2009 3 | |||
71151-EP02 IP Baseline Inspections Alert & Notification System 05/04/2009 05/08/2009 3 | |||
71151-EP03 IP This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures.}} | This report shows only on-site and announced inspection procedures.}} | ||
Latest revision as of 17:53, 14 January 2025
| ML080630243 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/03/2008 |
| From: | Marvin Sykes NRC/RGN-II/DRP/RPB3 |
| To: | Young D Florida Power & Light Co |
| References | |
| IR-08-001 | |
| Download: ML080630243 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 March 3, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing &
Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708
SUBJECT:
ANNUAL ASSESSMENT LETTER - CRYSTAL RIVER NUCLEAR PLANT (NRC INSPECTION REPORT 05000302/2008001)
Dear Mr. Young:
On February 7, 2008, the NRC staff completed its performance review of the Crystal River Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information," will include the security cornerstone review and resultant inspection plan.
Overall, Crystal River operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include TI 2515/171, Verification of Site Specific (B.5.b) Phase 2 and 3 Mitigation Strategies and TI 2515/172, Reactor Coolant System Dissimilar Metal.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
FPC 2
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4629 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72
Enclosure:
Crystal River Inspection/Activity Plan (03/01/08 - 09/30/09) cc w/encl: (See page 3)
Distribution:
Normal distribution list
FPC 3
cc w/encl.:
Jon A. Franke Director Site Operations Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Michael J. Annacone Plant General Manager Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Phyllis Dixon Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Stephen J. Cahill Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A)
Florida Power Corporation Electronic Mail Distribution Steven R. Carr Associate General Counsel Legal Department Progress Energy Service Company, LLC Electronic Mail Distribution William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Jim Mallay Framatome ANP, Inc.
Electronic Mail Distribution
Crystal River Inspection / Activity Plan 03/03/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 12:09:21 Report 22 1
- PREP TRIP-PROBLEM ID AND RESOL Baseline Inspections Identification and Resolution of Problems 03/05/2008 03/06/2008 3
71152B IP 5
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 04/07/2008 04/11/2008 3
71152B IP Baseline Inspections Identification and Resolution of Problems 04/21/2008 04/25/2008 3
71152B IP 3
PSB1-EP
- EP EXERCISE EP Baseline Inspection Exercise Evaluation 05/19/2008 05/23/2008 3
7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 05/19/2008 05/23/2008 3
7111404 IP Baseline Inspections Drill/Exercise Performance 05/19/2008 05/23/2008 3
71151-EP01 IP Baseline Inspections ERO Drill Participation 05/19/2008 05/23/2008 3
71151-EP02 IP Baseline Inspections Alert & Notification System 05/19/2008 05/23/2008 3
71151-EP03 IP 1
EB3-HS
- HEAT SINK Baseline Inspections Heat Sink Performance 07/21/2008 07/25/2008 3
7111107B IP 3
TI-171
- B.5.B PHASE 2&3 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/20/2008 10/24/2008 3
2515/171 IP 1
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 10/27/2008 10/29/2008 3
7112101 IP 4
PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections Access Control to Radiologically Significant Areas 12/01/2008 12/05/2008 3
7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 12/01/2008 12/05/2008 3
7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 12/01/2008 12/05/2008 3
7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 12/01/2008 12/05/2008 3
7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 12/01/2008 12/05/2008 3
71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 12/01/2008 12/05/2008 3
71151-PR01 IP 1
EB3TI172
- TI-172 Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 12/08/2008 12/12/2008 3
2515/172 IP 4
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections Evaluation of Changes, Tests, or Experiments 02/23/2009 02/27/2009 3
7111102 IP Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 02/23/2009 02/27/2009 3
7111117B IP Baseline Inspections Evaluation of Changes, Tests, or Experiments 03/09/2009 03/13/2009 3
7111102 IP Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 03/09/2009 03/13/2009 3
7111117B IP 1
PSB1EP
- EP INSPECTION EP Baseline Inspection Alert and Notification System Testing 05/04/2009 05/08/2009 3
7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 05/04/2009 05/08/2009 3
7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 05/04/2009 05/08/2009 3
7111404 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Crystal River Inspection / Activity Plan 03/03/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 12:09:21 Report 22 1
PSB1EP
- EP INSPECTION EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 05/04/2009 05/08/2009 3
7111405 IP Baseline Inspections Drill/Exercise Performance 05/04/2009 05/08/2009 3
71151-EP01 IP Baseline Inspections ERO Drill Participation 05/04/2009 05/08/2009 3
71151-EP02 IP Baseline Inspections Alert & Notification System 05/04/2009 05/08/2009 3
71151-EP03 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.