{{#Wiki_filter:==SUBJECT:==
{{#Wiki_filter:May 6, 2008
DRESDEN NUCLEAR POWER STATION NRC SECURITY TEMPORARY INSTRUCTION 2201/002 INSPECTION REPORT 05000237/2008406(DRS); 05000249/2008406(DRS)
 
==SUBJECT:==
DRESDEN NUCLEAR POWER STATION  
 
NRC SECURITY TEMPORARY INSTRUCTION 2201/002  
 
INSPECTION REPORT 05000237/2008406(DRS); 05000249/2008406(DRS)


==Dear Mr. Pardee:==
==Dear Mr. Pardee:==
Line 35: Line 41:


Sincerely,
Sincerely,
/RA by D. Funk acting for/
/RA by D. Funk acting for/  
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Nonpublic Enclosure: Inspection Report 05000237/2008406(DRS);
 
05000249/2008406(DRS)
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25  
w/Attachment: Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO C. Symonds, Dresden Site Security Manager J. Klinger, State Liaison Officer, State of Illinois cc w/o encl: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency Chairman, Illinois Commerce Commission
 
Nonpublic Enclosure: Inspection Report 05000237/2008406(DRS);  
 
05000249/2008406(DRS)  
 
w/Attachment: Supplemental Information  
 
cc w/encl:
D. Riffle, NSIR/DSO/DDSO  
 
C. Symonds, Dresden Site Security Manager  
 
J. Klinger, State Liaison Officer, State of Illinois  
 
cc w/o encl:
Site Vice President - Dresden Nuclear Power Station  
 
Plant Manager - Dresden Nuclear Power Station  
 
Regulatory Assurance Manager - Dresden Nuclear Power Station  
 
Chief Operating Officer and Senior Vice President  
 
Senior Vice President - Midwest Operations  
 
Senior Vice President - Operations Support  
 
Vice President - Licensing and Regulatory Affairs  
 
Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities  
 
Associate General Counsel  
 
Document Control Desk - Licensing  
 
Assistant Attorney General  
 
Illinois Emergency Management Agency  
 
Chairman, Illinois Commerce Commission
}}
}}

Latest revision as of 16:53, 14 January 2025

IR 05000237-08-406(DRS); IR 05000249-08-406(DRS); on 04/02/2008, Exelon Nuclear Corporate; 04/15/2008 - 04/16/2008; Dresden Nuclear Power Station, Units 2 and 3; Temporary Instruction 2201/002 Inspection - Cover Letter
ML081270591
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 05/06/2008
From: Eric Duncan
Plant Support Branch II
To: Pardee C
Exelon Generation Co
References
IR-08-406
Download: ML081270591 (4)


Text

May 6, 2008

SUBJECT:

DRESDEN NUCLEAR POWER STATION

NRC SECURITY TEMPORARY INSTRUCTION 2201/002

INSPECTION REPORT 05000237/2008406(DRS); 05000249/2008406(DRS)

Dear Mr. Pardee:

On April 16, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed a temporary instruction inspection at your Dresden Nuclear Power Station. The inspection covered the transition from a contract to a proprietary security force. The enclosed inspection report documents the inspection results, which were discussed on April 16, 2008, with Mr. D. Wozniak and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at Enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA by D. Funk acting for/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25

Nonpublic Enclosure: Inspection Report 05000237/2008406(DRS);

05000249/2008406(DRS)

w/Attachment: Supplemental Information

cc w/encl:

D. Riffle, NSIR/DSO/DDSO

C. Symonds, Dresden Site Security Manager

J. Klinger, State Liaison Officer, State of Illinois

cc w/o encl:

Site Vice President - Dresden Nuclear Power Station

Plant Manager - Dresden Nuclear Power Station

Regulatory Assurance Manager - Dresden Nuclear Power Station

Chief Operating Officer and Senior Vice President

Senior Vice President - Midwest Operations

Senior Vice President - Operations Support

Vice President - Licensing and Regulatory Affairs

Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities

Associate General Counsel

Document Control Desk - Licensing

Assistant Attorney General

Illinois Emergency Management Agency

Chairman, Illinois Commerce Commission