{{#Wiki_filter:October 28, 2008 Mr. William R. Campbell, Jr.
{{#Wiki_filter:October 28, 2008 Mr. William R. Campbell, Jr.
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801  


==SUBJECT:==
==SUBJECT:==
WATTS BAR NUCLEAR PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION - WATTS BAR EMERGENCY CORE COOLING SYSTEM BORON REQUIREMENTS (TAC NO. MD9396)
WATTS BAR NUCLEAR PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION - WATTS BAR EMERGENCY CORE COOLING SYSTEM BORON REQUIREMENTS (TAC NO. MD9396)  


==Dear Mr. Campbell:==
==Dear Mr. Campbell:==
 
By {{letter dated|date=August 1, 2008|text=letter dated August 1, 2008}}, Tennessee Valley Authority (TVA) proposed a license amendment to change the Watts Bar Nuclear Plant, Unit 1 (WBN-1), Technical Specifications (TSs). The proposed request is to revise the boron requirements for cold leg accumulators and refueling water storage tank.
By letter dated August 1, 2008, Tennessee Valley Authority (TVA) proposed a license amendment to change the Watts Bar Nuclear Plant, Unit 1 (WBN-1), Technical Specifications (TSs). The proposed request is to revise the boron requirements for cold leg accumulators and refueling water storage tank.
The staff has reviewed the information provided by TVA and has determined that additional information is required to complete its evaluation of the proposed license amendment. The specific questions are detailed in the enclosed request for additional information (RAI). We have had several discussions with your staff regarding these RAIs. Based on discussions with your staff, we understand that you plan to respond to the enclosed RAIs within 45 days of the date of this letter.
The staff has reviewed the information provided by TVA and has determined that additional information is required to complete its evaluation of the proposed license amendment. The specific questions are detailed in the enclosed request for additional information (RAI). We have had several discussions with your staff regarding these RAIs. Based on discussions with your staff, we understand that you plan to respond to the enclosed RAIs within 45 days of the date of this letter.
The staff expects and requires your timely and complete responses so as to complete its review consistent with our performance goals.
The staff expects and requires your timely and complete responses so as to complete its review consistent with our performance goals.
If you have any questions regarding this issue, please feel free to contact me at (301) 415-3100.
If you have any questions regarding this issue, please feel free to contact me at (301) 415-3100.
Sincerely,
Sincerely,  
                                              /RA/
/RA/
John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390
John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390  


==Enclosure:==
==Enclosure:==
 
RAI cc w/enclosure: See next page  
RAI cc w/enclosure: See next page


Mr. William R. Campbell, Jr.
Mr. William R. Campbell, Jr.
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801  


==SUBJECT:==
==SUBJECT:==
WATTS BAR NUCLEAR PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION - WATTS BAR EMERGENCY CORE COOLING SYSTEM BORON REQUIREMENTS (TAC NO. MD9396)
WATTS BAR NUCLEAR PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION - WATTS BAR EMERGENCY CORE COOLING SYSTEM BORON REQUIREMENTS (TAC NO. MD9396)  


==Dear Mr. Campbell:==
==Dear Mr. Campbell:==
 
By {{letter dated|date=August 1, 2008|text=letter dated August 1, 2008}}, Tennessee Valley Authority (TVA) proposed a license amendment to change the Watts Bar Nuclear Plant, Unit 1 (WBN-1), Technical Specifications (TSs). The proposed request is to revise the boron requirements for cold leg accumulators and refueling water storage tank.
By letter dated August 1, 2008, Tennessee Valley Authority (TVA) proposed a license amendment to change the Watts Bar Nuclear Plant, Unit 1 (WBN-1), Technical Specifications (TSs). The proposed request is to revise the boron requirements for cold leg accumulators and refueling water storage tank.
The staff has reviewed the information provided by TVA and has determined that additional information is required to complete its evaluation of the proposed license amendment. The specific questions are detailed in the enclosed request for additional information (RAI). We have had several discussions with your staff regarding these RAIs. Based on discussions with your staff, we understand that you plan to respond to the enclosed RAIs within 45 days of the date of this letter.
The staff has reviewed the information provided by TVA and has determined that additional information is required to complete its evaluation of the proposed license amendment. The specific questions are detailed in the enclosed request for additional information (RAI). We have had several discussions with your staff regarding these RAIs. Based on discussions with your staff, we understand that you plan to respond to the enclosed RAIs within 45 days of the date of this letter.
The staff expects and requires your timely and complete responses so as to complete its review consistent with our performance goals.
The staff expects and requires your timely and complete responses so as to complete its review consistent with our performance goals.
If you have any questions regarding this issue, please feel free to contact me at (301) 415-3100.
If you have any questions regarding this issue, please feel free to contact me at (301) 415-3100.
Sincerely,
Sincerely,  
                                              /RA/
/RA/
John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390
John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390  


==Enclosure:==
==Enclosure:==
RAI cc w/enclosures: See next page DISTRIBUTION:
RAI cc w/enclosures: See next page DISTRIBUTION:
PUBLIC                 RidsNrrPMJLamb       B. Parks, NRR         RidsNrrDorlDpr LP-WB R/F               RidsNrrLABClayton RidsOgcRp                 RidRgn2MailCenter RidsNrrDorlLpwb         RidsNrrDssSrxb       RidsAcrsAcnwMailCenter ADAMS Accession Number: ML082940170 OFFICE     LP-WBB/PM     LP-WB/LA         SRXB/BC           LP-WB/BC NAME       JLamb         BClayton         GCranston         LRaghavan DATE       10/ 21 /08     10/ 21 /08       10/ 21 /08       10/ 28 /08 OFFICIAL RECORD COPY
PUBLIC RidsNrrPMJLamb B. Parks, NRR RidsNrrDorlDpr LP-WB R/F RidsNrrLABClayton RidsOgcRp RidRgn2MailCenter RidsNrrDorlLpwb RidsNrrDssSrxb RidsAcrsAcnwMailCenter ADAMS Accession Number: ML082940170 OFFICE LP-WBB/PM LP-WB/LA SRXB/BC LP-WB/BC NAME JLamb BClayton GCranston LRaghavan DATE 10/ 21 /08 10/ 21 /08 10/ 21 /08 10/ 28 /08 OFFICIAL RECORD COPY  


William R. Campbell, Jr.
William R. Campbell, Jr.
Tennessee Valley Authority               WATTS BAR NUCLEAR PLANT cc:
Tennessee Valley Authority WATTS BAR NUCLEAR PLANT cc:
Mr. Gordon P. Arent                     Mr. Michael A. Purcell New Generation Licensing Manager         Senior Licensing Manager Tennessee Valley Authority               Nuclear Power Group 5A Lookout Place                         Tennessee Valley Authority 1101 Market Street                       4K Lookout Place Chattanooga, TN 37402-2801               1101 Market Street Chattanooga, TN 37402-2801 Mr. Ashok S. Bhatnagar Senior Vice President                   Ms. Beth A. Wetzel, Manager Nuclear Generation Development          Corporate Nuclear Licensing and and Construction                          Industry Affairs Tennessee Valley Authority               Tennessee Valley Authority 6A Lookout Place                        4K Lookout Place 1101 Market Street                       1101 Market Street Chattanooga, TN 37402-2801              Chattanooga, TN 37402-2801 Vice President                          Mr. Masoud Bajestani, Vice President Nuclear Support                          Watts Bar Unit 2 Tennessee Valley Authority              Watts Bar Nuclear Plant 3R Lookout Place                        Tennessee Valley Authority 1101 Market Street                      P.O. Box 2000 Chattanooga, TN 37402-2801              Spring City, TN 37381 Mr. Michael J. Lorek                    Mr. Michael K. Brandon, Manager Vice President                          Licensing and Industry Affairs Nuclear Engineering & Technical Services Watts Bar Nuclear Plant Tennessee Valley Authority               Tennessee Valley Authority 3R Lookout Place                        P.O. Box 2000 1101 Market Street                      Spring City, TN 37381 Chattanooga, TN 37402-2801 Mr. Gregory A. Boerschig, Plant Manager General Counsel                          Watts Bar Nuclear Plant Tennessee Valley Authority               Tennessee Valley Authority 6A West Tower                            P.O. Box 2000 400 West Summit Hill Drive              Spring City, TN 37381 Knoxville, TN 37902 Senior Resident Inspector Mr. John C. Fornicola, Manager          Watts Bar Nuclear Plant Nuclear Assurance                        U.S. Nuclear Regulatory Commission Tennessee Valley Authority              1260 Nuclear Plant Road 3R Lookout Place                        Spring City, TN 37381 1101 Market Street Chattanooga, TN 37402-2801              County Executive 375 Church Street Mr. Larry E. Nicholson, General Manager  Suite 215 Performance Improvement                  Dayton, TN 37321 Tennessee Valley Authority 3R Lookout Place                        County Mayor 1101 Market Street                      P. O. Box 156 Chattanooga, TN 37402-2801              Decatur, TN 37322 Mr. Michael D. Skaggs                    Mr. Lawrence E. Nanney, Director Site Vice President                      Division of Radiological Health Watts Bar Nuclear Plant                  Dept. of Environment & Conservation Tennessee Valley Authority              Third Floor, L and C Annex P. O. Box 2000                          401 Church Street Spring City, TN 37381                    Nashville, TN 37243-1532
Mr. Gordon P. Arent New Generation Licensing Manager Tennessee Valley Authority 5A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Vice President Nuclear Support Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Michael J. Lorek Vice President Nuclear Engineering & Technical Services Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, TN 37902 Mr. John C. Fornicola, Manager Nuclear Assurance Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Larry E. Nicholson, General Manager Performance Improvement Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Michael D. Skaggs Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority P. O. Box 2000 Spring City, TN 37381 Mr. Michael A. Purcell Senior Licensing Manager Nuclear Power Group Tennessee Valley Authority 4K Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Ms. Beth A. Wetzel, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4K Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Masoud Bajestani, Vice President Watts Bar Unit 2 Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 Mr. Michael K. Brandon, Manager Licensing and Industry Affairs Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 Mr. Gregory A. Boerschig, Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 Senior Resident Inspector Watts Bar Nuclear Plant U.S. Nuclear Regulatory Commission 1260 Nuclear Plant Road Spring City, TN 37381 County Executive 375 Church Street Suite 215 Dayton, TN 37321 County Mayor P. O. Box 156 Decatur, TN 37322 Mr. Lawrence E. Nanney, Director Division of Radiological Health Dept. of Environment & Conservation Third Floor, L and C Annex 401 Church Street Nashville, TN 37243-1532  


REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATIONS REVISIONS EMERGENCY CORE COOLING SYSTEM BORIC ACID CONCENTRATION REQUIREMENTS WATTS BAR NUCLEAR PLANT, UNIT 1 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-390 By letter dated August 1, 2008 (ADAMS Accession No. ML082180091), the Tennessee Valley Authority (TVA), the licensee for Watts Bar Nuclear Plant (WBN) Unit 1, submitted a request to revise the WBN Unit 1 Technical Specifications (TSs) to change the boron requirements for cold leg accumulators and refueling water storage tank (RWST). The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing this request, and has determined that additional information is necessary for the staff to complete its review, as discussed below.
Enclosure REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATIONS REVISIONS EMERGENCY CORE COOLING SYSTEM BORIC ACID CONCENTRATION REQUIREMENTS WATTS BAR NUCLEAR PLANT, UNIT 1 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-390 By {{letter dated|date=August 1, 2008|text=letter dated August 1, 2008}} (ADAMS Accession No. ML082180091), the Tennessee Valley Authority (TVA), the licensee for Watts Bar Nuclear Plant (WBN) Unit 1, submitted a request to revise the WBN Unit 1 Technical Specifications (TSs) to change the boron requirements for cold leg accumulators and refueling water storage tank (RWST). The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing this request, and has determined that additional information is necessary for the staff to complete its review, as discussed below.
Question 1. Inclusion Of Emergency Core Cooling System (ECCS) Boron Requirements In the Core Operating Limits Report (COLR)
Question 1. Inclusion Of Emergency Core Cooling System (ECCS) Boron Requirements In the Core Operating Limits Report (COLR)
NRC Generic Letter (GL) 88-16, Removal of Cycle-Specific Parameter Limits from Technical Specifications (TSs) provides a means by which licensees may avoid cycle-specific revisions to the TSs by modifying the TSs to note that cycle-specific parameters shall be maintained in a COLR, which is provided to the NRC for information on a cycle-specific basis. To implement the GL 88-16 guidance, licensees are required to maintain, in their TSs, references to NRC-approved methodologies that are used to determine the parameter operating limits. If the methodology is plant-specific, a reference to the NRC safety evaluation (SE) approving the use of the methodology is alternatively required.
NRC Generic Letter (GL) 88-16, Removal of Cycle-Specific Parameter Limits from Technical Specifications (TSs) provides a means by which licensees may avoid cycle-specific revisions to the TSs by modifying the TSs to note that cycle-specific parameters shall be maintained in a COLR, which is provided to the NRC for information on a cycle-specific basis. To implement the GL 88-16 guidance, licensees are required to maintain, in their TSs, references to NRC-approved methodologies that are used to determine the parameter operating limits. If the methodology is plant-specific, a reference to the NRC safety evaluation (SE) approving the use of the methodology is alternatively required.
TVA proposes to implement the guidance contained in GL 88-16 to provide discreet levels of ECCS boron concentration requirements. Each level would be specified in the applicable Surveillance Requirement, and the specific level determined for the cycle would be specified in the COLR. To support this request, the licensee has proposed a COLR reference to Westinghouse document WCAP-16932-P, Revision 1, as approved by the NRC staffs SE.
TVA proposes to implement the guidance contained in GL 88-16 to provide discreet levels of ECCS boron concentration requirements. Each level would be specified in the applicable Surveillance Requirement, and the specific level determined for the cycle would be specified in the COLR. To support this request, the licensee has proposed a COLR reference to Westinghouse document WCAP-16932-P, Revision 1, as approved by the NRC staffs SE.
However, WCAP-16932-P describes the technical adequacy of an assumption crediting control rod insertion for certain postulated post-loss-of-coolant accident (LOCA) scenarios, in which trip reactivity is required for post-LOCA subcriticality. Hence, this proposed reference appears inappropriate, because it does not contain the methodology used to determine the cycle-specific ECCS boron concentration requirement.
However, WCAP-16932-P describes the technical adequacy of an assumption crediting control rod insertion for certain postulated post-loss-of-coolant accident (LOCA) scenarios, in which trip reactivity is required for post-LOCA subcriticality. Hence, this proposed reference appears inappropriate, because it does not contain the methodology used to determine the cycle-specific ECCS boron concentration requirement.
Additionally, the NRC staff believes that a strong contingent of the cycle-to-cycle variability in required ECCS boron concentration is the inventory of Tritium Producing Burnable Absorber Rods (TPBARs) in the core. This belief is supported by, among other things, the fact that a previously approved request submitted by TVA provided discreet levels of boron concentrations based solely on the TPBAR inventory.
Additionally, the NRC staff believes that a strong contingent of the cycle-to-cycle variability in required ECCS boron concentration is the inventory of Tritium Producing Burnable Absorber Rods (TPBARs) in the core. This belief is supported by, among other things, the fact that a previously approved request submitted by TVA provided discreet levels of boron concentrations based solely on the TPBAR inventory.  
Enclosure


In light of these considerations, please provide the following additional information:
In light of these considerations, please provide the following additional information:
Line 80: Line 76:
Confirm that your analytic codes and methods are capable of accounting for the neutronic effects of boron concentration levels as high as 3800 parts per million (ppm).
Confirm that your analytic codes and methods are capable of accounting for the neutronic effects of boron concentration levels as high as 3800 parts per million (ppm).
Question 3. Critical Boron Requirements for a High Burnable Absorber Loading The NRC staffs initial review of the fuel system design required to support the requested TPBAR loading is documented in numerous letters and submittals between TVA and the NRC staff. The NRC staffs review was governed, in part, by the guidance contained in Section 4.2 of the Standard Review Plan (SRP 4.2). SRP 4.2 directs the NRC staff to review areas concerning reactivity control requirements and provisions. As such, the licensee submitted a description of changes in critical boron requirements to support operation with the requested number of TPBARs (Westinghouse Report NDP-00-0344, submitted to NRC on August 20, 2001). These boron requirements increased over those required for previous Watts Bar Cycle designs (see page 2-20 of NDP-00-0344).
Question 3. Critical Boron Requirements for a High Burnable Absorber Loading The NRC staffs initial review of the fuel system design required to support the requested TPBAR loading is documented in numerous letters and submittals between TVA and the NRC staff. The NRC staffs review was governed, in part, by the guidance contained in Section 4.2 of the Standard Review Plan (SRP 4.2). SRP 4.2 directs the NRC staff to review areas concerning reactivity control requirements and provisions. As such, the licensee submitted a description of changes in critical boron requirements to support operation with the requested number of TPBARs (Westinghouse Report NDP-00-0344, submitted to NRC on August 20, 2001). These boron requirements increased over those required for previous Watts Bar Cycle designs (see page 2-20 of NDP-00-0344).
While the NRC staff does not intend to repeat its review of the original request to operate a tritium production core, certain assumptions regarding the initial boric acid concentration could affect the required performance of the ECCS, immediate post-LOCA) subcriticality, and the outcome of the
While the NRC staff does not intend to repeat its review of the original request to operate a tritium production core, certain assumptions regarding the initial boric acid concentration could affect the required performance of the ECCS, immediate post-LOCA) subcriticality, and the outcome of the  


long-term core cooling calculation.
long-term core cooling calculation.
Line 95: Line 91:
: 1. Please provide the following information for the WBN Unit 1 Nuclear Steam Supply System (NSSS):
: 1. Please provide the following information for the WBN Unit 1 Nuclear Steam Supply System (NSSS):
: a. Volume of the lower plenum, core and upper plenum below the bottom elevation of the hot leg, each identified separately. Also, provide heights of these regions.
: a. Volume of the lower plenum, core and upper plenum below the bottom elevation of the hot leg, each identified separately. Also, provide heights of these regions.
: b. Loop friction and geometry pressure losses from the core exit through the steam
: b. Loop friction and geometry pressure losses from the core exit through the steam  


generators to the inlet nozzle of the reactor vessel. Also, provide the locked rotor Reactor Coolant Pump (RCP) k-factor. Please provide the mass flow rates, flow areas, k-factors, and coolant temperatures for the pressure losses provided (upper plenum, hot legs, Steam Generators (SGs), suction legs, RCPs, and discharge legs). Please include the reduced SG flow areas due to plugged tubes. Please also provide the loss from each of the intact cold legs through the annulus to a single broken cold leg.
generators to the inlet nozzle of the reactor vessel. Also, provide the locked rotor Reactor Coolant Pump (RCP) k-factor. Please provide the mass flow rates, flow areas, k-factors, and coolant temperatures for the pressure losses provided (upper plenum, hot legs, Steam Generators (SGs), suction legs, RCPs, and discharge legs). Please include the reduced SG flow areas due to plugged tubes. Please also provide the loss from each of the intact cold legs through the annulus to a single broken cold leg.
Line 101: Line 97:
: d. Capacity of the condensate storage tank.
: d. Capacity of the condensate storage tank.
: e. Boric acid concentration vs. time for the limiting large break.
: e. Boric acid concentration vs. time for the limiting large break.
: f. Flushing flow rate at the time of switch to simultaneous injection.
: f.
Flushing flow rate at the time of switch to simultaneous injection.
: g. High Pressure Safety Injection runout flow rate.
: g. High Pressure Safety Injection runout flow rate.
: 2. What is the sump temperature vs. time following recirculation and how does this impact precipitation? Is the boric acid concentration in the vessel below the precipitation limit based on the minimum sump temperature at the time the switch to simultaneous injection is performed? Please explain.
: 2. What is the sump temperature vs. time following recirculation and how does this impact precipitation? Is the boric acid concentration in the vessel below the precipitation limit based on the minimum sump temperature at the time the switch to simultaneous injection is performed? Please explain.

Latest revision as of 14:43, 14 January 2025

Request for Additional Information - Watts Bar Emergency Core Cooling System Boron Requirements
ML082940170
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 10/28/2008
From: John Lamb
Watts Bar Special Projects Branch
To: Campbell W
Tennessee Valley Authority
Lamb John G./NRR/DORL, 415-3100
References
TAC MD9396
Download: ML082940170 (7)


Text

October 28, 2008 Mr. William R. Campbell, Jr.

Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

WATTS BAR NUCLEAR PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION - WATTS BAR EMERGENCY CORE COOLING SYSTEM BORON REQUIREMENTS (TAC NO. MD9396)

Dear Mr. Campbell:

By letter dated August 1, 2008, Tennessee Valley Authority (TVA) proposed a license amendment to change the Watts Bar Nuclear Plant, Unit 1 (WBN-1), Technical Specifications (TSs). The proposed request is to revise the boron requirements for cold leg accumulators and refueling water storage tank.

The staff has reviewed the information provided by TVA and has determined that additional information is required to complete its evaluation of the proposed license amendment. The specific questions are detailed in the enclosed request for additional information (RAI). We have had several discussions with your staff regarding these RAIs. Based on discussions with your staff, we understand that you plan to respond to the enclosed RAIs within 45 days of the date of this letter.

The staff expects and requires your timely and complete responses so as to complete its review consistent with our performance goals.

If you have any questions regarding this issue, please feel free to contact me at (301) 415-3100.

Sincerely,

/RA/

John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390

Enclosure:

RAI cc w/enclosure: See next page

Mr. William R. Campbell, Jr.

Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

WATTS BAR NUCLEAR PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION - WATTS BAR EMERGENCY CORE COOLING SYSTEM BORON REQUIREMENTS (TAC NO. MD9396)

Dear Mr. Campbell:

By letter dated August 1, 2008, Tennessee Valley Authority (TVA) proposed a license amendment to change the Watts Bar Nuclear Plant, Unit 1 (WBN-1), Technical Specifications (TSs). The proposed request is to revise the boron requirements for cold leg accumulators and refueling water storage tank.

The staff has reviewed the information provided by TVA and has determined that additional information is required to complete its evaluation of the proposed license amendment. The specific questions are detailed in the enclosed request for additional information (RAI). We have had several discussions with your staff regarding these RAIs. Based on discussions with your staff, we understand that you plan to respond to the enclosed RAIs within 45 days of the date of this letter.

The staff expects and requires your timely and complete responses so as to complete its review consistent with our performance goals.

If you have any questions regarding this issue, please feel free to contact me at (301) 415-3100.

Sincerely,

/RA/

John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390

Enclosure:

RAI cc w/enclosures: See next page DISTRIBUTION:

PUBLIC RidsNrrPMJLamb B. Parks, NRR RidsNrrDorlDpr LP-WB R/F RidsNrrLABClayton RidsOgcRp RidRgn2MailCenter RidsNrrDorlLpwb RidsNrrDssSrxb RidsAcrsAcnwMailCenter ADAMS Accession Number: ML082940170 OFFICE LP-WBB/PM LP-WB/LA SRXB/BC LP-WB/BC NAME JLamb BClayton GCranston LRaghavan DATE 10/ 21 /08 10/ 21 /08 10/ 21 /08 10/ 28 /08 OFFICIAL RECORD COPY

William R. Campbell, Jr.

Tennessee Valley Authority WATTS BAR NUCLEAR PLANT cc:

Mr. Gordon P. Arent New Generation Licensing Manager Tennessee Valley Authority 5A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Vice President Nuclear Support Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Michael J. Lorek Vice President Nuclear Engineering & Technical Services Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, TN 37902 Mr. John C. Fornicola, Manager Nuclear Assurance Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Larry E. Nicholson, General Manager Performance Improvement Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Michael D. Skaggs Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority P. O. Box 2000 Spring City, TN 37381 Mr. Michael A. Purcell Senior Licensing Manager Nuclear Power Group Tennessee Valley Authority 4K Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Ms. Beth A. Wetzel, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4K Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Masoud Bajestani, Vice President Watts Bar Unit 2 Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 Mr. Michael K. Brandon, Manager Licensing and Industry Affairs Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 Mr. Gregory A. Boerschig, Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 Senior Resident Inspector Watts Bar Nuclear Plant U.S. Nuclear Regulatory Commission 1260 Nuclear Plant Road Spring City, TN 37381 County Executive 375 Church Street Suite 215 Dayton, TN 37321 County Mayor P. O. Box 156 Decatur, TN 37322 Mr. Lawrence E. Nanney, Director Division of Radiological Health Dept. of Environment & Conservation Third Floor, L and C Annex 401 Church Street Nashville, TN 37243-1532

Enclosure REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATIONS REVISIONS EMERGENCY CORE COOLING SYSTEM BORIC ACID CONCENTRATION REQUIREMENTS WATTS BAR NUCLEAR PLANT, UNIT 1 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-390 By letter dated August 1, 2008 (ADAMS Accession No. ML082180091), the Tennessee Valley Authority (TVA), the licensee for Watts Bar Nuclear Plant (WBN) Unit 1, submitted a request to revise the WBN Unit 1 Technical Specifications (TSs) to change the boron requirements for cold leg accumulators and refueling water storage tank (RWST). The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing this request, and has determined that additional information is necessary for the staff to complete its review, as discussed below.

Question 1. Inclusion Of Emergency Core Cooling System (ECCS) Boron Requirements In the Core Operating Limits Report (COLR)

NRC Generic Letter (GL) 88-16, Removal of Cycle-Specific Parameter Limits from Technical Specifications (TSs) provides a means by which licensees may avoid cycle-specific revisions to the TSs by modifying the TSs to note that cycle-specific parameters shall be maintained in a COLR, which is provided to the NRC for information on a cycle-specific basis. To implement the GL 88-16 guidance, licensees are required to maintain, in their TSs, references to NRC-approved methodologies that are used to determine the parameter operating limits. If the methodology is plant-specific, a reference to the NRC safety evaluation (SE) approving the use of the methodology is alternatively required.

TVA proposes to implement the guidance contained in GL 88-16 to provide discreet levels of ECCS boron concentration requirements. Each level would be specified in the applicable Surveillance Requirement, and the specific level determined for the cycle would be specified in the COLR. To support this request, the licensee has proposed a COLR reference to Westinghouse document WCAP-16932-P, Revision 1, as approved by the NRC staffs SE.

However, WCAP-16932-P describes the technical adequacy of an assumption crediting control rod insertion for certain postulated post-loss-of-coolant accident (LOCA) scenarios, in which trip reactivity is required for post-LOCA subcriticality. Hence, this proposed reference appears inappropriate, because it does not contain the methodology used to determine the cycle-specific ECCS boron concentration requirement.

Additionally, the NRC staff believes that a strong contingent of the cycle-to-cycle variability in required ECCS boron concentration is the inventory of Tritium Producing Burnable Absorber Rods (TPBARs) in the core. This belief is supported by, among other things, the fact that a previously approved request submitted by TVA provided discreet levels of boron concentrations based solely on the TPBAR inventory.

In light of these considerations, please provide the following additional information:

Revise your proposed TS reference so that it accurately reflects a methodology document describing explicitly how the boron concentration level published in the COLR will be determined.

Explain what additional cycle-specific design considerations warrant your proposed boron concentration requirements inclusion in the COLR as opposed to in the TSs. Why is this proposal inconsistent with your previous TS requirement?

Question 2. Analytic Basis for ECCS Boron Concentration Requirements.

As required by Title 10 of the Code of Federal Regulations, Section 50.46, each pressurized light water nuclear power reactor must be provided with an ECCS that must be designed so that its calculated cooling performance following postulated LOCAs conforms to, among others, a requirement for long-term cooling. After any calculated successful initial operation of the ECCS, the calculated core temperature shall be maintained at an acceptably low value and decay heat shall be removed for the extended period of time required by the long-lived radioactivity remaining in the core.

As a part of this requirement, Westinghouse-evaluated ECCS designs are typically required to assist in maintaining a subcritical core configuration. As such, the ECCS is designed to contain sufficient boron to compensate for positive reactivity effects that could be associated with a postulated LOCA, for instance, reductions in average coolant temperature.

Please justify the technical adequacy of your proposed ECCS boron concentration requirements:

You state, the negative worth of each absorber, including the reactor coolant system (RCS) boron worth, decreases (page E1-4 of submittal letter). Explain how your analysis accounts for the phenomena that contribute to the reduction of the boron worth.

Confirm that your analytic codes and methods are capable of accounting for the neutronic effects of boron concentration levels as high as 3800 parts per million (ppm).

Question 3. Critical Boron Requirements for a High Burnable Absorber Loading The NRC staffs initial review of the fuel system design required to support the requested TPBAR loading is documented in numerous letters and submittals between TVA and the NRC staff. The NRC staffs review was governed, in part, by the guidance contained in Section 4.2 of the Standard Review Plan (SRP 4.2). SRP 4.2 directs the NRC staff to review areas concerning reactivity control requirements and provisions. As such, the licensee submitted a description of changes in critical boron requirements to support operation with the requested number of TPBARs (Westinghouse Report NDP-00-0344, submitted to NRC on August 20, 2001). These boron requirements increased over those required for previous Watts Bar Cycle designs (see page 2-20 of NDP-00-0344).

While the NRC staff does not intend to repeat its review of the original request to operate a tritium production core, certain assumptions regarding the initial boric acid concentration could affect the required performance of the ECCS, immediate post-LOCA) subcriticality, and the outcome of the

long-term core cooling calculation.

Please explain how the core design computer codes determine the critical boron concentration for cycle reloads.

The NRC staff reviewed Licensing Topical Report WCAP-11596-P-A describing the qualification of the PHOENIX-P/ANC code system. Most of the presented validation for critical boron concentration extended to slightly higher than 1000 ppm, with increased scatter at higher boron concentrations.

Does the current validation data set for the applicable version of PHOENIX/ANC include critical boron concentration measurements that extend to 2000 ppm or beyond?

Do available core-follow statistics include reactors operating with heavy loadings of neutronic absorbers with low atomic numbers?

How does this compare to critical boron concentrations predicted for current core designs at similar Westinghouse 4-loop Pressurized-Water Reactors (PWRs)?

How is the core critical boron concentration incorporated into the post-LOCA long-term core cooling analysis?

Question 4. Nuclear Safety Advisory Letter 07-7 The NRC staff is aware that Westinghouse has recently issued a Nuclear Safety Advisory Letter concerning the capability of a PWR core to remain subcritical in the early stages following a large break LOCA based on the contribution of negative reactivity from core voiding during the blowdown, existing RCS boron concentration, and cold leg accumulator boron concentration.

Confirm whether the proposed boron concentration levels account for the potential effects identified in that Nuclear Safety Advisory Letter.

Question 5. Selection of Pipe Breaks for Post-LOCA Subcriticality For the scenarios used to evaluate post-LOCA subcriticality, a cold leg accumulator line break and a pressurizer surge line break are assumed. The post-LOCA subcriticality analyses do not appear to account for reactor coolant pipe breaks. Please explain.

Question 6. Staff Confirmatory Calculation of Post-LOCA Long-Term Core Cooling Due to the high ECCS boric acid concentration requirements, the NRC staff intends to perform confirmatory analysis regarding the long term core cooling capability.

1. Please provide the following information for the WBN Unit 1 Nuclear Steam Supply System (NSSS):
a. Volume of the lower plenum, core and upper plenum below the bottom elevation of the hot leg, each identified separately. Also, provide heights of these regions.
b. Loop friction and geometry pressure losses from the core exit through the steam

generators to the inlet nozzle of the reactor vessel. Also, provide the locked rotor Reactor Coolant Pump (RCP) k-factor. Please provide the mass flow rates, flow areas, k-factors, and coolant temperatures for the pressure losses provided (upper plenum, hot legs, Steam Generators (SGs), suction legs, RCPs, and discharge legs). Please include the reduced SG flow areas due to plugged tubes. Please also provide the loss from each of the intact cold legs through the annulus to a single broken cold leg.

c. Capacity and boron concentration of the RWST.
d. Capacity of the condensate storage tank.
e. Boric acid concentration vs. time for the limiting large break.
f.

Flushing flow rate at the time of switch to simultaneous injection.

g. High Pressure Safety Injection runout flow rate.
2. What is the sump temperature vs. time following recirculation and how does this impact precipitation? Is the boric acid concentration in the vessel below the precipitation limit based on the minimum sump temperature at the time the switch to simultaneous injection is performed? Please explain.
3. Please provide the following elevation data:
a. bottom elevation of the suction leg horizontal leg piping
b. top elevation of the cold leg at the RCP discharge
c. top elevation of the core (also, height of core)
d. bottom elevation of the downcomer Question 7. Boric Acid Concentration Calculation of Post-LOCA Long-Term Core Cooling The NRC staff is aware that a boric acid concentration calculation has been performed that more closely aligns to the NRC staffs current expectations and acceptance criteria regarding the precipitability of boric acid in the long-term phase following a LOCA. Please provide a summary of this calculation.