ML091120795: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:April 22, 2009 Carol Berrigan, Senior Director Industry Infrastructure Nuclear Energy Institute 1776 Eye St., NW Washington, DC 250006
{{#Wiki_filter:April 22, 2009 Carol Berrigan, Senior Director Industry Infrastructure Nuclear Energy Institute 1776 Eye St., NW Washington, DC 250006  


==Dear Ms. Berrigan:==
==Dear Ms. Berrigan:==
The Nuclear Regulatory Commission (NRC) is pleased that you will participate in a public Commission meeting on new reactor component fabrication and oversight, Wednesday, June 3, 2009. The meeting will be held in the Commissioners Conference Room on the first floor of the NRCs Headquarters building at One White Flint North, Rockville, Maryland; it will have two parts. In the morning, 9:30-11:30 a.m., you will be part of an industry panel. The Commission is interested in hearing your views, as a representative of the Nuclear Energy Institute, on new reactor component fabrication and oversight from a broad industry perspective, including integrity of the supply chain, historical quality issues, and challenges facing vendors and engineering, procurement, construction contractors (EPCs). In the afternoon, 1:30-3:30 p.m.,
The Nuclear Regulatory Commission (NRC) is pleased that you will participate in a public Commission meeting on new reactor component fabrication and oversight, Wednesday, June 3, 2009. The meeting will be held in the Commissioners Conference Room on the first floor of the NRCs Headquarters building at One White Flint North, Rockville, Maryland; it will have two parts. In the morning, 9:30-11:30 a.m., you will be part of an industry panel. The Commission is interested in hearing your views, as a representative of the Nuclear Energy Institute, on new reactor component fabrication and oversight from a broad industry perspective, including integrity of the supply chain, historical quality issues, and challenges facing vendors and engineering, procurement, construction contractors (EPCs). In the afternoon, 1:30-3:30 p.m.,
NRC staff and a representative from Autorite de Surete Nucleaire in France, will provide a presentation on the new reactor vendor inspection program and global regulatory cooperation in vendor oversight. I am enclosing a copy of the draft meeting agenda for your information (enclosure 1). My staff will keep you informed of any updates to the agenda.
NRC staff and a representative from Autorite de Surete Nucleaire in France, will provide a presentation on the new reactor vendor inspection program and global regulatory cooperation in vendor oversight. I am enclosing a copy of the draft meeting agenda for your information (enclosure 1). My staff will keep you informed of any updates to the agenda.
Line 24: Line 23:
Enclosed are guidelines for viewgraphs, if you choose to use them (enclosure 2). PowerPoint or other electronic presentation formats are acceptable. This Commission meeting will be webcast live at the Web address: www.nrc.gov. If you intend to use viewgraphs they will also be posted on the NRC website prior to the meeting. If you have any questions, please contact Ms. Bavol at 301-415-1651.
Enclosed are guidelines for viewgraphs, if you choose to use them (enclosure 2). PowerPoint or other electronic presentation formats are acceptable. This Commission meeting will be webcast live at the Web address: www.nrc.gov. If you intend to use viewgraphs they will also be posted on the NRC website prior to the meeting. If you have any questions, please contact Ms. Bavol at 301-415-1651.
Your presentation at the Commission meeting should be based on the assumption that Commissioners are familiar with the content of your written material. Please plan your oral presentation for 15 minutes or less, discussing the important points on which you wish to focus the Commissions attention.
Your presentation at the Commission meeting should be based on the assumption that Commissioners are familiar with the content of your written material. Please plan your oral presentation for 15 minutes or less, discussing the important points on which you wish to focus the Commissions attention.
The NRC Headquarters building is located opposite the White Flint Metro Station on Rockville Pike and Marinelli Drive, Rockville, Maryland. The White Flint Metro Station is on the Red Line of the Washington area subway system. Reserved visitor parking for Commission guests is available. If you wish to use reserved parking, please notify Ms. Bavol in advance. If reserved parking has been arranged, please check-in with the security staff at the entrance to the NRC
The NRC Headquarters building is located opposite the White Flint Metro Station on Rockville Pike and Marinelli Drive, Rockville, Maryland. The White Flint Metro Station is on the Red Line of the Washington area subway system. Reserved visitor parking for Commission guests is available. If you wish to use reserved parking, please notify Ms. Bavol in advance. If reserved parking has been arranged, please check-in with the security staff at the entrance to the NRC  


campus on Marinelli Drive when you arrive. A Security Guard will call for an escort.
2 campus on Marinelli Drive when you arrive. A Security Guard will call for an escort.
Sincerely,
Sincerely,  
                                    /RA/
/RA/
Annette L. Vietti-Cook Secretary of the Commission
Annette L. Vietti-Cook Secretary of the Commission  


==Enclosures:==
==Enclosures:==
: 1. Draft Agenda
: 1. Draft Agenda
: 2. Briefing Visuals Guidance 2}}
: 2. Briefing Visuals Guidance}}

Latest revision as of 12:18, 14 January 2025

4/22/09 Ltr to C. Berrigan Re Participation in Commission Meeting on New Reactor Component Fabrication and Oversight on 6/3/09
ML091120795
Person / Time
Issue date: 04/22/2009
From: Annette Vietti-Cook
NRC/SECY
To: Berrigan C
Nuclear Energy Institute
References
Download: ML091120795 (2)


Text

April 22, 2009 Carol Berrigan, Senior Director Industry Infrastructure Nuclear Energy Institute 1776 Eye St., NW Washington, DC 250006

Dear Ms. Berrigan:

The Nuclear Regulatory Commission (NRC) is pleased that you will participate in a public Commission meeting on new reactor component fabrication and oversight, Wednesday, June 3, 2009. The meeting will be held in the Commissioners Conference Room on the first floor of the NRCs Headquarters building at One White Flint North, Rockville, Maryland; it will have two parts. In the morning, 9:30-11:30 a.m., you will be part of an industry panel. The Commission is interested in hearing your views, as a representative of the Nuclear Energy Institute, on new reactor component fabrication and oversight from a broad industry perspective, including integrity of the supply chain, historical quality issues, and challenges facing vendors and engineering, procurement, construction contractors (EPCs). In the afternoon, 1:30-3:30 p.m.,

NRC staff and a representative from Autorite de Surete Nucleaire in France, will provide a presentation on the new reactor vendor inspection program and global regulatory cooperation in vendor oversight. I am enclosing a copy of the draft meeting agenda for your information (enclosure 1). My staff will keep you informed of any updates to the agenda.

To assist the Commission in preparing for the meeting, please e-mail any written material, including viewgraphs/slides, to Ms. Rochelle Bavol and Ms. Sandy Joosten (rochelle.bavol@nrc.gov and sandy.joosten@nrc.gov) in the Office of the Secretary, by May 27, 2009, so that it can be distributed to the Commission for review in advance of the meeting.

Enclosed are guidelines for viewgraphs, if you choose to use them (enclosure 2). PowerPoint or other electronic presentation formats are acceptable. This Commission meeting will be webcast live at the Web address: www.nrc.gov. If you intend to use viewgraphs they will also be posted on the NRC website prior to the meeting. If you have any questions, please contact Ms. Bavol at 301-415-1651.

Your presentation at the Commission meeting should be based on the assumption that Commissioners are familiar with the content of your written material. Please plan your oral presentation for 15 minutes or less, discussing the important points on which you wish to focus the Commissions attention.

The NRC Headquarters building is located opposite the White Flint Metro Station on Rockville Pike and Marinelli Drive, Rockville, Maryland. The White Flint Metro Station is on the Red Line of the Washington area subway system. Reserved visitor parking for Commission guests is available. If you wish to use reserved parking, please notify Ms. Bavol in advance. If reserved parking has been arranged, please check-in with the security staff at the entrance to the NRC

2 campus on Marinelli Drive when you arrive. A Security Guard will call for an escort.

Sincerely,

/RA/

Annette L. Vietti-Cook Secretary of the Commission

Enclosures:

1. Draft Agenda
2. Briefing Visuals Guidance