ML091410688: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_TfLW4TNHItaD | {{#Wiki_filter:_TfLW4TNHItaD LAR MXM-I IUNr John Richmond From: | ||
Richard Conte, Sent: | |||
Friday, October 03, 2008 11:13 AM To: | |||
John Richmond; Kay Gallagher Cc: | |||
Michael Modes; Glenn Meyer; Marsha Gamberoni; Darrell Roberts; Doug Tifft; Heather Jones | |||
==Subject:== | ==Subject:== | ||
LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG. RE: OC Sandbed access Doug I would like you to help out on OC and Heather BV - See john for your roles. | LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG. RE: OC Sandbed access Doug I would like you to help out on OC and Heather BV - See john for your roles. | ||
Kay need a DRS Action Item with the following subtasks: | Kay need a DRS Action Item with the following subtasks: | ||
"Effectively manage the OC license renewal commitments review (detailed inspection planing and related gov. | |||
JR/GM many sub-sub tasks might be needed for each of these subtask. If so, go with a project plan like BV. | P-and public outreach)" | ||
JR/GM many sub-sub tasks might be needed for each of these subtask. If so, go with a project plan like BV. | |||
'4 Outside of the scope L | |||
Outside of the scope | |||
: 2. By Oct. 22, conduct briefing for inspection plan and related outreach - obtain final comments on Outage Comm Plan (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.) | : 2. By Oct. 22, conduct briefing for inspection plan and related outreach - obtain final comments on Outage Comm Plan (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.) | ||
: 3. By Nov. 5, conduct Prebief on inspection results (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.) - | : 3. By Nov. 5, conduct Prebief on inspection results (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.) - | ||
| Line 28: | Line 35: | ||
: 4. By Nov. 6, conduct exit on site - BC and TL (potential weekend work if OC SU is Nov. 11 or sooner) DDD optional or if needed for crisis. | : 4. By Nov. 6, conduct exit on site - BC and TL (potential weekend work if OC SU is Nov. 11 or sooner) DDD optional or if needed for crisis. | ||
: 5. By Nov. 10 - final quick look letter - sign out within day (startup assumed to be 11/11) - note same DRS players involved in BV LR exit | : 5. By Nov. 10 - final quick look letter - sign out within day (startup assumed to be 11/11) - note same DRS players involved in BV LR exit | ||
: 6. By Nov. 11 Implement comm plan for quick look letter (startup assumed to be 11/11) - note same DRS players involved in BV LR exit | : 6. By Nov. 11 Implement comm plan for quick look letter (startup assumed to be 11/11) - note same DRS players involved in BV LR exit 4. | ||
Outside of the scope 8BY Dec. 17 Issue IR and implement related Comm Plan | Outside of the scope 8BY Dec. 17 Issue IR and implement related Comm Plan "0 | ||
From: John Richmond Sent: Friday, October 03, 2008 9:22 AM To: Michael Modes; Timothy OHara Cc: Richard Conte | |||
==Subject:== | ==Subject:== | ||
| Line 38: | Line 45: | ||
2 | 2 | ||
Received: from R1CLSTRO1 .nrc.gov ([148.184.99.7]) by R1 MS01 .nrc.gov | Received: from R1CLSTRO1.nrc.gov ([148.184.99.7]) by R1 MS01.nrc.gov | ||
([148.184.99.10]) with mapi; Fri, 3 Oct 2008 11:13:20 -0400 Content-Type: application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding: binary From: Richard Conte <Richard.Conte@nrc.gov> | ([148.184.99.10]) with mapi; Fri, 3 Oct 2008 11:13:20 -0400 Content-Type: application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding: binary From: Richard Conte <Richard.Conte@nrc.gov> | ||
To: John Richmond <John.Richmond@nrc.gov>, Kay Gallagher | To: John Richmond <John.Richmond@nrc.gov>, Kay Gallagher | ||
<Kay.Gallagher@nrc.gov> | |||
CC: Michael Modes <Michael. Modes@nrc.gov>, Glenn Meyer <Glenn.Meyer@nrc.gov>, | CC: Michael Modes <Michael. Modes@nrc.gov>, Glenn Meyer <Glenn.Meyer@nrc.gov>, | ||
Marsha Gamberoni <Marsha.Gamberoni@nrc.gov>, Darrell Roberts | Marsha Gamberoni <Marsha.Gamberoni@nrc.gov>, Darrell Roberts | ||
<Darrell. Roberts@nrc.gov>, Doug Tifft <Doug.Tifft@nrc.gov>, Heather Jones | |||
<Heather.Jones@nrc.gov> | |||
Date: Fri, 3 Oct 2008 11:13:19 -0400 | Date: Fri, 3 Oct 2008 11:13:19 -0400 | ||
| Line 51: | Line 58: | ||
LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG. RE: | LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG. RE: | ||
OC Sandbed access Thread-Topic: LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG. | OC Sandbed access Thread-Topic: LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG. | ||
RE: OC Sandbed access Thread-Index: AcklWwCSi8knN PezRIeZUk/YNIZeZAAC8OYQ Message-ID: <2856BC46 F6A308418F033D973BBOEE72969750439C@R1CLSTRO1 .nrc.gov> | RE: OC Sandbed access Thread-Index: AcklWwCSi8knN PezRIeZUk/YNIZeZAAC8OYQ Message-ID: <2856BC46 F6A308418F033D973BBOEE72969750439C@R1CLSTRO1.nrc.gov> | ||
==References:== | ==References:== | ||
<2856BC46F6A308418F033D973BBOEE72969744F33B@R1 CLSTRO1 .nrc.gov> | <2856BC46F6A308418F033D973BBOEE72969744F33B@R1 CLSTRO1.nrc.gov> | ||
In-Reply-To: <2856BC46F6A308418F033D973BBOEE72969744F33B@R1CLSTRO1.nrc.gov> | In-Reply-To: <2856BC46F6A308418F033D973BBOEE72969744F33B@R1CLSTRO1.nrc.gov> | ||
Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach: | Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach: | ||
X-MS-Exchange-Organization-SCL: -1 X-MS-TN EF-Correlator: | X-MS-Exchange-Organization-SCL: -1 X-MS-TN EF-Correlator: | ||
<2856BC46F6A308418F033D973BBOEE72969750439C@R1 CLSTR01 .nrc.gov> | <2856BC46F6A308418F033D973BBOEE72969750439C@R1 CLSTR01.nrc.gov> | ||
MIME-Version: 1.0}} | MIME-Version: 1.0}} | ||
Latest revision as of 11:43, 14 January 2025
| ML091410688 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 10/03/2008 |
| From: | Conte R NRC Region 1 |
| To: | Gallagher K, Richmond J NRC Region 1 |
| References | |
| FOIA/PA-2009-0070 | |
| Download: ML091410688 (3) | |
Text
_TfLW4TNHItaD LAR MXM-I IUNr John Richmond From:
Richard Conte, Sent:
Friday, October 03, 2008 11:13 AM To:
John Richmond; Kay Gallagher Cc:
Michael Modes; Glenn Meyer; Marsha Gamberoni; Darrell Roberts; Doug Tifft; Heather Jones
Subject:
LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG. RE: OC Sandbed access Doug I would like you to help out on OC and Heather BV - See john for your roles.
Kay need a DRS Action Item with the following subtasks:
"Effectively manage the OC license renewal commitments review (detailed inspection planing and related gov.
P-and public outreach)"
JR/GM many sub-sub tasks might be needed for each of these subtask. If so, go with a project plan like BV.
'4 Outside of the scope L
Outside of the scope
- 2. By Oct. 22, conduct briefing for inspection plan and related outreach - obtain final comments on Outage Comm Plan (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.)
- 3. By Nov. 5, conduct Prebief on inspection results (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.) -
distribute draft of quick look letter
- 4. By Nov. 6, conduct exit on site - BC and TL (potential weekend work if OC SU is Nov. 11 or sooner) DDD optional or if needed for crisis.
- 5. By Nov. 10 - final quick look letter - sign out within day (startup assumed to be 11/11) - note same DRS players involved in BV LR exit
- 6. By Nov. 11 Implement comm plan for quick look letter (startup assumed to be 11/11) - note same DRS players involved in BV LR exit 4.
Outside of the scope 8BY Dec. 17 Issue IR and implement related Comm Plan "0
From: John Richmond Sent: Friday, October 03, 2008 9:22 AM To: Michael Modes; Timothy OHara Cc: Richard Conte
Subject:
OC Sandbed access The mock-up training was very useful. They made a concrete block, same shape and dimension as a sliced section of the drywell, then used their boring tool to cut a tunnel (19" or 20" diameter, 8 to 12 foot long) into the sandbed region, to prove the tool would work. Plywood sheeting takes the place of the steel liner.
Once you're inside, I think it's only 17 or 18 inches wide. I would not recommend anyone try to enter the sandbed cavity if they have a chest size larger than mine or Tim's. It might be reasonable to crawl through the tunnel and stick your head inside for a look see. And if you're even a little uneasy in tight spaces, forget it!
2
Received: from R1CLSTRO1.nrc.gov ([148.184.99.7]) by R1 MS01.nrc.gov
([148.184.99.10]) with mapi; Fri, 3 Oct 2008 11:13:20 -0400 Content-Type: application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding: binary From: Richard Conte <Richard.Conte@nrc.gov>
To: John Richmond <John.Richmond@nrc.gov>, Kay Gallagher
<Kay.Gallagher@nrc.gov>
CC: Michael Modes <Michael. Modes@nrc.gov>, Glenn Meyer <Glenn.Meyer@nrc.gov>,
Marsha Gamberoni <Marsha.Gamberoni@nrc.gov>, Darrell Roberts
<Darrell. Roberts@nrc.gov>, Doug Tifft <Doug.Tifft@nrc.gov>, Heather Jones
<Heather.Jones@nrc.gov>
Date: Fri, 3 Oct 2008 11:13:19 -0400
Subject:
LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG. RE:
OC Sandbed access Thread-Topic: LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG.
RE: OC Sandbed access Thread-Index: AcklWwCSi8knN PezRIeZUk/YNIZeZAAC8OYQ Message-ID: <2856BC46 F6A308418F033D973BBOEE72969750439C@R1CLSTRO1.nrc.gov>
References:
<2856BC46F6A308418F033D973BBOEE72969744F33B@R1 CLSTRO1.nrc.gov>
In-Reply-To: <2856BC46F6A308418F033D973BBOEE72969744F33B@R1CLSTRO1.nrc.gov>
Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach:
X-MS-Exchange-Organization-SCL: -1 X-MS-TN EF-Correlator:
<2856BC46F6A308418F033D973BBOEE72969750439C@R1 CLSTR01.nrc.gov>
MIME-Version: 1.0