{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:       RO, SRO-U SYSTEM c TITLE:       OPEN PORV BLOCK VALVES CANDIDATE: _____________________________________________
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:
EXAMINER: _____________________________________________
RO, SRO-U SYSTEM c TITLE:
OPEN PORV BLOCK VALVES CANDIDATE:
EXAMINER:  


RO, SRO-U SYSTEM c JOB PERFORMANCE MEASURE DATA PAGE Task:   Open PORV Block Valves Alternate Path: YES Facility JPM #: NEW K/A: 010A2.03           Importance:       RO: 4.1         SRO: 4.2 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PZR PCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: PORV failures.
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 2 of 13 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task:
Open PORV Block Valves Alternate Path: YES Facility JPM #: NEW K/A: 010A2.03 Importance:
RO: 4.1 SRO: 4.2 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PZR PCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: PORV failures.
Task Standard: At least one PORV in service per SOP-1B, Attachment 6.
Task Standard: At least one PORV in service per SOP-1B, Attachment 6.
Preferred Evaluation Location: Simulator       __X__       In Plant   _____
Preferred Evaluation Location: Simulator
Preferred Evaluation Method:       Perform     __X__       Simulate   _____
__X__
In Plant Preferred Evaluation Method:
Perform
__X__
Simulate  


==References:==
==References:==
SOP-1B, Primary Coolant System - Cooldown Validation Time:15 minutes         Time Critical:   NO Candidate: __________________________________________________
SOP-1B, Primary Coolant System - Cooldown Validation Time: 15 minutes Time Critical:
Time Start: ________         Time Finish:     ________
NO Candidate: __________________________________________________
Performance Time:       ________ minutes Performance Rating:     SAT______         UNSAT ______
Time Start: ________
Time Finish:
Performance Time:
________ minutes Performance Rating:
SAT______
UNSAT ______
Comments:
Comments:
Examiner: _______________________________                   Date:   ______________
Examiner: _______________________________
Signature PALISADES NUCLEAR PLANT                  Page 2 of 13                          JULY 2008
Date:
Signature  


RO, SRO-U SYSTEM c EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 3 of 13 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
SOP-1B, Attachment 6, Opening of PORV Isolation Valves, Rev. 8 GCL 9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, Rev. 28 Also see Simulator Operator Instructions (last page of this document).
SOP-1B, Attachment 6, Opening of PORV Isolation Valves, Rev. 8 GCL 9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, Rev. 28 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Line 40: Line 54:
P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs.
P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs.
PCS boron has been verified at Cold Shutdown concentration.
PCS boron has been verified at Cold Shutdown concentration.
GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.
GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.
INITIATING CUES:
INITIATING CUES:
The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist.
The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist.  
PALISADES NUCLEAR PLANT                    Page 3 of 13                            JULY 2008


RO, SRO-U SYSTEM c Proc. Step             TASK ELEMENT 1                                 STANDARD                 Grade Locate GCL 9-1                             GCL-9-1 located.
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 4 of 13 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate GCL 9-1 GCL-9-1 located.
n/a                                                                                            S U Comment:
S U Comment:
Evaluator provides the operator a working copy GCL 9-1, completed through Step 2.10.
Evaluator provides the operator a working copy GCL 9-1, completed through Step 2.10.
Proc. Step             TASK ELEMENT 2                                 STANDARD                 Grade OPEN PORV Isolation Valves. Refer to SOP-1B, Attachment 6, Opening Of PORV Isolation Valves.                         SOP-1B, Att. 6 located GCL 9-1, Sep              MO-1042A                                                                    S U 2.11 MO-1043A Comment:
Proc. Step TASK ELEMENT 2 STANDARD Grade GCL 9-1, Sep 2.11 OPEN PORV Isolation Valves. Refer to SOP-1B, Attachment 6, Opening Of PORV Isolation Valves.
MO-1042A MO-1043A SOP-1B, Att. 6 located S U Comment:
Evaluator provides the operator a working copy of SOP-1B, Attachment 6.
Evaluator provides the operator a working copy of SOP-1B, Attachment 6.
Proc. Step             TASK ELEMENT 3                                 STANDARD                 Grade ENSURE the following conditions:
Proc. Step TASK ELEMENT 3 STANDARD Grade 2.0a.1 ENSURE the following conditions:
HS-1042B (HS-1043B) checked in CLOSE
: 1. HS-1042B (HS-1043B), PZR to Quench Tank T-73 in CLOSE position.
: 1. HS-1042B (HS-1043B), PZR to          position.
HS-1042B (HS-1043B) checked in CLOSE position.
2.0a.1                                                                                          S U Quench Tank T-73 in CLOSE position.
S U Comment:  
Comment:
PALISADES NUCLEAR PLANT                    Page 4 of 13                              JULY 2008


RO, SRO-U SYSTEM c Proc. Step           TASK ELEMENT 4                                     STANDARD                 Grade ENSURE the following conditions:
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 5 of 13 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 2.0a.2 ENSURE the following conditions:
: 2. MO-1042A (MO-1043A), Power Relief       MO-1042A (MO-1043A) checked closed.
: 2. MO-1042A (MO-1043A), Power Relief Valve Isolation closed.
2.0a.2                                                                                              S U Valve Isolation closed.
MO-1042A (MO-1043A) checked closed.
Comment:
S U Comment:
Proc. Step           TASK ELEMENT 5                                     STANDARD                 Grade ENSURE the following conditions:
Proc. Step TASK ELEMENT 5 STANDARD Grade 2.0a.3 ENSURE the following conditions:
PCS pressure checked between 2010 and 2100
: 3. PCS pressure control established:
: 3. PCS pressure control established:
2.0a.3                                                psia                                          S U SOP-1     2010 to 2100 psia Comment:
SOP-1 2010 to 2100 psia PCS pressure checked between 2010 and 2100 psia S U Comment:
Proc. Step           TASK ELEMENT 6                                     STANDARD                 Grade HS-1042B (HS-1043B) placed to OPEN for PLACE HS-1042B (HS-1043B), PZR approx. 15 seconds Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN         AND THEN 2.0b    PLACE to CLOSE, leaving handswitch in                                                     S U HS-1042B (HS-1043B) placed to CLOSE, with CLOSE position when complete.
Proc. Step TASK ELEMENT 6 STANDARD Grade 2.0b PLACE HS-1042B (HS-1043B), PZR Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN PLACE to CLOSE, leaving handswitch in CLOSE position when complete.
handswitch left in CLOSE position.
HS-1042B (HS-1043B) placed to OPEN for approx. 15 seconds AND THEN HS-1042B (HS-1043B) placed to CLOSE, with handswitch left in CLOSE position.
Comment:
S U Comment:
NOTE: Operator can do either channel first. Typically the left side valve operations (non-parentheses) are completed first.
NOTE: Operator can do either channel first. Typically the left side valve operations (non-parentheses) are completed first.
CRITICAL STEP PALISADES NUCLEAR PLANT                      Page 5 of 13                                JULY 2008
CRITICAL STEP  


RO, SRO-U SYSTEM c Proc. Step             TASK ELEMENT 7                                           STANDARD               Grade OPERATE HS-1042A (HS-1043A), Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed:                         HS-1042A (HS-1043A) operated intermittently until red light lights.
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 6 of 13 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade 2.0c OPERATE HS-1042A (HS-1043A), Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed:
: 1. MO-1042A (MO-1043A) red position indication lamp lights (indicates valve is 2.0c    5% open, green position indication lamp is                                                   S U also lighted at this point).
: 1. MO-1042A (MO-1043A) red position indication lamp lights (indicates valve is 5% open, green position indication lamp is also lighted at this point).
: 2. PRV-1042B (PRV-1043B), Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
: 2. PRV-1042B (PRV-1043B), Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
Comment:
HS-1042A (HS-1043A) operated intermittently until red light lights.
S U Comment:
NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open and stay open. This will require the block valve to be closed.
NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open and stay open. This will require the block valve to be closed.
CRITICAL STEP Proc. Step             TASK ELEMENT 8                                           STANDARD               Grade IF a PORV opens during performance of Step 2.0c AND the applicable PCS MO-1042A (MO-1043A), PORV Isolation Valve pressure action limit is exceeded (SOP-1, closed.
CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade 1.0a.1 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken:
1800 psia), THEN the following actions 1.0a.1                                                                                                  S U shall be taken:
: 1. CLOSE affected PORV Isolation Valve.
: 1. CLOSE affected PORV Isolation Valve.
Comment:
MO-1042A (MO-1043A), PORV Isolation Valve closed.
S U Comment:
NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open, necessitating closing its block valve that was opened.
NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open, necessitating closing its block valve that was opened.
Evaluator: Operator action by procedure states that if 1800 psia is exceeded, affected PORV Isolation Valve must be closed. Operator should close valve before this pressure is reached.
Evaluator: Operator action by procedure states that if 1800 psia is exceeded, affected PORV Isolation Valve must be closed. Operator should close valve before this pressure is reached.
CRITICAL STEP PALISADES NUCLEAR PLANT                          Page 6 of 13                                JULY 2008
CRITICAL STEP  


RO, SRO-U SYSTEM c Proc. Step             TASK ELEMENT 9                                       STANDARD                     Grade Following alarms are acknowledged:
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 7 of 13 JULY 2008 Proc. Step TASK ELEMENT 9 STANDARD Grade n/a The following alarms annunciate with PORV opening:
: 1. EK-1373, Operator Action: Refer to ONP-The following alarms annunciate with            18: Follow Up Action: Check Acoustic PORV opening:                                Monitor Panel for open valve; Check TIA-
: 1. EK-1373, SV AND/OR PORV OPEN, (Audible Acoustic Monitor alarm on back of Panel C-11A in alarm from FI-1042B Accelerometer (#4) Hi noise).
: 1. EK-1373, SV AND/OR PORV OPEN,                0106 discharge temperature; Refer to ONP-(Audible Acoustic Monitor alarm on            23.1.
: 2. EK0743, Pressurizer PWR Operated Relief Valve Discharge HI Temp (TIA-0106, Relief and Safety Valve Discharge Temp, reads up-scale).
back of Panel C-11A in alarm from FI-      2. EK-0743, Operator Action: Refer to ONP-n/a        1042B Accelerometer (#4) Hi noise).          23.1; Follow Up Action: Evaluate desired       S U
Following alarms are acknowledged:
: 2. EK0743, Pressurizer PWR Operated              position of MO-1042A; Refer to LCOs; Refer Relief Valve Discharge HI Temp (TIA-          to ORM.
: 1. EK-1373, Operator Action: Refer to ONP-18: Follow Up Action: Check Acoustic Monitor Panel for open valve; Check TIA-0106 discharge temperature; Refer to ONP-23.1.
0106, Relief and Safety Valve              3. Acoustic Monitor Reset pushbutton pushed Discharge Temp, reads up-scale).              to silence audible Acoustic Monitor alarm (PORV MOV Block Valve must be closed, for alarm to clear).
: 2. EK-0743, Operator Action: Refer to ONP-23.1; Follow Up Action: Evaluate desired position of MO-1042A; Refer to LCOs; Refer to ORM.
Comment:
: 3. Acoustic Monitor Reset pushbutton pushed to silence audible Acoustic Monitor alarm (PORV MOV Block Valve must be closed, for alarm to clear).
S U Comment:
NOTE: Alarms do not affect this JPM. PORV MOV Block valve must be closed by procedure.
NOTE: Alarms do not affect this JPM. PORV MOV Block valve must be closed by procedure.
Operator should acknowledge and consult ARPs.
Operator should acknowledge and consult ARPs.
Evaluator Cue: If Operator begins to reference ONPs, STATE: Follow in-use SOP, ONPs will be referenced/entered if PCS leakage or loss of PZR pressure control remain evident.
Evaluator Cue: If Operator begins to reference ONPs, STATE: Follow in-use SOP, ONPs will be referenced/entered if PCS leakage or loss of PZR pressure control remain evident.
Evaluator Cue: If Operator begins to reference LCOs, STATE: Another Operator will reference Technical Specifications and the ORM (Operating Requirements Manual).
Evaluator Cue: If Operator begins to reference LCOs, STATE: Another Operator will reference Technical Specifications and the ORM (Operating Requirements Manual).
Proc. Step             TASK ELEMENT 10                                       STANDARD                     Grade IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1,     PCS pressure restored to band as directed by 1800 psia), THEN the following actions       CRS.
Proc. Step TASK ELEMENT 10 STANDARD Grade 1.0a.2 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken:
1.0a.2    shall be taken:                                                                                 S U
: 2. RESTORE PCS pressure as directed by CRS.
: 2. RESTORE PCS pressure as directed by CRS.
Comment:
PCS pressure restored to band as directed by CRS.
S U Comment:
Evaluator Cue: GIVE PCS pressure band of 2010 to 2100 psia, if asked by operator.
Evaluator Cue: GIVE PCS pressure band of 2010 to 2100 psia, if asked by operator.
CRITICAL STEP PALISADES NUCLEAR PLANT                        Page 7 of 13                                    JULY 2008
CRITICAL STEP  


RO, SRO-U SYSTEM c Proc. Step             TASK ELEMENT 11                                     STANDARD                     Grade IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken:                               Since PORV still indicates open, the operator 1.0a.3                                                                                                  S U will NOT perform this step.
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 8 of 13 JULY 2008 Proc. Step TASK ELEMENT 11 STANDARD Grade 1.0a.3 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken:
: 3. When directed by CRS, repeat Section 2.0 to open PORV Isolation Valve one additional time ..
: 3. When directed by CRS, repeat Section 2.0 to open PORV Isolation Valve one additional time..
Comment:
Since PORV still indicates open, the operator will NOT perform this step.
S U Comment:
Evaluator Cue: If asked direction concerning repeating the steps with the PORV, direct them to perform the other PORV.
Evaluator Cue: If asked direction concerning repeating the steps with the PORV, direct them to perform the other PORV.
NOTE: The same sequence as above will be repeated, with the parentheses swapped for the other channel. The following operation will not cause a PORV opening.
NOTE: The same sequence as above will be repeated, with the parentheses swapped for the other channel. The following operation will not cause a PORV opening.
Proc. Step             TASK ELEMENT 12                                     STANDARD                     Grade ENSURE the following conditions:
Proc. Step TASK ELEMENT 12 STANDARD Grade 2.0a.1 ENSURE the following conditions:
(HS-1042B) HS-1043B checked in CLOSE
: 1. (HS-1042B) HS-1043B, PZR to Quench Tank T-73 in CLOSE position.
: 1. (HS-1042B) HS-1043B, PZR to              position.
(HS-1042B) HS-1043B checked in CLOSE position.
2.0a.1                                                                                                  S U Quench Tank T-73 in CLOSE position.
S U Comment:
Comment:
Proc. Step TASK ELEMENT 13 STANDARD Grade 2.0a.2 ENSURE the following conditions:
Proc. Step             TASK ELEMENT 13                                     STANDARD                     Grade ENSURE the following conditions:
: 2. (MO-1042A) MO-1043A, Power Relief Valve Isolation closed.
: 2. (MO-1042A) MO-1043A, Power Relief       (MO-1042A) MO-1043A checked closed.
(MO-1042A) MO-1043A checked closed.
2.0a.2                                                                                                  S U Valve Isolation closed.
S U Comment:  
Comment:
PALISADES NUCLEAR PLANT                        Page 8 of 13                                    JULY 2008


RO, SRO-U SYSTEM c Proc. Step           TASK ELEMENT 14                                     STANDARD                 Grade ENSURE the following conditions:
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 9 of 13 JULY 2008 Proc. Step TASK ELEMENT 14 STANDARD Grade 2.0a.3 ENSURE the following conditions:
PCS pressure checked between 2010 and 2100
: 3. PCS pressure control established:
: 3. PCS pressure control established:
2.0a.3                                                psia                                          S U SOP-1     2010 to 2100 psia Comment:
SOP-1 2010 to 2100 psia PCS pressure checked between 2010 and 2100 psia S U Comment:
NOTE: this PCS pressure band can be that which was set in JPM Task Element Step 9.
NOTE: this PCS pressure band can be that which was set in JPM Task Element Step 9.
Proc. Step           TASK ELEMENT 15                                     STANDARD                 Grade (HS-1042B) HS-1043B placed to OPEN for PLACE (HS-1042B) HS-1043B, PZR approx. 15 seconds Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN         AND THEN 2.0b    PLACE to CLOSE, leaving handswitch in                                                     S U (HS-1042B) HS-1043B placed to CLOSE, with CLOSE position when complete.
Proc. Step TASK ELEMENT 15 STANDARD Grade 2.0b PLACE (HS-1042B) HS-1043B, PZR Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN PLACE to CLOSE, leaving handswitch in CLOSE position when complete.
handswitch left in CLOSE position.
(HS-1042B) HS-1043B placed to OPEN for approx. 15 seconds AND THEN (HS-1042B) HS-1043B placed to CLOSE, with handswitch left in CLOSE position.
Comment:
S U Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT                      Page 9 of 13                                JULY 2008
CRITICAL STEP  


RO, SRO-U SYSTEM c Proc. Step             TASK ELEMENT 16                                         STANDARD                 Grade OPERATE (HS-1042A) HS-1043A, Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed:
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 10 of 13 JULY 2008 Proc. Step TASK ELEMENT 16 STANDARD Grade 2.0c OPERATE (HS-1042A) HS-1043A, Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed:
: 1. (MO-1042A) MO-1043A red position (HS-1042A) HS-1043A operated intermittently indication lamp lights (indicates valve is 2.0c                                                    until red light lights.                        S U 5% open, green position indication lamp is also lighted at this point).
: 1. (MO-1042A) MO-1043A red position indication lamp lights (indicates valve is 5% open, green position indication lamp is also lighted at this point).
: 2. (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
: 2. (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
Comment:
(HS-1042A) HS-1043A operated intermittently until red light lights.
S U Comment:
NOTE: PORV does not open and stays closed.
NOTE: PORV does not open and stays closed.
CRITICAL STEP Proc. Step             TASK ELEMENT 17                                         STANDARD                 Grade IF (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats,         Determines that this step does not apply.
CRITICAL STEP Proc. Step TASK ELEMENT 17 STANDARD Grade 2.0d IF (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
2.0d    THEN repeat Step 2.0c.                                                                          S U Comment:
Determines that this step does not apply.
PALISADES NUCLEAR PLANT                          Page 10 of 13                                  JULY 2008
S U Comment:  


RO, SRO-U SYSTEM c Proc. Step             TASK ELEMENT 18                                   STANDARD                     Grade WHEN the following conditions exist,
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 11 of 13 JULY 2008 Proc. Step TASK ELEMENT 18 STANDARD Grade 2.0e WHEN the following conditions exist,
: 1. (MO-1042A) MO-1043A, Power Relief Valve Isolation is 5% open (red position indication lamp lit).
: 1. (MO-1042A) MO-1043A, Power Relief Valve Isolation is 5% open (red position indication lamp lit).
(MO-1042A) MO-1043 A to the full open 2.0e    2. (PRV-1042B) PRV-1043B, Power                                                             S U position.
: 2. (PRV-1042B) PRV-1043B, Power Operated Relief is closed.
Operated Relief is closed.
THEN FULLY OPEN (MO-1042A) MO-1043A, Power Relief Isolation.
THEN FULLY OPEN (MO-1042A) MO-1043A, Power Relief Isolation.
Comment:
(MO-1042A) MO-1043 A to the full open position.
CRITICAL STEP Proc. Step             TASK ELEMENT 19                                   STANDARD                     Grade Repeat this attachment for remaining Operator asks if CRS wants this done.
S U Comment:
2.0f    PORV Channel Isolation Valve.                                                                S U Comment:
CRITICAL STEP Proc. Step TASK ELEMENT 19 STANDARD Grade 2.0f Repeat this attachment for remaining PORV Channel Isolation Valve.
Operator asks if CRS wants this done.
S U Comment:
Evaluator Cue: If asked by operator to open other channel PORV block valve, REPLY no for the present time.
Evaluator Cue: If asked by operator to open other channel PORV block valve, REPLY no for the present time.
Proc. Step             TASK ELEMENT 20                                   STANDARD                     Grade Notify the CRS that one PORV Block           CRS notified that one PORV Block Valve is n/a    Valve is open.                               open.                                          S U Comment:
Proc. Step TASK ELEMENT 20 STANDARD Grade n/a Notify the CRS that one PORV Block Valve is open.
END OF TASK PALISADES NUCLEAR PLANT                      Page 11 of 13                                  JULY 2008
CRS notified that one PORV Block Valve is open.
S U Comment:
END OF TASK  


RO, SRO-U SYSTEM c CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 12 of 13 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Plant has been taken off-line, with the reactor tripped.
The Plant has been taken off-line, with the reactor tripped.
P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs.
P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs.
PCS boron has been verified at Cold Shutdown concentration.
PCS boron has been verified at Cold Shutdown concentration.
GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.
GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.
INITIATING CUES:
INITIATING CUES:
The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist.
The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist.  
PALISADES NUCLEAR PLANT                Page 12 of 13                        JULY 2008


RO, SRO-U SYSTEM c SIMULATOR OPERATOR INSTRUCTIONS IC-69 MFPs tripped, P-8A, AFWP, inservice.
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 13 of 13 JULY 2008 SIMULATOR OPERATOR INSTRUCTIONS IC-69 MFPs tripped, P-8A, AFWP, inservice.
NOP and NOT (2060#, 532 F)
NOP and NOT (2060#, 532 F)
Banks of backup PZR heaters secured for reduced spray flow (GCL 9-1, step 2.8)
Banks of backup PZR heaters secured for reduced spray flow (GCL 9-1, step 2.8)
Line 165: Line 179:
Double charging and letdown inservice.
Double charging and letdown inservice.
Cover gas valved out to VCT, N2 tag next to VCT vent switch USE CAE or:
Cover gas valved out to VCT, N2 tag next to VCT vent switch USE CAE or:
Insert Location                     Description           Delay     Ramp Event     Value   Final Time Malfunctions:
Location Description Delay Ramp Event Value Final Insert Time Malfunctions:
(NONE)
(NONE)
RC 19     PORV Relief Valve Partially Lifts     5 sec.                             100   Trigger 1 RC 20     PORV Relief Valve Partially Lifts     5 sec.                             100   Trigger 2 Remotes:
RC 19 PORV Relief Valve Partially Lifts 5 sec.
CV-       PORV Relief Valve Open Light ON       5 sec.                             ON     Trigger 1 1042B-R CV-        PORV Relief Valve Open Light ON       5 sec.                             ON     Trigger 2 1043B-R Overrides:
100 Trigger 1 RC 20 PORV Relief Valve Partially Lifts 5 sec.
100 Trigger 2 Remotes:
CV-1042B-R PORV Relief Valve Open Light ON 5 sec.
ON Trigger 1 CV-1043B-R PORV Relief Valve Open Light ON 5 sec.
ON Trigger 2 Overrides:
(NONE)
(NONE)
Triggers:
Triggers:
Number Event                                   Action                   Description 1         ZLO2P(16).and..not.et_array(2) 2         ZLO2P(19).and..not.et_array(1)       set thkkarc20=1.0 3
Number Event Action Description 1
4 PALISADES NUCLEAR PLANT                Page 13 of 13                          JULY 2008}}
ZLO2P(16).and..not.et_array(2) 2 ZLO2P(19).and..not.et_array(1) set thkkarc20=1.0 3
4}}

Latest revision as of 11:35, 14 January 2025

NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO, SRO-U System C, Title: Open PORV Block Valves
ML091520329
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200311 List:
References
Download: ML091520329 (13)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:

RO, SRO-U SYSTEM c TITLE:

OPEN PORV BLOCK VALVES CANDIDATE:

EXAMINER:

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 2 of 13 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task:

Open PORV Block Valves Alternate Path: YES Facility JPM #: NEW K/A: 010A2.03 Importance:

RO: 4.1 SRO: 4.2 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PZR PCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: PORV failures.

Task Standard: At least one PORV in service per SOP-1B, Attachment 6.

Preferred Evaluation Location: Simulator

__X__

In Plant Preferred Evaluation Method:

Perform

__X__

Simulate

References:

SOP-1B, Primary Coolant System - Cooldown Validation Time: 15 minutes Time Critical:

NO Candidate: __________________________________________________

Time Start: ________

Time Finish:

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 3 of 13 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-1B, Attachment 6, Opening of PORV Isolation Valves, Rev. 8 GCL 9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, Rev. 28 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The Plant has been taken off-line, with the reactor tripped.

P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs.

PCS boron has been verified at Cold Shutdown concentration.

GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.

INITIATING CUES:

The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist.

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 4 of 13 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate GCL 9-1 GCL-9-1 located.

S U Comment:

Evaluator provides the operator a working copy GCL 9-1, completed through Step 2.10.

Proc. Step TASK ELEMENT 2 STANDARD Grade GCL 9-1, Sep 2.11 OPEN PORV Isolation Valves. Refer to SOP-1B, Attachment 6, Opening Of PORV Isolation Valves.

MO-1042A MO-1043A SOP-1B, Att. 6 located S U Comment:

Evaluator provides the operator a working copy of SOP-1B, Attachment 6.

Proc. Step TASK ELEMENT 3 STANDARD Grade 2.0a.1 ENSURE the following conditions:

1. HS-1042B (HS-1043B), PZR to Quench Tank T-73 in CLOSE position.

HS-1042B (HS-1043B) checked in CLOSE position.

S U Comment:

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 5 of 13 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 2.0a.2 ENSURE the following conditions:

2. MO-1042A (MO-1043A), Power Relief Valve Isolation closed.

MO-1042A (MO-1043A) checked closed.

S U Comment:

Proc. Step TASK ELEMENT 5 STANDARD Grade 2.0a.3 ENSURE the following conditions:

3. PCS pressure control established:

SOP-1 2010 to 2100 psia PCS pressure checked between 2010 and 2100 psia S U Comment:

Proc. Step TASK ELEMENT 6 STANDARD Grade 2.0b PLACE HS-1042B (HS-1043B), PZR Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN PLACE to CLOSE, leaving handswitch in CLOSE position when complete.

HS-1042B (HS-1043B) placed to OPEN for approx. 15 seconds AND THEN HS-1042B (HS-1043B) placed to CLOSE, with handswitch left in CLOSE position.

S U Comment:

NOTE: Operator can do either channel first. Typically the left side valve operations (non-parentheses) are completed first.

CRITICAL STEP

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 6 of 13 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade 2.0c OPERATE HS-1042A (HS-1043A), Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed:

1. MO-1042A (MO-1043A) red position indication lamp lights (indicates valve is 5% open, green position indication lamp is also lighted at this point).
2. PRV-1042B (PRV-1043B), Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.

HS-1042A (HS-1043A) operated intermittently until red light lights.

S U Comment:

NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open and stay open. This will require the block valve to be closed.

CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade 1.0a.1 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken:

1. CLOSE affected PORV Isolation Valve.

MO-1042A (MO-1043A), PORV Isolation Valve closed.

S U Comment:

NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open, necessitating closing its block valve that was opened.

Evaluator: Operator action by procedure states that if 1800 psia is exceeded, affected PORV Isolation Valve must be closed. Operator should close valve before this pressure is reached.

CRITICAL STEP

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 7 of 13 JULY 2008 Proc. Step TASK ELEMENT 9 STANDARD Grade n/a The following alarms annunciate with PORV opening:

1. EK-1373, SV AND/OR PORV OPEN, (Audible Acoustic Monitor alarm on back of Panel C-11A in alarm from FI-1042B Accelerometer (#4) Hi noise).
2. EK0743, Pressurizer PWR Operated Relief Valve Discharge HI Temp (TIA-0106, Relief and Safety Valve Discharge Temp, reads up-scale).

Following alarms are acknowledged:

1. EK-1373, Operator Action: Refer to ONP-18: Follow Up Action: Check Acoustic Monitor Panel for open valve; Check TIA-0106 discharge temperature; Refer to ONP-23.1.
2. EK-0743, Operator Action: Refer to ONP-23.1; Follow Up Action: Evaluate desired position of MO-1042A; Refer to LCOs; Refer to ORM.
3. Acoustic Monitor Reset pushbutton pushed to silence audible Acoustic Monitor alarm (PORV MOV Block Valve must be closed, for alarm to clear).

S U Comment:

NOTE: Alarms do not affect this JPM. PORV MOV Block valve must be closed by procedure.

Operator should acknowledge and consult ARPs.

Evaluator Cue: If Operator begins to reference ONPs, STATE: Follow in-use SOP, ONPs will be referenced/entered if PCS leakage or loss of PZR pressure control remain evident.

Evaluator Cue: If Operator begins to reference LCOs, STATE: Another Operator will reference Technical Specifications and the ORM (Operating Requirements Manual).

Proc. Step TASK ELEMENT 10 STANDARD Grade 1.0a.2 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken:

2. RESTORE PCS pressure as directed by CRS.

PCS pressure restored to band as directed by CRS.

S U Comment:

Evaluator Cue: GIVE PCS pressure band of 2010 to 2100 psia, if asked by operator.

CRITICAL STEP

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 8 of 13 JULY 2008 Proc. Step TASK ELEMENT 11 STANDARD Grade 1.0a.3 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken:

3. When directed by CRS, repeat Section 2.0 to open PORV Isolation Valve one additional time..

Since PORV still indicates open, the operator will NOT perform this step.

S U Comment:

Evaluator Cue: If asked direction concerning repeating the steps with the PORV, direct them to perform the other PORV.

NOTE: The same sequence as above will be repeated, with the parentheses swapped for the other channel. The following operation will not cause a PORV opening.

Proc. Step TASK ELEMENT 12 STANDARD Grade 2.0a.1 ENSURE the following conditions:

1. (HS-1042B) HS-1043B, PZR to Quench Tank T-73 in CLOSE position.

(HS-1042B) HS-1043B checked in CLOSE position.

S U Comment:

Proc. Step TASK ELEMENT 13 STANDARD Grade 2.0a.2 ENSURE the following conditions:

2. (MO-1042A) MO-1043A, Power Relief Valve Isolation closed.

(MO-1042A) MO-1043A checked closed.

S U Comment:

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 9 of 13 JULY 2008 Proc. Step TASK ELEMENT 14 STANDARD Grade 2.0a.3 ENSURE the following conditions:

3. PCS pressure control established:

SOP-1 2010 to 2100 psia PCS pressure checked between 2010 and 2100 psia S U Comment:

NOTE: this PCS pressure band can be that which was set in JPM Task Element Step 9.

Proc. Step TASK ELEMENT 15 STANDARD Grade 2.0b PLACE (HS-1042B) HS-1043B, PZR Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN PLACE to CLOSE, leaving handswitch in CLOSE position when complete.

(HS-1042B) HS-1043B placed to OPEN for approx. 15 seconds AND THEN (HS-1042B) HS-1043B placed to CLOSE, with handswitch left in CLOSE position.

S U Comment:

CRITICAL STEP

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 10 of 13 JULY 2008 Proc. Step TASK ELEMENT 16 STANDARD Grade 2.0c OPERATE (HS-1042A) HS-1043A, Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed:

1. (MO-1042A) MO-1043A red position indication lamp lights (indicates valve is 5% open, green position indication lamp is also lighted at this point).
2. (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.

(HS-1042A) HS-1043A operated intermittently until red light lights.

S U Comment:

NOTE: PORV does not open and stays closed.

CRITICAL STEP Proc. Step TASK ELEMENT 17 STANDARD Grade 2.0d IF (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.

Determines that this step does not apply.

S U Comment:

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 11 of 13 JULY 2008 Proc. Step TASK ELEMENT 18 STANDARD Grade 2.0e WHEN the following conditions exist,

1. (MO-1042A) MO-1043A, Power Relief Valve Isolation is 5% open (red position indication lamp lit).
2. (PRV-1042B) PRV-1043B, Power Operated Relief is closed.

THEN FULLY OPEN (MO-1042A) MO-1043A, Power Relief Isolation.

(MO-1042A) MO-1043 A to the full open position.

S U Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 19 STANDARD Grade 2.0f Repeat this attachment for remaining PORV Channel Isolation Valve.

Operator asks if CRS wants this done.

S U Comment:

Evaluator Cue: If asked by operator to open other channel PORV block valve, REPLY no for the present time.

Proc. Step TASK ELEMENT 20 STANDARD Grade n/a Notify the CRS that one PORV Block Valve is open.

CRS notified that one PORV Block Valve is open.

S U Comment:

END OF TASK

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 12 of 13 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

The Plant has been taken off-line, with the reactor tripped.

P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs.

PCS boron has been verified at Cold Shutdown concentration.

GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.

INITIATING CUES:

The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist.

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 13 of 13 JULY 2008 SIMULATOR OPERATOR INSTRUCTIONS IC-69 MFPs tripped, P-8A, AFWP, inservice.

NOP and NOT (2060#, 532 F)

Banks of backup PZR heaters secured for reduced spray flow (GCL 9-1, step 2.8)

Two PCPs secured with associated PZR Spray Valves closed (GCL-9-1, Steps 2.9 and 2.10)

Double charging and letdown inservice.

Cover gas valved out to VCT, N2 tag next to VCT vent switch USE CAE or:

Location Description Delay Ramp Event Value Final Insert Time Malfunctions:

(NONE)

RC 19 PORV Relief Valve Partially Lifts 5 sec. 100 Trigger 1 RC 20 PORV Relief Valve Partially Lifts 5 sec. 100 Trigger 2 Remotes:

CV-1042B-R PORV Relief Valve Open Light ON 5 sec.

ON Trigger 1 CV-1043B-R PORV Relief Valve Open Light ON 5 sec.

ON Trigger 2 Overrides:

(NONE)

Triggers:

Number Event Action Description 1

ZLO2P(16).and..not.et_array(2) 2 ZLO2P(19).and..not.et_array(1) set thkkarc20=1.0 3

4