{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                              NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                              REGION II
REGION II  
                                SAM NUNN ATLANTA FEDERAL CENTER
SAM NUNN ATLANTA FEDERAL CENTER
                                61 FORSYTH STREET, SW, SUITE 23T85
61 FORSYTH STREET, SW, SUITE 23T85  
                                    ATLANTA, GEORGIA 30303-8931
ATLANTA, GEORGIA 30303-8931  
                                          June 4, 2009
Mr. Dennis R. Madison
June 4, 2009  
Vice President
Southern Nuclear Operating
Mr. Dennis R. Madison  
  Company, Inc.
Vice President  
Edwin I. Hatch Nuclear Plant
Southern Nuclear Operating
11028 Hatch Parkway North
  Company, Inc.  
Baxley, GA 31513
Edwin I. Hatch Nuclear Plant  
SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL
11028 Hatch Parkway North  
              EXAMINATION 05000321/2009302 AND 05000366/2009302
Baxley, GA 31513  
Dear Mr. Madison:
In a telephone conversation on June 2, 2009, between Mr. Steve Grantham - Operations
SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL  
Training Supervisor, Mr. Charlie Edmund - Lead Instructor Nuclear Operations, Mr. Anthony
EXAMINATION 05000321/2009302 AND 05000366/2009302  
Ball - Plant Instructor Nuclear Operations, and Mr. Bruno Caballero - Operations Engineer,
arrangements were made for the administration of licensing examinations at the Edwin I. Hatch
Dear Mr. Madison:  
Nuclear Plant. The operating test is scheduled to be administered during the two weeks of
October 26 and November 2, 2009. The written examination is scheduled to be administered
In a telephone conversation on June 2, 2009, between Mr. Steve Grantham - Operations  
the week of November 9, 2009. The on-site preparatory week is scheduled for the week of
Training Supervisor, Mr. Charlie Edmund - Lead Instructor Nuclear Operations, Mr. Anthony  
October 5, 2009.
Ball - Plant Instructor Nuclear Operations, and Mr. Bruno Caballero - Operations Engineer,  
As agreed during the telephone conversation, your staff will prepare both the operating test and
arrangements were made for the administration of licensing examinations at the Edwin I. Hatch  
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
Nuclear Plant. The operating test is scheduled to be administered during the two weeks of  
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
October 26 and November 2, 2009. The written examination is scheduled to be administered  
Commission (NRC) regional office will discuss with your staff any changes that might be
the week of November 9, 2009. The on-site preparatory week is scheduled for the week of  
necessary before the examinations are administered. Your staff has also agreed to make
October 5, 2009.  
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
As agreed during the telephone conversation, your staff will prepare both the operating test and  
outline by August 14, 2009. Mr. Bruno Caballero provided the written examination outline to
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,  
your staff on May 7, 2009. The operating test, written examination, and the supporting
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory  
reference materials identified in Attachment 3 to ES-201 will be due by September 4, 2009.
Commission (NRC) regional office will discuss with your staff any changes that might be  
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
necessary before the examinations are administered. Your staff has also agreed to make  
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
copies of all examination materials that are necessary for administering the examination.  
outline, examination, and test before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use.
To meet the above schedule, it will be necessary for your staff to furnish the operating test  
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
outline by August 14, 2009. Mr. Bruno Caballero provided the written examination outline to  
your response be contained in a separate enclosure and appropriately marked. Any delay in
your staff on May 7, 2009. The operating test, written examination, and the supporting  
receiving the required examination and reference materials, or the submittal of inadequate or
reference materials identified in Attachment 3 to ES-201 will be due by September 4, 2009.
incomplete materials, may cause the examinations to be rescheduled.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations  
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the  
outline, examination, and test before they are submitted to the NRC for review and approval. All  
materials shall be complete and ready-to-use.  
We request that any personal, proprietary, sensitive unclassified, or safeguards information in  
your response be contained in a separate enclosure and appropriately marked. Any delay in  
receiving the required examination and reference materials, or the submittal of inadequate or  
incomplete materials, may cause the examinations to be rescheduled.  


SNC                                           2
SNC  
In order to conduct the requested written examinations and operating tests, it will be necessary
2  
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
In order to conduct the requested written examinations and operating tests, it will be necessary  
your staff should retain the original simulator performance data (e.g., system pressures,
for your staff to provide adequate space and accommodations in accordance with ES-402, and  
temperatures, and levels) generated during the dynamic operating tests until the examination
to make the simulation facility available on the dates noted above. In accordance with ES-302,  
results are final.
your staff should retain the original simulator performance data (e.g., system pressures,  
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
temperatures, and levels) generated during the dynamic operating tests until the examination  
effect while the written examinations and operating tests are being administered.
results are final.  
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in  
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
effect while the written examinations and operating tests are being administered.  
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
To permit timely NRC review and evaluation, your staff should submit preliminary reactor  
date, a postponement may be necessary. Signed applications certifying that all training has
operator and senior reactor operator license applications (Office of Management and Budget  
been completed should be submitted at least 14 days before the first examination date.
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),  
This letter contains information collections that are subject to the Paperwork Reduction Act of
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first  
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
examination date. If the applications are not received at least 30 days before the examination  
approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for
date, a postponement may be necessary. Signed applications certifying that all training has  
this collection of information is estimated to average 500 hours per response, including the time
been completed should be submitted at least 14 days before the first examination date.  
for reviewing instructions, gathering and maintaining the data needed, writing the examinations,
and completing and reviewing the collection of information. Send comments on any aspect of
This letter contains information collections that are subject to the Paperwork Reduction Act of  
this collection of information, including suggestions for reducing the burden, to the Information
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under  
and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for  
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;
this collection of information is estimated to average 500 hours per response, including the time  
for reviewing instructions, gathering and maintaining the data needed, writing the examinations,  
and completing and reviewing the collection of information. Send comments on any aspect of  
this collection of information, including suggestions for reducing the burden, to the Information  
and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,  
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;  
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0018), Office of Management and Budget, Washington, DC 20503.
0018), Office of Management and Budget, Washington, DC 20503.  
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
of information unless it displays a currently valid OMB control number.  
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs document system (ADAMS).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be  
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the
available electronically for public inspection in the NRC Public Document Room or from the  
Public Electronic Reading Room).
Publicly Available Records (PARS) component of the NRCs document system (ADAMS).
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the  
Public Electronic Reading Room).  


SNC                                           3
SNC  
Thank you for your cooperation in this matter. Mr. Steve Grantham has been advised of the
3  
policies and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Bruno Caballero at (404) 562-4608,
(Internet E-mail: Bruno.Caballero@nrc.gov), or me at (404) 562-4550, (Internet E-mail:
Thank you for your cooperation in this matter. Mr. Steve Grantham has been advised of the  
Malcolm.Widmann@nrc.gov).
policies and guidelines referenced in this letter. If you have any questions regarding the NRC's  
                                              Sincerely,
examination procedures and guidelines, please contact Mr. Bruno Caballero at (404) 562-4608,  
                                              /RA/
(Internet E-mail: Bruno.Caballero@nrc.gov), or me at (404) 562-4550, (Internet E-mail:  
                                              Malcolm T. Widmann, Chief
Malcolm.Widmann@nrc.gov).  
                                              Operations Branch
                                              Division of Reactor Safety
Sincerely,  
Docket Nos.: 50-321, 50-366
License Nos.: DPR-57, NPF-5
/RA/  
Malcolm T. Widmann, Chief  
Operations Branch  
Division of Reactor Safety  
Docket Nos.: 50-321, 50-366  
License Nos.: DPR-57, NPF-5  
(cc: w/encl - See Page 3)
(cc: w/encl - See Page 3)


SNC                                     4
SNC  
cc: w/encl
4  
Angela Thornhill                           Senior Resident Inspector
Managing Attorney and Compliance Officer   Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc.   Edwin I. Hatch Nuclear Plant
cc: w/encl  
Electronic Mail Distribution               U.S. NRC
Angela Thornhill  
                                          11030 Hatch Parkway N
Managing Attorney and Compliance Officer  
Jeffrey T. Gasser                         Baxley, GA 30334
Southern Nuclear Operating Company, Inc.  
Executive Vice President
Electronic Mail Distribution  
Southern Nuclear Operating Company, Inc.  Arthur H. Domby, Esq.
Electronic Mail Distribution               Troutman Sanders
Jeffrey T. Gasser  
                                          Electronic Mail Distribution
Executive Vice President  
Raymond D. Baker
Southern Nuclear Operating Company, Inc.  
Licensing Manager                         Dr. Carol Couch, Director
Electronic Mail Distribution  
Southern Nuclear Operating Company, Inc.   Environmental Protection
Electronic Mail Distribution               Department of Natural Resources
Raymond D. Baker  
                                          Electronic Mail Distribution
Licensing Manager  
L. Mike Stinson, Vice President
Southern Nuclear Operating Company, Inc.  
Fleet Operations Support                   Cynthia Sanders
Electronic Mail Distribution  
Southern Nuclear Operating Company, Inc.   Program Manager
Electronic Mail Distribution               Radioactive Materials Program
L. Mike Stinson, Vice President  
                                          Department of Natural Resources
Fleet Operations Support  
David H. Jones                             Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.  
Vice President
Electronic Mail Distribution  
Engineering                               Jim Sommerville
Southern Nuclear Operating Company, Inc.   (Acting) Chief
David H. Jones  
Electronic Mail Distribution               Environmental Protection Division
Vice President  
                                          Department of Natural Resources
Engineering  
Moanica Caston                             Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.  
Vice President and General Counsel
Electronic Mail Distribution  
Southern Nuclear Operating Company, Inc.   Mr. Steven M. Jackson
Electronic Mail Distribution               Senior Engineer - Power Supply
Moanica Caston  
                                          Municipal Electric Authority of Georgia
Vice President and General Counsel  
Steven B. Tipps                           Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.  
Hatch Principal Engineer - Licensing
Electronic Mail Distribution  
Edwin I. Hatch Nuclear Plant               Mr. Reece McAlister
Electronic Mail Distribution               Executive Secretary
Steven B. Tipps  
                                          Georgia Public Service Commission
Hatch Principal Engineer - Licensing  
Mr. Ken Rosanski                           Electronic Mail Distribution
Edwin I. Hatch Nuclear Plant  
Resident Manager
Electronic Mail Distribution  
Edwin I. Hatch                             Chairman
Oglethorpe Power Corporation              Appling County Commissioners
Mr. Ken Rosanski  
Electronic Mail Distribution              County Courthouse
Resident Manager
                                          69 Tippins Street, Suite 201
Edwin I. Hatch
Lee Foley                                  Baxley, GA 31513
Oglethorpe Power Corporation
Manager of Contracts Generation
Electronic Mail Distribution  
Oglethorpe Power Corporation              Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              ATTN: Mr. John Hammonds
Lee Foley
                                          Training Manager
Manager of Contracts Generation
Bob Masse                                  Hatch Nuclear Plant
Oglethorpe Power Corporation
Resident Manager                          11028 Hatch Parkway North
Electronic Mail Distribution
Vogtle Electric Generating Plant          Baxley, GA 31513
Oglethorpe Power Corporation
Bob Masse
Electronic Mail Distribution
Resident Manager  
Vogtle Electric Generating Plant
Oglethorpe Power Corporation
Electronic Mail Distribution
Senior Resident Inspector
Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant
U.S. NRC
11030 Hatch Parkway N
Baxley, GA  30334
Arthur H. Domby, Esq.
Troutman Sanders
Electronic Mail Distribution
Dr. Carol Couch, Director
Environmental Protection
Department of Natural Resources
Electronic Mail Distribution
Cynthia Sanders
Program Manager
Radioactive Materials Program
Department of Natural Resources
Electronic Mail Distribution
Jim Sommerville
(Acting) Chief
Environmental Protection Division
Department of Natural Resources
Electronic Mail Distribution
Mr. Steven M. Jackson
Senior Engineer - Power Supply
Municipal Electric Authority of Georgia
Electronic Mail Distribution
Mr. Reece McAlister
Executive Secretary
Georgia Public Service Commission
Electronic Mail Distribution
Chairman  
Appling County Commissioners  
County Courthouse  
69 Tippins Street, Suite 201  
Baxley, GA 31513  
Southern Nuclear Operating Company, Inc.  
ATTN: Mr. John Hammonds  
Training Manager  
Hatch Nuclear Plant  
11028 Hatch Parkway North  
Baxley, GA 31513
}}
}}

Latest revision as of 11:31, 14 January 2025

Notification of Licensed Operator Initial Examination 05000321/09-302 and 05000366/09-302
ML091550455
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/04/2009
From: Widmann M
NRC/RGN-II/DRS/OLB
To: Madison D
Southern Nuclear Operating Co
References
05000321/09-302, 05000366/09-302
Download: ML091550455 (4)


See also: IR 05000321/2009302

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

June 4, 2009

Mr. Dennis R. Madison

Vice President

Southern Nuclear Operating

Company, Inc.

Edwin I. Hatch Nuclear Plant

11028 Hatch Parkway North

Baxley, GA 31513

SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL

EXAMINATION 05000321/2009302 AND 05000366/2009302

Dear Mr. Madison:

In a telephone conversation on June 2, 2009, between Mr. Steve Grantham - Operations

Training Supervisor, Mr. Charlie Edmund - Lead Instructor Nuclear Operations, Mr. Anthony

Ball - Plant Instructor Nuclear Operations, and Mr. Bruno Caballero - Operations Engineer,

arrangements were made for the administration of licensing examinations at the Edwin I. Hatch

Nuclear Plant. The operating test is scheduled to be administered during the two weeks of

October 26 and November 2, 2009. The written examination is scheduled to be administered

the week of November 9, 2009. The on-site preparatory week is scheduled for the week of

October 5, 2009.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by August 14, 2009. Mr. Bruno Caballero provided the written examination outline to

your staff on May 7, 2009. The operating test, written examination, and the supporting

reference materials identified in Attachment 3 to ES-201 will be due by September 4, 2009.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outline, examination, and test before they are submitted to the NRC for review and approval. All

materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

SNC

2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for

this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, writing the examinations,

and completing and reviewing the collection of information. Send comments on any aspect of

this collection of information, including suggestions for reducing the burden, to the Information

and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-

0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs document system (ADAMS).

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the

Public Electronic Reading Room).

SNC

3

Thank you for your cooperation in this matter. Mr. Steve Grantham has been advised of the

policies and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Bruno Caballero at (404) 562-4608,

(Internet E-mail: Bruno.Caballero@nrc.gov), or me at (404) 562-4550, (Internet E-mail:

Malcolm.Widmann@nrc.gov).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-321, 50-366

License Nos.: DPR-57, NPF-5

(cc: w/encl - See Page 3)

SNC

4

cc: w/encl

Angela Thornhill

Managing Attorney and Compliance Officer

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Jeffrey T. Gasser

Executive Vice President

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Raymond D. Baker

Licensing Manager

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

L. Mike Stinson, Vice President

Fleet Operations Support

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

David H. Jones

Vice President

Engineering

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Moanica Caston

Vice President and General Counsel

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Steven B. Tipps

Hatch Principal Engineer - Licensing

Edwin I. Hatch Nuclear Plant

Electronic Mail Distribution

Mr. Ken Rosanski

Resident Manager

Edwin I. Hatch

Oglethorpe Power Corporation

Electronic Mail Distribution

Lee Foley

Manager of Contracts Generation

Oglethorpe Power Corporation

Electronic Mail Distribution

Bob Masse

Resident Manager

Vogtle Electric Generating Plant

Oglethorpe Power Corporation

Electronic Mail Distribution

Senior Resident Inspector

Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant

U.S. NRC

11030 Hatch Parkway N

Baxley, GA 30334

Arthur H. Domby, Esq.

Troutman Sanders

Electronic Mail Distribution

Dr. Carol Couch, Director

Environmental Protection

Department of Natural Resources

Electronic Mail Distribution

Cynthia Sanders

Program Manager

Radioactive Materials Program

Department of Natural Resources

Electronic Mail Distribution

Jim Sommerville

(Acting) Chief

Environmental Protection Division

Department of Natural Resources

Electronic Mail Distribution

Mr. Steven M. Jackson

Senior Engineer - Power Supply

Municipal Electric Authority of Georgia

Electronic Mail Distribution

Mr. Reece McAlister

Executive Secretary

Georgia Public Service Commission

Electronic Mail Distribution

Chairman

Appling County Commissioners

County Courthouse

69 Tippins Street, Suite 201

Baxley, GA 31513

Southern Nuclear Operating Company, Inc.

ATTN: Mr. John Hammonds

Training Manager

Hatch Nuclear Plant

11028 Hatch Parkway North

Baxley, GA 31513